Prefabricated steel tube concrete and reinforced concrete assembled bridge and construction method thereof
By introducing support mechanisms and shock absorbers into prefabricated steel pipe concrete and reinforced concrete assembled bridges, the problem of bridge tilting under high gravity is solved, the safety and service life of the bridge are improved, and the stability of the bridge is ensured under high load conditions.
Patent Information
- Application Number
- CN202210405081.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-18
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-04-18
AI Technical Summary
When existing prefabricated assembled bridges are used, when the gravity on one side is too high, the bridge body is prone to tilt, which seriously affects the life safety of people on the bridge.
A prefabricated steel pipe concrete and reinforced concrete assembly bridge was designed. By installing a support mechanism between the cover beam and the pier column, including supporting grooves, steel plates, threaded rods and shot put components, it ensures that the bridge does not fall when subjected to great force, and passes through The combination of shot put and elastic rope reduces vibration conduction and improves the stability and service life of the bridge.
It effectively avoids the inclination or tilt of the bridge, improves the safety and service life of the bridge, and at the same time enhances the sturdiness of the pier columns to ensure the stable operation of the bridge under high load conditions.
Smart Images

Figure CN114687294B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of assembled bridges, and relates to a prefabricated steel tube concrete and reinforced concrete assembled bridge and a construction method thereof. Background Art
[0002] Assembled bridges are the same as prefabricated bridges. As the name suggests, they are different from traditional on-site construction methods such as steel bar tying and concrete pouring. For prefabricated bridges, part or all of the components of the bridge's substructure (piers, abutments, cap beams) and superstructure (box beams, slab beams, T-beams) are processed and formed in the prefabricated component factory, then transported to the construction site for hoisting and splicing into the main body of the bridge. The various components of the bridge are mechanically connected through pre-embedded holes, pre-embedded steel bars, and connecting devices processed during the prefabrication production process. The grouting sleeves in the components are used for grouting, so that the concrete fully fills the gaps between the components to achieve the effect of overall strengthening.
[0003] Prefabricated assembly technology has the advantages of standardized component production, fast and convenient on-site installation, and energy-saving and environmentally friendly construction. It can reduce the impact on the atmospheric environment and traffic roads, improve quality and safety, and civilized construction level. It is the development trend of my country's bridge industry. When the prefabricated bridge is in use, when the gravity on one side is too large, the bridge body is prone to tipping over, seriously affecting life safety. For this reason, prefabricated steel tube concrete and reinforced concrete assembled bridges and their construction methods are proposed. Summary of the invention
[0004] In view of this, the present invention provides a prefabricated steel tube concrete and reinforced concrete assembled bridge and a construction method thereof in order to solve the problem that when the gravity on one side of the existing prefabricated assembled bridge is too large during use, the bridge body is prone to tipping over, seriously affecting the life safety of people on the bridge.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] A prefabricated steel tube concrete and reinforced concrete assembled bridge comprises a cap, a pier and a cap beam, a plurality of first connecting ribs are pre-embedded in the upper surface of the cap, the pier comprises a steel pipe, two symmetrical reinforcing plates are fixedly connected to the circumferential outer wall of the steel pipe, a side column is fixedly connected to one side of the reinforcing plate, a steel bar ring is fixedly connected between two side columns at the same height, vertical ribs are fixedly connected between a plurality of steel bar rings, an outer ring concrete is prefabricated on the circumferential outer wall of the steel pipe, an inner ring concrete is prefabricated inside the steel pipe, and the steel bar ring and the vertical ribs are located inside the outer ring concrete, a plurality of first plug holes are provided at the bottom of the outer ring concrete, and the first plug holes are plugged with the first connecting ribs, a plurality of second connecting ribs are pre-embedded in the top of the outer ring concrete, a plurality of second plug holes are provided at the bottom of the cap beam, and the second plug holes are plugged with the second connecting ribs, a supporting mechanism is provided between the reinforcing plate and the cap beam, the supporting mechanism comprises three supporting grooves and a steel plate, the three supporting grooves They are all opened on one side of the cap beam, and a connecting mounting hole is opened between the three supporting grooves, and a first internal threaded sleeve is embedded in the mounting hole, and a first threaded rod is threadedly connected in the first internal threaded sleeve. The steel plate is welded to one side of the reinforcement plate, and the other end of the steel plate is fixedly connected to an angle steel, and one side of the angle steel is fixedly connected to three reinforcement plates, and one side of the reinforcement plate is fixedly connected to a support frame, and the support frames are respectively located in the support grooves, and a socket is opened on one side of the support frame, and the first threaded rod is respectively plugged into the socket, and a slot is opened on one side of the steel plate, and the slot is plugged into the reinforcement plate, and six symmetrically distributed first connecting blocks are embedded in the top of the cap beam, and the upper surface of the first connecting block is fixedly connected to a support, two side beams and an intermediate beam are provided between the two cap beams, and the bottoms of the two side beams and the intermediate beam are fixedly connected to two second connecting blocks, and the second connecting blocks are respectively welded to the top of the support.
