A test device for simulating the influence of foundation pit excavation on tunnel and active control using a support servo system

By designing a test device that simulates the impact of foundation pit excavation on the tunnel and actively control the foundation pit excavation on the tunnel in the existing technology, the problem of difficult control of the impact of foundation pit excavation on the tunnel in the existing technology is solved, scientific construction guidance is provided, and construction risks are reduced. , realizes effective control of tunnel deformation.

CN114482150BActive Publication Date: 2024-11-15ZHEJIANG UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210087667.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-25
Publication Date
2024-11-15
Estimated Expiration
2042-01-25

AI Technical Summary

Technical Problem

The existing technology lacks effective research and guidance to support the impact of servo systems on the adjacent tunnels in the foundation pit, which makes it difficult to control the deformation of the tunnel during construction, which may lead to serious problems such as water and sand gushing, affecting economic security.

Method used

Design an indoor test device that simulates the impact and active control of foundation pit excavation on the tunnel using a supporting servo system, including model boxes, simulated tunnel pipes, foundation pit structure systems, hydraulic servo systems and measurement systems, and is applied through the hydraulic servo system control and application Simulate the axial force on the support, and record and measure the tunnel deformation in real time, simulate the impact of the support servo system on the tunnel and the active control effect during foundation pit excavation.

Benefits of technology

It provides scientific guidance on the axial force adjustment of servo system in actual construction, reduces the impact of foundation pit excavation on the tunnel, reduces the construction risks, and has extremely strong practical value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114482150B_ABST
    Figure CN114482150B_ABST
Patent Text Reader

Abstract

The present invention provides a test device for simulating the influence of foundation pit excavation using a support servo system on a tunnel and active control, comprising a model box, a simulated tunnel pipe, a foundation pit structure system, a hydraulic servo system and a measurement system. The model box is filled with soil; the foundation pit structure comprises a simulated support and a simulated ground-connected wall, a plurality of strain gauges are arranged on the outer walls around the simulated ground-connected wall, and the simulated support adopts a servo support form; the hydraulic servo system can control the axial force applied to the simulated support; a measurement section is arranged at a certain interval along the axis of the simulated tunnel pipe, strain gauges and infrared ranging devices are arranged on the inner wall of the measurement section, and the measurement system is used to obtain the measurement signals of each strain gauge and infrared ranging device. Through the device, the influence of foundation pit excavation using a support servo system on the deformation of adjacent tunnels can be simulated, and the influence of the active control of the servo system on the adjacent deformed tunnel can be studied.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel and underground space engineering, and particularly relates to a test device for simulating the influence of foundation pit excavation on a tunnel and active control using a supporting servo system. Background Art

[0002] With the rapid development of urban rail transit and urban construction, more and more foundation pit projects are close to underground structures. Foundation pit construction will have an impact on the adjacent underground structures, especially in soft soil areas such as Hangzhou and Shanghai, where the impact is more significant. As a key protection object, tunnels have higher control requirements for the deformation of the surrounding environment caused by foundation pit excavation. At present, in order to reduce the impact of foundation pit excavation on adjacent tunnels, many projects use support servo systems. A jack with adjustable axial force is added to the traditional support to compensate for the axial force in time, control the deformation of the foundation pit and then control the deformation of the adjacent tunnel. However, there is a lack of research results on the impact of foundation pit excavation using a support servo system on adjacent tunnels, and there is also a lack of scientific guidance for the setting and adjustment of the axial force of the servo system in actual projects.

[0003] During the foundation pit construction process, deformation of adjacent tunnels is inevitable. If the tunnel deforms too much, the segment structure will be damaged, which may cause serious problems such as water and sand gushing, resulting in huge economic losses and even threatening people's lives. Therefore, it is of great significance to conduct in-depth research on the active control of the support servo system to restore the deformation of adjacent tunnels.

[0004] In terms of indoor models, existing model tests only analyze the deformation of the foundation pit itself using a support servo system or only simulate the impact of foundation pit excavation using traditional support methods on the tunnel. There is no indoor model test device that studies the impact of foundation pit excavation using a support servo system on the tunnel.

[0005] In summary, there are still many deficiencies in the research on the impact of foundation pit excavation on tunnels using a support servo system. It is urgent to obtain data through indoor model tests to further guide construction and reduce the impact of foundation pit excavation on adjacent tunnels. Summary of the invention

[0006] In view of the above-mentioned problems existing in the prior art, the purpose of the present invention is to provide an indoor simulation test device for simulating the influence of foundation pit excavation on tunnels and active control using a support servo system, so as to provide valuable data for actual projects, reduce the influence of foundation pit excavation on adjacent tunnels, and guide and optimize construction.

