A complete set of controllable shear and pull-out connectors for a detachable steel-concrete composite beam bridge and a construction method thereof
By using removable controllable shear and pull-resistant connectors in the steel-concrete composite beam bridge, the problem of difficulty in controlling shear and pull-resistant connectors in the negative bending moment section is solved, and the durability of concrete slabs is improved and The overall stress performance is suitable for rapid and industrial construction.
Patent Information
- Application Number
- CN202210555820.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-20
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-05-20
AI Technical Summary
In the negative bending moment section of steel-concrete composite beam bridge, it is difficult for the connection parts to effectively control shear resistance and pull-out resistance, resulting in the inability to effectively release the tensile stress of the concrete slab, affecting the long-term performance and durability of the structure, and at the same time reserved. Holes or keyways affect the overall stress performance.
A set of controllable shear-resistant and pull-resistant connectors are adopted for detachable steel-concrete combination beam bridges, including bolts, embedded parts, upper and lower steel plates, steel pipes, grooves and elastic materials, which are realized through bolts and steel pads and nut structures. Controllable longitudinal shear load and grooves are provided on the precast concrete bridge deck to reduce the impact on the overall nature.
It effectively reduces the tensile stress of concrete slabs, avoids cracks, improves the integrity and pull-resistance of the connecting area, enhances the overall stress performance of precast concrete bridge panels, and is suitable for rapid and industrial construction.
Smart Images

Figure CN114808666B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of structural engineering, and in particular to a set of controllable shear-resistant and pull-out-resistant connectors for a detachable steel-concrete composite beam bridge and a construction method thereof. Background Art
[0002] Connectors are the key to the combined effect and joint work of concrete bridge decks and steel beams. Connectors mainly bear the longitudinal shear force between the interface of steel beams and concrete slabs, limit the free sliding between the interfaces, and thus ensure the coordinated deformation between steel beams and concrete slabs, and ensure that steel beams and concrete slabs work together to improve the stiffness and bearing capacity of the cross-section; connectors can also resist the vertical separation and lifting of the concrete slab caused by the overall longitudinal bending and local transverse bending.
[0003] For the steel-concrete composite beam in the negative moment section, the upper concrete bridge deck is in a tensile state, making it more prone to cracking. The tensile stress in the concrete slab caused by shrinkage creep and temperature effects cannot be effectively released due to the constraints of the bolt connectors, which will have an adverse effect on the long-term performance and durability of the concrete slab. In summary, in the negative moment section of the continuous composite beam bridge, the use of shear connectors will have an adverse effect on the structural stress. However, if shear connectors are not used to prevent the steel and concrete from combining, although the above problems can be improved, the vertical lifting problem of the concrete slab cannot be effectively solved.
[0004] At present, there are many types of connectors for the steel-concrete continuous composite beam bridges that use cast-in-place concrete bridge decks and precast concrete bridge decks with reserved keyways or holes for negative moment zones. There are on-site wet operations for the connection area between cast-in-place concrete bridge decks and precast concrete bridge decks with reserved keyways or holes. Although there are fewer on-site wet operations for precast concrete bridge decks with reserved keyways or holes, the reserved keyways or holes affect the overall stress performance of the connection area of the precast concrete bridge deck. In addition, most of the existing connectors that are resistant to pull-out but not resistant to shear adopt the method of wrapping elastic materials outside the connectors, which inevitably bear the longitudinal shear force in the negative moment zone and cannot be accurately controlled and calculated. With the improvement of environmental protection requirements and the development of prefabricated bridge technology, it is urgent to develop a controllable shear and pull-out connector suitable for the negative moment zone of continuous composite beam bridges, which has simple connection, no concrete wet operation on site, and good overall performance in the connection area, and is detachable. Summary of the invention
[0005] The purpose of the present invention is to provide a complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge and a construction method thereof, so as to solve the problems existing in the prior art.
[0006] The technical solution adopted to achieve the purpose of the present invention is as follows: a set of controllable shear-resistant and pull-out-resistant connectors for a detachable steel-concrete composite beam bridge, including a plurality of bolts and a plurality of embedded parts.
[0007] The embedded parts include an upper steel plate, a lower steel plate and a plurality of steel pipes, and the cross section of the steel pipes is a straight-sided ellipse.
