Steel structure transfer method, device, electronic equipment and storage medium
By using automatic guided transport vehicle AGV in steel structure production plants to cooperate with RFID electronic tags, the transfer of steel structures is automatically controlled, and the problems of low transit efficiency and high accident rate in the existing technology are solved, achieving high efficiency and safety steel structure transport.
Patent Information
- Application Number
- CN202210287767.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-22
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-03-22
AI Technical Summary
In steel structure production factories, the transfer efficiency of steel structures in the prior art is low and easy to cause safety accidents. This is mainly due to the need to manually drive a flatbed vehicle and have a driving license, and the path needs to be manually judged during the transfer process, resulting in a high participation rate of technicians. Inefficient and high accident rate.
Automatically guide the transport vehicle AGV to communicate with the RFID electronic tag configured on the gantry. By obtaining production plans and real-time production information, the transport route is automatically determined, and the AGV is controlled to transport the target steel structure from the starting position to the end position, realizing the Automatic transportation.
It improves the efficiency of steel structure transfer, reduces accident rate, reduces manual participation, and achieves safe and reliable transportation of unmanned driving.
Smart Images

Figure CN114693211B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the field of intelligent management technology, and in particular to a steel structure transport method, device, electronic equipment and storage medium. Background Art
[0002] In recent years, due to the many advantages of steel structures such as high strength, light weight and good seismic resistance, they have been widely used in my country's modernization construction, such as warehouses, supermarkets, stadiums and large exhibition halls.
[0003] In a steel structure production factory, workers are required to drive flatbed trucks to transport qualified steel structures out to make room for new steel structures. When the transported steel structure has no production plan for the next process, it needs to be stored in a temporary storage area and then transported to the next process when there is a production plan for this steel structure workpiece.
[0004] In the existing steel structure transportation process, the transportation needs to be carried out by manually driving a flatbed truck, and the driver needs to have a driving license. The relevant personnel are in short supply and the transportation efficiency is low. During the transportation process, manual route judgment is required based on experience, which can easily cause safety accidents. Summary of the invention
[0005] The embodiments of the present invention provide a steel structure transfer method, device, electronic equipment and storage medium, which can realize the automatic transfer of steel structures, improve the transfer efficiency and reduce the accident rate.
[0006] In a first aspect, an embodiment of the present invention provides a steel structure transfer method, which is applied to a steel structure transfer system, wherein the steel structure transfer system is respectively connected to an automatic guided transport vehicle AGV and a radio frequency identification RFID electronic tag configured on a gantry, and the method comprises:
[0007] Acquire a production plan and real-time production information of the steel structure, and determine a transfer route of the target steel structure according to the production plan and the real-time production information, wherein the transfer route includes a starting position and an end position of the target steel structure;
[0008] Control the AGV to move the target gantry to the starting position, and store the tag information of the target steel structure through the radio frequency identification RFID electronic tag set on the target gantry, and the target gantry is used to place the target steel structure;
[0009] The AGV is controlled to move to the position of the target gantry, and the tag information is identified. When the tag information is the target information, the target steel structure is transferred to the AGV, and the AGV transfers the target steel structure to the terminal position according to the transfer route.
[0010] In a second aspect, an embodiment of the present invention provides a steel structure transfer device, which is applied to a steel structure transfer system. The steel structure transfer system is respectively connected to an automatic guided transport vehicle AGV and a radio frequency identification RFID electronic tag configured on a gantry for communication. The device includes:
[0011] A determination module, used to obtain a production plan and real-time production information of the steel structure, and determine a transfer route of the target steel structure according to the production plan and the real-time production information, wherein the transfer route includes a starting position and an end position of the target steel structure;
[0012] A storage module, used to control the AGV to move the target gantry to the starting position, and store the tag information of the target steel structure through the radio frequency identification RFID electronic tag set on the target gantry, and the target gantry is used to place the target steel structure;
[0013] The transfer module is used to control the AGV to move to the position of the target gantry, identify the label information, and when the label information is the target information, transfer the target steel structure to the AGV, and the AGV transfers the target steel structure to the terminal position according to the transfer route.
[0014] In a third aspect, an embodiment of the present invention further provides an electronic device, the electronic device comprising:
[0015] at least one processor; and
[0016] a memory communicatively connected to the at least one processor; wherein,
[0017] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the steel structure transporting method described in any embodiment of the present invention.
[0018] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to implement the steel structure transfer method described in any embodiment of the present invention when executed by a processor.
[0019] The technical solution of the embodiment of the present invention is applied to the steel structure transfer system. The steel structure transfer system is respectively connected with the automatic guided transport vehicle AGV and the radio frequency identification RFID electronic tag configured on the gantry. First, by obtaining the production plan and real-time production information of the steel structure, the transfer route of the target steel structure is determined according to the production plan and real-time production information. The transfer route includes the starting position and the end position of the target steel structure; then the AGV is controlled to move the target gantry to the starting position, and the label information of the target steel structure is stored through the radio frequency identification RFID electronic tag set on the target gantry, wherein the target gantry is used to place the target steel structure; finally, the AGV is controlled to move to the position of the target gantry, identify the label information, and when the label information is the target information, the target steel structure is transferred to the AGV, and the AGV transfers the target steel structure to the end position according to the transfer route. The technical solution provided by the embodiment of the present invention can automatically control the AGV to transfer the target steel structure from the starting position of the target gantry to the end position through the steel structure transfer system, and the transfer operation during the transfer process can be realized automatically without manual participation, which solves the problem of high participation rate of technicians in the prior art and achieves the beneficial effect of improving transfer efficiency and reducing accident rate.
