A method for sealing a gas extraction borehole without grouting
Through the combination of shape memory polyurethane tube and PVC sealing tube, the fixed-point sealing and reuse of drilling is achieved by using temperature changes, solving the problems of low efficiency and high cost of sealing of existing gas extraction drilling holes, and achieving simplicity and rapidity The sealing process and efficient gas extraction.
Patent Information
- Application Number
- CN202210756583.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-30
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-06-30
AI Technical Summary
The existing gas extraction drilling sealing methods have problems such as poor permeability, complex operation, high cost and inability to reuse the sealing materials, resulting in low sealing efficiency and difficulty in gas extraction.
The shape memory polyurethane tube is combined with PVC sealing tube. The outer diameter of the shape memory polyurethane tube is reduced by heating and enters the drilling hole. The original shape is squeezed and fixed drilling wall is restored as the temperature decreases, so as to achieve fixed-point sealing, and repeat it through high-temperature disturbance equipment. Use shape memory polyurethane tubes.
The hole sealing process is achieved in a simple, fast, low-cost and reusable manner, which improves gas extraction efficiency and reduces the hole sealing cost.
Smart Images

Figure CN114941513B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for sealing a gas extraction drilling hole, in particular to a method for sealing a gas extraction drilling hole at a fixed point without grouting. Background Art
[0002] Gas disasters seriously threaten the safety of coal mine production. At present, the most effective measure to prevent and control gas disasters in coal mines is gas extraction. However, more than 95% of high-gas and outburst mines in my country belong to low-permeability coal seams, with a permeability coefficient of only 10. -3 ~10 -4 mD, the coal seam has poor permeability. In addition, the gas extraction drilling holes are not tightly sealed, resulting in serious gas leakage during the extraction process. The gas extraction concentration of the borehole decays rapidly. The difficulty in gas extraction and the low efficiency of gas extraction are common technical problems in domestic outstanding mines.
[0003] Most of my country's coal mines have gas outflow, and the annual gas outflow in coal mines across the country is 10 billion m 3 As the mining depth continues to increase, the ground stress and gas pressure continue to increase, the gas outburst volume continues to increase, and the risk of coal and gas outbursts continues to increase. Gas accidents have become one of the most harmful natural disasters in my country's coal mine disasters. In the process of managing coal mine gas problems, drilling gas extraction is one of the most effective measures. After drilling the borehole, it is generally required to seal the borehole. Drilling sealing is a key factor in maintaining negative pressure in the hole. The quality of the sealing directly affects the efficiency of subsequent gas extraction through drilling, and the most important factors affecting the sealing quality are the sealing material and sealing process.
[0004] At present, the most commonly used sealing method for coal mine gas extraction boreholes in my country is grouting. The main grouting materials are polyurethane, cement mortar, etc., and there are problems to varying degrees when they are used. Among them, polyurethane is used as a grouting material. When liquid polyurethane is injected into the borehole for sealing, it cannot well seal the cracks around the borehole after solidification due to its poor permeability and fluidity. When cement mortar is used as a grouting material, when cement mortar is injected into the borehole for sealing, it is easy to shrink and crack after solidification, and the solidification time is long, and the operation is complicated. In addition, before the above two materials are grouting and sealing, they need to be prepared on site into liquid grouting materials (liquid polyurethane or liquid cement mortar), so that they can solidify and seal after being injected into the borehole. If they are prepared in advance, the grouting materials will partially solidify. Therefore, the above grouting and sealing process is cumbersome and requires a lot of manpower and material resources. The sealing efficiency is low, and the two grouting materials are expensive, resulting in high sealing costs. After the sealing, the solidified sealing materials are connected to the gas extraction pipe and can only be used once and cannot be reused. When sealing a new borehole, it is necessary to re-equip the grouting materials and extraction pipes. Therefore, how to provide a method that can ensure the sealing quality while also having a simple and fast sealing process, and can be recycled and reused after the gas extraction of the current borehole is completed, is one of the research directions of this industry. Summary of the invention
