User load criterion demand response method and device for new energy consumption
By calculating the CDL curve and load line for new energy consumption-friendly consumption by user load nodes, an incentive subsidy model is established, and user electricity consumption behavior is optimized, which solves the high cost and calculation pressure problems of large-scale users participating in the traditional demand response mode. Improved the efficiency of new energy consumption.
Patent Information
- Application Number
- CN202210095138.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-26
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-01-26
AI Technical Summary
When the traditional demand response model participates on a large scale, the communication and control costs are high, the calculation results are not accurate enough, and it is difficult to effectively reduce the system operation costs. The baseline pressure of the incentive demand response calculation load is high, which affects the efficiency of new energy consumption.
By calculating the CDL curve that is most friendly to new energy consumption by user load nodes, dividing common domains, iteratively compute the contribution ratio of each generator to the load node, establishing a user incentive subsidy model, and formulating based on the similarity of load line and response adjustment amount, Incentive subsidies to optimize users' electricity consumption behavior to reduce system operation costs.
It effectively reduces the communication and control costs in response to large-scale users' demands, improves the cost efficiency of system operation, and promotes the consumption of new energy.
Smart Images

Figure CN114498629B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of demand response, and in particular to a method and device for large-scale user load criterion demand response for new energy consumption. Background Art
[0002] Due to the exploitation and use of a large amount of fossil energy, global warming and resource shortages are becoming increasingly serious. New clean and renewable energy represented by solar energy and wind energy are developing rapidly and will gradually replace non-renewable resources as the main power generation method. However, the output of new energy is easily affected by unstable factors such as seasons and climate, has obvious volatility and randomness, and is poorly controllable. The traditional supply and demand balance adjustment method mainly relies on controllable units or a large number of abandoned wind and solar power, which is costly and inefficient, and can no longer adapt to the current power grid with a high proportion of new energy. The ongoing power system reform has made the flexible load on the user side an important alternative regulation resource for the power system. The United States took the lead in proposing the concept of demand response. At the same time, demand response has also developed by leaps and bounds in my country. In order to maintain the balance between the supply and demand of the power grid as much as possible, the dispatching center sets prices or incentive signals to guide users to change their electricity consumption behavior according to the user's day-ahead electricity consumption behavior. Air conditioning load, as a typical flexible load with strong regulation ability, is often an important part of participating in demand response. After implementing demand response, the power system can not only reduce the cost of power generation but also improve the reliability of power grid operation. It has been regarded as the preferred solution for energy conservation and emission reduction in the power system in recent years.
[0003] Traditional demand response modes are divided into price-based demand response and incentive-based demand response. Price-based demand response guides users to optimize their own load distribution through different electricity price mechanisms such as time-of-use electricity prices and peak prices to meet the needs of stable operation of the power system and allocate electricity more reasonably. At present, price-based demand response is widely used in the field of electric vehicles. In real life, it is an involuntary adjustment method for users. It is not friendly to users with rigid loads and weak decision-making ability, which is not conducive to attracting massive users to participate. It can only be applied to small-scale systems. Incentive-based demand response mainly includes operating modes such as direct load control, interruptible load, and emergency demand response mechanism. Compared with price-based demand response, incentive-based demand response does not involve basic electricity prices, and users will not bear the risk of loss of benefits. At present, incentive-based demand response mainly uses the load data when users do not participate in demand response, that is, the customer baseline load (CBL) and the actual load curve of users to evaluate the contribution of users to demand response. The dispatch center needs to calculate the load baseline for each user participating in the demand response, and faces huge communication and computing pressure. At the same time, when the demand response is promoted on a large scale, events that require users to respond will occur frequently, resulting in insufficient load data of normal electricity consumption of users required by the dispatch center, making the calculation results inaccurate. Therefore, it is an urgent problem to be solved to build a large-scale user load quasi-line demand response model for new energy consumption to determine the subsidy price for residential users to participate in demand response, thereby reducing the excessively high communication and control costs of large-scale user demand response, while significantly reducing the system operation costs and promoting the consumption of new energy grid connection. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a large-scale user load line demand response method and device for new energy consumption, which can effectively reduce the excessively high communication and control costs when responding to large-scale user demand, while greatly reducing the system operating costs and promoting the consumption of new energy grid connection.
[0005] The first aspect of the embodiment of the present invention discloses a user load criterion demand response method for new energy consumption, including:
[0006] Step 1: Taking the minimum operating cost of the system as the goal, taking into account the contribution ratio of traditional power generation and renewable energy power generation to different load nodes, as well as the line flow constraints, calculate the CDL curve and system flow data that are most friendly to renewable energy consumption at each load node;
[0007] Step 2: first divide the common domain according to the CDL curve and the system power flow data, and finally obtain the contribution ratio of each generator to each load node through certain steps, and return the result to step 1, so as to iterate and calculate the CDL curve that meets the convergence condition;
[0008] Step 3: quantify the actual effect of the user at the corresponding load criterion based on the calculated CDL curve, which serves as the basis for formulating incentive subsidies for users;
[0009] Step 4: Establish a quantitative model for user incentive subsidies by comprehensively considering the similarity between user load and load guideline and the amount of user load response adjustment.
[0010] As a preferred embodiment, in the first aspect of the present invention, the step 1 comprises:
[0011] Define the ideal load curve shape of each load node that is conducive to absorbing new energy as the load criterion; the load criterion is calculated by comprehensively considering the dynamic contribution ratio of the generator to the load node, the system operation status and the new energy forecast status, and the expected load line type is calculated. The closer it is to the line type, the more conducive it is to smoothing the fluctuation of new energy power generation in the power grid;
[0012] The CDL objective function is set to minimize the operating cost of the entire system while promoting the consumption of new energy as much as possible. The specific expression of the CDL objective function is as follows:
[0013]
[0014] Where P G,i (t) is the active output of the i-th adjustable generator in the system in time period t, T is the total number of time periods; N G is the number of adjustable generators; P R (t) is the output of all renewable energy sources in the system during period t; P R,max (t) is the maximum value of all renewable energy power generation output in period t, which can be obtained by forecasting in the day ahead; a i , b i , c i is the cost coefficient of the i-th controllable generator; C R Costs for curtailing wind and solar power;
[0015] In the above CDL objective function, is the total operating cost of the controllable generator set, C R (P R,max (t)-P R (t)) is the penalty fee for power abandonment;
[0016] The constraints for calculating the CDL curve model include the upper and lower bounds of the output of the controllable generator set, the upward and downward ramping constraints of the controllable generator set, the spinning reserve constraints, and the output range constraints of new energy sources. They also include power balance constraints and multi-node system power flow constraints, as follows:
[0017]
[0018] P inj =K P *P G +K R *P R -K D *P D
[0019] P inj =B*θ
[0020]
[0021] In the formula, C i,d is the ratio of the output of the i-th adjustable generator transmitted to the load node d; is the power consumption of the load participating in the demand response of load node d in the total period; is the load directrix value of load node d; is the power of the non-adjustable load at load node d in period t; C j,d is the ratio of the output of the jth renewable energy generator transmitted to the load node d; P R,j (t) is the active power output of the jth renewable energy generator in the system during period t; P inj is the node injection power matrix; KP, KR, KD are the traditional generator connection matrix, the new energy generator connection matrix and the load connection matrix; PG, PR, PD are the traditional generator power matrix, the new energy generator power matrix and the load matrix; B is the line admittance matrix; K L is the line connection matrix; X b represents the admittance of each line; θ is the vector formed by the node voltage phase angles.
