By designing a steel head temperature controllable water-through device including sink, cooler and water spray structure, the slipping problem caused by the low temperature of the steel head is solved, and the effective control and cooling effect of the steel head temperature is achieved, reducing the Steel blasting accident occurred.
Patent Information
- Application Number
- CN202210289959.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-23
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-03-23
AI Technical Summary
The low temperature of the steel head steel causes slippage in the rolling roll of the No. 17 rolling mill, causing steel flushing accidents. The existing technology is difficult to effectively solve this problem.
Design a water-through device with controllable temperature of steel heads, including sinks, coolers and water spray structures. Through the combination of high-pressure cooling water flow and air blow pipes, the steel head is not treated with water or less water when passing through the cooler. , realize temperature control.
Effectively ensure the temperature of the steel head, reduce steel flush accidents, and provide good cooling effect and extend the service life of the equipment.
Smart Images

Figure CN114643294B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a water penetration device, in particular to a water penetration device with controllable steel head temperature. Background Art
[0002] The second bar line of our steel rolling division is a full continuous rolling bar hot rolling production line with an annual design capacity of 800,000 tons. The main products are 18-25MM diameter construction bars (steel). Since its completion and commissioning in 2006, the production capacity has increased year by year. By 2019, the rolling line capacity reached 1 million tons, and the load exceeded the design capacity by 25%. The equipment in the middle and finishing rolling areas of the main rolling line frequently caused equipment accidents due to overload. In March 2020, in order to reduce the accident rate, the equipment was upgraded and renovated to reduce the failure rate.
[0003] Since the upgrade and renovation was put into use in May 2020, the steel heads at the outlet of No. 16 rolling mill have been punched many times when passing through the 38-meter-long water trough to the inlet of No. 17 rolling mill. After process verification, the reasons for the punching are: the steel temperature of the steel head is too low, resulting in a relatively large hardness of the steel head, and the steel head slipped when entering the rolling mill of No. 17 rolling mill and could not smoothly enter the frame rolling mill, resulting in punching.
[0004] For this purpose, our company has specially developed a treatment method, which is to make the steel head passing through the water-piercing device not be treated with water or be treated with less water to ensure the temperature of the steel head. This device is specially developed to realize this method. Summary of the invention
[0005] The purpose of the present invention is to provide a water-piercing device with controllable steel head temperature, so that the steel head passing through the water-piercing device is not subjected to water treatment or is subjected to less water treatment to ensure sufficient steel head temperature.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] A temperature-controllable water-penetrating device for a steel head comprises a water tank, a mounting support supported on both sides of the water tank is arranged above the water tank, a plurality of coolers arranged along the length direction of the water tank are arranged directly above the water tank, the coolers are fixed on a support beam, and both ends of the support beam are fixedly supported on the mounting support, the cooler comprises a water-penetrating conduit, the water-penetrating conduit is in the shape of a long axis, a steel-running hole is provided in the middle, a water-filling cavity surrounding the steel-running hole is provided at the front end of the water-penetrating conduit, a trumpet-shaped first cooling groove connected to the water-filling cavity is provided in the steel-running hole at the rear end of the water-filling cavity, the diameter of the first cooling groove near the water-filling cavity is larger than the diameter of the far water-filling cavity, and a water spray structure is provided at the connection between the water-filling cavity and the first cooling groove to make the water flow in the water-filling cavity spirally flow into the first cooling groove, the steel-running hole in the rear end direction of the water-penetrating conduit has a second cooling groove, a water-blocking nozzle is coaxially provided in the second cooling groove, and the rear end of the water-blocking nozzle is sealed and connected to the second cooling groove all around, A water storage space is provided between the front end of the water blocking nozzle and the second cooling groove, a through hole is provided in the middle of the water blocking nozzle, the through hole is coaxial with the steel running hole, and a water inlet conduit connected to the water filling chamber is provided on the outside of the front end of the water penetration conduit, and a water outlet conduit connected to the second cooling groove is provided on the outside of the rear end of the water penetration conduit, the steel running holes of all coolers on the mounting support are coaxial, and each water inlet conduit is provided with a separate first electrically controlled valve, and a hot metal detection device with a detection direction pointing to the axis of the steel running hole is provided at the front end of the water tank located in front of the cooler.
[0008] On the basis of the above solution and as a preferred solution of the above solution: at least one third cooling groove is arranged between the first cooling groove and the second cooling groove of the steel running hole.
[0009] On the basis of the above scheme and as a preferred scheme of the above scheme: the third cooling groove is a cavity structure with a prismatic cross-section.
