A method and system for determining the power balance of a microgrid considering energy storage operation mode

By analyzing the energy storage and load characteristics in the microgrid, determining the power balance requirements of the microgrid, solving the problem that the impact of the microgrid on the large power grid in the existing technology has not been fully considered, and achieving lower grid equipment planning and design capacity and Higher equipment utilization efficiency.

CN114881385BActive Publication Date: 2024-12-06CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111159459.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-30
Publication Date
2024-12-06
Estimated Expiration
2041-09-30

AI Technical Summary

Technical Problem

The existing power systems fail to fully consider the impact of the microgrid when calculating the power balance of the large power grid, resulting in excessive demands on the grid equipment capacity, excessive investment, and low equipment operation efficiency.

Method used

A method for determining power balanced power in the microgrid is proposed to consider the energy storage operation mode. By analyzing the number of micro-power and loads in the microgrid, typical daily operation data and load translation power value, the load power demand model and the power output model are determined. Combining the energy storage charging and discharging model and operation constraints, the impact of different types of energy storage on the microgrid is analyzed, the final contact line power requirements are determined, and the impact of the microgrid on the large power grid is evaluated.

Benefits of technology

Effectively screen out the upper and lower limits of microgrid power, reasonably evaluate the impact of microgrid on large grid planning, reduce the grid-side equipment planning and design capacity, reduce investment, and improve equipment utilization efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114881385B_ABST
    Figure CN114881385B_ABST
Patent Text Reader

Abstract

The present invention relates to a method and system for determining the power balance of a microgrid considering an energy storage operation mode, comprising: determining a load power demand model, a power output model and a load shiftable power model according to the number of micro power sources and loads in a microgrid area, typical daily operation data and load shiftable power values; determining the initial interconnection line power demand of a microgrid area without energy storage according to the power output model and the load power demand model; determining the energy storage charging and discharging model and operation constraints according to the number and capacity information of energy storage in the microgrid; determining the functional positioning and operation target of each energy storage according to the typical daily operation data and load shiftable power value of each energy storage, and classifying the energy storage; analyzing the impact of different types of energy storage on the microgrid, and determining the final interconnection line power demand based on the initial interconnection line power demand; and determining the maximum power demand and the minimum external transmission power when the power system is balanced according to the final interconnection line power demand.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of smart grid planning, and more specifically, to a method and system for determining the electric power balance of a microgrid taking into account an energy storage operation mode. Background Art

[0002] Building a new power system with new energy as the main body is a complex and arduous system engineering, facing many severe challenges. With the increasing proportion of new energy installed capacity, in order to better smooth the fluctuations of new energy and increase the consumption of new energy, the grid form of the new power system will change from the traditional grid dominated by one-way step-by-step transmission to an energy Internet including AC / DC hybrid large grid, microgrid, local DC grid and adjustable load; the operation characteristics of the new power system will also change from the real-time balance mode of source following load and the integrated control mode of large grid to the non-complete real-time balance mode of source, grid, load and storage synergistic interaction and the synergistic control mode of large grid and microgrid. As an effective supplement to the large grid, the microgrid can balance the regional energy source and load, realize the local consumption of a high proportion of distributed power sources, and alleviate the pressure of the large grid to cope with the large-scale random power access; at the same time, through the coordinated control of the source, load and storage inside the microgrid, the upper and lower limits of the power exchange with the main grid can be effectively reduced, the installed capacity can be reduced, and the power supply burden of the grid can be reduced.

[0003] As a basic tool for power system planning, power balance calculation is of great significance for analyzing the evolution path of new power systems. In the future, with the gradual evolution of the power grid, the impact of microgrids on the power balance of large power grids will become an important factor affecting power system planning. However, the calculation of power balance in existing power systems rarely considers the impact of microgrids. Generally, it is simply calculated according to the maximum load mode. The upper limit of node power is calculated using the maximum load of the microgrid, and the lower limit of power is calculated using the minimum power value of the microgrid (positive or negative). This will lead to excessive capacity requirements for equipment such as grid-side transformers in the planning and design of future power grids, excessive investment, and reduced equipment operating efficiency. How to simply and efficiently evaluate the upper and lower limits of the microgrid's interconnection line power, reasonably evaluate the impact of microgrids on the power balance of future power systems, and accurately carry out the planning and design of power systems is a major problem that needs to be solved urgently. Summary of the invention

[0004] The present invention proposes a method and system for determining the electric power balance of a microgrid taking into account an energy storage operation mode, so as to solve the problem of how to simply and efficiently evaluate the upper and lower limits of the interconnection line power of the microgrid.

[0005] In order to solve the above problem, according to one aspect of the present invention, a method for determining the power balance of a microgrid considering an energy storage operation mode is provided, the method comprising:

[0006] Determine the load power demand model, power output model and load shiftable power model based on the number of micro power sources and loads in the microgrid area, typical daily operation data and load shiftable power value;

[0007] Determine the initial tie line power demand of the microgrid area without energy storage according to the power output model and the load power demand model;

[0008] Determining an energy storage charging and discharging model and operation constraints according to the quantity and capacity information of energy storage in the microgrid;

[0009] According to the typical daily operation data of each energy storage and the load transferable power value, determine the functional positioning and operation target of each energy storage, and classify the energy storage;

[0010] According to the energy storage charging and discharging model, operation constraints and load shiftable power model, combined with the energy storage analysis method, the impact of different types of energy storage on the microgrid is analyzed, and based on the initial tie line power demand, the final tie line power demand is determined;

[0011] According to the final interconnection line power demand, the maximum power demand and the minimum external power required to meet the power system balance under the typical operation mode of energy storage are determined.

[0012] Preferably, the method of determining the load power demand model, the micro power output model and the load shiftable power model according to the number of micro power sources and loads in the microgrid area, typical daily operation data and load shiftable power value includes:

[0013] Obtain the number of loads in the microgrid and typical daily operation data, and build a load power demand model, including:

[0014] l x =L x (t), x=1,2,3,...,a,

[0015] Among them, l x is the power demand of the xth load, L x (t) is the power of the xth load at time t; a is the number of loads;

[0016] Obtain the number of loads in the microgrid and the characteristics of the transferable power, and build a load transferable power model, including:

[0017] s x =S x (t), x=1,2,3,...,a,

[0018] Among them, s x is the transferable power of the xth load, S x(t) is the transferable power of the x-th load at time t; a is the number of loads;

[0019] Obtain the number of micro-power sources in the microgrid and typical daily operation data, and build a power output model, including:

[0020] f y =F y (t), y=1,2,3,...,b,

[0021] Among them, f y is the power of the yth micro power source; F y (t) is the power of the yth micro power source at time t; b is the number of micro power sources in the microgrid.

[0022] Preferably, the initial tie line power requirement includes:

[0023]

[0024] Among them, the w 0 (t) is the initial tie line power demand.

