A method for supporting the excavation of a mine chamber by combining metal shed and concrete masonry to fill a mixture underground

By using the combined method of metal shed and concrete masonry to perform excavation and support of cemented and filled mixtures in mine construction, the construction efficiency and safety of cemented and filled mixtures are solved, and the stability of the tunnel and the support structure are realized. Repairability reduces construction costs and construction periods.

CN114776308BActive Publication Date: 2024-11-19TONGLING NONFERROUS METALS ANQING YUESHAN MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210449091.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-27
Publication Date
2024-11-19
Estimated Expiration
2042-04-27

AI Technical Summary

Technical Problem

In mine construction, the existence of cemented and filled mixtures has affected construction efficiency and safety. The traditional support methods cannot meet their unique rock properties, resulting in poor stability, easy hydrolysis and low strength of the support structure.

Method used

The combination of metal shed and concrete masonry is used to excavate and support the underground filling mixture. The combination of metal shed and concrete masonry provides stability and stiffness, and is repaired after blasting, reducing the concrete support workload and improving the Construction safety and efficiency.

Benefits of technology

It realizes the improvement of construction quality and safety in the cemented and filled mixture, ensures the stability of the tunnel and the repairability of the support structure, reduces construction costs and construction periods, and avoids defects in traditional support methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114776308B_ABST
    Figure CN114776308B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for supporting the excavation of a mine chamber by a metal shed and concrete masonry combined method for filling a mixture underground, and specifically relates to the field of mine construction, including an excavation method, a support method and an excavation steel frame support, wherein the excavation steel frame support includes a tunnel profile, a longitudinal channel steel is provided at the top of the tunnel profile, a thick wooden board is provided on the upper side of the longitudinal channel steel, an anchor net is provided between the thick wooden board and the longitudinal channel steel, and a top I-beam is connected below the longitudinal channel steel. The present invention can reduce the drilling depth, prevent the blasthole from being too deep, and reduce the probability of stuck drill and blasthole wall collapse by adopting a short excavation, short support and small cycle excavation blasting method, which is flexible and convenient, and the cycle length of excavation and support can be adjusted according to the construction and safety conditions, generally controlled at 1.0m, and the amount of explosives for each excavation blasting can be controlled to reduce the damage to the metal shed, and if the excavation working face is slag powder or a cavity, manual cleaning can be used to form a groove.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of mine construction, and in particular to a method for supporting a mine chamber by excavating a mixed body filled underground using a metal shed and concrete masonry combined method. Background Art

[0002] Subsequently, cemented filling is a commonly used method for dealing with goafs and is widely used in domestic underground mines. In actual production, due to the needs of mining projects, construction shaft and tunnel projects are often arranged in the cemented filling body. The cemented filling body is different from ordinary rocks, and its physical and mechanical properties are quite different from those of ordinary rocks. The ore, mineral powder, waste rock, accumulated water and other foreign matter remaining in the filled void cause inclusions, inclusions, voids, etc. in the filling body during cemented filling, forming a mixture similar to cemented filling. This situation is particularly serious in the cemented filling body and the floor of the goaf.

[0003] The strength of cemented filling mixture is not as good as that of cemented filling, let alone ordinary original rock. The drilling, blasting and support in cemented filling mixture are different from those in ordinary rock. When excavating in general filling, a thin layer of concrete should be sprayed as early as possible to seal the surrounding rock of the tunnel to prevent water absorption, deliquescence or weathering, and then anchor rods or metal meshes should be driven in, re-sprayed, and retractable metal brackets should be set up to form a support with sufficient flexibility and retractability in time. However, in the filling mixture, because the presence of inclusions, inclusions, voids, etc. directly affects the construction efficiency and safety, a support method different from the above must be adopted.

[0004] For example, Longmenshan Copper Mine is a small- to medium-sized mine that is mined underground. Longmenshan Copper Mine is a concealed skarn-type copper-iron deposit. The top and bottom surrounding rocks of the ore body are mainly skarnized diorite, garnet skarn, and diorite, with a small amount of kaolinized diorite and carbonated diorite in some areas. The general ore hardness is f=10-12, and the surrounding rock hardness is f=12-14.