[0010] On the basis of the above scheme and as a preferred scheme of the above scheme: the front end of the steel running hole and the front end of the water blocking nozzle both have a trumpet-shaped guide structure.
[0011] On the basis of the above scheme and as a preferred scheme of the above scheme: the hot metal detection device includes a hot metal detector.
[0012] On the basis of the above scheme and as a preferred scheme of the above scheme: a first air blowing pipe connected to the water filling chamber is arranged on the outer side of the front end of the water-penetrating conduit, and a second electrically-controlled valve is arranged on the first air blowing pipe.
[0013] On the basis of the above scheme and as a preferred scheme of the above scheme: the water spray structure includes a plurality of water spray holes connecting the water filling chamber and the first cooling groove, the water spray holes are evenly distributed around the steel running hole, and the length direction of the water spray holes is inclined in a different plane from the axis of the steel running hole.
[0014] On the basis of the above scheme and as a preferred scheme of the above scheme: the rear end of the last cooler in the rear end direction of the water tank is provided with a recoil cavity connected to the end of the steel running hole, the end of the steel running hole has a bell mouth with the large end facing backwards, a water guide nozzle is provided in the recoil cavity, the rear end of the water guide nozzle is sealed and connected to the rear end of the recoil cavity, there is a distance between the front end and the end of the steel running hole, and the water guide nozzle has a through hole coaxial with the steel running hole, and a recoil water pipe connected to the recoil cavity is provided on the outside of the recoil cavity.
[0015] On the basis of the above scheme and as a preferred scheme of the above scheme: a third electrically-controlled valve is provided on the rebound water pipe.
[0016] On the basis of the above scheme and as a preferred scheme of the above scheme: a support sleeve is arranged on the rear side of the recoil cavity, the support sleeve has an avoidance hole coaxial with the steel running hole, a hollow drain port is arranged on the lower side of the front end of the support sleeve, an inner groove surrounding the avoidance hole is arranged in the rear end direction of the drain port of the support sleeve, a second blowing pipe connected to the inner groove is arranged on the outside of the support sleeve, a trumpet surface with a large end facing forward is provided between the drain port on the inner side of the support sleeve and the inner groove, a plurality of blowing ports are arranged on the trumpet surface, which are evenly distributed around the avoidance hole and penetrate from the trumpet surface to the inner groove, and the length direction of the blowing port is inclined toward the drain port and points to the axis of the avoidance hole.
[0017] On the basis of the above scheme and as a preferred scheme of the above scheme: a cover is arranged above the water tank to cover the cooler.
[0018] The beneficial effects of the present invention are:
[0019] The water-piercing device with controllable steel head temperature of the present invention can ensure that the steel head passing through the water-piercing device is not subjected to water treatment or is subjected to less water treatment to ensure sufficient steel head temperature, and ensure that the steel passing through the water-piercing device has a very good cooling effect on the steel head portion. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the structure of the water-piercing device of the steel head with controllable temperature of the present invention;
[0021] Figure 2 It is a schematic diagram of the structure of the cooler of the present invention;
[0022] Figure 3 It is a schematic diagram of the cross-section structure of the cooler of the present invention;
[0023] Figure 4 It is a structural schematic diagram of the rebound water pipe part of the present invention;
[0024] Figure 5 It is a schematic diagram of the cutaway structure of the rebound water pipe part of the present invention;
[0025] Figure 6It is a schematic diagram of the cover body arrangement of the present invention.
