A method for arranging flood discharge tunnels on the bank taking into account both scouring pits and jet energy dissipation

By optimizing the layout of the flood discharge tunnel group, taking into account the interference of water jets and the landing point, and setting multiple parameters to meet the preset conditions, the problem of the water cushion effect not being fully utilized in the existing technology was solved, and the project safety and investment were reduced.

CN114386153BActive Publication Date: 2024-11-05POWERCHINA HUADONG ENG CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210040601.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-13
Publication Date
2024-11-05
Estimated Expiration
2042-01-13

AI Technical Summary

Technical Problem

In existing technologies, the arrangement of spillway groups on the riverbank fails to effectively consider the water cushion effect caused by the interference of water jets, leading to downstream river scouring problems. This poses engineering safety and investment risks, especially in hydropower projects with large discharge volumes and narrow valleys.

Method used

By optimizing the layout of the flood discharge tunnel group, taking into account the interference between water jets and the dispersion of landing points, a first layout parameter and a second layout parameter are set, including the shape of the flood discharge tunnel outlet, the angle of the spillway, the intersection angle, the spacing and the flow velocity, etc. The parameters are adjusted to meet the preset conditions and ensure that the water cushion effect generated by the interference of water jets is fully utilized.

Benefits of technology

It reduced the risks and investment of the flood discharge tunnel complex layout project, reduced the scouring depth of the downstream river channel, improved the flow control effect, and met the actual needs of various factors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114386153B_ABST
    Figure CN114386153B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for arranging a bank flood discharge tunnel group taking into account scouring pits and jet energy dissipation. The method comprises the following steps: calculating the number of flood discharge tunnels required to be arranged on the flood discharge bank based on the maximum flood discharge volume of the flood discharge bank and the flood discharge volume of a single flood discharge tunnel; setting a first arrangement parameter of each flood discharge tunnel based on the relationship between the upstream and downstream water levels and flows; obtaining a second arrangement parameter of each flood discharge tunnel based on the first arrangement parameter; verifying whether the first arrangement parameter meets a preset arrangement condition based on the second arrangement parameter, if not, adjusting the first arrangement parameter, re-obtaining the second arrangement parameter for verification, and arranging the flood discharge tunnel group based on the first arrangement parameter of each flood discharge tunnel and the number of flood discharge tunnels if the condition is met. The present invention comprehensively considers the scouring pits and water tongue landing points of the flood discharge tunnels, and provides a bank flood discharge tunnel group arrangement method that is practical and takes into account multiple factors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water conservancy engineering, and in particular relates to a method for arranging a bank flood discharge tunnel group taking into account both flushing pits and jet energy dissipation. Background Art

[0002] The spillway is an important bank discharge structure in large and medium-sized hydropower projects. When the jet flow falls into the downstream river during the flood discharge, the local scouring of the downstream river channel is related to the project safety. The downstream river channel of the spillway of the existing high-head spillway structure is based on rock. Due to the large flow rate of high dam discharge, the layout of the spillway usually adopts the layout of the spillway group to meet the requirements of the discharge flow.

[0003] During the flood discharge process, the water tongue of the spillway tunnel diffuses longitudinally and transversely after the jet flows out of the bank. The aeration and dispersion of the jet and the water tongue falling characteristics make it more difficult to control the flow velocity at the riverside. Affected by the upstream water tongue, the diffusion distance of the downstream water tongue in the water cushion will increase slightly, resulting in a decrease in the impact pressure on the bottom plate of the water cushion pond. Therefore, when the flood discharge tunnel group is arranged, the interference between the water tongues plays an important role in the flow pattern and energy dissipation of the downstream river channel. The flow field test results show that if multiple water tongues are close to each other, they will merge into a jet, and the downstream scouring pit will be superimposed; if the distance between multiple water tongues is too large, the jets between the water tongues will not interfere with each other and will not play the role of water cushion; when the spacing between multiple water tongues is appropriate, the collision and interference of the jets in the downstream river channel will help to strengthen the energy dissipation effect, effectively exert the water cushion effect, and reduce the depth of the downstream scouring pit.