[0025] Preferably, the step of determining the energy storage charging and discharging model and operation constraints according to the energy storage quantity and capacity information in the microgrid includes:

[0026] Determine the parameter model of the energy storage system, for any energy storage power at time t, including:

[0027] q z =Q z (t), z=1,2,...,c,

[0028] Determine the charging and discharging model of the energy storage system. The charging and discharging amount of the energy storage at time t satisfies:

[0029]

[0030] The energy storage system cannot be charged or discharged at the same time. For any i-th sampling period, and satisfy:

[0031]

[0032] The real-time power of the energy storage system is subject to the upper limit of the charging and discharging power, which satisfies:

[0033]

[0034]

[0035] The amount of electricity stored in the energy storage system is limited by the capacity of the energy storage system and should meet the following requirements:

[0036] 0≤Q i ≤Q max ,

[0037] Among them, q z is the charging and discharging power of the zth energy storage; Q z (t) is the charging and discharging power of the zth energy storage at time t; c is the number of energy storages in the microgrid; Q 0 The electric energy stored in the energy storage system at the initial moment; Q t is the electric energy stored in the energy storage system at time t; T is the sampling period; The electric power consumed during the charging process of the energy storage system in the zth sampling period; is the electric power consumed by the energy storage system during the discharge process of the i-th sampling period; η is the energy conversion efficiency coefficient of the energy storage system; They are the real-time upper and lower limits of the charging and discharging power of the energy storage system; Q max is the capacity of the energy storage system.

[0038] Preferably, the classification of energy storage includes:

[0039] If the energy storage in the microgrid is charged and discharged regularly on a typical day, it is defined as Class I energy storage. At the same time, if the shiftable load shifts regularly on a typical day, it is also defined as Class I energy storage. Class I energy storage is mainly used for regular peak shaving and valley filling.

[0040] If the energy storage in the microgrid follows the power changes of the load or power source and is used to smooth the power fluctuations of the load or power source, it is defined as Class II energy storage;

[0041] If the energy storage in the microgrid is used to control the power of the microgrid interconnection line, ensure the power balance of the microgrid, and control the external exchange power, it is defined as Class III energy storage.

[0042] Preferably, the analysis of the impact of different types of energy storage on the microgrid based on the energy storage charging and discharging model, operation constraints and load shiftable power model in combination with the energy storage analysis method, and the determination of the final tie line power demand based on the initial tie line power demand includes:

[0043] Analyze the impact of the peak-shaving and load-shifting functions of Class I energy storage on the power of the microgrid, and determine the first modified positive tie line power demand;

[0044] Determine the second modified tie line power demand based on the impact of the Class II storage energy and load fluctuation tracking energy storage on the microgrid power and the first modified tie line power demand;

[0045] The final interconnection line power requirement is determined according to the Class III energy storage interconnection line power correction and the second corrected interconnection line power requirement.

[0046] Preferably, the analyzing the influence of the peak shaving and valley filling function and the load shifting function of the Class I energy storage on the power of the microgrid, determining the first modified positive interconnection line power demand, and determining the first modified positive interconnection line power demand include:

[0047]

[0048]

[0049]

[0050]

[0051]

[0052]

[0053]

[0054]

[0055] Among them, w 1 (t) is the first corrected tie line power demand; are the power of energy storage charging and discharging, P 1max is the maximum charge and discharge power of energy storage, [t d , t e ] is the set charging time. When the energy storage capacity exceeds 90% of the total capacity, charging stops; [t f , t g ] is the set charging time. When the energy storage capacity is less than 10% of the total capacity, the discharge stops. [t d , t e ] and [t f , t g ] The time at both ends does not overlap; P zmax is the maximum power of the zth energy storage; α is the calculation factor of type I energy storage; The power consumed by the movable load after translation, which is equivalent to the power of energy storage charging; is the power reduction during the shifting period of the shiftable load, which is equivalent to the power of energy storage discharge; P smax is the maximum translation power of the load that can be translated, [t r , t s ] is the set translation load recovery time; [t p , t q ] is the set translation time of the translatable load; [t d , t e ] and [t f , t g] The time at both ends does not overlap; S x is the transferable power of the xth load.

[0056] Preferably, the step of tracking the impact of energy storage on the microgrid power according to the Class II energy storage load fluctuation and the first corrected tie line power demand to determine the second corrected tie line power demand comprises:

[0057]

[0058] P 2 (t) = f(t) - f 0 (t)+Δf(t),

[0059]

[0060]

[0061]

[0062]

[0063] Among them, w 2 (t) is the second modified tie line power demand; P 2 (t) is the power characteristic of Class II energy storage after superimposing the power offset constant; P 2 (t) is greater than 0 for charging state, P 2 (t) is less than 0, which is the discharge state; f 0 (t) is the target function of the power output curve after averaging and smoothing the three historical output data; Δf(t) is the power offset constant; β is the calculation factor of Class II energy storage; at this time, the maximum external power value is The minimum external power value is

[0064] Preferably, the determining of the final tie line power requirement according to the Class III energy storage tie line power correction and the second corrected tie line power requirement comprises:

[0065]

[0066] Among them, w 3 (t) is the final tie line power requirement; and They are the charging and discharging power characteristics corresponding to the energy storage on the source and load sides respectively.

[0067] Preferably, the method further comprises:

[0068] After adding Class III energy storage, the maximum charging and discharging power P of the energy storage is limited. 3max, the maximum external power can be adjusted to Adjust the minimum external power to At the same time, due to the energy storage capacity Q 3max Limited, check and calculate the threshold of energy storage system action; among them,

[0069]

[0070]

[0071] Among them, γ is the type III energy storage calculation factor;

[0072] Select w 2 (t) Maximum value or maximum value The corresponding time t 0 , the computing power is greater than The corresponding time point t 1 , t 2 According to t 1 , t 2 Calculate the amount of electricity Z that needs to be compensated during the time period t ,include:

[0073]

[0074]

[0075] Where, T is the sampling point period;

[0076] If the amount of electricity to be compensated is Z t <Q 3max , then the energy storage capacity can meet the power compensation requirements, and the discharge power characteristics are:

[0077]

[0078] If the amount of electricity to be compensated is Z t >Q 3max , then the energy storage capacity cannot meet the discharge compensation requirements, and the maximum compensable power P needs to be recalculated. 3 ,include:

[0079]

[0080]

[0081] The corresponding maximum compensation power P can be obtained by solving 3 and the corresponding time point t′ 1 , t′ 2 ; The corresponding energy storage discharge power characteristics are:

[0082]

[0083] Similarly, when calculating the minimum value of the external power, when Z t <Q 3max In this case, the corresponding charging power for:

[0084]

[0085] When Z t >Q 3max In this case, the corresponding charging power for:

[0086]

[0087]

[0088]

[0089] Calculate the charging and discharging power characteristics corresponding to Class II energy storage and

[0090] Preferably, the step of determining the maximum power demand and the minimum external power required to meet the power system balance under the typical operation mode of energy storage according to the final tie line power demand includes:

[0091] W max =max{w 3 (t)},

[0092]

[0093] Among them, w 3 (t) is the final tie line power requirement; W max is the maximum power requirement; W min is the minimum power.