[0020] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the embodiments of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0022] Figure 1 It is a schematic flow chart of a steel structure transport method provided by an embodiment of the present invention;
[0023] Figure 2A is another schematic flow chart of the steel structure transport method provided by an embodiment of the present invention;
[0024] Figure 2B A schematic diagram of the area division of the temporary storage location of the steel structure provided in an embodiment of the present invention;
[0025] Figure 3 is a structural schematic diagram of a steel structure transfer device provided by an embodiment of the present invention;
[0026] Figure 4It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0027] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0028] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0029] The steel structure transfer method provided in the embodiment of the present invention can be performed by the steel structure transfer device provided in the embodiment of the present invention, and the device can be implemented in software and / or hardware, and can generally be integrated in a computer device such as a server.
[0030] The steel structure transfer method provided in the embodiment of the present invention is applied to a steel structure transfer system, and the steel structure transfer system is respectively connected to the automatic guided vehicle AGV and the radio frequency identification RFID electronic tag configured on the gantry for communication.
[0031] The steel structure transfer system refers to an intelligent transfer system that can realize automatic transfer of factory steel structures, intelligently plan the storage area of target steel structures, and automatically identify the information of target steel structures.
[0032] The gantry is used to place the steel structure. Since the steel structure is large in size and weight, in order to facilitate the subsequent automatic guided transport vehicle AGV to carry the steel structure for transportation, it is generally necessary to place the steel structure on the gantry in advance before the steel structure is transported. The gantry provided by the embodiment of the present invention is integrated with an information storage module for storing label information such as the project number, drawing number and name of the steel structure currently placed on the gantry. The current label information can be stored by a radio frequency identification (Radio Frequency Identification, referred to as RFID) electronic tag, so that when the steel structure currently placed on the gantry is transported, the information of the steel structure can be identified to ensure the correctness of the steel structure to be transported. Therefore, the steel structure transportation system is configured with a radio frequency identification RFID electronic tag on the gantry for communication connection to synchronize the label information stored on the gantry to the steel structure transportation system, so as to facilitate the steel structure transportation system to clarify the information of the steel structure to be transported. Further, the gantry provided by the embodiment of the present invention can also realize the positioning function. The gantry is connected to the steel structure transportation system for communication, and can send the location information of the current gantry to the steel structure transportation system.
[0033] Automated Guided Vehicle (AGV) is used to transport large steel structures, which is different from the conventional flatbed trucks that manually drive steel structures. The AGV provided in the embodiment of the present invention has the following characteristics: it is integrated with the fifth generation mobile communication technology (5G) to communicate with the steel structure transport system, and can be controlled by the steel structure transport system to achieve unmanned driving; it can scan the RFID electronic tags on the gantry and autonomously identify the information of the steel structure; it can automatically judge the passability of the road during the transport process; it can intelligently weigh the weight of the steel structure and estimate the center of gravity of the steel structure.
[0034] For details, please refer to Figure 1 , Figure 1 A schematic flow chart of a steel structure transfer method provided by an embodiment of the present invention, the method may specifically include the following steps:
[0035] S110, obtaining a production plan and real-time production information of the steel structure, and determining a transfer route of the target steel structure according to the production plan and the real-time production information, wherein the transfer route includes a starting position and an end position of the target steel structure.
[0036] The production plan is a pre-made plan for producing steel structures in a factory. The current production plan is affected by factors such as the demand volume of the demander, the urgency of the demand, the production rate of the production equipment, and the number of normal operating production equipment.
[0037] The real-time production information may indicate the current production volume produced, the production volume being produced, the transfer volume of the steel structure being transferred, etc.
[0038] When the steel structure is completed, the current production plan and real-time production information need to be combined to determine the transfer route of the target steel structure, where the current target steel structure refers to the steel structure to be transferred that has been completed in the steel structure workshop and passed the quality inspection.
[0039] When determining the transfer route of the target steel structure based on the production plan and real-time production information, the transfer route is affected by whether there are obstacles on the transfer road and by the terminal location. The steel structure transfer system preferentially determines the road from the starting position to the terminal position without obstacles as the transfer route. If the production volume is large, the location where the target steel structure is piled up is generated as a temporary storage location; if there is no accumulation and production is proceeding normally, the transfer is carried out according to the normal production process. Optionally, the terminal location can be a sandblasting room.
[0040] The starting point of the target steel structure transfer route is the steel structure workshop currently producing steel structures. Specifically, in the steel structure workshop, there may be multiple workstations producing steel structures. Therefore, the current starting point can be fixed to the workstation of the target steel structure.
[0041] S120, controlling the AGV to move the target gantry to the starting position, and storing the tag information of the target steel structure through the radio frequency identification RFID electronic tag set on the target gantry.
[0042] When the target steel structure needs to be transferred after passing the quality inspection, a gantry needs to be placed in advance at the location where the target steel structure is transferred out so as to place the target steel structure on the gantry.
[0043] In the present invention, the target gantry means a gantry on which the target steel structure is placed.
[0044] Among them, the method of controlling the AGV to move the target gantry to the starting position can be that the steel structure transfer system sends the location information of the target gantry to the AGV, and the location information includes the current position of the AGV (starting position) and the location information of the target gantry (end position). The steel structure transfer system plans a first driving route for the current AGV. After the AGV drives to the target gantry according to the first driving route, it can send confirmation information to the steel structure transfer system. Exemplarily, the confirmation information can be "reached the destination" or "arrived". After the steel structure transfer system receives the confirmation information, it plans a second driving route for the AGV so that the AGV moves the target gantry to the position of the target steel structure. Among them, in the re-planned second driving route, the current location information of the target gantry is the starting position of the second driving route, and the position of the target steel structure is the end position of the second driving route.
