A safety management method and system for nuclear power plant maintenance business

By obtaining and analyzing operational activity information of nuclear power plant maintenance business, identifying and classifying risks, and automating safety supervision processes, the problem of inadequate safety management in the field of nuclear power plant maintenance support has been solved, and safety supervision efficiency and on-site safety are improved.

CN114638544BActive Publication Date: 2024-11-26JIANGSU NUCLEAR POWER CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210386566.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-12
Publication Date
2024-11-26
Estimated Expiration
2042-04-12

AI Technical Summary

Technical Problem

After the number of units increased in the nuclear power plant maintenance support field, the personnel quality and inadequate safety management have been achieved, resulting in chaos on-site operations and an increase in high-risk workload, resulting in frequent safety incidents and affecting the safe and stable operation of the units.

Method used

By obtaining operational activity information, conducting safety risk analysis, determining safety supervision processes, including obtaining work ticket QR codes, analyzing work content and contractor information, identifying hazard sources, grading and evaluating risk levels, and automating safety supervision processes to improve efficiency.

Benefits of technology

It has realized automated safety supervision of nuclear power plant maintenance business, improved the degree of automation and efficiency of safety supervision processes, reduced the occurrence of safety incidents, and ensured the safety and stability of on-site operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114638544B_ABST
    Figure CN114638544B_ABST
Patent Text Reader

Abstract

The present invention provides a safety management method and system for nuclear power plant maintenance business, the method comprising: obtaining operation activity information; the operation activity information includes contractor information and work content information; performing safety risk analysis on the operation activity information to obtain risk level analysis results; determining the safety supervision process according to the risk level analysis results; and processing the maintenance business according to the safety supervision process. The present invention can automatically obtain operation activity information and perform risk assessment based on the operation activity information, thereby improving the automation and efficiency of the safety supervision process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of information management systems, and in particular to a safety management method and system for maintenance services of nuclear power plants. Background Art

[0002] Since the Chernobyl nuclear power plant accident in 1986, the term "nuclear safety culture" has been proposed in the nuclear power field, which is a great starting point for the field of nuclear power safety. There have been many major nuclear safety accidents in the history of nuclear power, which have sounded the alarm for the nuclear power field and also provided good experience feedback for the nuclear power field.

[0003] At present, the number of units in the field of maintenance support has increased exponentially. If the current units are still managed according to the previous single-unit management mode, there will inevitably be problems such as insufficient personnel, accumulated work, inadequate management, and frequent safety incidents. In serious cases, the safe and stable operation of the units will be affected. The maintenance support of nuclear power plants first adopts the group management mode, which is very suitable for the operation and management of nuclear power units after they are built, especially for the unified management of multiple nuclear power units at the same site. The promotion of group management is an important form for nuclear power operation management to reduce the unit output cost, which can play a positive role in economic cost, labor cost and other aspects. In the group mode, the management and replication of multiple units can radiate the experience feedback or highlight work of a single unit to other units, so that if one unit does not make a mistake, all units will not make a mistake; if one unit has a highlight, all units will have a highlight. The establishment of the group management mode can completely avoid the occurrence of information shielding, realize experience and resource sharing, and ensure the safe and stable operation of the units. Due to the improvement of management model level, in addition to economy and manpower, group reactor management has also made outstanding contributions to improving the safety, stability and environmental protection of nuclear power units.

[0004] However, the following problems still exist in the safety management of maintenance support in the nuclear power plant cluster model:

[0005] 1. With the increase in the number of units, the number of contractors has also increased significantly. The age structure of the personnel is complex, the quality of the personnel is uneven, and the degree of acceptance of relevant requirements in the nuclear power field is different. As a result, it is impossible to establish a sound safety management system for the rich, resulting in chaotic on-site operations and employees ignoring safety.

[0006] 2. With the increase in the number of units, the scaffolding and insulation workload of the units in the maintenance support field is increasing day by day, resulting in a huge increase in the workload of high-risk work in the maintenance support department; not only will the scaffolding and insulation professions have high safety risk work, but the lifting and hoisting profession is also an important position with high safety risks. If there is a problem in the lifting work, the hanging objects may be damaged at the least, and serious personal injury accidents may occur at the worst. Therefore, once a mistake is made in the lifting work, it will cause huge personnel and economic losses.