[0008] The upper steel plate and the lower steel plate are both arranged horizontally, and the upper steel plate is located directly above the lower steel plate, and a plurality of vertical steel pipes are welded between the upper steel plate and the lower steel plate.
[0009] A plurality of embedded parts are embedded in the precast concrete bridge deck, and the lower surface of the lower steel plate is flush with the lower surface of the precast concrete bridge deck.
[0010] The upper surface of the precast concrete bridge deck is provided with a plurality of grooves, the size of the grooves matches the size of the upper steel plates, and the plurality of upper steel plates are installed at the bottom of the grooves.
[0011] The lower ends of several of the bolts are connected to the upper surface of the steel beam, and the upper ends pass through the lower steel plate, steel pipe and upper steel plate of the corresponding embedded parts in sequence. A steel pad is installed on each bolt and the nut structure is tightened. The lower surface of the steel pad is in contact with the upper steel plate, and the upper surface is in contact with the nut structure. The top of the bolt is located in the groove.
[0012] The groove is filled with elastic material.
[0013] Furthermore, the upper surface of the upper steel plate is evenly coated with lubricating oil.
[0014] Furthermore, several layers of plastic film are laid on the plate surface where the steel backing plate contacts the upper steel plate.
[0015] Furthermore, a vertical edge sealing plate is attached to each side wall of the groove, adjacent edge sealing plates are welded to each other, the lower edge of the edge sealing plate is welded to the upper steel plate, and the upper edge is flush with the upper surface of the precast concrete bridge deck.
[0016] Furthermore, a horizontal movable steel cover is installed at the opening of the groove, the edge of the movable steel cover contacts the edge sealing plate, the lower surface of the movable steel cover contacts the top of a plurality of bolts, and the upper surface is flush with the upper surface of the concrete bridge deck.
[0017] Furthermore, the upper steel plate and the lower steel plate are both provided with a plurality of through holes for the steel pipes to be inserted into, the upper end of the through hole of the upper steel plate is provided with a groove, and the lower end of the through hole of the lower steel plate is provided with a groove, the upper end of the steel pipe is inserted into the through hole of the upper steel plate and is welded to the upper steel plate through the groove, and the lower end of the steel pipe is inserted into the through hole of the lower steel plate and is welded to the lower steel plate through the groove.
[0018] Furthermore, the nut structure includes two nuts that are screwed into the bolts and pressed against each other, and the lower nut is pressed against the steel pad.
[0019] Furthermore, each nut is spot welded to the bolt.
[0020] Furthermore, the steel beam is an I-beam, and the bolts and the upper flange of the steel beam are welded by arc welding.
[0021] According to the above-mentioned construction method of a complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge, the following steps are included:
[0022] 1) Connect several of the bolts to the steel beam.
[0023] 2) The embedded parts are embedded in the precast concrete bridge deck, and the edge sealing plates are welded on the upper surface of the upper steel plate.
[0024] 3) Pass the bolts through the corresponding embedded parts respectively.
[0025] 4) Install a steel backing plate on the bolt and tighten the nut structure, and spot weld the nut structure and the bolt.
[0026] 5) Fill the groove with elastic material and install the movable steel cover plate at the open end of the groove.
[0027] The beneficial effects of the present invention are:
[0028] 1. It can effectively reduce the tensile stress of precast concrete slabs in the negative bending zone of steel-concrete composite beam bridges, reduce or avoid the development of cracks in the concrete slabs in the negative bending zone, and thus improve the long-term performance and durability of precast concrete bridge decks;
[0029] 2. The longitudinal shear force borne by the connector can be reliably calculated by adjusting the friction coefficient of the pressure surface;
[0030] 3. The existing precast bridge deck generally adopts a reserved square through hole of about 400 mm or a post-casting groove along the upper surface of the steel beam. The reserved holes are large and involve a wide area, which weakens the integrity of the precast bridge deck. The present invention only opens a groove on the surface of the concrete layer of the precast concrete bridge deck. The groove does not need to penetrate the precast concrete bridge deck and will not cause the disconnection of the steel bars inside the precast concrete bridge deck, which has little effect on the integrity of the precast concrete bridge deck. Therefore, the present invention can solve the problem of local weakening of the precast concrete bridge deck due to the reserved holes or keyways, so that it has better integrity.
