Modular construction method for large diameter vertebral equipment

By dividing large-diameter vertebral equipment into independent modules and hoisting on the ground, using the flip method and flip lifting technology, the problems of high-altitude operations and long construction periods during construction are solved, and an efficient and safe construction process is achieved, reducing the Cost and improve quality.

CN114922489BActive Publication Date: 2024-11-26CHINA CHEM ENG SECOND CONSTR
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202210519502.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-13
Publication Date
2024-11-26
Estimated Expiration
2042-05-13

AI Technical Summary

Technical Problem

During the construction process, large-diameter vertebral equipment has problems such as many high-altitude operations, high welding difficulties and long construction periods, resulting in high construction costs and poor quality.

Method used

Using modular construction method, the conical cylinder is divided into multiple independent modules. Each module is hoisted after being paired on the ground. The loading rod and lifting steel frame are used for flip-up and flip-up to reduce high-altitude operations and through Multi-lifting point technology realizes modular installation.

Benefits of technology

It effectively reduces high-altitude operations, reduces project costs, improves construction quality and efficiency, shortens construction period, and realizes the simple, safe and economical production and installation of large-scale vertebral equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114922489B_ABST
    Figure CN114922489B_ABST
Patent Text Reader

Abstract

The present invention relates to a modular construction method for a large-diameter vertebral body equipment, wherein the vertebral body equipment comprises at least two conical cylinders, each conical cylinder is used as an independent module, and each conical cylinder is assembled separately and then hoisted; the conical cylinder is divided into a plurality of strips along the height direction, and each strip includes a plurality of wall panels as an assembly welding unit; positioning blocks are set on an assembly platform according to the diameter of each strip of the conical cylinder, and a plurality of holding rods are evenly distributed along the circumference of the assembly platform as an assembly jig, and the wall panels are hoisted and welded by using the assembly jig; the holding rod is moved according to the diameter of each strip, and each strip is hoisted and welded layer by layer by using the inverted assembly method to complete the ground assembly of the conical cylinder; a hoisting steel frame is set in the conical cylinder, and a lifting lug is set at the end of the hoisting steel frame, and modular installation is performed by using a crawler crane. The present invention adopts a ground assembly module of a holding rod, which reduces high-altitude operations, reduces engineering costs, improves construction quality, and shortens construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of chemical equipment assembly and hoisting, and in particular to a modular construction method for large-diameter vertebral equipment. Background Art

[0002] Clarifiers and other cone equipment usually include two cone-shaped cylinders, upper and lower, with relatively large diameter and weight. For example, the non-standard equipment clarifiers in the brine section of the 1 million tons / year soda ash plant of the Qinghai Salt Lake Metal Magnesium Integration Project, because the previous construction method of similar projects was to set up scaffolding on the foundation for assembly and installation, there were many high-altitude operations, welding was difficult, assembly was also very difficult, and the amount of senior welders, materials and machinery required was large, and the construction period was long. Summary of the invention

[0003] The purpose of the present invention is to provide a modular construction method for large-diameter vertebral equipment which can reduce high-altitude operations and help shorten the construction period.

[0004] To achieve the above object, the technical solution adopted by the present invention is:

[0005] A modular construction method for a large-diameter vertebral body equipment, the vertebral body equipment comprising at least two conical cylinders, each conical cylinder being used as an independent module, each conical cylinder being assembled separately and then hoisted; wherein at least one conical cylinder is assembled on the ground using the following first method, the first method comprising the steps of:

[0006] Step 1: divide the conical cylinder into a plurality of strips along the height direction, each strip comprising a plurality of wall panels as a group welding unit;

[0007] Step 2: Set the positioning blocks on the assembly platform according to the diameter of each strip of the conical cylinder, evenly distribute multiple holding rods along the circumference of the assembly platform as assembly jigs, and use the assembly jigs to lift the wall panels and weld them; move the holding rods according to the diameter of each strip, use the inverted method to lift and weld each strip layer by layer, and complete the ground assembly of the conical cylinder;

[0008] Step three, set up a lifting steel frame in the conical cylinder, set up lifting ears at the ends of the lifting steel frame, and use a crawler crane for modular installation.