[0007] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:

[0008] The present invention provides a test device for simulating the influence of foundation pit excavation on tunnel and active control using a support servo system, characterized in that it comprises a model box, a simulated tunnel pipe, a foundation pit structure system, a hydraulic servo system and a measuring system; the model box is filled with soil; the foundation pit structure system comprises a simulated support and a simulated ground connection wall, the simulated ground connection wall is inserted into the soil, a plurality of strain gauges are arranged on the outer walls around the simulated ground connection wall, and the simulated support adopts a servo support form; the hydraulic servo system can control the axial force applied to the simulated support and record the axial force; measurement sections are arranged at a certain interval along the axis of the simulated tunnel pipe, strain gauges and infrared ranging devices are arranged on the inner walls of the measurement sections, and the measuring system is used to obtain measurement signals of each strain gauge and the infrared ranging device.

[0009] Furthermore, a plurality of simulation supports of different heights are arranged from top to bottom in the foundation pit excavation area, and the simulation supports are arranged according to the working conditions to be simulated.

[0010] Furthermore, the hydraulic servo system includes an electrical and monitoring system and a jack, and the simulated support is connected to the jack by bolts; the jack is connected to the electrical and monitoring system by wires, and the electrical and monitoring system can adjust and record the axial force on the jack in real time.

[0011] Furthermore, the simulated support is arranged on a support platform, and the support platform is located in the foundation pit excavation area. The support platform offsets the gravity of the simulated support and constrains its lateral movement.

[0012] Furthermore, the measuring system includes an automatic data acquisition instrument, a strain gauge connected to the automatic data acquisition instrument, an infrared ranging output system and an infrared ranging device connected to the automatic data acquisition instrument.

[0013] Furthermore, the strain gauge and the infrared distance measuring device are fixed on the arch waist, arch top and arch bottom positions on both sides of the inner wall of the measuring section.

[0014] Furthermore, a plurality of strain gauges are arranged on the outer walls around the simulated ground connection wall, and the strain gauges are connected to an automatic data acquisition instrument.

[0015] The present invention also discloses a test method for simulating the influence of foundation pit excavation on tunnel and active control using a support servo system, which comprises the following steps:

[0016] 1) Arrangement of test equipment

[0017] An infrared distance measuring device and a strain gauge are installed on the inner wall of the corresponding monitoring section of the simulated tunnel pipe, and are connected to the infrared distance measuring output device and the automatic data acquisition instrument through wires respectively; the simulated tunnel pipe is fixed at the corresponding position of the model box, and then the model box is filled with soil; a number of strain gauges are installed at the corresponding position of the side wall of the simulated ground connection wall as required, and the strain gauges are connected to the automatic data acquisition instrument; after the installation is completed, the simulated ground connection wall is inserted into the corresponding position of the soil, and the simulated ground connection wall surrounds the simulated foundation pit;

[0018] 2) After the layout is completed, simulate the construction:

[0019] 2.1) Excavate the simulated foundation pit in layers; when the soil in the foundation pit is excavated to the corresponding simulated support erection height, stop excavation, set up a support platform in the simulated foundation pit and lay out simulated supports, one end of the simulated support is in contact with the simulated ground wall, and the other end can be connected to the jack by bolts as needed, and then the jack is in contact with another simulated ground wall, or it can also be directly in contact with another simulated ground wall; the simulated support is erected on the support platform, and the jack is connected to the electrical and monitoring system; after the installation is completed, excavate the next layer of earthwork;

[0020] 2.2) Repeat step 2.1) when digging to the next simulated support erection height until the excavation reaches the designed foundation pit bottom;

[0021] 2.3 During the excavation process, the electrical and monitoring system is used to adjust and record the axial force on the simulated support and jack. At the same time, the automatic data acquisition instrument and the infrared ranging output device record the deformation of the simulated ground-connected wall and the simulated tunnel pipe in real time, thereby simulating the impact of foundation pit excavation using the support servo system on the tunnel, and studying the effect of the servo system's active control on the tunnel deformation recovery.

