A walking type pushing device and method for active adjustment of steel trusses

By using a combination of controller, track beam and three-way walking jack in the pushing device, adaptive pushing of large-span double-layer steel truss beams is realized, which solves the complexity and efficiency of pushing direction adjustment in the existing technology. Low problems, reducing construction costs and safety risks.

CN114892540BActive Publication Date: 2024-10-22CCCC SECOND HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210665210.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-13
Publication Date
2024-10-22
Estimated Expiration
2042-06-13

AI Technical Summary

Technical Problem

When the existing push device is used in the construction of long-span double-layer steel truss beams, especially when constructing bridges with many vertical curve designs, the push direction adjustment is complicated, the efficiency is low, and the control system is complex and expensive, which increases the construction cost. and security risks.

Method used

A walking pushing device including a controller, track beam, slideway and three-way walking jack is used to realize the active adjustment of the steel truss beam through wireless connection. The low friction characteristics of the integrated slider and slideway are used to realize the steel truss adjustment. The adaptive jacking of the trusses reduces the stress on the nodes, and the vertical and horizontal forces are accurately adjusted through the modular jack control unit.

Benefits of technology

The device has a clear force structure and can adaptively adjust the elevation, reduce the horizontal force on the top of the pier, reduce construction costs, improve construction efficiency, and reduce safety risks. It is suitable for jacking construction of vertical curved steel truss beams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114892540B_ABST
    Figure CN114892540B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of bridge construction, and particularly relates to a walking-type jacking device and method for active adjustment of steel trusses. A walking-type jacking device for active adjustment of steel trusses comprises a controller and a track beam. A slideway is provided on the top of the track beam. Three-way walking-type jacks are provided at both ends of the track beam. An integrated slider is also provided on the slideway between the two three-way walking-type jacks. The three-way walking-type jacks and the integrated slider are respectively connected to the controller by wireless. The top of the three-way walking-type jack and the integrated slider are used to place the steel trusses to be pushed. The three-way walking-type jack is controlled by the controller to push forward, so that the steel trusses move forward along the slideway on the integrated slider. The present invention can meet the requirements of reducing the force on the nodes while pushing them by providing an integrated slider on the slideway between the two three-way walking-type jacks. The elevation can be adaptively adjusted during the pushing process, which is conducive to reducing construction safety risks and accelerating construction progress.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a walking type jacking device and method for active adjustment of a steel truss. Background Art

[0002] Since the successful application of the Ager Bridge in 1959, the jacking construction technology has been widely used in various bridge types due to its outstanding advantages such as safety, high quality, speed, economy, no need for support, no interference and less space. After the efforts of countless bridge builders to improve and perfect it, it has become an important and classic construction technology in the history of world bridges. At present, there are two main types of equipment used in jacking construction, one is the steel strand dragging type, and the other is the jacking and pushing type using hydraulic cylinders.

[0003] With the rapid development of China's economy, domestic bridge and building construction has developed rapidly. In the field of bridge structure construction, there are more and more restrictive factors in bridge construction, and steel bridge jacking schemes are increasingly being adopted. Due to the needs of planning and space utilization, large-span double-deck steel truss bridges are increasingly used. When constructing large-span double-deck steel trusses, jacking construction schemes are mostly used. Due to the heavy self-weight characteristics of large-span steel trusses, the most ideal force condition is node force. However, traditional steel truss jacking is mostly achieved by dragging or walking jack + fixed slider. This method is more suitable for the same longitudinal slope or a large vertical curve radius. For double-deck steel beam bridges with many vertical curves in the span, a large amount of vertical elevation adjustment is required for jacking, and the existing jacking operation method is not applicable.

