A waterproof board laying trolley and waterproof board construction method

By designing waterproof plate laying trolleys, using hydraulic cylinders and elastic telescopic parts technology, the simultaneous laying of geotextiles and waterproof plates in the inner wall of the tunnel is solved, and the construction efficiency and quality are improved.

CN114483117BActive Publication Date: 2024-11-22SICHUAN RONGYIXIU TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011167050.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-27
Publication Date
2024-11-22
Estimated Expiration
2040-10-27

AI Technical Summary

Technical Problem

The laying efficiency of waterproofing plates in existing tunnel construction is low, and it is difficult to lay geotextiles and waterproofing plates at the same time, resulting in construction efficiency and quality problems.

Method used

A waterproof plate laying trolley is designed, including a gantry, laying device, guiding device and hoisting device. The rotation of the rotating arm and laying roller is controlled through the hydraulic cylinder, and combined with elastic telescopic parts and connecting balls to realize geotextile and waterproof plate. The position of the gantry is adjusted by adjusting the hydraulic cylinder to adapt to different tunnel shapes.

Benefits of technology

The laying efficiency of the tunnel inner wall geotextile and waterproof plates is improved, manual operation errors are reduced, construction quality and standardized construction are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114483117B_ABST
    Figure CN114483117B_ABST
Patent Text Reader

Abstract

The present application relates to a waterproof board laying trolley, which includes a gantry, a laying device, two guiding devices for guiding the movement of the laying device, and a lifting device for controlling the lifting and movement of the gantry. The two ends of the gantry along the length direction of the tunnel are coaxially provided with arc-shaped guide rails, and the two guiding devices are slidably connected to the guide rails. The laying device includes two supports respectively fixed to the two guiding devices and two laying members connected to the supports. The laying members include a rotating arm hinged to the support and a control hydraulic cylinder. The two ends of the control hydraulic cylinder are respectively hinged to the rotating arm and the support. The control hydraulic cylinder is located on the side of the rotating arm facing the center of the gantry. The two rotating arms connected to the same support are respectively provided with laying rollers for winding geotextiles or waterproof boards. The two ends of the laying rollers are respectively rotatably connected to the rotating arms at the two ends of the gantry and the two laying rollers are parallel to each other. The present application can lay geotextiles and waterproof boards at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of tunnel construction, and in particular to a waterproof board laying trolley and a waterproof board construction method. Background Art

[0002] Waterproofing is a key step in the tunnel construction process, and composite lining waterproofing technology is currently the most commonly used construction technology for tunnel waterproofing. It mainly achieves the purpose of waterproofing by laying geotextiles and waterproof boards on the tunnel section. Waterproof boards are usually laid after the primary support and then the secondary lining is constructed. The waterproof board construction mostly uses a simple stand. The transportation and forward advancement of the waterproof board are purely manpower-dependent, and the construction efficiency is low. The laying and hanging are all manual operations, with large errors and prone to quality problems. It is difficult to meet the on-site construction progress, construction quality and standardized construction of tunnels.

[0003] In the existing related technology, a Chinese patent with application number CN201510985751.8 discloses an intelligent trolley for tunnel construction, and its technical highlights are: it includes a gantry, a conveying mechanism, a lifting mechanism, a movable locking mechanism and two traveling trolleys, the gantry is fixedly provided with two symmetrical arc tracks, and the two traveling trolleys are symmetrically arranged on the two arc tracks; the conveying mechanism includes a bracket and a reel, the bracket is arranged at the bottom of the gantry for supporting the waterproof material, and the reel is rotatably arranged on the two traveling trolleys for winding the waterproof material on the bracket; the lifting mechanism is a plurality of groups, and the plurality of groups of lifting mechanisms are fixed on the gantry for lifting the waterproof material; the movable locking mechanism is arranged at the lower part of the gantry for moving and locking the gantry.

[0004] Regarding the above-mentioned related technologies, the inventors believe that in the actual construction process, it is still necessary to first lay the geotextile on the inner wall of the tunnel and then lay the waterproof board, and the overall construction efficiency is relatively low. Summary of the invention

[0005] In order to simultaneously lay geotextile and waterproof board on the inner wall of a tunnel, the present application provides a waterproof board laying trolley and a waterproof board construction method.

[0006] In the first aspect, the present application provides a waterproof board laying trolley, which adopts the following technical solution:

[0007] A waterproof board laying trolley comprises a gantry, a laying device, two guiding devices for guiding the movement of the laying device and a lifting device for controlling the lifting and movement of the gantry, wherein arc-shaped guide rails are coaxially arranged at both ends of the gantry along the length direction of the tunnel, and the two guiding devices are slidably connected to the guide rails, the laying device comprises two supporting members respectively fixed to the two guiding devices and two laying members connected to the supporting members, the laying members comprise a rotating arm hinged to the supporting members and a control hydraulic cylinder, the two ends of the control hydraulic cylinder are respectively hinged to the rotating arm and the supporting member, the control hydraulic cylinder is located on the side of the rotating arm facing the center of the gantry, the two rotating arms connected to the same supporting member are respectively provided with laying rollers for winding geotextile or waterproof board, the two ends of the laying rollers are respectively rotatably connected to the rotating arms at the two ends of the gantry and the two laying rollers are parallel to each other.

[0008] By adopting the above technical solution, when laying geotextile and waterproof sheet, the portal frame is first located in the center of the tunnel portion to be laid through the jacking device, and then the geotextile and waterproof sheet are respectively wound around two laying rollers, and the laying roller wrapped with the geotextile is located at the top, and the rotation of the rotating arm is controlled by controlling the extension and contraction of the hydraulic cylinder so that the two rotating arms are both in contact with the inner wall of the tunnel, and finally the support is guided by the guiding device to slide along the guide rail, and the laying roller is driven to rotate while pressing the geotextile and waterproof sheet to the inner wall of the tunnel respectively, and the geotextile and waterproof sheet are fixed during the pressing process, so that the geotextile and waterproof sheet can be laid at the same time, thereby optimizing the construction efficiency.