[0007] Based on this, how to manage the maintenance support field more safely and efficiently has become an urgent problem to be solved. Summary of the invention

[0008] In order to overcome the deficiencies of the prior art, an object of the present invention is to provide a safety management method and system for nuclear power plant maintenance services.

[0009] To achieve the above object, the present invention provides the following solutions:

[0010] A safety management method for nuclear power plant maintenance business, comprising:

[0011] Acquiring operation activity information; the operation activity information includes contractor information and work content information;

[0012] Performing a safety risk analysis on the operation activity information to obtain a risk level analysis result;

[0013] Determine the safety supervision process based on the risk level analysis results;

[0014] Maintenance operations are handled according to the safety supervision process.

[0015] Preferably, the obtaining of the operation activity information includes:

[0016] Get the preset work ticket QR code;

[0017] Scan and analyze the work ticket QR code to obtain the work content information; the work content information includes start time information and work ticket information;

[0018] Based on the remote platform, the contractor information is determined according to the work ticket information; the contractor information includes company information, on-site staff information and number of workers information.

[0019] Preferably, the performing of safety risk analysis on the operation activity information to obtain risk level analysis results includes:

[0020] Performing safety analysis on the work ticket information to obtain hazard source information;

[0021] Classifying the hazard source information to obtain risk information; the risk information includes hazardous chemical information, special equipment information, electrical machinery information, biological information, civil engineering information, radiation information, transportation information, high-value equipment information and / or other information;

[0022] Based on the hierarchical assessment method, the risk information is graded to obtain the risk level analysis result.

[0023] Preferably, the safety analysis of the work ticket information to obtain the hazard source information includes:

[0024] Parsing the work ticket information to obtain the work area, work equipment and work activity type;

[0025] Performing risk identification on buildings, system equipment and personnel in the operation area to obtain a first identification result;

[0026] Performing hazard identification on the operating equipment to obtain a second identification result;

[0027] Performing hazard identification on the type of operation activity to obtain a third identification result;

[0028] The hazard source information is obtained by performing a comprehensive analysis based on the first identification result, the second identification result and the third identification result.

[0029] Preferably, the risk information is graded based on the graded assessment method to obtain the risk level analysis result, including:

[0030] The risk information is evaluated using at least one of the quantitative evaluation methods such as right or wrong judgment method, accident tree analysis method, event tree analysis method, operating condition hazard analysis method and fire and explosion mathematical model calculation to obtain the risk level analysis result; the risk level analysis result includes major risk, high risk, moderate risk or low risk.

[0031] Preferably, determining the safety supervision process according to the risk level analysis result includes:

[0032] If the risk level analysis result is low risk, the safety supervision process is determined as a normal supervision process;

[0033] If the risk level analysis result is a medium risk, the safety supervision process is determined as the collaboration unit-operation department-safety quality supervision process;

[0034] If the risk level analysis result is a high risk, the safety supervision process is determined as the collaboration unit-operation department-operation office-safety and quality supervision process;

[0035] If the risk level analysis result is a major risk, the safety supervision process will be determined as a supplementary control measure process.

[0036] Preferably, the supplementary control measures process includes:

[0037] Modifying the contractor information and the work content information to obtain modified work information;

[0038] A safety risk analysis is performed based on the modified work information to obtain a risk level analysis result after supplementing control measures.

[0039] A safety management system for nuclear power plant maintenance business, comprising:

[0040] An acquisition module, used to acquire operation activity information; the operation activity information includes contractor information and work content information;

[0041] An analysis module, used to perform safety risk analysis on the operation activity information to obtain risk level analysis results;

[0042] A determination module, used to determine the safety supervision process according to the risk level analysis result;

[0043] The supervision module is used to process the maintenance business according to the safety supervision process.

[0044] Preferably, the acquisition module specifically includes:

[0045] A QR code acquisition unit, used to acquire a preset work ticket QR code;

[0046] A parsing unit, used to scan and parse the work ticket QR code to obtain the work content information; the work content information includes start time information and work ticket information;

[0047] A determination unit is used to determine the contractor information based on the work ticket information based on a remote platform; the contractor information includes company information, on-site staff information and number of workers information.