[0009] Furthermore, any one of the holding poles comprises a steel pipe column, a holding pole lifting ear, an angle steel tie rod, a lifting chain and an assembly lifting ear; a column base plate is fixedly arranged on the assembly platform, and the bottom of the steel pipe column is fixedly connected to the column base plate; the holding pole lifting ear is laterally connected to the top of the steel pipe column, the angle steel tie rod is obliquely arranged on the side away from the holding pole lifting ear, the top end of the angle steel tie rod is connected to the top of the steel pipe column, and the bottom end of the angle steel tie rod is connected to the positioning block arranged on the assembly platform; at least two lifting holes are arranged on the holding pole lifting ear, and the lifting chain is selectively installed in any one of the lifting holes, and the assembly lifting ear is arranged on the inner wall of the assembly welding unit of the conical cylinder and is connected to the lifting chain.

[0010] Furthermore, the hoisting steel frame is welded by two or more transverse steel sections and two or more longitudinal steel sections, and the ends of the transverse steel sections and the longitudinal steel sections are connected to the inner wall of the conical cylinder.

[0011] Furthermore, the lifting steel frame connection is selected and arranged on a belt plate with the smallest diameter and the thickest wall thickness.

[0012] Furthermore, the lifting lugs at the ends of the lifting steel frame are plate-type lifting lugs, and all the lifting lugs are composed of main lifting lugs and auxiliary lifting lugs that are arranged at intervals.

[0013] Further, at least one other conical cylinder is ground assembled using the following second method, wherein the second method comprises the steps of:

[0014] Step 1: divide the conical cylinder into a plurality of strips along the height direction, each strip comprising a plurality of wall panels as a group welding unit;

[0015] Step 2: welding the wall panels of each layer of strips layer by layer to complete the ground assembly of the conical cylinder;

[0016] Step three: weld the cross support inside the conical cylinder, use the on-site crawler crane or truck crane to flip the assembled conical cylinder, and then use the crawler crane for modular lifting.

[0017] Furthermore, during welding, the longitudinal seams of the strips are welded in sequence and then the circumferential seams are welded.

[0018] The present invention adopts the method of assembling modules on the ground with a pole, and the welding appearance is well formed, which reduces the high-altitude work, reduces the engineering cost, improves the construction quality, and shortens the construction period; the multi-hanging point technology is adopted to complete the modular lifting. It is a simple, safe and economical new process for manufacturing and installing large vertebral equipment.

[0019] The invention is suitable for the manufacture, installation and construction of clarification barrels and similar large-scale cone equipment, and is particularly advantageous when the equipment is installed in a wide area around the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings herein are used to provide further explanation of the present invention and constitute a part of this application. The illustrative embodiments of the present invention and their description are used to explain the present invention and do not constitute improper limitations on the present invention.

[0021] Figure 1 It is a schematic diagram of the installation of the upper and lower barrel bodies of the clarification barrel of the present invention.

[0022] Figure 2 It is a structural schematic diagram of the pole holding device.

[0023] Figure 3 This is a schematic diagram of the lifting steel frame and lifting lug settings.

[0024] 1-Steel pipe column, 2-Holding rod lifting ear, 3-Lifting ear cover plate, 4-Lifting chain, 5-Assembly lifting ear, 6-Stiffening plate, 7-Connecting plate, 8-Angle steel pull rod, 9-Positioning block, 10-Column bottom plate, 11-Assembly platform, 12-Wall panel, 13-Upper cone, 14-Lower cone, 15-Concrete foundation, 16-Lifting steel frame, 17-Main lifting ear, 18-Auxiliary lifting ear. DETAILED DESCRIPTION

[0025] In order to make those skilled in the art better understand the present invention, the present invention is further clearly and completely described below in conjunction with the accompanying drawings and embodiments. It should be noted that, in the absence of conflict, the features in the embodiments and examples of this application can be combined with each other.

[0026] A typical embodiment of the present invention provides a modular construction method for a large-diameter vertebral body device, wherein the vertebral body device comprises at least two conical cylinders, each of which is used as an independent module and each conical cylinder is assembled separately and then hoisted.

[0027] Wherein, at least one conical cylinder is ground assembled using the following first method, the first method comprising the steps of:

[0028] Step 1: divide the conical cylinder into a plurality of strips along the height direction, each strip comprising a plurality of wall panels as a group welding unit;

[0029] Step 2: Set the positioning blocks on the assembly platform according to the diameter of each strip of the conical cylinder, evenly distribute multiple holding rods along the circumference of the assembly platform as assembly jigs, and use the assembly jigs to lift the wall panels and weld them; move the holding rods according to the diameter of each strip, use the inverted method to lift and weld each strip layer by layer, and complete the ground assembly of the conical cylinder;

[0030] Step three, a hoisting steel frame 16 is arranged in the conical cylinder, a lifting lug is arranged at the end of the hoisting steel frame 16, and a crawler crane is used for modular installation.