[0031] 4. The problem of broken steel bars is solved, and the stress-bearing steel bars in the connection area are made continuous, so that it has better integrity, and the overall stress-bearing performance of the precast concrete bridge deck in the connection area is improved. It has reliable pull-out resistance and can effectively resist the lifting effect of the precast concrete slab relative to the steel beam.
[0032] 5. It can realize the assembly and rapid construction of steel-concrete composite bridges, which is conducive to speeding up bridge construction and shortening the construction period. The construction quality is reliable, which is conducive to the industrialization of bridge construction and has broad market application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 A schematic diagram of connecting a steel beam and a precast concrete bridge deck using the connecting piece of the present invention;
[0034] Figure 2 It is a connection diagram of bolt, steel plate and nut structure;
[0035] Figure 3 It is a schematic diagram of the connection between the embedded parts and the edge banding board;
[0036] Figure 4 It is a cross-sectional view of the connection between the steel beam and the precast concrete bridge deck;
[0037] Figure 5 It is a schematic diagram of the installation of the connecting piece of the present invention;
[0038] Figure 6 It is a cross-sectional view of the connection between the embedded parts and the edge banding board.
[0039] In the figure: bolts 1, embedded parts 2, upper steel plate 201, lower steel plate 202, steel pipe 203, precast concrete bridge deck 3, groove 301, steel pad 4, nut structure 5, edge sealing plate 6, movable steel cover plate 7 and steel beam 8. DETAILED DESCRIPTION
[0040] The present invention is further described below in conjunction with the embodiments, but it should not be understood that the above subject matter of the present invention is limited to the following embodiments. Without departing from the above technical ideas of the present invention, various substitutions and changes are made according to the common technical knowledge and customary means in the art, which should all be included in the protection scope of the present invention.
[0041] Embodiment 1:
[0042] See also Figure 1 This embodiment discloses a set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge, including a plurality of bolts 1 and a plurality of embedded parts 2.
[0043] The embedded part 2 includes an upper steel plate 201, a lower steel plate 202 and a steel pipe 203. The cross section of the steel pipe 203 is a straight-sided ellipse.
[0044] See also Figure 3 The upper steel plate 201 and the lower steel plate 202 are both arranged horizontally and the upper steel plate 201 is located directly above the lower steel plate 202 , and one or more vertical steel pipes 203 are welded between the upper steel plate 201 and the lower steel plate 202 . Figure 3 The structure shown in a is a structure in which a steel pipe 203 is welded between the upper steel plate 201 and the lower steel plate 202. Figure 3 b shows a structure in which a plurality of steel pipes 203 are welded between the upper steel plate 201 and the lower steel plate 202 .
[0045] See also Figure 6 The upper steel plate 201 and the lower steel plate 202 are both provided with through holes for the steel pipe 203 to extend into, the upper end of the through hole of the upper steel plate 201 is provided with a groove, and the lower end of the through hole of the lower steel plate 202 is provided with a groove, the upper end of the steel pipe 203 extends into the through hole of the upper steel plate 201 and is welded to the upper steel plate 201 through the groove, and the lower end of the steel pipe 203 extends into the through hole of the lower steel plate 202 and is welded to the lower steel plate 202 through the groove. The upper and lower ends of the steel pipe 203 are flush with the upper surface of the upper steel plate 201 and the lower surface of the lower steel plate 202, respectively, and the upper surface of the upper steel plate 201 and the lower surface of the lower steel plate 202 need to be polished and smooth.
[0046] See also Figure 4 Or 5, a plurality of the embedded parts 2 are embedded in the precast concrete bridge deck 3, and the lower surface of the lower steel plate 202 is flush with the lower surface of the precast concrete bridge deck 3. The lower steel plate 202 is located below the steel mesh of the precast concrete bridge deck 3, and the steel pipe 203 passes through the gap of the steel mesh of the precast concrete bridge deck 3, that is, the installation of the embedded parts 2 will not cause the disconnection of the steel bars of the precast concrete bridge deck 3, and the stress-bearing steel bars in the connection area are continuous, so that it has better integrity.