[0009] Optionally, an elastic telescopic part is provided at the end of the rotating arm away from the supporting part, and the elastic telescopic part includes a telescopic rod fixed to the rotating arm, a telescopic tube sleeved on the telescopic rod, and two telescopic springs, the two telescopic springs are respectively sleeved on the telescopic rod and the telescopic tube, the telescopic rod is inserted into the telescopic tube and the two have the same central axis, the telescopic tube is sleeved with a fixed tube fixed to the rotating arm, the facing ends of the two telescopic springs are connected to the telescopic tube, the ends of the two telescopic springs away from each other are respectively connected to the telescopic rod and the fixed tube, and the end of the laying roller is rotatably connected to the telescopic tube.

[0010] By adopting the above technical solution, due to construction and design reasons, the inner wall of the tunnel is not completely arc-shaped. When the laying roller is against the inner wall of the tunnel, the two telescopic springs can make the telescopic tube tend to maintain its original state. In the process of laying geotextile and waterproof board, the laying roller will cause the telescopic tube to shrink toward the telescopic rod. At this time, the two telescopic springs will pull the telescopic tube toward the inner wall of the tunnel, so that during the laying process, the laying roller can maintain a relatively close fit to the inner wall of the tunnel.

[0011] Optionally, a connecting piece for connecting a laying roller is provided at the end of the telescopic tube, and the connecting piece includes two connecting plates with an arc-shaped plate structure, one of the connecting plates is fixed to the telescopic tube, the laying roller is clamped between the two connecting plates and the laying roller is provided with a limiting ring groove, one end of the two connecting plates are hinged to each other, and the other end of the two connecting plates are provided with fasteners that enable the two to clamp the laying roller, and the inner side of the connecting plate is rotatably connected to a plurality of connecting balls that are rollingly connected to the limiting ring groove.

[0012] By adopting the above technical scheme, since it is necessary to lay geotextile and waterproof sheet at the same time, the geotextile and waterproof sheet can be firstly wrapped around different laying rollers, and then when laying at different positions of the tunnel, it is only necessary to cancel the restriction on the two connecting plates through fasteners, and then open the connecting plate not fixed to the telescopic tube, remove the used laying roller and replace it with the laying roller wrapped with geotextile or waterproof sheet, so that the construction efficiency can be further improved while laying the geotextile and waterproof sheet at the same time, and the connecting ball can effectively reduce the obstruction encountered by the laying roller during rotation, and when the two connecting plates are opened, the connecting ball will not be separated from the connecting plate, so as to reduce the possibility of damaging the geotextile or waterproof sheet due to excessive obstruction encountered by the laying roller, and the axial slip of the laying roller can be limited by clamping the connecting ball in the limiting ring groove, so as to optimize the stability during use.

[0013] Optionally, the fastener includes a fastening rod hinged to one of the connecting plates and a fastening screw threadedly connected to the fastening rod, and the connecting plate that is not rotatably connected to the fastening rod is provided with a fastening opening for clamping the fastening rod, and a fastening countersunk hole adapted for the fastening screw is provided on the edge of the opening of the fastening opening, and the fastening screw is abutted against the fastening countersunk hole.

[0014] By adopting the above technical scheme, when it is necessary to disassemble the laying roller, it is only necessary to rotate the fastening screw to disengage the fastening screw from the fastening countersunk hole, and then rotate the fastening rod to disengage the fastening rod from the fastening opening, thereby canceling the fastening effect on the connecting plate; at the same time, when the fastening screw is inserted into the fastening countersunk hole, it can relatively fully limit the slight rotation between the two connecting plates, so as to effectively reduce the possibility of increased vibration caused by the increase in the gap between the laying roller and the connecting plate during use, thereby further optimizing the use effect.

[0015] Optionally, the fastening screw is rotatably connected to an abutment tube at one end thereof facing the fastening counterbore, the abutment tube is sleeved and connected to the fastening rod by axial sliding movement along the fastening rod, and the abutment tube abuts against the inner wall of the fastening counterbore.

[0016] By adopting the above technical solution, the abutment tube can further reduce the possibility of the fastening screw tube rotating due to vibration during use, so as to further optimize the stability during use.

[0017] Optionally, the support member includes a support arm and a sleeve fixedly connected to the guide device and a support tube slidably connected to the support arm, the rotating arm and the control hydraulic cylinder are both rotatably connected to the support tube, and the support arm is fixedly connected to a telescopic hydraulic cylinder that controls the telescopic extension of the support tube.

[0018] By adopting the above technical scheme, when paving the transition between the curved surface and the non-curved inner wall of the tunnel, the sliding of the support pipe can be controlled by the telescopic hydraulic cylinder to change the diameter of the rotation path of the laying roller, so that adaptive adjustments can be made during the laying process; it is also possible to adjust the distance between the laying roller and the rotation center of the laying roller when laying according to tunnels of different specifications or at positions of different diameters in the tunnel, without the need to re-erect and use gantries of different specifications, so as to further optimize the construction efficiency.

[0019] Optionally, two rotating arms connected to the same laying roller are fixedly connected with connecting pipes, one of the connecting pipes is sleeved in the other connecting pipe, and one of the connecting pipes is rotatably connected to a support member.

[0020] By adopting the above technical solution, the rotation centers of the two laying rollers can be made relatively close to each other through the connecting pipe, which reduces the complexity of adjusting the angle of the laying roller to fit the inner wall of the tunnel, and can also increase the synchronization and integrity of the rotation of the two rotating arms connecting the laying rollers.

