One-time dam tailings pond flood discharge system

By designing a once-built dam tailings pond drainage system with an open-air spillway and intercepting ditch, the problems of high construction difficulty and poor inspection conditions in the existing technology have been solved, and the effects of convenient construction, convenient inspection and high system reliability have been achieved. .

CN114541340BActive Publication Date: 2024-10-22CHINA ENFI ENG CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210248040.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-14
Publication Date
2024-10-22
Estimated Expiration
2042-03-14

AI Technical Summary

Technical Problem

The existing tailings pond drainage system is difficult to construct and poses great safety risks. In addition, inspection conditions during operation are poor, making it difficult to observe operating conditions.

Method used

A one-time dam tailings reservoir flood drainage system is adopted, including an open-air spillway and intercepting ditch. The spillway is an open-air structure to facilitate construction and inspection. A stilling basin and overflow weir are set up to control the water flow. The dam body is raised in stages. Construction, unified layout of downstream facilities to save investment.

Benefits of technology

It reduces construction difficulty and safety hazards, improves system reliability and convenience of inspection and maintenance, and ensures the flood drainage capacity and investment benefits of the tailings pond.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114541340B_ABST
    Figure CN114541340B_ABST
Patent Text Reader

Abstract

The present invention discloses a single-dam tailings pond flood discharge system, including a dam body, a spillway and an intercepting ditch. The dam body is suitable for being built on the mountain of the tailings pond; the spillway is suitable for being opened on the dam shoulder on one side of the dam body, and the upstream of the spillway is connected to the tailings pond area; the intercepting ditch is suitable for being opened on the mountain of the tailings pond, and the downstream of the spillway is connected to the intercepting ditch, and at least part of the intercepting ditch is located downstream of the spillway. The spillway of the single-dam tailings pond flood discharge system of the embodiment of the present invention is an open-air structure, which is convenient for construction, and has relatively low requirements for the geological conditions and construction conditions of the foundation. The operating status is easy to observe, and it is convenient for inspection and maintenance during use. After the tailings pond is closed, it can be used as a permanent flood discharge system, which has high reliability and is convenient for later inspection and maintenance. The intercepting ditch and the spillway of the single-dam tailings pond flood discharge system of the embodiment of the present invention are uniformly arranged, and downstream facilities are shared, saving investment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tailings pond drainage equipment, and in particular to a single-dam tailings pond flood discharge system. Background Art

[0002] The tailings pond flood discharge system is an important safety facility of the tailings pond. It must ensure sufficient discharge capacity to ensure flood discharge within the corresponding design flood control standards of the tailings pond. In related technologies, the tailings pond flood discharge form generally adopts drainage well (chute) - drainage pipe (tunnel), but the drainage well (chute) - drainage pipe (tunnel) type flood discharge system is affected by topographic and geological conditions, and the construction is difficult. Safety accidents are prone to occur during the construction process. In addition, the drainage well (chute) - drainage pipe (tunnel) type flood discharge system is mostly a concealed project, which needs to be inspected at any time during operation. The working conditions of the inspectors are poor, and the operating conditions are not easy to observe. Summary of the invention

[0003] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.

[0004] To this end, an embodiment of the present invention provides a one-time dam tailings pond flood discharge system that is easy to implement and convenient for inspection and maintenance.

[0005] The one-time dam-building tailings pond flood discharge system of an embodiment of the present invention comprises a dam body, a spillway and an intercepting ditch, wherein the dam body is suitable for being built on a tailings pond mountain; the spillway is suitable for being opened on a dam shoulder on one side of the dam body, and the upstream of the spillway is connected with the tailings pond area; the intercepting ditch is suitable for being opened on a tailings pond mountain, and the downstream of the spillway is connected with the intercepting ditch, and at least a part of the intercepting ditch is located downstream of the spillway.

[0006] The spillway of the one-time dam-building tailings pond flood discharge system in the embodiment of the present invention is an open-air structure, which is easy to construct and has relatively low requirements on the geological conditions and construction conditions of the base. The operating status is easy to observe and convenient for inspection and maintenance during use. After the tailings pond is closed, it can be used as a permanent flood discharge system with high reliability, which is convenient for later inspection and maintenance. The intercepting ditch and the spillway of the one-time dam-building tailings pond flood discharge system in the embodiment of the present invention are arranged in a unified manner, share downstream facilities, and save investment.

[0007] In some embodiments, the spillway includes a water diversion section and a chute, the water diversion section is located upstream of the chute and communicates with the chute, and the water diversion section is communicated with the tailings pond area.

[0008] In some embodiments, the cross-sectional area of ​​the water diversion section is greater than the cross-sectional area of ​​the chute.