[0026] In the figure:
[0027] Water tank -1, installation support -2, cooler -3, support beam -4, water penetration conduit -5, steel running hole -6, water filling cavity -7, first cooling trough -8, second cooling trough -9, water inlet conduit -10, water outlet conduit -11, first electric control valve -12, water blocking nozzle -13, third cooling trough -14, guide structure -15, hot metal detector -16, first air blowing pipe -17, second electric control valve -18, water spray hole -19, rebound cavity -20, bell mouth -21, water guide nozzle -22, rebound water pipe -23, third electric control valve -24, support sleeve -25, avoidance hole -26, drain port -27, inner trough -28, second air blowing pipe -29, air blowing port -30, cover body -31. DETAILED DESCRIPTION
[0028] The technical solutions in the embodiments of the present invention are described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0029] See also Figure 1-5, a water-piercing device with controllable steel head temperature, which can ensure that the steel head passing through the water-piercing device is not subjected to water treatment or is subjected to less water treatment to ensure sufficient steel head temperature, and ensure that the steel passing through the water-piercing device has a very good cooling effect outside the steel head part. Its structure includes a water trough 1 for collecting cooling water, and a mounting support 2 supported on both sides of the water trough 1 is arranged above the water trough 1. The length direction of the mounting support 2 is arranged in the same direction as the length direction of the water trough, and then a support beam 4 is placed horizontally on the mounting support 2 so that both ends of the support beam are fixedly connected to the mounting support. A plurality of coolers 3 arranged along the length direction of the water trough 1 are arranged directly above the water trough 1, and the cooler 3 is fixed on the support beam 4, and both ends of the support beam 4 are fixedly supported on the mounting support 2. The cooler 3 includes a water-penetrating conduit 5, and the water-penetrating conduit 5 is in the shape of a long axis, and has a steel-running hole 6 passing through it in the middle. When cooling, the steel coming out of the rolling mill passes from the front end to the rear end of the steel-running hole 6, and its purpose is to enable the steel to be cooled in the steel-running hole 6. When setting on site, multiple coolers 3 will be set up, so that the cooling length of the multiple steel-running holes 6 combined together reaches about 38 meters, to ensure a good cooling effect, and the purpose is The temperature of the steel output from the front rolling mill to the next station rolling mill can be quickly reduced from 930 degrees to below 870 degrees to meet the steel rolling requirements. For this purpose, the front end of the water-penetrating conduit 5 is provided with a water-filling chamber 7 surrounding the steel-running hole 6. The steel-running hole 6 at the rear end of the water-filling chamber 7 is provided with a trumpet-shaped first cooling groove 8 connected to the water-filling chamber 7. The diameter of the first cooling groove 8 near the water-filling chamber 7 is greater than the diameter of the far water-filling chamber 7. A water spraying structure is provided at the connection between the water-filling chamber 7 and the first cooling groove 8 to make the water flow in the water-filling chamber 7 spirally flow into the first cooling groove 8. The steel-running hole 6 at the rear end of the water-penetrating conduit 5 is provided with a second cooling groove 9. The water storage effect of the first cooling groove and the second cooling groove plays a sufficient cooling effect on the steel passing through the first cooling groove and the second cooling groove. A water-blocking nozzle 13 is coaxially provided in the second cooling groove 9. The rear end of the water-blocking nozzle 13 is sealed and connected to the second cooling groove 9 on all sides. There is a water storage space between the front end of the water blocking nozzle 13 and the second cooling groove 9, the middle of the water blocking nozzle 13 is a through hole, the through hole is coaxial with the steel running hole 6, and the outer side of the front end of the water penetration conduit 5 is provided with a water inlet conduit 10 connected to the water filling cavity 7, and the outer side of the rear end of the water penetration conduit 5 is provided with a water outlet conduit 11 connected to the second cooling groove 9, the steel running holes 6 of all coolers 3 on the mounting support 2 are coaxial, and each water inlet conduit 10 is provided with a separate first electric control valve 12,The front end of the water tank 1 located in front of the cooler 3 is provided with a hot metal detection device with the detection direction pointing to the axis of the steel running hole 6, wherein the water inlet pipe is connected to the high-pressure cooling water with a pressure of 25-27KP. Under the pressure shock, most of the cooling water can flow from the first cooling tank to the second cooling tank and then be discharged from the water outlet pipe. The cooperation of the water blocking nozzle of the second cooling tank allows the water flow to enter the second cooling tank so that the water blocking nozzle forms a retention for the water flow, and at the same time, a large amount of water is aggregated to form cooling for the steel, and it can ensure that a large amount of water flow is discharged from the outlet pipe instead of being sprayed out from both ends of the steel running hole in large quantities. At the same time, no matter whether it is the water flowing out from both ends of the steel running hole or the water discharged from the outlet pipe, it will be discharged into the water tank and collected and recycled for processing and application. The guide structure can guide the direction of the water flow, and the towing of the steel during the passage guides the water flow, ensuring that the water flow flows from front to back in large quantities. And the steel is cooled throughout the flow process. In the process of high-pressure cooling water entering the first cooling groove from the water filling chamber, the water flow in the first cooling groove has a high-pressure water flow vortex under the influence of the water spray structure. This high-pressure vortex forms a certain support for the steel passing through the steel running hole 6 at high speed, so that a water film is formed between the steel and the steel running hole 6. This effect not only promotes the cooling effect, but also protects the steel running hole 6 and prolongs the service life of the device. In order to meet the effect of generating vortex water flow, the water spray structure includes a plurality of water spray holes 19 connecting the water filling chamber 7 and the first cooling groove 8. The water spray holes 19 are evenly distributed around the steel running hole 6, and the length direction of the water spray holes 19 is inclined in a different plane from the axis of the steel running hole 6, so that the water in the water filling chamber 7 is guided by the water spray holes 19 in a spiral inclination when in the first cooling groove 8 to form a high-pressure spiral vortex. Due to the setting of the hot metal detection device, the cooler that the steel head is about to pass can be determined based on the steel head detection time and the moving speed. In order to achieve no or less water cooling treatment for the steel head, the first electric control valve can be closed to cut off the water to the cooler before the steel head passes through according to the above judgment. And it can be further provided with a first blowing pipe 17 connected to the water filling chamber 7 on the outside of the front end of the water-penetrating conduit 5, and a second electric control valve 18 is provided on the first blowing pipe 17. The first blowing pipe 17 is connected to the air source, and the opening and closing of the second electric control valve 18 is used to control the first blowing pipe 17 to blow away most of the accumulated water in the steel running hole, so that the steel head can be completely untreated to maintain the temperature. ,
[0030] Among them, in order to promote the cooling effect of the cooler, at least one third cooling groove 14 is provided between the first cooling groove 8 and the second cooling groove 9 of the steel running hole 6. The third cooling groove 14 is a cavity structure with a prismatic cross section, and the third cooling groove 14 of this structure can store water well and facilitate water flow. Furthermore, in order to facilitate the passage of steel, the front end of the steel running hole 6 and the front end of the water blocking nozzle 13 are both provided with a trumpet-shaped guide structure 15.
