Device and method for treating adhesion outside the shield body by using shield tail freezing pipe and heat pipe
Through the alternating treatment of the freezing and heating of the shield tail freezing tube and the heat pipe device, the problem of digging line deviation caused by adhesions in the shield machine is solved, efficient removal of adhesions is achieved, and the excavation efficiency and safety are improved.
Patent Information
- Application Number
- CN202210446459.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-26
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-04-26
AI Technical Summary
During the excavation process of the shield machine, the adhesive increases the relative friction of the shield moving, resulting in the attitude shift of the shield and the deviation of the excavation line. It is difficult for the existing technology to effectively remove large areas or high-strength adhesions, which affects the excavation efficiency and safe.
The shield-tail freezing pipe and heat pipe device are used to process the adhesives alternately through freezing and heating, reduce their viscosity and make them fall off, including refrigeration pipes, refrigerant transport devices, hot water insulation pipes and hot water pumps, and use refrigeration pipes to match the The adhesion is frozen and the hot water insulation pipe is heated to achieve alternating measures of cold and heat to reduce adhesion.
Effectively removes the external adhesives of the shield, reduces construction costs, improves excavation efficiency, simplifies construction methods, and ensures the stability of the shield and the accuracy of the excavation line.
Smart Images

Figure CN114798601B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of processing of shield body adhesions, and more specifically, to a device and method for processing shield body adhesions by using a shield tail freezing pipe and a heat pipe. Background Art
[0002] The thrust of the shield machine during the tunneling process is mainly due to the thrust of the shield tail cylinder and the forward excavation of the cutter head. The shield body is smooth and has no other equipment. When the shield machine encounters some sticky objects during the shield excavation, the adhesion increases the relative friction of the shield machine when it moves forward. At this time, the posture of the shield body will be affected by the adhesion and deviate. In severe cases, the excavation line of the shield machine will have a large deviation, which makes the risk of receiving the shield body greater. At present, when adhesions appear around the shield body, the only way is to increase the thrust of the shield machine and rotate the shield body so that the adhesions fall off due to the friction of the surrounding soil. This method may work when small adhesions exist. When the adhesions are large or the affected area is wide, the removal of the adhesions requires special targeted measures.
[0003] Given the current situation of shield machine equipment, it is obviously not feasible to excavate the surrounding soil during the excavation process, as this will affect the stability of the soil around the shield machine. Summary of the invention
[0004] In order to achieve these purposes and other advantages according to the present invention, on the one hand, an embodiment of the present invention provides a device for treating adhesions outside the shield body by using a shield tail freezing pipe and a heat pipe, including a shield tail freezing pipeline, a freezing liquid conveying device, a hot water insulation pipeline, and a hot water pipe pump. The shield tail freezing pipeline is embedded in the inner wall of the tail of the shield machine, the freezing liquid conveying device is connected to the shield tail freezing pipeline to push freezing liquid to the shield tail freezing pipeline, and the hot water insulation pipeline is arranged on the inner wall of the shield machine shell.
[0005] Preferably, the shield tail freezing pipeline is formed by connecting a plurality of freezing pipelines in parallel, and two adjacent freezing pipelines are connected by a U-shaped connecting pipe.
[0006] Preferably, the hot water insulation pipeline includes a hot water tank, a hot water pump and a hot water pipe, the hot water pipe includes a main hot water pipe and a plurality of branch hot water pipes, one end of the main hot water pipe is connected to the hot water tank, and the other end is connected to the branch hot water pipe; the hot water pump is installed on the main hot water pipe;
[0007] The shield machine shell is provided with radial holes, and the branch hot water pipe passes through the radial holes and is attached to the inner wall of the shield machine shell.
[0008] Preferably, a ball valve is installed on the branch hot water pipe to control the opening and closing of the branch hot water pipe, and a valve is installed on each freezing pipe.
[0009] On the other hand, one embodiment of the present invention provides a method for treating adhesions outside the shield body using a shield tail cryotube and a heat pipe, comprising the following steps:
[0010] S1. Preparation before freezing;
[0011] S2, using the shield tail freezing pipeline to freeze the adhesion;
[0012] S3. Remove adhesions.