[0094] According to another aspect of the present invention, a microgrid power balance power determination system considering an energy storage operation mode is provided, the system comprising:

[0095] The source-load model determination unit is used to determine the load power demand model, the power output model and the load shiftable power model according to the number of micro power sources and loads in the microgrid area, typical daily operation data and load shiftable power value;

[0096] An initial tie line power demand determination unit, used to determine the initial tie line power demand of the microgrid area without energy storage conditions according to the power output model and the load power demand model;

[0097] An energy storage modeling unit, used to determine an energy storage charging and discharging model and operation constraints according to the amount and capacity information of energy storage in the microgrid;

[0098] The energy storage classification unit is used to determine the functional positioning and operation target of each energy storage and classify the energy storage according to the typical daily operation data of each energy storage and the load shiftable power value;

[0099] The final interconnection demand power determination unit is used to analyze the impact of different types of energy storage on the microgrid according to the energy storage charging and discharging model, operation constraints and load shiftable power model in combination with the energy storage analysis method, and determine the final interconnection line power demand based on the initial interconnection line power demand;

[0100] The microgrid power demand determination unit is used to determine the maximum power demand and the minimum external power when the power system is balanced under the typical operation mode of energy storage according to the final interconnection line power demand.

[0101] The present invention provides a method and system for determining the electric power balance of a microgrid taking into account the energy storage operation mode. By analyzing the output characteristics of flexible resources of different types of energy storage and loads in the microgrid, the overall external power output or demand characteristics of the microgrid are calculated, and the upper and lower limits of the microgrid power can be effectively screened out as the upper and lower limits of the interaction between the microgrid and the large power grid, so as to reasonably evaluate the impact of the microgrid on the planning of the large power grid, and quickly evaluate the impact of the microgrid on the power balance of the system, effectively reduce the planning and design capacity of the equipment on the grid side, reduce the grid investment, and improve the equipment utilization efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0102] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:

[0103] Figure 1 It is a flowchart of a method 100 for determining a microgrid power balance power considering an energy storage operation mode according to an embodiment of the present invention;

[0104] Figure 2 Schematic diagram of the structure of a microgrid power balancing power determination system 200 considering an energy storage operation mode according to an embodiment of the present invention. DETAILED DESCRIPTION

[0105] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.

[0106] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.

[0107] Figure 1 FIG. 1 is a flow chart of a method 100 for determining a microgrid power balance power considering an energy storage operation mode according to an embodiment of the present invention. Figure 1 As shown, a method 100 for determining a microgrid power balance power considering an energy storage operation mode provided in an embodiment of the present invention includes:

[0108] Step 101, according to the number and typical daily data of micro power sources and loads in the microgrid area, determine the power output model, load power demand model and load shiftable power model.

[0109] Preferably, the method of determining the load power demand model, the micro power output model and the load shiftable power model according to the number of micro power sources and loads in the microgrid area, typical daily operation data and load shiftable power value includes:

[0110] Obtain the number of loads in the microgrid and typical daily operation data, and build a load power demand model, including:

[0111] l x =L x (t), x=1,2,3,...,a,

[0112] Among them, l x is the power demand of the xth load, L x (t) is the power of the xth load at time t; a is the number of loads;

[0113] Obtain the number of loads in the microgrid and the characteristics of the transferable power, and build a load transferable power model, including:

[0114] s x =S x (t), x=1,2,3,...,a,

[0115] Among them, s x is the transferable power of the xth load, S x (t) is the transferable power of the x-th load at time t; a is the number of loads;

[0116] Obtain the number of micro power sources in the microgrid and typical daily operation data, and build a power output model, including:

[0117] f y=F y (t), y=1,2,3,...,b,

[0118] Among them, f y is the power of the yth micro power source; F y (t) is the power of the yth micro power source at time t; b is the number of micro power sources in the microgrid.

[0119] In the present invention, firstly, the power demand model of each load in the microgrid area, the shiftable load shiftable power model and the power output model are defined, including:

[0120] 1) Define the load power demand model. There are a loads in the microgrid, then the power of the xth load at time t is:

[0121] l x =L x (t), x=1,2,3,...,a,

[0122] Among them, l x is the power of the xth load, L x (t) is the power of the xth load at time t; a is the number of loads;

[0123] 2) Define the load shiftable power model. If there are a loads in the microgrid, the shiftable power of the xth load at time t is:

[0124] s x =S x (t), x=1,2,3,...,a,

[0125] Among them, s x is the transferable power of the xth load, S x (t) is the transferable power of the x-th load at time t; a is the number of loads;

[0126] 2) Define the micro power output model. The micro power sources inside the microgrid mainly consider distributed wind power, photovoltaic power, small hydropower, etc. Assuming that there are b micro power sources in the microgrid, the power of the yth micro power source at time t is:

[0127] f y =F y (t), y=1,2,3,...,b,

[0128] Among them, f y is the power of the yth micro power source; F y (t) is the power of the yth micro power source at time t; b is the number of micro power sources in the microgrid.

[0129] Step 102, determining the initial interconnection line power demand of the microgrid area without energy storage according to the power output model and the load power demand model.

[0130] Preferably, the initial tie line power requirement includes:

[0131]

[0132] Among them, the w 0 (t) is the initial tie line power demand.

[0133] In the present invention, the power demand w of the microgrid area interconnection line without energy storage is calculated based on the power output and load power demand. 0 (t), including:

[0134]

[0135] Among them, the w 0 (t) is the initial tie line power demand.

[0136] Step 103: Determine the energy storage charging and discharging model and operation constraints according to the quantity and capacity information of the energy storage in the microgrid.

[0137] Preferably, the step of determining the energy storage charging and discharging model and operation constraints according to the energy storage quantity and capacity information in the microgrid includes:

[0138] Determine the parameter model of the energy storage system, for any energy storage power at time t, including:

[0139] q z =Q z (t), z=1,2,...,c,

[0140] Determine the charging and discharging model of the energy storage system. The charging and discharging amount of the energy storage at time t satisfies:

[0141]

[0142] The energy storage system cannot be charged or discharged at the same time. For any i-th sampling period, and satisfy:

[0143]

[0144] The real-time power of the energy storage system is subject to the upper limit of the charging and discharging power, which satisfies:

[0145]

[0146]

[0147] The amount of electricity stored in the energy storage system is limited by the capacity of the energy storage system and should meet the following requirements:

[0148] 0≤Q i ≤Q max ,

[0149] Among them, q z is the charging and discharging power of the zth energy storage; Q z (t) is the charging and discharging power of the zth energy storage at time t; c is the number of energy storages in the microgrid; Q 0 The electric energy stored in the energy storage system at the initial moment; Q t is the electric energy stored in the energy storage system at time t; T is the sampling period; The electric power consumed during the charging process of the energy storage system in the zth sampling period; is the electric power consumed by the energy storage system during the discharge process of the i-th sampling period; η is the energy conversion efficiency coefficient of the energy storage system; They are the real-time upper and lower limits of the charging and discharging power of the energy storage system; Q max is the capacity of the energy storage system.