[0045] Among them, after the AGV moves to the position of the target gantry, since the height of the target gantry is higher than the AGV, it can directly drive to the bottom of the target gantry and lift up the target gantry to realize the transfer of the target gantry through the AGV.
[0046] Generally, after the AGV transfers the target gantry to the location of the target steel structure, it will use a crane or other related technical vehicles to transfer the target steel structure to the target gantry. Since the target steel structure still needs to undergo quality inspection, register label information and other related operations, the AGV will not always stay on the current target gantry after the transfer. The steel structure transfer system can mobilize the current AGV to other locations according to the production situation in the workshop to transfer the remaining gantries or steel structures to be transported, etc., so as to improve the utilization rate of the AGV.
[0047] Optionally, the method of moving the target gantry to the position of the target steel structure is not limited to using an AGV for movement, and the target gantry may also be placed at the position of the target steel structure by manually driving a forklift.
[0048] After controlling the target gantry to move to the starting position, the target steel structure can be lifted onto the target gantry by using a crane.
[0049] Furthermore, a radio frequency identification RFID electronic tag is set on the target gantry to store the tag information of the target steel structure. The current tag information may be the project number, drawing number, part name, characteristic size, and workshop date of the target steel structure. The tag information of the target steel structure can be manually input into the target gantry to realize the storage of the tag information of the target steel structure, and the tag information of the target steel structure and the location information of the target gantry that have been stored are sent to the steel structure transfer system.
[0050] After the target steel structure on the target gantry is moved away, the tag information stored in the RFID electronic tag on the current target gantry can be manually updated to facilitate the subsequent storage of the remaining steel structure information.
[0051] In the prior art, the label information of steel structures is stored in the form of steel nails on the side of the steel structure to mark the project information and drawing number information. After long-term storage, the information is covered with rust stains and cannot be identified. The only way to make a judgment is to measure with a tape measure and compare it with the drawing, which is time-consuming and laborious. In the embodiment of the present invention, a radio frequency identification RFID electronic tag is set on the target gantry to facilitate information maintenance, long-term storage, and electronic identification, which is convenient and fast.
[0052] S130, control the AGV to move to the position of the target gantry, identify the tag information, and when the tag information is the target information, transfer the target steel structure to the AGV, and the AGV transfers the target steel structure to the terminal position according to the transfer route.
[0053] After receiving the location information sent by the target gantry, the steel structure transfer system sends the instruction to transfer the target steel structure to the AGV, and also needs to send the location information and target information of the target gantry. The purpose of this is to facilitate the AGV to automatically drive to the starting position according to the location information of the target gantry, and then compare the label information of the target steel structure to be transferred with the label information on the target gantry to prevent transfer errors, thereby increasing the workload.
[0054] Among them, the target information represents the information of the target steel structure to be transferred sent by the steel structure transfer system to the AGV. The target information can be distinguished from the label information stored in the electronic tag in step S120, and can be part of the label information, for example, it can be the project number of the target steel structure to be transferred, or characteristic dimensions, etc.
[0055] Optionally, the target information may also be completely consistent with the tag information stored in the electronic tag, and the setting of the specific target information is not limited here.
[0056] When the AGV reaches the location of the target gantry according to the route planned by the steel structure transport system, it transfers the target steel structure to the AGV after confirming that the tag information is the target information.
[0057] The method for confirming that the tag information is the target information may be that a scanning module is integrated on the AGV to scan and identify the RFID electronic tag on the target gantry to confirm whether the tag information is consistent with the target information.
[0058] The target steel structure can be transferred to the AGV in such a way that the AGV drives to the bottom of the target gantry, and after starting the transfer, lifts up the target gantry together with the target steel structure to transfer the target gantry and the target steel structure to the AGV together. The AGV transfers the target steel structure to the terminal position according to the transfer route. When transferring the target steel structure to the terminal position, the target gantry and the target steel structure are transferred together, and the target steel structure is always placed on the target gantry.
[0059] Optionally, during the AGV transfer process, there may be temporary obstacles on the transfer road that make it impossible to pass. At this time, the AGV can send a warning message of road congestion to the steel structure transfer system, and the steel structure transfer system can control other AGV vehicles to clear the obstacle, or send a prompt message to the staff to clear the obstacle. The AGV can also re-plan the transfer route, so that the starting position is the current position of the AGV, and the end position is consistent with the pre-planned end position.
[0060] The steel structure transfer method provided by the embodiment of the present invention is applied to the steel structure transfer system. The steel structure transfer system is respectively connected to the automatic guided transport vehicle AGV and the radio frequency identification RFID electronic tag configured on the gantry. First, by obtaining the production plan and real-time production information of the steel structure, the transfer route of the target steel structure is determined according to the production plan and the real-time production information. The transfer route includes the starting position and the end position of the target steel structure; then the AGV is controlled to move the target gantry to the starting position, and the label information of the target steel structure is stored through the radio frequency identification RFID electronic tag set on the target gantry, wherein the target gantry is used to place the target steel structure; finally, the AGV is controlled to move to the position of the target gantry, identify the label information, and when the label information is the target information, the target steel structure is transferred to the AGV, and the AGV transfers the target steel structure to the end position according to the transfer route. The technical solution provided by the embodiment of the present invention can automatically control the AGV to transfer the target steel structure from the starting position of the target gantry to the end position through the steel structure transfer system, and the transfer operation during the transfer process can be realized automatically without manual participation, which solves the problem of high participation rate of technicians in the prior art and achieves the beneficial effect of improving transfer efficiency and reducing accident rate.
