Bathroom shower production line
By designing an automated bathroom shower production line group, the problems of inconvenience and inefficiency of manual operation are solved, automatic water testing and drying of showers are realized, and detection accuracy and processing efficiency are improved.
Patent Information
- Application Number
- CN202111681188.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2041-12-31
AI Technical Summary
In the existing shower production line, it is necessary to manually connect the shower thread head to the water supply equipment, and conduct water testing and drying, resulting in inconvenient operation, inefficient efficiency and inaccurate inspection.
A shower production line group for bathrooms is designed, including a base frame, mounting frame, support frame, fixing frame, collection box, conveying fixing components, water test detection components, clamping components and blow-drying components. Through an automated conveying and fixing system, automatic water test detection and drying treatment of showers are realized.
It realizes automatic fixation of shower thread head and effective management of water flow, ensuring the accuracy of detection results, reducing manual operation, and improving processing efficiency.
Smart Images

Figure CN114486214B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of shower head production, and in particular to a shower head production line group for bathrooms. Background Art
[0002] In the prior art, after the shower is assembled, it is necessary to manually test the showers one by one, connect the threaded head of the shower to the water outlet of the water supply device, turn on the water source and reciprocate the adjustment piece of the shower cover to observe whether the water spraying at different gears is normal, then remove the shower, and the next person uses an air gun to insert it into the threaded head on the shower, and repeatedly turn the adjustment piece of the shower cover to dry the inside of the shower; when manually connecting the threaded head of the shower to the water outlet of the water supply device, the shower is not completely fixed, and manual hand-held assistance is required. When the water valve is opened, water is easy to leak out at the joint, making the detection effect inaccurate. When manually holding the shower to dry, it is necessary to hold the shower with one hand and repeatedly turn the adjustment piece of the shower cover, and use the other hand to dry the inside of the shower with an air gun. The operation is extremely inconvenient, resulting in low drying efficiency.
[0003] In summary, a bathroom shower production line is urgently needed to solve the above problems. Summary of the invention
[0004] In order to overcome the disadvantages that when manually connecting the shower head threaded head to the water outlet of the water supply equipment, the shower head is not completely fixed, manual hand-held assistance is required, and water is easily leaked at the joint when the water valve is opened, resulting in inaccurate detection effect, the present invention provides a bathroom shower production line unit.
[0005] Technical solution: A shower production line for a bathroom, comprising a base frame, a first mounting frame, a second supporting frame, a first fixing frame, a collecting box, a conveying and fixing component, a water testing and detecting component, a clamping component and a blow-drying component; the first mounting frame is fixedly connected to the left upper part of the base frame; the second supporting frame is fixedly connected to the right upper part of the base frame; the first fixing frame is fixedly connected to the rear upper part of the base frame; a collecting box is arranged on the left upper part of the base frame; the collecting box is located below the first mounting frame; a conveying and fixing component for conveying and fixing the shower is installed on the right upper part of the base frame; the conveying and fixing component is connected to the first mounting frame; a water testing and detecting component for performing water spray detection on the shower is installed on the upper part of the conveying and fixing component; a clamping component for clamping the shower is installed on the right part of the first mounting frame; the clamping component is connected to the first fixing frame; a blow-drying component for blowing dry the inside of the shower is installed on the second supporting frame; the blow-drying component is connected to the first fixing frame.
[0006] Further description, the conveying and fixing assembly includes a third support frame, a second conveyor belt, a receiving plate, a third conveyor belt, a baffle, a second fixed frame, a first fixed plate, an elastic telescopic rod, a first wedge block, a first arc plate, a semicircular plate, a limit frame, a first L-shaped plate, a second L-shaped plate, a rack, a first flat gear and a first transmission rod; the third support frame is fixedly connected to the left upper part of the bottom frame; a second conveyor belt is installed on the front and rear upper parts of the third support frame through brackets; two symmetrical receiving plates are fixedly connected to the middle of the third support frame; a third conveyor belt is respectively installed on the right parts of the two receiving plates; a baffle is respectively fixedly connected to the right parts of the two receiving plates; the two third conveyor belts are located between the two baffles; a second fixed frame is respectively fixedly connected to the front and rear upper parts of the first mounting frame; a first fixed plate is respectively fixedly connected to the opposite sides of the two second fixed frames; an elastic telescopic rod is each slidably connected to the two first fixed plates The telescopic rod, the telescopic end of the elastic telescopic rod passes through the first fixed plate; the back sides of the two elastic telescopic rods are each fixedly connected to a first wedge block; the telescopic ends of the two elastic telescopic rods are each fixedly connected to a first arc plate; the two first arc plates are each fixedly connected to a first fixed plate through a spring; the right sides of the two first fixed plates are each fixedly connected to a first L-shaped plate; a limiting frame is fixedly connected between the two first L-shaped plates; a first transmission rod is rotatably connected between the front side of the limiting frame and the front receiving plate through a bracket; another first transmission rod is rotatably connected between the rear side of the limiting frame and the rear receiving plate through a bracket; a semicircular plate is fixedly connected to the middle part of the two first transmission rods through a connecting block; a first flat gear is respectively fixedly connected to the right part of the two first transmission rods; a second L-shaped plate is respectively fixedly connected to the right part of the two elastic telescopic rods; a rack is respectively fixedly connected to the right part of the two second L-shaped plates; and the two second fixed frames are both connected to the water testing detection component.
[0007] Further explanation: the right part of the two receiving plates is provided with a rectangular groove for installing the third conveyor belt.
[0008] Further explanation: arc-shaped rubber sheets are arranged on the opposite sides of the two first arc-shaped plates to prevent the shower head from being damaged by the arc-shaped rubber sheets.
[0009] Further description, a spring plate for limiting the position of the shower head is provided on the limiting frame.