[0022] As a preferred embodiment, in the first aspect of the present invention, the step 2 comprises:
[0023] The load nodes are divided into different common domains; a common domain is defined as a group of continuous nodes powered by the same generator; unconnected nodes powered by the same generator are regarded as independent common domains; therefore, a node belongs to and only belongs to one common domain; the level of the common domain is determined by the number of generators that provide output to the nodes in the common domain, and its value cannot be less than 1 or greater than the total number of generators in the system; there are two cases for the line between two nodes: one is located inside the common domain, that is, it connects two nodes in the same common domain; the other is located outside the common domain, that is, the two nodes it connects are in different common domains; the line between one or more external identical common domains is defined as a link; the actual power direction of all lines on a link is the same, always flowing from a common domain with a smaller level to a common domain with a larger level;
[0024] If the flow direction of all lines in the system is known, then according to the above definition, a unique set of common domains and links will be obtained; with common domains as nodes and links as lines, the system will be simplified into a directed, acyclic graph; the direction of the link can only be from the common domain of the lower level to the common domain of the higher level, so the graph is directed but acyclic;
[0025] Calculate the contribution ratio of each generator to different load nodes; give an assumption: for a given common domain, if the contribution ratio of the generator to the input power is A, then the contribution ratio of the generator to the output power and the node load in the common domain is also A; on this basis, calculate through the following formula:
[0026] F kxy =C kx *F xy
[0027]
[0028]
[0029] In the formula, F kxy The power provided by generator k on the link between common domain x and common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y; F xy is the total power on the link between common domain x and common domain y; I y is the input power of common domain y; N is the number of other common domains that can transmit power to common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y.
[0030] As a preferred embodiment, in the first aspect of the present invention, the step 3 comprises:
[0031] Define a reference value to describe the shape of the user's actual load curve and normalize the user's actual load curve; let l(t) be a user's actual load curve, and the total power in T Take α as the reference to normalize, that is:
[0032]
[0033] In the formula, l * (t) is the actual load curve l(t) of the user after normalization function f u (·) The per-unit value after the action; after the actual load curve of the user is normalized, the characteristics of the order of magnitude will be eliminated, and only the characteristics of the shape of the actual load curve of the user will be retained;
[0034] Define an indicator to measure the similarity between the user's actual load curve shape and the load guideline. The expression is:
[0035]
[0036] Where d is the Euclidean distance between two sequences; E is the measurement index after converting the Euclidean distance to the interval (0,1], which is defined as the load line similarity; ε is a given constant value;
[0037] The load guideline similarity E reflects the role of the user's actual load curve in promoting the consumption of new energy, and can be used as a basis for calculating the subsidies for users participating in demand response. The larger the E, the more conducive the user is to promoting the consumption of new energy and will receive relatively more incentive subsidies.
[0038] As a preferred embodiment, in the first aspect of the present invention, the step 4 comprises:
[0039] The actual load curve shape after response is obtained based on the minimum change Assuming that users who participate in demand response are completely rational, they take the load criterion issued by the power dispatching center as the adjustment target, and take subsidy incentives into consideration without changing the total electricity consumption in a day, and change their electricity consumption behavior autonomously, so that the load criterion similarity after users participate in demand response is increased by ΔE compared with before participation. The specific expression is as follows:
[0040]
[0041] In the formula, is the load curve before user demand response;
[0042] Calculate the incentive subsidy that the user will eventually receive; when the user responds to the off-peak period, the electricity subsidy is adjusted to H1 yuan / (kWh), the electricity subsidy is adjusted to H2 yuan / (kWh) during the off-peak period, and the electricity subsidy is adjusted to H3 yuan / (kWh) during the peak period. Different coefficients are set according to the load line similarity E to calculate the final subsidy to ensure that the subsidy obtained by the user is fair and reasonable; the specific subsidy calculation formula is as follows:
[0043] F(z)=(H1×P mid +H2×P low +H3×P high )×γz)
[0044] Where F(z) is the subsidy amount obtained by the zth user; γ(z) = E(z) × 0.8 is the price coefficient calculated by the zth user based on the load line similarity; P mid , P low , P high The adjusted power consumption of users in response to off-peak hours, off-peak hours and peak hours respectively.
[0045] The second aspect of the present invention discloses a user load criterion demand response device for new energy consumption, comprising:
[0046] The curve calculation unit is used to minimize the operating cost of the system, while considering the contribution ratio of traditional power generation and new energy power generation to different load nodes, as well as the line flow constraints, to calculate the CDL curve and system flow data that are most friendly to the consumption of new energy at each load node;
[0047] An iterative calculation unit is used to first divide the common domain according to the CDL curve and the system power flow data, and finally obtain the contribution ratio of each generator to each load node through certain steps, and return the result to step 1, so as to obtain the CDL curve that meets the convergence condition through iterative cycle calculation;
[0048] The basis unit is used to quantify the actual effect of the user at the corresponding load criterion based on the calculated CDL curve, which serves as the basis for formulating the incentive subsidy for the user;
[0049] The model building unit is used to comprehensively consider the similarity between the user load and the load guideline and the user load response adjustment amount to establish a quantitative model for user incentive subsidies.