[0047] The upper surface of the precast concrete bridge deck 3 is provided with a plurality of grooves 301, the size of the grooves 301 matches the size of the upper steel plate 201, and the upper steel plate 201 is installed at the bottom of the grooves 301. The grooves 301 are located above the steel mesh of the precast concrete bridge deck 3, that is, the steel mesh is continuous at the grooves 301, and the continuity of the stress-bearing steel bars in the connection area can improve the overall stress-bearing performance of the shear key connection area.
[0048] A vertical edge sealing plate 6 is attached to each side wall of the groove 301 , and adjacent edge sealing plates 6 are welded to each other. The lower edge of the edge sealing plate 6 is welded to the upper steel plate 201 , and the upper edge is flush with the upper surface of the precast concrete bridge deck 3 .
[0049] The steel beam 8 is an I-beam. The lower ends of the plurality of bolts 1 are welded to the upper flange of the steel beam 8 by arc welding. The upper ends of the bolts 1 have a certain length of thread. The upper ends of the bolts 1 pass through the lower steel plate 202, the steel pipe 203 and the upper steel plate 201 of the corresponding embedded part 2 in sequence. Figure 2 , a steel plate 4 is installed on each bolt 1 and a nut structure 5 is tightened, the lower surface of the steel plate 4 contacts the upper steel plate 201, the upper surface contacts the nut structure 5, and the top of the bolt 1 is located in the groove 301. The nut structure 5 includes two nuts that are screwed into the bolt 1 and pressed against each other, the lower nut is pressed against the steel plate 4, and each nut is spot welded to the bolt 1.
[0050] like Figure 1 As shown, the straight side of the cross section of the steel pipe 203 is parallel to the length direction of the steel beam 8 , and the plurality of embedded parts 2 are distributed at equal intervals in the length direction of the steel beam 8 .
[0051] The groove 301 is filled with an elastic material, and the elastic material is rubber, foam or asphalt.
[0052] A horizontal movable steel cover plate 7 is installed at the open portion of the groove 301 , the edge of the movable steel cover plate 7 contacts the edge sealing plate 6 , the lower surface of the movable steel cover plate 7 contacts the top of the bolt 1 , and the upper surface is flush with the upper surface of the concrete bridge deck 3 .
[0053] When the precast concrete bridge deck 3 or the steel beam 8 is damaged and needs to be replaced, the movable steel cover 7 is opened, the elastic material in the groove 301 is removed, the spot welding of the bolt 1 and the nut structure 5 is decomposed, the steel pad 4 and the nut structure 5 are taken out, and the precast concrete bridge deck 3 and the steel beam 8 are disassembled. When the precast concrete bridge deck 3 needs to be replaced, the old precast concrete bridge deck 3 is removed, and the new precast concrete bridge deck 3 is installed on the steel beam 8, and the bolts 1, the steel pad 4 and the nut structure 5 are used to reconnect, and the asphalt waterproof material is filled into the groove 301 and the movable steel cover 7 is installed. When the steel beam 8 needs to be replaced, the old steel beam 8 is removed, and the new steel beam 8 is installed with the precast concrete bridge deck 3, and the bolts 1, the steel pad 4 and the nut structure 5 are used to reconnect, and the elastic material is filled into the groove 301 and the movable steel cover 7 is installed.
[0054] It is worth noting that the connection structure described in this embodiment can use the friction between the steel pad 4 and the upper surface of the upper steel plate 201 to provide sufficient shear bearing capacity.
[0055] Embodiment 2:
[0056] This embodiment discloses a construction method of a complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge as described in Embodiment 1, comprising the following steps:
[0057] 1) Connect a plurality of the bolts 1 to the steel beam 8.
[0058] 2) The embedded parts 2 are embedded in the precast concrete bridge deck 3 , and the edge sealing plates 6 are welded on the upper surface of the upper steel plate 201 .
[0059] 3) Pass the plurality of bolts 1 through the corresponding embedded parts 2 respectively.
[0060] 4) Install the steel backing plate 4 on the bolt 1 and tighten the nut structure 5, and spot weld the nut structure 5 and the bolt 1.
[0061] 5) Fill the groove 301 with elastic material, and install the movable steel cover plate 7 at the open end of the groove 301 .
[0062] Embodiment 3:
[0063] See also Figure 1 This embodiment discloses a set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge, including a plurality of bolts 1 and a plurality of embedded parts 2.
[0064] The embedded part 2 includes an upper steel plate 201, a lower steel plate 202 and a steel pipe 203. The cross section of the steel pipe 203 is a straight-sided ellipse.