[0048] Preferably, the analysis module specifically includes:

[0049] A hazard source identification unit, used to perform safety analysis on the work ticket information to obtain hazard source information;

[0050] A classification unit, used to classify the hazard source information to obtain risk information; the risk information includes hazardous chemical information, special equipment information, electrical machinery information, biological information, civil engineering information, radiation information, transportation information, high-value equipment information and / or other information;

[0051] The evaluation unit is used to classify the risk information based on a hierarchical evaluation method to obtain the risk level analysis result.

[0052] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects:

[0053] The present invention provides a safety management method and system for nuclear power plant maintenance business, the method comprising: obtaining operation activity information; the operation activity information includes contractor information and work content information; performing safety risk analysis on the operation activity information to obtain risk level analysis results; determining the safety supervision process according to the risk level analysis results; and processing the maintenance business according to the safety supervision process. The present invention can automatically obtain operation activity information and perform risk assessment based on the operation activity information, thereby improving the automation and efficiency of the safety supervision process. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0055] Figure 1 A method flow chart of a security management method in an embodiment provided by the present invention;

[0056] Figure 2 A schematic diagram of the overall process in the embodiment provided by the present invention;

[0057] Figure 3 This is a module connection diagram of the security management system in the embodiment provided by the present invention. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0060] The terms "first", "second", "third" and "fourth" in the specification and claims of the present application and the drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a series of steps, processes, methods, etc. are not limited to the listed steps, but may optionally include steps that are not listed, or may optionally include other step elements inherent to these processes, methods, products or devices.

[0061] The purpose of the present invention is to provide a safety management method and system for nuclear power plant maintenance business, which can improve the automation and efficiency of the safety supervision process.

[0062] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0063] This embodiment realizes the information processing of maintenance support business. Due to the large amount of on-site work for maintenance support, manual records may have omissions, errors, and untimely reporting of work start, resulting in safety personnel being unable to arrive on-site for supervision in time. To solve this problem, this embodiment realizes information notification and recording of work. When the work is about to start, scan the QR code of the work ticket at the terminal, and the system can record the start time of this work, and send the work ticket number, risk analysis number, name of the person in charge of the work, work location and other information to the mobile phone of the safety management team via SMS, ensuring that the safety management team can track all medium and high-risk work conditions on site in real time, so that risk work is safe and controllable.

[0064] In this embodiment, in the face of the difficulty that contractors have in promoting safety work, the wide application range of informatization is effectively utilized to create a safety management investigation system. From top to bottom, the safety management investigation system will be gradually pushed to all employees of the counterpart contractors by the department groups, work teams, and counterpart contractor teams. The individuals will complete and submit the results, and the final investigation results will be summarized in the informatization background for unified collection and analysis.

[0065] Figure 1 A method flow chart of a safety management method for nuclear power plant maintenance business in an embodiment of the present invention is shown in FIG. Figure 1 As shown, the present invention provides a safety management method for nuclear power plant maintenance business, comprising:

[0066] Step 100: Acquire operation activity information; the operation activity information includes contractor information and work content information;

[0067] Step 200: Performing a safety risk analysis on the operation activity information to obtain a risk level analysis result;

[0068] Step 300: Determine the safety supervision process according to the risk level analysis result;

[0069] Step 400: Process the maintenance business according to the safety supervision process.

[0070] Preferably, the step 100 includes:

[0071] Get the preset work ticket QR code;

[0072] Scan and analyze the work ticket QR code to obtain the work content information; the work content information includes start time information and work ticket information;

[0073] Based on the remote platform, the contractor information is determined according to the work ticket information; the contractor information includes company information, on-site staff information and number of workers information.

[0074] Optionally, the safety risk analysis in this embodiment refers to dividing the execution process of a specific work activity into several steps, identifying and analyzing the possible operational safety risks faced by each step, formulating targeted preventive measures, and implementing them during the specific work activity.

[0075] Preferably, the step 200 includes:

[0076] Performing safety analysis on the work ticket information to obtain hazard source information;

[0077] Classifying the hazard source information to obtain risk information; the risk information includes hazardous chemical information, special equipment information, electrical machinery information, biological information, civil engineering information, radiation information, transportation information, high-value equipment information and / or other information;

[0078] Based on the hierarchical assessment method, the risk information is graded to obtain the risk level analysis result.

