Production capacity prediction method and device for volume fracturing horizontal wells under advanced energy supplementation development mode
By obtaining the basic parameters of the reservoir and wells, calculating the average formation pressure and porosity, dividing the production stages, and constructing a productivity model, the existing technology solves the problem of being unable to predict the productivity of horizontal wells with advanced energy replenishment fracturing in low-pressure tight oil reservoirs. Accurate prediction of production capacity and optimization of oil well development are achieved.
Patent Information
- Application Number
- CN202011381169.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-11-30
AI Technical Summary
Existing technology cannot accurately predict the productivity of fracturing horizontal wells under advanced energy replenishment conditions in low-pressure tight oil reservoirs, resulting in poor oil well development results.
By obtaining the basic parameters of tight reservoirs and horizontal wells, determining the effective seepage distance of the injected fluid and the area of the advanced energy replenishment area, calculating the average formation pressure and initial porosity and permeability, dividing the production stages and constructing the corresponding productivity model, in order to Accurately predict horizontal well productivity.
It has achieved accurate prediction of the productivity of advanced volume fracturing horizontal wells in low-pressure tight oil reservoirs, optimized the production allocation and process parameter design of oil wells, and improved development efficiency.
Smart Images

Figure CN114575831B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of oil and gas field development, and in particular to a method and device for predicting the productivity of a volumetric fracturing horizontal well in an advanced energy supplement development mode. Background Art
[0002] This section is intended to provide a background or context to the embodiments of the invention recited in the claims. No admission is made that the description herein is prior art by inclusion in this section.
[0003] Tight oil reservoirs are large in quantity and widely distributed, and are an important successor to conventional oil and gas resources. Low-pressure tight oil, represented by the Chang 7 tight oil in the Ordos Basin, is one of the main components of my country's tight oil resources. Due to the poor physical properties of the tight oil reservoir itself, horizontal well volume fracturing is required to achieve efficient development. In addition to low porosity and low permeability, low-pressure tight oil also has the characteristics of low pore pressure. The formation pressure coefficient is 0.7 to 0.9, and the formation energy is seriously insufficient, which has an adverse effect on the development effect of the oil well.
[0004] In recent years, a new development method of advance water injection and energy replenishment has emerged for the development of low-pressure tight oil, which can effectively solve the problem of low reservoir pore pressure. Advance water injection and energy replenishment are essentially different from hydraulic fracturing. On the one hand, the process of hydraulic fracturing is very fast, the construction displacement is large, and the construction is completed in a few hours. The pressure is mainly concentrated near the cracks and has a limited extension range in the reservoir. Advance energy replenishment is a slow equilibrium process. It usually takes half a year or even a year to inject water in the same well. The pressure range is wide and the pressure tends to be balanced within the energy replenishment range. On the other hand, the fracturing fluid after hydraulic fracturing will be quickly returned after the well is opened. Most of the fracturing fluid can be discharged in a short period of time, and then the formation crude oil can be mined. The injected water of advance energy replenishment will remain in the formation and coexist with the formation crude oil, and it will be mined at the same time as the crude oil. There is also an essential difference between advance water injection and water injection well network energy replenishment. The water injection well network energy replenishment is a process in which there are both water injection wells and oil production wells in the well network. It is a process of water drive oil between wells, in which the water injection wells inject water and the oil production wells produce oil. Advance water injection and energy replenishment is a process of injection and production in the same well, and there is no water drive oil.
[0005] Advance water injection replenishment involves injecting large amounts of water into the reservoir over a long period of time, which causes great changes in formation pressure, porosity, and permeability, forming a high-pressure zone near the horizontal well. Moreover, since advance water injection is implemented before hydraulic fracturing, the production mechanism of the horizontal well after hydraulic fracturing becomes more complicated, two seepage areas appear, and the prediction of horizontal well production capacity becomes more difficult. At present, the production capacity prediction methods and technologies for tight oil are all carried out on fractured horizontal wells under the original reservoir conditions, and it is impossible to calculate the production capacity of fractured horizontal wells under advance water injection conditions. Therefore, it is of great significance to form a production capacity prediction method for low-pressure tight oil reservoirs with advance water injection volume fractured horizontal wells. Summary of the invention
[0006] The embodiment of the present invention provides a method for predicting the productivity of a volume fracturing horizontal well under an advanced energy replenishment development mode, which is used to accurately predict the productivity of a volume fracturing horizontal well under advanced energy replenishment in a low-pressure tight oil reservoir, and provide technical support for accurate evaluation and prediction of the productivity of low-pressure tight oil, optimization of production allocation and optimization design of process parameters. The method includes:
[0007] Obtain basic parameters of tight reservoirs and horizontal wells for advanced water injection, including the actual production time t of the horizontal wells;
[0008] The effective seepage distance r of the injected fluid and the area V of the advance energy replenishment area are determined according to the basic parameters. The average formation pressure p of the advance energy replenishment area is determined according to the area V of the advance energy replenishment area and the basic parameters. e ;
[0009] According to the average formation pressure p e and basic parameters to determine the initial porosity of the reservoir after the energy replenishment in the advanced energy replenishment area before the start of hydraulic fracturing and the initial permeability k ie1 ;
[0010] According to the effective seepage distance r, average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters, determine the stage time t1 of the first stage of horizontal well production, wherein the first stage is the stage of seepage in the energy replenishment area, and the second stage is the stage of seepage in the entire fracturing influence area, and the second stage begins after the first stage ends;
[0011] According to the actual production time t, effective seepage distance r, average formation pressure p e , initial reservoir porosity Initial permeability k ie1 and basic parameters to construct the first model of volumetric fracturing capacity of tight oil horizontal wells in the advanced energy replenishment area;
[0012] According to the actual production time t, average formation pressure p e and basic parameters to construct the second model of volume fracturing capacity of tight oil horizontal wells in the entire fracturing influence area;
[0013] When t≤t1, the first model is used to predict the productivity of the horizontal well; when t>t1, the second model is used to predict the productivity of the horizontal well.
