By applying simulation force and pre-tuning force before the steel-wood structure is built, the installation error and structural damage caused by the prone to deformation of the wooden structure in the steel-wood structure is solved, and smaller deformation and higher installation reliability are achieved ensures good performance of the building.

CN114626125BActive Publication Date: 2024-11-15CHENGDU DONGNAN BUILDING MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210144009.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-16
Publication Date
2024-11-15
Estimated Expiration
2042-02-16

AI Technical Summary

Technical Problem

During the construction of steel-wood structures, due to the prone to deformation of the wooden structure, the truss arch units cannot be well connected, resulting in structural damage and installation errors, affecting the reliability and performance of the building.

Method used

By applying simulated force and pre-tuning force before construction, the deformation of the truss arch unit is adjusted, the deformation of the chord point is measured using coordinate position sensors, the pre-tuning force is calculated and the corresponding pre-tuning force is applied, to ensure that the truss arch unit is in Reliability and stability when building.

Benefits of technology

It effectively reduces the deformation of the truss arch unit, enhances the reliability and reliability of installation, and ensures the good performance of the building during construction. The deformation generated by the traditional method is smaller than that of the traditional installation method.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114626125B_ABST
    Figure CN114626125B_ABST
Patent Text Reader

Abstract

The invention relates to a method for pre-erecting a steel-wood structure under load, and the steps are: S1, fixing the truss arch unit according to the building angle position; S2, connecting multiple chords into a truss arch unit through multiple initial pyramid steel frames; S3, measuring the limit of deformation by means of simulated force, and selecting the simulated force corresponding to the average deformation as the pre-adjustment force; S4, according to the pre-adjustment force; S5, reassembling the truss arch unit; S6, drilling. The beneficial effect achieved by the present invention is: by applying simulated force to pre-adjust and adjust the truss arch unit before erection, not only the reliability of the truss arch unit itself during erection is guaranteed, but also the deformation of the truss arch unit is less than the deformation of the traditional combination method, which ensures the reliability of the entire building during installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction, in particular to a method for pre-erecting a steel-wood structure under stress. Background Art

[0002] When architects are designing structures, they perform stress analysis on the building structures based on the load conditions, such as concrete structures, masonry structures, steel structures, light steel structures, wooden structures, and composite structures.

[0003] For steel-wood composite structures, although the architects met the strength requirements during structural calculations, during the actual construction process, due to the easy deformation of the wood structure, errors are very likely to occur during installation, resulting in poor assembly. The material used in general wood structures is mostly glued wood (easy to process and low cost), but its strength is not as good as that of logs. When errors occur and forced assembly is carried out, structural damage is likely to occur.

[0004] Our company used steel-wood structure to build a venue in an agricultural expo park in Chengdu, using multiple truss arch units. Each truss arch unit includes a wooden chord and a steel section. However, the deformation of the truss arch unit can easily lead to a poor connection between the truss arch units. The strong deformation stress generated during the connection affects the performance of the entire building. Summary of the invention

[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a method for pre-erection of a steel-wood structure by applying a simulated force to pre-adjust and adjust the truss arch unit before erection, thereby not only ensuring the reliability of the truss arch unit itself during erection, but also the deformation of the truss arch unit is less than that of the traditional method, thereby ensuring the reliability of the entire building during installation.

[0006] The purpose of the present invention is achieved through the following technical scheme: a method for pre-erecting a steel-wood structure under stress, the steps of which are:

[0007] S1, initial placement;

[0008] Place multiple chords on the assembly frame; adjust the positions of the chords so that they are not in the same plane and are parallel in space, and then fix the chords; when adjusting the positions of the chords, make their inclination angles consistent with the angles at which the building is erected;

[0009] S2, connected to form a truss arch unit;

[0010] Connecting the chords through the initial pyramid steel frames to form a truss arch unit; the initial pyramid steel frames are multiple in number and are spaced apart from each other to form multiple connection nodes;