[0061] Figure 2A 1 is another schematic flow chart of the steel structure transport method provided by an embodiment of the present invention. The relationship between this embodiment and the above embodiment is a further refinement of the corresponding features of the above embodiment. Figure 2A As shown, the method may include the following steps:
[0062] S210. Obtain the production plan and real-time production information of the steel structure.
[0063] Real-time production information includes production volume information and transfer volume information; the terminal location includes a temporary storage location.
[0064] Among them, the current production volume information indicates how many steel structures have been produced according to the current production plan; the transfer volume information indicates the number of steel structures currently being transferred, and the number of steel structures that have completed transfer at the terminal location.
[0065] When placing the target steel structure in a temporary storage location, at least one of the following situations may occur:
[0066] 1) The demander unilaterally breaches the contract, resulting in steel structure inventory, and the steel structure needs to be transferred out of the workshop to make room for the steel structure production of other projects; 2) After the steel structure is completed, there is no assembly demand within a certain period of time, and the steel structure needs to be temporarily stored; 3) The steel structure is not completed, and there is an urgent project that requires the current steel structure to be temporarily transferred out to free up a workstation; 4) The demander's project plan is delayed, resulting in temporary accumulation of steel structures, which need to be temporarily stored. The specific reasons for temporary storage of steel structures are subject to the actual situation during production and are not restricted here.
[0067] S220. Determine the production progress information of the steel structure according to the production plan and production volume information.
[0068] The steel structure production progress information can be expressed in the form of planned production volume divided by the produced volume.
[0069] When the production progress is fast and causes the steel structure of the next process sandblasting process to pile up, or other plans affect the production of the current steel structure, step S221 is executed.
[0070] S221. When the production progress information and the transfer volume information exceed the preset values, the target steel structure is stored in a temporary storage location.
[0071] When the production progress information is fast, the transfer volume information exceeds a certain carrying capacity, or the demander's plan changes temporarily, the target steel structure needs to be stored in a temporary storage location.
[0072] In an optional embodiment, the steel structure transfer system includes a storage management subsystem, and the storage management subsystem is used to manage the steel structure according to the position information of the steel structure in the temporary storage location.
[0073] In the storage management subsystem, a plan view of the temporary storage location can be displayed, so that when logging into the storage management subsystem in the visual interface, the steel structure placed in the temporary storage location can be visually seen.
[0074] For example, the staff can see in the temporary storage management subsystem which areas of the temporary storage location are empty and which areas have steel structures. Optionally, the label information of the stored steel structures can also be seen, so as to know which steel structure is stored in which area grid of the temporary storage location. The current area grid can be reflected in the form of coordinates, so as to facilitate the automatic control of the steel structure transfer system AGV to transfer the target steel structure to a specific area grid, and also to facilitate the control of the AGV to transfer the target steel structure from a specific area grid.
[0075] The storage management subsystem manages the steel structures placed in temporary storage locations in the following ways:
[0076] a) Divide the temporary storage location into multiple areas based on the size information of the steel structure.
[0077] Divide the steel structure storage area into several rectangular blocks, and comprehensively evaluate the length and width of the rectangular blocks according to the daily production steel structure size to accommodate the storage of most steel structures. Classify and divide the steel structure storage area according to the commonly used steel structure segment sizes of the products. The block sizes of different steel structure segment grids of different products are different. For details, please refer to Figure 2B , Figure 2B A schematic diagram of the regional division of the temporary storage position of the steel structure provided in the embodiment of the present invention, in the figure: Area A can store relatively small steel structures such as the main beam, turntable, and end beam of the portal crane; Area B can store the jib, trunk beam of the portal crane, the door frame, beam, trolley frame and other steel structures of the shore bridge crane; Area C can store large hull sections, offshore platform sections, front and rear beams of the shore bridge crane, large floating crane arms, etc.; the aisle can temporarily store steel structure sections urgently needed for assembly.
[0078] b) Obtain the production requirements of the target steel structure.
[0079] The production demand of the target steel structure can be divided according to the degree of urgency. If the production demand of the target steel structure is urgent, it will not be stored in the temporary storage location. If the urgency of the production demand is non-urgent, it can be stored in the temporary storage location.
[0080] c) If there is no production demand for the target steel structure within the first preset time period, the target steel structure is stored in a corresponding area of the temporary storage location according to the size of the target steel structure, and the storage management subsystem stores the location information of the target steel structure.
[0081] The first preset time period can be set according to the demand time of the factory, for example, it can be two days. That is, within two days, there is no production demand for the target steel structure, and the steel structure transfer system can control the AGV to store the target steel structure to the corresponding area of the temporary storage location according to the size of the target steel structure.
[0082] Among them, when the steel structure transfer system can control the AGV to store the target steel structure in the corresponding area of the temporary storage location according to the size of the target steel structure, the transfer destination of the AGV is the regional grid coordinates of the corresponding area of the temporary storage location.
[0083] After the target steel structure is transferred to the regional grid of the corresponding area of the temporary storage location, the storage management subsystem stores the location information of the target steel structure, indicating that the target steel structure is stored at the current location, so that when there is subsequent production demand, the current target steel structure can be automatically transferred according to the current location information.
[0084] In another optional embodiment, the steel structure transport method provided by the embodiment of the present invention further includes:
[0085] If the target steel structure has production demand within the second preset time period, the location information of the target steel structure is sent to the AGV; the AGV transfers the target steel structure in a temporary storage location according to the location information of the target steel structure.
[0086] The second preset time period is different from the first preset time period, that is, when the target steel structure placed in the temporary storage position has production demand in the later stage, the steel structure transfer system sends the location information of the target steel structure to the AGV, and transfers the target steel structure from the corresponding area grid of the temporary storage position. At this time, it is generally transferred to the next process, such as the sandblasting room.