[0004] In the prior art, bank spillway tunnels are mainly arranged based on the dispersion of water tongue landing points, without considering the energy dissipation of the water cushion effect caused by the water tongue interference and the role of reducing the depth of the scouring pit. In recent years, the hydropower projects developed in the central and western hydropower bases of my country have large discharge volumes and narrow river valleys, and the scouring of the downstream river channels has also caused a series of hydraulic problems. Therefore, my country now needs a bank spillway tunnel arrangement method that is practical and takes into account multiple factors. Summary of the invention

[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a method for arranging a group of flood discharge tunnels on the shore that takes into account both scouring pits and jet energy dissipation, comprehensively considers the interference between water tongues and the dispersion and scouring of water tongue landing points, optimizes the method for arranging a group of flood discharge tunnels on the shore, and gives full play to the role of the water cushion effect caused by the interference of water tongues, further reducing the risk and investment of the arrangement project of the group of flood discharge tunnels on the shore.

[0006] In order to achieve the above technical objectives, the present invention provides a method for arranging a bank flood discharge tunnel group taking into account both scouring pits and jet energy dissipation, the method comprising:

[0007] Calculate the number of spillway tunnels required on the spillway bank based on the maximum spillway discharge on the spillway bank and the spillway discharge of a single spillway tunnel;

[0008] Based on the relationship between the upstream and downstream water levels and flows, the first layout parameters of each spillway are set, wherein the first layout parameters include the spillway outlet body parameter m, the spillway outlet angle α, the intersection angle θ between the spillway and the bank slope, the spacing between adjacent spillway tunnels Δs, and the slope angle distance s between the spillway outlet and the bank slope;

[0009] Based on the first layout parameters, the second layout parameters of each spillway are obtained, wherein the second layout parameters include the shore flow velocity v a , pit depth T, width b from the deepest point of the pit to the edge of the pit;

[0010] Based on the second layout parameter, verify whether the first layout parameter meets the preset layout condition. If not, adjust the first layout parameter and re-acquire the second layout parameter for verification. If it meets the condition, arrange the flood discharge tunnel group based on the first layout parameter of each flood discharge tunnel and the number of flood discharge tunnels.

[0011] As a further optimization of the above solution, the specific steps of verifying whether the first arrangement parameter meets the preset arrangement condition based on the second arrangement parameter include:

[0012] S1. Determine the shore velocity v of the second arrangement parameter a Is it greater than the first threshold? If the shore velocity v a If it is greater than the first threshold, the first arrangement parameters m, the spillway outlet shape parameter, α, the spillway outlet angle, or the intersection angle θ between the spillway and the bank slope, and the spacing Δs between adjacent spillways are adjusted. Otherwise, the process proceeds to step S2.

[0013] S2, judging whether the second arrangement parameter scouring pit depth T is greater than the second threshold value, if the scouring pit depth T is greater than the second threshold value, adjusting the first arrangement parameter adjacent spillway spacing Δs, the distance s between the spillway exit and the slope angle of the bank, and then returning to step S1, if the scouring pit depth T is not greater than the second threshold value, entering step S3;

[0014] S3, determine whether the second layout parameter, the distance s between the spillway exit and the bank slope angle, is greater than the third threshold value; if the distance s between the spillway exit and the bank slope angle is greater than the third threshold value, adjust the first layout parameters, the intersection angle θ between the spillway exit and the bank slope, and the distance s between the spillway exit and the bank slope angle, and then return to step S2; if the distance s between the spillway exit and the bank slope angle is not greater than the third threshold value, the first layout parameter meets the preset layout conditions.