[0005] The mining method used is vertical medium-deep hole drilling and subsequent filling, with a stage height of 30-50m. The stope is arranged perpendicular to the strike, and the ore is funneled out of the V-shaped trench or electric rake road. A pedestrian skylight is arranged at the end of the stope as a passage for personnel to pass through and ventilate the stope. The stope is about 40-80m long, 12-15m wide, and 30-70m high. The general stope empty area volume is about 30,000-40,000m 3 .

[0006] The E-4S stope in the middle section of -545m in Longmenshan Copper Mine is the main mining site, with a total ore volume of 100,000 tons. The mining is carried out by the segmented open-pit method, and the bottom mining tunnel is located in the middle section of -545m. Three mining chambers are designed and arranged below the stope, and the chambers must pass through the previous cemented filling body. In order to prevent damage from seismic waves and shock waves caused by secondary blasting during the mining process, the three mining tunnels must have high stability during the mining period, so the support requirements for the three mining chambers are higher.

[0007] Longmenshan Copper Mine uses unclassified tailings as filling aggregate and uses the mine filling special cementing material produced by Tongguan Jianan Company as filling binder. The production process adopts intermittent cementing filling mode, with filling production during the day shift and stopping filling at night shift.

[0008] In the production process, the cemented filling uses all tailings without classification. The median particle size of the whole tailings is d50=0.0426mm, d10=0.003mm, d60=0.0684mm, and the unevenness coefficient Cu=22.8. The tailings larger than 0.074mm account for 36.8%, and the tailings smaller than 0.018mm account for 36.0%. The fine particle content of the whole tailings is too high. The main process parameters of the whole tailings filling are as follows:

[0009] Because the adjacent mining areas of the E-4S mining area in the middle section of -545m have completed mining and filling, according to production needs, the mining chamber in the middle section of -545m of the E-4S mining area needs to pass through the filling body of the adjacent E-3S mining area, and the designed tunnel length is 33.5m.

[0010] When the E-3S mining area is subsequently cemented and filled, the cementing mortar filled into the mining area is mixed with the residual ore, cross-fall waste rock, and mineral powder in the mining area to form a cementing and filling mixture. Because the original mining area adopts a trench-type flat-bottom structure for ore discharge, the rock loader cannot enter the mining area when discharging ore at the bottom of the mining area. After the ore discharge is completed, there are residual ore piles and mineral powder in the mining area. The residual ore piles and mineral powder are piled on the bottom plate of the mining area, with varying heights of about 3-5m. In addition, during the period from the mining area to the filling, the surrounding rock of the mining area and waste rock collapsed and also piled on the bottom plate of the mining area. During the cementing and filling of the mining area, the cementing mortar flows in along the gaps or cavities of the ore pile, fills and solidifies. At the same time, the cementing mortar cannot flow into or flows into the loose mineral powder and ore blocks in small quantities, forming a mixture of ore + waste rock + mineral powder + cementing body on the bottom plate of the cementing and filling mining area. This mixture is different from the original rock and the cemented filling body. The cemented body and the isolated rocks are interwoven, sometimes loose and sometimes hard. There is hardness in the broken parts and powder in the hard parts. There are slurry and voids in the gaps. It swells when it comes into contact with water during construction and gets stuck when drilling. It is a weak crushing medium with the characteristics of low strength, poor stability and easy hydrolysis.

[0011] During the on-site construction of the filling mixture in the mining area, the blastholes could not be drilled, the inner wall of the blastholes was rough and collapsed seriously during charging, and charging was difficult. Some blastholes had many cracks and large cavities, the blasting effect was poor, and the excavation efficiency was low. The tunnel section could not be controlled, the over-excavation and under-excavation phenomenon was serious, and the construction quality could not be controlled. During the construction process, the tunnel roof and side plates frequently collapsed, fell off, and the roof could not be cleared, which seriously threatened the safety of the construction workers.

[0012] The strength of the cemented filling mixture is not as good as that of the cemented filling body, let alone the ordinary original rock. Due to the change of surrounding rock stress after excavation, settlement and deformation occur after support, causing deformation and damage of the support structure. At the same time, as the secondary blasting of the mining chamber is frequent, general rigid support cannot be repaired.