[0004] In the utility model patent with the authorization publication number CN201574358U and the name of "walking translation jacking device", a jacking support oil cylinder is set on the base, and a jacking device for longitudinal movement of the translation jacking support platform and a jacking device for lateral movement of the translation jacking support platform are set on the base or the translation jacking support platform to realize the jacking of the box girder and the movement along the bridge direction. At the same time, the adjustment of the transverse bridge direction can also be realized to adapt to the line type and slope requirements of different bridge types and directions. However, there are still the following shortcomings: the control system of the jacking device is complicated, and the jacking operation must be interrupted when adjusting the jacking direction. The jacking process is intermittent and the efficiency is low. The jacking device disclosed in the Chinese utility model patent with the authorization announcement number CN201574358U and the authorization announcement date September 8, 2010, named "Walking Translational Pushing Device", is a set of walking multi-point continuous pushing equipment integrating lifting, translation and lateral adjustment developed on the basis of the wedge-type pushing construction technology of the Millau Bridge in France, to achieve the movement or adjustment of the box girder in the longitudinal, vertical and transverse directions of the bridge. The equipment includes a lifting cylinder, a lower support frame, a sliding system, an upper support frame, a horizontal pushing cylinder and a lateral adjustment cylinder. This walking multi-point pushing device uses the two steps of "lifting" and "pushing" alternately to first lift the box girder and then push it forward; then the lifting cylinder returns oil to place the box girder on the temporary structure of the bridge pier; finally, the pushing cylinder returns oil to continue the next cycle. Through the cycle of the pushing steps, the box girder is finally pushed to the predetermined position. The jacking device has better realized the bridge jacking technology. Since the jacking force and friction force are all internal forces of the jacking equipment, the horizontal force of the temporary pier (or structural pier) can be better controlled; the jacking device has its own vertical jack, which can better adapt to the changes in the vertical line shape of the box beam, and the support reaction force can be adjusted at any time to ensure that the force of each support is uniform; it can meet the local force requirements of the box beam structure and does not need to be strengthened. However, the vertical and longitudinal jacks of the jacking device have high synchronization requirements; the accuracy and performance requirements of the hydraulic and electrical synchronous control system are also high; the hydraulic and electrical synchronous control equipment system of the jacking device is relatively complex, the system is also relatively large, and it is inconvenient to transport, and it is expensive and has a high construction cost. Summary of the invention

[0005] In view of the above problems, the purpose of the present invention is to provide a walking-type jacking device and method for active adjustment of steel trusses. The device has a clear force structure and a reasonable vertical force distribution. It can meet the requirements of reducing node forces while jacking the nodes. During the jacking process, the elevation can be adaptively adjusted, thereby reducing the horizontal force on the pier top and the investment in large temporary structures. It is particularly suitable for the jacking construction of vertical curved steel trusses, which is beneficial to reducing construction safety risks and accelerating construction progress.

[0006] The technical solution of the present invention is: a walking-type pushing device for active adjustment of steel trusses, comprising a controller and a track beam, a slideway is provided on the top of the track beam, three-way walking jacks are respectively provided at both ends of the track beam, and an integrated slider is also provided on the slideway between the two three-way walking jacks, the three-way walking jacks and the integrated slider are respectively connected to the controller wirelessly, the top of the three-way walking jack and the integrated slider are used to place the steel truss to be pushed, and the three-way walking jack is controlled by the controller to push forward, so that the steel truss moves forward along the slideway on the integrated slider.

[0007] The track beam is a box-shaped or I-shaped steel structure.

[0008] The slideway is made of stainless steel plate, the friction coefficient between the slideway and the integrated slider is less than 0.08, and the friction between the three-way walking jack and the lower chord of the steel truss is greater than 0.3.

[0009] The three-way walking jack adopts a modular design, including a vertical jack, a horizontal jack, a correction jack, and a jack control unit. The vertical jack is provided with a vertical jack pressure sensor, a vertical jack overflow valve, and a vertical jack displacement sensor. The jack control unit monitors the hydraulic oil chamber pressure of the vertical jack through the vertical jack pressure sensor, and adjusts the pressure through the vertical jack overflow valve. The jack control unit detects the displacement of the telescopic end of the vertical jack through the vertical jack displacement sensor. The horizontal jack is provided with a horizontal jack pressure sensor, a horizontal jack overflow valve, and a horizontal jack displacement sensor. The jack control unit monitors the horizontal jack through the horizontal jack pressure sensor. The hydraulic oil chamber pressure of the jack is monitored by the pressure sensor, and the pressure is adjusted through the overflow valve of the horizontal jack. The jack control unit detects the displacement of the telescopic end of the horizontal jack through the horizontal jack displacement sensor. The correcting jack is provided with a correcting jack pressure sensor, a correcting jack overflow valve, and a correcting jack displacement sensor. The jack control unit monitors the hydraulic oil chamber pressure of the correcting jack through the correcting jack pressure sensor, and adjusts the pressure through the overflow valve of the correcting jack. The jack control unit detects the displacement of the telescopic end of the correcting jack through the correcting jack displacement sensor. The jack control unit is provided with a WI-Fi module, and the three-way walking jack is wirelessly connected to the controller through the WI-Fi module.