[0011] S3, data collection and calculation of simulation force;

[0012] According to the structure of the truss arch unit, the stress conditions during construction are analyzed and calculated, so as to know the stress points, magnitude and direction of the bearing force of each chord of the truss arch unit; according to the limit value of the bearing force, the range value of the bearing force is set;

[0013] A coordinate position sensor is attached to the stress point; a simulated force is applied to the stress point, and the simulated force is the extreme value of the bearing force; and the spatial coordinate change value of the stress point when the chord is deformed by stress is measured by the coordinate position sensor;

[0014] The average value of the spatial coordinate change value is selected as the average deformation of the chord at the force point; the simulated force corresponding to the average deformation is used as the pre-adjustment force;

[0015] S4, simulate applying pre-adjusting force;

[0016] The corresponding pre-adjustment force is calculated based on the average deformation of the force-bearing point;

[0017] Apply pre-adjusting force to each stress point to make the truss arch unit deform;

[0018] Use the clamping frame A to fix the two ends of the truss arch unit; fix the two ends of the initial pyramid steel frame on the truss arch unit through the clamping frame B; maintain the spatial position between the chords;

[0019] S5, reassemble the truss arch unit;

[0020] Keeping the adjustment force unchanged, dismantling the original pyramid steel frame, releasing the stress caused by the original pyramid steel frame; and reinstalling a new pyramid steel frame;

[0021] Adjust the tightening condition of the tightening frame A, release the stress at the tightening point, and tighten it again; then remove the tightening frame B;

[0022] S6, drilling;

[0023] Without removing the clamping frame A, a hole is drilled at the end of the chord to form a connecting hole); the connecting hole forms an acute angle with the center line of the chord;

[0024] Without removing the clamping frame A, gradually release the simulated force.

[0025] Furthermore, in the steps S3 and S4, when applying the simulated force and the pre-adjusted force, they are respectively decomposed into applying the simulated force in the cross-sectional direction and applying the simulated force in the axial direction;

[0026] When the simulated force in the cross-sectional direction is applied, it is decomposed into two mutually perpendicular forces in the cross-sectional area, namely, the horizontal force in the cross-sectional area and the vertical force in the cross-sectional area; that is, the force in the cross-sectional direction of the entire truss arch unit when the building is constructed is simulated, and the interaction force between the chords is simulated;

[0027] When the simulated force in the axial direction is applied, the axial force of the entire truss arch unit during the construction of the building is simulated; the entire truss arch unit is subjected to tension or pressure together.

[0028] Furthermore, when the simulated force is applied, the force in the cross-sectional direction is simulated by a cross-sectional force simulation mechanism; the cross-sectional force simulation mechanism includes a portal frame and a displacement hydraulic cylinder; the portal frame has vertical columns and multiple cross beams, and the vertical columns and cross beams are provided with multiple position-controllable sliding displacement hydraulic cylinders; the displacement hydraulic cylinders on the vertical columns apply horizontal force along the cross section, and the displacement hydraulic cylinders on the cross beams apply vertical force along the cross section.

[0029] Furthermore, the bottom end of the portal frame is hinged on the base, and a guide ring is provided near the bottom end; when the bottom end of the portal frame rotates around the base, it slides along the guide ring at the same time; the guide ring and the portal frame can also be locked by a threaded rod.

[0030] Furthermore, when the simulated force is applied, the axial force is simulated by an axial force simulation mechanism; the axial force simulation mechanism includes a winch and a force-bearing frame; the winch can slide controllably up and down along the force-bearing frame; the winch is installed at the force-bearing point of the truss arch unit via a steel rope.

[0031] Furthermore: the stress points of the truss arch unit are clamped by a clamping frame C; the displacement hydraulic cylinder applies force to the outer side of the clamping frame C; and the steel rope also acts on the clamping frame C.