[0087] Optionally, when the steel structure transfer system sends the location information of the target steel structure to the AGV, the target information and the terminal location are also sent to the AGV, so that the AGV can clearly know which type of target steel structure is being transferred in which area grid of the temporary storage location, so as to ensure the accuracy of the transfer of the target steel structure.
[0088] Optionally, when the area in the temporary storage location is full of steel structures, steel structures with normal production demand urgency can also be stored in the aisle. For example, steel structures expected to be used within two days can be stored in the aisle, thereby improving the area utilization of the temporary storage location.
[0089] Furthermore, when storing steel structures in the temporary storage management subsystem, the following specifications are generally followed:
[0090] Steel Structure Storage Management System General specifications for steel structure storage locations include at least one of the following:
[0091] 1) Arrange in accordance with the project time sequence, and place the steel structures of the projects with earlier time nodes on the outside of the current area; 2) Arrange the steel structures of the same project according to the time sequence of the assembly and welding process, and place the steel structures with earlier demand on the outside of the current area. 3) For projects that have been delayed, re-maintain the demand time nodes of the steel structures according to the project requirements for reasonable storage; 4) For projects that have squeezed inventory due to unilateral breach of contract by the demander, plan a certain area inside according to the product and steel structure size; 5) The steel structure sections that are ready for assembly in the next two days can be temporarily placed inside the aisle, and they will not be transported away in time within two days without affecting the transfer of the steel structures inside; 6) For changes in project time nodes, the project manager will promptly maintain the storage management subsystem according to the current location of the steel structure, optimize the transfer, and clean the aisle before the steel structure is needed.
[0092] S230, controlling the AGV to move the target gantry to the starting position, and storing the tag information of the target steel structure through the radio frequency identification RFID electronic tag set on the target gantry.
[0093] The current starting position is the position of the regional grid in the temporary storage area of the target steel structure.
[0094] S240: Obtain the current position of the AGV.
[0095] Before controlling the AGV to move to the position of the target gantry, the current position of the AGV needs to be obtained. In the steel structure transport method provided by the embodiment of the present invention, the number of AGVs can be multiple, so as to control multiple AGVs to transport simultaneously and improve the transport efficiency.
[0096] When there are multiple AGVs, when the steel structure transfer system controls the AGV to move to the position of the target gantry, it can be based on the proximity principle, that is, the AGV that is closer to the target gantry and is not in working state can be moved to the position of the target gantry, or the AGV with a smoother road from the current position to the position of the target gantry can be controlled to move to the position of the target gantry. The specific method of controlling the AGV to move to the position of the target gantry is not limited here.
[0097] S241. Determine the driving route of the AGV according to the current position of the AGV and the position of the target gantry, and send the driving route and target information to the AGV.
[0098] When controlling the AGV to the target gantry position, the steel structure transfer system determines the AGV's driving route based on the AGV's current position and the target gantry position, so that the AGV drives to the target gantry position according to the driving route. The target information is sent to the AGV so that the AGV can clearly identify the target steel structure to be transferred and prevent transfer errors.
[0099] S242, the AGV drives to the position of the target gantry according to the driving route, and reads the RFID electronic tag according to the tag recognition module to determine whether the tag information is consistent with the target information.
[0100] The inconsistency between the tag information and the target information may be due to a storage error when storing the tag information of the target steel structure on the target gantry, or it may be due to a worker placing the target steel structure incorrectly on the target gantry. To ensure the correctness of the transfer of the target steel structure during the transfer process, the AGV needs to further determine whether the tag information is consistent with the target information.
[0101] If there is any inconsistency, the transfer will not be carried out, and an early warning message may be sent to the steel structure transfer system or staff so that the staff can check and confirm.
[0102] S243. When the tag information is consistent with the target information, the target steel structure is transferred from the gantry to the AGV.
[0103] Optionally, a built-in camera is provided on the AGV; the label information includes actual size information of the target steel structure.
[0104] The advantage of having a built-in camera on the AGV is that it can use the built-in camera to identify the position of the target steel structure when it is placed on the AGV. If it is not placed properly, it needs to be adjusted. If the information is correct, the AGV drills under the target gantry and lifts it up, determines the center of gravity of the steel structure by weighing the distribution, and adjusts the position so that the center of gravity of the steel structure is at the center of the AGV transfer vehicle.
[0105] Optionally, the number of built-in lenses can be 2, 4 or 6, preferably 4, which are arranged at the four corners of the target steel structure where the AGV is placed. The specific number and location of the built-in lenses are not limited here.
[0106] The embodiment of the present invention further provides an optional embodiment, wherein the method further includes:
[0107] The built-in lens is used to predict the size information of the target steel structure and obtain the predicted size information; when the difference between the predicted size information and the actual size information is within the preset range, the AGV transfers the target steel structure to the terminal location according to the transfer route.
[0108] After transferring the target steel structure on the target gantry to the AGV, the AGV can also predict the size information of the target steel structure based on the built-in lens to further determine the consistency between the target steel structure that the AGV needs to transfer and the target steel structure currently transferred from the target gantry.
[0109] S250 and AGV transfer the target steel structure to the final location according to the transfer route.
[0110] Optionally, when the AGV enters and exits the steel structure workshop to transfer the target steel structure, the AGV can communicate with the electric door of the steel structure workshop through the 5G network, so that when the AGV drives in front of the electric door, the electric door can open automatically, facilitating the entry and exit of the AGV transfer vehicle.