[0150] In the present invention, according to the quantity and capacity information of energy storage in the microgrid, the energy storage charging and discharging model and operation constraints are determined, including:

[0151] 1) Parameter model of energy storage system. There are c energy storages in the microgrid, and the power of the zth energy storage at time t is:

[0152] q z =Q z (t) z=1,2,...,c

[0153] Among them, q z is the charging and discharging power of the zth energy storage; Q z (t) is the charging and discharging power of the zth energy storage at time t

[0154] 2) Charging and discharging model of energy storage system. Energy storage has the dual characteristics of power supply and load. During the low load period or the period of full generation of new energy, energy storage acts as a load to store the electric energy in the microgrid system; during the peak load period or the period of high electricity price, energy storage acts as a power supply to release the stored energy to supply power to the microgrid. There is a certain amount of energy loss in the charging and discharging process. Therefore, the charging and discharging amount of energy storage at time t satisfies:

[0155]

[0156] Where: Q 0 The electric energy stored in the energy storage system at the initial moment; Q tis the electric energy stored in the energy storage system at time t; T is the sampling period; The electric power consumed during the charging process of the energy storage system in the zth sampling period; is the electric power consumed by the energy storage system during the discharge process of the zth sampling period; η is the energy conversion efficiency coefficient of the energy storage system.

[0157] The energy storage system cannot be charged or discharged at the same time. For any i-th sampling period, and Should meet:

[0158]

[0159] The real-time power of the energy storage system is subject to the upper limit of the charging and discharging power, which satisfies:

[0160]

[0161]

[0162] Where: They are the real-time upper and lower limits of the energy storage system’s charging and discharging power. In addition, the amount of electricity stored in the energy storage system is limited by the capacity of the energy storage system and should meet the following requirements:

[0163] 0≤Q i ≤Q max

[0164] Where: Q max is the capacity of the energy storage system.

[0165] Step 104, according to the typical daily operation data of each energy storage and the load shiftable power value, determine the functional positioning and operation target of each energy storage, and classify the energy storage.

[0166] Preferably, the classification of energy storage includes:

[0167] If the energy storage in the microgrid is charged and discharged regularly on a typical day, it is defined as Class I energy storage. At the same time, if the shiftable load shifts regularly on a typical day, it is also defined as Class I energy storage. Class I energy storage is mainly used for regular peak shaving and valley filling.

[0168] If the energy storage in the microgrid follows the power changes of the load or power source and is used to smooth the power fluctuations of the load or power source, it is defined as Class II energy storage;

[0169] If the energy storage in the microgrid is used to control the power of the microgrid interconnection line, ensure the power balance of the microgrid, and control the external exchange power, it is defined as Class III energy storage.

[0170] In the present invention, the functional positioning and operation target of each energy storage are determined according to the typical daily operation data of each energy storage and the load shiftable power value, and the energy storage is classified, including:

[0171] If the energy storage in the microgrid is charged and discharged regularly on a typical day, it is defined as Class I energy storage. At the same time, if the shiftable load shifts regularly on a typical day, it is also defined as Class I energy storage. Class I energy storage is mainly used for regular peak shaving and valley filling.

[0172] If the energy storage in the microgrid follows the power changes of the load or power source and is used to smooth the power fluctuations of the load or power source, it is defined as Class II energy storage;

[0173] If the energy storage in the microgrid is used to control the power of the microgrid interconnection line, ensure the power balance of the microgrid, and control the external exchange power, it is defined as Class III energy storage.

[0174] Step 105, analyzing the impact of different types of energy storage on the microgrid based on the energy storage charging and discharging model, operation constraints and load shiftable power model in combination with the energy storage analysis method, and determining the final tie line power demand based on the initial tie line power demand.

[0175] Preferably, the analysis of the impact of different types of energy storage on the microgrid based on the energy storage charging and discharging model, operation constraints and load shiftable power model in combination with the energy storage analysis method, and the determination of the final tie line power demand based on the initial tie line power demand includes:

[0176] Analyze the impact of the peak-shaving and load-shifting functions of Class I energy storage on the power of the microgrid, and determine the first modified positive tie line power demand;

[0177] Determine the second modified tie line power demand based on the impact of the Class II storage energy and load fluctuation tracking energy storage on the microgrid power and the first modified tie line power demand;

[0178] The final interconnection line power requirement is determined according to the Class III energy storage interconnection line power correction and the second corrected interconnection line power requirement.

[0179] Preferably, the analyzing the impact of the peak shaving and valley filling function and the load shifting function of the Class I energy storage on the power of the microgrid and determining the first modified positive tie line power demand comprises:

[0180]

[0181]

[0182]

[0183]

[0184]

[0185]

[0186]

[0187]

[0188] Among them, w 1 (t) is the first corrected tie line power demand; are the power of energy storage charging and discharging, P 1max is the maximum charge and discharge power of energy storage, [t d , t e ] is the set charging time. When the energy storage capacity exceeds 90% of the total capacity, charging stops; [t f , t g ] is the set charging time. When the energy storage capacity is less than 10% of the total capacity, the discharge stops. [t d , t e ] and [t f , t g ] The time at both ends does not overlap; P zmax is the maximum power of the zth energy storage; α is the calculation factor of type I energy storage; The power consumed by the movable load after translation, which is equivalent to the power of energy storage charging; is the power reduction during the shifting period of the shiftable load, which is equivalent to the power of energy storage discharge; P smax is the maximum translation power of the load that can be translated, [t r , t s ] is the set translation load recovery time; [t p , t q ] is the set translation time of the translatable load; [t d , t e ] and [t f , t g ] The time at both ends does not overlap; S x is the transferable power of the xth load.

[0189] Preferably, the step of tracking the impact of energy storage on the microgrid power according to the Class II energy storage load fluctuation and the first corrected tie line power demand to determine the second corrected tie line power demand comprises:

[0190]

[0191] P 2 (t) = f(t) - f 0 (t)+Δf(t),

[0192]

[0193]

[0194]

[0195]

[0196] Among them, w 2 (t) is the second corrected tie line power demand; P 2 (t) is the power characteristic of Class II energy storage after superimposing the power offset constant; P 2 (t) is greater than 0 for charging state, P 2 (t) is less than 0, which is the discharge state; f 0 (t) is the target function of the power output curve after averaging and smoothing the three historical output data; Δf(t) is the power offset constant; β is the calculation factor of Class II energy storage; at this time, the maximum external power value is The minimum external power value is

[0197] Preferably, the determining of the final tie line power requirement according to the Class III energy storage tie line power correction and the second corrected tie line power requirement comprises:

[0198]

[0199] Among them, w 3 (t) is the final tie line power requirement; and They are the charging and discharging power characteristics corresponding to the energy storage on the source and load sides respectively.

[0200] Preferably, the method further comprises:

[0201] After adding Class III energy storage, the maximum charging and discharging power P of the energy storage is limited. 3max , the maximum external power can be adjusted to Adjust the minimum external power to At the same time, due to the energy storage capacity Q 3max Limited, check and calculate the threshold of energy storage system action; among them,

[0202]

[0203]

[0204] Among them, γ is the type III energy storage calculation factor;

[0205] Select w 2 (t) Maximum value or maximum value The corresponding time t 0 , the computing power is greater than The corresponding time point t 1 , t 2 According to t 1 , t 2 Calculate the amount of electricity Z that needs to be compensated during the time period t ,include:

[0206]

[0207]

[0208] Where, T is the sampling point period;

[0209] If the amount of electricity to be compensated is Z t <Q 3max , then the energy storage capacity can meet the power compensation requirements, and the discharge power characteristics are:

[0210]

[0211] If the amount of electricity to be compensated is Z t >Q 3max , then the energy storage capacity cannot meet the discharge compensation requirements, and the maximum compensable power P needs to be recalculated. 3 ,include:

[0212]

[0213]

[0214] The corresponding maximum compensation power P can be obtained by solving 3 and the corresponding time point t′ 1 , t′ 2 ; The corresponding energy storage discharge power characteristics are:

[0215]

[0216] Similarly, when calculating the minimum value of the external power, when Z t <Q 3max In this case, the corresponding charging power for:

[0217]

[0218] When Z t >Q 3max In this case, the corresponding charging power for:

[0219]

[0220]

[0221]

[0222] Calculate the charging and discharging power characteristics corresponding to Class II energy storage and

[0223] In the present invention, the impact of Class I energy storage, Class II energy storage and Class III energy storage on the microgrid tie line power is analyzed in sequence to determine the final tie line power demand.