[0032] Preferably, the clamping frame A, the clamping frame B, and the clamping frame C all include a plurality of clamping frames; the clamping frame includes a plurality of frame plates, and the frame plates are assembled by extension ears and bolts; in the clamping frame A, the clamping frame has an integrated force-bearing plate; the force-bearing plates are connected by waist-shaped holes and adjusting screws, forming a structure in which the clamping frame A can expand or tighten;

[0033] The clamping frame B has the same structure as the clamping frame A;

[0034] In the clamping frame C, the clamping frame has an integrated force column; the output end of the displacement hydraulic cylinder is adapted to the force column through the jack to achieve cross-sectional force; the steel rope also acts on the force column of the clamping frame C to achieve axial force.

[0035] Preferably, the truss arch unit comprises an upper chord and two lower chords, which are connected in a cross section to form an isosceles triangle shape; the initial pyramid steel frame is four pyramid steel frames, and the new pyramid steel frame is also a four-pyramid steel frame.

[0036] Preferably, the tetrahedral pyramid steel frame includes five base plates and six steel rods; the five base plates are equivalent to the five vertices of the tetrahedral pyramid, and the six steel rods are on the six sides of the tetrahedral pyramid; the base plate has an integrated ear seat, and the ends of the six steel rods are installed on the corresponding ear seats through bolts and screw holes.

[0037] Preferably, the six steel rods are welded in groups of three to form a tripod shape, and the three vertices of the tripod are respectively mounted on three chord rods.

[0038] The present invention has the following advantages:

[0039] When assembling the truss arch unit, the position is set according to the position in the building; after the initial assembly is completed, the limit of the deformation of the truss arch unit is measured by applying a simulated force; the average value of the deformation is taken to apply a pre-adjusting force, and the truss arch unit is reassembled according to the pre-adjusting force. After the reassembly, the truss arch unit itself has a stress equivalent to the pre-adjusting force; when constructing the building, the actual deformation is equal to the deformation of the traditional installation method minus the deformation caused by the pre-adjusting force; that is, the actual deformation is smaller than the deformation of the traditional installation method, which is convenient for connection and installation, and because the truss arch unit is reassembled, the reliability is also enhanced;

[0040] By decomposing the simulated force into the force in the cross-sectional direction and the force in the axial direction, and decomposing the force in the cross-sectional direction into the horizontal force in the cross-sectional area and the vertical force in the cross-sectional area, the simulated force is applied according to these decomposed forces, which can not only realize the simulation of size, but also the simulation of direction. Compared with the simple formula calculation method in calculation and analysis, this scheme is more realistic and reliable, ensuring the good reliability of the building after construction.

[0041] The cross-sectional force simulation mechanism and the axial force simulation mechanism have simple structures and are easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 A schematic diagram of applying a simulated force according to the present invention;

[0043] Figure 2 A schematic diagram of the formal directions of the simulated forces applied within the cross section;

[0044] Figure 3 A schematic diagram of the front view direction of the clamp frame A and the truss arch unit;

[0045] Figure 4 A schematic diagram of the cross-sectional direction set for the clamp frame A and the truss arch unit;

[0046] Figure 5 A schematic diagram of the cross-sectional directions set for the clamp frame C and the truss arch unit;

[0047] Figure 6It is a schematic diagram of the cross-sectional direction when the simulated force is applied in the cross-sectional area;

[0048] Figure 7 is a structural schematic diagram of a truss arch unit;

[0049] In the figure: 1-assembly frame, 2-truss arch unit, 201-connecting hole, 202-upper chord, 203-lower chord, 3-pyramid steel frame, 301-bottom plate, 30101-ear seat, 302-steel rod, 4-clamping frame A, 401-loaded plate, 5-clamping frame B, 6-section force simulation mechanism, 601-gantry, 602-displacement hydraulic cylinder, 603-base, 604-guide ring, 605-threaded screw rod, 7-axial example simulation mechanism, 701-winch, 702-loaded base frame, 703-steel rope, 8-clamping frame C, 801-loaded column, 9-clamping frame, 901-frame plate, 90101-extension ear. DETAILED DESCRIPTION

[0050] The present invention is further described below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description.