[0014] The embodiment of the present invention also provides a device for predicting the productivity of a volume fracturing horizontal well in an advanced energy replenishment development mode, which is used to accurately predict the productivity of a volume fracturing horizontal well in an advanced energy replenishment low-pressure tight oil reservoir, and provide technical support for accurate evaluation and prediction of low-pressure tight oil productivity, optimized production allocation and optimized design of process parameters. The device includes:
[0015] An acquisition module is used to obtain basic parameters of tight reservoirs and horizontal wells for advanced water injection and energy replenishment, including the actual production time t of the horizontal wells;
[0016] The determination module is used to determine the effective seepage distance r of the injected fluid and the area V of the advance energy replenishment area according to the basic parameters, and determine the average formation pressure p of the advance energy replenishment area according to the area V of the advance energy replenishment area e ;
[0017] The determination module is also used to determine the average formation pressure p e and basic parameters to determine the initial porosity of the reservoir after the energy replenishment in the advanced energy replenishment area before the start of hydraulic fracturing and the initial permeability k ie1 ;
[0018] The determination module is also used to determine the effective seepage distance r, the average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters, determine the stage time t1 of the first stage of horizontal well production. The first stage is the stage of seepage in the energy replenishment area, and the second stage is the stage of seepage in the entire fracturing influence area. After the first stage is completed, the second stage begins;
[0019] The model building module is used to calculate the actual production time t, effective seepage distance r, average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters to construct the first model of volumetric fracturing capacity of tight oil horizontal wells in the advanced energy replenishment area;
[0020] The model building module is also used to calculate the actual production time t, average formation pressure p e and basic parameters to construct the second model of volume fracturing capacity of tight oil horizontal wells in the entire fracturing influence area;
[0021] The production capacity prediction module is used to predict the production capacity of the horizontal well using the first model when t≤t1; and to predict the production capacity of the horizontal well using the second model when t>t1.
[0022] An embodiment of the present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method for predicting the production capacity of volumetric fracturing horizontal wells under the above-mentioned advanced energy replenishment development mode is implemented.
[0023] An embodiment of the present invention further provides a computer-readable storage medium storing a computer program for executing the above-mentioned method for predicting the productivity of volumetric fracturing horizontal wells under the advanced energy replenishment development mode.
[0024] In the embodiment of the present invention, considering the fact that low-pressure tight oil advance energy replenishment has a great influence on the production of volume fracturing horizontal wells, an innovative method and device for predicting the production capacity of volume fracturing horizontal wells by advance energy replenishment are formed, which has the following significant advantages:
[0025] 1. An innovative calculation method for the impact of advance energy replenishment of low-pressure tight oil on tight reservoirs and fluid parameters has been formed. It can calculate the changes in average formation pressure, porosity and permeability under different reservoir physical conditions and different basic parameters, as well as the size of the advance energy replenishment area, which can provide a basis for the formulation of technical policies for advance energy replenishment development.
[0026] 2. An innovative method for dividing the production stages of horizontal wells with advance energy replenishment fracturing has been established, and a stage time calculation model for the transition between different production stages has been established. This can realize the division of production stages under different reservoir conditions, different advance energy replenishment scales, and different mining systems, and can predict production changes, providing a basis for optimizing the production allocation of oil wells.
[0027] 3. For the first time, a capacity prediction method for different production stages has been developed, which can accurately predict the capacity of oil wells under complex mining conditions of advance energy replenishment for volume fracturing horizontal wells.
[0028] 4. Two sets of production capacity models for different production stages of tight oil volume fracturing horizontal wells under the advance energy replenishment development mode were innovatively established. The first model takes into account the impact of advance energy replenishment on reservoir parameters and the impact of stress sensitivity on oil well production, and can more accurately predict the initial production of horizontal wells under the advance energy replenishment mode; the second model can more accurately predict the production of horizontal wells over the entire life cycle under the advance energy replenishment mode, providing a basis for optimizing oil well production allocation and production system optimization, and has broad application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0030] Figure 1 This is a flow chart of a method for predicting the productivity of a horizontal well subjected to volumetric fracturing with advanced energy replenishment in an embodiment of the present invention;
[0031] Figure 2 It is a schematic diagram of the division of different seepage stages of a fractured horizontal well under the condition of advanced water injection and energy replenishment in an embodiment of the present invention;
[0032] Figure 3 Schematic diagram of seepage in the advanced energy replenishment area in the first stage in an embodiment of the present invention;
[0033] Figure 4 Schematic diagram of seepage in the entire fracturing influence area in the second stage in an embodiment of the present invention;
[0034] Figure 5 It is a schematic structural diagram of a device for predicting productivity of horizontal wells by advanced energy replenishment volume fracturing according to an embodiment of the present invention;
[0035] Figure 6 The figure is a schematic diagram of the structure of a computer device in an embodiment of the present invention. DETAILED DESCRIPTION
[0036] To make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. Here, the exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.
[0037] The embodiment of the present invention provides a method for predicting the productivity of a horizontal well by volume fracturing with advanced energy replenishment, such as Figure 1 As shown, the method includes steps 101 to 106:
[0038] Step 101, obtaining basic parameters of a tight reservoir and a horizontal well for advanced water injection and energy replenishment, wherein the basic parameters include an actual production time t of the horizontal well.