[0021] Optionally, the jacking device includes multiple walking parts and multiple jacking parts, the multiple walking parts are rollers distributed in an array and rotatably connected to the lower part of the gantry, the jacking parts are vertically fixed to the hydraulic cylinder of the gantry, and the telescopic end of the jacking parts is provided with an adjusting part for adjusting the lateral position of the gantry.

[0022] By adopting the above technical solution, during use, the gantry can be towed by a towing vehicle to move through the walking parts. After being towed to the construction location, the jacking parts adjust the height position of the gantry, and finally the position of the gantry along the width direction of the tunnel is adjusted by the adjusting parts. This can effectively reduce the positioning preparation work for the gantry before laying geotextiles and waterproof boards, so as to further improve construction efficiency.

[0023] Optionally, the adjusting member includes an adjusting tube fixedly connected to the telescopic end of the lifting member, an adjusting rod passing through the adjusting tube and an adjusting seat against the ground. The adjusting rod is rotatably connected to the adjusting seat. The adjusting rod is fixedly connected to an adjusting hydraulic cylinder for controlling the sliding of the adjusting tube along the adjusting rod. A plurality of sliding grooves extending axially thereof are provided around the adjusting rod. A plurality of sliding balls are rollingly connected in the sliding grooves. The sliding balls are rotatably connected to the adjusting tube. The adjusting rod is perpendicular to the length direction of the tunnel and is horizontally arranged.

[0024] By adopting the above technical scheme, when it is necessary to adjust the position of the gantry along the width direction of the tunnel, it is only necessary to control the adjusting tube to slide axially along the adjusting rod through the adjusting hydraulic cylinder, and the adjusting hydraulic cylinder is connected to the adjusting rod, so that when the adjusting seat is against the ground to support the gantry, the adjusting seat can make adaptive angle adjustments without interfering with the adjusting hydraulic cylinder. In addition, it can be connected in the slide groove by the sliding ball, which effectively reduces the obstruction to the sliding of the adjusting tube. At the same time, the sliding ball is slidably connected in the slide groove, which can effectively increase the contact area between the sliding ball and the adjusting rod, thereby reducing the possibility of damage to the adjusting part due to excessive load.

[0025] In a second aspect, the present application provides a waterproof board construction method, which adopts the following technical solution:

[0026] A construction method of a waterproof board comprises the following steps: S1, construction preparation: before laying the waterproof board, checking the water leakage of the initial support, and measuring and checking the over-excavation and under-excavation of the support section; material preparation: winding the waterproof board and the geotextile on two laying rollers respectively;

[0027] S2. Position the operation trolley: Position and level the waterproof board laying trolley, affix reflective signs and safety signs to the door frame, turn on the switch of the special power distribution box for the waterproof board laying trolley, and check whether the no-load test run is normal;

[0028] S3, fixing the laying roller: rotating the laying roller wrapped with the geotextile and the laying roller wrapped with the waterproof sheet to different rotating arms respectively, and making the laying roller wrapped with the geotextile be located above the other laying roller before laying;

[0029] S4, gantry position adjustment: the gantry is raised by the lifting member, and then the adjustment tube is slid along the adjustment rod by adjusting the hydraulic cylinder to adjust the position of the gantry along the tunnel width direction;

[0030] S5. Laying of waterproof sheet: The two laying rollers are made to fit the inner wall of the tunnel by telescopic hydraulic cylinder and control hydraulic cylinder. Then the support is driven to slide along the guide rail in an annular direction by the guiding device, and the geotextile and waterproof sheet are laid on the inner wall of the tunnel at the same time. During the laying process, the geotextile is fixed to the surface of the shotcrete by special hot-melt washers and nails, and the waterproof sheet is welded and fixed layer by layer.

[0031] In summary, the present application includes at least one of the following beneficial technical effects:

[0032] 1. When laying geotextile and waterproof sheet, first use the jacking device to make the portal frame located in the center of the tunnel part to be laid, then wind the geotextile and waterproof sheet around two laying rollers respectively, and the laying roller wrapped with the geotextile is located at the top, and control the rotation of the rotating arm by controlling the extension and contraction of the hydraulic cylinder so that both rotating arms are in contact with the inner wall of the tunnel, and finally guide the support to slide along the guide rail through the guiding device, and drive the laying roller to rotate while pressing the geotextile and waterproof sheet to the inner wall of the tunnel respectively, and fix the geotextile and waterproof sheet during the pressing process, so that the geotextile and waterproof sheet can be laid at the same time, optimizing the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application;

[0034] Figure 2 yes Figure 1 A magnified schematic diagram of part A;

[0035] Figure 3 is a partial cross-sectional view of a laying device and a schematic diagram of a guiding device according to an embodiment of the present application;

[0036] Figure 4 is a schematic structural diagram of a laying roller according to an embodiment of the present application;

[0037] Figure 5 yes Figure 3 A magnified schematic diagram of part B;

[0038] Figure 6 yes Figure 3 A magnified schematic diagram of part C;

[0039] Figure 7 yes Figure 1 The enlarged schematic diagram of the D part;

[0040] Figure 8 It is a partial cross-sectional schematic diagram of the adjusting member of the embodiment of the present application.

[0041] Description of reference numerals: 1. gantry; 11. guide rail; 12. shield; 2. guide device; 21. guide seat; 22. guide gear; 221. limiting plate; 222. wheel groove; 23. driving member; 231. driving motor; 232. driving gear; 3. laying device; 31. supporting member; 311. supporting arm; 312. supporting tube; 313. telescopic hydraulic cylinder; 32. laying member; 321. rotating arm; 322. control hydraulic cylinder; 33. laying roller; 331. limiting ring groove; 34. elastic telescopic member; 341. telescopic rod; 342. telescopic tube; 343. Telescopic spring; 344, fixing tube; 345, limiting flange; 35, connecting piece; 351, connecting plate; 352, fastening countersunk hole; 353, connecting ball; 354, fastening opening; 36, fastening piece; 361, fastening rod; 362, fastening screw; 363, abutting tube; 364, limiting groove; 365, limiting block; 37, connecting tube; 4, lifting device; 41, walking piece; 42, lifting piece; 43, adjusting piece; 431, adjusting tube; 432, adjusting rod; 433, adjusting seat; 434, adjusting hydraulic cylinder; 435, slide groove; 436, sliding ball. DETAILED DESCRIPTION

[0042] The following is combined with Figure 1-8 This application is described in further detail.