[0013] Therefore, choosing a suitable construction support scheme in the filling mixture is the key to meeting the unique characteristics of the filling mixture and achieving safe and efficient construction. Summary of the invention

[0014] The purpose of the present invention is to ensure the construction quality and safety. According to the unique rock properties of the filling mixture, the safety of the top plate exposed during the excavation of the filling mixture and the stability of the support of the later mining chamber are solved. After field investigation, study, discussion and repeated comparison, a metal shed and concrete masonry combined method of excavation and support tunnel construction is adopted in the filling mixture passed by the three tunnels of the mining chamber.

[0015] In order to achieve the above object, the present invention adopts the following technical solutions:

[0016] The method of supporting the excavation of a mine chamber by a metal shed and concrete masonry combined method by filling a mixture underground includes:

[0017] A tunneling method, comprising the following steps:

[0018] S1. First, prepare for construction, measure orientation, check and find the top board;

[0019] S2. Support the top plate of the working face before excavation;

[0020] S3. When drilling in the filling body that is cemented with filling slurry, the drill rod should be rotated more and pushed less to keep the blasthole straight;

[0021] S4. Use oblique cut holes to increase the distance from the peripheral holes to the sidewall of the tunnel contour line, and use manual cleaning to find the under-excavated part of the tunnel after blasting;

[0022] A support method, the support method comprising the following steps:

[0023] A1. Choose a support scheme combining metal shed and concrete masonry. Every two excavations and one metal shed support is one excavation and support cycle, and every two excavation and support cycles is one pouring cycle.

[0024] A2. The roof and legs of the metal shed are made of I-16 I-steel. The roof is erected on the legs, and the two are connected by bolts. The legs are fixed on the anchor rods of the rock wall.

[0025] A3. A top beam is installed on the roof of the metal shed, and three channel steels are installed on the top beam in parallel with the tunnel excavation direction. The model of the channel steel is [14 type. Thick wooden boards and anchor nets are laid on the channel steels and fixed with triangular wood, nails, etc.;

[0026] A4. The horizontal connection between the metal scaffolds is made of two channel steels, and the top beam is made of three channel steels parallel to the tunneling direction. The columns and the top beam are welded with angle steels to make diagonal braces. The angle steels are L8 angle steels to increase the strength of the metal scaffolds.

[0027] A5. When the metal shed is installed to the tunnel head, the three channel steels on the top beam must be horizontally extended to the excavation working face. The channel steels can be directly inserted into the beam sockets, or the channel steels extended from the top plate can be vertically lifted up with wood;

[0028] A6. Install metal mesh between the metal shed legs, pour concrete between the metal shed legs and the roadway slab, use the metal mesh as a counterweight, and pour it into the vertical wall. The strength of the poured concrete shall not be less than C20;

[0029] A7. Metal scaffolding should be inspected and repaired after each blasting operation;

[0030] Tunneling steel frame support, the tunneling steel frame support includes a tunnel profile, a longitudinal channel steel is provided on the top of the tunnel profile, a thick wooden board is provided on the upper side of the longitudinal channel steel, an anchor net is provided between the thick wooden board and the longitudinal channel steel, a top I-beam is connected to the bottom of the longitudinal channel steel, a plurality of side I-beams are provided on the side of the tunnel profile, a plurality of channel steels are connected to the side I-beams, a plurality of channels filled with concrete are installed in the channel steel, an anchor net is laid on the side of the concrete close to the mine chamber, a plurality of fixed anchor piles are installed in the concrete, the anchor piles pass through the concrete and the anchor net, the side I-beams are connected to the top I-beam by angle steel, and a section of the longitudinal channel steel extending out of the side I-beam is a cantilevered channel steel.

[0031] The present invention is further configured as follows: in step S1, the net excavation section is 2.8m×2.5m, the excavation working face adopts manual drilling and charging, and the excavation tunnel cycle length each time in the filling mixture does not exceed 1.0m.

[0032] The present invention is further configured as follows: in the step S2, 2 to 4 beam holes are manually dug out in the filling mixture at the top of the excavation working face, and the depth of the beam holes is 20-30 mm. A metal shed behind the tunnel excavation working face is used to pick out channel steels on the roof of the shed toward the working face. The picked out channel steels can be directly inserted into the beam holes, and thick wooden boards are padded on top to protect the top.

[0033] The present invention is further configured as follows: if the stone on the top of the excavation working surface in step S2 cannot be dug out of the beam socket, the channel steel picked out from the top plate can also be lifted up with vertical wood, so that the operators on the working surface can work under the channel steel and the top protective board.