[0022] According to the above technical solution, the beneficial effects of the present invention are:

[0023] The test device provided by the present invention can simulate the influence of foundation pit excavation on the tunnel using a supporting servo system, can effectively simulate actual construction, and can provide valuable data basis for the adjustment of the axial force of the servo system during the actual construction process, so as to provide reference for actual construction and reduce risks; and the present invention can also study the influence of active control of the servo system on the deformation recovery of the tunnel, has the advantages of simple structure and easy use, and has extremely strong practical value. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:

[0025] Figure 1It is a schematic diagram of the overall structure of the test device provided by an embodiment of the present invention;

[0026] Figure 2 is a plane diagram of a test device model in an embodiment of the present invention;

[0027] Figure 3 is a cross-sectional view of a test device model in an embodiment of the present invention;

[0028] Figure 4 is a schematic diagram of a simulated tunnel pipe monitoring section in an embodiment of the present invention;

[0029] Explanation of reference numerals: model box 1; soil 2; simulated tunnel pipe 3; strain gauge 4; wire 5; automatic data acquisition instrument 6; electrical and monitoring system 7; jack 8; simulated support 9; support platform 10; simulated ground-connected wall 11; infrared ranging device 12; infrared ranging output device 13. DETAILED DESCRIPTION

[0030] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for those of ordinary skill in the art, without departing from the principles of the present invention, several improvements and modifications may be made to the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

[0031] It should be noted that all directional indications in the embodiments of the present application (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0032] like Figure 1 , 2 As shown in Figure 4, this embodiment provides a test device for simulating the influence of foundation pit excavation using a support servo system on a tunnel and active control, including a model box 1, the model box 1 is filled with soil 2, a simulated tunnel pipe 3 and a foundation pit structure system are buried in the soil 2, the foundation pit structure system is composed of a simulated support 9, a support platform 10 and a simulated ground wall 11, the simulated ground wall 11 surrounds a simulated foundation pit, and a plurality of strain gauges 4 are arranged around the outer wall of the simulated ground wall 11. The simulated support is set according to the working conditions to be simulated. The simulated support 9 can be in contact with the simulated ground wall at one end and connected to the jack 8 at the other end by high-strength bolts, and is erected on the support platform 10, and the jack 8 is in contact with the simulated ground wall 11. The simulated support 9 can also be directly in contact with the simulated ground wall at both ends; the inner wall of the simulated tunnel pipe 3 is provided with a plurality of infrared ranging devices 12 and strain gauges 4.

[0033] Specifically, Figure 3As shown, a number of simulated supports 9 of different heights are arranged from top to bottom inside the foundation pit excavation area. The simulated supports 9 can be lateral supports or oblique supports, which can be adjusted according to design requirements. The number and arrangement of the simulated supports 9 can be flexibly adjusted according to the simulated excavation conditions. For example, in this embodiment, there are three layers of supports, each of which includes three lateral simulated supports 9 and four oblique simulated supports 9.

[0034] Specifically, the simulation support 9 is connected to the jack 8 by high-strength bolts and is mounted on a support platform 10. The jack 8 is connected to the electrical and monitoring system 7 by a wire 5. The electrical and monitoring system 7 can adjust and record the axial force on the jack 8 in real time.

[0035] Specifically, a plurality of strain gauges 4 are arranged around the outer wall of the simulated ground-connected wall 11, which can monitor the deformation of the simulated ground-connected wall 11 during the excavation of the foundation pit, and the position of the strain gauge 4 is flexibly adjusted according to the simulated excavation conditions. For example, in this embodiment, a total of 30 strain gauges are arranged on the outer wall of the simulated ground-connected wall 11.

[0036] Specifically, the simulated tunnel pipe 3 is provided with a number of monitoring sections at a certain interval, and each monitoring section is provided with 4 infrared ranging devices 12 and 4 strain gauges 4. The infrared ranging devices 12 and strain gauges 4 are respectively located at the arch waist, arch top and arch bottom on both sides of the simulated tunnel pipe 3, so as to monitor the deformation and internal force changes of the simulated tunnel pipe 3 during the foundation pit excavation process.

[0037] Specifically, the infrared distance measuring devices 12 are a pair, and are connected to the infrared distance measuring output device 13 through a wire 5 to measure the deformation of the simulated tunnel tube 3 .

[0038] Specifically, the strain gauge 4 is connected to the automatic data acquisition device via a wire 5 to measure the change of the internal force of the simulated tunnel pipe 3 .

[0039] When the indoor simulation test device for simulating the influence of foundation pit excavation on tunnel and active control using a supporting servo system of the present invention is used:

[0040] 1) Arrangement of test equipment

[0041] The infrared ranging device 12 and the strain gauge 4 are installed on the inner wall of the corresponding monitoring section of the simulated tunnel pipe 3, and are connected to the infrared ranging output device 13 and the automatic data acquisition instrument 6 through the wire 5 respectively; the simulated tunnel pipe 3 is fixed at the corresponding position of the model box 1, and then the soil 2 is filled into the model box 1; a number of strain gauges 4 are installed at the corresponding positions of the side walls of the simulated ground-connected wall 11 as needed, and the strain gauges 4 are connected to the automatic data acquisition instrument 6; after the installation is completed, the simulated ground wall 11 is inserted into the corresponding position in the soil 2, and the simulated ground-connected wall 11 surrounds a simulated foundation pit.