[0007] Furthermore, mounting grooves are provided at both ends of the middle beam and the side beams, and shock-absorbing mechanisms are provided in the mounting grooves. The shock-absorbing mechanisms include two fixing sleeves and two lead balls. The two fixing sleeves are fixedly connected to the bottom of the mounting grooves, connecting rods are threadedly connected in the two fixing sleeves, and fixing rings are fixedly connected to the circumferential outer walls of the connecting rods. A second internally threaded sleeve is embedded in the top of the mounting groove, and a second threaded rod is threadedly connected to the second internally threaded sleeve. A lifting plate is movably connected to the bottom of the second threaded rod, and elastic ropes are fixedly connected to the top and bottom of the lead balls, and the two ends of the elastic ropes are respectively fixed to the lifting plate and the fixing ring.
[0008] Furthermore, two limit plates are fixedly connected to the bottom of the installation groove, and the two limit plates are respectively located on both sides of the lifting plate.
[0009] Furthermore, the top of the second threaded rod is fixedly connected with a force-bearing block.
[0010] Furthermore, one side of the reinforcement plate is provided with penetrating fixing holes, and the fixing holes are evenly distributed.
[0011] Furthermore, a plurality of evenly distributed third connecting ribs are pre-embedded on both sides of the middle beam and one side of the side beam, and sleeves are movably connected between two adjacent third connecting ribs.
[0012] Furthermore, six groups of symmetrically distributed limiting columns are integrally formed on the upper surface of the cap beam, and a plurality of groups of limiting holes are provided at the bottom of the cap beam, and the limiting columns are plugged into the limiting holes.
[0013] Furthermore, a partition is integrally formed on the upper surface of the cap beam.
[0014] Furthermore, multiple grouting holes and exhaust holes are reserved on the circumferential outer wall of the pier and both sides of the cap beam.
[0015] The present invention also proposes a construction method for a prefabricated steel tube concrete and reinforced concrete assembled bridge, comprising the following steps:
[0016] S1. Hoist the prefabricated pier column onto the cap, roughen the surface of the cap before hoisting, then align the first plug hole at the bottom of the pier column with the first connecting rib, fully insert the first connecting rib into the first plug hole, adjust the level of the pier column using a jack, and then inject high-strength grouting material between the first connecting rib and the first plug hole through the grouting hole on the pier column to fix the pier column and the cap;
[0017] S2, hoist the cap beam to the top of the pier column, roughen the top of the pier column before hoisting, then align the second plug hole at the bottom of the cap beam with the second connecting rib, insert the second connecting rib into the second plug hole, then inject high-strength slurry between the second plug hole and the second connecting rib through the grouting hole on the cap beam, insert the support frame into the support groove at the same time, then rotate the first threaded rod so that the first threaded rod extends from the first internal threaded sleeve and is inserted into the support frame, and further fix the cap beam through the support frame to improve the stability of the cap beam;
[0018] S3, welding a support above the first connection block on the surface of the cap beam, then placing the middle beam and the side beam between the two cap beams, and making the second connection block at the bottom of the middle beam and the side beam be located above the support, and after the position adjustment of the middle beam and the side beam is completed, welding is performed between the first connection block, the second connection block and the support;
[0019] S4. The second threaded rod is rotated by the force block, and the second threaded rod drives the lifting plate to move upward, so that the elastic ropes at the top and bottom of the shot put are tightened, and at the same time, the limit plate plays a role in limiting the lifting plate to prevent the lifting plate from rotating;
[0020] S5. After the installation is completed, wet joint construction is performed between the side beams, the middle beams and the cap beams, and the side beams, the middle beams and the cap beams are connected;
[0021] S6. When a vehicle passes over the side beam or the middle beam, the vibration generated by the side beam and the middle beam is transmitted to the lead ball. The elastic ropes at the top and bottom of the lead ball reduce the vibration of the side beam and the middle beam, thereby increasing the service life of the bridge.