[0039] Among them, the basic parameters include the original formation pressure p of the reservoir i , starting pressure gradient G, effective thickness h, volume compression coefficient of crude oil C0, volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f , initial water saturation S wc, original reservoir porosity φ, horizontal well downhole water injection pressure p iw , the distance L between the first perforation point and the last perforation point, the volume coefficient B of the injected water w , total water injection volume W p , original reservoir porosity The stress sensitivity coefficient υ and the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and the width of the artificial crack w f , fracture permeability k fe1 , the number of artificial fractures n, the coefficient of variation of artificial fracture permeability γ f , crude oil viscosity μ, bottom hole production pressure p w , the spacing l between the hydraulic fractures and the half length x of the artificial fractures f .
[0040] The original formation pressure p i Determined by well testing or downhole pressure gauge measurement data; the starting pressure gradient G is obtained by measuring the tight reservoir through indoor experiments. The starting pressure gradient of reservoirs with different physical properties is different, and its unit is MPa / s; the effective thickness h is determined by well logging data, and its unit is meter (m); the volume compression coefficient of crude oil C0, the volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f , initial water saturation S wc , Volume coefficient of injected water B w Calculated through indoor experimental data or logging data; Downhole water injection pressure p iw , bottom hole production pressure p w Obtained through actual on-site measurement; the distance L between the first perforation point and the last perforation point is determined through logging data or actual measurement, and its unit is meter (m); the total water injection volume W p Determined by actual on-site measurement, the unit is cubic meter (m 3 ), original reservoir porosity φ, original reservoir matrix permeability k i , original reservoir porosity The stress sensitivity coefficient υ and the original reservoir matrix permeability k i The stress sensitivity coefficient γ is determined by indoor core measurement; the width of the artificial fracture w f , fracture permeability k fe1 , the number of artificial fractures n, the coefficient of variation of artificial fracture permeability γ f , crude oil viscosity μ is obtained through indoor fracturing simulation experiments or logging data; the fracture spacing l is obtained through the actual fracturing construction parameters on site; the half length x of the artificial fracture f Determined by artificial crack monitoring.
[0041] Step 102: Determine the effective seepage distance r of the injected fluid and the area V of the advance energy replenishment area according to the basic parameters, and determine the average formation pressure p of the advance energy replenishment area according to the area V of the advance energy replenishment area and the basic parameters. e .
[0042] In low-pressure tight reservoirs, long-term low-volume water injection to replenish energy is carried out before horizontal well volume fracturing, and the pressure and physical properties of the formation will change. First, the impact range of the advance water injection in the formation, that is, the area of the advance energy replenishment zone, is determined.
[0043] Specifically, according to the downhole water injection pressure p iw , original formation pressure p i , start pressure gradient G, determine the downhole water injection pressure p iw Under the condition of the starting pressure gradient G, the effective seepage distance r of the injected fluid in the reservoir matrix is caused; according to the effective thickness h, the effective seepage distance r, and the distance L from the first perforation point to the last perforation point, the area V of the advance energy replenishment area is determined.
[0044] The effective seepage distance r is calculated according to the following formula:
[0045]
[0046] The advance energy replenishment area is an elliptical area. The area V of the advance energy replenishment area is calculated according to the following formula:
[0047] V=h(2rL+4πr 2 )
[0048] Due to the influence of advance charging, the formation pressure of the reservoir around the horizontal well will change significantly. Advance charging is different from fracturing. The water injection pressure will be lower than the fracture initiation pressure, and no new fractures will be generated. The pressure change will only occur within the advance charging range. Moreover, due to the slow injection speed and long time, the pressure in the advance charging area is close to equilibrium, and the pressure decreases slowly or does not decrease.
[0049] According to the original formation pressure p i , total water injection volume W p , Volume coefficient of injected water B w , original reservoir porosity φ, original water saturation S wc , the volume compression coefficient of crude oil C0, the volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f and the area V of the advance energy replenishment area to determine the average formation pressure p within the advance energy replenishment area e The formula used is as follows:
[0050]
[0051] Step 103: According to the average formation pressure p e and basic parameters to determine the initial porosity of the reservoir after the energy replenishment in the advanced energy replenishment area before the start of hydraulic fracturing and the initial permeability k ie1 .
[0052] Tight reservoirs have strong stress sensitivity. The change in pore volume caused by the change in pore pressure causes changes in porosity and permeability, which is different from conventional reservoirs. Moreover, under the condition of advanced energy replenishment, the amount of injected water is often much greater than the amount of fracturing fluid, which causes a huge change in the porosity and permeability of the reservoir matrix before hydraulic fracturing. This change not only affects the fracturing process, but also has a great impact on the production capacity of the oil well, which cannot be ignored.
[0053] Specifically, according to the original reservoir porosity Original reservoir porosity The stress sensitivity coefficient υ and the original formation pressure p i and the average formation pressure p e , determine the initial porosity According to the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and the original formation pressure p i and the average formation pressure p e , determine the initial permeability k ie1 . and k ie1 Both are reservoir porosity and permeability before hydraulic fracturing begins.
[0054] The initial porosity is calculated using the following formula:
[0055]
[0056] The initial permeability k is calculated using the following formula: ie1 :
[0057]
[0058] Step 104: According to the effective seepage distance r and the average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters, determine the stage time t1 of the first stage of horizontal well production.
[0059] Among them, the first stage is the stage of seepage in the energy replenishment area, and the second stage is the stage of seepage in the entire fracturing influence area. The second stage begins after the first stage ends.
[0060] Since there is a long-term water injection process before hydraulic fracturing, the production process of horizontal wells under advanced energy replenishment conditions is more complicated. According to the differences in formation parameters and the characteristics of the seepage process of oil well production, the entire seepage stage is divided into two stages: Figure 2 An exemplary schematic diagram of the division of different seepage stages of a fractured horizontal well under advanced water injection and energy replenishment conditions is given: the first stage is the seepage in the advanced energy replenishment area, where the formation pressure is the highest, the distance to the wellbore is the closest, and it is the area where flow occurs first. For example, Figure 3 A schematic diagram of seepage in the advance energy replenishment area in the first stage is given; the second stage is the seepage in the entire hydraulic fracturing affected area. Since the artificial fractures are far away, the extension range will exceed the range of the advance energy replenishment area, and the pore pressure is low, so when the pressure in the advance energy replenishment range drops to the original formation pressure of the reservoir, the entire hydraulic fracturing affected area will begin to seep. For example, Figure 4 A schematic diagram of the second stage seepage in the entire fracture affected area is given.