[0042] 2) After the layout is completed, simulate the construction:

[0043] 2.1) Excavate the simulated foundation pit in layers. When the soil in the foundation pit is excavated to the corresponding height of the simulated support 9, stop excavating. Set a support platform 10 in the simulated foundation pit and lay out the simulated support 9. One end of the simulated support 9 is in contact with the simulated ground wall 11, and the other end can be connected to the jack 8 by bolts as needed, and then the jack is in contact with another simulated ground wall 11, or it can be directly in contact with another simulated ground wall 11; the simulated support 9 is erected on the support platform 10, and the jack 8 is connected to the electrical and monitoring system 7; after the installation is completed, excavate the next layer of earthwork;

[0044] 2.2) When excavating to the next simulated support erection height, repeat step 2.1) until excavation reaches the designed foundation pit bottom.

[0045] 2.3) During the excavation process, the electrical and monitoring system 7 adjusts and records the axial force on the simulated support 9 and the jack 8. At the same time, the automatic data acquisition device 6 and the infrared ranging output device 13 record the deformation of the simulated ground-connected wall 11 and the simulated tunnel pipe 3 in real time, thereby simulating the impact of foundation pit excavation using the support servo system on the tunnel, and studying the role of the servo system's active control in the tunnel deformation recovery.

[0046] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A test method for simulating the influence of foundation pit excavation on tunnel and active control using a support servo system, the test method is implemented based on a test device, the test device includes a model box, a simulated tunnel pipe, a foundation pit structure system, a hydraulic servo system and a measurement system; the model box is filled with soil; the foundation pit structure system includes a simulated support and a simulated ground connection wall, the simulated ground connection wall is inserted into the soil, and a plurality of strain gauges are arranged on the outer walls around the simulated ground connection wall, and the simulated support adopts a servo support form; the hydraulic servo system controls the axial force applied to the simulated support and records the axial force; measurement sections are arranged at a certain interval along the axis of the simulated tunnel pipe, strain gauges and infrared ranging devices are arranged on the inner walls of the measurement sections, and the measurement system is used to obtain measurement signals of each strain gauge and infrared ranging device; The hydraulic servo system includes an electrical and monitoring system and a jack, wherein the simulated support and the jack are connected by bolts; the jack is connected to the electrical and monitoring system through a wire, and the electrical and monitoring system can adjust and record the axial force on the jack in real time; The simulated support is arranged on a support platform, and the support platform is located in the foundation pit excavation area, and the support platform offsets the gravity of the simulated support and constrains its lateral movement; The measuring system comprises an automatic data acquisition instrument, a strain gauge connected to the automatic data acquisition instrument, an infrared distance measurement output system and an infrared distance measurement device connected thereto; It is characterized in that The test method comprises the following steps: 1) Arrangement of test equipment An infrared distance measuring device and a strain gauge are installed on the inner wall of the corresponding monitoring section of the simulated tunnel pipe, and are connected to the infrared distance measuring output device and the automatic data acquisition instrument through wires respectively; the simulated tunnel pipe is fixed at the corresponding position of the model box, and then the model box is filled with soil; a number of strain gauges are installed at the corresponding position of the side wall of the simulated ground connection wall as required, and the strain gauges are connected to the automatic data acquisition instrument; after the installation is completed, the simulated ground connection wall is inserted into the corresponding position of the soil, and the simulated ground connection wall surrounds the simulated foundation pit; 2) After the layout is completed, simulate the construction: 2.1) Excavate the simulated foundation pit in layers; when the soil in the foundation pit is excavated to the corresponding simulated support erection height, stop excavation, set up a support platform in the simulated foundation pit and lay out simulated supports, one end of the simulated support is in contact with the simulated ground wall, and the other end is connected to the jack through bolts, and then the jack is in contact with another simulated ground wall; the simulated support is erected on the support platform, and the jack is connected to the electrical and monitoring system; after the installation is completed, excavate the next layer of earthwork; 2.2) Repeat step 2.1) when digging to the next simulated support erection height until the excavation reaches the designed foundation pit bottom; 2.3) During the excavation process, the electrical and monitoring system adjusts and records the axial forces on the simulated supports and jacks. At the same time, the automatic data acquisition instrument and the infrared ranging output device record the deformation of the simulated ground-connected wall and the simulated tunnel pipe in real time, thereby simulating the impact of foundation pit excavation using the support servo system on the tunnel, and studying the role of the servo system's active control in the tunnel deformation recovery.

2. The test method according to claim 1, It is characterized in that The strain gauge and the infrared distance measuring device are fixed on the arch waist, arch top and arch bottom positions on both sides of the inner wall of the measuring section.