[0015] As a further optimization of the above solution, in step S1, the first threshold is 6.0 m / s, and the second arrangement parameter shore flow velocity v a The calculation formula is as follows:

[0016]

[0017] in is the velocity attenuation coefficient, B is the river width at the spillway, s is the distance from the spillway outlet to the bank slope angle, v m is the maximum bottom flow velocity between the water tongue of the spillway tunnel and its adjacent downstream spillway tunnel water tongue, and L0 is the jet flow distance before the jet flow tongue enters the water.

[0018] As a further optimization of the above solution, in step S2, the specific process of judging whether the second arrangement parameter pit depth T is greater than the second threshold value is as follows:

[0019] Obtaining the upstream and downstream water level difference of each spillway, and calculating the second arrangement parameter scouring depth T of each spillway based on the upstream and downstream water level difference of each spillway;

[0020] Get the maximum value T of the second layout parameter of each spillway hole in the scouring depth T m ;

[0021] Based on the same upstream and downstream water level difference, the depth of the downstream scouring pit T is calculated when only one spillway tunnel is arranged at the upstream of the spillway tunnel group. c , T c Set as the second threshold;

[0022] Judge the inequality T m ≤T c If inequality (2) does not hold, then adjust the first layout parameters, i.e., the distance between adjacent spillways Δs and the distance between the spillway outlet and the slope angle s, and re-obtain the second layout parameters for verification.

[0023] As a further optimization of the above scheme, in step S3, the third threshold is calculated by the geometric relationship between the spillway and the bank slope. The specific calculation formula of the third threshold is as follows:

[0024] Y3=L0sinθ-s (3)

[0025] Wherein Y3 represents the third threshold value.

[0026] As a further optimization of the above solution, the specific process of judging whether the distance s between the outlet of the second arrangement parameter flood discharge tunnel and the slope angle is greater than the third threshold is:

[0027] Constructing a flood spillway tunnel parameter model based on the first layout parameter, and obtaining a second layout parameter, a width b from the deepest point of the scouring pit to the edge of the scouring pit, based on the flood spillway tunnel parameter model;

[0028] Calculate the third threshold value Y3 based on the spillway tunnel parameter model;

[0029] Determine whether the inequality b≤L0sinθ-s=Y3 (4) holds. If the inequality (4) does not hold, adjust the first layout parameters, the intersection angle θ between the spillway tunnel and the bank slope, and the angle distance s between the spillway tunnel outlet and the bank slope, and re-obtain the second layout parameters, the pit depth T and the width b from the deepest point of the pit to the edge of the pit, and verify again.

[0030] The method for arranging flood discharge tunnels on the bank taking into account both flushing pits and jet energy dissipation of the present invention has the following beneficial effects:

[0031] 1. The present invention obtains the second arrangement parameter of the spillway tunnel, i.e., the bank flow velocity, through the first arrangement parameter of the spillway tunnel, and determines the bank flow velocity so that the value of the bank flow velocity is always no greater than the first threshold value, thereby reducing the influence of the water tongue interference between the spillway tunnels during the arrangement of the spillway tunnel group on the flow velocity and flow state of the river channel, and reducing the influence of the upstream spillway tunnel on the downstream river channel.

[0032] 2. The present invention verifies whether the water tongue interference between adjacent spillways produces a water cushion effect by obtaining the relationship between the scouring pit depth of each spillway in the spillway tunnel group and the second threshold value, and adjusts the first layout parameter so that the water cushion produced by the water tongue interference can fully play its role, thereby reducing the downstream scouring pit depth.

[0033] 3. The present invention verifies the second arrangement parameters, namely, the bank flow velocity, the depth of the scouring pit, and the width from the deepest point of the scouring pit to the edge of the scouring pit, and adjusts the arrangement method of the flood discharge tunnel group. It comprehensively considers the scouring pit and the water tongue landing point of the flood discharge tunnel, gives full play to the role of the water cushion in energy dissipation, and meets the requirements of the water tongue landing point, the bank flow velocity, the non-overlapping scouring pit, and the good scouring pit shape. It reduces the risk and investment of the bank flood discharge tunnel group arrangement project, has strong operability, and is easy to promote. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 It is a general flow chart of a method for arranging bank flood discharge tunnels taking into account both scouring pits and jet energy dissipation of the present invention;