[0043] The present application embodiment discloses a waterproof board laying trolley. Figure 1 and Figure 2 The trolley includes a gantry 1, a laying device 3 for laying geotextile and waterproof board, two guiding devices 2 and a lifting device 4 for controlling the lifting and movement of the gantry 1. The gantry 1 is provided with arc-shaped guide rails 11 at both ends along the length direction of the tunnel. The two guide rails 11 are arranged on the same central axis and the arc-shaped openings of both are facing downward. The laying device 3 is connected to the guiding device 2, and the two guiding devices 2 are respectively slidably connected to the guide rails 11, and the distribution direction of the two guiding devices 2 is parallel to the axial direction of the two guide rails 11, so as to guide the laying device 3 to slide along the guide rails 11 when laying geotextile and waterproof board.

[0044] Reference Figure 2 and Figure 3The laying device 3 includes two support members 31 respectively fixedly connected to the two guide devices 2 and two laying members 32 connected to the support members 31, that is, each support member 31 is provided with two laying members 32. The laying member 32 includes a rotating arm 321 hinged to the support member 31 and a control hydraulic cylinder 322, the cylinder body and the telescopic end of the control hydraulic cylinder 322 are respectively hinged to the rotating arm 321 and the support member 31, so that the two ends of the control hydraulic cylinder 322 are respectively hinged to the rotating arm 321 and the support member 31, preferably, the cylinder body of the control hydraulic cylinder 322 is hinged to the support member 31. And the two control hydraulic cylinders 322 connected to the same support member 31 are respectively located on the side away from the two rotating arms 321, and the control hydraulic cylinder 322 is located on the side of the rotating arm 321 facing the support member 31 connected to the two, so that the rotation of the rotating arm 321 can be controlled by the telescopic control hydraulic cylinder 322, and the rotation plane of the rotating arm 321 is parallel to the plane where the arc of the guide rail 11 is located.

[0045] Reference Figure 2 and Figure 3 , two rotating arms 321 connected to the same support 31 are respectively provided with laying rollers 33, the two laying rollers 33 are parallel to each other, one end of the laying roller 33 is rotatably connected to the end of the rotating arm 321 away from the portal frame 1, and the other end of the laying roller 33 is rotatably connected to the end of one of the rotating arms 321 located at the other end of the portal frame 1. The two laying rollers 33 are used to wrap the geotextile and the waterproof board respectively when in use, and the laying roller 33 wrapped with the geotextile before laying is located above the other laying roller 33, so that when in use, the geotextile can be laid first through one of the laying rollers 33, and then the waterproof board can be laid through the other laying roller 33, so as to improve the construction efficiency and optimize the use effect. The spacing between the two laying rollers 33 is greater than 500mm, so that the geotextile can be fixed on the surface of the shotcrete by special hot-melt washers and nails.

[0046] Reference Figure 2 and Figure 3 The guide rail 11 is a double-sided rack, that is, the two tooth surfaces of the guide rail 11 are respectively located at the edges on both sides of the circle center of the guide rail 11 and away from it. The guide device 2 includes a guide seat 21 in a channel steel structure and at least three guide gears 22 meshing with the guide rail 11. The multiple guide gears 22 are arranged on the edges on both sides of the guide rail 11. The guide gears 22 are rotatably connected to the guide seat 21, and the rotation plane of the guide gears 22 is perpendicular to the opening direction of the guide seat 21. The opening of the guide seat 21 faces the door frame 1. The support member 31 is fixedly connected to the guide seat 21. At this time, the rotation of the guide seat 21 relative to the guide rail 11 can be limited by the multiple guide gears 22.

[0047] The guide seat 21 is provided with a driving member 23 for driving one or more guide gears 22, so that when in use, the driving member 23 can drive the guide gear 22 to rotate and drive the guide seat 21 to slide along the guide rail 11, thereby driving the laying device 3 to slide along the guide rail 11, and at this time, by controlling the telescopic control of the rotating arm 321 of the hydraulic cylinder 322, the laying roller 33 can be adaptively adjusted in angle, so that the two laying rollers 33 can be relatively closely attached to the inner wall of the tunnel for laying.

[0048] The driving member 23 includes a driving motor 231 and a driving gear 232 coaxially fixedly connected to the output shaft of the driving motor 231, the driving gear 232 is meshed with one of the guide gears 22 to drive the guide gear 22 to rotate, and the driving motor 231 is a worm gear reduction motor. In addition, the side of one of the guide gears 22 can be fixedly connected to a driven gear arranged on the same central axis of the guide gear 22, and the driven gear is meshed with the driving gear 232 to reduce the installation space.

[0049] Reference Figure 2 and Figure 3 At the same time, in order to limit the guide seat 21 from detaching from the guide rail 11, the two axial side walls of the guide gear 22 are respectively fixedly connected with limiting plates 221, so that a wheel groove 222 with an isosceles trapezoidal cross-section is formed between the guide gear 22 and the two limiting plates 221, and the guide rail 11 is clamped in the wheel groove 222 and the two are adapted to each other.

[0050] In order to reduce the possibility of the guide rail 11 being damaged by heavy objects in the tunnel during use, shields 12 in the form of channel steel are respectively connected to the two ends of the portal frame 1 along the length direction of the tunnel, and the two guide rails 11 are respectively arranged in the two shields 12, and a connecting strip is fixedly connected to the side of the guide rail 11 away from the guide seat 21, and the connecting strip is fixedly connected to the inner wall of the shield 12 to protect the guide rail 11. The shield 12 and the guide seat 21 are arranged with openings facing each other, and part of the guide seat 21 passes through the opening of the shield 12 and is connected to the support member 31.