[0061] In this step, according to the volume compression coefficient of crude oil C0, the volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f , initial water saturation S wc , calculate the comprehensive compressibility coefficient C of the reservoir t ; According to the initial permeability k ie1 , original reservoir matrix permeability k i The stress sensitivity coefficient γ and bottom hole production pressure p w and the average formation pressure p e , determine the matrix permeability k in the first stage in the energy replenishment area i1 ; According to the fracture permeability k fe1 , artificial fracture permeability variation coefficient γ f , bottom hole production pressure p w and the average formation pressure p e , determine the permeability k of the artificial fractures in the first production stage in the energy replenishment area f1 ; According to the comprehensive compression coefficient C of the reservoir t , initial porosity Original reservoir porosity The stress sensitivity coefficient υ and bottom hole production pressure p w , average formation pressure p e , crude oil viscosity μ, initial permeability k ie1 , artificial fracture permeability k f1, the width of the artificial crack w f , effective seepage distance r, original formation pressure p i , the matrix permeability k in the first stage of the energy replenishment area i1 and the original reservoir matrix permeability k i The stress sensitivity coefficient γ is used to determine the stage time t1 of the first stage of horizontal well production.
[0062] Among them, the comprehensive compressibility coefficient C of the reservoir is calculated according to the following formula: t :
[0063]
[0064] The matrix permeability k in the first stage in the energy replenishment area is calculated according to the following formula i1 :
[0065]
[0066] The permeability k of the artificial fractures in the first production stage in the energy replenishment area is calculated according to the following formula f1 :
[0067]
[0068] The stage time t1 of the first stage is calculated according to the following formula:
[0069]
[0070] When the boundary pressure of the advance energy replenishment area is equal to the original formation pressure, the first stage after time t1 ends and the second stage of seepage begins.
[0071] Step 105: According to the actual production time t, the effective seepage distance r, and the average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters, and construct the first model of volumetric fracturing capacity of tight oil horizontal wells in the advanced energy replenishment area.
[0072] According to the initial permeability k ie1 , bottom hole production pressure p w , average formation pressure p e , actual production time t, original reservoir matrix permeability k i The stress sensitivity coefficient γ and the reservoir comprehensive compression coefficient C t , initial porosity Original reservoir porosity stress sensitivity coefficient υ, crude oil viscosity μ, artificial fracture width w fand the fracture spacing l of the hydraulic fractures to determine the first pressure wave propagation distance l1. The calculation formula of l1 is as follows:
[0073]
[0074] After l1 is calculated, according to the permeability k of the artificial fractures in the first production stage in the energy replenishment area f1 , the matrix permeability k in the first stage of the energy replenishment area i1 , the width of the artificial crack w f , the first pressure wave propagation distance l1, crude oil viscosity μ, bottom hole production pressure p w , average formation pressure p e , original reservoir matrix permeability k i , effective seepage distance r, number of artificial fractures n and effective thickness h, determine the first model q1. q1 is as follows:
[0075]
[0076] Step 106: According to the actual production time t and the average formation pressure p e The second volume fracturing capacity model of tight oil horizontal wells within the entire fracturing influence area is constructed based on the basic parameters.
[0077] Step 106 may be specifically performed as follows: Steps 1061 to 1063:
[0078] Step 1061: Based on the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and bottom hole production pressure p w and the original formation pressure p i , determine the matrix permeability k in the second stage of the entire seepage area i2 .
[0079] k i2 The calculation formula is:
[0080]
[0081] Step 1062: According to the crack permeability k fe1 , artificial fracture permeability variation coefficient γ f , bottom hole production pressure p w and the average formation pressure p e , determine the permeability k of the artificial fracture in the second stage in the entire seepage area f2 .
[0082] k f2 The calculation formula is:
[0083]
[0084] Step 1063: According to k ie2 , bottom hole production pressure p w , original formation pressure p i , original reservoir matrix permeability k i The stress sensitivity coefficient γ, the original reservoir porosity φ, and the reservoir comprehensive compression coefficient C t , crude oil viscosity μ, artificial fracture width w f The second pressure wave propagation distance l2 is determined based on the fracture spacing l and the actual production time t.
[0085] The calculation formula of l2 is as follows:
[0086]
[0087] Step 1064: Based on the permeability k of the artificial fractures in the second stage in the entire seepage area f2 , the matrix permeability k in the second stage of the entire seepage area i2 , the width of the artificial crack w f , the second pressure wave propagation distance l2, crude oil viscosity μ, bottom hole production pressure p w , original formation pressure p i , half length of artificial crack x f , the number of artificial cracks n and the effective thickness h, determine the second model q2.
[0088] in,
[0089]
[0090] Step 107: when t≤t1, use the first model to predict the productivity of the horizontal well; when t>t1, use the second model to predict the productivity of the horizontal well.
[0091] Since the stage time of the first stage is t1, when time t1 is exceeded, the second stage is entered. Therefore, when t≤t1, the first model is used to predict the production capacity of the horizontal well; when t>t1, the second model is used to predict the production capacity of the horizontal well.