[0036] Figure 2 This is a diagram of the water cushion effect after the water tongues of the three flood discharge tunnels enter the water;

[0037] Figure 3 This is a schematic diagram of the water tongue entering the flood discharge tunnel. DETAILED DESCRIPTION

[0038] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0039] The embodiment of the present invention provides a method for arranging a bank flood discharge tunnel group taking into account both scouring pits and jet energy dissipation, and the method comprises:

[0040] Calculate the number of spillway tunnels required on the spillway bank based on the maximum spillway discharge on the spillway bank and the spillway discharge of a single spillway tunnel;

[0041] Based on the relationship between the upstream and downstream water levels and flows, the first layout parameters of each spillway are set, wherein the first layout parameters include the spillway outlet body parameter m, the spillway outlet angle α, the intersection angle θ between the spillway and the bank slope, the spacing between adjacent spillway tunnels Δs, and the slope angle distance s between the spillway outlet and the bank slope;

[0042] Based on the first layout parameters, the second layout parameters of each spillway are obtained, wherein the second layout parameters include the shore flow velocity v a , pit depth T, width b from the deepest point of the pit to the edge of the pit;

[0043] Based on the second layout parameter, verify whether the first layout parameter meets the preset layout condition. If not, adjust the first layout parameter and re-acquire the second layout parameter for verification. If it meets the condition, arrange the flood discharge tunnel group based on the first layout parameter of each flood discharge tunnel and the number of flood discharge tunnels.

[0044] refer to Figure 1 In this embodiment, the arrangement of the bank spillway group requires multiple parameters for decision making, among which the spillway outlet body parameter m, the spillway outlet angle α, the intersection angle θ between the spillway and the bank slope, the spacing between adjacent spillway tunnels Δs, and the distance s between the spillway outlet and the bank slope angle are the main parameters. In this embodiment, they are used as the first arrangement parameters, and the optimal arrangement method of the bank spillway group is obtained by adjusting them. Specifically, the maximum flood discharge required by the bank spillway is obtained, and the number of spillway tunnels required to be arranged is calculated according to the flood discharge of each spillway tunnel, wherein the calculation formula for the maximum flood discharge of the spillway tunnel is as follows:

[0045] Where Q is the total discharge flow of the spillway; μ is the discharge coefficient, A is the water flow area of ​​the spillway, H0 is the elevation from the upstream water level of the spillway to the inlet bottom plate, H p For free outflow.

[0046] Then, based on the water level-flow relationship of the spillway tunnel, the value of the first layout parameter can be determined in the preliminary stage, and the second layout parameter, the shore flow velocity v, can be obtained according to the value of the first layout parameter a , pit depth T, width b from the deepest point of the pit to the edge of the pit. By verifying the second layout parameter, it can be obtained whether the value of the first layout parameter meets the preset conditions.

[0047] Specifically, by verifying the shore flow velocity v a It can be obtained whether the interference between the water tongues of the spillway tunnel affects the flow velocity and flow state of the downstream river channel. By verifying the depth of the scouring pit T, it can be obtained whether the upstream water tongue of the spillway tunnel produces a water cushion effect on the downstream water tongue. By verifying the width b from the deepest point of the scouring pit to the edge of the scouring pit, it can be obtained whether the scouring pit has an impact on the embankment slope, thereby judging whether the first layout parameter meets the preset conditions. If not, the first layout parameter needs to be adjusted, and then verified again. If it meets, the spillway tunnel group can be arranged according to the first layout parameter. The present invention comprehensively considers the scouring pit and the water tongue landing point of the spillway tunnel, and adjusts the first layout parameter by verifying the second layout parameter, so that the spillway tunnel group arrangement method meets the requirements of water tongue landing point, bank flow velocity, non-overlapping scouring pits, and better scouring pit shape, giving full play to the interference effect of the water tongues between the spillway tunnels, reducing the risk and investment of the shore spillway tunnel group arrangement project, and providing a shore spillway tunnel group arrangement method that meets practical conditions and takes into account multiple factors.