[0013] Preferably,
[0014] The following steps are also included between step S2 and step S3:
[0015] C1. Use hot water insulation pipes to heat the adhesions;
[0016] C2. Use the shield tail refrigeration pipeline and hot water insulation pipeline to perform alternating hot and cold treatment on the adhesion;
[0017] Preferably,
[0018] S1. Preparation before freezing, specifically including the following steps:
[0019] S11. Determine the approximate position of the adhesion on the shield machine, stop the shield machine excavation equipment, and open the valve on the shield tail freezing pipeline;
[0020] S12: Start the adhesion detection system to detect the specific position and adhesion status of the adhesion.
[0021] Preferably,
[0022] S2, using the shield tail freezing pipeline to freeze the adhesion, specifically including the following steps:
[0023] S21. According to the range of the adhesion, the freezing pipe at the corresponding position is opened, and the temperature of the inner wall of the shield body is measured at regular intervals;
[0024] S22, when the temperature of the inner wall of the shield body is lower than 0°, the temperature is kept constant, the freezing is continued, and the deformation change of the shield body of the attachment part is detected;
[0025] S23. After freezing for 3-5 hours, the freezing is stopped when the deformation of the shield body of the attachment part no longer changes.
[0026] Preferably,
[0027] C1. Using hot water insulation pipes to heat the adhesion; specifically including the following steps:
[0028] C11. Open the radial holes that are closer to the adhesion object according to the range of the adhesion object, and extend the heating conduit to the adhesion object through the radial holes;
[0029] C12, open the hot water valve to quickly heat the adherend with hot water;
[0030] C2. Using the shield tail refrigeration pipeline and the hot water insulation pipeline to perform hot and cold alternating treatment on the adhesion, specifically including the following steps:
[0031] After heating for 2-3 hours, the hot water pipe is withdrawn and the freezing step of step S2 is repeated, and the heating step of step S3 is repeated again after the end, and the adherend is subjected to alternate freezing and heating measures to reduce its viscosity;
[0032] S3, adhesion removal, specifically including the following steps:
[0033] Start the shield machine, rotate the shield in a small range, and test the adhesion area and depth of the adhesions on the outside of the shield to confirm whether all the adhesions have been cleared.
[0034] Preferably, in step S11, determining the approximate position of the adhesion on the shield machine specifically includes the following steps:
[0035] A. Before the shield machine is excavated or the shield body of the shield machine is deformed, different measuring points are arranged on the same annular surface of the shield body of the shield machine, and the ovality and concave-convex deformation of the shield body of the shield machine are measured by a total station, and the data fitting is used to process them as the original data;
[0036] B. When it is necessary to detect shield deformation or shield adhesion during excavation, different measuring points are arranged on the shield section to be measured, and the total station is used to measure the different measuring points on the same section of the shield steel shell to fit into a circle, which is compared with the initial measurement data to reflect the elliptical deformation and concave-convex deformation of the whole circle;
[0037] C. Compare the fitting circles of the shield section before and after deformation, draw quasi-concentric circles, mark the section with obvious differences between the two, and set it as the deformed section;
[0038] D. Perform detailed ultrasonic detection on the deformed section, use ultrasonic detection method to perform ultrasonic detection on the shield, analyze the corresponding detection spectrum, judge the sound velocity, amplitude and attenuation coefficient of the deformed section of the shield, and determine the distribution, area and strength of the shield adhesion.
[0039] The present invention at least includes the following beneficial effects: the present invention adopts a freezing method, uses a freezing tube to freeze the surrounding adhesions, and then pours hot water through the radial holes on the shield body after freezing. Through the alternation of hot and cold, the physical properties of the adhesion objects are changed, thereby reducing the adhesion, and then falling off from the shield body.
[0040] (1) The construction method is simple in principle and uses alternating hot and cold to reduce the adhesion characteristics of objects, thereby directly removing the adhered objects;
[0041] (2) This device uses the refrigeration device equipped at the tail of the shield machine to directly freeze the adhesion through the refrigeration pipeline at the tail of the shield, without the need for additional equipment for treatment, thus reducing the construction cost.
[0042] (3) The freezing method and the freeze-thaw method (freezing first and then heating) are used to deal with adhered objects, which can effectively remove adhered objects on the outside of the shield and increase the shield excavation efficiency.
[0043] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a schematic diagram of a device for treating adhesions outside the shield body by using a freezing method based on using a shield tail freezing tube and a heat pipe in one embodiment of the present invention.
[0045] Figure 2 It is a schematic diagram of treating adhesions by freeze-thaw method based on an apparatus for treating adhesions outside the shield body using a shield tail freezing tube and a heat pipe in one embodiment of the present invention.