[0092] In the embodiment of the present invention, considering the fact that low-pressure tight oil advance energy replenishment has a great influence on the production of volume fracturing horizontal wells, an innovative method and device for predicting the production capacity of volume fracturing horizontal wells by advance energy replenishment are formed, which has the following significant advantages:
[0093] 1. An innovative calculation method for the impact of advance energy replenishment of low-pressure tight oil on tight reservoirs and fluid parameters has been formed. It can calculate the changes in average formation pressure, porosity and permeability under different reservoir physical conditions and different basic parameters, as well as the size of the advance energy replenishment area, which can provide a basis for the formulation of technical policies for advance energy replenishment development.
[0094] 2. An innovative method for dividing the production stages of horizontal wells with advance energy replenishment fracturing has been established, and a stage time calculation model for the transition between different production stages has been established. This can realize the division of production stages under different reservoir conditions, different advance energy replenishment scales, and different mining systems, and can predict production changes, providing a basis for optimizing the production allocation of oil wells.
[0095] 3. For the first time, a capacity prediction method for different production stages has been developed, which can accurately predict the capacity of oil wells under complex mining conditions of advance energy replenishment for volume fracturing horizontal wells.
[0096] 4. Two sets of production capacity models for different production stages of tight oil volume fracturing horizontal wells under the advance energy replenishment development mode were innovatively established. The first model takes into account the impact of advance energy replenishment on reservoir parameters and the impact of stress sensitivity on oil well production, and can more accurately predict the initial production of horizontal wells under the advance energy replenishment mode; the second model can more accurately predict the production of horizontal wells over the entire life cycle under the advance energy replenishment mode, providing a basis for optimizing oil well production allocation and production system optimization, and has broad application prospects.
[0097] The present invention also provides a device for predicting the productivity of horizontal wells by advanced energy replenishment volume fracturing, as described in the following embodiments. Since the principle of solving the problem by the device is similar to the method for predicting the productivity of horizontal wells by advanced energy replenishment volume fracturing, the implementation of the device can refer to the implementation of the method for predicting the productivity of horizontal wells by advanced energy replenishment volume fracturing, and the repeated parts will not be repeated.
[0098] like Figure 5 As shown, the device 500 includes an acquisition module 501, a determination module 502, a model building module 503 and a production capacity prediction module 504.
[0099] The acquisition module 501 is used to acquire basic parameters of the tight reservoir and the horizontal well for advanced water injection and energy replenishment, and the basic parameters include the actual production time t of the horizontal well;
[0100] The determination module 502 is used to determine the effective seepage distance r of the injected fluid and the area V of the advance energy replenishment area according to the basic parameters, and to determine the average formation pressure p of the advance energy replenishment area according to the area V of the advance energy replenishment area and the basic parameters. e ;
[0101] The determination module 502 is further configured to determine the average formation pressure pe and basic parameters to determine the initial porosity of the reservoir after the energy replenishment in the advanced energy replenishment area before the start of hydraulic fracturing and the initial permeability k ie1 ;
[0102] The determination module 502 is further used to determine the effective seepage distance r, the average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters, determine the stage time t1 of the first stage of horizontal well production. The first stage is the stage of seepage in the energy replenishment area, and the second stage is the stage of seepage in the entire fracturing influence area. After the first stage is completed, the second stage begins;
[0103] The model building module 503 is used to build a model based on the actual production time t, effective seepage distance r, average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters to construct the first model of volumetric fracturing capacity of tight oil horizontal wells in the advanced energy replenishment area;
[0104] The model building module 503 is also used to calculate the actual production time t, the average formation pressure p e and basic parameters to construct the second model of volume fracturing capacity of tight oil horizontal wells in the entire fracturing influence area;
[0105] The production capacity prediction module 504 is used to predict the production capacity of the horizontal well using the first model when t≤t1; and to predict the production capacity of the horizontal well using the second model when t>t1.
[0106] In one implementation of the present invention, the basic parameters also include the original formation pressure p of the reservoir. i , starting pressure gradient G, effective thickness h, volume compression coefficient of crude oil C0, volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f , initial water saturation S wc , original reservoir porosity φ, horizontal well downhole water injection pressure p iw , the distance L between the first perforation point and the last perforation point, the volume coefficient B of the injected water w , total water injection volume W p , original reservoir porosity The stress sensitivity coefficient υ and the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and the width of the artificial crack w f , fracture permeability k fe1, the number of artificial fractures n, the coefficient of variation of artificial fracture permeability γ f , crude oil viscosity μ, bottom hole production pressure p w , the spacing l between the hydraulic fractures and the half length x of the artificial fractures f .
[0107] In an implementation of the embodiment of the present invention, the determination module 502 is used to:
[0108] According to the downhole water injection pressure p iw , original formation pressure p i , start pressure gradient G, determine the downhole water injection pressure p iw Under the condition of , the effective seepage distance r of the injected fluid caused by the starting pressure gradient G in the reservoir matrix;
[0109] According to the effective thickness h, the effective seepage distance r, and the distance L between the first perforation point and the last perforation point, the area V of the advance energy replenishment area is determined;
[0110] According to the original formation pressure p i , total water injection volume W p , Volume coefficient of injected water B w , original reservoir porosity φ, original water saturation S wc , the volume compression coefficient of crude oil C0, the volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f and the area V of the advance energy replenishment area to determine the average formation pressure p within the advance energy replenishment area e .
[0111] In an implementation of the embodiment of the present invention, the determination module 502 is used to:
[0112] According to the original reservoir porosity Original reservoir porosity The stress sensitivity coefficient υ and the original formation pressure p i and the average formation pressure p e , determine the initial porosity
[0113] According to the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and the original formation pressure p i and the average formation pressure p e , determine the initial permeability k ie1 .