[0048] Based on the above method, the specific steps of the second arrangement parameter verifying whether the first arrangement parameter meets the preset arrangement condition include:

[0049] S1. Determine the shore velocity v of the second arrangement parameter a Is it greater than the first threshold? If the shore velocity v a If it is greater than the first threshold, the first arrangement parameters m, the spillway outlet shape parameter, α, the spillway outlet angle, or the intersection angle θ between the spillway and the bank slope, and the spacing Δs between adjacent spillways are adjusted. Otherwise, the process proceeds to step S2.

[0050] S2, judging whether the second arrangement parameter scouring pit depth T is greater than the second threshold value, if the scouring pit depth T is greater than the second threshold value, adjusting the first arrangement parameter adjacent spillway spacing Δs, the distance s between the spillway exit and the slope angle of the bank, and then returning to step S1, if the scouring pit depth T is not greater than the second threshold value, entering step S3;

[0051] S3, determine whether the second layout parameter, the distance s between the spillway exit and the bank slope angle, is greater than the third threshold value; if the distance s between the spillway exit and the bank slope angle is greater than the third threshold value, adjust the first layout parameters, the intersection angle θ between the spillway exit and the bank slope, and the distance s between the spillway exit and the bank slope angle, and then return to step S2; if the distance s between the spillway exit and the bank slope angle is not greater than the third threshold value, the first layout parameter meets the preset layout conditions.

[0052] refer to Figure 1 In this embodiment, the second arrangement parameter is used to verify whether the first arrangement parameter meets the preset conditions, so as to adjust the corresponding first arrangement parameter, and the first arrangement parameter that meets the preset conditions can be quickly obtained, which has strong operability. Specifically, first obtain the second arrangement parameter shore flow velocity v a Determine whether it is greater than the first threshold. If the shore flow velocity v a If it is greater than the first threshold, it means that the shore flow velocity v after the flood discharge tunnel group is arranged according to the first arrangement parameter at this time a If the conditions are not met, the flow velocity and flow pattern of the downstream river will be affected, and the bank flow velocity v a With the first layout parameter, the spillway outlet shape parameter m, the spillway outlet angle α, the intersection angle θ between the spillway and the bank slope, and the spacing Δs between adjacent spillways, if the bank flow velocity v a Therefore, it is necessary to adjust the spillway outlet shape parameter m, the spillway outlet angle α or the intersection angle θ between the spillway and the bank slope, and the spacing Δs between adjacent spillways. a Make adjustments and recalculate the shore velocity v after the adjustments a , until the shore velocity v a If it is less than or equal to the first threshold, the next step of verification is performed.

[0053] Furthermore, based on the shore velocity v a The first layout parameter when it is less than or equal to the first threshold value obtains the second layout parameter of the scouring pit depth T, and determines whether the scouring pit depth T is greater than the second threshold value. If the scouring pit depth T is greater than the second threshold value, it means that there is no water cushion effect between the water tongues of adjacent spillway tunnels. Therefore, the interference effect between the water tongues of adjacent spillway tunnels can be enhanced by adjusting the first layout parameter of the adjacent spillway tunnel spacing Δs and the distance s between the spillway tunnel outlet and the slope angle. After adjusting the first layout parameter, it is necessary to recalculate and verify the shore flow velocity v a and the depth of the scour pit T, until the shore velocity v a Once the verification of the pit depth T is passed, you can proceed to the next step of verification.