[0034] The present invention is further configured as follows: in the step S3, when drilling in the loose body that is not bonded by the filling slurry, a shallow blasthole can be manually dug out and filled with mud, and the mud is prepared by yellow mud and fine sand.

[0035] The present invention is further configured as follows: in step A1, the net cross-section of the metal shed support is 2.4m×2.2m, and the spacing between the metal shed supports is 1m.

[0036] The beneficial effects of the present invention are:

[0037] The excavation method of the present invention adopts a short excavation, short support and small cycle excavation blasting method, which has the following advantages: the short excavation and short support scheme can reduce the drilling depth, prevent the blasthole from being too deep, reduce the probability of drill jamming and blasthole wall collapse, is flexible and convenient, and the excavation and support cycle length can be adjusted according to the construction and safety conditions, generally controlled at 1.0m, and the amount of explosives for each excavation blasting can be controlled to reduce damage to the metal scaffolding. If the excavation working face is slag powder or a cavity, manual cleaning can be used to form a groove, which is beneficial to control the contour specifications of the tunnel and reduce the workload of concrete support. The support method of the present invention The advantages of choosing a metal shed and concrete masonry combined support construction are as follows: the metal shed + concrete masonry support has good stability and high support rigidity. The metal support can be repaired a second time when it is damaged. The combined support of the two can complement each other's strengths and weaknesses, which can not only meet the current support stability, but also ensure that the secondary blasting during the later mining operations will not damage the support structure, and can avoid the spraying support process. The channel steel above the metal shed can be extended 1.0~1.2m to the excavation direction, and the construction workers' working surface is under the extended channel steel and wooden board, which can ensure construction safety, and the construction speed is fast, the construction period is shortened, and the support cost is low. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a schematic diagram of the excavation and support process of excavating and supporting a mine chamber by the combined method of metal shed and concrete masonry of the present invention for underground filling of a mixed body.

[0039] Figure 2It is a schematic diagram of the supporting structure of the mine chamber for supporting the mine chamber by excavating the mine chamber with a mixture filled underground by the combined method of metal shed and concrete masonry of the present invention.

[0040] Figure 3 It is a schematic diagram of the support structure of the underground filling mixture excavation support out of the mine chamber excavation face by the combined method of metal shed and concrete masonry of the present invention.

[0041] In the figure: 1. Tunnel outline; 2. Longitudinal channel steel; 3. Thick wooden planks; 4. Anchor net; 5. Top I-beam; 6. Side I-beam; 7. Channel steel; 8. Concrete; 9. Fixed anchor piles; 10. Angle steel. DETAILED DESCRIPTION

[0042] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Example

[0043] like Figure 1-3 As shown, the excavation method of the underground filling mixed body excavation support out of the mine chamber by the metal shed and concrete masonry combined method comprises the following steps:

[0044] S1. Firstly, make preparations before construction, measure orientation, check and find the top plate. The net section of excavation is 2.8m×2.5m. The excavation working face adopts manual drilling and charging. The length of each excavation tunnel cycle in the filling mixture shall not exceed 1.0m.

[0045] S2. Support the top board of the working face before excavation. Dig out 2 to 4 beam holes manually in the filling mixture of the top of the excavation working face. The depth of the beam hole is 20-30 mm. Use the metal shed behind the tunnel excavation working face to pick out channel steel on the top of the shed toward the working face. The picked out channel steel 7 can be directly inserted into the beam hole. Thick wooden boards 3 are padded on the top of the channel steel 7 to protect the top. If the beam hole cannot be dug out due to stones on the top of the excavation working face, the channel steel 7 picked out from the top board can also be lifted up with vertical wood, so that the operators on the working face can work under the channel steel 7 and the top protection board;

[0046] S3. When drilling in a filling body that is cemented by filling slurry, the drill rod should be rotated more and pushed less to keep the blasthole straight. When drilling in a loose body that is not cemented by filling slurry, a shallow blasthole can be dug out manually and filled with mud. The mud is made of yellow mud and fine sand.

[0047] S4. Use oblique groove holes to increase the distance from the peripheral holes to the side wall of the tunnel contour line 1. Manual clearance is used for the under-excavated parts of the tunnel after blasting.