[0022] S7. When one side of the cap beam is subjected to heavier force, the support frame supports one side of the cap beam and transmits the gravity to the pier to prevent the cap beam from tilting or falling.
[0023] The beneficial effects of the present invention are:
[0024] 1. The prefabricated steel tube concrete and reinforced concrete assembled bridge disclosed in the present invention has a support mechanism installed between the cap beam and the pier, so that when one side of the cap beam bears a large load, the support frame can support one side of the cap beam to avoid tilting or tipping of the cap beam, thereby improving the safety of the bridge.
[0025] 2. The prefabricated steel tube concrete and reinforced concrete assembled bridge disclosed in the present invention has lead balls installed at both ends of the middle beam and the side beam, so that when the middle beam or the side beam vibrates, the vibration can be transmitted to the lead balls, and the elastic ropes at the top and bottom of the lead balls can reduce the vibration, thereby improving the service life of the bridge.
[0026] 3. The prefabricated steel tube concrete and reinforced concrete assembled bridge disclosed in the present invention, through the coordinated use of the third connecting bar and the sleeve, increases the load-bearing capacity of the gap between the side beam and the middle beam when the wet joint is constructed between the side beam and the middle beam, thereby further improving the safety of the bridge.
[0027] 4. The prefabricated steel tube concrete and reinforced concrete assembled bridge disclosed in the present invention uses reinforcing plates, steel rings and vertical bars in coordination, so that when the outer ring concrete is poured outside the steel tube, the outer ring concrete can be better fixed to the steel tube, thereby improving the strength of the pier column.
[0028] 5. The prefabricated steel tube concrete and reinforced concrete assembled bridge disclosed in the present invention makes the side beams and the middle beams more stable by installing limit columns on the top of the cap beam, thereby avoiding displacement of the side beams and the middle beams after long-term use.
[0029] 6. The prefabricated steel tube concrete and reinforced concrete assembled bridge disclosed in the present invention can support one side of the cap beam when the load-bearing side of the cap beam is relatively large, so as to avoid the cap beam from tilting or falling, thereby improving the safety of the bridge. At the same time, when the middle beam or the side beam vibrates, the vibration can be transmitted to the lead ball, and the vibration of the bridge can be reduced by the elastic ropes at the top and bottom of the lead ball, thereby improving the service life of the bridge. When the wet joint is constructed between the side beam and the middle beam, the load-bearing capacity of the gap between the side beam and the middle beam can be increased, thereby further improving the safety of the bridge, and the outer ring concrete can be better fixed to the steel pipe, thereby improving the firmness of the pier.
[0030] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0032] Figure 1 A schematic diagram of the three-dimensional structure of the prefabricated steel tube concrete and reinforced concrete assembled bridge of the present invention from a first viewing angle;
[0033] Figure 2 A second perspective three-dimensional schematic diagram of the prefabricated steel tube concrete and reinforced concrete assembled bridge of the present invention;
[0034] Figure 3 It is a schematic diagram of the cross-sectional structure of the cap beam and pier column in the prefabricated steel tube concrete and reinforced concrete assembled bridge of the present invention;
[0035] Figure 4 This is a schematic diagram of the internal structure of the pier column in the prefabricated steel tube concrete and reinforced concrete assembled bridge of the present invention;
[0036] Figure 5 For the present invention Figure 4 The enlarged structural diagram at A in the middle;
[0037] Figure 6 It is a schematic diagram of the structure of the support mechanism in the prefabricated steel tube concrete and reinforced concrete assembled bridge of the present invention;
[0038] Figure 7 It is a schematic diagram of the cross-sectional structure of the middle side beam of the prefabricated steel tube concrete and reinforced concrete assembled bridge of the present invention;
[0039] Figure 8 For the present invention Figure 7Enlarged structural diagram at B in the middle.