[0051] like Figure 1 to Figure 7 As shown in the figure, the method for pre-erecting the steel-wood structure under stress comprises the following steps:

[0052] S1, initial placement;

[0053] Place multiple chords on the assembly frame 1; adjust the positions of the chords so that they are not in the same plane and are parallel in space, and then fix the chords; when adjusting the positions of the chords, make their inclination angles consistent with the angles at which the building is erected;

[0054] S2, connected to form truss arch unit 2;

[0055] Connecting the chords through the initial pyramid steel frames 3 to form a truss arch unit 2; the initial pyramid steel frames 3 are multiple in number and are spaced apart from each other to form multiple connection nodes;

[0056] S3, data collection and calculation of simulation force;

[0057] According to the structure of the truss arch unit 2, the stress conditions during construction are analyzed and calculated, so as to obtain the stress points, magnitude and direction of the bearing force corresponding to each chord of the truss arch unit 2; according to the limit value of the bearing force, the range value of the bearing force is set;

[0058] A coordinate position sensor is attached to the stress point; a simulated force is applied to the stress point, and the simulated force is the extreme value of the bearing force; and the spatial coordinate change value of the stress point when the chord is deformed by stress is measured by the coordinate position sensor;

[0059] The average value of the spatial coordinate change value is selected as the average deformation of the chord at the force point; the simulated force corresponding to the average deformation is used as the pre-adjustment force;

[0060] S4, simulate applying pre-adjusting force;

[0061] The corresponding pre-adjustment force is calculated based on the average deformation of the force-bearing point;

[0062] Apply pre-adjusting force to each stress point to make the truss arch unit deform;

[0063] The two ends of the truss arch unit 2 are fixed by a clamping frame A4; the two ends of the initial pyramid steel frame 3 on the truss arch unit 2 are fixed by a clamping frame B; the spatial position between the chords is maintained;

[0064] S5, reassemble the truss arch unit 2;

[0065] Keeping the adjustment force unchanged, dismantling the initial pyramid steel frame 3, releasing the stress caused by the initial pyramid steel frame 3; and reinstalling a new pyramid steel frame 3;

[0066] Adjust the tightening condition of the tightening frame A4, release the stress at the tightening point, and tighten it again; then remove the tightening frame B5;

[0067] S6, drilling;

[0068] Without removing the clamping frame A4, a hole is drilled at the end of the chord rod to form a connecting hole 201; the connecting hole 201 forms an acute angle with the center line of the chord rod;

[0069] Without removing the clamping frame A4, the simulated force is gradually released.

[0070] In this solution, further, when applying the simulated force and the pre-adjusted force in steps S3 and S4, they are respectively decomposed into applying the simulated force in the cross-sectional direction and applying the simulated force in the axial direction.

[0071] Furthermore, when the simulated force is applied in the cross-sectional direction, it is decomposed into two mutually perpendicular forces in the cross-sectional direction, called the horizontal force in the cross-sectional direction and the vertical force in the cross-sectional direction; that is, it simulates the force of the entire truss arch unit 2 in the cross-sectional direction when the building is constructed, and also simulates the interaction force between the chords.

[0072] Furthermore, when the simulated force in the axial direction is applied, the axial force of the entire truss arch unit 2 during the construction of the building is simulated; the entire truss arch unit 2 is subjected to tension or pressure together.

[0073] In this embodiment, when the simulated force is applied, the force in the cross-sectional direction is simulated by the cross-sectional force simulation mechanism 6; the cross-sectional force simulation mechanism 6 includes a portal frame 601 and a displacement hydraulic cylinder 602; the portal frame 601 has vertical columns and multiple horizontal beams, and the vertical columns and the horizontal beams are provided with multiple position-controllable sliding displacement hydraulic cylinders 602; the displacement hydraulic cylinders 602 on the vertical columns apply horizontal force along the cross section, and the displacement hydraulic cylinders 602 on the horizontal beams apply vertical force along the cross section.