[0065] See also Figure 3 The upper steel plate 201 and the lower steel plate 202 are both arranged horizontally and the upper steel plate 201 is located directly above the lower steel plate 202 , and one or more vertical steel pipes 203 are welded between the upper steel plate 201 and the lower steel plate 202 . Figure 3 The structure shown in a is a structure in which a steel pipe 203 is welded between the upper steel plate 201 and the lower steel plate 202. Figure 3 b shows a structure in which a plurality of steel pipes 203 are welded between the upper steel plate 201 and the lower steel plate 202 .
[0066] See also Figure 6 The upper steel plate 201 and the lower steel plate 202 are both provided with through holes for the steel pipe 203 to extend into, the upper end of the through hole of the upper steel plate 201 is provided with a groove, and the lower end of the through hole of the lower steel plate 202 is provided with a groove, the upper end of the steel pipe 203 extends into the through hole of the upper steel plate 201 and is welded to the upper steel plate 201 through the groove, and the lower end of the steel pipe 203 extends into the through hole of the lower steel plate 202 and is welded to the lower steel plate 202 through the groove. The upper and lower ends of the steel pipe 203 are flush with the upper surface of the upper steel plate 201 and the lower surface of the lower steel plate 202, respectively, and the upper surface of the upper steel plate 201 and the lower surface of the lower steel plate 202 need to be polished and smooth.
[0067] See also Figure 4Or 5, a plurality of embedded parts 2 are embedded in the precast concrete bridge deck 3, and the lower surface of the lower steel plate 202 is flush with the lower surface of the precast concrete bridge deck 3.
[0068] The upper surface of the precast concrete bridge deck 3 is provided with a plurality of grooves 301 , the size of the grooves 301 matches the size of the upper steel plate 201 , the upper steel plate 201 is installed at the bottom of the grooves 301 , and the upper surface of the upper steel plate 201 is evenly coated with lubricating oil.
[0069] A vertical edge sealing plate 6 is attached to each side wall of the groove 301 , and adjacent edge sealing plates 6 are welded to each other. The lower edge of the edge sealing plate 6 is welded to the upper steel plate 201 , and the upper edge is flush with the upper surface of the precast concrete bridge deck 3 .
[0070] The steel beam 8 is an I-beam. The lower ends of the plurality of bolts 1 are welded to the upper flange of the steel beam 8 by arc welding. The upper ends of the bolts 1 have a certain length of thread. The upper ends of the bolts 1 pass through the lower steel plate 202, the steel pipe 203 and the upper steel plate 201 of the corresponding embedded part 2 in sequence. Figure 2 , a steel plate 4 is installed on each bolt 1 and a nut structure 5 is tightened, the lower surface of the steel plate 4 contacts the upper steel plate 201, the upper surface contacts the nut structure 5, and the top of the bolt 1 is located in the groove 301. The nut structure 5 includes two nuts that are screwed into the bolt 1 and pressed against each other, the lower nut is pressed against the steel plate 4, and each nut is spot welded to the bolt 1.
[0071] like Figure 1 As shown, the straight side of the cross section of the steel pipe 203 is parallel to the length direction of the steel beam 8 , and the plurality of embedded parts 2 are distributed at equal intervals in the length direction of the steel beam 8 .
[0072] The groove 301 is filled with an elastic material, and the elastic material is rubber, foam or asphalt.
[0073] A horizontal movable steel cover plate 7 is installed at the open portion of the groove 301 , the edge of the movable steel cover plate 7 contacts the edge sealing plate 6 , the lower surface of the movable steel cover plate 7 contacts the top of the bolt 1 , and the upper surface is flush with the upper surface of the concrete bridge deck 3 .
[0074] When the precast concrete bridge deck 3 or the steel beam 8 is damaged and needs to be replaced, the movable steel cover 7 is opened, the elastic material in the groove 301 is removed, the spot welding of the bolt 1 and the nut structure 5 is decomposed, the steel pad 4 and the nut structure 5 are taken out, and the precast concrete bridge deck 3 and the steel beam 8 are disassembled. When the precast concrete bridge deck 3 needs to be replaced, the old precast concrete bridge deck 3 is removed, the new precast concrete bridge deck 3 is installed on the steel beam 8, lubricating oil is applied, the bolt 1, the steel pad 4 and the nut structure 5 are used to reconnect, the asphalt waterproof material is filled into the groove 301, and the movable steel cover 7 is installed. When the steel beam 8 needs to be replaced, the old steel beam 8 is removed, the new steel beam 8 is installed with the precast concrete bridge deck 3, lubricating oil is applied, the bolt 1, the steel pad 4 and the nut structure 5 are used to reconnect, the elastic material is filled into the groove 301, and the movable steel cover 7 is installed.