[0050] As a preferred embodiment, in the second aspect of the present invention, the curve calculation unit includes:
[0051] The first definition subunit is used to define the ideal load curve shape of each load node that is conducive to absorbing new energy as a load criterion; the load criterion is a desired load line shape calculated by comprehensively considering the dynamic contribution ratio of the generator to the load node, the system operation status and the new energy forecast status. The closer to the line shape, the more conducive it is to smoothing the fluctuation of new energy power generation in the power grid;
[0052] The CDL objective function setting subunit is used to set the CDL objective function to minimize the operating cost of the entire system while promoting the consumption of new energy as much as possible. The specific expression of the CDL objective function is as follows:
[0053]
[0054] Where P G,i (t) is the active output of the i-th adjustable generator in the system in time period t, T is the total number of time periods; N G is the number of adjustable generators; P R (t) is the output of all renewable energy sources in the system during period t; P R,max (t) is the maximum value of all renewable energy power generation output in period t, which can be obtained by forecasting in the day ahead; a i , bi , c i is the cost coefficient of the i-th controllable generator; C R Costs for curtailing wind and solar power;
[0055] In the above CDL objective function, is the total operating cost of the controllable generator set, C R (P R,max (t)-P R (t)) is the penalty fee for power abandonment;
[0056] The constraint subunit is used to calculate the constraints of the CDL curve model. In addition to the upper and lower bounds of the output of the controllable generator set, the upward and downward ramping constraints of the controllable generator set, the spinning reserve constraints, and the new energy output range constraints, it also includes power balance constraints and multi-node system power flow constraints, as follows:
[0057]
[0058] P inj =K P *P G +K R *P R -K D *P D
[0059] P inj =B*θ
[0060]
[0061] In the formula, C i,d is the ratio of the output of the i-th adjustable generator transmitted to the load node d; is the power consumption of the load participating in the demand response of load node d in the total period; is the load directrix value of load node d; is the power of the non-adjustable load at load node d in period t; C j,d is the ratio of the output of the jth renewable energy generator transmitted to the load node d; P R,j (t) is the active power output of the jth renewable energy generator in the system during period t; P inj is the node injection power matrix; KP, KR, KD are the traditional generator connection matrix, the new energy generator connection matrix and the load connection matrix; PG, PR, PD are the traditional generator power matrix, the new energy generator power matrix and the load matrix; B is the line admittance matrix; K L is the line connection matrix; X b represents the admittance of each line; θ is the vector formed by the node voltage phase angles.
[0062] As a preferred embodiment, in the second aspect of the present invention, the iterative calculation unit includes:
[0063] The common domain division subunit is used to divide the load nodes into different common domains; a common domain is defined as a group of continuous nodes powered by the same generator; unconnected nodes powered by the same generator are regarded as independent common domains; therefore, a node belongs to and only belongs to one common domain; the level of the common domain is determined by the number of generators that provide output to the nodes in the common domain, and its value cannot be less than 1 or greater than the total number of generators in the system; there are two cases for the line between two nodes: one is located inside the common domain, that is, it connects two nodes in the same common domain; the other is located outside the common domain, that is, the two nodes it connects are in different common domains; the line between one or more external identical common domains is defined as a link; the actual power direction of all lines on a link is the same, always flowing from a common domain with a smaller level to a common domain with a larger level;
[0064] If the flow direction of all lines in the system is known, then according to the above definition, a unique set of common domains and links will be obtained; with common domains as nodes and links as lines, the system will be simplified into a directed, acyclic graph; the direction of the link can only be from the common domain of the lower level to the common domain of the higher level, so the graph is directed but acyclic;
[0065] The contribution ratio calculation subunit is used to calculate the contribution ratio of each generator to different load nodes; given an assumption: for a given common domain, if the contribution ratio of the generator to the input power is A, then the contribution ratio of the generator to the output power and the node load in the common domain is also A; on this basis, the following formula is used for calculation:
[0066] F kxy =C kx *F xy
[0067]
[0068]
[0069] In the formula, F kxy The power provided by generator k on the link between common domain x and common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y; F xy is the total power on the link between common domain x and common domain y; I y is the input power of common domain y; N is the number of other common domains that can transmit power to common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y.
[0070] As a preferred embodiment, in the second aspect of the present invention, the basis unit includes:
[0071] The second definition subunit is used to define a reference value that describes the shape of the user's actual load curve and normalize the user's actual load curve; l(t) is a user's actual load curve, and the total power in T Take α as the reference to normalize, that is:
[0072]
[0073] In the formula, l * (t) is the actual load curve l(t) of the user after normalization function f u (·) The per-unit value after the action; after the actual load curve of the user is normalized, the characteristics of the order of magnitude will be eliminated, and only the characteristics of the shape of the actual load curve of the user will be retained;
[0074] The third definition subunit is used to define an indicator for measuring the similarity between the user's actual load curve shape and the load guideline, and the expression is:
[0075]
[0076] Where d is the Euclidean distance between two sequences; E is the measurement index after converting the Euclidean distance to the interval (0,1], which is defined as the load line similarity; ε is a given constant value;
[0077] The incentive subsidy subunit is used for the load guideline similarity E, which reflects the role of the user's actual load curve in promoting the consumption of new energy, and can be used as a basis for calculating the subsidies for users participating in demand response. The larger the E, the more conducive the user is to promoting the consumption of new energy, and will receive relatively more incentive subsidies.
[0078] As a preferred embodiment, in the second aspect of the present invention, the model building unit includes:
[0079] The lifting amount calculation subunit is used to obtain the actual load curve shape after the response based on the minimum change amount. Assuming that users who participate in demand response are completely rational, they take the load criterion issued by the power dispatching center as the adjustment target, and take subsidy incentives into consideration without changing the total electricity consumption in a day, and change their electricity consumption behavior autonomously, so that the load criterion similarity after users participate in demand response is increased by ΔE compared with before participation. The specific expression is as follows:
[0080]
[0081] In the formula, is the load curve before user demand response;
[0082] The incentive subsidy calculation subunit is used to calculate the incentive subsidy that the user finally receives. When the user responds to the off-peak period, the electricity subsidy is adjusted to H1 yuan / (kWh), the electricity subsidy is adjusted to H2 yuan / (kWh) during the off-peak period, and the electricity subsidy is adjusted to H3 yuan / (kWh) during the peak period. Different coefficients are set according to the load line similarity E to calculate the final subsidy, ensuring that the subsidy obtained by the user is fair and reasonable. The specific subsidy calculation formula is as follows:
[0083] F(z)=(H1×P mid +H2×P low +H3×P high )×γ(z)
[0084] Where F(z) is the subsidy amount obtained by the zth user; γ(z) = E(z) × 0.8 is the price coefficient calculated by the zth user based on the load line similarity; P mid , P low , P high The adjusted power consumption of users in response to off-peak hours, off-peak hours and peak hours respectively.