[0048] In this embodiment, a short-dig, short-support, small-cycle excavation and blasting method is adopted. The short-dig, short-support scheme can shorten the drilling depth, prevent the blasthole from being too deep, and reduce the probability of drill jamming and blasthole wall collapse. It is flexible and convenient, and the cycle length of excavation and support can be adjusted according to the construction and safety conditions, generally controlled at 1.0m. The amount of explosives for each excavation blasting can also be controlled to reduce damage to the metal scaffolding. Moreover, if the excavation working face is slag powder or voids, manual cleaning can be used to form a groove, which is beneficial to control the specifications of the tunnel profile 1 and reduce the workload of concrete 8 support. Example

[0049] like Figure 1-3 As shown in the figure, the metal shed and concrete masonry combined method is a support method for underground filling mixed body excavation support out of the mine chamber. The mine tunnel support must not only solve the safety during excavation, but also require high stability during the mining period. Because the filling body itself is not very strong, there is a certain amount of displacement and settlement after support, so the metal shed + concrete masonry support scheme is selected. The metal shed is used to deal with its displacement and settlement, and the concrete masonry support is used to strengthen the stability of the filling body. It includes the following steps:

[0050] A1. Choose a metal shed combined with concrete masonry support solution. Every two excavations and one metal shed support is one excavation and support cycle, and every two excavation and support cycles is one pouring cycle. The net section of the metal shed support is 2.4m×2.2m, and the spacing between metal shed supports is 1m.

[0051] A2. The roof and legs of the metal shed are made of I-16 (detailed specifications: 160*88*6.0; theoretical weight: 20.513) I-beam (steel with an I-shaped cross-section). The roof is erected on the legs, and the two are connected by bolts. The legs are fixed on the anchor rods on the rock wall.

[0052] A3. A top beam is installed on the roof of the metal shed. Three channel steels 7 are installed on the top beam in the direction of tunnel excavation. The channel steel 7 (the channel steel is cold-bent equilateral channel steel with a groove-shaped long steel strip cross section. It is a carbon structural steel with a complex cross section. Its cross section is groove-shaped and has good welding and riveting performance during use) is of type [14 (specification: 14#a; height: 140; leg width: 58; waist thickness: 6.0; cross-sectional area: 18.516; weight: 14.535; or specification: 14#b; height: 140; leg width: 60; waist thickness: 8.0; cross-sectional area: 21.316; weight: 16.733;). Thick wooden boards 3 and anchor nets 4 are laid on the channel steel 7 and fixed with triangular wood, nails, etc.

[0053] A4. The horizontal connection between the metal scaffolds is made of two channel steels 7. The top beam is made of three channel steels 7 parallel to the tunneling direction. The columns and the top beam are welded with angle steels 10 for diagonal bracing. The angle steels 10 are L8 type angle steels to increase the strength of the metal scaffolds.

[0054] A5. When the metal shed is installed to the tunnel head, the three channel steels 7 on the top beam must be horizontally extended to the excavation working surface. The channel steels 7 can be directly inserted into the beam socket, or the channel steels 7 extended from the top plate can be vertically lifted up with wood;

[0055] A6. Install metal mesh between the metal shed legs, pour concrete 8 between the metal shed legs and the roadway slab, use the metal mesh as a counterweight, and pour it into the vertical wall. The strength of the poured concrete 8 shall not be less than C20;

[0056] A7. Metal scaffolding should be inspected and repaired after each blasting operation.

[0057] In this embodiment, the main advantages of selecting metal shed + concrete support construction are as follows: 1. The metal shed + concrete support has good stability and high support rigidity. The metal support can be repaired for a second time when it is damaged. The combined support of the two can complement each other, which can not only meet the current support stability, but also ensure the damage to the support structure by secondary blasting during the later mining operations. 2. The spraying support process can be avoided. 3. The channel steel 7 above the metal shed can be extended 1.0~1.2m to the excavation direction. The working surface of the construction personnel is under the extended channel steel and wooden board, which can ensure construction safety. 4. The construction speed is fast, shortening the construction period. 5. The support cost is low. Example