[0114] In an implementation of the embodiment of the present invention, the determination module 502 is used to:
[0115] According to the volume compression coefficient of crude oil C0 and the volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f , initial water saturation S wc , calculate the comprehensive compressibility coefficient C of the reservoir t ;
[0116] According to the initial permeability k ie1 , original reservoir matrix permeability k i The stress sensitivity coefficient γ and bottom hole production pressure p w and the average formation pressure p e , determine the matrix permeability k in the first stage in the energy replenishment area i1 ;
[0117] According to the crack permeability k fe1 , artificial fracture permeability variation coefficient γ f , bottom hole production pressure p w and the average formation pressure p e , determine the permeability k of the artificial fractures in the first production stage in the energy replenishment area f1 ;
[0118] According to the comprehensive compression coefficient C t , initial porosity Original reservoir porosity The stress sensitivity coefficient υ and bottom hole production pressure p w , average formation pressure p e , crude oil viscosity μ, initial permeability k ie1 , artificial fracture permeability k f1 , the width of the artificial crack w f , effective seepage distance r, original formation pressure p i , the matrix permeability k in the first stage of the energy replenishment area i1 and the original reservoir matrix permeability k i The stress sensitivity coefficient γ is used to determine the stage time t1 of the first stage of horizontal well production.
[0119] In one implementation of the embodiment of the present invention, the model building module 503 is used to:
[0120] According to the initial permeability k ie1 , bottom hole production pressure p w , average formation pressure p e , actual production time t, original reservoir matrix permeability k i The stress sensitivity coefficient γ and the reservoir comprehensive compression coefficient C t , initial porosity Original reservoir porosity stress sensitivity coefficient υ, crude oil viscosity μ, artificial fracture width w f and the distance l between the fractures, determining the propagation distance l1 of the first pressure wave;
[0121] According to the permeability k of the artificial fractures in the first production stage in the energy replenishment area f1 , the matrix permeability k in the first stage of the energy replenishment area i1 , the width of the artificial crack w f , the first pressure wave propagation distance l1, crude oil viscosity μ, bottom hole production pressure p w , average formation pressure p e , original reservoir matrix permeability k i , effective seepage distance r, the number of artificial fractures n and the effective thickness h, determine the first model q1.
[0122] In one implementation of the embodiment of the present invention, the model building module 503 is used to:
[0123] According to the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and bottom hole production pressure p w and the original formation pressure p i , determine the matrix permeability k in the second stage of the entire seepage area i2 ;
[0124] According to the crack permeability k fe1 , artificial fracture permeability variation coefficient γ f , bottom hole production pressure p w and the average formation pressure p e , determine the permeability k of the artificial fracture in the second stage in the entire seepage area f2 ;
[0125] According to k ie2 , bottom hole production pressure p w , original formation pressure p i , original reservoir matrix permeability k i The stress sensitivity coefficient γ, the original reservoir porosity φ, and the reservoir comprehensive compression coefficient C t , crude oil viscosity μ, artificial fracture width w f The second pressure wave propagation distance l2 is determined based on the fracture spacing l and the actual production time t;
[0126] According to the permeability k of the artificial fractures in the second stage in the whole seepage area f2 , the matrix permeability k in the second stage of the entire seepage area i2 , the width of the artificial crack w f, the second pressure wave propagation distance l2, crude oil viscosity μ, bottom hole production pressure p w , original formation pressure p i , half length of artificial crack x f , the number of artificial cracks n and the effective thickness h, determine the second model q2.
[0127] In the embodiment of the present invention, considering the fact that low-pressure tight oil advance energy replenishment has a great influence on the production of volume fracturing horizontal wells, an innovative method and device for predicting the production capacity of volume fracturing horizontal wells by advance energy replenishment are formed, which has the following significant advantages:
[0128] 1. An innovative calculation method for the impact of advance energy replenishment of low-pressure tight oil on tight reservoirs and fluid parameters has been formed. It can calculate the changes in average formation pressure, porosity and permeability under different reservoir physical conditions and different basic parameters, as well as the size of the advance energy replenishment area, which can provide a basis for the formulation of technical policies for advance energy replenishment development.
[0129] 2. An innovative method for dividing the production stages of horizontal wells with advance energy replenishment fracturing has been established, and a stage time calculation model for the transition between different production stages has been established. This can realize the division of production stages under different reservoir conditions, different advance energy replenishment scales, and different mining systems, and can predict production changes, providing a basis for optimizing the production allocation of oil wells.
[0130] 3. For the first time, a capacity prediction method for different production stages has been developed, which can accurately predict the capacity of oil wells under complex mining conditions of advance energy replenishment for volume fracturing horizontal wells.
[0131] 4. Two sets of production capacity models for different production stages of tight oil volume fracturing horizontal wells under the advance energy replenishment development mode were innovatively established. The first model takes into account the impact of advance energy replenishment on reservoir parameters and the impact of stress sensitivity on oil well production, and can more accurately predict the initial production of horizontal wells under the advance energy replenishment mode; the second model can more accurately predict the production of horizontal wells over the entire life cycle under the advance energy replenishment mode, providing a basis for optimizing oil well production allocation and production system optimization, and has broad application prospects.
[0132] An embodiment of the present invention further provides a computer device, Figure 6 Schematic diagram of a computer device in an embodiment of the present invention. The computer device can implement all steps in the method for predicting the productivity of a volumetric fractured horizontal well in the advanced energy supplement development mode in the above embodiment. The computer device specifically includes the following contents:
[0133] Processor (processor) 601, memory (memory) 602, communication interface (CommunicationsInterface) 603 and communication bus 604;
[0134] The processor 601, the memory 602, and the communication interface 603 communicate with each other through the communication bus 604; the communication interface 603 is used to realize information transmission between related devices;
[0135] The processor 601 is used to call the computer program in the memory 602, and when the processor executes the computer program, the method for predicting the production capacity of a volumetric fractured horizontal well in the advanced energy replenishment development mode in the above embodiment is implemented.