[0085] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0086] The present invention can effectively reduce the excessively high communication and control costs when responding to large-scale user demands, while significantly reducing system operating costs and promoting the inclusion of new energy sources in the grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0087] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0088] Figure 1 It is a flow chart of a method for responding to user load criterion demand for new energy consumption according to the present invention;
[0089] Figure 2 This is a schematic diagram of the IEEE standard six-node test system used for testing the present invention;
[0090] Figure 3 A schematic diagram of load directrixes of each load node calculated by the present invention;
[0091] Figure 4 A schematic diagram of user load curve shaping with different response effects calculated by the present invention;
[0092] Figure 5 It is a schematic diagram of the output curve of renewable energy that can be absorbed when there is no demand response calculated by the present invention;
[0093] Figure 6 It is a schematic diagram of the output curve of renewable energy that can be absorbed when there is demand response calculated by the present invention;
[0094] Figure 7 It is a structural block diagram of the user load standard line demand response device for new energy consumption of the present invention. DETAILED DESCRIPTION
[0095] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0096] It should be noted that the terms "first", "second", "third", "fourth", etc. in the specification and claims of the present invention are used to distinguish different objects rather than to describe a specific order. The terms "including" and "having" in the embodiments of the present invention and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device including a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0097] Embodiment 1
[0098] Please refer to Figure 1 As shown, a user load criterion demand response method for new energy consumption includes the following steps:
[0099] Step 1: With the goal of minimizing the system's operating cost, while considering the contribution ratio of traditional power generation and renewable energy power generation to different load nodes, as well as line flow constraints and other conditions, calculate the CDL curve and flow data that are most friendly to renewable energy consumption for each load node.
[0100] The main implementation steps are as follows:
[0101] (1) Define the ideal load curve shape of each load node that is conducive to the absorption of new energy as the load criterion line; this curve is calculated by comprehensively considering the dynamic contribution ratio of the generator to the load node, the system operation status and the new energy forecast status, and the expected load line shape is obtained. The closer it is to this line shape, the more conducive it is to smoothing the fluctuation of new energy power generation in the power grid; the load criterion line here is the calculated expected load line shape.
[0102] (2) The CDL objective function is set to minimize the operating cost of the entire system while promoting the consumption of new energy as much as possible. The specific expression of the CDL objective function is as follows:
[0103]
[0104] Where P G,i (t) is the active output of the i-th adjustable generator in the system in time period t, T is the total number of time periods; N G is the number of adjustable generators; P R (t) is the output of all renewable energy sources in the system during period t; P R,max (t) is the maximum value of all renewable energy power generation output in period t, which can be obtained by forecasting in the day ahead; a i , b i , c i is the cost coefficient of the i-th controllable generator; C R Costs for curtailing wind and solar power;
[0105] The first term of the CDL objective function is the total operating cost of the controllable generator set, and the second term is the penalty cost for power abandonment. R If the setting is large enough, wind and solar power curtailment costs will only be incurred when the controllable units cannot meet the regulation requirements.
[0106] (3) The constraints for calculating the CDL curve model include the upper and lower bounds of the output of the controllable generator set, the upward and downward ramping constraints of the controllable generator set, the spinning reserve constraints, the output range constraints of new energy sources, and other constraints. They also include power balance constraints and multi-node system power flow constraints, as follows:
[0107]
[0108] P inj =K P *P G +K R *P R -K D *P D
[0109] P inj =B*θ
[0110]
[0111] In the formula, C i,d is the ratio of the output of the i-th adjustable generator transmitted to the load node d; is the power consumption of the load participating in the demand response of load node d in the total period; is the load directrix value of load node d; is the power of the non-adjustable load at load node d in period t; C j,d is the ratio of the output of the jth renewable energy generator transmitted to the load node d; P R,j (t) is the active power output of the jth renewable energy generator in the system during period t; P inj is the node injection power matrix; KP, KR, KD are the traditional generator connection matrix, the new energy generator connection matrix and the load connection matrix; PG, PR, PD are the traditional generator power matrix, the new energy generator power matrix and the load matrix; B is the line admittance matrix; K L is the line connection matrix; X b represents the admittance of each line; θ is the vector formed by the node voltage phase angles.
[0112] The optimization model formed by the above constraints can simultaneously obtain the CDL curve and the system power flow data, that is, after the optimization model is solved, the CDL curve and the system power flow are obtained simultaneously.
[0113] Step 2: Based on the CDL curve and system power flow data obtained in step 1, first divide the common domain, and finally obtain the contribution ratio of each generator to each load node through certain steps, and return the result to step 1. In this way, the CDL curve that meets the convergence conditions is calculated through iterative cycles. The main implementation steps are as follows:
[0114] (1) Divide the load nodes into different common domains; a common domain is defined as a group of consecutive nodes powered by the same generator; unconnected nodes powered by the same generator are regarded as independent common domains; therefore, a node belongs to and only belongs to one common domain; the level of the common domain is determined by the number of generators that provide output to the nodes in the common domain, and its value cannot be less than 1 or greater than the total number of generators in the system; there are two cases for the line between two nodes: one is located inside the common domain, that is, it connects two nodes in the same common domain; the other is located outside the common domain, that is, the two nodes it connects are in different common domains; the line between one or more external common domains is defined as a link; the actual power direction of all lines on a link is the same, always flowing from a common domain with a smaller level to a common domain with a larger level;
[0115] If the flow direction of all lines in the system is known, then according to the above definition, a unique set of common domains and links will be obtained; with common domains as nodes and links as lines, the system will be simplified into a directed, acyclic graph; the direction of the link can only be from the common domain of the lower level to the common domain of the higher level, so the graph is directed but acyclic;
[0116] (2) Calculate the contribution ratio of each generator to different load nodes; Given an assumption: for a given common domain, if the contribution ratio of the generator to the input power is A, then the contribution ratio of the generator to the output power and the node load in the common domain is also A; On this basis, calculate by the following formula:
[0117] F kxy =C kx *F xy
[0118]
[0119]
[0120] In the formula, F kxy The power provided by generator k on the link between common domain x and common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y; F xy is the total power on the link between common domain x and common domain y; I y is the input power of common domain y; N is the number of other common domains that can transmit power to common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y.
[0121] Step 3: quantify the actual effect of users at the corresponding load criterion based on the calculated CDL curve, which serves as the basis for formulating incentive subsidies for users.