[0009] In some embodiments, the spillway further comprises a first energy dissipation pool, the first energy dissipation pool is located downstream of the chute, and the two ends of the first energy dissipation pool are respectively connected to the chute and the intercepting ditch. Therefore, in these embodiments, the one-time dam tailings pond flood discharge system of the embodiment of the present invention dissipates the energy of the water flowing from the chute to the intercepting ditch through the provision of the first energy dissipation pool, so that the rapid flow flowing downward quickly becomes a slow flow, and the length of the guardrail can be shortened.

[0010] In some embodiments, the spillway further comprises an overflow weir, and the overflow weir is located at the inlet of the water diversion section. Therefore, in these embodiments, the one-time damming tailings pond flood discharge system of the embodiments of the present invention reduces the influence of the water flow in the tailings pond area on the water flow in the spillway through the setting of the overflow weir.

[0011] In some embodiments, there are multiple dam bodies, and the dam top elevations of the multiple dam bodies increase sequentially.

[0012] In some embodiments, there are multiple spillways, and the multiple spillways correspond one-to-one to the multiple dam bodies.

[0013] In some embodiments, the plurality of spillways are located on the same side of the dam body. Therefore, in these embodiments, the spillway of the tailings pond flood discharge system of the one-time dam construction embodiment of the present invention can be constructed in phases as the dam body is constructed and raised in phases. After the next phase of dam body raising is completed and the next phase of spillway is put into use, the previous phase of spillway system is blocked and backfilled, which is flexible in operation.

[0014] In some embodiments, the intercepting ditch includes a tail channel and a steep trough, the tail channel is located downstream of the intercepting ditch; the steep trough is located upstream of the tail channel, there are multiple steep troughs, multiple steep troughs are connected to multiple spillways in a one-to-one correspondence, and the steep trough is located downstream of the corresponding spillway.

[0015] In some embodiments, the intercepting ditch further includes a second energy dissipation pool, which is located downstream of the steep trough, and the two ends of the second energy dissipation pool are respectively connected to the steep trough and the tail channel. Therefore, in these embodiments, the one-time dam tailings pond flood discharge system of the embodiment of the present invention dissipates the energy of the water flowing from the steep trough to the tail channel through the provision of the second energy dissipation pool, so that the rapid flow flowing downward quickly becomes a slow flow, which can shorten the length of the guardrail. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of a flood discharge system for a tailings pond built once according to an embodiment of the present invention.

[0017] Figure 2 yes Figure 1 Partial enlargement of Figure a.

[0018] Figure 3 It is a schematic diagram of a chute-drain pipe type flood discharge system of the related technology.

[0019] Figure 4 It is a schematic diagram of a drainage well-tunnel type flood drainage system of related technology.

[0020] Reference numerals: dam body 10, first-phase dam body 11, second-phase dam body 12, third-phase dam body 13, fourth-phase dam body 14,

[0021] Tailings pond area 20,

[0022] Chute 31, drainage pipe 32, drainage well 33, tunnel 34,

[0023] Spillway 40, first-stage spillway 401, second-stage spillway 402, third-stage spillway 403, fourth-stage spillway 404, water diversion section 41, chute 42, first stilling pool 43,

[0024] Intercepting ditch 50, tail channel 51, steep trough 52, and second stilling pool 53. DETAILED DESCRIPTION

[0025] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0026] The following describes a one-time damming tailings pond flood discharge system according to an embodiment of the present invention in conjunction with the accompanying drawings.

[0027] like Figure 1 and Figure 2 As shown, the one-time dam-building tailings pond flood discharge system of the embodiment of the present invention includes a dam body 10 , a spillway 40 and a diversion ditch 50 .

[0028] The dam body 10 is suitable for being built on the mountain of the tailings pond; the spillway 40 is suitable for being opened on the dam shoulder on one side of the dam body 10, the spillway 40 is an open channel, and the upstream of the spillway 40 is connected with the tailings pond area 20; the intercepting ditch 50 is suitable for being opened on the mountain of the tailings pond, the intercepting ditch 50 is opened around the tailings pond area 20, the downstream of the spillway 40 is connected with the intercepting ditch 50, and at least part of the intercepting ditch 50 is located downstream of the spillway 40. It should be noted that the water in the tailings pond area 20 flows into the upstream of the spillway 40 and flows along the spillway 40 to the downstream of the spillway 40, and then the water in the spillway 40 flows into the downstream of the intercepting ditch 50 to complete the flood discharge, that is, the direction of the water flow is: tailings pond area 20-upstream of the spillway 40-downstream of the spillway 40-downstream of the intercepting ditch.

