Project Cost Consulting Management Planning Method
By establishing a database and accounting library, building an adaptive model, matching the consultation form to experienced units, the problems of a wide variety of projects and low allocation efficiency in engineering consultation are solved, and efficient and accurate consultation results and workflow are achieved.
Patent Information
- Application Number
- CN202210293386.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-03-23
AI Technical Summary
During the engineering consultation process, due to the wide variety of engineering projects, it is difficult for consultants to become familiar with various project types, resulting in poor consultation results and difficult to efficiently allocate when the number of consultation orders is large, resulting in low work efficiency.
By establishing a database and accounting library, classifying data and building an adaptive initial model and regeneration model, matching the consultation form to experienced units for consultation, and optimizing the priority of dispatching through model calculation and ranking, real-time allocation and efficient consultation form provisioning can be achieved through model calculation and ranking optimization. distribute.
It improves the work efficiency during consultation, ensures the accuracy of the consultation results, reduces the accumulation of consultation forms for a single consultant, enhances the consulting experience of each unit, and achieves a more efficient and fast consulting process.
Smart Images

Figure CN114693098B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to engineering cost consulting technology, and more specifically, to an engineering cost consulting management planning method. Background Art
[0002] Engineering planning is a certain application of science and mathematics. Through this application, the properties of natural materials and energy can be used through various structures, machines, products, systems and processes to make efficient, reliable and useful things for mankind in the shortest time and with less manpower. Thus, the concept of engineering was born, and it gradually developed into an independent discipline and skill. In real life, engineering is closely related to everything, but the implementation of engineering requires relatively professional knowledge reserves, and there are connections between different projects, so the implementation of engineering requires higher professional knowledge.
[0003] However, in the actual construction process, the professional knowledge of the construction personnel cannot meet the requirements, and engineering consultation is needed. Engineering consultation refers to the intellectual service of consulting activities for the decision-making and management of engineering construction projects of government departments, project owners and other types of customers, following the principles of independence, science and fairness, using the knowledge and experience of multiple disciplines such as engineering technology, science and technology, economic management and laws and regulations, including consulting consultation in the early stage of project establishment, consulting in the survey and design stage, consulting in the construction stage, and evaluation after commissioning or delivery. With the development of information technology, the way of conducting engineering consultation is becoming more and more convenient, and people often conduct engineering consultation through the Internet and other channels.
[0004] However, due to the wide variety of engineering projects and the relatively low probability of some engineering projects occurring, when conducting network engineering consulting, the consultants are unable to be familiar with all types of projects, which leads to poor final consulting results.
[0005] Therefore, a new solution needs to be proposed to solve this problem. Summary of the invention
[0006] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a construction cost consulting management planning method, which can reasonably allocate consulting orders and enable consultants to obtain more accurate consulting information as much as possible. At the same time, when the number of consulting orders is too large, the consulting orders can be allocated in time, thereby achieving higher work efficiency.
[0007] The above technical purpose of the present invention is achieved through the following technical solution: the engineering cost consulting management planning method comprises the following steps:
[0008] Each unit establishes a database with its own batch of data sheets, and classifies the data sheets in the database into several subcategories;
[0009] Establish several adaptive initial models according to the sub-categories, and each unit adjusts the floating range of its own adaptive initial models;
[0010] An accounting database is established with a batch of data sheets, and the data sheets in the accounting database are classified into several middle categories, with the number of middle categories corresponding to the number of small categories;
[0011] Synchronously input the middle class into several adaptive initial models of each unit and output the results;
[0012] The calculation results of the middle and adaptive initial models and the middle content are ranked according to accuracy;
[0013] When an inquiry form appears, the model is used to calculate and match the corresponding specific type, and based on the ranking, the inquiry form is sent to the first-ranked unit for consultation. After receiving the order, the unit is displayed as switching from idle state to working state. If the previous units are in working state, it will be sent to the highest-ranked unit in idle state for docking.
[0014] By adopting the above technical solution and the above method, when people need consultation, they can receive the consultation through the person being consulted in the crew with the most experience as possible, and the consultation can be highly accurate, and the consultation forms can be allocated in real time to avoid the situation where a large number of consultation forms are piled up at a single person being consulted. This can greatly improve the work efficiency during consultation and enable each crew to develop a certain type of consultation experience, so as to provide more efficient, quick and rapid consultation in the future.
[0015] The present invention is further configured to: record the consultation forms by return visits, and enter the forms into a new order library for each unit, and import the data of the new order library into an adaptive initial model, adjust the adaptive initial model, and form an adaptive regeneration model.
[0016] By adopting the above technical solution and recording the return visits, the model in this method can be updated, and an adaptive initial model can be derived based on a large number of actual cases, so that the final consulting data has higher accuracy.