[0054] Furthermore, based on the shore velocity v aOn the basis of the first layout parameters that have been verified by the scouring pit depth T, the second layout parameter, the distance s between the spillway tunnel outlet and the slope angle, is obtained to determine whether the distance s between the spillway tunnel outlet and the slope angle is greater than the third threshold. If it is greater, it means that the scouring pit has an impact on the bank slope, and it is necessary to adjust the first layout parameters, the intersection angle θ between the spillway tunnel and the bank slope, and the distance s between the spillway tunnel outlet and the slope angle. Then, the scouring pit depth T and the distance s between the spillway tunnel outlet and the bank slope are recalculated and verified. After verification, the first layout parameters that meet the conditions can be obtained.

[0055] Based on the above method, in step S1, the first threshold is 6.0 m / s, and the second arrangement parameter shore flow velocity v a The calculation formula is as follows:

[0056]

[0057] in is the velocity attenuation coefficient, B is the river width at the spillway, s is the distance from the spillway outlet to the bank slope angle, v m is the maximum bottom flow velocity between the water tongue of the spillway tunnel and its adjacent downstream spillway tunnel water tongue, and L0 is the jet flow distance before the jet flow tongue enters the water.

[0058] refer to Figure 1-3 It should be noted that the first threshold is preferably 6.0 m / s, and the second arrangement parameter shore velocity v a The calculation formula is as follows:

[0059]

[0060] Among them, the calculation formula of the jet flow distance L0 before the jet flow tongue enters the water is as follows:

[0061]

[0062] According to the wall jet theory, when two water jets interact with each other, the water velocity v of the upstream j-th spillway water jet is j The maximum bottom flow velocity v between the two water tongues of the jth spillway and the j+1th spillway downstream jm The relationship is:

[0063]

[0064] The combined equations (1), (6), and (7) can be used to calculate the shore velocity v a , where v1 is the outlet flow rate of the spillway, a is the vertical distance from the spillway to the riverbed, h1 is the outlet water depth of the spillway, and h t The depth of water downstream of the scouring pit, is the velocity attenuation coefficient, B is the river width at the spillway, s is the distance from the spillway outlet to the bank slope angle, vm is the maximum bottom flow velocity between the water tongue of the spillway and its adjacent downstream spillway, L0 is the distance of the jet flow before the jet flow enters the water, s j is the distance from the jth spillway outlet to the bank slope angle, v jm is the maximum bottom flow velocity between the jth spillway water tongue and the j+1th spillway water tongue downstream, Δs a is the maximum bottom velocity v jm The distance between the appearance position and the water tongue entry point, d j is the water entry thickness of the water tongue generated by the j-th spillway tunnel.

[0065] Based on the above method, the specific process of judging whether the second arrangement parameter pit depth T is greater than the second threshold value is as follows:

[0066] Obtaining the upstream and downstream water level difference of each spillway, and calculating the second arrangement parameter scouring depth T of each spillway based on the upstream and downstream water level difference of each spillway;

[0067] Get the maximum value T of the second layout parameter of each spillway hole in the scouring depth T m ;

[0068] Based on the same upstream and downstream water level difference, the depth of the downstream scouring pit T is calculated when only one spillway tunnel is arranged at the upstream of the spillway tunnel group. c , T c Set as the second threshold;

[0069] Judge the inequality T m ≤T c If inequality (2) does not hold, then adjust the first layout parameters, i.e., the distance between adjacent spillways Δs and the distance between the spillway outlet and the slope angle s, and re-obtain the second layout parameters for verification.

[0070] refer to Figure 1-3 In this embodiment, by verifying the scouring depth T, it can be obtained whether the upstream water tongue of the spillway tunnel has a water cushion effect on the downstream water tongue. Specifically, the scouring depth T of each spillway tunnel is calculated based on the upstream and downstream water levels of the spillway tunnel. The specific calculation formula is as follows:

[0071] T=kq a Z b (8)

[0072] Where k is a coefficient based on rock characteristics, q is the flow rate per unit width of the spillway, Z is the water level difference between upstream and downstream, a and b are constants. The depth of the downstream scouring pit T is calculated based on the formula when only one spillway is arranged at the upstream of the spillway group with the same water level difference between upstream and downstream. c , then the depth of the scouring pit is T cis the depth of the scouring pit when there is no interference between the water tongues of the spillway tunnels, and then the maximum value T among the scouring pit depths T of each spillway tunnel is selected m , by comparing T m With T c The size of the water tongues in the flood discharge tunnel is used to determine whether there is interference between the water tongues and whether a water cushion effect is generated. If T m Less than or equal to T c This indicates that there is a water cushion effect. This method can quickly and intuitively verify whether there is interference between the water tongues of the discharge flood tunnel, which is convenient for adjusting the first layout parameters and has strong operability.