[0010] The integrated slider includes an integrated slider base, a vertical jack, and a cushion block. The vertical jack is installed on the upper part of the integrated slider base, the cushion block is installed on the top of the vertical jack, a rubber pad is provided on the upper surface of the cushion block, and a polytetrafluoroethylene plate is provided on the lower part of the integrated slider base.

[0011] The vertical jack is provided with a vertical jack control unit, a vertical jack pressure sensor, a vertical jack overflow valve, and a vertical jack displacement sensor. The vertical jack control unit monitors the hydraulic oil chamber pressure of the vertical jack through the vertical jack pressure sensor, and adjusts the pressure through the vertical jack overflow valve. The vertical jack control unit detects the displacement of the telescopic end of the vertical jack through the vertical jack displacement sensor. The vertical jack control unit is provided with a vertical jack WI-Fi module, and the vertical jack is wirelessly connected to the controller through the vertical jack WI-Fi module.

[0012] A method for pushing a steel truss for active adjustment, using any one of the above-mentioned walking-type pushing devices for active adjustment of a steel truss, comprises the following steps:

[0013] S1: Construction of temporary piers and pier-side supports. The temporary piers use bored cast-in-place pile foundations, and the pier-side supports use the permanent structure cap pier body as the supporting structure. Track beams are set on the pier-side supports.

[0014] S2: After the track beam is installed, the steel truss is assembled on the assembly bracket. After a certain number of segments are assembled, it is ready to be pushed forward. The three-way walking jack is supported near the node position of the steel truss. Under the control of the controller, the vertical jack of the three-way walking jack is started to lift the steel truss, and the integrated slider is moved and supported to the position directly below the node of the steel truss;

[0015] S3: The vertical jack of the integrated slider is started. At this time, the static friction between the three-way walking jack and the steel truss is greater than the maximum static friction between the integrated slider and the slideway. The horizontal jack of the three-way walking jack is started to push the steel truss forward. The horizontal jack of the three-way walking jack is closed after the push is extended to the maximum position. The vertical jack of the integrated slider is started to push to separate the contact surface between the three-way walking jack and the steel truss. The horizontal jack of the three-way walking jack is retracted to prepare for the next push operation. The above process is repeated to realize the alternate push of the three-way walking jack and the integrated slider. The integrated slider gradually moves from the previous node to the next node.

[0016] S4: After a section is pushed into place, under the control of the controller, the three-way walking jack lifts the steel truss, and the winch moves the integrated slider back to the next node position to prepare for the next push operation. The cycle continues until the steel truss is pushed into place.

[0017] In step S3, the vertical jack of the integrated slider, under the control of the controller, dynamically adjusts the drastic changes in vertical force and displacement caused by the vertical curve of the longitudinal slope of the steel truss beam, so that the force on the support point remains consistent with the design value.

[0018] The technical effects of the present invention are: 1. The present invention arranges an integrated slider on the slideway between two three-way walking jacks, which can meet the requirements of reducing the node force while pushing the node, and can adaptively adjust the elevation during the pushing process, which is beneficial to reducing the construction safety risk and accelerating the construction progress; 2. The present invention selects different materials for the contact surface of the three-way walking jack and the steel truss, the integrated slider and the slideway, to ensure that the friction between the three-way walking jack and the lower chord of the steel truss is greater than the friction between the integrated slider and the slideway, and the longitudinal jack of the three-way walking jack is pushed forward to achieve the forward movement of the steel truss on the integrated slider, which is simple and convenient; 3. The integrated slider of the present invention is provided with a vertical jack, so that the integrated slider can actively adjust the vertical reaction force and vertical displacement value during the pushing process, and provide a precise reaction force and vertical elevation control for the steel truss with a vertical curve during the pushing construction process.