[0074] Furthermore, the bottom end of the portal frame 601 is hinged on the base 603, and a guide ring 604 is provided near the bottom end thereof; when the bottom end of the portal frame 601 rotates around the base 603, it slides along the guide ring 604 at the same time; the guide ring 604 and the portal frame 601 can also be locked by a threaded screw rod 605.

[0075] In this embodiment, when the simulated force is applied, the axial force is simulated by the axial force simulation mechanism 7; the axial force simulation mechanism 7 includes a winch 701 and a force-bearing base frame 702; the winch 701 can slide up and down along the force-bearing base frame 702 in a controllable manner; the winch 701 is pulled at the force-bearing point of the truss arch unit 2 via a steel rope 703.

[0076] In this embodiment, the stress points of the truss arch unit 2 are clamped by the clamping frame C8; the displacement hydraulic cylinder 602 applies force to the outer side of the clamping frame C8; and the steel rope 703 also acts on the clamping frame C8.

[0077] Furthermore, the clamping frame A4, the clamping frame B5, and the clamping frame C8 all include a plurality of clamping frames 9; the clamping frame 9 includes a plurality of frame plates 901, and the frame plates 901 are assembled by extension ears 90101 and bolts; in the clamping frame A4, the clamping frame 9 has an integral force plate 401; the force plates 401 are connected by waist-shaped holes and adjusting screws 10, forming a structure that the clamping frame A4 can expand or tighten. The structure of the clamping frame B5 is the same as that of the clamping frame A4.

[0078] Furthermore, in the clamping frame C8, the clamping frame 9 has an integrated load-bearing column 801; the output end of the displacement hydraulic cylinder 602 is adapted to the load-bearing column 801 through the socket to achieve cross-sectional force; the steel rope 703 also acts on the load-bearing column 801 of the clamping frame C8 to achieve axial force.

[0079] In this embodiment, the truss arch unit 2 includes an upper chord 202 and two lower chords 203, which are connected in the cross section to form an isosceles triangle shape; the initial pyramid steel frame 3 is four pyramid steel frames, and the new pyramid steel frame 3 is also a quadrangular pyramid steel frame. Specifically, the quadrangular pyramid steel frame includes five bottom plates 301 and six steel rods 302; the five bottom plates 301 are equivalent to the five vertices of the quadrangular pyramid, and the six steel rods 302 are on the six sides of the quadrangular pyramid; the bottom plate 301 has an integrated ear seat 30101, and the ends of the six steel rods 302 are installed on the corresponding ear seats 30101 through bolts and screw holes.

[0080] Furthermore, six steel rods 302 are welded in groups of three to form a tripod shape, and the three vertices of the tripod are respectively mounted on three chord rods. The two tripods can ensure the position between the two lower chord rods 203, and the two tripods can adjust the angle, so as to adapt and adjust the height position between the upper chord rod 202 and the lower chord rod 203.

[0081] When applying the simulated force and the pre-adjusted force in the cross-sectional direction in step S3 and step S4:

[0082] First, install the clamping frame C8 on the truss arch unit 2, and at the same time rotate the angle of the portal frame 601 so that the displacement hydraulic cylinder 602 is perpendicular to the side of the clamping frame C8;

[0083] Then the displacement hydraulic cylinder 602 is moved along the portal frame 601. When the displacement hydraulic cylinder 602 is aligned with the load-bearing column 801 on the clamp frame C8, the output end of the displacement hydraulic cylinder 602 extends out and docks with the load-bearing column 801; when the displacement hydraulic cylinder 602 continues to apply force, pressure will be generated; when multiple displacement hydraulic cylinders 602 work together, a simulated force within the cross section can be formed.