[0111] It is important to know that in the production process of steel structures, there are several situations for the transfer process after the target steel structure is transported out of the steel structure workshop: 1) Normal plan: steel structure workshop-sandblasting room-paint spraying room-final assembly; 2) No final assembly plan in the short term: steel structure workshop-sandblasting room-paint spraying room-temporary storage location-final assembly; 3) Project postponement and secondary start-up: steel structure workshop-temporary storage location-sandblasting room-paint spraying room-final assembly; 4) Second project start-up and no final assembly plan in the short term: steel structure workshop-temporary storage location-sandblasting room-paint spraying room-temporary storage area-final assembly; 5) Temporary storage location-steel structure workshop-sandblasting room-paint spraying room-final assembly.
[0112] The steel structure transfer method provided by the embodiment of the present invention is not limited to the transfer stage of transferring the target steel structure from the steel structure workshop to the sandblasting room or the temporary storage location. In any of the above transfer processes, as long as the target steel structure needs to be transferred, the steel structure transfer method provided by the embodiment of the present invention can be used.
[0113] Optionally, when a built-in lens is provided on the AGV, the AGV transfers the target steel structure to the terminal position according to the transfer route, including: obtaining width information of the transfer route according to the built-in lens, the width information of the transfer route is affected by obstacles on the transfer route; comparing the relationship between the minimum spacing between obstacles and the maximum width dimension of the target steel structure; when the minimum spacing between obstacles is greater than the maximum width dimension of the target steel structure, the AGV transfers the target steel structure to the terminal position according to the transfer route; when the minimum spacing between obstacles is less than or equal to the maximum width dimension of the target steel structure, re-planning the transfer route.
[0114] That is, during the process of AGV transporting the target steel structure, there may be obstacles on the transport route. If the transport route is blocked by obstacles, the current AGV may not be able to achieve normal transport. Therefore, the built-in camera needs to detect the width information of the road, and if there is an obstacle, the width information of the obstacle and one side of the road, to evaluate whether the AGV can pass normally. When the minimum distance between obstacles is greater than the maximum width of the target steel structure, the AGV can pass normally to achieve the transport of the target steel structure, and the AGV transports it according to the original transport route.
[0115] If the minimum spacing between obstacles is less than or equal to the maximum width of the target steel structure, the roads are judged to be different and cannot pass normally. At this time, the AGV can issue a warning message, and the steel structure transfer system can re-plan the transfer route for the current AGV, or call other AGVs to clear the obstacles, or send a warning message to the staff to achieve manual obstacle removal, etc.
[0116] The steel structure transfer method provided in the embodiment of the present invention can realize intelligent management of steel structures produced in the factory through the steel structure transfer system. All transfer processes and transfer instructions can be traced, thereby improving the transfer efficiency. A temporary storage management subsystem is provided to realize intelligent management and control of temporarily stored steel structures, thereby reducing the probability of repeated transfer, reducing energy consumption, and improving the space utilization rate of temporary storage locations. The steel structure transfer system can realize automatic transfer during the steel structure transfer process, thereby reducing labor costs. The AGV realizes unmanned automatic driving, which is safe and reliable, and reduces the accident rate.
[0117] Figure 3 1 is a schematic diagram of a steel structure transfer device provided in an embodiment of the present invention, and the device is suitable for executing the steel structure transfer method provided in an embodiment of the present invention. The device is applied to a steel structure transfer system, and the steel structure transfer system is respectively connected to an automatic guided transport vehicle AGV and a radio frequency identification RFID electronic tag configured on a gantry, such as Figure 3 As shown, the device may specifically include: a determination module 310, a storage module 320 and a transfer module 330, wherein:
[0118] A determination module 310 is used to obtain a production plan and real-time production information of the steel structure, and determine a transfer route of the target steel structure according to the production plan and the real-time production information, wherein the transfer route includes a starting position and an end position of the target steel structure;
[0119] The storage module 320 is used to control the AGV to move the target gantry to the starting position, and store the tag information of the target steel structure through the radio frequency identification RFID electronic tag set on the target gantry, and the target gantry is used to place the target steel structure;
[0120] The transfer module 330 is used to control the AGV to move to the position of the target gantry, identify the label information, and when the label information is the target information, transfer the target steel structure to the AGV, and the AGV transfers the target steel structure to the terminal position according to the transfer route.
[0121] The steel structure transfer device provided by the embodiment of the present invention is applied to the steel structure transfer system. The steel structure transfer system is respectively connected to the automatic guided transport vehicle AGV and the radio frequency identification RFID electronic tag configured on the gantry. First, by obtaining the production plan and real-time production information of the steel structure, the transfer route of the target steel structure is determined according to the production plan and the real-time production information. The transfer route includes the starting position and the end position of the target steel structure; then the AGV is controlled to move the target gantry to the starting position, and the label information of the target steel structure is stored through the radio frequency identification RFID electronic tag set on the target gantry, wherein the target gantry is used to place the target steel structure; finally, the AGV is controlled to move to the position of the target gantry, identify the label information, and when the label information is the target information, the target steel structure is transferred to the AGV, and the AGV transfers the target steel structure to the end position according to the transfer route. The technical solution provided by the embodiment of the present invention can automatically control the AGV to transfer the target steel structure from the starting position of the target gantry to the end position through the steel structure transfer system, and the transfer operation during the transfer process can be realized automatically without manual participation, which solves the problem of high participation rate of technicians in the prior art and achieves the beneficial effect of improving transfer efficiency and reducing accident rate.
[0122] In one embodiment, the real-time production information includes production volume information and transfer volume information; and the terminal location includes a temporary storage location.
[0123] Accordingly, the determination module includes: a determination unit and a storage unit, wherein:
[0124] A determination unit, configured to determine the production progress information of the steel structure according to the production plan and the production volume information;
[0125] The storage unit is used to store the target steel structure at the temporary storage location when the production progress information and the transfer volume information exceed preset values.