[0010] Further explanation, the water test detection component includes a first electric guide rail, a first electric slider, a second fixed plate, a first fixed sleeve, a water outlet pipe, a second flat gear, a first electric rotating shaft, a third flat gear, a third fixed plate, a telescopic tube, a water pressure gauge, a fourth fixed plate, a disc, a fixed block, a second electric rotating shaft, a first transmission plate, a first fixed rod and a concave block; a first electric guide rail is fixedly connected to each of the two second fixed frames on opposite sides; a first electric slider is slidably connected to each of the two first electric guide rails; a second fixed plate is fixedly connected to each of the two first electric sliders on opposite sides; a first fixed sleeve is fixedly connected between the two second fixed plates; a water outlet pipe is rotatably connected to the lower side of the first fixed sleeve; a second flat gear is fixed to the water outlet pipe; the second flat gear is located below the first fixed sleeve; a first fixed sleeve is installed at the rear of the second fixed plate in front. An electric shaft; the rotating part of the first electric shaft is fixedly connected to the third flat gear; the third flat gear and the second flat gear are meshed with each other; the third fixed plate is fixedly connected to the rear part of the upper side of the second fixed plate in front; the telescopic tube is fixedly connected to the rear of the third fixed plate; a water pressure gauge is installed on the upper part of the telescopic tube; the upper inner side of the first fixed sleeve is fixedly connected to the telescopic tube; the telescopic tube is connected to the water outlet pipe; the fourth fixed plate is fixedly connected to the left part of the first fixed sleeve; the fixing block is fixedly connected to the lower part of the fourth fixed plate; the bottom of the fourth fixed plate is fixedly connected to the disc; the second electric shaft is installed on the left part of the fixing block; the rotating end of the second electric shaft is rotatably connected to the disc; the rotating part of the second electric shaft is fixedly connected to the first transmission plate; the first fixing rod is fixedly connected to the left part of the first transmission plate; the lower side of the first fixing rod is fixedly connected to a concave block; a semicircular through groove is opened on the disc, and the first fixing rod is located in the through groove.
[0011] Further description, the clamping assembly includes a third fixing frame, a second fixing sleeve, a second transmission rod, a second fixing rod, an electric clamp, a fourth flat gear, an elastic telescopic plate, a first electric push rod, a second mounting frame, a main motor, a fifth flat gear, a second electric guide rail, a second electric slider, a fifth fixing plate and a second wedge block; a second electric guide rail is fixedly connected to the upper front part and the upper rear part of the first mounting frame; a second electric slider is slidably connected to the opposite sides of the two second electric guide rails; a third fixing frame is fixedly connected between the two second electric sliders; a second fixing sleeve is rotatably connected to the middle part of the third fixing frame; and a second fixing frame is fixedly connected to the upper part of the first fixing frame; A main motor is installed on the second mounting frame; a fifth flat gear is fixedly connected to the output shaft of the main motor; a first electric push rod is fixedly connected to the upper part of the first fixed frame; the first electric push rod is located in front of the second mounting frame; an elastic telescopic plate is fixedly connected to the telescopic end of the first electric push rod; the second transmission rod is rotatably connected to the telescopic end of the elastic telescopic plate; the second transmission rod is transmission-connected to the second fixed sleeve; a second fixed rod is fixedly connected to the middle part of the second transmission rod; an electric clamp is fixedly connected to the left side of the second fixed rod; a fourth flat gear is fixedly connected to the upper part of the second transmission rod; a fifth fixed plate is respectively fixedly connected to the left front and left rear of the third fixed frame; a second wedge-shaped block is respectively fixedly connected to the left side of the two fifth fixed plates.
[0012] Further description, the blow-drying component includes a second electric push rod, a sixth fixed plate, an air gun, an arc-shaped slider, a tension spring, a third wedge block, a third electric guide rail, a third electric slider, a limit plate, a third fixed rod, a second transmission plate, a third transmission plate, an arc-shaped electric slide rail, a fourth electric slider, a second arc plate, a clamping plate, a fourth fixed rod and a fourth wedge block; the second electric push rod is fixedly connected to the upper part of the first fixed frame; the second electric push rod is located at the rear of the second mounting frame; the sixth fixed plate is fixedly connected to the telescopic end of the second electric push rod; the air gun is installed at the front of the sixth fixed plate; a fourth wedge block is fixedly connected to the upper left and upper right parts of the second support frame; the third electric guide rail is fixedly connected to the middle of the second support frame; the third electric slider is slidably connected to the third electric guide rail; the limit plate is fixedly connected to the upper side of the third electric slider; A third fixed rod is fixedly connected to the middle of the positioning plate; the middle of the third fixed rod is rotatably connected to the second transmission plate and the third transmission plate; two fourth fixed rods are fixedly connected to the middle of the second transmission plate and the third transmission plate; an arc slider is fixedly connected to the lower side of each of the four fourth fixed rods; the four arc sliders are all slidably connected to the limit plate; a tension spring is fixedly connected between the two fourth fixed rods on the left; another tension spring is fixedly connected between the two fourth fixed rods on the right; a third wedge block is fixedly connected to the rear part of the second transmission plate and the rear part of the third transmission plate; an arc electric slide rail is fixedly connected to the front part of the second transmission plate and the third transmission plate; a fourth electric slide rail is slidably connected to each of the two arc electric slide rails; a second arc plate is fixedly connected to the rear side of each of the two fourth electric slides; a clamp is fixedly connected to the opposite sides of the two second arc plates.
[0013] Further explanation: arc-shaped rubber sheets are arranged on the opposite sides of the two arc-shaped electric slide rails to prevent the shower head from being pinched and damaged.