[0019] The following is a further description with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 The present invention is a schematic structural diagram of a walking-type pushing device for active adjustment of a steel truss according to an embodiment of the present invention.

[0021] Figure 2 The present invention is a schematic diagram of an integrated slider structure of a walking-type pushing device for active adjustment of a steel truss according to an embodiment of the present invention.

[0022] Figure 3 This is a schematic diagram of the synchronous movement of an integrated slider of a walking-type pushing device for active adjustment of a steel truss according to an embodiment of the present invention.

[0023] Figure 4 The present invention is a schematic diagram of the return movement of an integrated slider of a walking-type pushing device for active adjustment of a steel truss according to an embodiment of the present invention.

[0024] Figure 5 The present invention is a flow chart of the vertical jack control of a walking-type jacking device for active adjustment of a steel truss according to an embodiment of the present invention.

[0025] Figure 6 The present invention is a control flow chart of a three-way walking jack of a walking jacking device for active adjustment of a steel truss according to an embodiment of the present invention.

[0026] Figure numerals: 1. three-way walking jack; 2. slideway; 3. integrated slider; 4. track beam; 5. steel truss beam; 6. controller; 7. vertical jack; 8. integrated slider base; 9-pad; 10-rubber pad; 11-PTFE plate. DETAILED DESCRIPTION

[0027] Example 1

[0028] like Figure 1 As shown, a walking-type pushing device for active adjustment of steel trusses comprises a controller 6 and a track beam 4. A slideway 2 is provided on the top of the track beam 4. Three-way walking jacks 1 are provided at both ends of the track beam 4 respectively. An integrated slider 3 is also provided on the slideway 2 between the two three-way walking jacks 1. The three-way walking jacks 1 and the integrated slider 3 are respectively connected to the controller 6 by wireless. The tops of the three-way walking jacks 1 and the integrated slider 3 are used for placing the steel trusses 5 to be pushed. The three-way walking jacks 1 are controlled by the controller 6 to push forward, so that the steel trusses 5 move forward along the slideway 2 on the integrated slider 3.

[0029] In actual use, the present invention sets an integrated slider 3 on the slideway 2 between two three-way walking jacks 1, and the top of the three-way walking jack 1 and the integrated slider 3 is used to place the steel truss 5 to be pushed, and the controller 6 controls the three-way walking jack 1 to push forward, so that the steel truss 5 moves forward along the slideway 2 on the integrated slider 3. The present invention sets an integrated slider 3 on the slideway 2 between two three-way walking jacks 1, which can meet the requirements of reducing the node force while pushing the node, and can adaptively adjust the elevation during the pushing process, which is conducive to reducing the construction safety risk and accelerating the construction progress.

[0030] Example 2

[0031] Preferably, on the basis of Example 1, in this embodiment, the track beam 4 is a box-type or I-shaped steel structure.

[0032] In actual use, the track beam 4 of the present invention is a box-shaped or I-shaped steel structure, and the track beam 4 can provide vertical support for the slideway 2, the three-way walking jack 1 and the integrated slider 3.

[0033] Example 3

[0034] Preferably, based on Example 1 or Example 2, in this embodiment, the material of the slide 2 is a stainless steel plate, the friction coefficient between the slide 2 and the integrated slider 3 is less than 0.08, and the friction force between the three-way walking jack 1 and the lower chord of the steel truss 5 is greater than 0.3.

[0035] In actual use, the slideway 2 of the present invention is made of stainless steel plate, which is characterized by a smooth surface and low friction resistance. Under a small horizontal force, the integrated slider can move longitudinally. The friction coefficient between the slideway 2 and the integrated slider 3 is less than 0.08, and the friction between the three-way walking jack 1 and the lower chord of the steel truss 5 is greater than 0.3. Assuming that the maximum reaction force in the single pier pushing stage is F, the front and rear three-way walking jacks 1 each bear 1 / 9F, and the integrated slider 3 bears 7 / 9F. The forward friction provided by the three-way walking jack 1 is not less than 2×1 / 9F×0.3=1 / 15F, and the friction required for the sliding of the integrated slider 3 is not more than 0.062F, which meets the requirements for the steel beam pushing.