[0224] First, the impact of Class I energy storage is analyzed and the power demand of the microgrid regional interconnection line is calculated. In order to simplify the calculation, the shiftable load is equivalent to Class I energy storage, the charging and discharging efficiency η = 1, and there is no capacity reservation limit.

[0225] 1) Impact of energy storage on microgrid power in Class I energy storage

[0226] The main function of Class I energy storage in a microgrid is to make full use of the output of the micropower source in the microgrid. When the output of the micropower source is large, the energy storage is charged, and when the output of the microgrid is small, the energy storage is discharged. At the same time, taking into account the service life of the energy storage battery, Class I energy storage is simplified to constant power charging or discharging:

[0227]

[0228]

[0229]

[0230]

[0231] Where P 1max is the maximum charging and discharging power of energy storage, are the power of energy storage charging and discharging, [t d , t e ] is the set charging time. When the energy storage capacity exceeds 90% of the total capacity, charging stops; [t f , t g ] is the set charging time. When the energy storage capacity is less than 10% of the total capacity, the discharge stops. [t d , t e ] and [t f , t g ] The time at both ends does not overlap; P zmax is the maximum power of the zth energy storage; α is the calculation factor of Class I energy storage; the maximum power of the zth energy storage is P zmax .

[0232] 2) Impact of shiftable loads in Class I energy storage on microgrid power

[0233] By adjusting the power of the shiftable load in the microgrid, peak shaving and valley filling can also be effectively achieved; the shiftable load is equivalent to Class I energy storage:

[0234]

[0235]

[0236]

[0237] In the formula, The power consumed by the movable load after translation, which is equivalent to the power of energy storage charging; It is the power reduction during the shifting period of the shiftable load, which is equivalent to the power of energy storage discharge. smax is the maximum translation power of the translational load; [t r , t s ] is the set translation load recovery time; [t p , t q ] is the set translation time of the translatable load; [t d , t e ] and [t f , t g ]The time at both ends does not overlap.

[0238] In summary, the first modified tie line power demand can be obtained as:

[0239]

[0240] Then, consider the impact of Class II and Class III energy storage on power demand.

[0241] (1) Analyze the impact of Class II energy storage on power demand, including:

[0242] In order to simplify the calculation of power balance, the existing historical data of power supply or load output is mainly used, and the moving average method is used to adjust the output. The three historical output data can be averaged as the data after power processing, and the objective function of the smoothed power output curve is:

[0243]

[0244] Therefore, the energy storage charging and discharging power characteristics are:

[0245] P 2 (t) = f(t) - f 0 (t)

[0246] Where: P 2 (t) is greater than 0 for charging state, P 2(t) is less than 0, which is the discharge state. 2 (t) In order to ensure the utilization rate of energy storage equipment and prevent the phenomenon that the energy storage cannot continue to work due to capacity limitation caused by long-term charging (or discharging) state, a power offset constant Δf(t) is set, which takes effect when the energy storage capacity rises to 90% or drops to 10%. The specific parameters are:

[0247]

[0248]

[0249] Where: β is the type II energy storage calculation factor.

[0250] After adding the power offset constant, the power characteristics of Class II energy storage are:

[0251] P 2 (t) = f(t) - f 0 (t)+Δf(t).

[0252] (2) Calculation method for Class III side energy storage power characteristics.

[0253] The load-side energy storage adjusts the external power by controlling its output. After correction by the output power of Class I energy storage and Class II energy storage, the external power of the microgrid is:

[0254]

[0255] Among them: The maximum external power value is The minimum external power value is

[0256] After adding Class III energy storage, the ideal effect is to adjust the fluctuating load curve into a nearly stable load curve, so that the power demand exchanged between the microgrid and the external grid is controlled at a low level. 3max , its maximum external power can only be adjusted to The minimum external power can only be adjusted to In addition, due to the energy storage capacity Q 3max The threshold of the energy storage system action needs to be verified and calculated. 3max The parameters are as follows:

[0257]

[0258]

[0259] Where γ is the Class III energy storage calculation factor.

[0260] Select w 2 (t) Maximum value or maximum value The corresponding time t 0 , the computing power is greater than The corresponding time point t 1 , t 2 According to t 1 , t 2 Calculate the amount of electricity Z that needs to be compensated during the time period t .

[0261]

[0262]

[0263] Where: T is the sampling point period. If the amount of electricity to be compensated Z t <Q 3max , then the energy storage capacity can meet the power compensation requirements, and the discharge power characteristics are:

[0264]

[0265] If the amount of electricity to be compensated is Z t >Q 3max , then the energy storage capacity cannot meet the discharge compensation requirements, and the maximum compensable power P needs to be recalculated. 3 , the calculation method is as follows:

[0266]

[0267]

[0268] The corresponding maximum compensation power P can be obtained by solving 3 and the corresponding time point t′ 1 , t′ 2 ; The corresponding energy storage discharge power characteristics are:

[0269]

[0270] Similarly, the minimum value of the external power can be calculated when Z t <Q 3max In this case, the corresponding charging power

[0271]

[0272]

[0273]

[0274] When Z t >Q 3max In this case, the corresponding charging power

[0275]

[0276]

[0277]

[0278] The charging and discharging power characteristics corresponding to Class III energy storage can be calculated respectively

[0279] Step 106: Determine the maximum power demand and minimum external power required to meet the power system balance under the typical operation mode of energy storage according to the final interconnection line power demand.

[0280] Preferably, the step of determining the maximum power demand and the minimum external power required to meet the power system balance under the typical operation mode of energy storage according to the final tie line power demand includes:

[0281] W max =max{w 3 (t)},

[0282]

[0283] Among them, w 3 (t) is the final tie line power requirement; W max is the maximum power requirement; W min is the minimum power.

[0284] In the present invention, in a regional power system containing energy storage, the charging and discharging power characteristics of the energy storage system can be obtained by merging, decomposing and measuring the microgrid system. After combining the power generation output characteristics and the load output characteristics, the system exchange power characteristics of the microgrid can be solved. Through the power characteristics of the microgrid, the balance of the power system under the typical operation mode of the energy storage can be calculated, and the maximum power demand W can be calculated. max And the minimum external power W min ,include:

[0285] W max =max{w 3 (t)},

[0286]

[0287] Among them, w 3 (t) is the final tie line power requirement; W max is the maximum power requirement; W min is the minimum power.