[0051] Reference Figure 2 and Figure 3 The support member 31 includes a support arm 311 fixedly connected to the guide seat 21 and a support tube 312 which is slidably connected to the support arm 311 through an outer sleeve, and a rotating arm 321 and a control hydraulic cylinder 322 are both rotatably connected to the support tube 312. The support arm 311 is fixedly connected to a telescopic hydraulic cylinder 313, the cylinder body of the telescopic hydraulic cylinder 313 is fixedly connected to the support arm 311, and the telescopic end of the telescopic hydraulic cylinder 313 is movably connected to the outer wall of the support tube 312, so that when the control hydraulic cylinder 322 controls the rotation of the rotating arm 321, the support tube 312 can be adaptively extended and retracted through the telescopic hydraulic cylinder 313, so that the laying roller 33 connected to the rotating arm 321 is pressed against the inner wall of the tunnel.

[0052] At the same time, since two laying rollers 33 are provided, in order to make the rotation centers of the two laying rollers 33 coincide with each other, so as to increase the synchronization of the radial spacing of the two laying rollers 33 relative to the support member 31 along the guide rail 11 when adjusting the angle of the rotating arm 321. The two rotating arms 321 connected to the same laying roller 33 are provided with connecting tubes 37, and the two ends of the connecting tubes 37 are respectively fixedly connected to the two rotating arms 321 connected to the laying roller 33. And one of the connecting tubes 37 is sleeved on the other connecting tube 37, and one of the connecting tubes 37 is rotatably connected to the support tube 312, so that when the laying roller 33 is rotated by driving the rotating arm 321 to adjust the angle, the coaxiality of the rotation path of the two laying rollers 33 can be optimized to increase the synchronization of the two laying rollers 33.

[0053] Preferably, the connecting tube 37 with a larger diameter among the two connecting tubes 37 is located between the two supporting members 31 , and both ends of the connecting tube 37 with a smaller diameter are respectively passed through and rotatably connected to the supporting tube 312 .

[0054] Reference Figure 5 The end of the rotating arm 321 away from the support 31 is provided with an elastic telescopic member 34, so as to enable the laying roller 33 to maintain a relatively close fit to the inner wall of the tunnel. The elastic telescopic member 34 includes a telescopic rod 341 fixedly connected to the rotating arm 321, a telescopic tube 342 sleeved on the telescopic rod 341, and two telescopic springs 343. The telescopic rod 341 is located at the end of the rotating arm 321 away from the support 31, and the line connecting the part of the telescopic rod 341 connected to the rotating arm 321 and the rotation center of the rotating arm 321 is parallel to the axial direction of the telescopic rod 341. Among them, the laying roller 33 is rotatably connected to the end of the telescopic tube 342 away from the rotating arm 321.

[0055] The telescopic rod 341 is inserted into the telescopic tube 342 and the two are arranged on the same central axis. The telescopic tube 342 is covered with a fixed tube 344 fixedly connected to the rotating arm 321, and the fixed tube 344 is arranged on the same central axis as the telescopic tube 342. Two telescopic springs 343 are respectively sleeved on the telescopic tube 342 and the telescopic rod 341, and the facing ends of the two telescopic springs 343 are respectively fixedly connected to the telescopic tube 342, and the ends of the two telescopic springs 343 that are far away from each other are respectively fixedly connected to the telescopic rod 341 and the fixed tube 344, so that the two telescopic springs 343 can be used to perform bidirectional elastic restrictions on the telescopic tube 342 during use, thereby optimizing the use effect.

[0056] The opening edge of the telescopic tube 342 located in the fixed tube 344 is folded outward to form a limiting flange 345, which is adapted to the inner wall of the fixed tube 344, so that after the telescopic spring 343 is separated from the telescopic tube 342 after long-term use, the limiting flange 345 can still limit the free expansion and contraction of the end of the telescopic spring 343 connected to the telescopic tube 342, and can limit and support the end of the telescopic tube 342 located in the fixed tube 344, thereby reducing the plastic deformation caused by the torque during use. In addition, the opening edge of the fixed tube 344 sleeved on the telescopic tube 342 is also folded inward to form a limiting flange 345, so that the end of the telescopic spring 343 connected to the inner wall of the fixed tube 344 can be limited, and the telescopic tube 342 can be limited from the fixed tube 344.

[0057] Reference Figure 3 The end of the telescopic tube 342 away from the rotating arm 321 is provided with a connecting piece 35 for connecting the laying roller 33, and the connecting piece 35 includes two arc-shaped connecting plates 351. One of the connecting plates 351 is fixedly connected to the end of the telescopic tube 342 away from the rotating arm 321, and the arc-shaped end of the other connecting plate 351 is hinged to the telescopic tube 342, and the arcs of the two connecting plates 351 are coaxial and open to each other. The two ends of the laying roller 33 are clamped between the two connecting plates 351 of different connecting pieces 35, and the rotation plane of the connecting plate 351 is parallel to the radial plane of the laying roller 33. The ends of the two connecting plates 351 that are not hinged to each other are provided with fasteners 36 that enable the two to clamp the laying roller 33, so that the laying roller 33 is rotatably connected to the end of the telescopic tube 342 through the connecting piece 35.