[0031] Wherein, at least one other conical cylinder is ground assembled using the following second method, wherein the second method comprises the steps of:

[0032] Step 1: divide the conical cylinder into a plurality of strips along the height direction, each strip comprising a plurality of wall panels as a group welding unit;

[0033] Step 2: welding the wall panels of each layer of strips layer by layer to complete the ground assembly of the conical cylinder;

[0034] Step three: weld the cross support inside the conical cylinder, use the on-site crawler crane or truck crane to flip the assembled conical cylinder, and then use the crawler crane for modular lifting.

[0035] This embodiment takes a clarification barrel device as an example to further clearly and completely explain the technical solution and its effect claimed by the present invention. The clarification barrel is composed of a lower cone and an upper cone. For the convenience of installation, it is divided into two modules for production and installation. Among them, the upper cone is module 1 and the lower cone is module 2.

[0036] Table 1 is the data of each strip board of module 1

[0037]

[0038] Table 2 is the data of each strip board of module 2

[0039]

[0040] The clarification tank consists of two parts: the lower cone and the upper cone. In order to facilitate installation, we divide it into two modules for production and installation.

[0041] The manufacturing and installation process of the two modules is to assemble them on the ground, and then use a crane to hoist them into place. The difference is that module 2 is a conical cylinder with a larger diameter, and it is difficult to use a crane to assist in assembly. The first method is used for assembly on site, that is, the Lit-made pole inverted installation construction process. From Table 1 and Table 2, it can be seen that module 1 is not very large in terms of both the plate height and diameter. It is easier to use a 120t crane for manufacturing and installation, and the first method is used for assembly.

[0042] Module 1 group welding

[0043] Module 1 is divided into 5 strips, and the longitudinal seams of each strip are welded in sequence before the circumferential seams. During the welding process, anti-deformation measures such as expansion joints and rigid reinforcement are taken to ensure the quality of module 1 assembly.

[0044] Module 1 is hoisted into place

[0045] Weld the cross support to the completed module 1 on the ground to facilitate flipping and lifting.

[0046] The assembled module 1 was flipped over using the on-site 120t crawler crane (main crane) and 30t truck crane (auxiliary crane), and then the modular lifting was performed using the 120t crawler crane.

[0047] Prefabricated platform laying

[0048] A (L26m*26m) assembly platform is laid according to the diameter of the cone clarifier. In order to ensure the assembly quality of the cone equipment, positioning blocks are welded on the assembly platform according to the different diameters of the 7 sections of the cylinder of module 2 before prefabrication, and 12 (seamless steel pipe Φ219*8 L=3.5m) holding rods are evenly distributed along the circumference for the upper cone assembly hoisting.

[0049] Module 2 group welding

[0050] 1. Design of the tire assembly

[0051] The holding rod includes a steel pipe column 1, a holding rod lifting lug 2, an angle steel tie rod 8, a lifting fall chain 4 and an assembly lifting lug 5; a column base plate 10 is fixedly arranged on the assembly platform, and the bottom of the steel pipe column 1 is fixedly connected to the column base plate 10; the holding rod lifting lug 2 is laterally connected to the top of the steel pipe column 1, and the angle steel tie rod 8 is obliquely arranged on the side away from the holding rod lifting lug 2, and the top end of the angle steel tie rod 8 is connected to the top of the steel pipe column 1 through a connecting plate 7, and the bottom end of the angle steel tie rod 8 is connected to a positioning block 9 arranged on the assembly platform 11; at least two lifting holes are arranged on the holding rod lifting lug 2, and the lifting fall chain 4 is selectively installed in any one of the lifting holes, and the assembly lifting lug 5 is arranged on the assembly welding unit wall plate 12 of the conical cylinder and is connected to the lifting fall chain 4.

[0052] As the actual weight of module 2 is 48.81t, in order to ensure the stability of the equipment during production, 12 holding rods are used on site. The bearing capacity of each holding rod is 4.07t. The table shows that the steel pipe Φ152*8 for the column meets the requirements. In fact, the seamless steel pipe Φ219*8 supplied by Party A is selected, and the length of each holding rod is 3.5m.