[0014] Further description, it also includes a first support frame and a first conveyor belt; the first support frame is fixedly connected to the right upper part of the base frame; and the first conveyor belt is installed on the upper part of the first support frame.
[0015] The beneficial effects of the present invention are as follows:
[0016] When the present invention is used, it can automatically fix the threaded head of the shower and the lower part of the shower, tighten the water outlet pipe into the threaded head of the shower to supply water, avoid water leakage, monitor through the water pressure gauge to ensure the accuracy of the detection result, automatically fix the shower when the inside of the shower is dried, insert the air gun into the threaded head to start, and reciprocate the shower cover adjustment piece at the same time, without manual hand-held operation, saving a lot of manpower and improving processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of a first stereoscopic structure of a bathroom shower production line of the present invention;
[0018] Figure 2This is a schematic diagram of a second three-dimensional structure of the bathroom shower production line of the present invention;
[0019] Figure 3 A top view of a bathroom shower production line assembly according to the present invention;
[0020] Figure 4 It is a schematic diagram of the three-dimensional structure of the conveying and fixing components of the bathroom shower production line of the present invention;
[0021] Figure 5 It is a partial three-dimensional structural schematic diagram of the conveying and fixing components of the bathroom shower production line of the present invention;
[0022] Figure 6 It is a schematic diagram of the three-dimensional structure of the water testing component of the bathroom shower production line of the present invention;
[0023] Figure 7 It is a partial three-dimensional structural schematic diagram of the water testing component of the bathroom shower production line of the present invention;
[0024] Figure 8 It is a schematic diagram of the three-dimensional structure of the clamping assembly of the bathroom shower production line of the present invention;
[0025] Fig. 9 It is a schematic diagram of the three-dimensional structure of the blow-drying component of the bathroom shower production line of the present invention;
[0026] Fig.10 It is a schematic diagram of a first partial three-dimensional structure of the blow-drying component of the bathroom shower production line of the present invention;
[0027] Fig.11 It is a schematic diagram of a second partial three-dimensional structure of the blow-drying component of the bathroom shower production line of the present invention.
[0028] In the above drawings: 1-base frame, 2-first mounting frame, 3-first support frame, 4-first conveyor belt, 5-second support frame, 6-first fixed frame, 7-collection box, 101-third support frame, 102-second conveyor belt, 103-receiving plate, 104-third conveyor belt, 105-baffle, 106-second fixed frame, 107-first fixed plate, 108-elastic telescopic rod, 109-first wedge block, 110-first arc plate, 111-semicircular plate, 112-limiting frame, 113-first L-shaped plate , 114-second L-shaped plate, 115-rack, 116-first flat gear, 117-first transmission rod, 201-first electric guide rail, 202-first electric slider, 203-second fixed plate, 204-first fixed sleeve, 205-water outlet pipe, 206-second flat gear, 207-first electric shaft, 208-third flat gear, 209-third fixed plate, 210-telescopic tube, 211-water pressure gauge, 212-fourth fixed plate, 213-disc, 214-fixed block, 215-second electric Dynamic shaft, 216-first transmission plate, 217-first fixed rod, 218-concave block, 301-third fixed frame, 302-second fixed sleeve, 303-second transmission rod, 304-second fixed rod, 305-electric clamp, 306-fourth flat gear, 307-elastic telescopic plate, 308-first electric push rod, 309-second mounting frame, 310-main motor, 311-fifth flat gear, 312-second electric guide rail, 313-second electric slider, 314-fifth fixed plate, 315-second Wedge block, 401-second electric push rod, 402-sixth fixed plate, 403-air gun, 404-arc-shaped slider, 405-tension spring, 406-third wedge block, 407-third electric guide rail, 408-third electric slider, 409-limiting plate, 410-third fixed rod, 411-second transmission plate, 412-third transmission plate, 413-arc-shaped electric slide rail, 414-fourth electric slider, 415-second arc plate, 416-clamp, 417-fourth fixed rod, 418-fourth wedge block. DETAILED DESCRIPTION
[0029] The present invention will now be described more fully below with reference to the accompanying drawings, in which currently preferred embodiments of the present invention are shown. However, the present invention may be implemented in many different forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided for thoroughness and completeness, and these embodiments fully convey the scope of the present invention to the skilled person.
[0030] Example
[0031] A bathroom shower production line, such as Figure 1-11As shown, it includes a base frame 1, a first mounting frame 2, a second supporting frame 5, a first fixed frame 6, a collecting box 7, a conveying and fixing component, a water testing and detecting component, a clamping component and a blow-drying component; the first mounting frame 2 is fixedly connected to the left upper part of the base frame 1; the second supporting frame 5 is fixedly connected to the right upper part of the base frame 1; the first fixed frame 6 is fixedly connected to the rear upper part of the base frame 1; a collecting box 7 is arranged on the left upper part of the base frame 1; the collecting box 7 is located below the first mounting frame 2; a conveying and fixing component is installed on the right upper part of the base frame 1; the conveying and fixing component is connected to the first mounting frame 2; a water testing and detecting component is installed on the upper part of the conveying and fixing component; the clamping component is installed on the right part of the first mounting frame 2; the clamping component is connected to the first fixed frame 6; the blow-drying component is installed on the second supporting frame 5; the blow-drying component is connected to the first fixed frame 6.