[0036] Example 4

[0037] Preferably, on the basis of Example 1 or Example 3, Figure 6 As shown, in this embodiment, the three-way walking jack 1 adopts a modular design, including a vertical jack, a horizontal jack, a correction jack, and a jack control unit. The vertical jack is provided with a vertical jack pressure sensor, a vertical jack overflow valve, and a vertical jack displacement sensor. The jack control unit monitors the hydraulic oil chamber pressure of the vertical jack through the vertical jack pressure sensor, and adjusts the pressure through the vertical jack overflow valve. The jack control unit detects the displacement of the telescopic end of the vertical jack through the vertical jack displacement sensor. The horizontal jack is provided with a horizontal jack pressure sensor, a horizontal jack overflow valve, and a horizontal jack displacement sensor. The jack control unit monitors the hydraulic oil chamber pressure of the vertical jack through the vertical jack pressure sensor, and adjusts the pressure through the vertical jack overflow valve. Measure the hydraulic oil chamber pressure of the horizontal jack, and adjust the pressure through the horizontal jack overflow valve, the jack control unit detects the telescopic end displacement of the horizontal jack through the horizontal jack displacement sensor, the correcting jack is provided with a correcting jack pressure sensor, a correcting jack overflow valve, and a correcting jack displacement sensor, the jack control unit monitors the hydraulic oil chamber pressure of the correcting jack through the correcting jack pressure sensor, and adjusts the pressure through the correcting jack overflow valve, the jack control unit detects the telescopic end displacement of the correcting jack through the correcting jack displacement sensor, the jack control unit is provided with a WI-Fi module, and the three-way walking jack 1 is wirelessly connected to the controller 6 through the WI-Fi module.

[0038] In actual use, the three-way walking jack 1 of the present invention adopts a modular design, including a vertical jack, a horizontal jack, a deviation correction jack, and a jack control unit, which has the following functions: during the jacking process of the steel truss beam 5, the vertical jack provides vertical force, and the horizontal jack provides horizontal force for jacking forward; it provides vertical force as a support point during jacking conversion; and it provides vertical support when the beam is dropped. The jack control unit collects corresponding data through the jack pressure sensor and the jack displacement sensor, and is wirelessly connected to the controller 6 through the WI-Fi module of the jack control unit. The vertical jack, the horizontal jack, and the deviation correction jack are controlled through the instructions issued by the controller 6.

[0039] Example 5

[0040] Preferably, on the basis of Example 1 or Example 4, Figure 2 As shown, in this embodiment, the integrated slider 3 includes an integrated slider base 8, a vertical jack 7, and a cushion block 9. The vertical jack 7 is installed on the upper part of the integrated slider base 8, and the cushion block 9 is installed on the top of the vertical jack 7. A rubber pad 10 is provided on the upper surface of the cushion block 9, and a polytetrafluoroethylene plate 11 is provided on the lower part of the integrated slider base 8.

[0041] During actual use, the vertical jack 7 provided on the integrated slider 3 of the present invention enables the slider to actively adjust the vertical reaction force and vertical displacement value during the jacking process, and provides a precise reaction force and vertical elevation control during the jacking construction process for the steel truss with vertical curves.

[0042] Example 6

[0043] Preferably, on the basis of Example 1 or Example 4, Figure 5 As shown, in this embodiment, the vertical jack 7 is provided with a vertical jack control unit, a vertical jack pressure sensor, a vertical jack overflow valve, and a vertical jack displacement sensor. The vertical jack control unit monitors the hydraulic oil chamber pressure of the vertical jack 7 through the vertical jack pressure sensor, and adjusts the pressure through the vertical jack overflow valve. The vertical jack control unit detects the displacement of the telescopic end of the vertical jack 7 through the vertical jack displacement sensor. The vertical jack control unit is provided with a vertical jack WI-Fi module, and the vertical jack 7 is wirelessly connected to the controller 6 through the vertical jack WI-Fi module.