[0084] When applying the simulated force and pre-adjusted force in the axial direction in step S3 and step S4: fix the steel rope 703 at the root of the load-bearing column 801; pull it through the winch 701, and when the winch 701 moves on the load-bearing base frame 702, it will form tensions with different inclination angles. If you want to achieve pressure, you can pull it in the opposite direction. Since there are multiple load-bearing points on the truss arch unit 2, it is necessary to set up multiple winches 701 and corresponding load-bearing base frames 702.

[0085] Of course, when applying the simulation force and the pre-adjustment force, the cross-sectional force simulation mechanism 6 and the axial force simulation mechanism 7 may also be selected to be performed simultaneously.

[0086] It should be noted that each displacement hydraulic cylinder 602 is connected to a pressure measuring gauge, and each steel rope 703 is also provided with a corresponding tension measuring gauge. At each force point on the truss arch unit 2, the size and angle of each displacement hydraulic cylinder 602, and the size and angle applied by each steel rope 703 should be calculated and set in advance.

[0087] The above embodiments only express preferred implementation modes, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention.

Claims

1. A method for pre-erecting a steel-wood structure under load, characterized in that: The steps are: S1, initial placement; Placing a plurality of chord rods on an assembly frame (1); adjusting the positions of the chord rods so that the chord rods are not in the same plane and the chord rods are spatially parallel, and then fixing the chord rods; when adjusting the positions of the chord rods, making their inclination angles consistent with the angles at which the building is erected; S2, connected to form a truss arch unit (2); The chords are connected through the initial pyramid steel frames (3) to form a truss arch unit (2); the initial pyramid steel frames (3) are multiple in number and are spaced apart from each other to form multiple connection nodes; S3, data collection and calculation of simulation force; According to the structure of the truss arch unit (2), the stress conditions during construction are analyzed and calculated, so as to obtain the stress points, magnitude and direction of the bearing force corresponding to each chord of the truss arch unit (2); and according to the limit value of the bearing force, the range value of the bearing force is set; A coordinate position sensor is attached to the stress point; a simulated force is applied to the stress point, and the simulated force is the extreme value of the bearing force; and the spatial coordinate change value of the stress point when the chord is deformed by stress is measured by the coordinate position sensor; The average value of the spatial coordinate change value is selected as the average deformation of the chord at the force point; the simulated force corresponding to the average deformation is used as the pre-adjustment force; S4, simulate applying pre-adjusting force; The corresponding pre-adjustment force is calculated based on the average deformation of the force-bearing point; Apply pre-adjusting force to each stress point to make the truss arch unit deform; The two ends of the truss arch unit (2) are fixed by a clamping frame A (4); the two ends of the initial pyramid steel frame (3) on the truss arch unit (2) are fixed by a clamping frame B; and the spatial position between the chords is maintained; S5, reassembling the truss arch unit (2); Keeping the adjustment force unchanged, disassembling the initial pyramid steel frame (3), releasing the stress caused by the initial pyramid steel frame (3); and reinstalling a new pyramid steel frame (3); Adjust the tightening condition of the tightening frame A (4), release the stress at the tightening position, and tighten again; then remove the tightening frame B (5); S6, drilling; Without removing the clamping frame A (4), drilling a hole at the end of the chord rod to form a connecting hole (201); the connecting hole (201) forms an acute angle with the center line of the chord rod; Without removing the clamping frame A (4), gradually release the simulated force.

2. The method for pre-erecting a steel-wood structure according to claim 1, characterized in that: When applying the simulated force and the pre-adjusted force in the steps S3 and S4, they are respectively decomposed into applying the simulated force in the cross-sectional direction and applying the simulated force in the axial direction; When the simulated force in the cross-sectional direction is applied, it is decomposed into two mutually perpendicular forces in the cross-sectional direction, namely, the horizontal force in the cross-sectional direction and the vertical force in the cross-sectional direction; that is, the force in the cross-sectional direction of the entire truss arch unit (2) during the construction of the building is simulated, and the interaction force between the chords is simulated; When the simulated force in the axial direction is applied, the axial force of the entire truss arch unit (2) during building construction is simulated; the entire truss arch unit (2) is subjected to tension or pressure together.