[0058] like Figure 2-3 As shown, the supporting method for supporting the excavation of a mine chamber by a combination of a metal shed and concrete masonry method for filling a mixture in an underground mine chamber also includes excavation steel frame support, which includes a tunnel profile 1, a longitudinal channel steel 72 is provided on the top of the tunnel profile 1, a thick wooden board 3 is provided on the upper side of the longitudinal channel steel 72, an anchor net 4 is provided between the thick wooden board 3 and the longitudinal channel steel 72, a top I-beam 5 is connected to the bottom of the longitudinal channel steel 72, a plurality of side I-beams 6 are provided on the side of the tunnel profile 1, a plurality of channel steels 7 are connected to the side I-beams 6, a plurality of channel steels 8 filled with concrete are installed in the channel steel 7, an anchor net 4 is laid on the side of the concrete 8 close to the mine chamber, a plurality of fixed anchor piles 9 are installed in the concrete 8, the anchor piles are arranged through the concrete 8 and the anchor net 4, the side I-beams 6 and the top I-beams 5 are connected by angle steels 10, and a section of the longitudinal channel steel 72 extending out of the side I-beams 6 is a cantilevered channel steel;

[0059] In this embodiment, the underground filling mixture is supported by excavating and supporting the mine chamber through the combination of metal shed and concrete masonry. Not only does the use of concrete masonry reduce costs while providing a stable support function, but the combination of metal shed and concrete masonry also makes the construction safer.

[0060] In the present invention: the design specification of the mining chamber is 2.4m×2.2m, the specification of the support section is adjusted to 2.8m×2.5m, the construction personnel strictly follow the measured center line for construction, the distance from the center line of the tunnel to the wall shall not be less than the design, and the over-excavation shall not be greater than 0.2m; the bottom plate should be kept flat, with a ditch, more holes should be drilled during excavation, the charge amount should be controlled, the tunnel contour 1 is not damaged, and the support workload is reduced; the metal shed is made and installed on site; the installation personnel must confirm the safety of the surrounding top and side plates before entering the working face, knock on the top carefully, and deal with floating stones in time; before installing the metal shed, the position of the metal shed foot and the wall anchor piles is determined according to the center line given by the measurement, and the floating slag is removed from the place to the hard bottom of the original rock; the metal shed columns should be perpendicular to the center line of the tunnel and welded and fixed to the wall anchor piles; the columns between every two frames of the metal shed support are connected by 2 [14 channel steel 7, The upper channel steel 7 is not more than 800mm away from the top plate, and the lower channel steel 7 is not more than 700mm away from the bottom plate; the 3 channel steels 7 on the top beam are evenly distributed; when the metal shed is installed to less than one frame at the head of the tunnel, the 3 channel steels 7 on the top beam must extend to the beam socket in the working surface, and the channel steels 7 are covered with wooden boards to ensure that no slag or blocks fall off; the metal shed should be covered with anchor nets 4 and wood on the top of the metal shed, and the overlap of the anchor nets 4 should be tightened with wire or welded; the gap between the top anchor net 4 and the top plate should be tightly backed with wooden boards, and no slag should fall; the gap between the metal shed and the side wall should be filled with concrete 8 tightly, so that the metal shed and concrete 8 form a whole, and the strength of concrete 8 should not be less than C20; every two excavations is a pouring cycle, and all the poured concrete 8 is completed at one time each time, and the construction joints are handled according to regulations; test blocks of concrete 8 are retained on site for inspection.

[0061] Verification: The excavation and support of the E-4S mining field in the middle section of Longmenshan Copper Mine -545m adopted the metal shed + concrete masonry method, and the actual excavation was 33.4m, and the support concrete was 8130.5 m3. The contour of the tunnel was controlled within the specified range, and the safety of personnel during the construction was guaranteed due to the good support of the top slab;

[0062] After three consecutive months of settlement and displacement observation, the maximum deformation of the metal shed support was -5.0mm in the vertical direction and 2mm in the horizontal direction. The settlement and deformation of the metal shed + concrete masonry structure tended to be stable in the later period. Although the mining chamber was damaged during the production and mining, it met the mining requirements after repair.