[0017] The present invention is further configured as follows: the accounting library, database and new order library are regularly aggregated to form a ranking library, and the data sheets in the ranking library are classified into major categories, the major categories are imported into the model of each unit to calculate the accuracy, the major categories and the adaptive regeneration model calculation results and the major category contents are ranked according to the accuracy, and the dispatch priority is based on the updated ranking.
[0018] By adopting the above technical solution and performing ranking regularly, the priority of dispatching orders can be adjusted according to the final accuracy, so that the consultant can always get the most accurate feedback possible when consulting the consultee.
[0019] The present invention is further configured as follows: the ranking update cycle is 1-3 months / time.
[0020] The present invention is further configured as follows: when an inquiry form appears, the corresponding specific type is matched through model calculation, and when all units are in working condition, the content of the inquiry form is matched with other inquiry forms, and the inquiry form is sent to the unit with the highest matching degree for synchronous processing.
[0021] By adopting the above technical solution and the above method, when there are a large number of consultation forms, the pressure of the consultation forms can be reduced by matching the content of the consultation form with other consultation forms and sending the consultation form to the unit with the highest matching degree for synchronous processing.
[0022] The present invention is further configured as follows: when a consultation form appears, the corresponding specific type is matched through model calculation, and when all units are in working condition, the consultation form is dispatched to the unit with the highest priority, and the consultation form is sorted, and the sorting contents are respectively manual consultation and system consultation.
[0023] The present invention is further configured such that: the system consultation is calculated by using an adaptive initial model or an adaptive regeneration model of a corresponding classification in a corresponding unit, and the result is displayed to the consultant.
[0024] The present invention is further configured such that: the adaptive initial model and the adaptive regeneration model are both established by MATALB.
[0025] In summary, the present invention has the following beneficial effects:
[0026] Through the above method, when people need consultation, they can receive the consultation through the person being consulted in the crew with the most experience as possible, and the consultation can be of high accuracy, and the consultation forms can be allocated in real time to avoid the situation where a large number of consultation forms are piled up at a single person being consulted. This can greatly improve the work efficiency during consultation and enable each crew to develop a certain type of consultation experience, so as to conduct more efficient, quick and rapid consultation in the future. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a flowchart of the present invention. DETAILED DESCRIPTION
[0028] The present invention is described in detail below in conjunction with the accompanying drawings and embodiments.
[0029] Example:
[0030] The project cost consulting management planning method, such as Figure 1 As shown, the following steps are included:
[0031] Each unit establishes a database with a batch of data sheets, and classifies the data sheets in the database into several subcategories. For example, if there are 100 data sheets in the database and there are 13 specific subcategories, the data sheets in the database are divided into 7, 9, 11, 3, 11, 3, 4, 8, 7, 11, 13, 7, and 6 subcategories. The subcategories include earthwork projects, pile foundation projects, masonry projects, scaffolding projects, concrete and reinforced concrete projects, reinforced concrete component transportation projects, reinforced concrete component installation projects, doors, windows and wooden structure projects, floor projects, roof projects, decoration projects, and metal component manufacturing, installation and transportation projects.
[0032] According to the subcategories, MATLAB is used to establish several adaptive initial models. According to the engineering cost consultation form, each unit adjusts the floating range of its own adaptive initial models. That is, the floating range is the upper and lower limits of the set single parameters, for example, cement quantity, cement unit price, sand quantity, sand unit price, gravel quantity, gravel unit price, labor surcharge, machinery surcharge, construction period, etc.
[0033] An accounting database is established with a batch of data sheets, and the data sheets in the accounting database are classified into several middle categories. The number of middle categories corresponds to the number of small categories, that is, the specific contents of the middle categories are earthwork projects, pile foundation projects, masonry projects, scaffolding projects, concrete and reinforced concrete projects, reinforced concrete component transportation projects, reinforced concrete component installation projects, doors, windows and wooden structure projects, floor projects, roof projects, decoration projects, and metal component manufacturing, installation and transportation projects.
[0034] Then the middle class is synchronously input into several adaptive initial models of each unit and the results are output.
[0035] The calculation results of the middle class and adaptive initial model and the middle class content are ranked according to accuracy.
[0036] When a consultation order appears in the 1st to 3rd month, the corresponding specific type is matched through adaptive initial model calculation, and the consultation order is sent to the first-ranked unit for consultation based on the ranking. After receiving the order, the unit will be displayed as switching from idle state to working state. If the upper-ranked units are in working state, they will be sent to the highest-ranked unit in idle state for docking.
[0037] The consultation forms are recorded back and entered into a new form library for each unit. The data of the new form library is imported into the adaptive initial model, and the adaptive initial model is adjusted to form an adaptive regeneration model.