[0032] The conveying fixed assembly includes a third support frame 101, a second conveyor belt 102, a receiving plate 103, a third conveyor belt 104, a baffle 105, a second fixed frame 106, a first fixed plate 107, an elastic telescopic rod 108, a first wedge block 109, a first arc plate 110, a semicircular plate 111, a limit frame 112, a first L-shaped plate 113, a second L-shaped plate 114, a rack 115, a first flat gear 116 and a first transmission rod 117; the third support frame 101 is fixedly connected to the left upper side of the bottom frame 1; the upper front and upper rear of the third support frame 101 A second conveyor belt 102 is installed on each of the parts through a bracket; two symmetrical receiving plates 103 are fixedly connected to the middle of the third support frame 101; a third conveyor belt 104 is installed on the right part of each of the two receiving plates 103; a baffle 105 is fixedly connected to the right part of each of the two receiving plates 103; the two third conveyor belts 104 are located between the two baffles 105; a second fixing frame 106 is fixedly connected to the front and rear parts of the upper side of the first mounting frame 2; a first fixing plate 107 is fixedly connected to the opposite sides of the two second fixing frames 106; each of the two first fixing plates 107 is slidably connected to An elastic telescopic rod 108, the telescopic end of the elastic telescopic rod 108 passes through the first fixed plate 107; the two elastic telescopic rods 108 are each fixedly connected to a first wedge block 109 on the back side; the telescopic ends of the two elastic telescopic rods 108 are each fixedly connected to a first arc plate 110; the two first arc plates 110 are each fixedly connected to a first fixed plate 107 through a spring; the right sides of the two first fixed plates 107 are each fixedly connected to a first L-shaped plate 113; a limiting frame 112 is fixedly connected between the two first L-shaped plates 113; the front side of the limiting frame 112 is connected to the front receiving plate 103 A first transmission rod 117 is rotatably connected through a bracket; another first transmission rod 117 is rotatably connected between the rear side of the limit frame 112 and the rear receiving plate 103 through a bracket; the middle parts of the two first transmission rods 117 are fixedly connected to a semicircular plate 111 through a connecting block; the right parts of the two first transmission rods 117 are respectively fixedly connected to a first flat gear 116; the right parts of the two elastic telescopic rods 108 are respectively fixedly connected to a second L-shaped plate 114; the right parts of the two second L-shaped plates 114 are respectively fixedly connected to a rack 115; and the two second fixed frames 106 are both connected to the water testing detection assembly.
[0033] The right part of the two receiving plates 103 is provided with a rectangular groove for installing the third conveyor belt 104 .
[0034] The two first arc-shaped plates 110 are provided with arc-shaped rubber sheets on the opposite sides thereof to prevent the shower head from being damaged.
[0035] The limiting frame 112 is provided with a spring plate for limiting the shower head.
[0036] The water testing assembly includes a first electric guide rail 201, a first electric slider 202, a second fixed plate 203, a first fixed sleeve 204, a water outlet pipe 205, a second flat gear 206, a first electric shaft 207, a third flat gear 208, a third fixed plate 209, a telescopic tube 210, a water pressure gauge 211, a fourth fixed plate 212, a disc 213, a fixed block 214, a second electric shaft 215, a first transmission plate 216, a first fixed rod 217 and a concave block 218; the two second fixed frames 106 are fixed on opposite sides thereof. There is a first electric guide rail 201 connected to each of the two first electric guide rails 201; a first electric slider 202 is slidably connected to each of the two first electric sliders 202; a second fixing plate 203 is fixedly connected to the opposite sides of each of the two first electric sliders 202; a first fixing sleeve 204 is fixedly connected between the two second fixing plates 203; a water outlet pipe 205 is rotatably connected to the lower side of the first fixing sleeve 204; a second flat gear 206 is fixedly connected to the water outlet pipe 205; the second flat gear 206 is located below the first fixing sleeve 204; a first electric slider 202 is installed at the rear of the second fixing plate 203 in front The first electric rotating shaft 207 is fixedly connected to the rotating part of the first electric rotating shaft 207; the third flat gear 208 is meshed with the second flat gear 206; the third fixed plate 209 is fixedly connected to the rear of the upper side of the second fixed plate 203 in the front; the third fixed plate 209 is fixedly connected to the rear of the telescopic tube 210; the telescopic tube 210 is installed on the upper part of the water pressure gauge 211; the upper side of the first fixed sleeve 204 is fixedly connected to the telescopic tube 210; the telescopic tube 210 is connected to the water outlet pipe 205; the left part of the first fixed sleeve 204 is fixedly connected to the fourth fixed plate 212; the fourth A fixing block 214 is fixedly connected to the lower part of the fixing plate 212; a disc 213 is fixedly connected to the bottom of the fourth fixing plate 212; a second electric shaft 215 is installed on the left part of the fixing block 214; the rotating end of the second electric shaft 215 is rotatably connected to the disc 213; the rotating part of the second electric shaft 215 is fixedly connected to the first transmission plate 216; a first fixing rod 217 is fixedly connected to the left part of the first transmission plate 216; a concave block 218 is fixedly connected to the lower side of the first fixing rod 217; a semicircular through groove is opened on the disc 213, and the first fixing rod 217 is located in the through groove.
[0037] The clamping assembly includes a third fixing frame 301, a second fixing sleeve 302, a second transmission rod 303, a second fixing rod 304, an electric clamp 305, a fourth flat gear 306, an elastic telescopic plate 307, a first electric push rod 308, a second mounting frame 309, a main motor 310, a fifth flat gear 311, a second electric guide rail 312, a second electric slider 313, a fifth fixing plate 314 and a second wedge block 315; a second electric guide rail 312 is fixedly connected to the upper front and upper rear of the first mounting frame 2; a second electric slider 313 is slidably connected to the opposite sides of the two second electric guide rails 312; the third fixing frame 301 is fixedly connected between the two second electric sliders 313; the second fixing sleeve 302 is rotatably connected to the middle part of the third fixing frame 301; the second mounting frame 309 is fixedly connected to the upper part of the first fixing frame 6; A main motor 310 is installed on the second mounting frame 309; the output shaft of the main motor 310 is fixedly connected to the fifth flat gear 311; the first electric push rod 308 is fixedly connected to the upper part of the first fixed frame 6; the first electric push rod 308 is located in front of the second mounting frame 309; the telescopic end of the first electric push rod 308 is fixedly connected to an elastic telescopic plate 307; the telescopic end of the elastic telescopic plate 307 is rotatably connected to the second transmission rod 303; the second transmission rod 303 is transmission-connected to the second fixed sleeve 302; the middle part of the second transmission rod 303 is fixedly connected to the second fixed rod 304; the left side of the second fixed rod 304 is fixedly connected to the electric clamp 305; the upper part of the second transmission rod 303 is fixedly connected to the fourth flat gear 306; the left front part and the left rear part of the third fixed frame 301 are each fixedly connected to a fifth fixed plate 314; the left side of the two fifth fixed plates 314 are each fixedly connected to a second wedge block 315.