[0136] An embodiment of the present invention further provides a computer-readable storage medium storing a computer program for executing the above-mentioned method for predicting the productivity of volumetric fracturing horizontal wells under the advanced energy replenishment development mode.
[0137] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0138] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0139] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0140] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0141] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for predicting the productivity of horizontal wells with volume fracturing under advanced energy replenishment development mode. It is characterized in that The method comprises: Obtain basic parameters of tight reservoirs and horizontal wells for advanced water injection, including the actual production time t of the horizontal wells; The effective seepage distance r of the injected fluid and the area V of the advance energy replenishment area are determined according to the basic parameters. The average formation pressure p of the advance energy replenishment area is determined according to the area V of the advance energy replenishment area and the basic parameters. e ; According to the average formation pressure p e and basic parameters to determine the initial porosity of the reservoir after the energy replenishment in the advanced energy replenishment area before the start of hydraulic fracturing and the initial permeability k ie1 ; According to the effective seepage distance r, average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters to determine the stage time t of the first stage of horizontal well production 1 , where the first stage is the stage of seepage in the energy replenishment area, and the second stage is the stage of seepage in the entire fracturing affected area. After the first stage is completed, the second stage begins; According to the actual production time t, effective seepage distance r, average formation pressure p e , initial reservoir porosity Initial permeability k ie1 and basic parameters to construct the first model of volumetric fracturing capacity of tight oil horizontal wells in the advanced energy replenishment area; According to the actual production time t, the original formation pressure p i and basic parameters to construct the second model of volume fracturing capacity of tight oil horizontal wells in the entire fracturing influence area; When t≤t 1 When t>t 1 When , the second model is used to predict the production capacity of the horizontal well; Among them, the basic parameters also include the original formation pressure p of the reservoir i , starting pressure gradient G, effective thickness h, volume compressibility coefficient C of crude oil 0 , Volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f , initial water saturation S wc , original reservoir porosity φ, horizontal well downhole water injection pressure p iw , the distance L between the first perforation point and the last perforation point, the volume coefficient B of the injected water w , total water injection volume W p , original reservoir porosity The stress sensitivity coefficient υ and the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and the width of the artificial crack w f , fracture permeability k fe1 , the number of artificial fractures n, the coefficient of variation of artificial fracture permeability γ f , crude oil viscosity μ, bottom hole production pressure p w , the spacing l between the hydraulic fractures and the half length x of the artificial fractures f ; According to the basic parameters, the effective seepage distance r and the area V of the advance energy replenishment area are determined. According to the area V of the advance energy replenishment area and the basic parameters, the average formation pressure p of the advance energy replenishment area is determined. e ,include: According to the downhole water injection pressure p iw , original formation pressure p i , start pressure gradient G, determine the downhole water injection pressure p iw Under the condition of , the effective seepage distance r of the injected fluid caused by the starting pressure gradient G in the reservoir matrix; According to the effective thickness h, the effective seepage distance r, and the distance L between the first perforation point and the last perforation point, the area V of the advance energy replenishment area is determined; According to the original formation pressure p i , total water injection volume W p , Volume coefficient of injected water B w , original reservoir porosity φ, original water saturation S wc 、Volume compression coefficient C of crude oil 0 , Volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f and the area V of the advance energy replenishment area to determine the average formation pressure p within the advance energy replenishment area e ; According to the original formation pressure p i , total water injection volume W p , Volume coefficient of injected water B w , original reservoir porosity φ, original water saturation S wc 、Volume compression coefficient C of crude oil 0 , Volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f and the area V of the advance energy replenishment area to determine the average formation pressure p within the advance energy replenishment area e ,include: The average formation pressure p within the advance energy replenishment area is determined by the following formula e :
2. The method according to claim 1, It is characterized in that According to the average formation pressure p e and basic parameters to determine the initial porosity of the reservoir after energy replenishment before hydraulic fracturing begins. and the initial permeability k ie1 ,include: According to the original reservoir porosity Original reservoir porosity The stress sensitivity coefficient υ and the original formation pressure p i and the average formation pressure p e , determine the initial porosity According to the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and the original formation pressure p i and the average formation pressure p e , determine the initial permeability k ie1 .
3. The method according to claim 1, It is characterized in that According to the average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters to determine the stage time t of the first stage of horizontal well production 1 ,include: According to the volume compression coefficient C of crude oil 0 , Volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f , initial water saturation S wc , calculate the comprehensive compressibility coefficient C of the reservoir t ; According to the initial permeability k ie1 , original reservoir matrix permeability k i The stress sensitivity coefficient γ and bottom hole production pressure p w and the average formation pressure p e , determine the matrix permeability k in the first stage in the energy replenishment area i1 ; According to the crack permeability k fe1 , artificial fracture permeability variation coefficient γ f , bottom hole production pressure p w and the average formation pressure p e , determine the permeability k of the artificial fractures in the first production stage in the energy replenishment area f1 ; According to the comprehensive compression coefficient C t , initial porosity Original reservoir porosity The stress sensitivity coefficient υ and bottom hole production pressure p w , average formation pressure p e , crude oil viscosity μ, initial permeability k ie1 , artificial fracture permeability k f1 , the width of the artificial crack w f , effective seepage distance r, original formation pressure p i , the matrix permeability k in the first stage of the energy replenishment area i1 and the original reservoir matrix permeability k i The stress sensitivity coefficient γ determines the stage time t of the first stage of horizontal well production. 1 .