[0031] Wherein, the hot metal detection device includes a hot metal detector 16 .
[0032] Because a hot metal detection device needs to be set behind the last cooler 3 in the rear direction of the water tank 1 to perform heat inspection on the steel, further, a rebound chamber 20 is provided at the rear end of the last cooler 3 in the rear direction of the water tank 1 to dock with the end of the steel running hole 6, and the end of the steel running hole 6 has a bell mouth 21 with the large end facing backwards, and a water guide nozzle 22 is provided in the rebound chamber 20, and the rear end of the water guide nozzle 22 is sealed and connected to the rear end of the rebound chamber 20, and there is a gap between the front end and the end of the steel running hole 6, and the water guide nozzle 22 has a through hole coaxial with the steel running hole 6, and a rebound water pipe 23 connected to the rebound chamber 20 is provided on the outside of the rebound chamber 20. The water in the steel running hole of the cooler is prevented from spraying out of the rear end through the rebound chamber 20 structure, and water is pushed toward the steel running hole through the rebound water pipe 23 to counteract the water flow in the steel running hole to form a slow resistance, and the on and off of the rebound water is controlled by the third electric control valve 24 provided on the rebound water pipe 23. A support sleeve 25 is further arranged on the rear side of the recoil cavity 20, and the support sleeve 25 has an avoidance hole 26 coaxial with the steel running hole 6, and a hollow drain port 27 is arranged on the lower side of the front end of the support sleeve 25, and an inner groove 28 surrounding the avoidance hole 26 is arranged in the rear end direction of the drain port 27 of the support sleeve 25, and a second blowing pipe 29 connected to the inner groove 28 is arranged on the outside of the support sleeve 25, and a trumpet surface with a large end facing forward is provided between the drain port 27 on the inner side of the support sleeve 25 and the inner groove 28, and a plurality of blowing ports 30 are evenly distributed around the avoidance hole 26 and penetrate from the trumpet surface to the inner groove 28, and the length direction of the blowing port 30 is obliquely pointed to the axis of the avoidance hole 26 in the direction of the drain port 27, and a high-pressure airflow is blown out through the blowing port 30 to blow away water stains or slag on the steel, thereby reducing the detection influence of water stains and slag on the hot metal detection device.
[0033] Then, a cover body 31 is further arranged above the water tank 1 to cover the cooler 3 , and the cover body 31 is used to slow down the diffusion of water vapor and isolate and protect the safe environment.