[0040] Figure numerals: 1, cap; 2, pier column; 3, cap beam; 4, grouting hole; 5, exhaust hole; 6, partition; 7, middle beam; 8, side beam; 9, support; 10, limit column; 11, steel pipe; 12, reinforcement plate; 13, fixing hole; 14, support mechanism; 15, outer ring concrete; 16, inner ring concrete; 17, steel ring; 18, vertical reinforcement; 19, first connecting reinforcement; 20, second connecting reinforcement; 21, side column; 22, steel plate; 23, plug Groove; 24, angle steel; 25, reinforcement plate; 26, support frame; 27, first threaded rod; 28, support groove; 29, first internal threaded sleeve; 30, third connecting rib; 31, sleeve; 32, second internal threaded sleeve; 33, force block; 34, lifting plate; 35, lead ball; 36, installation groove; 37, second connecting block; 38, limit plate; 39, second threaded rod; 40, elastic rope; 41, fixing sleeve; 42, connecting rod; 43, fixing ring. DETAILED DESCRIPTION
[0041] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0042] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0043] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0044] Embodiment 1
[0045] like Figure 1-Figure 8 As shown, a prefabricated steel tube concrete and reinforced concrete assembled bridge includes a pedestal 1, a pier 2 and a cap beam 3. A plurality of first connecting ribs 19 are pre-embedded on the upper surface of the pedestal 1. The pier 2 includes a steel tube 11. Two symmetrical reinforcing plates 12 are welded to the circumferential outer wall of the steel tube 11. A side column 21 is welded to one side of the reinforcing plate 12. A steel bar ring 17 is tied between the two side columns 21 at the same height. Vertical ribs 18 are tied between the plurality of steel bar rings 17. An outer ring concrete 15 is prefabricated on the circumferential outer wall of the steel tube 11. An inner ring concrete 16 is prefabricated inside the steel tube 11. The steel bar ring 17 and the vertical ribs 18 are located inside the outer ring concrete 15. Through the cooperation of the reinforcing plate 12, the steel bar ring 17 and the vertical ribs 18, when the outer ring concrete 15 is poured outside the steel tube 11, the outer ring concrete 15 can be better fixed to the steel tube 11, thereby improving the firmness of the pier 2.
[0046] A plurality of first plug holes are provided at the bottom of the outer ring concrete 15, and the first plug holes are plugged with the first connecting ribs 19. A plurality of second connecting ribs 20 are pre-buried at the top of the outer ring concrete 15. A plurality of second plug holes are provided at the bottom of the cap beam 3, and the second plug holes are plugged with the second connecting ribs 20. The first plug holes at the bottom of the pier column 2 are aligned with the first connecting ribs 19, so that the first connecting ribs 19 are fully inserted into the first plug holes. The level of the pier column 2 is adjusted using a jack, and then the first connecting ribs 19 and the first plug holes are grouted through the grouting holes 4 on the pier column 2. High-strength grouting material is injected between the holes to fix the pier 2 and the cap 1. Similarly, the cap beam 3 can be fixed. A support mechanism 14 is provided between the reinforcement plate 12 and the cap beam 3. The support mechanism 14 includes three support grooves 28 and a steel plate 22. The three support grooves 28 are all opened on one side of the cap beam 3. A connecting mounting hole is opened between the three support grooves 28. A first internal threaded sleeve 29 is pre-buried in the mounting hole. The first internal threaded sleeve 29 is threadedly connected with a first threaded rod 27. The steel plate 22 is welded to one side of the reinforcement plate 12. On the other side, an angle steel 24 is welded to the other end of the steel plate 22, and three reinforcing plates 25 are welded to one side of the angle steel 24. A support frame 26 is welded to one side of the reinforcing plate 25, and the support frames 26 are respectively located in the support grooves 28. A plug hole is opened on one side of the support frame 26, and the first threaded rod 27 is respectively plugged into the plug hole. The support frame 26 is inserted into the support groove 28, and then the first threaded rod 27 is rotated to make the first threaded rod 27 extend from the first internal thread sleeve 29 and insert into the support frame 26, and the cap beam 3 is advanced through the support frame 26. One-step fixation improves the stability of the cap beam 3. A slot 23 is opened on one side of the steel plate 22, and the slot 23 is plugged into the reinforcement plate 12. Six symmetrically distributed first connecting blocks are pre-embedded on the top of the cap beam 3. Supports 9 are welded to the upper surfaces of the first connecting blocks. Two side beams 8 and one middle beam 7 are arranged between the two cap beams 3, and two second connecting blocks 37 are welded to the bottom of the two side beams 8 and one middle beam 7, and the second connecting blocks 37 are respectively welded to the top of the supports 9, and the side beams 8 and the middle beam 7 are welded to the cap beam 3 through the supports 9.