[0038] In addition, the accounting library, database and new order library will be aggregated into a ranking library every 1-3 months, and the data sheets in the ranking library will be classified into major categories. The major categories will be imported into the adaptive regeneration model of each unit to calculate the accuracy. The major categories, the adaptive regeneration model calculation results and the major category contents will be ranked according to the accuracy, and the order dispatch priority will be based on the updated ranking.
[0039] After the end of the 1st to 3rd month, when a consultation form appears, the adaptive regeneration model is used to calculate and match the corresponding specific type, and based on the ranking, the consultation form is sent to the first-ranked unit for consultation. After receiving the order, the unit will be displayed as switching from idle state to working state. If the upper-ranked units are in working state, they will be sent to the highest-ranked unit in idle state for docking.
[0040] At the same time, when an inquiry form appears, the corresponding specific type is matched through model calculation. When all units are in working condition, the content of the inquiry form is matched with other inquiry forms, and the inquiry form is sent to the unit with the highest matching degree for synchronous processing.
[0041] When a consultation form appears, the corresponding specific type is matched through model calculation. When all units are in working condition, the consultation form is sent to the unit with the highest priority and sorted into manual consultation and system consultation. The system consultation is calculated through the adaptive initial model or adaptive regeneration model of the corresponding classification in the corresponding unit, and the results are displayed to the consultant.
[0042] Through the above method, when people conduct engineering cost consultation through this method, they can directly let the consultant with the highest success rate and the most experience under the current circumstances to consult the engineering cost sheet. Such consultation can, to a great extent, enable the consultants of each unit to develop individual types of consulting experience, and in the subsequent consultation process, they can have a higher success rate. At the same time, their work efficiency is higher, and in the long-term planning consultation process, the consultants of each unit can be fully trained.
[0043] Moreover, when there are a large number of consultants, the consultants can choose whether to consult manually or by the system, which can effectively divert the consultants, avoid the situation where too many consultations lead to chaos in the final work, and avoid the situation where consultants make appointments in vain and cannot consult. At the same time, consultants with similar specific consultation contents can be consulted simultaneously through the same consultant, which increases the trust between the consultant and the consultant, and greatly improves work efficiency.
[0044] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A method for engineering cost consulting management planning, characterized by: The following steps are included: Each unit establishes a database with a batch of data sheets, and classifies the data sheets in the database into several subcategories, including earthwork engineering, pile foundation engineering, masonry engineering, scaffolding engineering, concrete and reinforced concrete engineering, reinforced concrete component transportation engineering, reinforced concrete component installation engineering, door and window and wood structure engineering, floor engineering, roof engineering, decoration engineering, and metal component manufacturing, installation and transportation engineering; Establish several adaptive initial models according to the sub-categories, and adjust the floating range of the adaptive initial models according to the engineering cost consultation form and by each unit. The floating range is the upper and lower limits of the set single parameters, and the single parameters are cement quantity, cement unit price, sand quantity, sand unit price, gravel quantity, gravel unit price, labor surcharge, machinery surcharge and construction period; A calculation library is established with a batch of data sheets, and the data sheets in the calculation library are classified into several middle categories, the number of middle categories corresponds to the number of small categories, and the middle categories are simultaneously input into several adaptive initial models of each unit and the results are output; the calculation results of the middle categories and the adaptive initial models and the contents of the middle categories are ranked according to the accuracy; When a consultation form appears, the model is used to calculate and match the corresponding specific type. According to the ranking, the consultation form is sent to the first-priority unit for consultation. After the unit receives the order, it will be displayed as switching from idle state to working state. If the previous units are in working state, it will be sent to the highest-priority unit in idle state for connection. Make a return visit to the consultation form and record it, and enter it into a new order library for each unit, and import the data of the new order library into the adaptive initial model, adjust the adaptive initial model, and form an adaptive regeneration model; The accounting database, database and new order database are regularly aggregated to form a ranking database, and the data in the ranking database are classified into major categories. The major categories are imported into the models of each unit to calculate the accuracy. The major categories, adaptive regeneration model calculation results and major category contents are ranked according to accuracy. The dispatch priority is based on the updated ranking, and the ranking update cycle is 1-3 months / time; The adaptive initial model and the adaptive regeneration model are both established by MATALB.
2. The method for project cost consulting management planning according to claim 1 is characterized by: When an inquiry form appears, the corresponding specific type is matched through model calculation. When all units are in working condition, the content of the inquiry form is matched with other inquiry forms, and the inquiry form is sent to the unit with the highest matching degree for synchronous processing.
3. The method for project cost consulting management planning according to claim 1 is characterized by: When a consultation form appears, the corresponding specific type is matched through model calculation. When all units are in working condition, the consultation form is sent to the unit with the highest priority and sorted into manual consultation and system consultation.
4. The method for project cost consulting management planning according to claim 3 is characterized by: The system consultation is performed by calculating the adaptive regeneration model of the corresponding classification in the corresponding unit, and the result is displayed to the consultant.