[0046] Figure 3 It is a schematic diagram of the structure of a hot water pipeline in one embodiment of the present invention.
[0047] Figure 4 This is a schematic diagram of the structural distribution of determining the approximate position of the adhesion on the shield machine in step S11 in one implementation scheme of the present invention.
[0048] Figure 5 It is a schematic diagram of the deformation and concavity of the shield body of a tunnel boring machine in one embodiment of the present invention. DETAILED DESCRIPTION
[0049] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0050] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art can think of other obvious variations. The basic principles of the present invention defined in the following description can be applied to other embodiments, variations, improvements, equivalents, and other technical solutions that do not deviate from the spirit and scope of the present invention.
[0051] Those skilled in the art should understand that, in the disclosure of the present invention, the orientation or position relationship indicated by the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. are based on the orientation or position relationship shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the above terms should not be understood as limiting the present invention.
[0052] It is to be understood that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.
[0053] like Figure 1-5 As shown, on the one hand, an embodiment of the present invention provides a device for treating adhesions outside the shield body by using a shield tail freezing pipe and a heat pipe, comprising a shield tail freezing pipeline 1, a freezing liquid conveying device 2, a hot water insulation pipeline 3, and a hot water pipe pump. The shield tail freezing pipeline 1 is embedded in the inner wall of the tail of the shield machine, the freezing liquid conveying device 2 is connected to the shield tail freezing pipeline 1 to push freezing liquid to the shield tail freezing pipeline 1, and the hot water insulation pipeline 3 is arranged on the inner wall of the shield machine shell.
[0054] The refrigerant delivery device 2 pushes the refrigerant to the shield tail refrigeration pipeline 1 through the connecting pipeline 5.
[0055] The shield tail refrigeration pipeline 1 is composed of multiple refrigeration pipelines in parallel, and two adjacent refrigeration pipelines are connected by a U-shaped connecting pipe. Among them, the supporting equipment of the shield tail of the shield machine will have a refrigeration device to freeze the refrigerant in the shield tail refrigeration pipeline 1.
[0056] This device uses the shield tail's own matching freezing device to directly freeze the adhesion through the shield tail freezing pipeline, without adding additional equipment for treatment, thus reducing the construction cost. The freeze-thaw method (freezing first, then heating) can also be used to treat adhesion, which can effectively remove adhesion on the outside of the shield and increase the shield excavation efficiency.
[0057] The hot water insulation pipeline 3 includes a hot water tank 310, a hot water pump and a hot water pipe 320. The hot water pipe 320 includes a main hot water pipe 321 and a plurality of branch hot water pipes 322. One end of the main hot water pipe 321 is connected to the hot water tank 310, and the other end is connected to the branch hot water pipes 322. The hot water pump is installed on the main hot water pipe 321.
[0058] The shield machine housing is provided with radial holes, and the branch hot water pipe 322 passes through the radial holes and is attached to the inner wall of the shield machine housing. In this way, the hot water covers a wider area, ensuring that every position can be heated by hot water.
[0059] A ball valve is installed on the branch hot water pipe 322 to control the opening and closing of the branch hot water pipe 322, and a valve is installed on each freezing pipe, so that the branch hot water pipe 322 at the corresponding position can be selected according to the actual position of the adhered object for precise heating.
[0060] The branch hot water pipes 322 are evenly distributed along the inner wall of the shield machine shell, so that adhesions at any position can be heated.
[0061] Example 1 (using freezing method to treat adhered objects outside the shield)
[0062] A method for treating adhesions outside the shield body by using a shield tail freezing pipe and a heat pipe, comprising the following steps:
[0063] S1. Preparation before freezing;
[0064] S11. Determine the approximate position of the adhesion on the shield machine, stop the shield machine excavation equipment, and open the valve on the shield tail freezing pipeline;
[0065] S12, starting the adhesion detection system.
[0066] S2, using the shield tail freezing pipeline to freeze the adhesion;
[0067] S21. According to the range of the adhesion, the freezing pipe at the corresponding position is opened, and the temperature of the inner wall of the shield body is measured at regular intervals;
[0068] S22, when the temperature of the inner wall of the shield body is lower than 0°, the temperature is kept constant, the freezing is continued, and the deformation change of the shield body of the attachment part is detected;
[0069] S23. After freezing for 3-5 hours, the freezing is stopped when the deformation of the shield body of the attachment part no longer changes.