[0047] Embodiment 2
[0048] Reference Figure 1-Figure 8The present invention provides a new technical solution, a prefabricated steel tube concrete and reinforced concrete assembled bridge, comprising a cap 1, a pier 2 and a cap beam 3, wherein a plurality of first connecting ribs 19 are pre-buried on the upper surface of the cap 1, the pier 2 comprises a steel tube 11, and two symmetrical reinforcing plates 12 are welded to the circumferential outer wall of the steel tube 11, and a through fixing hole 13 is opened on one side of the reinforcing plate 12, and the fixing holes 13 are evenly distributed, and a side column 21 is welded on one side of the reinforcing plate 12, and the side columns 21 of the same height are connected to each other. Steel bar rings 17 are tied in between, and vertical bars 18 are tied between multiple steel bar rings 17. The circumferential outer wall of the steel pipe 11 is prefabricated with an outer ring concrete 15, and an inner ring concrete 16 is prefabricated inside the steel pipe 11. The steel bar rings 17 and the vertical bars 18 are located inside the outer ring concrete 15. Through the cooperation of the reinforcement plate 12, the steel bar rings 17 and the vertical bars 18, when the outer ring concrete 15 is poured outside the steel pipe 11, the outer ring concrete 15 can be better fixed to the steel pipe 11, thereby improving the firmness of the pier 2.
[0049] A plurality of first plug holes are provided at the bottom of the outer ring concrete 15, and the first plug holes are plugged into the first connecting ribs 19. Six groups of symmetrically distributed limiting columns 10 are integrally formed on the upper surface of the cap beam 3. A plurality of groups of limiting holes are provided at the bottom of the cap beam 3, and the limiting columns 10 are plugged into the limiting holes. A partition 6 is integrally formed on the upper surface of the cap beam 3. The limiting columns 10 can prevent the cap beam 3 from shifting after long-term use. A plurality of second connecting ribs 20 are pre-embedded at the top of the outer ring concrete 15. A plurality of second plug holes are provided at the bottom of the cap beam 3, and the second plug holes are plugged into the limiting holes. The first hole is connected with the second connecting rib 20, the first plug hole at the bottom of the pier 2 is aligned with the first connecting rib 19, the first connecting rib 19 is fully inserted into the first plug hole, and then the level of the pier 2 is adjusted using a jack, and then high-strength grouting material is injected between the first connecting rib 19 and the first plug hole through the grouting hole 4 on the pier 2 to fix the pier 2 and the base 1. Similarly, the cap beam 3 can be fixed. A plurality of grouting holes 4 and exhaust holes 5 are reserved on the circumferential outer wall of the pier 2 and the two sides of the cap beam 3. The grouting holes 4 can be used to fix the first connecting rib 19 and the first plug hole. A high-strength grouting material is injected into the first and second sockets to fix the bridge. A support mechanism 14 is provided between the reinforcement plate 12 and the cap beam 3. The support mechanism 14 includes three support grooves 28 and a steel plate 22. The three support grooves 28 are all opened on one side of the cap beam 3. A connecting mounting hole is opened between the three support grooves 28. A first internal threaded sleeve 29 is pre-buried in the mounting hole. The first internal threaded sleeve 29 is threadedly connected with a first threaded rod 27. The steel plate 22 is welded to one side of the reinforcement plate 12, and an angle is welded at the other end of the steel plate 22. Steel 24, three reinforcing plates 25 are welded on one side of the angle steel 24, and support frames 26 are welded on one side of the reinforcing plates 25, and the support frames 26 are respectively located in the support grooves 28, and a socket is opened on one side of the support frames 26, and the first threaded rod 27 is respectively plugged into the socket, and the support frame 26 is inserted into the support groove 28, and then the first threaded rod 27 is rotated so that the first threaded rod 27 extends out from the first internal threaded sleeve 29 and is inserted into the support frame 26, and the cap beam 3 is further fixed by the support frame 26 to improve the stability of the cap beam 3.
[0050] A slot 23 is provided on one side of the steel plate 22, and the slot 23 is plugged into the reinforcement plate 12. Six symmetrically distributed first connecting blocks are pre-embedded in the top of the cap beam 3, and a support 9 is welded to the upper surface of the first connecting block. Two side beams 8 and one middle beam 7 are provided between the two cap beams 3, and two second connecting blocks 37 are welded to the bottom of the two side beams 8 and one middle beam 7, and the second connecting blocks 37 are respectively welded to the top of the support 9, and the side beams 8 and the middle beam 7 are welded to the cap beam 3 through the support 9. A plurality of evenly distributed third connecting ribs 30 are pre-embedded on both sides of the middle beam 7 and one side of the side beam 8, and a sleeve 31 is sleeved between two adjacent third connecting ribs 30. Through the coordinated use of the third connecting ribs 30 and the sleeve 31, when wet joint construction is performed between the side beams 8 and the middle beam 7, the load-bearing capacity of the gap between the side beams 8 and the middle beam 7 is increased.