[0126] In one embodiment, the steel structure transfer system includes a storage management subsystem, and the storage management subsystem is used to manage the steel structure according to the position information of the steel structure in the temporary storage location;
[0127] Accordingly, the device further comprises: a dividing module and a storage module; wherein:
[0128] A division module, used for dividing the temporary storage location into a plurality of areas according to the size information of the steel structure;
[0129] An acquisition module, specifically used to acquire the production requirements of the target steel structure;
[0130] The storage module is used to store the target steel structure in the corresponding area of the temporary storage position according to the size of the target steel structure if there is no production demand for the target steel structure within a first preset time period, and the storage management subsystem stores the location information of the target steel structure.
[0131] In one embodiment, the device further includes: a sending module; wherein:
[0132] A sending module, configured to send the location information of the target steel structure to the AGV if the target steel structure has a production demand within a second preset time period;
[0133] The transfer module is specifically used for the AGV to transfer the target steel structure in the temporary storage location according to the location information of the target steel structure.
[0134] In one embodiment, the transfer module 330 includes: a first acquisition unit, a sending unit, a judgment unit and a transfer unit, wherein:
[0135] A first acquisition unit, used to acquire the current position of the AGV;
[0136] A sending unit, used to determine the driving route of the AGV according to the current position of the AGV and the position of the target gantry, and send the driving route and target information to the AGV;
[0137] A judgment unit, used for the AGV to travel to the position of the target gantry according to the travel route, and read the RFID electronic tag according to the tag recognition module to judge whether the tag information is consistent with the target information;
[0138] A transfer unit is used to transfer the target steel structure from the gantry to the AGV when the tag information is consistent with the target information.
[0139] In one embodiment, a built-in camera is provided on the AGV; the tag information includes actual size information of the target steel structure;
[0140] The device also includes: a prediction module; wherein:
[0141] A prediction module, used to predict the size information of the target steel structure using a built-in lens to obtain predicted size information;
[0142] The transfer module is specifically used for, when the difference between the predicted size information and the actual size information is within a preset range, the AGV transfers the target steel structure to the terminal location according to the transfer route.
[0143] In one embodiment, the transfer module includes: a second acquisition unit, a comparison unit, a transfer unit and a planning unit, wherein:
[0144] A second acquisition unit, configured to acquire width information of the transfer route according to the built-in lens, wherein the width information of the transfer route is affected by obstacles on the transfer route;
[0145] A comparison unit, used for comparing the relationship between the minimum spacing between the obstacles and the maximum width of the target steel structure;
[0146] A transfer unit, used for, when the minimum spacing between the obstacles is greater than the maximum width dimension of the target steel structure, the AGV transfers the target steel structure to the terminal position according to the transfer route;
[0147] The planning unit is used to re-plan the transfer route when the minimum spacing between the obstacles is less than or equal to the maximum width dimension of the target steel structure.
[0148] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example for illustration. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working process of the functional modules described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0149] An embodiment of the present invention also provides an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the steel structure transfer method described in any embodiment of the present invention.
[0150] An embodiment of the present invention further provides a computer-readable medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the steel structure transfer method described in any embodiment of the present invention when executed.
[0151] Reference below Figure 4 , which shows a schematic diagram of the structure of a computer system 500 of an electronic device suitable for implementing an embodiment of the present invention. Figure 4 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.
[0152] like Figure 4As shown, the computer system 500 includes a central processing unit (CPU) 501, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 502 or a program loaded from a storage part 508 into a random access memory (RAM) 503. In the RAM 503, various programs and data required for the operation of the system 500 are also stored. The CPU 501, the ROM 502, and the RAM 503 are connected to each other via a bus 504. An input / output (I / O) interface 505 is also connected to the bus 504.
[0153] The following components are connected to the I / O interface 505: an input section 506 including a keyboard, a mouse, etc.; an output section 507 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 508 including a hard disk, etc.; and a communication section 509 including a network interface card such as a LAN card, a modem, etc. The communication section 509 performs communication processing via a network such as the Internet. A drive 510 is also connected to the I / O interface 505 as needed. A removable medium 511, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 510 as needed, so that a computer program read therefrom is installed into the storage section 508 as needed.
[0154] In particular, according to the embodiments disclosed in the present invention, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present invention include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication part 509, and / or installed from the removable medium 511. When the computer program is executed by the central processing unit (CPU) 501, the above-mentioned functions defined in the system of the present invention are executed.
[0155] It should be noted that the computer-readable medium shown in the present invention may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present invention, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wire, optical cable, RF, etc., or any suitable combination of the above.
[0156] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present invention. In this regard, each box in the flow chart or block diagram can represent a module, a program segment, or a part of a code, and the above-mentioned module, program segment, or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flow chart, and the combination of the boxes in the block diagram or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0157] The modules and / or units involved in the embodiments of the present invention may be implemented in software or hardware. The modules and / or units described may also be arranged in a processor. For example, it may be described as follows: a processor includes a determination module, a storage module, and a transfer module. The names of these modules do not, in some cases, limit the modules themselves.
[0158] As another aspect, the present invention also provides a computer-readable medium, which may be included in the device described in the above embodiment; or it may exist independently and not be assembled into the device. The above computer-readable medium carries one or more programs, and when the above one or more programs are executed by a device, the device includes: obtaining the production plan and real-time production information of the steel structure, determining the transfer route of the target steel structure according to the production plan and the real-time production information, and the transfer route includes the starting position and the end position of the target steel structure; controlling the AGV to move the target gantry to the starting position, storing the tag information of the target steel structure through the radio frequency identification RFID electronic tag set on the target gantry, and the target gantry is used to place the target steel structure; controlling the AGV to move to the position of the target gantry, identifying the tag information, and when the tag information is the target information, transferring the target steel structure to the AGV, and the AGV transfers the target steel structure to the end position according to the transfer route.