[0038] The blow-drying assembly includes a second electric push rod 401, a sixth fixed plate 402, an air gun 403, an arc-shaped slider 404, a tension spring 405, a third wedge block 406, a third electric guide rail 407, a third electric slider 408, a limit plate 409, a third fixed rod 410, a second transmission plate 411, a third transmission plate 412, an arc-shaped electric slide rail 413, a fourth electric slider 414, a second arc plate 415, a clamping plate 416, a fourth fixed rod 417 and a fourth wedge block 418; the first fixed frame 6 The second electric push rod 401 is fixedly connected to the second support frame 5; the second electric push rod 401 is located at the rear of the second mounting frame 309; the telescopic end of the second electric push rod 401 is fixedly connected to the sixth fixing plate 402; the front of the sixth fixing plate 402 is installed with an air gun 403; a fourth wedge block 418 is fixedly connected to the upper left and upper right parts of the second support frame 5; the middle part of the second support frame 5 is fixedly connected to the third electric guide rail 407; the third electric slider 408 is slidably connected to the third electric guide rail 407; the upper side of the third electric slider 408 is fixedly connected to a limit plate 409; a third fixing rod 410 is fixedly connected to the middle of the limiting plate 409; a second transmission plate 411 and a third transmission plate 412 are rotatably connected to the middle of the third fixing rod 410; two fourth fixing rods 417 are fixedly connected to the middle of the second transmission plate 411 and the third transmission plate 412; an arc-shaped slider 404 is fixedly connected to the lower side of each of the four fourth fixing rods 417; the four arc-shaped sliders 404 are all slidably connected to the limiting plate 409; a tension spring 405 is fixedly connected between the two fourth fixing rods 417 on the left; the two fourth fixing rods 417 on the right Another tension spring 405 is fixed between the fixed rods 417; a third wedge block 406 is fixed to the rear of the second transmission plate 411 and the rear of the third transmission plate 412; an arc-shaped electric slide rail 413 is fixed to the front of the second transmission plate 411 and the third transmission plate 412; a fourth electric slider 414 is slidably connected to each of the two arc-shaped electric slide rails 413; a second arc-shaped plate 415 is fixed to the rear side of each of the two fourth electric sliders 414; and a clamping plate 416 is fixed to the opposite sides of the two second arc-shaped plates 415.
[0039] Among them, arc-shaped rubber sheets are arranged on the opposite sides of the two arc-shaped electric slide rails 413 to prevent the shower head from being damaged.
[0040] It also includes a first support frame 3 and a first conveyor belt 4; the first support frame 3 is fixedly connected to the upper right part of the base frame 1; and the first conveyor belt 4 is installed on the upper part of the first support frame 3.
[0041] During operation, the shower head to be processed is conveyed to the two receiving plates 103, and the shower head cover adjustment piece is directed to the left direction. At the same time, the two second conveyor belts 102 are controlled to start, and the shower head is conveyed to the right direction, so that the shower head cover adjustment piece moves from the bell mouth on the left side of the two receiving plates 103 to the right direction. When the shower head is conveyed to the two third conveyor belts 104, the shower head cover adjustment piece is located between the two receiving plates 103. At the same time, the two third conveyor belts 104 are controlled to start, and the shower head is conveyed to the two semicircular plates 111 until the shower head is blocked by the limit frame 112.