[0122] The specific implementation includes the following steps:
[0123] (1) Define a reference value to describe the shape of the user's actual load curve and normalize the user's actual load curve; let l(t) be a user's actual load curve, and the total power in time period T (one day) Take α as the reference to normalize, that is:
[0124]
[0125] In the formula, l * (t) is the actual load curve l(t) of the user after normalization function f u (·) The per-unit value after the action; after the actual load curve of the user is normalized, the characteristics of the order of magnitude will be eliminated, and only the characteristics of the shape of the actual load curve of the user will be retained;
[0126] (2) Define an indicator to measure the similarity between the user's actual load curve shape and the load guideline. The expression is:
[0127]
[0128] Where d is the Euclidean distance between two sequences; E is the measurement index after converting the Euclidean distance to the interval (0,1], which is defined as the load line similarity; ε is a given constant value;
[0129] The load guideline similarity E reflects the role of the user's actual load curve in promoting the consumption of new energy, and can be used as a basis for calculating the subsidies for users participating in demand response. The larger the E, the more conducive the user is to promoting the consumption of new energy and will receive relatively more incentive subsidies.
[0130] Step 4: Establish a quantitative model for user incentive subsidies by comprehensively considering the similarity between user load and load guideline and the amount of user load response adjustment.
[0131] The specific implementation steps are as follows:
[0132] (1) The actual load curve shape after the response is obtained based on the minimum change Assuming that users who participate in demand response are completely rational, they take the load criterion issued by the power dispatching center as the adjustment target, and take subsidy incentives into consideration without changing the total electricity consumption in a day, and change their electricity consumption behavior autonomously, so that the load criterion similarity after users participate in demand response is increased by ΔE compared with before participation. The specific expression is as follows:
[0133]
[0134] In the formula, is the load curve before user demand response;
[0135] (2) Calculate the incentive subsidy that users will eventually receive; according to the provisions of Document No. 89 of Su Jia Gong
[2018] , the peak hours of electricity consumption are 8:00-12:00 and 17:00-21:00; the off-peak hours are 12:00-17:00; 21:00-24:00; and the off-peak hours are 0:00-8:00. The Electric Power Dispatching Center stipulates that when users adjust their electricity consumption during off-peak hours, the subsidy is 5 yuan / (kWh), the subsidy is 7 yuan / (kWh) during off-peak hours, and the subsidy is 10 yuan / (kWh) during peak hours. Different coefficients are set according to the response effect measurement (quadratic similarity) to calculate the final subsidy to ensure that the subsidy obtained by users is fair and reasonable. The specific subsidy calculation formula is as follows:
[0136] F(z)=(5×P mid +7×P low +10×P high )×γ(z)
[0137] Where F(z) is the subsidy amount obtained by the zth user; γ(z) = E(z) × 0.8 is the price coefficient calculated by the zth user based on the load line similarity; P mid , P low , P high The adjusted power consumption of users in response to off-peak hours, off-peak hours and peak hours respectively.
[0138] (3) The IEEE standard six-node test system is used to test and verify the multi-node system demand response model based on CDL proposed in the present invention. The topology diagram of the six-node test system is shown in FIG. Figure 2 The load criterion diagram of each load node calculated is shown in Figure 3 As shown, the load node 3 is taken as an example to calculate the user load curve shaping under different response effects. Figure 4 In order to intuitively express the role of this mechanism in absorbing new energy, the amount of abandoned electricity of new energy is calculated under different line similarities, and the proportion of abandoned electricity to the maximum output of new energy units is defined as the abandonment rate. Figure 5 is the calculated output curve of renewable energy that can be absorbed when there is no demand response. Figure 6 It is the calculated output curve of renewable energy that can be absorbed when there is demand response. In addition, the incentive subsidies for different users calculated by the formula in step 2 are shown in Table 1, and the statistical analysis of the system operation cost under different criteria is shown in Table 2.
[0139] Table 1 Incentive subsidies for different users
[0140]
[0141] Table 2 Cost analysis under different alignment similarities
[0142]
[0143] Embodiment 2
[0144] Please refer to Figure 7 As shown, a user load criterion demand response device for new energy consumption includes:
[0145] The curve calculation unit 21 is used to calculate the CDL curve and system flow data that are most friendly to the consumption of new energy for each load node, taking the minimum operation cost of the system as the goal, while considering the contribution ratio of traditional power generation and new energy power generation to different load nodes, as well as the line flow constraints;
[0146] The iterative calculation unit 22 is used to first divide the common domain according to the CDL curve and the system power flow data, and finally obtain the contribution ratio of each generator to each load node through certain steps, and return the result to step 1, so as to obtain the CDL curve that meets the convergence condition through iterative cycle calculation;
[0147] According to the unit 23, it is used to quantify the actual effect of the user at the corresponding load standard line based on the calculated CDL curve, which serves as a basis for formulating the incentive subsidy for the user;
[0148] The model building unit 24 is used to comprehensively consider the similarity between the user load and the load guideline and the user load response adjustment amount to establish a user incentive subsidy quantitative model.
[0149] Preferably, the curve calculation unit 21 includes:
[0150] The first definition subunit is used to define the ideal load curve shape of each load node that is conducive to absorbing new energy as a load criterion; the load criterion is a desired load line shape calculated by comprehensively considering the dynamic contribution ratio of the generator to the load node, the system operation status and the new energy forecast status. The closer to the line shape, the more conducive it is to smoothing the fluctuation of new energy power generation in the power grid;
[0151] The CDL objective function setting subunit is used to set the CDL objective function to minimize the operating cost of the entire system while promoting the consumption of new energy as much as possible. The specific expression of the CDL objective function is as follows:
[0152]
[0153] Where P G,i (t) is the active output of the i-th adjustable generator in the system in time period t, T is the total number of time periods; N G is the number of adjustable generators; P R (t) is the output of all renewable energy sources in the system during period t; P R,max (t) is the maximum value of all renewable energy power generation output in period t, which can be obtained by forecasting in the day ahead; a i , b i , c i is the cost coefficient of the i-th controllable generator; C R Costs for curtailing wind and solar power;
[0154] In the above CDL objective function, is the total operating cost of the controllable generator set, C R (P R,max (t)-P R (t)) is the penalty fee for power abandonment;
[0155] The constraint subunit is used to calculate the constraints of the CDL curve model. In addition to the upper and lower bounds of the output of the controllable generator set, the upward and downward ramping constraints of the controllable generator set, the spinning reserve constraints, and the new energy output range constraints, it also includes power balance constraints and multi-node system power flow constraints, as follows:
[0156]
[0157] P inj =K P *P G +K R *P R -K D *P D
[0158] P inj =B*θ
[0159]
[0160] In the formula, C i,d is the ratio of the output of the i-th adjustable generator transmitted to the load node d; is the power consumption of the load participating in the demand response of load node d in the total period; is the load directrix value of load node d; is the power of the non-adjustable load at load node d in period t; C j,d is the ratio of the output of the jth renewable energy generator transmitted to the load node d; P R,j (t) is the active power output of the jth renewable energy generator in the system during period t; P inj is the node injection power matrix; KP, KR, KD are the traditional generator connection matrix, the new energy generator connection matrix and the load connection matrix; PG, PR, PD are the traditional generator power matrix, the new energy generator power matrix and the load matrix; B is the line admittance matrix; K L is the line connection matrix; X b represents the admittance of each line; θ is the vector formed by the node voltage phase angles.