[0288] In order to solve the problem of large planned capacity of grid-side equipment caused by microgrids, the method of the present invention is based on the functional positioning and operating characteristics of flexible resources such as energy storage and adjustable loads in microgrids. By decoupling and analyzing the impact of three types of energy storage on grid output, such as peak shaving and valley filling, power supply or load fluctuation smoothing, and interconnection line power correction, the method can achieve rapid calculation of the upper and lower limits of the interconnection line power of the microgrid. This is to facilitate the subsequent calculation of the power balance of the system. The present invention can quickly evaluate the impact of the microgrid on the power balance of the system, effectively reduce the planning and design capacity of grid-side equipment, reduce grid investment, and improve equipment utilization efficiency.

[0289] Figure 2 FIG. 2 is a schematic diagram of a microgrid power balance power determination system 200 considering an energy storage operation mode according to an embodiment of the present invention. Figure 2 As shown, a microgrid power balance power determination system 200 considering the energy storage operation mode provided in an embodiment of the present invention includes: a source-load model determination unit 201, an initial interconnection line power demand determination unit 202, an energy storage modeling unit 203, an energy storage classification unit 204, a final interconnection demand power determination unit 205 and a power determination unit 206.

[0290] Preferably, the source-load model determination unit 201 is used to determine the load power demand model, the power output model and the load shiftable power model according to the number of micro power sources and loads in the microgrid area, typical daily operation data and the load shiftable power value.

[0291] Preferably, the source-load model determination unit 201 determines the load power demand model, the micro power output model and the load shiftable power model according to the number of micro power sources and loads in the microgrid area, typical daily operation data and load shiftable power value, including:

[0292] Obtain the number of loads in the microgrid and typical daily operation data, and build a load power demand model, including:

[0293] l x =L x (t), x=1,2,3,...,a,

[0294] Among them, l x is the power demand of the xth load, L x (t) is the power of the xth load at time t; a is the number of loads;

[0295] Obtain the number of loads in the microgrid and the characteristics of the transferable power, and build a load transferable power model, including:

[0296] s x =S x(t), x=1,2,3,...,a,

[0297] Among them, s x is the transferable power of the xth load, S x (t) is the transferable power of the x-th load at time t; a is the number of loads;

[0298] Obtain the number of micro power sources in the microgrid and typical daily operation data, and build a power output model, including:

[0299] f y =F y (t), y=1,2,3,...,b,

[0300] Among them, f y is the power of the yth micro power source; F y (t) is the power of the yth micro power source at time t; b is the number of micro power sources in the microgrid.

[0301] Preferably, the initial tie line power demand determining unit 202 is used to determine the initial tie line power demand of the microgrid area without energy storage according to the power model and the load model.

[0302] Preferably, the initial tie line power requirement includes:

[0303]

[0304] Among them, the w 0 (t) is the initial tie line power demand.

[0305] Preferably, the energy storage modeling unit 203 is used to determine the energy storage charging and discharging model and operation constraints according to the quantity and capacity information of the energy storage in the microgrid.

[0306] Preferably, the modeling unit 203 determines the energy storage charging and discharging model and operation constraints according to the energy storage quantity and capacity information in the microgrid, including:

[0307] Determine the parameter model of the energy storage system, for any energy storage power at time t, including:

[0308] q z =Q z (t), z=1,2,...,c,

[0309] Determine the charging and discharging model of the energy storage system. The charging and discharging amount of the energy storage at time t satisfies:

[0310]

[0311] The energy storage system cannot be charged or discharged at the same time. For any i-th sampling period, and satisfy:

[0312]

[0313] The real-time power of the energy storage system is subject to the upper limit of the charging and discharging power, which satisfies:

[0314]

[0315]

[0316] The amount of electricity stored in the energy storage system is limited by the capacity of the energy storage system and should meet the following requirements:

[0317] 0≤Q i ≤Q max ,

[0318] Among them, q z is the charging and discharging power of the zth energy storage; Q z (t) is the charging and discharging power of the zth energy storage at time t; c is the number of energy storages in the microgrid; Q 0 The electric energy stored in the energy storage system at the initial moment; Q t is the electric energy stored in the energy storage system at time t; T is the sampling period; The electric power consumed during the charging process of the energy storage system in the zth sampling period; is the electric power consumed by the energy storage system during the discharge process of the i-th sampling period; η is the energy conversion efficiency coefficient of the energy storage system; They are the real-time upper and lower limits of the charging and discharging power of the energy storage system; Q max is the capacity of the energy storage system.

[0319] Preferably, the energy storage classification unit 204 is used to determine the functional positioning and operation target of each energy storage and classify the energy storage according to the typical daily operation data of each energy storage and the load shiftable power value.

[0320] Preferably, the energy storage classification unit 204 classifies energy storage, including:

[0321] If the energy storage in the microgrid is charged and discharged regularly on a typical day, it is defined as Class I energy storage. At the same time, if the shiftable load shifts regularly on a typical day, it is also defined as Class I energy storage. Class I energy storage is mainly used for regular peak shaving and valley filling.

[0322] If the energy storage in the microgrid follows the power changes of the load or power source and is used to smooth the power fluctuations of the load or power source, it is defined as Class II energy storage;

[0323] If the energy storage in the microgrid is used to control the power of the microgrid interconnection line, ensure the power balance of the microgrid, and control the external exchange power, it is defined as Class III energy storage.

[0324] Preferably, the final interconnection demand power determination unit 205 is used to analyze the impact of different types of energy storage on the microgrid based on the energy storage charging and discharging model, operation constraints and load shiftable power model in combination with the energy storage analysis method, and determine the final interconnection line power demand based on the initial interconnection line power demand.

[0325] Preferably, the final tie line power demand determination unit 205 analyzes the impact of different types of energy storage on the microgrid according to the energy storage charging and discharging model, operation constraints and load shiftable power model in combination with the energy storage analysis method, and determines the final tie line power demand based on the initial tie line power demand, including:

[0326] Analyze the impact of the peak-shaving and load-shifting functions of Class I energy storage on the power of the microgrid, and determine the first modified positive tie line power demand;

[0327] Determine the second modified tie line power demand based on the impact of the Class II storage energy and load fluctuation tracking energy storage on the microgrid power and the first modified tie line power demand;

[0328] The final interconnection line power requirement is determined according to the Class III energy storage interconnection line power correction and the second corrected interconnection line power requirement.

[0329] Preferably, the final interconnection demand power determination unit 205 analyzes the impact of the peak shaving and valley filling function of the Class I energy storage and the load shifting function on the microgrid power, and determines the first modified positive interconnection line power demand, and determines the first modified positive interconnection line power demand, including:

[0330]

[0331]

[0332]

[0333]

[0334]

[0335]

[0336]

[0337]

[0338] Among them, w 1(t) is the first corrected tie line power demand; are the power of energy storage charging and discharging, P 1max is the maximum charge and discharge power of energy storage, [t d , t e ] is the set charging time. When the energy storage capacity exceeds 90% of the total capacity, charging stops; [t f , t g ] is the set charging time. When the energy storage capacity is less than 10% of the total capacity, the discharge stops. [t d , t e ] and [t f , t g ] The time at both ends does not overlap; P zmax is the maximum power of the zth energy storage; α is the calculation factor of type I energy storage; The power consumed by the movable load after translation, which is equivalent to the power of energy storage charging; is the power reduction during the shifting period of the shiftable load, which is equivalent to the power of energy storage discharge; P smax is the maximum translation power of the load that can be translated, [t r , t s ] is the set translation load recovery time; [t p , t q ] is the set translation time of the translatable load; [t d , t e ] and [t f , t g ] The time at both ends does not overlap; S x is the transferable power of the xth load.