[0070] S5. Remove adhesions.
[0071] Start the shield machine, rotate the shield in a small range, and test the adhesion area and depth of the adhesions on the outside of the shield to confirm whether all the adhesions have been cleared.
[0072] Example 2 (using freeze-thaw method to treat adhered objects outside the shield)
[0073] A method for treating adhesions outside the shield body by using a shield tail freezing pipe and a heat pipe, comprising the following steps:
[0074] S1. Preparation before freezing;
[0075] S11. Determine the approximate position of the adhesion on the shield machine, stop the shield machine excavation equipment, and open the valve on the shield tail freezing pipeline;
[0076] S12, starting the adhesion detection system.
[0077] S2, using the shield tail freezing pipeline to freeze the adhesion;
[0078] S21. According to the range of the adhesion, the freezing pipe at the corresponding position is opened, and the temperature of the inner wall of the shield body is measured at regular intervals;
[0079] S22, when the temperature of the inner wall of the shield body is lower than 0°, the temperature is kept constant, the freezing is continued, and the deformation change of the shield body of the attachment part is detected;
[0080] S23. After freezing for 3-5 hours, the freezing is stopped when the deformation of the shield body of the attachment part no longer changes.
[0081] S3, using hot water insulation pipeline to heat the adhesion;
[0082] S31, opening a radial hole that is closer to the adhesion object according to the range of the adhesion object, and extending the heating conduit to the adhesion object through the radial hole;
[0083] S32, opening the hot water heating valve to quickly heat the adherend with hot water;
[0084] S4, using the shield tail refrigeration pipeline and the hot water insulation pipeline to perform alternating hot and cold treatment on the adhesion;
[0085] After heating for 2-3 hours, the hot water pipeline is withdrawn and the freezing step of step S2 is repeated. After the freezing step S3 is repeated again, the adhesion is subjected to alternate freezing and heating measures to reduce its viscosity.
[0086] S5. Remove adhesions.
[0087] Start the shield machine, rotate the shield in a small range, and test the adhesion area and depth of the adhesions on the outside of the shield to confirm whether all the adhesions have been cleared.
[0088] Measuring points 7 are arranged on the shield machine shell 6, a total station 8 is used to measure the coordinates of the measuring points on the shield machine shell 6, the total station 8 is placed on a tripod 9, there are currently 4 deformation points of the shield body, namely 10, 11, 12, and 13, a shield body design curve 14, an ultrasonic transmitter 15, and an ultrasonic wave 16 for ultrasonic detection.
[0089] Among them, in Example 1 and Example 2, in step S11, determining the approximate position of the adhesion on the shield machine specifically includes the following steps:
[0090] A. Before the shield machine is excavated or the shield body of the shield machine is deformed, different measuring points are arranged on the same annular surface of the shield body of the shield machine, and the ovality and concave-convex deformation of the shield body of the shield machine are measured by a total station, and the data fitting is used to process them as the original data;
[0091] B. When it is necessary to detect shield deformation or shield adhesion during excavation, different measuring points are arranged on the shield section to be measured, and the total station is used to measure the different measuring points on the same section of the shield steel shell to fit into a circle, which is compared with the initial measurement data to reflect the elliptical deformation and concave-convex deformation of the whole circle;
[0092] C. Compare the fitting circles of the shield section before and after deformation, draw quasi-concentric circles, mark the section with obvious differences between the two, and set it as the deformed section;
[0093] D. Perform detailed ultrasonic detection on the deformed section, use ultrasonic detection method to perform ultrasonic detection on the shield, analyze the corresponding detection spectrum, judge the sound velocity, amplitude and attenuation coefficient of the deformed section of the shield, and determine the distribution, area and strength of the shield adhesion.