[0161] Preferably, the iterative calculation unit 22 comprises:
[0162] The common domain division subunit is used to divide the load nodes into different common domains; a common domain is defined as a group of continuous nodes powered by the same generator; unconnected nodes powered by the same generator are regarded as independent common domains; therefore, a node belongs to and only belongs to one common domain; the level of the common domain is determined by the number of generators that provide output to the nodes in the common domain, and its value cannot be less than 1 or greater than the total number of generators in the system; there are two cases for the line between two nodes: one is located inside the common domain, that is, it connects two nodes in the same common domain; the other is located outside the common domain, that is, the two nodes it connects are in different common domains; the line between one or more external identical common domains is defined as a link; the actual power direction of all lines on a link is the same, always flowing from a common domain with a smaller level to a common domain with a larger level;
[0163] If the flow direction of all lines in the system is known, then according to the above definition, a unique set of common domains and links will be obtained; with common domains as nodes and links as lines, the system will be simplified into a directed, acyclic graph; the direction of the link can only be from the common domain of the lower level to the common domain of the higher level, so the graph is directed but acyclic;
[0164] The contribution ratio calculation subunit is used to calculate the contribution ratio of each generator to different load nodes; given an assumption: for a given common domain, if the contribution ratio of the generator to the input power is A, then the contribution ratio of the generator to the output power and the node load in the common domain is also A; on this basis, the following formula is used for calculation:
[0165] F kxy =C kx *F xy
[0166]
[0167]
[0168] In the formula, F kxy The power provided by generator k on the link between common domain x and common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y; F xy is the total power on the link between common domain x and common domain y; I y is the input power of common domain y; N is the number of other common domains that can transmit power to common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y.
[0169] Preferably, the basis unit 23 includes:
[0170] The second definition subunit is used to define a reference value that describes the shape of the user's actual load curve and normalize the user's actual load curve; l(t) is a user's actual load curve, and the total power in T Take α as the reference to normalize, that is:
[0171]
[0172] In the formula, l * (t) is the actual load curve l(t) of the user after normalization function f u (·) The per-unit value after the action; after the actual load curve of the user is normalized, the characteristics of the order of magnitude will be eliminated, and only the characteristics of the shape of the actual load curve of the user will be retained;
[0173] The third definition subunit is used to define an indicator for measuring the similarity between the user's actual load curve shape and the load guideline, and the expression is:
[0174]
[0175] Where d is the Euclidean distance between two sequences; E is the measurement index after converting the Euclidean distance to the interval (0,1], which is defined as the load line similarity; ε is a given constant value;
[0176] The incentive subsidy subunit is used for the load guideline similarity E, which reflects the role of the user's actual load curve in promoting the consumption of new energy, and can be used as a basis for calculating the subsidies for users participating in demand response. The larger the E, the more conducive the user is to promoting the consumption of new energy, and will receive relatively more incentive subsidies.
[0177] Preferably, the model building unit 24 includes:
[0178] The lifting amount calculation subunit is used to obtain the actual load curve shape after the response based on the minimum change amount. Assuming that users who participate in demand response are completely rational, they take the load criterion issued by the power dispatching center as the adjustment target, and take subsidy incentives into consideration without changing the total electricity consumption in a day, and change their electricity consumption behavior autonomously, so that the load criterion similarity after users participate in demand response is increased by ΔE compared with before participation. The specific expression is as follows:
[0179]
[0180] In the formula, is the load curve before user demand response;
[0181] The incentive subsidy calculation subunit is used to calculate the incentive subsidy that the user finally receives. When the user responds to the off-peak period, the electricity subsidy is adjusted to H1 yuan / (kWh), the electricity subsidy is adjusted to H2 yuan / (kWh) during the off-peak period, and the electricity subsidy is adjusted to H3 yuan / (kWh) during the peak period. Different coefficients are set according to the load line similarity E to calculate the final subsidy, so as to ensure that the subsidy obtained by the user is fair and reasonable. The specific subsidy calculation formula is as follows:
[0182] F(z)=(H1×P mid +H2×P low +H3×P high )×γ(z)
[0183] Where F(z) is the subsidy amount obtained by the zth user; γ(z) = E(z) × 0.8 is the price coefficient calculated by the zth user based on the load line similarity; P mid , P low , P high The adjusted power consumption of users in response to off-peak hours, off-peak hours and peak hours respectively.