[0051] In the present invention, both ends of the middle beam 7 and the side beam 8 are provided with mounting grooves 36, and the mounting grooves 36 are provided with shock-absorbing mechanisms, which include two fixing sleeves 41 and two lead balls 35, and the two fixing sleeves 41 are fixedly connected to the bottom of the mounting grooves 36, and the two fixing sleeves 41 are threadedly connected with connecting rods 42, and the circumferential outer walls of the connecting rods 42 are welded with fixing rings 43, and the top of the mounting groove 36 is pre-buried with a second internally threaded sleeve 32 penetrating therethrough, and the second internally threaded sleeve 32 is internally threadedly connected with a second threaded rod 39, and the top of the second threaded rod 39 is welded with a force block 33, which facilitates the rotation of the second threaded rod 39, and the bottom of the second threaded rod 39 is welded with a force block 33. A lifting plate 34 is rotatably connected, and the top and bottom of the lead ball 35 are fixedly connected with elastic ropes 40, and the two ends of the elastic ropes 40 are respectively fixed to the lifting plate 34 and the fixing ring 43, and the bottom of the mounting groove 36 is fixedly connected with two limit plates 38, and the two limit plates 38 are respectively located on both sides of the lifting plate 34. The limit plates 38 play a role in limiting the lifting plate 34 to prevent the lifting plate 34 from rotating. The elastic rope 40 can be tightened by rotating the second threaded rod 39. At the same time, the vibration generated by the side beam 8 and the middle beam 7 is transmitted to the lead ball 35. The elastic ropes 40 at the top and bottom of the lead ball 35 reduce the vibration of the side beam 8 and the middle beam 7, thereby improving the service life of the bridge.
[0052] The advantages of the second embodiment over the first embodiment are:
[0053] First, by installing the lead balls 35 at both ends of the middle beam 7 and the side beam 8, when the middle beam 7 or the side beam 8 vibrates, the vibration can be transmitted to the lead balls 35, and the elastic ropes 40 at the top and bottom of the lead balls 35 can reduce the vibration, thereby improving the service life of the bridge;
[0054] Second, by using the third connecting rib 30 and the sleeve 31 in coordination, the load-bearing capacity of the gap between the side beam 8 and the middle beam 7 is increased when the wet joint is constructed between the side beam 8 and the middle beam 7;
[0055] 3. Through the coordinated use of the reinforcing plate 12 , the steel ring 17 and the vertical ribs 18 , when the outer ring concrete 15 is poured outside the steel pipe 11 , the outer ring concrete 15 can be better fixed to the steel pipe 11 .
[0056] The construction method of the prefabricated steel tube concrete and reinforced concrete assembled bridge comprises the following steps:
[0057] S1, hoist the prefabricated pier 2 onto the cap 1, roughen the surface of the cap 1 before hoisting, then align the first plug hole at the bottom of the pier 2 with the first connecting rib 19, so that the first connecting rib 19 is fully inserted into the first plug hole, and then use a jack to adjust the level of the pier 2, and then inject high-strength grouting material between the first connecting rib 19 and the first plug hole through the grouting hole 4 on the pier 2 to fix the pier 2 and the cap 1;
[0058] S2, hoist the cap beam 3 to the top of the pier column 2, roughen the top of the pier column 2 before hoisting, then align the second plug hole at the bottom of the cap beam 3 with the second connecting rib 20, insert the second connecting rib 20 into the second plug hole, and then inject high-strength slurry between the second plug hole and the second connecting rib 20 through the grouting hole 4 on the cap beam 3, and at the same time insert the support frame 26 into the support groove 28, and then rotate the first threaded rod 27 so that the first threaded rod 27 extends from the first internal threaded sleeve 29 and is inserted into the support frame 26, and the cap beam 3 is further fixed by the support frame 26 to improve the stability of the cap beam 3;
[0059] S3, welding the support 9 above the first connection block on the surface of the cap beam 3, then placing the middle beam 7 and the side beam 8 between the two cap beams 3, and making the second connection block 37 at the bottom of the middle beam 7 and the side beam 8 be located above the support 9, after the position adjustment of the middle beam 7 and the side beam 8 is completed, welding is performed between the first connection block, the second connection block 37 and the support 9;
[0060] S4. The second threaded rod 39 is rotated by the force block 33, and the second threaded rod 39 drives the lifting plate 34 to move upward, so that the elastic ropes 40 at the top and bottom of the shot put 35 are tightened, and at the same time, the limiting plate 38 limits the lifting plate 34 to prevent the lifting plate 34 from rotating;
[0061] S5. After the installation is completed, wet joint construction is performed between the side beams 8, the middle beams 7 and the cap beams 3, and the side beams 8, the middle beams 7 and the cap beams 3 are connected;
[0062] S6. When a vehicle passes over the side beam 8 or the middle beam 7, the vibration generated by the side beam 8 and the middle beam 7 is transmitted to the lead ball 35, and the elastic ropes 40 at the top and bottom of the lead ball 35 reduce the vibration of the side beam 8 and the middle beam 7, thereby improving the service life of the bridge;
[0063] S7. When one side of the cap beam 3 is subjected to heavy force, the support frame 26 supports one side of the cap beam 3 and transmits the gravity to the pier 2 to prevent the cap beam 3 from tilting or falling.