[0058] Reference Figure 3 and Figure 4 In addition, in order to reduce the obstruction encountered by the laying roller 33 when rotating and to limit the axial movement of the laying roller 33, at least one limiting annular groove 331 is respectively provided around the two ends of the laying roller 33, and the two limiting annular grooves 331 are respectively located at the positions where the laying roller 33 is clamped by the connecting plates 351 of the two connecting members 35. A plurality of connecting balls 353 are rollingly connected around the limiting annular grooves 331, and the connecting balls 353 are partially embedded in the inner wall of the connecting plate 351 and can rotate axially, and the connecting balls 353 are penetrated by rollers and the rollers are fixedly connected to the connecting plate 351, and the rollers are parallel to the axial direction of the laying roller 33, so that the connecting balls 353 are rotatably connected to the connecting plate 351, and the rotation of the connecting balls 353 can effectively reduce the obstruction encountered by the laying roller 33 when rotating, and the axial slippage of the laying roller 33 can be limited by the connecting balls 353 being located in the limiting annular grooves 331, so as to optimize the stability when laying the geotextile and waterproof board.

[0059] Reference Figure 6The two ends of the arc-shaped connecting plate 351 are respectively folded outward to form folded parts, which are used to connect the fastener 36 and reduce the interference with the laying roller 33. The fastener 36 includes a fastening rod 361 and a fastening screw 362 which is covered and threadedly connected to the fastening rod 361. The fastening rod 361 is hinged to the folded part of one connecting plate 351 in the connecting member 35. The folded part of the other connecting plate 351 in the connecting member 35 is provided with a fastening opening 354. The fastening opening 354 is located at one end of the connecting plate 351 away from the hinged end of the connecting plate 351, and the opening direction of the fastening opening 354 is parallel to the rotation plane of the fastening rod 361. A fastening countersunk hole 352 is provided at the opening edge of the fastening opening 354, and the fastening countersunk hole 352 is adapted to the outer wall of the fastening screw tube 362. The opening of the fastening countersunk hole 352 faces the direction away from the connecting plate 351 in the connecting piece 35 where no fastening countersunk hole 352 is provided. The fastening screw tube 362 is inserted into and abuts against the inner wall of the fastening countersunk hole 352, and the diameter of the outer wall of the fastening screw tube 362 is greater than the width of the fastening opening 354 in the opening direction.

[0060] After the two ends of the laying roller 33 are respectively clamped between the two connecting plates 351 of different connecting members 35, the fastening rod 361 is rotated so that the fastening rod 361 is clamped in the fastening opening 354, and then the fastening screw 362 is rotated to abut against the inner wall of the fastening countersunk hole 352 to clamp the two connecting plates 351, so that the laying roller 33 is rotatably connected to the telescopic tube 342 through the connecting member 35, and at the same time, the movement of the fastening screw 362 can be limited by the fastening countersunk hole 352 to further optimize the stability during use, so that the geotextile and the waterproof board can be relatively stable at the same time.

[0061] Reference Figure 6 The fastening screw 362 is rotatably connected with an abutment tube 363 located at one end of the fastening screw 362 facing the fastening counterbore 352. The abutment tube 363 is adapted to the fastening counterbore 352. The abutment tube 363 is outer-circuited with the fastening rod 361 and the two are arranged with the same central axis. The abutment tube 363 is connected to the fastening rod 361 along the axial sliding of the fastening rod 361. The abutment tube 363 is inserted and abutted against the inner wall of the fastening counterbore 352 to reduce the possibility of loosening of the fastening screw 362 due to vibration during use, further optimize the stability during use, and reduce the possibility of increasing the gap between the laying roller 33 and the connecting plate 351 due to the loosening of the fastening screw 362, so as to increase the vibration of the laying roller 33.

[0062] At the same time, in order to further reduce the possibility of the fastening screw 362 rotating and loosening due to the rotation of the abutment tube 363, a plurality of limiting grooves 364 extending along the axial direction are opened around the fastening rod 361, and the limiting grooves 364 are open structures at both ends along the axial direction of the fastening rod 361, and a plurality of limiting blocks 365 are fixedly connected to the inner wall of the abutment tube 363 and the limiting blocks 365 are clamped in the limiting grooves 364 to limit the rotation of the abutment tube 363 and reduce the impact on the fastening screw 362.

[0063] Reference Figure 7 and Figure 8 The lifting device 4 includes a plurality of walking members 41 and a plurality of lifting members 42. The walking members 41 are arrayed and respectively connected to rollers at the lower end of the gantry 1, and the walking members 41 are rotatably connected to the gantry 1 so that when the position of the gantry 1 needs to be adjusted, the gantry 1 can be towed by a traction vehicle and moved by the rotation of the walking members 41.

[0064] A plurality of jacking members 42 are respectively arranged on the side of the walking member 41 in a one-to-one correspondence. The jacking member 42 is a hydraulic cylinder vertically fixedly connected to the bottom of the gantry 1. The cylinder body of the jacking member 42 is fixed to the gantry 1. The telescopic end of the jacking member 42 is provided with an adjusting member 43 for adjusting the position of the gantry 1 along the width direction of the tunnel. When the gantry 1 is eccentric relative to the tunnel, the gantry can be jacked up by the jacking member 42 first, and then the position of the gantry 1 relative to the width direction of the tunnel can be adjusted by the adjusting member 43. When the laying roller 33 is at a certain angle relative to the inner wall of the tunnel, the spacing of the adjusting members 43 can be controlled to be different, so that the gantry 1 can be rotated relative to the tunnel to make a fine adjustment of the angle, so that the two laying rollers 33 can be relatively closely attached to the inner wall of the tunnel.