[0029] The spillway of the one-time dam-building tailings pond flood discharge system in the embodiment of the present invention is an open-air structure, which is easy to construct and has relatively low requirements on the geological conditions and construction conditions of the base. The operating status is easy to observe and convenient for inspection and maintenance during use. After the tailings pond is closed, it can be used as a permanent flood discharge system with high reliability, which is convenient for later inspection and maintenance. The intercepting ditch and the spillway of the one-time dam-building tailings pond flood discharge system in the embodiment of the present invention are arranged in a unified manner, share downstream facilities, and save investment.

[0030] like Figure 2 As shown, in some embodiments, the spillway 40 includes a water diversion section 41 and a chute 42, the water diversion section 41 is located upstream of the chute 42 and is connected to the chute 42, the water diversion section 41 is connected to the tailings pond area 20, and the water diversion section 41 is used to divert water in the tailings pond area 20 into the chute 42.

[0031] In some embodiments, the cross-sectional area of ​​the water diversion section 41 is greater than the cross-sectional area of ​​the chute 42 .

[0032] like Figure 2 As shown, in some embodiments, the spillway 40 further includes a first energy dissipation pool 43, which is located downstream of the chute 42, and the two ends of the first energy dissipation pool 43 are respectively connected to the chute 42 and the intercepting ditch 50. The one-time dam tailings pond flood discharge system of the embodiment of the present invention dissipates the energy of the water flowing from the chute 42 to the intercepting ditch 50 through the provision of the first energy dissipation pool 43, so that the rapid flow discharged quickly becomes a slow flow, and the length of the guardrail can be shortened.

[0033] In some embodiments, the spillway 40 further includes an overflow weir, which is located at the inlet of the water diversion section 41. The one-time damming tailings pond flood discharge system of the embodiment of the present invention reduces the influence of the water flow in the tailings pond area on the water flow in the spillway by setting the overflow weir.

[0034] In some embodiments, there are multiple dam bodies 10, and the dam top elevations of the multiple dam bodies 10 increase in sequence.

[0035] Furthermore, there are multiple spillways 40 , and the multiple spillways 40 correspond one-to-one to the multiple dam bodies 10 .

[0036] Furthermore, a plurality of spillways 40 are located on the same side of the dam body 10 .

[0037] The spillway of the tailings pond flood discharge system of the one-time dam construction embodiment of the present invention can be constructed in stages as the dam body is built and raised in stages. After the next stage of dam body raising is completed and the next stage of spillway is put into use, the previous stage of spillway system is blocked and backfilled, which is flexible to operate.

[0038] like Figure 1As shown, in some embodiments, the intercepting ditch 50 includes a tail channel 51 and a steep groove 52, the tail channel 51 is located downstream of the intercepting ditch 50; the steep groove 52 is located upstream of the tail channel 51, there are multiple steep grooves 52, multiple steep grooves 52 are connected to multiple spillways 40 one by one, and the steep groove 52 is located downstream of the corresponding spillway 40. It should be noted that the water in the spillway 40 flows into the steep groove 52 along the spillway 40, and the water in the steep groove 52 continues to flow downstream along the intercepting ditch 50 until it enters the tail channel 51 to complete the flood discharge.

[0039] like Figure 1 As shown, in some embodiments, the intercepting ditch 50 further includes a second energy dissipation pool 53, which is located downstream of the steep trough 52, and the two ends of the second energy dissipation pool 53 are respectively connected to the steep trough 52 and the tail channel 51. The one-time dam tailings pond flood discharge system of the embodiment of the present invention dissipates the energy of the water flowing from the steep trough to the tail channel through the provision of the second energy dissipation pool, so that the rapid flow discharged quickly becomes a slow flow, and the length of the guardrail can be shortened.

[0040] like Figure 1 and Figure 2 As shown, in a specific embodiment, the dam body 10 is constructed in stages with a total dam height of 75m and a final dam top elevation of 230m. According to the process requirements, the dam body 10 is divided into a first-stage dam body 11, a second-stage dam body 12, a third-stage dam body 13 and a fourth-stage dam body 14. The first-stage dam top elevation is 200m, the second-stage dam top elevation is 210m, the third-stage dam top elevation is 220m, and the final dam top elevation is 230m.

[0041] The flood control standard of the tailings pond is based on a flood that occurs once in 1,000 years. The supporting flood discharge system adopts an open spillway type on the dam shoulder, and the spillway 40 is divided into a first-stage spillway 401, a second-stage spillway 402, a third-stage spillway 403 and a fourth-stage spillway 404 as the dam body 10 is built. The spillway 40 is arranged in the same manner as the intercepting ditch 50, and the overall layout adopts the type of water diversion section 41-spillway 42-first energy dissipation pool 43-steep trough 52-second energy dissipation pool 53-tail channel 51.