[0053] The clarification barrel of the cone equipment must be moved when the jig is assembled. The equipment assembly is divided into 6 belt plates. If each group is assembled and one belt is moved once, it needs 6 times. By calculating the vertical distance of the belt plate and conducting simulation tests, the arm lifting lug 2 is lengthened. The arm lifting lug 2 is provided with at least two lifting holes. The on-site arm only needs to be moved 3 times to complete the production task. The material of the arm lifting lug 2 is Q235B steel plate, δ=30mm. To ensure the strength of the lug, the lug cover plate 3 is welded on the lug plate of the arm lifting lug 2 as a reinforcement plate.

[0054] 2. Assembly welding

[0055] Before assembly, first recheck the dimensions of each wall panel, and if recalibration is required, hammer marks should be prevented. The assembly method is the inverted assembly method, and the seventh band is a folded edge that is directly welded to the sixth band wall panel. The horizontality deviation of the lower edges of the two adjacent wall panels of the first assembled sixth band plate is allowed to be no more than 2mm, and the horizontality of any two points on the entire circumference should not be greater than 6mm. The outward inclination of the ray is allowed to be no more than 3mm, and the outward inclination of the ray of the other circle groups of wall panels is allowed to be no more than 0.3% of the height of the circle of wall panels. The gap between the wall panel butt joints is 0~3mm. The inner surface of the wall panel should be flush, the misalignment of the longitudinal joint is 1 / 10 of the plate thickness, and the misalignment of the circumferential weld joint is 1 / 5 of the plate thickness.

[0056] When welding the wall panels, weld the longitudinal seams first, adjust and release the stress, and then weld the circumferential seams. When welding the circumferential seams, the welders should be evenly distributed and weld in the same direction. The welding process strictly follows the welding process parameters on the welding process card.

[0057] Before welding the circumferential seam, first design and manufacture the fixture for installation according to the cone inclination. Then spot weld the positioning card. The manufacturing deviation of the positioning card is no more than 3mm. The positioning card is not only the positioning tool for the circumferential weld of each module, but also the standard template to ensure the taper of each module. In the manufacturing process, it is necessary to ensure sufficient accuracy. In order to ensure that the adjustment of the misalignment and gap meets the specified requirements, the number of positioning cards should be determined according to the geometric dimensions of the module. Then spot weld and fix it.

[0058] After the assembly welding is completed, the barrel wall butt joints are subject to X-ray spot inspection, with a spot inspection rate of 10%.

[0059] Module 2 is hoisted into place

[0060] 1. Hoisting steel frame design

[0061] In order to keep module 2 balanced during the hoisting process, the hoisting points must be evenly distributed. Due to the large diameter and thin wall of the equipment, welding the lifting lugs directly on the equipment cannot meet the strength requirements. Six HN500*200*10*16 steel sections were selected on site to make a tic-tac-toe hoisting steel frame, which also played a reinforcing role and prevented the equipment from deformation.

[0062] Considering the strength requirements of the lifting steel frame itself, it should not be too long, and the equipment must be installed with a stirring device without burrs or other obstacles inside. The first strip of module 2 has the thickest wall and the smallest diameter. It is best to select a position above 2 / 3 of the first strip.

[0063] 2. Lifting eye welding

[0064] The lifting ears are 12 plate lifting ears, 6 main lifting ears and 6 auxiliary lifting ears (for adjusting the length of the wire rope and adjusting the balance), which are set at the ends of the cross frame and welded to the steel frame evenly along the Φ18m circumference.

[0065] 3. Modular installation

[0066] Equipment clarification tank module 2 lifting calculation lifting load calculation:

[0067] P =K1(Q1+Q2)=1.1*(48.81+4.5t+10)=69.64t; among them, Q1=48.81t, net weight of equipment; Q2=4.5t, 150t hook and wire rope; Q3=10t, weight of sling; K1=1.1, dynamic load coefficient.

[0068] 4. Selection of crane

[0069] According to the actual situation on site and force calculation, a 350t crawler crane was selected for modular installation. When hoisting the cone on the clarifier, according to the above hoisting data and after calculation, the QUY350SHW super-lifting condition tower jib lifting performance table was selected for hoisting. The table shows: the main arm length is 60m, the main arm angle is 85°, the tower jib length is 30m, the super-lifting counterweight radius is 11m + 40t super-lifting counterweight, and the slewing radius is 26m. The hoisting capacity is 76 tons, which meets the use requirements.