[0064] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. A prefabricated steel tube concrete and reinforced concrete assembled bridge, comprising a cap (1), a pier (2) and a cap beam (3), characterized in that: The upper surface of the cap (1) is pre-embedded with a plurality of first connecting ribs (19); the pier (2) comprises a steel pipe (11); the circumferential outer wall of the steel pipe (11) is fixedly connected to two symmetrical reinforcing plates (12); one side of the reinforcing plates (12) is fixedly connected to a side column (21); a steel bar ring (17) is fixedly connected between two side columns (21) at the same height; vertical ribs (18) are fixedly connected between the plurality of steel bar rings (17); an outer ring of concrete (15) is pre-fabricated on the circumferential outer wall of the steel pipe (11); an inner ring of concrete (16) is pre-fabricated inside the steel pipe (11); and the steel bar ring (17) and the The vertical reinforcement (18) is located in the outer ring concrete (15); a plurality of first plug holes are provided at the bottom of the outer ring concrete (15), and the first plug holes are plugged into the first connecting reinforcement (19); a plurality of second connecting reinforcements (20) are pre-buried at the top of the outer ring concrete (15); a plurality of second plug holes are provided at the bottom of the cap beam (3), and the second plug holes are plugged into the second connecting reinforcement (20); a support mechanism (14) is provided between the reinforcement plate (12) and the cap beam (3); the support mechanism (14) includes three support grooves (28) and a steel plate (22); the three support grooves (28) are provided on the cap beam ( 3), a connecting mounting hole is provided between the three support grooves (28), a first internal thread sleeve (29) is pre-buried in the mounting hole, a first threaded rod (27) is threadedly connected in the first internal thread sleeve (29), the steel plate (22) is welded to one side of the reinforcing plate (12), an angle steel (24) is fixedly connected to the other end of the steel plate (22), three reinforcing plates (25) are fixedly connected to one side of the angle steel (24), a support frame (26) is fixedly connected to one side of the reinforcing plate (25), and the support frames (26) are respectively located in the support grooves (28), and the support frames (26) One side of each of the two cap beams (3) is provided with a socket, and the first threaded rod (27) is respectively plugged into the socket, one side of the steel plate (22) is provided with a slot (23), and the slot (23) is plugged into the reinforcing plate (12), six symmetrically distributed first connection blocks are pre-buried at the top of the cap beam (3), a support (9) is fixedly connected to the upper surface of the first connection block, two side beams (8) and an intermediate beam (7) are provided between the two cap beams (3), and the bottoms of the two side beams (8) and the intermediate beam (7) are respectively fixedly connected with two second connection blocks (37), and the second connection blocks (37) are respectively welded to the top of the support (9); Both ends of the middle beam (7) and the side beam (8) are provided with mounting grooves (36), and shock-absorbing mechanisms are provided in the mounting grooves (36), and the shock-absorbing mechanisms include two fixing sleeves (41) and two lead balls (35), and the two fixing sleeves (41) are fixedly connected to the bottom of the mounting groove (36), and the two fixing sleeves (41) are threadedly connected to connecting rods (42), and the circumferential outer walls of the connecting rods (42) are fixedly connected to fixing rings (43), and the top of the mounting groove (36) is pre-buried with a penetrating second internal thread sleeve (32), and the second internal thread sleeve (32) is internally threadedly connected to a second threaded rod (39), and the bottom of the second threaded rod (39) is movably connected to a lifting plate (34), and the top and bottom of the lead balls (35) are fixedly connected to elastic ropes (40), and the two ends of the elastic rope (40) are respectively fixed to the lifting plate (34) and the fixing ring (43); The top of each of the second threaded rods (39) is fixedly connected to a force bearing block (33); One side of the reinforcing plate (12) is provided with penetrating fixing holes (13), and the fixing holes (13) are evenly distributed; A plurality of evenly distributed third connecting ribs (30) are pre-embedded on both sides of the middle beam (7) and one side of the side beam (8), and sleeves (31) are movably connected between two adjacent third connecting ribs (30); A plurality of grouting holes (4) and exhaust holes (5) are reserved on the circumferential outer wall of the pier column (2) and on both sides of the cap beam (3).