[0339] Preferably, the final interconnection demand power determination unit 205 determines the second modified interconnection line power demand according to the influence of the Class II energy storage load fluctuation tracking energy storage on the microgrid power and the first modified interconnection line power demand, including:

[0340]

[0341] P 2 (t)=f(t)-f 0 (t)+Δf(t),

[0342]

[0343]

[0344]

[0345]

[0346] Among them, w2 (t) is the second modified tie line power demand; P 2 (t) is the power characteristic of Class II energy storage after superimposing the power offset constant; P 2 (t) is greater than 0 for charging state, P 2 (t) is less than 0, which is the discharge state; f 0 (t) is the target function of the power output curve after averaging and smoothing the three historical output data; Δf(t) is the power offset constant; β is the calculation factor of Class II energy storage; at this time, the maximum external power value is The minimum external power value is

[0347] Preferably, the final interconnection demand power determination unit 205 determines the final interconnection line power demand according to the Class III energy storage interconnection line power correction and the second corrected interconnection line power demand, including:

[0348]

[0349] Among them, w 3 (t) is the final tie line power requirement; and They are the charging and discharging power characteristics corresponding to the energy storage on the source and load sides respectively.

[0350] Preferably, the final contact required power determination unit 205 further includes:

[0351] After adding Class III energy storage, the maximum charging and discharging power P of the energy storage is limited. 3max , the maximum external power can be adjusted to Adjust the minimum external power to At the same time, due to the energy storage capacity Q 3max Limited, check and calculate the threshold of energy storage system action; among them,

[0352]

[0353]

[0354] Among them, γ is the type III energy storage calculation factor;

[0355] Select w 2 (t) Maximum value or maximum value The corresponding time t 0 , the computing power is greater than The corresponding time point t 1 , t 2 According to t 1 , t 2 Calculate the amount of electricity Z that needs to be compensated during the time periodt ,include:

[0356]

[0357]

[0358] Where, T is the sampling point period;

[0359] If the amount of electricity to be compensated is Z t <Q 3max , then the energy storage capacity can meet the power compensation requirements, and the discharge power characteristics are:

[0360]

[0361] If the amount of electricity to be compensated is Z t >Q 3max , then the energy storage capacity cannot meet the discharge compensation requirements, and the maximum compensable power P needs to be recalculated. 3 ,include:

[0362]

[0363] The corresponding maximum compensation power P can be obtained by solving 3 and the corresponding time point t′ 1 , t′ 2 ; The corresponding energy storage discharge power characteristics are:

[0364]

[0365] Similarly, when calculating the minimum value of the external power, when Z t <Q 3max In this case, the corresponding charging power for:

[0366]

[0367] When Z t >Q 3max In this case, the corresponding charging power for:

[0368]

[0369]

[0370]

[0371] Calculate the charging and discharging power characteristics corresponding to Class II energy storage and

[0372] Preferably, the power determination unit 206 is used to determine the maximum power demand and the minimum external power required to meet the balance of the power system under the typical operation mode of energy storage according to the final interconnection line power demand.

[0373] Preferably, the power determination unit 206 determines the maximum power demand and the minimum external power required to meet the power system balance under the typical operation mode of energy storage according to the final tie line power demand, including:

[0374] W max =max{w 3 (t)},

[0375]

[0376] Among them, w 3 (t) is the final tie line power requirement; W max is the maximum power requirement; W min is the minimum power.

[0377] The microgrid power balancing power determination system 200 considering the energy storage operation mode according to an embodiment of the present invention corresponds to the microgrid power balancing power determination method 100 considering the energy storage operation mode according to another embodiment of the present invention, and will not be repeated here.

[0378] The invention has been described above with reference to a few embodiments. However, it is readily apparent to a person skilled in the art that other embodiments than the ones disclosed above are equally within the scope of the invention, as defined by the appended patent claims.

[0379] Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a / said / the [means, components, etc.]" are to be openly interpreted as at least one instance of the means, components, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not necessarily have to be performed in the exact order disclosed, unless explicitly stated otherwise.