[0075] It is worth noting that, since the upper surface of the upper steel plate 201 is evenly coated with lubricating oil, the steel pad 4 can slide on the upper steel plate 201, that is, the bolt 1 slides in the steel pipe 203 along the length direction of the steel beam 8, and the elastic material can provide space for the bolt 1 to slide, thereby reducing the longitudinal shear bearing capacity according to actual needs.
[0076] Embodiment 4:
[0077] This embodiment discloses a construction method of a complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge as described in Embodiment 3, comprising the following steps:
[0078] 1) Connect a plurality of the bolts 1 to the steel beam 8.
[0079] 2) The embedded parts 2 are embedded in the precast concrete bridge deck 3 , the edge sealing plates 6 are welded on the upper surface of the upper steel plate 201 , and lubricating oil is evenly applied on the upper surface of the upper steel plate 201 .
[0080] 3) Pass the plurality of bolts 1 through the corresponding embedded parts 2 respectively.
[0081] 4) Install the steel backing plate 4 on the bolt 1 and tighten the nut structure 5, and spot weld the nut structure 5 and the bolt 1.
[0082] 5) Fill the groove 301 with elastic material, and install the movable steel cover plate 7 at the open end of the groove 301 .
[0083] Embodiment 5:
[0084] See also Figure 1 This embodiment discloses a set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge, including a plurality of bolts 1 and a plurality of embedded parts 2.
[0085] The embedded part 2 includes an upper steel plate 201, a lower steel plate 202 and a steel pipe 203. The cross section of the steel pipe 203 is a straight-sided ellipse.
[0086] See also Figure 3 The upper steel plate 201 and the lower steel plate 202 are both arranged horizontally and the upper steel plate 201 is located directly above the lower steel plate 202 , and one or more vertical steel pipes 203 are welded between the upper steel plate 201 and the lower steel plate 202 . Figure 3 The structure shown in a is a structure in which a steel pipe 203 is welded between the upper steel plate 201 and the lower steel plate 202. Figure 3 b shows a structure in which a plurality of steel pipes 203 are welded between the upper steel plate 201 and the lower steel plate 202 .
[0087] See also Figure 6 The upper steel plate 201 and the lower steel plate 202 are both provided with through holes for the steel pipe 203 to extend into, the upper end of the through hole of the upper steel plate 201 is provided with a groove, and the lower end of the through hole of the lower steel plate 202 is provided with a groove, the upper end of the steel pipe 203 extends into the through hole of the upper steel plate 201 and is welded to the upper steel plate 201 through the groove, and the lower end of the steel pipe 203 extends into the through hole of the lower steel plate 202 and is welded to the lower steel plate 202 through the groove. The upper and lower ends of the steel pipe 203 are flush with the upper surface of the upper steel plate 201 and the lower surface of the lower steel plate 202, respectively, and the upper surface of the upper steel plate 201 and the lower surface of the lower steel plate 202 need to be polished and smooth.
[0088] See also Figure 4 Or 5, a plurality of embedded parts 2 are embedded in the precast concrete bridge deck 3, and the lower surface of the lower steel plate 202 is flush with the lower surface of the precast concrete bridge deck 3.
[0089] The upper surface of the precast concrete bridge deck 3 is provided with a plurality of grooves 301 , the size of the grooves 301 matches the size of the upper steel plate 201 , and the upper steel plate 201 is installed at the bottom of the grooves 301 .
[0090] A vertical edge sealing plate 6 is attached to each side wall of the groove 301 , and adjacent edge sealing plates 6 are welded to each other. The lower edge of the edge sealing plate 6 is welded to the upper steel plate 201 , and the upper edge is flush with the upper surface of the precast concrete bridge deck 3 .