[0159] According to the technical solution of the embodiment of the present invention, the transfer route of the target steel structure can be determined according to the production plan and real-time production information by obtaining the production plan and real-time production information of the steel structure, and the transfer route includes the starting position and the end position of the target steel structure; then the AGV is controlled to move the target gantry to the starting position, and the tag information of the target steel structure is stored through the radio frequency identification RFID electronic tag set on the target gantry, wherein the target gantry is used to place the target steel structure; finally, the AGV is controlled to move to the position of the target gantry, identify the tag information, and when the tag information is the target information, the target steel structure is transferred to the AGV, and the AGV transfers the target steel structure to the end position according to the transfer route. The technical solution provided by the embodiment of the present invention can automatically control the AGV to transfer the target steel structure from the starting position of the target gantry to the end position through the steel structure transfer system, and the transfer operation during the transfer process can be realized automatically without manual participation, which solves the problem of high technical personnel participation rate in the prior art and achieves the beneficial effect of improving transfer efficiency and reducing accident rate.
[0160] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions may occur depending on design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for transporting a steel structure, characterized in that: Applied to a steel structure transfer system, the steel structure transfer system is respectively connected to an automatic guided transport vehicle AGV and a radio frequency identification RFID electronic tag configured on a gantry, and the method comprises: Acquire a production plan and real-time production information of the steel structure, and determine a transfer route of the target steel structure according to the production plan and the real-time production information, wherein the transfer route includes a starting position and an end position of the target steel structure; Control the AGV to move the target gantry to the starting position, and store the tag information of the target steel structure through the radio frequency identification RFID electronic tag set on the target gantry, and the target gantry is used to place the target steel structure; The AGV is controlled to move to the position of the target gantry, and the tag information is identified. When the tag information is the target information, the target steel structure is transferred to the AGV, and the AGV transfers the target steel structure to the terminal position according to the transfer route.
2. The method according to claim 1, characterized in that The real-time production information includes production volume information and transfer volume information; the terminal location includes a temporary storage location; The step of determining a transfer route of the target steel structure according to the production plan and the real-time production information comprises: Determine the production progress information of the steel structure according to the production plan and the production volume information; When the production progress information and the transfer volume information exceed preset values, the target steel structure is stored in the temporary storage location.
3. The method according to claim 2, characterized in that The steel structure transfer system includes a storage management subsystem, and the storage management subsystem is used to manage the steel structure according to the position information of the steel structure in the temporary storage location; The storage management subsystem manages the steel structure placed in the temporary storage location in the following manner: Dividing the temporary storage location into a plurality of areas according to the size information of the steel structure; Obtaining production requirements of the target steel structure; If there is no production demand for the target steel structure within the first preset time period, the target steel structure is stored in a corresponding area of the temporary storage location according to the size of the target steel structure, and the storage management subsystem stores the location information of the target steel structure.
4. The method according to claim 3, characterized in that The method further comprises: If the target steel structure has a production demand within a second preset time period, sending the location information of the target steel structure to the AGV; The AGV transfers the target steel structure in the temporary storage location according to the location information of the target steel structure.
5. The method according to claim 1, characterized in that The controlling the AGV to move to the position of the target gantry and identifying the tag information includes: Obtain the current position of the AGV; Determine a driving route of the AGV according to a current position of the AGV and a position of the target gantry, and send the driving route and target information to the AGV; The AGV drives to the position of the target gantry according to the driving route, and reads the RFID electronic tag according to the tag recognition module to determine whether the tag information is consistent with the target information; When the tag information is consistent with the target information, the target steel structure is transferred from the gantry to the AGV.
6. The method according to claim 5, characterized in that The AGV is provided with a built-in camera; the tag information includes the actual size information of the target steel structure; After transferring the target steel structure to the AGV, the method further includes: Using a built-in lens to predict the size information of the target steel structure, and obtaining predicted size information; When the difference between the predicted size information and the actual size information is within a preset range, the AGV transfers the target steel structure to the terminal location according to the transfer route.
7. The method according to claim 6, characterized in that The AGV transfers the target steel structure to the terminal location according to the transfer route, including: Acquiring width information of the transfer route according to the built-in camera, wherein the width information of the transfer route is affected by obstacles on the transfer route; Comparing the relationship between the minimum spacing between the obstacles and the maximum width of the target steel structure; When the minimum spacing between the obstacles is greater than the maximum width of the target steel structure, the AGV transfers the target steel structure to the terminal position according to the transfer route; When the minimum spacing between the obstacles is less than or equal to the maximum width dimension of the target steel structure, the transfer route is replanned.
8. A steel structure transfer device, characterized in that: Applied to a steel structure transfer system, the steel structure transfer system is respectively connected to an automatic guided transport vehicle AGV and a radio frequency identification RFID electronic tag configured on a gantry, and the device comprises: A determination module, used to obtain a production plan and real-time production information of the steel structure, and determine a transfer route of the target steel structure according to the production plan and the real-time production information, wherein the transfer route includes a starting position and an end position of the target steel structure; A storage module, used to control the AGV to move the target gantry to the starting position, and store the tag information of the target steel structure through the radio frequency identification RFID electronic tag set on the target gantry, and the target gantry is used to place the target steel structure; The transfer module is used to control the AGV to move to the position of the target gantry, identify the label information, and when the label information is the target information, transfer the target steel structure to the AGV, and the AGV transfers the target steel structure to the terminal position according to the transfer route.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the steel structure transporting method according to any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steel structure transporting method as described in any one of claims 1 to 7 is implemented.