[0042] Then, the two second electric sliders 313 slide to the left on the two second electric guide rails 312 at the same time, thereby moving the third fixing frame 301 to the left, moving the second transmission rod 303 to the left, stretching the elastic telescopic plate 307, and opening the electric clamp 305 at the same time, until the two arc clamps 416 of the electric clamp 305 are located at the position of the shower threaded joint, and then the electric clamp 305 is closed to clamp the shower threaded joint, and at the same time, the second wedge block 315 squeezes the first wedge block 109, so that the elastic telescopic rod 108 slides in the first fixing plate 107, so that the spring between the first fixing plate 107 and the first arc plate 110 is The first arc plate 110 is stretched, and the first wedge block 109 is continuously squeezed, and then the elastic telescopic rod 108 is compressed, so that the two first arc plates 110 cooperate to clamp the lower part of the shower head, and at the same time, the elastic telescopic rod 108 drives the second L-shaped plate 114 to move, so that the rack 115 and the first flat gear 116 are meshed with each other, so that the first flat gear 116 drives the first transmission rod 117 to rotate, and the first transmission rod 117 drives the semicircular plate 111 to rotate, so that the two semicircular plates 111 are reversely flipped, so that the two semicircular plates 111 are in an open state, and at this time, the two second electric sliders 313 stop sliding;
[0043] Then, the two first electric sliders 202 slide downward on the two first electric guide rails 201 at the same time, so that the two second fixing plates 203 drive the first fixing sleeve 204 to move downward, so that the telescopic tube 210 is stretched, so that the lower part of the water outlet pipe 205 is inserted into the threaded joint on the shower head, and at the same time, the first electric rotating shaft 207 is controlled to start, and the first electric rotating shaft 207 drives the third flat gear 208 to drive the second flat gear 206 to rotate, and the second flat gear 206 drives the water outlet pipe 205 to rotate, so that the lower part of the water outlet pipe 205 is tightened to the threaded joint on the shower head, and then the telescopic tube 210 is supplied with water through the external water source, so that water is sprayed out from the bottom of the shower head, and at the same time, the water is supplied to the telescopic tube 210 through the external water source under the bottom frame 1. The collecting device collects the water sprayed from the bottom of the shower head, and monitors whether the water spraying of the shower head is normal through the remote monitoring water pressure gauge 211. At the same time, the concave block 218 is inserted into the shower head cover adjustment plate, and the second electric rotating shaft 215 is controlled to start and reciprocate, so that the first transmission plate 216 drives the first fixing rod 217 to reciprocate, so that the concave block 218 reciprocates to move the shower head cover adjustment plate, and then the water outlet of different gears is detected. After the detection is completed, the water supply to the telescopic tube 210 is stopped, and the first electric rotating shaft 207 rotates in the opposite direction, so that the second flat gear 206 drives the water outlet pipe 205 to rotate in the opposite direction, so that the lower part of the water outlet pipe 205 is connected to the shower head threaded joint. The second electric sliders 313 then slide in the opposite direction at the same time, so that the electric clamp 305 drives the shower head to move to the right, so that the spring plate on the limit frame 112 is compressed, and at the same time the fifth fixed plate 314 drives the second wedge block 315 to move to the right, and the compression degree of the first wedge block 109 is reduced, so that the elastic telescopic rod 108 releases the elastic force, and at the same time the spring between the first fixed plate 107 and the first curved plate 110 releases the elastic force, so that the first curved plate 110 releases the lower part of the shower head, and then the first electric push rod 308 is controlled to extend and retract, so that the elastic telescopic plate 307 drives the second transmission rod 303 to slide upward in the second fixed sleeve 302, so that the electric clamp 305 drives the shower head upward The second electric slider 313 moves, and then the two second electric sliders 313 continue to slide until they slide to the initial position. At this time, the fourth flat gear 306 and the fifth flat gear 311 are meshed with each other. Then the main motor 310 is controlled to start. Based on the view from top to bottom, the output shaft of the main motor 310 drives the fifth flat gear 311 to rotate counterclockwise, and then the fifth flat gear 311 drives the fourth flat gear 306 to drive the second transmission rod 303 to rotate counterclockwise, so that the electric clamp 305 drives the shower to rotate a preset angle, so that the shower cover adjustment piece is facing the third electric guide rail 407; if there is a shower with a problem during the detection, when the shower is rotated to the top of the collection box 7, the electric clamp 305 releases the shower, so that the shower is collected in the collection box 7;After the shower head cover adjustment piece is facing the third electric guide rail 407, the third electric slider 408 is controlled to move on the third electric guide rail 407 toward the shower head, and at the same time, the third electric slider 408 drives the limit plate 409 to move toward the shower head, thereby causing the second transmission plate 411 and the third transmission plate 412 to move toward the shower head, so that the two arc-shaped electric slide rails 413 are located outside the lower part of the shower head, and at the same time, the third wedge block 406 is squeezed by the fourth wedge block 418, thereby causing the second transmission plate 411 and the third transmission plate 412 to move toward the shower head. The third fixing rod 410 is rotated with the third fixing rod 410 as the rotating shaft, and the fourth fixing rod 417 drives the arc-shaped slider 404 to slide in the limit plate 409, so that the two tension springs 405 are stretched, so that the two arc-shaped electric slide rails 413 are close to each other to clamp the lower part of the shower head, and the two clamping plates 416 are close to each other to clamp the shower head cover adjustment plate, and then the second electric push rod 401 is controlled to extend to push the sixth fixing plate 402 to drive the air gun 403 to move downward, so that the air nozzle of the air gun 403 is inserted into the threaded connector on the shower head. The air gun 403 is then started to blow hot air into the shower head, and at the same time, the two fourth electric sliders 414 are controlled to slide back and forth in the two arc-shaped electric slide rails 413, so that the two clamping plates 416 reciprocate to move the shower head cover adjustment plate, so that the residual water in the shower head is quickly blown out, and the drying speed inside the shower head is accelerated. After the shower head is dried, the air gun 403 is turned off, and then the second electric push rod 401 is contracted to drive the sixth fixing plate 402 to rise and reset, and then the third electric slider 408 slides in the opposite direction to reset. , and then the third wedge block 406 is no longer squeezed, the tension spring 405 releases the elastic force to make the second transmission plate 411 and the third transmission plate 412 rotate in the opposite direction to reset, so that the two arc-shaped electric slide rails 413 are loosened and away from the shower head, and then the main motor 310 is controlled to start, so that the electric clamp 305 drives the shower head to rotate to the top of the first conveyor belt 4, and then the electric clamp 305 releases the shower head and puts the shower head on the first conveyor belt 4, and at the same time controls the first conveyor belt 4 to run, and transports the shower head to the subsequent processing position for processing. ;
[0044] While the present invention has been described with reference to exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments.The scope of the following claims is to be accorded the broadest interpretation so as to encompass all such modifications and equivalent structures and functions.