[0070] After hoisting into place, module 2 is butt-welded to module 1.

[0071] The scope of protection claimed by the present invention is not limited to the above specific embodiments. For those skilled in the art, the present invention may have various deformations and changes. Any modifications, improvements and equivalent substitutions made within the concept and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A modular construction method for a large-diameter cone device, wherein the cone device is a clarifier, which consists of a lower conical cylinder and an upper conical cylinder, and is characterized in that: Each cone cylinder is regarded as an independent module, and each cone cylinder is assembled separately before hoisting; the lower cone cylinder is module 1, and the upper cone cylinder is module 2. Table 1 is the data of each strip plate of module 1, and Table 2 is the data of each strip plate of module 2; Table 1 Table 2 The upper conical cylinder is assembled on the ground using the following first method, which includes the following steps: Step 1: divide the upper conical cylinder into a plurality of strips along the height direction, each strip comprising a plurality of wall panels as a group welding unit; Step 2: Set the positioning blocks on the assembly platform according to the diameter of each strip of the upper conical cylinder, and evenly distribute 12 holding rods along the circumference of the assembly platform as assembly jigs, each holding rod is 3.5m long; use the assembly jig to lift the wall panels and weld them; move the holding rods according to the diameter of each strip, and use the inverted method to lift and weld each strip layer by layer to complete the ground assembly of the upper conical cylinder; Any one of the holding poles comprises a steel pipe column, a holding pole lifting lug, an angle steel tie rod, a lifting fall chain and an assembly lifting lug; a column bottom plate is fixedly arranged on the assembly platform, and the bottom of the steel pipe column is fixedly connected to the column bottom plate; the holding pole lifting lug is laterally connected to the top of the steel pipe column, the angle steel tie rod is obliquely arranged on the side away from the holding pole lifting lug, the top end of the angle steel tie rod is connected to the top of the steel pipe column, and the bottom end of the angle steel tie rod is connected to the positioning block arranged on the assembly platform; at least two lifting holes are arranged on the holding pole lifting lug, and the lifting fall chain is selectively installed in any one of the lifting holes, and the assembly lifting lug is arranged on the inner wall of the assembly welding unit of the upper conical cylinder and is connected to the lifting fall chain; Step 3: a lifting steel frame is arranged in the upper conical cylinder, a lifting lug is arranged at the end of the lifting steel frame, and a crawler crane is used for modular installation; The hoisting steel frame is welded by two or more transverse steels and two or more longitudinal steels, and the ends of the transverse steels and the longitudinal steels are connected to the inner wall of the upper conical cylinder; the hoisting steel frame connection is selected and set on the belt plate with the smallest diameter and the thickest wall thickness; The lower conical cylinder is assembled on the ground using the following second method, which comprises the steps of: Step 1: divide the lower conical cylinder into a plurality of strips along the height direction, each strip comprising a plurality of wall panels as a group welding unit; Step 2: welding the wall panels of each layer layer by layer to complete the ground assembly of the lower conical cylinder; Step three: weld the cross support inside the lower conical cylinder, use the on-site crawler crane or truck crane to flip the assembled lower conical cylinder, and then use the crawler crane for modular lifting.

2. The modular construction method of large diameter vertebral equipment according to claim 1, characterized in that: The lifting ears at the ends of the lifting steel frames are plate-type lifting ears, and all the lifting ears are composed of main lifting ears and auxiliary lifting ears set at intervals.

3. The modular construction method of large diameter vertebral equipment according to claim 1, characterized in that: During welding, the longitudinal seams of each strip plate are welded in sequence and then the circumferential seams are welded.

Citation Information

Patent Citations

  • Construction method of tank wall of oil tank

    CN102162312A

  • Construction method for assembling cone steel coal bucket of super-large type bundling polygonal coal bunker group

    CN106760830A

  • Manufacturing and mounting methods of energy-saving Maerz lime kiln housing

    CN107954614A

  • Combined steel formwork capable of being assembled of silo cone bucket and construction method of combined steel formwork

    CN110748157A

  • Construction method of oil tank covered with soil, jacking device for construction of oil tank covered with soil, and use method of jacking device

    CN110905260A