[0184] The user load guideline demand response method and device for new energy consumption disclosed in the embodiments of the present invention are introduced in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for general technical personnel in this field, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A user load criterion demand response method for new energy consumption, characterized in that: include: Step 1: Taking the minimum operating cost of the system as the goal, taking into account the contribution ratio of traditional power generation and renewable energy power generation to different load nodes, as well as the line flow constraints, calculate the CDL curve and system flow data that are most friendly to renewable energy consumption at each load node; Step 2: first divide the common domain according to the CDL curve and the system power flow data, and finally obtain the contribution ratio of each generator to each load node through certain steps, and return the result to step 1, so as to iterate and calculate the CDL curve that meets the convergence condition; Step 3: quantify the actual effect of the user at the corresponding load criterion based on the calculated CDL curve, which serves as the basis for formulating incentive subsidies for users; Step 4: comprehensively consider the similarity between the user load and the load standard line and the user load response adjustment amount to establish a user incentive subsidy quantitative model; Wherein, the step 1 comprises: Define the ideal load curve shape of each load node that is conducive to absorbing new energy as the load criterion; the load criterion is calculated by comprehensively considering the dynamic contribution ratio of the generator to the load node, the system operation status and the new energy forecast status, and the expected load line type is calculated. The closer it is to the line type, the more conducive it is to smoothing the fluctuation of new energy power generation in the power grid; The CDL objective function is set to minimize the operating cost of the entire system while promoting the consumption of new energy as much as possible. The specific expression of the CDL objective function is as follows: Where P G,i (t) is the active output of the i-th adjustable generator in the system in time period t, T is the total number of time periods; N G is the number of adjustable generators; P R (t) is the output of all renewable energy sources in the system during period t; P R,max (t) is the maximum value of all renewable energy power generation output in period t, which can be obtained by forecasting in the day ahead; a i , b i , c i is the cost coefficient of the i-th controllable generator; C R Costs for curtailing wind and solar power; In the above CDL objective function, is the total operating cost of the controllable generator set, C R (P R,max (t)-P R (t)) is the penalty fee for power abandonment; The constraints for calculating the CDL curve model include the upper and lower bounds of the output of the controllable generator set, the upward and downward ramping constraints of the controllable generator set, the spinning reserve constraints, and the output range constraints of new energy sources. They also include power balance constraints and multi-node system power flow constraints, as follows: P inj =K P *P G +K R *P R -K D *P D P inj =B*θ In the formula, C i,d is the ratio of the output of the i-th adjustable generator transmitted to the load node d; is the power consumption of the load participating in the demand response of load node d in the total period; is the load directrix value of load node d; is the power of the non-adjustable load at load node d in period t; C j,d is the ratio of the output of the jth renewable energy generator transmitted to the load node d; P R,j (t) is the active power output of the jth renewable energy generator in the system during period t; P inj is the node injection power matrix; KP, KR, KD are the traditional generator connection matrix, the new energy generator connection matrix and the load connection matrix; PG, PR, PD are the traditional generator power matrix, the new energy generator power matrix and the load matrix; B is the line admittance matrix; K L is the line connection matrix; X b represents the admittance of each line; θ is the vector formed by the node voltage phase angle; The step 2 comprises: The load nodes are divided into different common domains; a common domain is defined as a group of continuous nodes powered by the same generator; unconnected nodes powered by the same generator are regarded as independent common domains; therefore, a node belongs to and only belongs to one common domain; the level of the common domain is determined by the number of generators that provide output to the nodes in the common domain, and its value cannot be less than 1 or greater than the total number of generators in the system; there are two cases for the line between two nodes: one is located inside the common domain, that is, it connects two nodes in the same common domain; the other is located outside the common domain, that is, the two nodes it connects are in different common domains; the line between one or more external identical common domains is defined as a link; the actual power direction of all lines on a link is the same, always flowing from a common domain with a smaller level to a common domain with a larger level; If the flow direction of all lines in the system is known, then according to the above definition, a unique set of common domains and links will be obtained; with common domains as nodes and links as lines, the system will be simplified into a directed, acyclic graph; the direction of the link can only be from the common domain of the lower level to the common domain of the higher level, so the graph is directed but acyclic; Calculate the contribution ratio of each generator to different load nodes; give an assumption: for a given common domain, if the contribution ratio of the generator to the input power is A, then the contribution ratio of the generator to the output power and the node load in the common domain is also A; on this basis, calculate through the following formula: F kxy =C kx *F xy In the formula, F kxy The power provided by generator k on the link between common domain x and common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y; F xy is the total power on the link between common domain x and common domain y; I y is the input power of common domain y; N is the number of other common domains that can transmit power to common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y; The step 3 comprises: Define a reference value to describe the shape of the user's actual load curve and normalize the user's actual load curve; let l(t) be a user's actual load curve, and the total power in T Taking α as the reference, normalize it, that is: In the formula, l * (t) is the actual load curve l(t) of the user after normalization function f u (·) The per-unit value after the action; after the actual load curve of the user is normalized, the characteristics of the order of magnitude will be eliminated, and only the characteristics of the shape of the actual load curve of the user will be retained; Define an indicator to measure the similarity between the user's actual load curve shape and the load guideline. The expression is: Where d is the Euclidean distance between two sequences; E is the measurement index after converting the Euclidean distance to the interval (0,1], which is defined as the load line similarity; ε is a given constant value; The load line similarity E reflects the role of the user's actual load curve in promoting the consumption of new energy, and can be used as a basis for calculating the subsidies for users participating in demand response. The larger the E, the more conducive the user is to promoting the consumption of new energy, and will receive relatively more incentive subsidies. The step 4 comprises: The actual load curve shape after response is obtained based on the minimum change Assuming that users who participate in demand response are completely rational, they take the load criterion issued by the power dispatching center as the adjustment target, and take subsidy incentives into consideration without changing the total electricity consumption in a day, and change their electricity consumption behavior autonomously, so that the load criterion similarity after users participate in demand response is increased by ΔE compared with before participation. The specific expression is as follows: In the formula, is the load curve before user demand response; Calculate the incentive subsidy that the user will eventually receive; when the user responds to the off-peak period, the electricity subsidy is adjusted to H1 yuan / (kWh), the electricity subsidy is adjusted to H2 yuan / (kWh) during the off-peak period, and the electricity subsidy is adjusted to H3 yuan / (kWh) during the peak period. Different coefficients are set according to the load line similarity E to calculate the final subsidy to ensure that the subsidy obtained by the user is fair and reasonable; the specific subsidy calculation formula is as follows: F(z)=(H1×P mid +H2×P low +H3×P high )×γ(z) Where F(z) is the subsidy amount obtained by the zth user; γ(z) = E(z) × 0.8 is the price coefficient calculated by the zth user based on the load line similarity; P mid , P low , P high The adjusted power consumption of users in response to off-peak hours, off-peak hours and peak hours respectively.