[0065] Reference Figure 7 and Figure 8 The adjusting member 43 includes an adjusting tube 431 fixedly connected to the telescopic end of the jacking member 42, an adjusting rod 432 passing through the adjusting tube 431, and an adjusting seat 433. The adjusting seat 433 is set against the ground, and the adjusting rod 432 is rotatably connected to the adjusting seat 433. The adjusting rod 432 is fixedly connected to an adjusting hydraulic cylinder 434, the cylinder body of the adjusting hydraulic cylinder 434 is fixedly connected to the adjusting rod 432, the telescopic end of the adjusting hydraulic cylinder 434 is fixedly connected to the adjusting tube 431, and the axial direction of the adjusting tube 431 is perpendicular to the length direction of the tunnel, preferably the adjusting tube 431 is parallel to the radial plane of the arc of the guide rail 11, so that when the position of the gantry 1 needs to be adjusted, it is only necessary to drive the adjusting tube 431 to slide along the axial direction of the adjusting rod 432 by the adjusting hydraulic cylinder 434, and the adjusting seat 433 is rotatably connected to the adjusting rod 432, so that the adjusting seat 433 can be relatively close to the ground without interfering with the sliding of the adjusting tube 431.

[0066] In addition, in order to reduce the obstacles encountered by the adjustment tube 431 when sliding along the adjustment rod 432, a plurality of slide grooves 435 extending along the axial direction of the adjustment rod 432 are provided around the adjustment rod 432, and a plurality of sliding balls 436 distributed along the extension direction of the adjustment rod 432 are rollingly connected in the slide grooves 435. The sliding balls 436 are partially embedded in the inner wall of the adjustment tube 431, and the sliding balls 436 can rotate relative to the adjustment tube 431. The rotation plane of the sliding balls 436 is parallel to the axial direction of the adjustment tube 431, and the sliding balls 436 are rotatably connected to the adjustment tube 431, so that the obstacles encountered by the adjustment tube 431 can be reduced by the sliding balls 436, and the contact area with the sliding balls 436 can be increased by the slide grooves 435, thereby optimizing the support effect.

[0067] Furthermore, the control hydraulic cylinder 32, the telescopic hydraulic cylinder 313, the lifting member 42 and the adjusting hydraulic cylinder 434 are all self-locking hydraulic cylinders.

[0068] The implementation principle of a waterproof board laying trolley in an embodiment of the present application is as follows: when laying geotextile and waterproof board on the inner wall of a tunnel at the same time, firstly place the gantry 1 in the tunnel through the towing of a tractor and the walking part 41, then raise the gantry 1 through the jacking part 42, and finally make the gantry 1 be located in the center of the tunnel through the adjusting part 43, and the telescopic hydraulic cylinder 313 extends the support tube 312 so that the laying roller 33 extends toward the inner wall of the tunnel, and in this process, the angle of the rotating arm 321 is adjusted by the control hydraulic cylinder 322 of different laying parts 32, so that both laying rollers 33 can be against the inner wall of the tunnel, and in addition, at the non-circular inner wall of the tunnel, the angle of the plane where the central axis of the two laying rollers 33 is located can be adjusted by the different extension amounts of the control hydraulic cylinders 322 of different laying parts 32, so that it can fit the inner wall of the non-circular section in the tunnel, thereby optimizing the use effect.

[0069] The embodiment of the present application also discloses a waterproof board construction method. The construction method comprises the following steps: S1, construction preparation: before laying the waterproof board, check the water leakage of the initial support and measure and check the over-excavation and under-excavation of the support section; material preparation: wind the waterproof board and the geotextile on two laying rollers 33 respectively;

[0070] S2. Position the operation trolley: Position and level the waterproof board laying trolley, affix reflective signs and safety signs to the door frame 1, turn on the switch of the special distribution box for the waterproof board laying trolley, and check whether the no-load test run is normal;

[0071] S3, fixing the laying roller: the laying roller 33 wrapped with the geotextile and the laying roller 33 wrapped with the waterproof sheet are respectively rotatably connected to the rotating arms 321 of different laying members 32 through the connecting members 35, and the laying roller 33 wrapped with the geotextile is located above the other laying roller 33 before laying;

[0072] S4, gantry position adjustment: the gantry 1 is raised by the lifting member 42, and then the adjustment tube 431 is slid along the adjustment rod 432 by adjusting the hydraulic cylinder 434 to adjust the position of the gantry 1 along the tunnel width direction;

[0073] S5. Laying of waterproof sheets: The two laying rollers 33 are made to fit the inner wall of the tunnel by telescopic hydraulic cylinder 313 and control hydraulic cylinder 322, and then the support member 31 is driven to slide along the guide rail 11 in an annular direction by the guide device 2, and the geotextile and waterproof sheets are laid on the inner wall of the tunnel at the same time. During the laying process, the geotextile is fixed to the sprayed concrete surface on the inner wall of the tunnel by special hot-melt washers and nails, and the waterproof sheets are welded and fixed layer by layer, so that the geotextile and waterproof sheets can be laid at the same time, thereby improving the construction efficiency.