[0073] Based on the above method, in step S3, the third threshold is calculated by the geometric relationship between the flood discharge tunnel and the bank slope. The specific calculation formula of the third threshold is as follows:

[0074] Y3=L0sinθ-s (3)

[0075] Wherein Y3 represents the third threshold value.

[0076] Based on the above method, the specific process of judging whether the distance s between the second arrangement parameter flood discharge tunnel outlet and the bank slope angle is greater than the third threshold is:

[0077] Constructing a flood spillway tunnel parameter model based on the first layout parameter, and obtaining a second layout parameter, a width b from the deepest point of the scouring pit to the edge of the scouring pit, based on the flood spillway tunnel parameter model;

[0078] Calculate the third threshold value Y3 based on the spillway tunnel parameter model;

[0079] Determine whether the inequality b≤L0sinθ-s=Y3(4) holds. If the inequality (4) does not hold, adjust the first layout parameters, the intersection angle θ between the spillway tunnel and the bank slope, and the distance s between the spillway tunnel outlet and the bank slope angle, and re-obtain the second layout parameters, the pit depth T and the width b from the deepest point of the pit to the edge of the pit, and verify again.

[0080] refer to Figure 1-3 In this embodiment, by verifying the width b from the deepest point of the scouring pit to the edge of the scouring pit, it can be obtained whether the scouring pit has an impact on the embankment slope. Specifically, when the scouring pit arranged in the spillway tunnel does not affect the slope, according to the geometric relationship between the spillway tunnel and the slope, it can be obtained that the second arrangement parameter, the width b from the deepest point of the scouring pit to the edge of the scouring pit, needs to satisfy the inequality:

[0081] b≤L0sinθ-s=Y3 (4)

[0082] Wherein Y3 represents the third threshold value, and the width b from the deepest point of the scouring pit to the edge of the scouring pit is obtained by constructing a spillway tunnel parameter model with the help of a model test method. If inequality (4) does not hold, it is necessary to repeatedly adjust the first arrangement parameter, the intersection angle θ between the spillway tunnel and the bank slope, and the angle distance s between the spillway tunnel outlet and the bank slope, until inequality (4) holds. This method can fully meet the parameter requirements of the present invention, and can verify some parameters, thereby improving the accuracy of the data in the present invention and ensuring the feasibility of the spillway tunnel group arrangement method of the present invention.

[0083] The present invention is not limited to the above-mentioned specific implementation modes. Various changes made by ordinary technicians in this field based on the above-mentioned concepts without creative work are all within the protection scope of the present invention.