[0079] In this embodiment, the hazard source information is divided into categories such as hazardous chemicals, special equipment, electrical / mechanical, biological, civil engineering, radiation, transportation, high-value equipment, and others. The specific hazard sources are:

[0080] 1) Hazard sources of hazardous chemicals. According to the theory of accidental release of energy, hazardous chemicals mainly target chemical energy, mainly explosives, compressed gases and liquefied gases (including flammable gases, non-flammable gases, and toxic gases) with a certain storage volume, flammable liquids, poisonous and infectious substances, corrosive substances, etc. From the perspective of factories and areas, it is mainly the storage tank area, room or warehouse, where those with explosive, flammable, explosive, toxic and other characteristics may cause group harm, while other corrosive substances have relatively less impact on the consequences of harm.

[0081] 2) Special equipment hazard sources: According to the special equipment safety regulations, special equipment hazard sources are mainly boilers, pressure vessels, elevators, pressure pipes, lifting machinery, special motor vehicles (forklifts) in the factory, etc. According to the consequences of their accidents, boiler explosions, pressure vessel explosions, and elevators may cause mass injuries; lifting causes a greater risk of high-value losses, and vehicles cause personal injury risks.

[0082] 3) Electrical / mechanical hazard sources. According to the theory of accidental energy release, electrical and mechanical hazard sources are mainly accidental releases of electrical energy and kinetic energy. Such hazard sources generally do not cause group harm.

[0083] 4) Biological hazards mainly refer to dangerous sources of risk such as food poisoning.

[0084] 5) Civil engineering hazards mainly include warehouses that may become dangerous or fail to protect against severe natural weather, and warehouses where high-value equipment is still stored.

[0085] 6) Radiation category refers to dangerous sources that pose radiation risks.

[0086] 7) Transportation category refers to dangerous sources that involve the risk of vehicle injury.

[0087] 8) High-value equipment refers to hazardous sources with a risk of direct economic property losses exceeding RMB 10 million.

[0088] 9) Others refer to dangerous sources that may easily cause personal injury and health damage, such as noise, high / low temperature, dust, etc.

[0089] Preferably, the safety analysis of the work ticket information to obtain the hazard source information includes:

[0090] Parsing the work ticket information to obtain the work area, work equipment and work activity type;

[0091] Performing risk identification on buildings, system equipment and personnel in the operation area to obtain a first identification result;

[0092] Performing hazard identification on the operating equipment to obtain a second identification result;

[0093] Performing hazard identification on the type of operation activity to obtain a third identification result;

[0094] The hazard source information is obtained by performing a comprehensive analysis based on the first identification result, the second identification result and the third identification result.

[0095] Specifically, reasonable and correct demarcation of identification objects can not only smoothly carry out the identification of hazardous and harmful factors and risk assessment work, but also ensure the comprehensiveness and systematicness of the identification of hazardous and harmful factors and risk assessment, which is an important part of the entire hazardous and harmful factor identification, risk assessment and control activities. Identification objects can be demarcated according to plant, area, system equipment, operation activities or a combination of the above methods:

[0096] The identification targets are buildings, structures and areas that may cause injury and health damage; the specific division is based on the factory buildings and area management responsibilities determined by the building regulations.

[0097] The identification targets are the systems and equipment that may cause injury and health damage during operation; each department is divided according to the systems and equipment of hazardous energy (energy carrier);

[0098] Delineate hazardous sources with reference to physical boundaries such as structures, rooms, physical enclosures, cofferdams, roads, and green spaces;

[0099] Identify work activities that may cause injury and damage to health;

[0100] Since there is a certain correlation between equipment systems and factory areas, some system equipment hazards can be included in the scope of factory and regional hazard identification, or they can be used as independent identification units.

[0101] As an optional implementation, this embodiment provides a method for identifying danger sources and carriers in an object:

[0102] 1) Identify the hazardous energy (energy carrier) or material that may be accidentally released, identify and analyze the system function deficiencies and unsafe conditions that may cause accidental energy release, and the possible consequences: Hazard factor identification is to identify the first type of hazardous sources (mechanical energy (including potential energy), electrical energy, thermal energy, chemical energy, radioactive energy, biological factors, etc.) and carriers, and then identify the second type of hazardous sources (human factors, material factors, environmental factors, and management factors) on this basis;

[0103] 2) Hazard identification should focus on the risks of accidents that may cause physical injuries, vehicle injuries, mechanical injuries, lifting injuries, electric shock, drowning, scalding (including acid, alkali, high temperature), radiation, fire, falling from heights, collapse, blasting, gunpowder explosion, boiler explosion, container explosion, other explosions, poisoning and suffocation, and other personal injuries and health damage;

[0104] 3) Hazard identification should take into account the activities of all personnel entering the workplace (including company employees, personnel from cooperative units, external inspectors, examiners, visitors, etc.); personnel behavior, ability and other human factors; unsafe conditions of buildings, facilities and equipment in the workplace (whether provided by the company or by the outside world); and related hazards that may be caused by engineering modifications.