2. The prefabricated steel tube concrete and reinforced concrete assembled bridge according to claim 1 is characterized in that: Two limit plates (38) are fixedly connected to the bottom of each of the installation slots (36), and the two limit plates (38) are respectively located on two sides of the lifting plate (34).
3. The prefabricated steel tube concrete and reinforced concrete assembled bridge according to claim 2 is characterized in that: Six groups of symmetrically distributed limiting columns (10) are integrally formed on the upper surface of the cap beam (3), and a plurality of groups of limiting holes are provided at the bottom of the cap beam (3), and the limiting columns (10) are plugged into the limiting holes.
4. The prefabricated steel tube concrete and reinforced concrete assembled bridge according to claim 1 is characterized in that: A partition plate (6) is integrally formed on the upper surface of the cap beam (3).
5. The construction method for the prefabricated steel tube concrete and reinforced concrete assembled bridge as claimed in claim 2, characterized in that: The following steps are involved: S1, hoisting the prefabricated pier column (2) onto the cap (1), roughening the surface of the cap (1) before hoisting, aligning the first insertion hole at the bottom of the pier column (2) with the first connecting rib (19), so that the first connecting rib (19) is fully inserted into the first insertion hole, adjusting the level of the pier column (2) using a jack, injecting high-strength grouting material between the first connecting rib (19) and the first insertion hole through the grouting hole (4) on the pier column (2), and fixing the pier column (2) and the cap (1); S2, hoisting the cap beam (3) to the top of the pier column (2), roughening the top of the pier column (2) before hoisting, then aligning the second insertion hole at the bottom of the cap beam (3) with the second connecting rib (20), inserting the second connecting rib (20) into the second insertion hole, injecting high-strength grout between the second insertion hole and the second connecting rib (20) through the grouting hole (4) on the cap beam (3), and inserting the support frame (26) into the support groove (28), rotating the first threaded rod (27) so that the first threaded rod (27) extends from the first internal threaded sleeve (29) and is inserted into the support frame (26), and further fixing the cap beam (3) through the support frame (26) to improve the stability of the cap beam (3); S3, welding a support (9) above the first connecting block on the surface of the cap beam (3), placing the middle beam (7) and the side beam (8) between the two cap beams (3), and making the second connecting block (37) at the bottom of the middle beam (7) and the side beam (8) be located above the support (9), and after the position adjustment of the middle beam (7) and the side beam (8) is completed, welding is performed between the first connecting block, the second connecting block (37) and the support (9); S4, the second threaded rod (39) is rotated by the force block (33), and the second threaded rod (39) drives the lifting plate (34) to move upward, so that the elastic ropes (40) at the top and bottom of the shot put (35) are tightened, and at the same time, the limiting plate (38) plays a role in limiting the lifting plate (34) to prevent the lifting plate (34) from rotating; S5. After the installation is completed, wet joint construction is performed between the side beams (8), the middle beams (7) and the cap beams (3), and the side beams (8), the middle beams (7) and the cap beams (3) are connected; S6. When a vehicle passes over the side beam (8) or the middle beam (7), the vibration generated by the side beam (8) and the middle beam (7) is transmitted to the lead ball (35), and the elastic ropes (40) at the top and bottom of the lead ball (35) reduce the vibration of the side beam (8) and the middle beam (7), thereby increasing the service life of the bridge; S7. When one side of the cap beam (3) is subjected to heavy force, the support frame (26) supports one side of the cap beam (3) and transmits the gravity to the pier column (2) to prevent the cap beam (3) from tilting or falling.