[0063] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for supporting the excavation of a mine chamber by combining a metal shed and concrete masonry, characterized in that: include: A tunneling method, comprising the following steps: S1. First, prepare for construction, measure orientation, check and find the top board; S2. Support the top plate of the working face before excavation; S3. When drilling in the filling body that is cemented with filling slurry, the drill rod should be rotated more and pushed less to keep the blasthole straight; S4. Use oblique cut holes to increase the distance from the peripheral holes to the sidewall of the roadway contour (1). After blasting, the under-excavated part of the roadway is cleared manually. A support method, the support method comprising the following steps: A1. Choose a support scheme combining metal shed and concrete masonry. Every two excavations and one metal shed support is one excavation and support cycle, and every two excavation and support cycles is one pouring cycle. A2. The roof and legs of the metal shed are made of I-16 I-steel. The roof is erected on the legs, and the two are connected by bolts. The legs are fixed on the anchor rods of the rock wall. A3. A top beam is installed on the roof of the metal shed, and three channel steels (7) are installed on the top beam in parallel with the tunnel excavation direction. The model of the channel steel (7) is [14 type). Thick wooden boards (3) and anchor nets (4) are laid on the channel steel (7) and fixed with triangular wood and nails; A4. The horizontal connection between the metal scaffolds is made of two channel steels (7), the top beam is made of three channel steels (7) parallel to the tunnel excavation direction, and the columns and the top beam are welded with angle steels (10) to form diagonal braces. The angle steels (10) are L8-type angle steels; A5. When the metal shed is installed to less than one frame at the head of the tunnel, the three channel steels (7) on the top beam must be horizontally extended to the excavation working face, and the extended channel steels (7) are directly inserted into the beam socket, or the channel steels (7) extended from the top plate are vertically lifted up with wood; A6. Install metal mesh between the metal shed legs, pour concrete (8) between the metal shed legs and the tunnel side slab, use the metal mesh as a counterweight, and pour it into the vertical wall. The strength of the poured concrete (8) shall not be less than C20; A7. Metal scaffolding should be inspected and repaired after each blasting operation; A tunneling steel frame support, the tunneling steel frame support comprising a tunnel profile (1), a longitudinal channel steel (2) being provided at the top of the tunnel profile (1), a thick wooden board (3) being provided on the upper side of the longitudinal channel steel (2), an anchor net (4) being provided between the thick wooden board (3) and the longitudinal channel steel (2), a top I-beam (5) being connected below the longitudinal channel steel (2), a plurality of side I-beams (6) being provided on the side of the tunnel profile (1), and a plurality of side I-beams (6) being connected on the side I-beams (6). A plurality of channel steels (7) are installed in the channel steels (7) and filled with a plurality of concrete (8). An anchor net (4) is laid on the side of the concrete (8) close to the mine chamber. A plurality of fixed anchor piles (9) are installed in the concrete (8). The anchor piles penetrate the concrete (8) and the anchor net (4). The side I-beam (6) and the top I-beam (5) are connected by angle steel (10). A section of the longitudinal channel steel (2) extending out of the side I-beam (6) is a cantilevered channel steel.

2. The method of supporting the underground mine chamber by using a metal shed and concrete masonry combined method is characterized in that: In step S1, the net excavation section is 2.8m×2.5m, and the excavation working face adopts manual drilling and charging. The excavation tunnel cycle length each time in the filling mixture does not exceed 1.0m.

3. The method of supporting the underground mine chamber by filling the mixture with metal shed and concrete masonry according to claim 1 is characterized in that: In step S2, 2 to 4 beam holes are manually dug out in the filling mixture at the top of the excavation working face, and the depth of the beam holes is 20 to 30 mm. A metal shed behind the tunnel excavation working face is used to pick out channel steel on the roof of the shed toward the working face, and the picked out channel steel is directly inserted into the beam hole, and a thick wooden board (3) is padded on top to protect the top.

4. The method of supporting the underground mine chamber by filling the mixture with metal shed and concrete masonry according to claim 1 is characterized in that: In the step S2, if the stone cannot be dug out of the beam hole at the top of the excavation working surface, the channel steel (7) picked out from the top plate is lifted up with vertical wood, so that the operators on the working surface can work under the channel steel (7) and the top protection board.

5. The method of supporting the underground mine chamber by filling the mixture with metal shed and concrete masonry according to claim 1 is characterized in that: In the step S3, when drilling in the loose body that has not been cemented by the filling slurry, a shallow blasthole is manually dug out and filled with mud, and the mud is prepared by yellow mud and fine sand.

6. The method of supporting the underground mine chamber by filling the mixture with metal shed and concrete masonry according to claim 1 is characterized in that: In step A1, the net cross-section of the metal shed support is 2.4m×2.2m, and the spacing between the metal shed supports is 1m.