[0105] 4) Hazard identification should take into account safety issues that may cause casualties and health damage raised by external supervision and inspection, internal supervision and inspection, hidden danger investigation and various assessments.

[0106] Preferably, the risk information is graded based on the graded assessment method to obtain the risk level analysis result, including:

[0107] The risk information is evaluated using at least one of the quantitative evaluation methods such as right or wrong judgment method, accident tree analysis method, event tree analysis method, operating condition hazard analysis method and fire and explosion mathematical model calculation to obtain the risk level analysis result; the risk level analysis result includes major risk, high risk, moderate risk or low risk.

[0108] Specifically, this embodiment divides the hazards into four risk levels: major risk (red), high risk (orange), moderate risk (yellow), and low risk (blue); the evaluation method for hazard classification can use quantitative evaluation methods such as right or wrong judgment method, accident tree analysis, event tree analysis, operating condition hazard analysis (LEC) method, fire and explosion mathematical model calculation, etc.

[0109] Furthermore, several assessment methods can be used to assess the same assessment object, complement each other, analyze and synthesize, and verify each other to improve the accuracy of the assessment results. From the perspective of facilitating independent development and comprehensive promotion, it is recommended to use the right and wrong judgment method and the operating condition hazard analysis (LEC) method. In special cases, the risk level can also be determined by the LEC method.

[0110] Figure 2 The overall flow diagram of the embodiment provided by the present invention is as follows: Figure 2 As shown, in this embodiment

[0111] 01 Step Preparation of "Job Safety Risk Analysis Sheet (JHA)" is prepared by the person in charge of maintenance preparation (work package preparer) and submits the "Job Safety Risk Analysis Sheet" (also used as a special safety preparation "Operation Technical Measures Plan"). The highest risk level of the steps in the "Job Safety Risk Analysis Sheet" is the level of the "Job Safety Risk Analysis Sheet". Operations assessed as low risk shall be subject to risk control by the operating unit.

[0112] Step 02: Additional control measures are required for operations assessed as major risks. Only after the risk is reduced to high or medium risk after re-evaluation can an application for the Operation Safety Risk Analysis Form be submitted.

[0113] 03 Step Review is to review the high-risk "Operation Safety Risk Analysis Sheet" proposed by the unit.

[0114] 04 Step review is to review the "Operation Safety Risk Analysis Sheet" that is assessed as high risk; the person in charge of the operation department shall set up safety checkpoints on the "Operation Safety Risk Analysis Sheet" (mainly for high-risk and medium-risk operation steps) and fill in the safety control contact person, who shall be the operation department staff.

[0115] Step 05 Review / approve the "Operation Safety Risk Analysis Sheet" for the pressurized leak plugging operation projects that are reviewed and assessed as high-risk; review and assess the "Operation Safety Risk Analysis Sheet" for the fire safety high-risk operation projects; approve other "Operation Safety Risk Analysis Sheets" that are assessed as high-risk.

[0116] 06 Step Approval (specific scope) For high-risk operations carried out by operating units during major holidays such as the National Day and the Spring Festival, or special or important events as required by superior documents, the "Operation Safety Risk Analysis Sheet" must be approved at a higher approval level and approved by the person in charge; approve the "Operation Safety Risk Analysis Sheet" for pressurized leak plugging operations that are assessed as high-risk; approve the "Operation Safety Risk Analysis Sheet" for operations that are assessed as high-risk for fire safety.

[0117] 07 Step review is to review the "Industrial / Fire Safety High / Medium Risk Operation Permit" that is assessed as high risk; set up safety checkpoints on the "Operation Safety Risk Analysis Form" (mainly set up points for high-risk operation steps, and set up points for random inspections of medium-risk operation steps), and fill in the safety supervision contact person.

[0118] 08 Step Approval is to approve the "Industrial / Fire Safety High / Medium Risk Work Permit" assessed as high risk.