3. The method for pre-erecting a steel-wood structure according to claim 2, characterized in that: When the simulated force is applied, the force in the cross-sectional direction is simulated by the cross-sectional force simulation mechanism (6); The cross-sectional force simulation mechanism (6) comprises a portal frame (601) and a displacement hydraulic cylinder (602); the portal frame (601) is provided with a vertical column and a plurality of horizontal beams, and a plurality of position-controllably sliding displacement hydraulic cylinders (602) are arranged on the vertical column and the horizontal beam; The displacement hydraulic cylinder (602) on the vertical column applies a force in the horizontal direction along the cross section, and the displacement hydraulic cylinder (602) on the cross beam applies a force in the vertical direction along the cross section.

4. The method for pre-erecting a steel-wood structure according to claim 3, characterized in that: The bottom end of the door frame (601) is hinged on the base (603), and a guide ring (604) is also provided near the bottom end to connect the door frame (601); When the bottom end of the portal frame (601) rotates around the base (603), it slides along the guide ring (604) at the same time; the guide ring (604) and the portal frame (601) can also be locked by a threaded screw rod (605).

5. The method for pre-erecting a steel-wood structure according to claim 4, characterized in that: When the simulated force is applied, the axial force simulation mechanism (7) simulates the axial force; The axial force simulation mechanism (7) comprises a winch (701) and a force-bearing base frame (702); the winch (701) can controllably slide up and down along the force-bearing base frame (702); and the winch (701) is pulled on the force-bearing point of the truss arch unit (2) via a steel rope (703).

6. The method for pre-erecting a steel-wood structure according to claim 5, characterized in that: The stress bearing points of the truss arch unit (2) are clamped by a clamping frame C (8); The displacement hydraulic cylinder (602) applies force to the outer side surface of the clamping frame C (8); the steel rope (703) also acts on the clamping frame C (8).

7. The method for pre-erecting a steel-wood structure according to claim 6, characterized in that: The tightening frame A (4), the tightening frame B (5), and the tightening frame C (8) all include a plurality of tightening frames (9); The clamping frame (9) comprises a plurality of frame plates (901), and the frame plates (901) are assembled by extension ears (90101) and bolts; In the tightening frame A (4), the tightening frame (9) has an integrated force-bearing plate (401); the force-bearing plates (401) are connected to each other through waist-shaped holes and adjusting screws (10), forming a structure in which the tightening frame A (4) can be expanded or tightened; The clamping frame B (5) has the same structure as the clamping frame A (4); In the clamping frame C (8), the clamping frame (9) has an integrated force-bearing column (801); the output end of the displacement hydraulic cylinder (602) is adapted to the force-bearing column (801) via a socket to achieve cross-sectional force application; the steel rope (703) also acts on the force-bearing column (801) of the clamping frame C (8) to achieve axial force application.

8. The method for pre-erecting a steel-wood structure according to any one of claims 1 to 7, characterized in that: The truss arch unit (2) comprises an upper chord (202) and two lower chords (203), which are connected in a cross section to form an isosceles triangle shape; The initial pyramid steel frame (3) is composed of four pyramid steel frames, and the new pyramid steel frame (3) is also composed of four pyramid steel frames.

9. The method for pre-erecting a steel-wood structure according to claim 8, characterized in that: The four-sided pyramid steel frame comprises five bottom plates (301) and six steel rods (302); The five bottom plates (301) are equivalent to the five vertices of the tetrahedron, and the six steel rods (302) are on the six sides of the tetrahedron; The bottom plate (301) is provided with an integrated ear seat (30101), and the ends of the six steel rods (302) are mounted on the corresponding ear seats (30101) through bolts and screw holes.

10. The method for pre-erecting a steel-wood structure according to claim 9, characterized in that: The six steel rods (302) are welded in groups of three to form a tripod shape, and the three vertices of the tripod are respectively installed on three chord rods.