Claims
1. A shower production line for a bathroom, comprising a base frame (1), a first mounting frame (2), a second support frame (5), a first fixing frame (6) and a collection box (7); the first mounting frame (2) is fixedly connected to the left upper portion of the base frame (1); the second support frame (5) is fixedly connected to the right upper portion of the base frame (1); the first fixing frame (6) is fixedly connected to the rear upper portion of the base frame (1); the collection box (7) is arranged on the left upper portion of the base frame (1); the collection box (7) is located below the first mounting frame (2); the characteristics are as follows: It also includes a conveying and fixing component, a water testing component, a clamping component and a blow-drying component; a conveying and fixing component for conveying and fixing the shower head is installed on the upper right side of the bottom frame (1); the conveying and fixing component is connected to the first mounting frame (2); a water testing component for performing water spraying detection on the shower head is installed on the upper part of the conveying and fixing component; a clamping component for clamping the shower head is installed on the right side of the first mounting frame (2); the clamping component is connected to the first fixing frame (6); a blow-drying component for drying the inside of the shower head is installed on the second supporting frame (5); the blow-drying component is connected to the first fixing frame (6); The conveying fixed assembly comprises a third support frame (101), a second conveyor belt (102), a receiving plate (103), a third conveyor belt (104), a baffle (105), a second fixed frame (106), a first fixed plate (107), an elastic telescopic rod (108), a first wedge block (109), a first arc-shaped plate (110), a semicircular plate (111), a limit frame (112), a first L-shaped plate (113), a second L-shaped plate (114), a rack (115), a first flat gear (116) and a first transmission rod (117); the third support frame (101) is fixedly connected to the left upper side of the bottom frame (1); the third support frame (101) is fixedly connected to the left upper side of the bottom frame (1); A second conveyor belt (102) is installed at the front side and the rear side of the upper side through a bracket; two symmetrical receiving plates (103) are fixedly connected to the middle of the third support frame (101); a third conveyor belt (104) is installed on the right side of each of the two receiving plates (103); a baffle plate (105) is fixedly connected to the right side of each of the two receiving plates (103); the two third conveyor belts (104) are located between the two baffle plates (105); a second fixing frame (106) is fixedly connected to the front side and the rear side of the upper side of the first mounting frame (2); a first fixing plate (107) is fixedly connected to the opposite sides of the two second fixing frames (106); each of the two first fixing plates (107) The sliding connection comprises an elastic telescopic rod (108), the telescopic end of the elastic telescopic rod (108) passing through the first fixed plate (107); the two elastic telescopic rods (108) are each fixedly connected to a first wedge block (109) on the opposite sides; the telescopic ends of the two elastic telescopic rods (108) are each fixedly connected to a first arc plate (110); the two first arc plates (110) are each fixedly connected to a first fixed plate (107) through a spring; the right sides of the two first fixed plates (107) are each fixedly connected to a first L-shaped plate (113); a limiting frame (112) is fixedly connected between the two first L-shaped plates (113); the front side of the limiting frame (112) and the front receiving plate (103) are connected to each other. ) are rotatably connected to a first transmission rod (117) via a bracket; another first transmission rod (117) is rotatably connected to a rear side of the limiting frame (112) and a rear receiving plate (103) via a bracket; a semicircular plate (111) is fixedly connected to the middle of the two first transmission rods (117) via a connecting block; a first flat gear (116) is fixedly connected to the right of the two first transmission rods (117); a second L-shaped plate (114) is fixedly connected to the right of the two elastic telescopic rods (108); a rack (115) is fixedly connected to the right of the two second L-shaped plates (114); and the two second fixing frames (106) are connected to the water testing component; The water testing component comprises a first electric guide rail (201), a first electric slider (202), a second fixed plate (203), a first fixed sleeve (204), a water outlet pipe (205), a second flat gear (206), a first electric rotating shaft (207), a third flat gear (208), a third fixed plate (209), a telescopic tube (210), a water pressure gauge (211), a fourth fixed plate (212), a disc (213), a fixed block (214), a second electric rotating shaft (215), a first transmission plate (216), a first fixed rod (217) and a concave block (218); two second fixed frames (106) facing each other A first electric guide rail (201) is fixedly connected to each side of the two first electric guide rails (201); a first electric slider (202) is slidably connected to each of the two first electric sliders (202); a second fixed plate (203) is fixedly connected to the opposite sides of the two first electric sliders (202); a first fixed sleeve (204) is fixedly connected between the two second fixed plates (203); a water outlet pipe (205) is rotatably connected to the lower side of the first fixed sleeve (204); a second flat gear (206) is fixedly connected to the water outlet pipe (205); the second flat gear (206) is located below the first fixed sleeve (204); a first electric slider is installed at the rear of the front second fixed plate (203) a rotating shaft (207); a third flat gear (208) is fixedly connected to the rotating part of the first electric rotating shaft (207); the third flat gear (208) and the second flat gear (206) are meshed with each other; a third fixed plate (209) is fixedly connected to the rear part of the upper side of the second fixed plate (203) in the front; a telescopic tube (210) is fixedly connected to the rear part of the third fixed plate (209); a water pressure gauge (211) is installed on the upper part of the telescopic tube (210); the upper side of the interior of the first fixed sleeve (204) is fixedly connected to the telescopic tube (210); the telescopic tube (210) is communicated with the water outlet pipe (205); a fourth fixed plate (212) is fixedly connected to the left part of the first fixed sleeve (204); A fixing block (214) is fixedly connected to the lower part of the fourth fixing plate (212); a disc (213) is fixedly connected to the bottom of the fourth fixing plate (212); a second electric rotating shaft (215) is installed on the left part of the fixing block (214); the rotating end of the second electric rotating shaft (215) is rotatably connected to the disc (213); the rotating part of the second electric rotating shaft (215) is fixedly connected to the first transmission plate (216); a first fixing rod (217) is fixedly connected to the left part of the first transmission plate (216); a concave