2. A user load criterion demand response device for new energy consumption, characterized in that: include: The curve calculation unit is used to minimize the operating cost of the system, while considering the contribution ratio of traditional power generation and new energy power generation to different load nodes, as well as the line flow constraints, to calculate the CDL curve and system flow data that are most friendly to the consumption of new energy at each load node; An iterative calculation unit is used to first divide the common domain according to the CDL curve and the system power flow data, and finally obtain the contribution ratio of each generator to each load node through certain steps, and return the result to step 1, so as to obtain the CDL curve that meets the convergence condition through iterative cycle calculation; The basis unit is used to quantify the actual effect of the user at the corresponding load criterion based on the calculated CDL curve, which serves as the basis for formulating the incentive subsidy for the user; The model building unit is used to comprehensively consider the similarity between the user load and the load criterion and the user load response adjustment amount to establish a user incentive subsidy quantitative model; Wherein, the curve calculation unit includes: The first definition subunit is used to define the ideal load curve shape of each load node that is conducive to absorbing new energy as a load criterion; the load criterion is a desired load line shape calculated by comprehensively considering the dynamic contribution ratio of the generator to the load node, the system operation status and the new energy forecast status. The closer to the line shape, the more conducive it is to smoothing the fluctuation of new energy power generation in the power grid; The CDL objective function setting subunit is used to set the CDL objective function to minimize the operating cost of the entire system while promoting the consumption of new energy as much as possible. The specific expression of the CDL objective function is as follows: C R (P R,max (t)-P R (t)) Where P G,i (t) is the active output of the i-th adjustable generator in the system in time period t, T is the total number of time periods; N G is the number of adjustable generators; P R (t) is the output of all renewable energy sources in the system during period t; P R,max (t) is the maximum value of all renewable energy power generation output in period t, which can be obtained by forecasting in the day ahead; a i , b i , c i is the cost coefficient of the i-th controllable generator; C R Costs for curtailing wind and solar power; In the above CDL objective function, is the total operating cost of the controllable generator set, C R (P R,max (t)-P R (t)) is the penalty fee for power abandonment; The constraint subunit is used to calculate the constraints of the CDL curve model. In addition to the upper and lower bounds of the output of the controllable generator set, the upward and downward ramping constraints of the controllable generator set, the spinning reserve constraints, and the new energy output range constraints, it also includes power balance constraints and multi-node system power flow constraints, as follows: P inj =K P *P G +K R *P R -K D *P D P inj =B*θ In the formula, C i,d is the ratio of the output of the i-th adjustable generator transmitted to the load node d; is the power consumption of the load participating in the demand response of load node d in the total period; is the load directrix value of load node d; is the power of the non-adjustable load at load node d in period t; C j,d is the ratio of the output of the jth renewable energy generator transmitted to the load node d; P R,j (t) is the active power output of the jth renewable energy generator in the system during period t; P inj is the node injection power matrix; KP, KR, KD are the traditional generator connection matrix, the new energy generator connection matrix and the load connection matrix; PG, PR, PD are the traditional generator power matrix, the new energy generator power matrix and the load matrix; B is the line admittance matrix; K L is the line connection matrix; X b represents the admittance of each line; θ is the vector formed by the node voltage phase angle; The iterative calculation unit comprises: The common domain division subunit is used to divide the load nodes into different common domains; a common domain is defined as a group of continuous nodes powered by the same generator; unconnected nodes powered by the same generator are regarded as independent common domains; therefore, a node belongs to and only belongs to one common domain; the level of the common domain is determined by the number of generators that provide output to the nodes in the common domain, and its value cannot be less than 1 or greater than the total number of generators in the system; there are two cases for the line between two nodes: one is located inside the common domain, that is, it connects two nodes in the same common domain; the other is located outside the common domain, that is, the two nodes it connects are in different common domains; the line between one or more external identical common domains is defined as a link; the actual power direction of all lines on a link is the same, always flowing from a common domain with a smaller level to a common domain with a larger level; If the flow direction of all lines in the system is known, then according to the above definition, a unique set of common domains and links will be obtained; with common domains as nodes and links as lines, the system will be simplified into a directed, acyclic graph; the direction of the link can only be from the common domain of the lower level to the common domain of the higher level, so the graph is directed but acyclic; The contribution ratio calculation subunit is used to calculate the contribution ratio of each generator to different load nodes; given an assumption: for a given common domain, if the contribution ratio of the generator to the input power is A, then the contribution ratio of the generator to the output power and the node load in the common domain is also A; on this basis, the following formula is used for calculation: F kxy =C kx *F xy In the formula, F kxy The power provided by generator k on the link between common domain x and common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y; F xy is the total power on the link between common domain x and common domain y; I y is the input power of common domain y; N is the number of other common domains that can transmit power to common domain y; C ky is the contribution ratio of generator k to the load and output power in the common domain y; The basis unit comprises: The second definition subunit is used to define a reference value that describes the shape of the user's actual load curve and normalize the user's actual load curve; l(t) is a user's actual load curve, and the total power in T Taking α as the reference, normalize it, that is: In the formula, l * (t) is the actual load curve l(t) of the user after normalization function f u (·) The per-unit value after the action; after the actual load curve of the user is normalized, the characteristics of the order of magnitude will be eliminated, and only the characteristics of the shape of the actual load curve of the user will be retained; The third definition subunit is used to define an indicator for measuring the similarity between the user's actual load curve shape and the load guideline, and the expression is: Where d is the Euclidean distance between two sequences; E is the measurement index after converting the Euclidean distance to the interval (0,1], which is defined as the load line similarity; ε is a given constant value; The incentive subsidy subunit is used for the load line similarity E, which reflects the role of the user's actual load curve in promoting the consumption of new energy. It can be used as a basis for calculating the subsidies for users participating in demand response. The larger the E, the more conducive the user is to promoting the consumption of new energy, and the more incentive subsidies will be obtained. The model building unit comprises: The lifting amount calculation subunit is used to obtain the actual load curve shape after the response based on the minimum change amount. Assuming that users who participate in demand response are completely rational, they take the load criterion issued by the power dispatching center as the adjustment target, and take subsidy incentives into consideration without changing the total electricity consumption in a day, and change their electricity consumption behavior autonomously, so that the load criterion similarity after users participate in demand response is increased by ΔE compared with before participation. The specific expression is as follows: In the formula, is the load curve before user demand response; The incentive subsidy calculation subunit is used to calculate the incentive subsidy that the user finally receives. When the user responds to the off-peak period, the electricity subsidy is adjusted to H1 yuan / (kWh), the electricity subsidy is adjusted to H2 yuan / (kWh) during the off-peak period, and the electricity subsidy is adjusted to H3 yuan / (kWh) during the peak period. Different coefficients are set according to the load line similarity E to calculate the final subsidy, so as to ensure that the subsidy obtained by the user is fair and reasonable. The specific subsidy calculation formula is as follows: F(z)=(H1×P mid +H2×P low +H3×P high )×γ(z) Where F(z) is the subsidy amount obtained by the zth user; γ(z) = E(z) × 0.8 is the price coefficient calculated by the zth user based on the load line similarity; P mid , P low , P high The adjusted power consumption of users in response to off-peak hours, off-peak hours and peak hours respectively.