[0091] The steel beam 8 is an I-beam. The lower ends of the plurality of bolts 1 are welded to the upper flange of the steel beam 8 by arc welding. The upper ends of the bolts 1 have a certain length of thread. The upper ends of the bolts 1 pass through the lower steel plate 202, the steel pipe 203 and the upper steel plate 201 of the corresponding embedded part 2 in sequence. Figure 2, a steel plate 4 is installed on each bolt 1 and a nut structure 5 is tightened, the lower surface of the steel plate 4 contacts the upper steel plate 201, the upper surface contacts the nut structure 5, and the top of the bolt 1 is located in the groove 301. The nut structure 5 includes two nuts that are screwed into the bolt 1 and pressed against each other, the lower nut is pressed against the steel plate 4, and each nut is spot welded to the bolt 1.
[0092] The surface of the steel backing plate 4 that contacts the upper steel plate 201 is covered with multiple layers of plastic film.
[0093] like Figure 1 As shown, the straight side of the cross section of the steel pipe 203 is parallel to the length direction of the steel beam 8 , and the plurality of embedded parts 2 are distributed at equal intervals in the length direction of the steel beam 8 .
[0094] The groove 301 is filled with an elastic material, and the elastic material is rubber, foam or asphalt.
[0095] A horizontal movable steel cover plate 7 is installed at the open portion of the groove 301 , the edge of the movable steel cover plate 7 contacts the edge sealing plate 6 , the lower surface of the movable steel cover plate 7 contacts the top of the bolt 1 , and the upper surface is flush with the upper surface of the concrete bridge deck 3 .
[0096] When the precast concrete bridge deck 3 or the steel beam 8 is damaged and needs to be replaced, the movable steel cover 7 is opened, the elastic material in the groove 301 is removed, the spot welding of the bolt 1 and the nut structure 5 is decomposed, the steel pad 4 and the nut structure 5 are taken out, and the precast concrete bridge deck 3 and the steel beam 8 are disassembled. When the precast concrete bridge deck 3 needs to be replaced, the old precast concrete bridge deck 3 is removed, the new precast concrete bridge deck 3 is installed on the steel beam 8, a plastic film is laid, the bolts 1, the steel pad 4 and the nut structure 5 are used to reconnect, the asphalt waterproof material is filled into the groove 301, and the movable steel cover 7 is installed. When the steel beam 8 needs to be replaced, the old steel beam 8 is removed, the new steel beam 8 is installed with the precast concrete bridge deck 3, a plastic film is laid, the bolts 1, the steel pad 4 and the nut structure 5 are used to reconnect, the elastic material is filled into the groove 301, and the movable steel cover 7 is installed.
[0097] It is worth mentioning that since multiple layers of plastic film are laid on the plate surface where the steel pad 4 contacts the upper steel plate 201, the steel pad 4 can slide on the upper steel plate 201, that is, the bolt 1 slides in the steel pipe 203 along the length direction of the steel beam 8, and the elastic material can provide space for the bolt 1 to slip, thereby reducing the longitudinal shear bearing capacity according to actual needs.
[0098] Embodiment 6:
[0099] This embodiment discloses a construction method of a complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge as described in Embodiment 5, comprising the following steps:
[0100] 1) Connect a plurality of the bolts 1 to the steel beam 8.
[0101] 2) The embedded parts 2 are embedded in the precast concrete bridge deck 3 , and the edge sealing plates 6 are welded on the upper surface of the upper steel plate 201 .
[0102] 3) Pass the plurality of bolts 1 through the corresponding embedded parts 2 respectively.
[0103] 4) Install the steel backing plate 4 on the bolt 1 and tighten the nut structure 5, and spot weld the nut structure 5 and the bolt 1. The lower plate surface of the steel backing plate 4 is paved with multiple layers of plastic film, and the plastic film is in contact with the upper surface of the upper steel plate 201.
[0104] 5) Fill the groove 301 with elastic material, and install the movable steel cover plate 7 at the open end of the groove 301 .