[0034] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A water-penetrating device with controllable steel head temperature, characterized in that: The invention comprises a water tank (1), a mounting support (2) supported on both sides of the water tank (1) is arranged above the water tank (1), a plurality of coolers (3) arranged along the length direction of the water tank (1) are arranged directly above the water tank (1), the coolers (3) are fixed on a support beam (4), both ends of the support beam (4) are fixedly supported on the mounting support (2), the coolers (3) comprise a water-penetrating conduit (5), the water-penetrating conduit (5) is in the shape of a long axis, a steel hole (6) passing through the middle, a water-filling cavity (7) surrounding the steel hole (6) is provided at the front end of the water-filling cavity (7), and a steel hole (6) at the rear end of the water-filling cavity (7) is provided in the steel hole (6) connected to the water-filling cavity (7) A trumpet-shaped first cooling groove (8), wherein the diameter of the first cooling groove (8) near the water filling chamber (7) is larger than the diameter of the first cooling groove (8) far from the water filling chamber (7), and a water spray structure is provided at the connection point between the water filling chamber (7) and the first cooling groove (8) so that the water flow in the water filling chamber (7) flows into the first cooling groove (8) in a spiral shape, and the steel running hole (6) in the rear end direction of the water penetration pipe (5) has a second cooling groove (9), and a water blocking nozzle (13) is coaxially provided in the second cooling groove (9), and the rear end of the water blocking nozzle (13) is sealedly connected to the second cooling groove (9) on all sides, and a water storage space is provided between the front end of the water blocking nozzle (13) and the second cooling groove (9), and the water blocking nozzle (13) A through hole is provided in the middle, the through hole is coaxial with the steel running hole (6), and a water inlet pipe (10) connected to the water filling chamber (7) is provided on the outside of the front end of the water penetration pipe (5), and a water outlet pipe (11) connected to the second cooling groove (9) is provided on the outside of the rear end of the water penetration pipe (5). The steel running holes (6) of all coolers (3) on the mounting support (2) are coaxial, and each water inlet pipe (10) is provided with a separate first electrically controlled valve (12). The front end of the water tank (1) located in front of the cooler (3) is provided with a hot metal detection device with the detection direction pointing to the axis of the steel running hole (6); the first cooling groove (8) of the steel running hole (6) is connected to the second cooling groove (9) by the first cooling groove (8) of the steel running hole (6). At least one third cooling groove (14) is provided between the two cooling grooves (9); a backlash cavity (20) connected to the end of the steel running hole (6) is provided at the rear end of the last cooler (3) in the rear end direction of the water groove (1); the end of the steel running hole (6) has a bell mouth (21) with the large end facing backwards; a water guide nozzle (22) is provided in the backlash cavity (20); the rear end of the water guide nozzle (22) is sealedly connected to the rear end of the backlash cavity (20); a distance is provided between the front end and the end of the steel running hole (6); the water guide nozzle (22) has a through hole coaxial with the steel running hole (6); and a backlash water pipe (23) connected to the backlash cavity (20) is provided on the outside of the backlash cavity (20);A support sleeve (25) is provided at the rear side of the recoil cavity (20), the support sleeve (25) having an avoidance hole (26) coaxial with the steel running hole (6), a hollow drain port (27) is provided at the lower side of the front end of the support sleeve (25), an inner groove (28) surrounding the avoidance hole (26) is provided at the rear end direction of the drain port (27) of the support sleeve (25), a second air blowing pipe (29) connected to the inner groove (28) is provided at the outer side of the support sleeve (25), a trumpet surface with a large end facing forward is provided between the drain port (27) on the inner side of the support sleeve (25) and the inner groove (28), a plurality of air blowing ports (30) are provided on the trumpet surface, which are evenly distributed around the avoidance hole (26) and penetrate from the trumpet surface to the inner groove (28), and the length direction of the air blowing port (30) is inclined toward the drain port (27) and points to the axis of the avoidance hole (26). ; 2. The water-piercing device with controllable steel head temperature according to claim 1, characterized in that: The third cooling groove (14) is a cavity structure with a prismatic cross section.
3. The temperature-controllable water-piercing device for steel head according to claim 1, characterized in that: The front end of the steel running hole (6) and the front end of the water blocking nozzle (13) both have a trumpet-shaped guide structure (15).
4. The temperature-controllable water-piercing device for steel head according to claim 1, characterized in that: The hot metal detection device comprises a hot metal detector (16).
5. The temperature-controllable water-piercing device for steel head according to claim 1, characterized in that: A first air blowing pipe (17) communicating with the water filling chamber (7) is arranged on the outer side of the front end of the water-penetrating conduit (5), and a second electrically controlled valve (18) is arranged on the first air blowing pipe (17).
6. The temperature-controllable water-piercing device for steel head according to claim 1, characterized in that: The water spray structure comprises a plurality of water spray holes (19) connecting the water filling chamber (7) and the first cooling groove (8); the water spray holes (19) are evenly distributed around the steel running hole (6); and the length direction of the water spray holes (19) is inclined in a non-planar manner with the axis of the steel running hole (6).
7. The temperature-controllable water-piercing device for steel head according to claim 1, characterized in that: The rebound water pipe (23) is provided with a third electrically controlled valve (24).
Citation Information
Patent Citations
Cooling equipment for large bar material
CN103357677A
Water penetration cooling line of controlled rolling and controlled cooling equipment
CN104646438A
Water penetration device capable of controlling temperature of steel head
CN114643294A
Rolling mill refill -unit
CN205200158U
Roller cooling water control device
CN212821768U