4. The method according to claim 3, It is characterized in that According to the actual production time t, effective seepage distance r, average formation pressure p e , initial porosity Initial permeability k ie1 Based on the basic parameters, the first model of volume fracturing capacity of tight oil horizontal wells in the advanced energy replenishment area is constructed, including: According to the initial permeability k ie1 , bottom hole production pressure p w , average formation pressure p e , actual production time t, original reservoir matrix permeability k i The stress sensitivity coefficient γ and the reservoir comprehensive compression coefficient C t , initial porosity Original reservoir porosity stress sensitivity coefficient υ, crude oil viscosity μ, artificial fracture width w f and the fracture spacing l of the hydraulic fractures, determine the first pressure wave propagation distance l 1 ; According to the permeability k of the artificial fractures in the first production stage in the energy replenishment area f1 , the matrix permeability k in the first stage of the energy replenishment area i1 , the width of the artificial crack w f , the first pressure wave propagation distance l 1 , crude oil viscosity μ, bottom hole production pressure p w , average formation pressure p e , original reservoir matrix permeability k i , effective seepage distance r, number of artificial fractures n and effective thickness h, determine the first model q 1 .
5. The method according to claim 3, It is characterized in that According to the actual production time t, average formation pressure p e The second model of volume fracturing capacity of tight oil horizontal wells in the entire fracturing influence area is constructed based on the basic parameters, including: According to the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and bottom hole production pressure p w and the original formation pressure p i , determine the matrix permeability k in the second stage of the entire seepage area i2 ; According to the crack permeability k fe1 , artificial fracture permeability variation coefficient γ f , bottom hole production pressure p w and the average formation pressure p e , determine the permeability k of the artificial fracture in the second stage in the entire seepage area f2 ; According to k ie2 , bottom hole production pressure p w , original formation pressure p i , original reservoir matrix permeability k i The stress sensitivity coefficient γ, the original reservoir porosity φ, and the reservoir comprehensive compression coefficient C t , crude oil viscosity μ, artificial fracture width w f The distance l between the fractures and the actual production time t are used to determine the propagation distance l of the second pressure wave. 2 ; According to the permeability k of the artificial fractures in the second stage in the whole seepage area f2 , the matrix permeability k in the second stage of the entire seepage area i2 , the width of the artificial crack w f , the second pressure wave propagation distance l 2 , crude oil viscosity μ, bottom hole production pressure p w , original formation pressure p i , half length of artificial crack x f , the number of artificial cracks n and the effective thickness h, determine the second model q 2 .
6. A device for predicting the production capacity of horizontal wells by volume fracturing under the advanced energy supplement development mode, It is characterized in that The device comprises: An acquisition module is used to obtain basic parameters of tight reservoirs and horizontal wells for advanced water injection and energy replenishment, including the actual production time t of the horizontal wells; The determination module is used to determine the effective seepage distance r of the injected fluid and the area V of the advance energy replenishment area according to the basic parameters, and determine the average formation pressure p of the advance energy replenishment area according to the area V of the advance energy replenishment area e ; The determination module is also used to determine the average formation pressure p e and basic parameters to determine the initial porosity of the reservoir after the energy replenishment in the advanced energy replenishment area before the start of hydraulic fracturing and the initial permeability k ie1 ; The determination module is also used to determine the effective seepage distance r, the average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters to determine the stage time t of the first stage of horizontal well production 1 The first stage is the stage of seepage in the energy replenishment area, and the second stage is the stage of seepage in the entire fracturing affected area. After the first stage is completed, the second stage begins; The model building module is used to calculate the actual production time t, effective seepage distance r, average formation pressure p e , initial porosity Initial permeability k ie1 and basic parameters to construct the first model of volumetric fracturing capacity of tight oil horizontal wells in the advanced energy replenishment area; The model building module is also used to calculate the actual production time t, the original formation pressure p i and basic parameters to construct the second model of volume fracturing capacity of tight oil horizontal wells in the entire fracturing influence area; Capacity forecasting module, used when t≤t 1 When t>t 1 When , the second model is used to predict the production capacity of the horizontal well; Among them, the basic parameters also include the original formation pressure p of the reservoir i , starting pressure gradient G, effective thickness h, volume compressibility coefficient C of crude oil 0 , Volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f , initial water saturation S wc , original reservoir porosity φ, horizontal well downhole water injection pressure p iw , the distance L between the first perforation point and the last perforation point, the volume coefficient B of the injected water w , total water injection volume W p , original reservoir porosity The stress sensitivity coefficient υ and the original reservoir matrix permeability k i , original reservoir matrix permeability k i The stress sensitivity coefficient γ and the width of the artificial crack w f , fracture permeability k fe1 , the number of artificial fractures n, the coefficient of variation of artificial fracture permeability γ f , crude oil viscosity μ, bottom hole production pressure p w , the spacing l between the hydraulic fractures and the half length x of the artificial fractures f ; Determine the module specifically for: According to the basic parameters, the effective seepage distance r and the area V of the advance energy replenishment area are determined. According to the area V of the advance energy replenishment area and the basic parameters, the average formation pressure p of the advance energy replenishment area is determined. e ,include: According to the downhole water injection pressure p iw , original formation pressure p i , start pressure gradient G, determine the downhole water injection pressure p iw Under the condition of , the effective seepage distance r of the injected fluid caused by the starting pressure gradient G in the reservoir matrix; According to the effective thickness h, the effective seepage distance r, and the distance L between the first perforation point and the last perforation point, the area V of the advance energy replenishment area is determined; According to the original formation pressure p i , total water injection volume W p , Volume coefficient of injected water B w , original reservoir porosity φ, original water saturation S wc 、Volume compression coefficient C of crude oil 0 , Volume compression coefficient of formation water C w 、The volume compression coefficient of rock C f and the area V of the advance energy replenishment area to determine the average formation pressure p within the advance energy replenishment area e ; Determine the module specifically for: The average formation pressure p within the advance energy replenishment area is determined by the following formula e :
7. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the method according to any one of claims 1 to 5 is implemented.
8. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Determination method and device of horizontal well productivity under volume fracturing
CN108547610A