[0074] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A waterproof board laying trolley, comprising a door frame (1), a laying device (3), two guiding devices (2) for guiding the movement of the laying device (3), and a lifting device (4) for controlling the lifting and movement of the door frame (1), characterized in that: The portal frame (1) is coaxially provided with arc-shaped guide rails (11) at both ends along the length direction of the tunnel, the two guide devices (2) are slidably connected to the guide rails (11), the laying device (3) comprises two support members (31) respectively fixed to the two guide devices (2) and two laying members (32) connected to the support members (31), the laying member (32) comprises a rotating arm (321) hinged to the support member (31) and a control hydraulic cylinder (322), the two ends of the control hydraulic cylinder (322) are respectively hinged to the rotating arm (321) and the support member (31), the control hydraulic cylinder (322) is located at the rotating arm (321) facing the support member (31), On one side of the center of the door frame (1), two rotating arms (321) connected to the same support member (31) are respectively provided with laying rollers (33) for winding geotextiles or waterproof boards, and the two ends of the laying rollers (33) are respectively rotatably connected to the rotating arms (321) at the two ends of the door frame (1), and the two laying rollers (33) are parallel to each other; the ends of the rotating arms (321) away from the support member (31) are provided with elastic telescopic members (34), and the elastic telescopic members (34) include a telescopic rod (341) fixed to the rotating arm (321), a telescopic tube (342) sleeved on the telescopic rod (341) and two telescopic springs (343), and the two telescopic springs (343) are provided with elastic telescopic members (341) and a telescopic tube (342) sleeved on the telescopic rod (341). The springs (343) are respectively mounted on the telescopic rod (341) and the telescopic tube (342); the telescopic rod (341) is inserted into the telescopic tube (342) and the two have the same central axis; the telescopic tube (342) is mounted on a fixed tube (344) fixed to the rotating arm (321); the facing ends of the two telescopic springs (343) are connected to the telescopic tube (342); the ends of the two telescopic springs (343) that are away from each other are respectively connected to the telescopic rod (341) and the fixed tube (344); the end of the laying roller (33) is rotatably connected to the telescopic tube (342); the end of the telescopic tube (342) is provided with a connecting rod for connecting to the laying roller (33); A connecting member (35), the connecting member (35) comprising two connecting plates (351) having an arc-shaped plate-like structure, wherein one of the connecting plates (351) is fixed to the telescopic tube (342), the laying roller (33) is clamped between the two connecting plates (351), and the laying roller (33) is provided with a limiting annular groove (331), one end of the two connecting plates (351) is hinged to each other, and the other ends of the two connecting plates (351) are provided with a fastener (36) for clamping the laying roller (33) together, and a plurality of connecting balls (353) rollingly connected to the limiting annular groove (331) are rotatably connected to the inner side of the connecting plate (351);The support member (31) comprises a support arm (311) fixedly connected to the guide device (2) and a support tube (312) which is sleeved and slidably connected to the support arm (311); the rotating arm (321) and the control hydraulic cylinder (322) are both rotatably connected to the support tube (312); the support arm (311) is fixedly connected to a telescopic hydraulic cylinder (313) for controlling the telescopic movement of the support tube (312); the lifting device (4) comprises a plurality of walking members (41) and a plurality of lifting members (42); the plurality of walking members (41) are rollers distributed in an array and rotatably connected to the lower part of the portal frame (1); the lifting member (42) is vertically fixed to the hydraulic cylinder of the portal frame (1); and the telescopic end of the lifting member (42) is provided with an adjusting member (43) for adjusting the lateral position of the portal frame (1). The adjusting member (43) comprises an adjusting tube (431) fixedly connected to the telescopic end of the lifting member (42), an adjusting rod (432) passing through the adjusting tube (431), and an adjusting seat (433) disposed against the ground. The adjusting rod (432) is rotatably connected to the adjusting seat (433). The adjusting rod (432) is fixedly connected to an adjusting hydraulic cylinder (434) for controlling the sliding movement of the adjusting tube (431) along the adjusting rod (432). A plurality of slide grooves (435) extending along the axial direction of the adjusting rod (432) are provided around the adjusting rod (432). A plurality of sliding balls (436) are rollingly connected in the slide grooves (435). The sliding balls (436) are rotatably connected to the adjusting tube (431). The adjusting rod (432) is arranged horizontally and perpendicular to the length direction of the tunnel.

2. The waterproof board laying trolley according to claim 1, characterized in that: The fastener (36) comprises a fastening rod (361) hinged to one of the connecting plates (351) and a fastening screw (362) threadedly connected to the fastening rod (361); a fastening opening (354) for clamping the fastening rod (361) is provided on the connecting plate (351) not rotatably connected to the fastening rod (361); a fastening countersunk hole (352) adapted to fit the fastening screw (362) is provided at the edge of the fastening opening (354); and the fastening screw (362) is abutted against the fastening countersunk hole (352).

3. The waterproof board laying trolley according to claim 2, characterized in that: The fastening screw tube (362) is rotatably connected to an abutment tube (363) at one end thereof facing the fastening counterbore (352); the abutment tube (363) is sleeved and connected to the fastening rod (361) by sliding along the axial direction of the fastening rod (361); the abutment tube (363) abuts against the inner wall of the fastening counterbore (352).

4. The waterproof board laying trolley according to claim 1, characterized in that: Two rotating arms (321) connected to the same laying roller (33) are fixedly connected to a connecting pipe (37), one of the connecting pipes (37) is sleeved on the other connecting pipe (37), and one of the connecting pipes (37) is rotatably connected to the support member (31).

5. A waterproof board construction method, characterized in that: The waterproof board laying trolley according to claim 1 is used, and the following steps are included: S1, construction preparation: before laying the waterproof board, check the water leakage of the initial support, and measure and check the over-excavation and under-excavation of the support section; material preparation: wind the waterproof board and the geotextile on two laying rollers (33) respectively; S2, positioning the operation trolley: positioning and leveling the waterproof board laying trolley, attaching reflective signs and safety signs to the door frame (1), turning on the switch of the special distribution box for the waterproof board laying trolley, and checking whether the no-load test run is normal; S3, fixing the laying rollers: rotating the laying roller (33) wrapped with the geotextile and the laying roller (33) wrapped with the waterproof board to different rotating arms (321) respectively, and making the laying roller (33) wrapped with the geotextile move in the laying process; S4, gantry position adjustment: the gantry (1) is raised by the lifting member (42), and then the adjusting tube (431) is slid along the adjusting rod (432) by the adjusting hydraulic cylinder (434), so as to adjust the position of the gantry (1) along the width direction of the tunnel; S5, waterproof board laying: the two laying rollers (33) are both attached to and adapted to the inner wall of the tunnel by the telescopic hydraulic cylinder (313) and the control hydraulic cylinder (322), and then the support member (31) is driven by the guide device (2) to slide along the guide rail (11) in an annular direction, and the geotextile and the waterproof board are laid on the inner wall of the tunnel at the same time, and during the laying process, the geotextile is fixed to the surface of the shotcrete by special hot-melt washers and nails, and the waterproof board is welded and fixed layer by layer.