Claims

1. A method for arranging flood discharge tunnels on the shore that takes into account both scouring pits and jet energy dissipation, characterized in that: The method comprises: Calculate the number of spillway tunnels required on the spillway bank based on the maximum spillway discharge on the spillway bank and the spillway discharge of a single spillway tunnel; Based on the relationship between the upstream and downstream water levels and flows, the first layout parameters of each spillway are set. The first layout parameters include the spillway outlet body parameters. , the corner of the flood discharge tunnel exit , the angle between the flood discharge tunnel and the bank slope , Distance between adjacent spillway tunnels , Distance between the outlet of the flood discharge tunnel and the slope angle of the bank ; Based on the first layout parameters, the second layout parameters of each spillway are obtained, wherein the second layout parameters include the bank flow velocity , pit depth , Width from the deepest point of the scouring pit to the edge of the scouring pit ; Verify whether the first layout parameter meets the preset layout condition based on the second layout parameter; if not, adjust the first layout parameter, re-acquire the second layout parameter for verification; if yes, arrange the spillway group based on the first layout parameter of each spillway and the number of spillway; The specific steps of verifying whether the first arrangement parameter meets the preset arrangement condition based on the second arrangement parameter include: S1. Determine the shore velocity of the second arrangement parameter Is it greater than the first threshold? If the shore flow velocity If it is greater than the first threshold, the first layout parameter, the spillway outlet shape parameter, is adjusted. , the corner of the flood discharge tunnel exit Or the angle between the spillway and the bank slope , Distance between adjacent spillway tunnels Otherwise, go to step S2; The first threshold is , the second arrangement parameter is the shore current velocity The calculation formula is as follows: (1) in is the velocity attenuation coefficient, is the width of the river channel at the flood discharge tunnel, is the distance from the outlet of the flood discharge tunnel to the slope angle of the bank, is the maximum bottom flow velocity between the spillway water tongue and its adjacent downstream spillway water tongue, It is the distance of the jet flow before the jet flow tongue enters the water; S2. Determine the depth of the second layout parameter pit Is it greater than the second threshold? If the depth of the crater If it is greater than the second threshold, the first layout parameter, the spacing between adjacent spillways, is adjusted. , Distance between the outlet of the flood discharge tunnel and the slope angle of the bank , then return to step S1, if the pit depth If it is not greater than the second threshold, the process proceeds to step S3; Get the second layout parameter of each spillway hole and the depth of the scouring pit The maximum value in ; Calculate the depth of the downstream scouring pit when only one spillway tunnel is arranged at the upstream of the spillway tunnel group based on the same upstream and downstream water level difference ,Will Set as the second threshold; S3. Determine the distance between the second layout parameter flood discharge tunnel outlet and the slope angle Is it greater than the third threshold? If the distance between the outlet of the flood discharge tunnel and the slope angle is If it is greater than the third threshold, the first layout parameter, the intersection angle between the flood discharge tunnel and the bank slope, is adjusted. , Distance between the outlet of the flood discharge tunnel and the slope angle of the bank , then return to step S2, if the distance between the outlet of the flood discharge tunnel and the slope angle is is not greater than a third threshold, then the first arrangement parameter meets the preset arrangement condition; The third threshold is calculated based on the geometric relationship between the spillway and the bank slope. The specific calculation formula of the third threshold is as follows: (3) in Indicates the third threshold.

2. The method for arranging a flood discharge tunnel group according to claim 1, characterized in that: In step S2, the second arrangement parameter pit depth is determined The specific process of whether it is greater than the second threshold is as follows: Obtain the upstream and downstream water level difference of each spillway, and calculate the second layout parameter scouring depth of each spillway based on the upstream and downstream water level difference of each spillway ; Determine inequality (2) is true. If inequality (2) is not true, adjust the first layout parameter, the distance between adjacent spillways. , Distance between the outlet of the flood discharge tunnel and the slope angle of the bank , and re-obtain the second layout parameters and verify again.

3. The method for arranging a flood discharge tunnel group according to claim 1, characterized in that: The second arrangement parameter is determined by the distance between the outlet of the flood discharge tunnel and the slope angle of the bank. The specific process of whether it is greater than the third threshold is: A flood discharge tunnel parameter model is constructed based on the first layout parameter, and a second layout parameter width from the deepest point of the scouring pit to the edge of the scouring pit is obtained based on the flood discharge tunnel parameter model. ; Calculation of the third threshold based on the spillway tunnel parameter model ; Determine inequality (4) is true. If inequality (4) is not true, adjust the first layout parameter, the intersection angle between the spillway and the slope. , Distance between the outlet of the flood discharge tunnel and the slope angle of the bank , and re-obtain the second layout parameter pit depth and the width from the deepest point of the crater to the edge of the crater , verify again.