block (218) is fixedly connected to the lower side of the first fixing rod (217); a semicircular through-groove is opened on the disc (213), and the first fixing rod (217) is located in the through-groove; The clamping assembly comprises a third fixing frame (301), a second fixing sleeve (302), a second transmission rod (303), a second fixing rod (304), an electric clamp (305), a fourth flat gear (306), an elastic telescopic plate (307), a first electric push rod (308), a second mounting frame (309), a main motor (310), a fifth flat gear (311), a second electric guide rail (312), a second electric slider (313), a fifth fixing plate (314) and a second wedge block (315); a second electric guide rail (312) is fixedly connected to the upper front part and the upper rear part of the first mounting frame (2); a second electric slider (313) is slidably connected to the opposite sides of the two second electric guide rails (312); the third fixing frame (301) is fixedly connected between the two second electric sliders (313); the middle part of the third fixing frame (301) is rotatably connected to the second fixing sleeve (302); the upper part of the first fixing frame (6) is fixedly connected to the second mounting frame (309); A main motor (310) is mounted on the second mounting frame (309); the output shaft of the main motor (310) is fixedly connected to a fifth flat gear (311); a first electric push rod (308) is fixedly connected to the upper portion of the first fixing frame (6); the first electric push rod (308) is located in front of the second mounting frame (309); an elastic expansion plate (307) is fixedly connected to the telescopic end of the first electric push rod (308); the elastic expansion plate (307) is rotatably connected to the second transmission rod (303); the second transmission rod ( The third fixing frame (303) is connected to the second fixing sleeve (302) in transmission connection; the middle of the second transmission rod (303) is fixedly connected to the second fixing rod (304); the left side of the second fixing rod (304) is fixedly connected to the electric clamp (305); the upper part of the second transmission rod (303) is fixedly connected to the fourth flat gear (306); the left front part and the left rear part of the third fixing frame (301) are each fixedly connected to a fifth fixing plate (314); the left sides of the two fifth fixing plates (314) are each fixedly connected to a second wedge block (315); The blow-drying assembly comprises a second electric push rod (401), a sixth fixed plate (402), an air gun (403), an arc-shaped slider (404), a tension spring (405), a third wedge-shaped block (406), a third electric guide rail (407), a third electric slider (408), a limit plate (409), a third fixed rod (410), a second transmission plate (411), a third transmission plate (412), an arc-shaped electric slide rail (413), a fourth electric slider (414), a second arc-shaped plate (415), a clamping plate (416), a fourth fixed rod (417) and a fourth wedge-shaped block (418); a first fixed frame (6) is fixedly connected to a second electric push rod (401) at the upper part; the second electric push rod (401) is located behind the second mounting frame (309); the telescopic end of the second electric push rod (401) is fixedly connected to a sixth fixing plate (402); an air gun (403) is installed at the front of the sixth fixing plate (402); a fourth wedge block (418) is fixedly connected to the upper left part and the upper right part of the second support frame (5); a third electric guide rail (407) is fixedly connected to the middle part of the second support frame (5); a third electric slide block (408) is slidably connected to the third electric guide rail (407); a limited The limiting plate (409) is provided with a third fixing rod (410) fixedly connected to the middle of the limiting plate (409); the middle of the third fixing rod (410) is rotatably connected to the second transmission plate (411) and the third transmission plate (412); the middle of the second transmission plate (411) and the third transmission plate (412) are both fixedly connected to two fourth fixing rods (417); the lower side of each of the four fourth fixing rods (417) is fixedly connected to an arc-shaped slider (404); the four arc-shaped sliders (404) are all slidably connected to the limiting plate (409); a tension spring (405) is fixedly connected between the two fourth fixing rods (417) on the left; the two fourth fixing rods (417) on the right are fixedly connected to the second transmission plate (411) and the third transmission plate (412); the fourth fixing rods (417) are fixedly connected to the lower side of each of the four fourth fixing rods (417); the four arc-shaped sliders (404) are all slidably connected to the limiting plate (409); a tension spring (405) is fixedly connected between the two fourth fixing rods (417) on the left; the two fourth fixing rods (417) on the right are fixedly connected to the second transmission plate (411) and the third transmission plate (412); the second transmission plate (411) and the third transmission plate (412) are both fixedly connected to the second transmission plate (41 ... Another tension spring (405) is fixedly connected between the four fixing rods (417); a third wedge block (406) is fixedly connected to the rear of the second transmission plate (411) and the rear of the third transmission plate (412); an arc-shaped electric slide rail (413) is fixedly connected to the front of the second transmission plate (411) and the third transmission plate (412); a fourth electric slider (414) is slidably connected to each of the two arc-shaped electric slide rails (413); a second arc-shaped plate (415) is fixedly connected to the rear side of each of the two fourth electric sliders (414); and a clamping plate (416) is fixedly connected to the opposite sides of the two second arc-shaped plates (415).
2. A bathroom shower production line according to claim 1, characterized in that: The right parts of the two receiving plates (103) are each provided with a rectangular groove for installing the third conveyor belt (104).
3. A bathroom shower production line according to claim 1, characterized in that: The two first curved plates (110) are provided with curved rubber sheets on the facing sides thereof to prevent the shower head from being damaged.
4. A bathroom shower production line according to claim 1, characterized in that: The limiting frame (112) is provided with a spring plate for limiting the shower head.
5. A bathroom shower production line according to claim 1, characterized in that: The two arc-shaped electric slide rails (413) are provided with arc-shaped rubber sheets on the opposite sides thereof to prevent the shower head from being damaged.
6. A bathroom shower production line according to claim 5, characterized in that: It also comprises a first support frame (3) and a first conveyor belt (4); the first support frame (3) is fixedly connected to the upper right part of the base frame (1); and the first conveyor belt (4) is installed on the upper part of the first support frame (3).
Citation Information
Patent Citations
Testing device for uniformity of sprayed water volume of sprinkler
CN110220685A
Shower air tightness test device and test method thereof
CN111089687A