[0380] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0381] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0382] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be loaded onto a computer or other programmable data processing device, so that a series of operation steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0383] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for determining the power balance of a microgrid considering an energy storage operation mode, characterized in that: The method comprises: Determine the load power demand model, power output model and load shiftable power model based on the number of micro power sources and loads in the microgrid area, typical daily operation data and load shiftable power value; Determine the initial tie line power demand of the microgrid area without energy storage according to the power output model and the load power demand model; Determine the energy storage charging and discharging model and operation constraints according to the energy storage quantity and capacity information in the microgrid; According to the typical daily operation data of each energy storage and the load transferable power value, determine the functional positioning and operation target of each energy storage, and classify the energy storage; According to the energy storage charging and discharging model, operation constraints and load shiftable power model, combined with the energy storage analysis method, the impact of different types of energy storage on the microgrid is analyzed, and based on the initial tie line power demand, the final tie line power demand is determined; According to the final tie line power demand, determine the maximum power demand and minimum external power required to meet the power system balance under the typical operation mode of energy storage; The method of determining the load power demand model, the micro power output model and the load shiftable power model according to the number of micro power sources and loads in the microgrid area, typical daily operation data and load shiftable power value includes: Obtain the number of loads in the microgrid and typical daily operation data, and build a load power demand model, including: l x =L x (t),x=1,2,3,...,a, Among them, l x is the power demand of the xth load, L x (t) is the power of the xth load at time t; a is the number of loads; Obtain the number of loads in the microgrid and the characteristics of the transferable power, and build a load transferable power model, including: s x =S x (t),x=1,2,3,...,a, Among them, s x is the transferable power of the xth load, S x (t) is the transferable power of the x-th load at time t; a is the number of loads; Obtain the number of micro-power sources in the microgrid and typical daily operation data, and build a power output model, including: f y =F y (t),y=1,2,3,...,b, Among them, f y is the power of the yth micro power source; F y (t) is the power of the yth micro power source at time t; b is the number of micro power sources in the microgrid; The initial interconnection line power demand of the microgrid area without energy storage includes: Among them, the w 0 (t) is the initial tie line power requirement; Wherein, determining the energy storage charging and discharging model and operation constraints according to the energy storage quantity and capacity information in the microgrid includes: Construct the parameter model of the energy storage system, for any energy storage power at time t, including: q z =Q z (t),z=1,2,...,c, Construct a charging and discharging model for the energy storage system. The charging and discharging amount of the energy storage at time t satisfies: The energy storage system cannot be charged or discharged at the same time. For any i-th sampling period, P t - and P t + satisfy: The real-time power of the energy storage system is subject to the upper limit of the charging and discharging power, which satisfies: The amount of electricity stored in the energy storage system is limited by the capacity of the energy storage system and should meet the following requirements: 0≤Q i ≤Q max , Among them, q z is the charging and discharging power of the zth energy storage; Q z (t) is the charging and discharging power of the zth energy storage at time t; c is the number of energy storages in the microgrid; Q0 is the electric energy stored in the energy storage system at the initial moment; Q t is the electric energy stored in the energy storage system at time t; T is the sampling period; P t + P is the power consumed by the energy storage system during the charging process of the zth sampling period; t - is the electric power consumed by the energy storage system during the discharge process of the i-th sampling period; η is the energy conversion efficiency coefficient of the energy storage system; They are the real-time upper and lower limits of the charging and discharging power of the energy storage system; Q max is the capacity of the energy storage system; The classification of energy storage includes: If the energy storage in the microgrid is charged and discharged regularly on a typical day, it is defined as Class I energy storage. At the same time, if the shiftable load shifts regularly on a typical day, it is also defined as Class I energy storage. Class I energy storage is mainly used for regular peak shaving and valley filling. If the energy storage in the microgrid follows the power changes of the load or power source and is used to smooth the power fluctuations of the load or power source, it is defined as Class II energy storage; If the energy storage in the microgrid is used to control the power of the microgrid interconnection line, ensure the power balance of the microgrid, and control the external exchange power, it is defined as Class III energy storage; Wherein, according to the energy storage charging and discharging model, operation constraints and load transferable power model, Combined with the energy storage analysis method, the impact of different types of energy storage on the microgrid is analyzed, and based on the initial tie line power demand, the final tie line power demand is determined, including: Analyze the impact of the peak-shaving and load-shifting functions of Class I energy storage on the power of the microgrid, and determine the first modified positive tie line power demand; Determine the second modified tie line power demand based on the impact of the Class II storage energy and load fluctuation tracking energy storage on the microgrid power and the first modified tie line power demand; Determining the final tie line power requirement according to the Class III energy storage tie line power correction and the second corrected tie line power requirement; The analysis of the impact of the peak-shaving and valley-filling function of the Class I energy storage and the load shifting function on the power of the microgrid, and determining the first modified positive interconnection line power demand, comprises: Among them, w 1 (t) is the first corrected tie line power demand; are the power of energy storage charging and discharging, P 1max is the maximum charge and discharge power of energy storage, [t d , t e ] is the set charging time. When the energy storage capacity exceeds 90% of the total capacity, charging stops; [t f , t g ] is the set charging time. When the energy storage capacity is less than 10% of the total capacity, the discharge stops. [t d , t e ] and [t f , t g ] The time at both ends does not overlap; P zmax is the maximum power of the zth energy storage; α is the calculation factor of type I energy storage; The power consumed by the movable load after translation, which is equivalent to the power of energy storage charging; is the power reduction during the shifting period of the shiftable load, which is equivalent to the power of energy storage discharge; P smax is the maximum translation power of the load that can be translated, [t r , t s ] is the set translation load recovery time; [t p , t q ] is the set translation time of the translatable load; [t d , t e ] and [t f , t g ] The time at both ends does not overlap; S x is the transferable power of the xth load; The method of tracking the influence of energy storage on the microgrid power according to the Class II energy storage load fluctuation and the first corrected tie line power demand to determine the second corrected tie line power demand includes: P2(t)=f(t)-f0(t)+Δf(t), Among them, w 2 (t) is the second corrected tie line power demand; P2(t) is the power characteristic of Class II energy storage after superimposing the power offset constant; P2(t) is greater than 0 for charging state, and P2(t) is less than 0 for discharging state; f0(t) is the target function of the power output curve after averaging and smoothing the three historical output data; Δf(t) is the power offset constant; β is the Class II energy storage calculation factor; at this time, the maximum external power value is The minimum external power value is The method of determining the final interconnection line power requirement according to the Class III energy storage interconnection line power correction and the second corrected interconnection line power requirement includes: Among them, w 3 (t) is the final tie line power requirement; P3 + (t) and P3 - (t) are the charging and discharging power characteristics corresponding to the energy storage on the source and load sides; Wherein, the method further comprises: After adding Class III energy storage, the maximum charging and discharging power P of the energy storage is limited. 3max , the maximum external power can be adjusted to Adjust the minimum external power to At the same time, due to the energy storage capacity Q 3max Limited, check and calculate the threshold of energy storage system action; among them, Among them, γ is the type III energy storage calculation factor; Select w 2 (t) Maximum value or maximum value At the corresponding time t0, the calculated power is greater than Corresponding time points t1, t2; calculate the amount of electricity Z that needs to be compensated based on the time periods t1 and t2 t ,include: Where, T is the sampling point period; If the amount of electricity to be compensated is Z t <Q 3max , then the energy storage capacity can meet the power compensation requirements, and the discharge power characteristics are: If the amount of electricity to be compensated is Z t >Q 3max , the energy storage capacity cannot meet the discharge compensation requirements, and the maximum compensable power P3 needs to be recalculated, including: The corresponding maximum compensation power P3 and the corresponding time points t'1 and t'2 can be obtained by solving the problem; the corresponding energy storage discharge power characteristics are: Similarly, when calculating the minimum value of the external power, when Z t <Q 3max In this case, the corresponding charging power is P3 + (t) is: When Z t >Q 3max In this case, the corresponding charging power is P3 + (t) is: Calculate the charging and discharging power characteristics P3 corresponding to Class III energy storage + (t) and P3 - (t); Wherein, determining the maximum power demand and the minimum external power when the power system is balanced under the typical operation mode of energy storage according to the final tie line power demand includes: W max =max{w 3 (t)}, Among them, w 3 (t) is the final tie line power requirement; W max is the maximum power requirement; W min is the minimum power.

2. A system for implementing the method for determining the microgrid power balance power considering the energy storage operation mode as described in claim 1, characterized in that: The system comprises: The source-load model determination unit is used to determine the load power demand model, the power output model and the load shiftable power model according to the number of micro power sources and loads in the microgrid area, typical daily operation data and load shiftable power value; An initial tie line power demand determination unit, used to determine the initial tie line power demand of the microgrid area without energy storage conditions according to the power output model and the load power demand model; An energy storage modeling unit, used to determine an energy storage charging and discharging model and operation constraints according to the amount and capacity information of energy storage in the microgrid; The energy storage classification unit is used to determine the functional positioning and operation target of each energy storage and classify the energy storage according to the typical daily operation data of each energy storage and the load shiftable power value; The final interconnection demand power determination unit is used to analyze the impact of different types of energy storage on the microgrid according to the energy storage charging and discharging model, operation constraints and load shiftable power model in combination with the energy storage analysis method, and determine the final interconnection line power demand based on the initial interconnection line power demand; The microgrid power demand determination unit is used to determine the maximum power demand and the minimum external power when the power system is balanced under the typical operation mode of energy storage according to the final interconnection line power demand.

Citation Information

Patent Citations

  • Micro-grid modular energy storage device optimal configuration and control method

    CN107508303A

  • Multi-microgrid interconnected operation coordinated scheduling optimization method in consideration of interaction response

    CN107958300A