[0044] In actual use, the present invention controls the vertical jack 7 through the controller 6 and the jack control unit to achieve precise control of the fulcrum reaction force and displacement, thereby ensuring the safety of the steel truss 5 during the jacking construction process.

[0045] Example 7

[0046] A method for pushing a steel truss for active adjustment, using any one of the above-mentioned walking-type pushing devices for active adjustment of a steel truss, comprises the following steps:

[0047] S1: Construction of temporary piers and pier-side supports. The temporary piers use bored cast-in-place pile foundations. The pier-side supports use the permanent structure cap pier body as the supporting structure. Track beams 4 are set on the pier-side supports.

[0048] S2: After the track beam 4 is installed, the steel truss beam 5 is assembled on the assembly bracket. After a certain number of segments are assembled, it is ready to be pushed forward. Figure 3 As shown, the three-way walking jack 1 is supported near the node position of the steel truss 5. Under the control of the controller 6, the vertical jack of the three-way walking jack 1 is started to lift the steel truss 5, and the integrated slider 3 is moved and supported at a position just below the node of the steel truss 5;

[0049] S3: The vertical jack of the integrated slider is started. At this time, the static friction between the three-way walking jack and the steel truss is greater than the maximum static friction between the integrated slider and the slideway. The horizontal jack of the three-way walking jack 1 is started to push the steel truss 5 forward. The horizontal jack of the three-way walking jack 1 is closed after being stretched to the maximum position. The vertical jack 7 of the integrated slider 3 is started to push to separate the contact surface between the three-way walking jack 1 and the steel truss 5. The horizontal jack of the three-way walking jack 1 is retracted to prepare for the next pushing operation. The above process is repeated to realize the alternating pushing of the three-way walking jack 1 and the integrated slider 3. The integrated slider gradually moves from the previous node to the next node.

[0050] S4: After an internode is pushed into place, Figure 4 As shown, under the control of the controller 6, the three-way walking jack 1 lifts the steel truss 5, and uses the winch to move the integrated slider 3 back to the next node position to prepare for the next stroke pushing operation, and the cycle operation is repeated until the steel truss is pushed into place.

[0051] In step S3, the vertical jack 7 of the integrated slider 3, under the control of the controller 6, dynamically adjusts the drastic changes in vertical force and displacement caused by the vertical curve of the longitudinal slope of the steel truss 5, so that the force on the support point remains consistent with the design value.

[0052] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.

Claims

1. A walking type pushing device for active adjustment of steel trusses, characterized in that: The invention comprises a controller (6) and a track beam (4), wherein a slideway (2) is provided on the top of the track beam (4), and three-way walking jacks (1) are respectively provided at both ends of the track beam (4), and an integrated slider (3) is also provided on the slideway (2) between the two three-way walking jacks (1), wherein the three-way walking jacks (1) and the integrated slider (3) are respectively connected to the controller (6) by wireless, and the tops of the three-way walking jacks (1) and the integrated slider (3) are used to place a steel truss beam (5) to be pushed, and the three-way walking jacks (1) are controlled by the controller (6) to push forward, so that the steel truss beam (5) moves forward along the slideway (2) on the integrated slider (3), and the integrated slider (3) comprises an integrated slider base (8), a vertical jack (7), and a cushion block (9), and the vertical jack (7) is installed on the integrated slider base (8). ), the cushion block (9) is installed on the top of the vertical jack (7), the upper surface of the cushion block (9) is provided with a rubber cushion (10), the lower part of the integrated slider base (8) is provided with a polytetrafluoroethylene plate (11), the vertical jack (7) is provided with a vertical jack control unit, a vertical jack pressure sensor, a vertical jack overflow valve, and a vertical jack displacement sensor, the vertical jack control unit monitors the hydraulic oil chamber pressure of the vertical jack (7) through the vertical jack pressure sensor, and adjusts the pressure through the vertical jack overflow valve, the vertical jack control unit detects the displacement of the telescopic end of the vertical jack (7) through the vertical jack displacement sensor, the vertical jack control unit is provided with a vertical jack WI-Fi module, and the vertical jack (7) is wirelessly connected to the controller (6) through the vertical jack WI-Fi module.

2. A walking type pushing device for active adjustment of steel trusses according to claim 1, characterized in that: The track beam (4) is a box-shaped or I-shaped steel structure.