Claims
1. A set of controllable shear and pull-out connectors for a detachable steel-concrete composite beam bridge, characterized in that: It comprises a plurality of bolts (1) and a plurality of embedded parts (2); The embedded part (2) comprises an upper steel plate (201), a lower steel plate (202) and a plurality of steel pipes (203); the cross section of the steel pipe (203) is a straight-sided ellipse; The upper steel plate (201) and the lower steel plate (202) are both arranged horizontally, and the upper steel plate (201) is located directly above the lower steel plate (202); a plurality of vertical steel pipes (203) are welded between the upper steel plate (201) and the lower steel plate (202); and the upper surface of the upper steel plate (201) is evenly coated with lubricating oil; A plurality of embedded parts (2) are embedded in the precast concrete bridge deck (3), and the lower surface of the lower steel plate (202) is flush with the lower surface of the precast concrete bridge deck (3); The upper surface of the precast concrete bridge deck (3) is provided with a plurality of grooves (301), the size of the grooves (301) matches the size of the upper steel plate (201), and the plurality of upper steel plates (201) are installed at the bottom of the grooves (301); The lower ends of the plurality of bolts (1) are connected to the upper surface of the steel beam (8), and the upper ends sequentially pass through the lower steel plate (202), the steel pipe (203), and the upper steel plate (201) of the corresponding embedded part (2). A steel pad (4) is installed on each bolt (1) and the nut structure (5) is tightened. The lower surface of the steel pad (4) contacts the upper steel plate (201), and the upper surface contacts the nut structure (5). The top of the bolt (1) is located in the groove (301); a gap exists between the bolt (1) and the inner wall of the steel pipe (203); The groove (301) is filled with an elastic material; during operation, the steel pad (4) slides on the upper steel plate (201); the bolt (1) slides in the steel pipe (203) along the length direction of the steel beam (8), and the elastic material can provide space for the bolt (1) to slide.
2. According to claim 1, a set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge is characterized in that: A plurality of layers of plastic film are laid on the plate surface of the steel backing plate (4) in contact with the upper steel plate (201).
3. The complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge according to claim 1 is characterized in that: A vertical edge sealing plate (6) is attached to each side wall of the groove (301), and adjacent edge sealing plates (6) are welded to each other. The lower edge of the edge sealing plate (6) is welded to the upper steel plate (201), and the upper edge is flush with the upper surface of the precast concrete bridge deck (3).
4. The complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge according to claim 3 is characterized in that: A horizontal movable steel cover plate (7) is installed at the open end of the groove (301), the edge of the movable steel cover plate (7) is in contact with the edge sealing plate (6), the lower surface of the movable steel cover plate (7) is in contact with the tops of the plurality of bolts (1), and the upper surface is flush with the upper surface of the concrete bridge deck (3).
5. The complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge according to claim 1 is characterized in that: The upper steel plate (201) and the lower steel plate (202) are both provided with a plurality of through holes for the steel pipe (203) to extend therethrough; the upper ends of the through holes of the upper steel plate (201) are provided with grooves, and the lower ends of the through holes of the lower steel plate (202) are provided with grooves; the upper ends of the steel pipes (203) extend into the through holes of the upper steel plate (201) and are welded to the upper steel plate (201) through the grooves; and the lower ends of the steel pipes (203) extend into the through holes of the lower steel plate (202) and are welded to the lower steel plate (202) through the grooves.
6. The complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge according to claim 1 is characterized in that: The nut structure (5) comprises two nuts that are both screwed into the bolt (1) and pressed against each other, and the lower nut is pressed against the steel pad (4).
7. The complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge according to claim 6 is characterized in that: Each nut is spot welded to the bolt (1) on which it is located.
8. The complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge according to claim 1 is characterized in that: The steel beam (8) is an I-beam, and the bolt (1) and the upper flange of the steel beam (8) are welded by arc welding.
9. The construction method of a complete set of controllable shear and pull-out resistant connectors for a detachable steel-concrete composite beam bridge according to claim 4 is characterized in that: The following steps are involved: 1) Connecting a plurality of the bolts (1) to a steel beam (8); 2) embedding the embedded part (2) in the precast concrete bridge deck (3), and welding an edge sealing plate (6) to the upper surface of the upper steel plate (201); 3) Passing a plurality of the bolts (1) through the corresponding embedded parts (2) respectively; 4) installing a steel backing plate (4) on the bolt (1) and tightening the nut structure (5), and spot welding the nut structure (5) and the bolt (1); 5) Fill the groove (301) with elastic material, and install the movable steel cover plate (7) at the open end of the groove (301).