[0042] The water diversion section 41 adopts a rectangular cross section with dimensions of 10m×2.5m and a length of 10m. The overflow weir 0 at the inlet of the water diversion section 41 has a weir top flow length of 10m, a weir height of 0.5m and a top width of 2m. The chute 42 adopts a rectangular cross section with dimensions of 4m×2m and a total length of 150m. The steep chute 52 adopts a rectangular cross section with dimensions of 2m×2m and a total length of 220m. The first stilling pool 43 and the second stilling pool 53 are both 15m long, 5m wide and 3m deep. The tail channel adopts a rectangular cross section with dimensions of 3m×2m and a length of 50m.

[0043] The spillway 40 is constructed in phases as the dam body 10 is raised in phases. After the next phase of the dam body 10 is raised and the next phase of the spillway 40 is put into use, the previous phase of the spillway 40 system is blocked and backfilled. The water diversion section 41, overflow weir and chute 42 of the later spillway 40 are the same as the water diversion section 41, overflow weir and chute 42 of the first phase of the spillway 401. The newly added steep troughs 52 of the later phases are connected to the steep troughs 52 of the first phase of the spillway 401. The first phase of the spillway 401 has an inflow elevation of 198m, the second phase of the spillway 402 has an inflow elevation of 208m, and the newly added spillway length is 85m; the third phase of the spillway 403 has an inflow elevation of 218m, and the newly added spillway length is 45m; the fourth phase of the spillway 404 has an inflow elevation of 228m, and the newly added spillway length is 20m.

[0044] The one-time dam-building tailings pond flood discharge system of the embodiment of the present invention adopts a continuous spillway to discharge flood water. The spillway can be constructed in stages as the dam body is raised in stages. As an open-air structure, the spillway is easy to implement and has low requirements for foundation geological conditions and construction conditions. The operating status is easy to observe and convenient for inspection and maintenance during use. After the reservoir is closed, it can be used as a permanent flood discharge system with high reliability and convenient for later inspection and maintenance.

[0045] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0046] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0047] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0048] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0049] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0050] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A one-time dam tailings pond flood discharge system, characterized in that: include: A dam body, wherein the dam body is suitable for being built on a tailings pond mountain; A spillway, wherein the spillway is suitable for being opened on the shoulder of the dam body on one side, the upstream of the spillway is connected with the tailings pond area, the spillway comprises a water diversion section, a chute and a first stilling pool, the water diversion section is located upstream of the chute and is connected with the chute, the water diversion section is connected with the tailings pond area, and the spillway is divided into a first-stage spillway, a second-stage spillway, a third-stage spillway and a fourth-stage spillway as the dam body is built; An intercepting ditch, the intercepting ditch is suitable for being opened on the tailings pond mountain, the downstream of the spillway is connected to the intercepting ditch, and at least part of the intercepting ditch is located downstream of the spillway, the intercepting ditch includes a tail channel, a steep trough and a second stilling pool, the tail channel is located downstream of the intercepting ditch, the steep trough is located upstream of the tail channel, there are multiple steep troughs, multiple steep troughs are connected to multiple spillways in a one-to-one correspondence, the steep trough is located downstream of the corresponding spillway, the second stilling pool is located downstream of the steep trough, the first stilling pool is located downstream of the chute, the two ends of the first stilling pool are respectively connected to the chute and the intercepting ditch, the two ends of the second stilling pool are respectively connected to the steep trough and the tail channel, the spillway and the intercepting ditch are arranged in the same manner, and the overall arrangement adopts the type of water diversion section-chute-first stilling pool-steep trough-second stilling pool-tail channel; There are multiple dam bodies, and the dam top elevations of the multiple dam bodies increase in sequence; there are multiple spillways, and the multiple spillways correspond to the multiple dam bodies one by one. The spillways are constructed in phases as the dam bodies are constructed and raised in stages. After the next phase of the dam body is raised and the next phase of the spillway is put into use, the previous phase of the spillway system is blocked and backfilled.

2. The one-time dam tailings pond flood discharge system according to claim 1 is characterized in that: The cross-sectional area of ​​the water diversion section is greater than the cross-sectional area of ​​the chute.

3. The one-time dam tailings pond flood discharge system according to claim 1 is characterized in that: The spillway further comprises an overflow weir, which is located at the inlet of the water diversion section.

4. The one-time dam tailings pond flood discharge system according to claim 1, characterized in that: The plurality of spillways are located on the same side of the dam body.