[0094] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. A method for treating an apparatus for treating adhesions outside the shield body using a shield tail freezing tube and a heat pipe, characterized in that: A device for treating adhesions outside the shield body by using a shield tail freezing pipe and a heat pipe, comprising a shield tail freezing pipeline, a freezing liquid delivery device, a hot water insulation pipeline, and a hot water pipe pump, wherein the shield tail freezing pipeline is embedded in the inner wall of the tail of the shield machine, the freezing liquid delivery device is connected to the shield tail freezing pipeline to push freezing liquid to the shield tail freezing pipeline, and the hot water insulation pipeline is arranged on the inner wall of the shield machine shell; The shield tail freezing pipeline is formed by connecting a plurality of freezing pipelines in parallel, and two adjacent freezing pipelines are connected by a U-shaped connecting pipe; The hot water insulation pipeline includes a hot water tank, a hot water pump and a hot water pipe, the hot water pipe includes a main hot water pipe and a plurality of branch hot water pipes, one end of the main hot water pipe is connected to the hot water tank, and the other end is connected to the branch hot water pipe; the hot water pump is installed on the main hot water pipe; The shield machine housing is provided with radial holes, and the branch hot water pipe passes through the radial holes and is attached to the inner wall of the shield machine housing; A ball valve is installed on the branch hot water pipe to control the opening and closing of the branch hot water pipe, and a valve is installed on each freezing pipe; The following steps are involved: S1. Preparation before freezing; S2, using the shield tail freezing pipeline to freeze the adhesion; S3, removal of adhesions; The following steps are also included between step S2 and step S3: C1. Use hot water insulation pipes to heat the adhesions; C2. Use the shield tail refrigeration pipeline and hot water insulation pipeline to perform alternating hot and cold treatment on the adhesion; The C1, using a hot water insulation pipeline to heat the adhesion; specifically comprises the following steps: C11. Open the radial holes that are closer to the adhesion object according to the range of the adhesion object, and extend the heating conduit to the adhesion object through the radial holes; C12, open the hot water valve to quickly heat the adherend with hot water; C2. Using the shield tail refrigeration pipeline and the hot water insulation pipeline to perform hot and cold alternating treatment on the adhesion, specifically including the following steps: After heating for 2-3 hours, the hot water pipe is withdrawn and the freezing step of step S2 is repeated, and the heating step of step S3 is repeated again after the end, and the adherend is subjected to alternate freezing and heating measures to reduce its viscosity; The above-mentioned S3, removing the adhesion, specifically comprises the following steps: Start the shield machine, rotate the shield in a small range, and test the adhesion area and depth of the adhesions on the outside of the shield to confirm whether all the adhesions have been cleared.
2. The method for treating the shield body adhesion using a shield tail freezing pipe and a heat pipe according to claim 1, characterized in that: The S1, preparation before freezing, specifically comprises the following steps: S11. Determine the approximate position of the adhesion on the shield machine, stop the shield machine excavation equipment, and open the valve on the shield tail freezing pipeline; S12: Start the adhesion detection system to detect the specific position and adhesion status of the adhesion.
3. The method for treating the shield body adhesion using a shield tail freezing pipe and a heat pipe according to claim 1, characterized in that: The S2, using the shield tail freezing pipeline to freeze the adhesion, specifically includes the following steps: S21. According to the range of the adhesion, the freezing pipe at the corresponding position is opened, and the temperature of the inner wall of the shield body is measured at regular intervals; S22. When the temperature of the inner wall of the shield is lower than 0°C, the temperature is kept constant, the freezing is continued, and the deformation change of the shield body at the attachment part is detected; S23. After freezing for 3-5 hours, the freezing is stopped when the deformation of the shield body of the attachment part no longer changes.
4. The method for treating the device for treating the adhesion outside the shield body by using the shield tail freezing pipe and the heat pipe according to claim 2, characterized in that: In step S11, the approximate position of the adhesion on the shield machine is determined, which specifically includes the following steps: A. Before the shield machine is excavated or the shield body of the shield machine is deformed, different measuring points are arranged on the same annular surface of the shield body of the shield machine, and the ovality and concave-convex deformation of the shield body of the shield machine are measured by a total station, and the data fitting is used to process them as the original data; B. When it is necessary to detect the deformation of the shield or the adhesion of the shield during tunneling, different measuring points are arranged on the shield section of the shield to be tested. The total station is used to measure the different measuring points on the same section of the shield steel shell of the shield to fit into a circle, and the circle is compared with the initial measurement data to reflect the elliptical deformation and concave-convex deformation of the whole circle; C. Compare the fitting circles of the shield section before and after deformation, draw quasi-concentric circles, mark the section with obvious differences between the two, and set it as the deformed section; D. Perform detailed ultrasonic detection on the deformed section, use ultrasonic detection method to perform ultrasonic detection on the shield, analyze the corresponding detection spectrum, judge the sound velocity, amplitude and attenuation coefficient of the deformed section of the shield, and determine the distribution, area and strength of the shield adhesion.