3. A walking type pushing device for active adjustment of steel trusses according to claim 1, characterized in that: The slideway (2) is made of a stainless steel plate, the friction coefficient between the slideway (2) and the integrated slider (3) is less than 0.08, and the friction force between the three-way walking jack (1) and the lower chord of the steel truss (5) is greater than 0.

3.

4. The walking type pushing device for active adjustment of steel trusses according to claim 1, characterized in that: The three-way walking jack (1) adopts a modular design and comprises a vertical jack, a horizontal jack, a deviation correction jack and a jack control unit. The vertical jack is provided with a vertical jack pressure sensor, a vertical jack overflow valve and a vertical jack displacement sensor. The jack control unit monitors the hydraulic oil chamber pressure of the vertical jack through the vertical jack pressure sensor and adjusts the pressure through the vertical jack overflow valve. The jack control unit detects the displacement of the telescopic end of the vertical jack through the vertical jack displacement sensor. The horizontal jack is provided with a horizontal jack pressure sensor, a horizontal jack overflow valve and a horizontal jack displacement sensor. The jack control unit monitors the horizontal jack through the horizontal jack pressure sensor. The hydraulic oil chamber pressure of the horizontal jack is monitored and the pressure is adjusted through the overflow valve of the horizontal jack. The jack control unit detects the displacement of the telescopic end of the horizontal jack through the displacement sensor of the horizontal jack. The deflection correction jack is provided with a deflection correction jack pressure sensor, a deflection correction jack overflow valve and a deflection correction jack displacement sensor. The jack control unit monitors the hydraulic oil chamber pressure of the deflection correction jack through the pressure sensor of the deflection correction jack and adjusts the pressure through the overflow valve of the deflection correction jack. The jack control unit detects the displacement of the telescopic end of the deflection correction jack through the displacement sensor of the deflection correction jack. The jack control unit is provided with a WI-Fi module. The three-way walking jack (1) is wirelessly connected to the controller (6) through the WI-Fi module.

5. A method for pushing a steel truss for active adjustment, using any one of the above-mentioned walking type pushing devices for active adjustment of a steel truss, characterized in that: The steps include: S1: Construction of temporary piers and pier support. The temporary piers are based on bored cast-in-place piles. The pier support uses the permanent structure cap pier as the supporting structure. Track beams (4) are set on the pier support. S2: After the track beam (4) is installed, the steel truss (5) is assembled on the assembly bracket. After a certain number of segments are assembled, it is ready to be pushed forward. The three-way walking jack (1) is supported near the node position of the steel truss (5). Under the control of the controller (6), the vertical jack of the three-way walking jack (1) is started to lift the steel truss (5), and the integrated slider (3) is moved and supported at a position directly below the node of the steel truss (5); S3: the vertical jack (7) of the integrated slider (3) is started. At this time, the static friction between the three-way walking jack (1) and the steel truss (5) is greater than the maximum static friction between the integrated slider (3) and the slideway (2). The horizontal jack of the three-way walking jack (1) is started to push the steel truss (5) forward. The horizontal jack of the three-way walking jack (1) is closed after the pushing is extended to the maximum position. The vertical jack (7) of the integrated slider (3) is started to push to separate the contact surface between the three-way walking jack (1) and the steel truss (5). The horizontal jack of the three-way walking jack (1) is retracted to prepare for the next pushing operation. The above process is repeated to realize the alternating pushing of the three-way walking jack (1) and the integrated slider (3). The integrated slider (3) gradually moves from the previous node to the next node. S4: After a section is pushed into place, under the control of the controller (6), the three-way walking jack (1) lifts up the steel truss (5), and the integrated slider (3) is moved back to the next node position by means of a winch to prepare for the next push operation, and the operation is repeated until the steel truss is pushed into place.

6. A jacking method for active adjustment of a steel truss according to claim 5, characterized in that: In step S3, the vertical jack (7) of the integrated slider (3), under the control of the controller (6), dynamically adjusts the drastic changes in vertical force and displacement caused by the vertical curve of the longitudinal slope of the steel truss (5), so that the force on the support point remains consistent with the design value.