[0119] 09 Step Review is to review the "Operation Safety Risk Analysis Sheet" for medium risks proposed by the unit.

[0120] 10 Steps to approve the "Operation Safety Risk Analysis Form" that is assessed as medium risk; the person in charge of the operation department sets up safety checkpoints on the "Operation Safety Risk Analysis Form" (mainly for medium-risk operation steps) and fills in the safety management contact person, who is the operation department staff.

[0121] 11-step review is to approve the "Industrial / Fire Safety High / Medium Risk Operation Permit" assessed as medium risk; set up safety checkpoints on the "Operation Safety Risk Analysis Form" (random inspection points for medium-risk operation steps) and fill in the safety supervision contact person.

[0122] Preferably, determining the safety supervision process according to the risk level analysis result includes:

[0123] If the risk level analysis result is low risk, the safety supervision process is determined as a normal supervision process;

[0124] If the risk level analysis result is a medium risk, the safety supervision process is determined as the collaboration unit-operation department-safety quality supervision process;

[0125] If the risk level analysis result is a high risk, the safety supervision process is determined as the collaboration unit-operation department-operation office-safety and quality supervision process;

[0126] If the risk level analysis result is a major risk, the safety supervision process will be determined as a supplementary control measure process.

[0127] Preferably, the supplementary control measures process includes:

[0128] Modifying the contractor information and the work content information to obtain modified work information;

[0129] A safety risk analysis is performed based on the modified work information to obtain a risk level analysis result after supplementing control measures.

[0130] Optionally, in this embodiment, "in order to reduce the risk of inadequate risk identification during medium and high risk operations on site, it also includes risk identification of all high risk locations involved on site. Differentiate the risks of falling personnel, falling objects, confined space, suffocation, poisoning, drowning, radiation, etc. involved in each high risk, and centrally record all medium and high risk locations on site, and summarize the recorded results into a real-time updated database. In the subsequent work preparation, the risk identification table is compared to identify the risks on site to ensure that the work risks are not missed or misidentified.

[0131] Figure 3 The module connection diagram of the security management system in the embodiment provided by the present invention is as follows: Figure 3 As shown, this embodiment also provides a safety management system for nuclear power plant maintenance business, including:

[0132] An acquisition module, used to acquire operation activity information; the operation activity information includes contractor information and work content information;

[0133] An analysis module, used to perform safety risk analysis on the operation activity information to obtain risk level analysis results;

[0134] A determination module, used to determine the safety supervision process according to the risk level analysis result;

[0135] The supervision module is used to process the maintenance business according to the safety supervision process.

[0136] Preferably, the acquisition module specifically includes:

[0137] A QR code acquisition unit, used to acquire a preset work ticket QR code;

[0138] A parsing unit, used to scan and parse the work ticket QR code to obtain the work content information; the work content information includes start time information and work ticket information;

[0139] A determination unit is used to determine the contractor information based on the work ticket information based on a remote platform; the contractor information includes company information, on-site staff information and number of workers information.

[0140] Preferably, the analysis module specifically includes:

[0141] A hazard source identification unit, used to perform safety analysis on the work ticket information to obtain hazard source information;

[0142] A classification unit, used to classify the hazard source information to obtain risk information; the risk information includes hazardous chemical information, special equipment information, electrical machinery information, biological information, civil engineering information, radiation information, transportation information, high-value equipment information and / or other information;

[0143] The evaluation unit is used to classify the risk information based on a hierarchical evaluation method to obtain the risk level analysis result.

[0144] The beneficial effects of the present invention are as follows:

[0145] The present invention can automatically obtain operation activity information and perform risk assessment based on the operation activity information, thereby improving the automation level and efficiency of the safety supervision process.

[0146] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0147] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A safety management method for nuclear power plant maintenance operations, It is characterized in that include: Get job activity information; The work activity information includes contractor information and work content information, including: Get the preset work ticket QR code; Scan and analyze the work ticket QR code to obtain the work content information; the work content information includes start time information and work ticket information; Based on the remote platform, the contractor information is determined according to the work ticket information; the contractor information includes company information, on-site staff information and number of workers information; Perform safety risk analysis on the operation activity information to obtain risk level analysis results, including: Performing safety analysis on the work ticket information to obtain hazard source information includes: parsing the work ticket information to obtain the work area, work equipment and work activity type; performing hazard identification on the buildings, system equipment and personnel in the work area to obtain a first identification result; performing hazard identification on the work equipment to obtain a second identification result; performing hazard identification on the work activity type to obtain a third identification result; performing comprehensive analysis based on the first identification result, the second identification result and the third identification result to obtain the hazard source information; Classifying the hazard source information to obtain risk information; the risk information includes hazardous chemical information, special equipment information, electrical machinery information, biological information, civil engineering information, radiation information, transportation information, high-value equipment information and / or other information; Based on the hierarchical assessment method, the risk information is graded to obtain the risk level analysis result, including: The risk information is evaluated by using at least one of a right or wrong judgment method, an accident tree analysis method, an event tree analysis method, an operation condition hazard analysis method, and a fire and explosion mathematical model calculation quantitative evaluation method to obtain the risk level analysis result; the risk level analysis result includes a major risk, a high risk, a medium risk, or a low risk; further, several evaluation methods are selected to evaluate the same evaluation object, and the methods complement, analyze, synthesize, and verify each other; Determine the safety supervision process based on the risk level analysis results, including: If the risk level analysis result is low risk, the safety supervision process is determined as a normal supervision process; If the risk level analysis result is a medium risk, the safety supervision process is determined as the collaboration unit-operation department-safety quality supervision process; If the risk level analysis result is a high risk, the safety supervision process is determined as the collaboration unit-operation department-operation office-safety and quality supervision process; If the risk level analysis result is a major risk, the safety supervision process will be determined as a supplementary control measures process; Maintenance operations are handled according to the safety supervision process.

2. The safety management method for nuclear power plant maintenance business according to claim 1, It is characterized in that The supplementary control measures process includes: Modifying the contractor information and the work content information to obtain modified work information; A safety risk analysis is performed based on the modified work information to obtain a risk level analysis result after supplementing control measures.

3. A safety management system for nuclear power plant maintenance operations, It is characterized in that include: An acquisition module is used to obtain job activity information; The operation activity information includes contractor information and work content information, specifically including: A QR code acquisition unit, used to acquire a preset work ticket QR code; A parsing unit, used to scan and parse the work ticket QR code to obtain the work content information; the work content information includes start time information and work ticket information; A determination unit, configured to determine the contractor information based on the work ticket information on a remote platform; the contractor information includes company information, on-site staff information, and number of workers; The analysis module is used to perform safety risk analysis on the operation activity information to obtain risk level analysis results, specifically including: A hazard source identification unit is used to perform safety analysis on the work ticket information to obtain hazard source information, including: parsing the work ticket information to obtain the work area, work equipment and work activity type; performing hazard identification on the buildings, system equipment and personnel in the work area to obtain a first identification result; performing hazard identification on the work equipment to obtain a second identification result; performing hazard identification on the work activity type to obtain a third identification result; performing comprehensive analysis based on the first identification result, the second identification result and the third identification result to obtain the hazard source information; A classification unit, used to classify the hazard source information to obtain risk information; the risk information includes hazardous chemical information, special equipment information, electrical machinery information, biological information, civil engineering information, radiation information, transportation information, high-value equipment information and / or other information; An evaluation unit, configured to classify the risk information based on a hierarchical evaluation method to obtain the risk level analysis result, including: The risk information is evaluated by using at least one of a right or wrong judgment method, an accident tree analysis method, an event tree analysis method, an operation condition hazard analysis method, and a fire and explosion mathematical model calculation quantitative evaluation method to obtain the risk level analysis result; the risk level analysis result includes a major risk, a high risk, a medium risk, or a low risk; further, several evaluation methods are selected to evaluate the same evaluation object, and the methods complement, analyze, synthesize, and verify each other; A determination module, used to determine the safety supervision process according to the risk level analysis result, including: if the risk level analysis result is low risk, determining the safety supervision process as a normal supervision process; If the risk level analysis result is a medium risk, the safety supervision process is determined as the collaboration unit-operation department-safety quality supervision process; If the risk level analysis result is a high risk, the safety supervision process is determined as the collaboration unit-operation department-operation office-safety and quality supervision process; If the risk level analysis result is a major risk, the safety supervision process will be determined as a supplementary control measures process; The supervision module is used to process the maintenance business according to the safety supervision process.