[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a method for sealing gas extraction drilling holes at fixed points without grouting. Under the premise of ensuring the sealing quality, there is no need for the grouting sealing process, making the sealing process simple and fast, and the gas can be recycled and reused after the current drilling hole is completed.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is: a method for sealing a gas extraction borehole without grouting, and the specific steps are as follows:
[0007] A. Determine the drilling location according to the coal seam conditions and construct the gas extraction borehole according to the design requirements;
[0008] B. Select a PVC sealing tube with an outer diameter of 0.5 to 0.7 times the diameter of the gas extraction borehole, and select a shape memory polyurethane tube with an outer diameter of 1.1 to 1.2 times the diameter of the gas extraction borehole. The inner diameter of the shape memory polyurethane tube is slightly larger than the outer diameter of the PVC sealing tube, and the length of the shape memory polyurethane tube is 1 / 3 to 1 / 2 of the length of the PVC sealing tube. The PVC sealing tube is coaxially composed of a flower tube and a solid tube. The flower tube is located at the front section of the PVC sealing tube. The shape memory polyurethane tube is sleeved outside the PVC sealing tube, and the shape memory polyurethane tube is located at the front section of the PVC sealing tube; rubber heads are installed at the front and rear ends of the shape memory polyurethane tube, and the shape memory polyurethane tube is sealed and fixedly connected to the outer wall of the PVC sealing tube through the rubber head; the shape recovery temperature of the shape memory polyurethane tube is 40 to 50°C;
[0009] C. The shape memory polyurethane tube is heated to a temperature of 55-60° C. At this time, the shape memory polyurethane tube changes from a rigid body to an elastic body, and the outer diameter of the shape memory polyurethane tube is pressed and deformed to reduce the outer diameter until the outer diameter of the shape memory polyurethane tube is smaller than the diameter of the gas extraction borehole. Then, the front section of the PVC sealing tube is sent together with the shape memory polyurethane tube into the gas extraction borehole to a certain depth, and the end of the rear section of the PVC sealing tube is outside the gas extraction borehole;
[0010] D. After the shape memory polyurethane tube enters the gas extraction borehole, wait for a period of time. When the temperature of the shape memory polyurethane tube is lower than 40°C, the outer diameter of the shape memory polyurethane tube gradually recovers to the original diameter. At this time, the shape memory polyurethane tube recovers from an elastic body to a rigid body. Since the outer diameter of the shape memory polyurethane tube is 1.1 to 1.2 times the borehole diameter, it squeezes the borehole wall during the recovery process until a rigid body is formed so that the shape memory polyurethane tube and the borehole wall of the gas extraction borehole are pressed and fixed. At this time, the shape memory polyurethane tube blocks the gap between the PVC sealing tube and the gas extraction borehole, that is, the grouting-free fixed-point sealing is completed. Finally, the end of the rear section of the PVC sealing tube is connected to the gas extraction system to extract gas from the gas extraction borehole;
[0011] E. After the gas extraction work of the gas extraction borehole is completed, the gas extraction system is separated from the end of the rear section of the PVC sealing pipe, and then the high-temperature disturbance transmitter is extended into the front section of the PVC sealing pipe through the end of the rear section of the PVC sealing pipe and the high-temperature disturbance device is turned on. The temperature of the high-temperature disturbance transmitter is adjusted by the high-temperature disturbance device so that the heating temperature is 60-80°C. The heat is transferred to the shape memory polyurethane tube through the through holes on the flower tube and part of the solid tube. Due to the increase in temperature, the shape memory polyurethane tube is changed from a rigid body to an elastic body again, and the extrusion force of the shape memory polyurethane tube on the gas extraction borehole is rapidly reduced. Then, a tensile force is applied to the PVC sealing pipe outside the gas extraction borehole. Since the shape memory polyurethane tube is fixedly connected to the PVC sealing pipe through the rubber head, and it is an elastic body at this time, the shape memory polyurethane tube can be pulled out together with the PVC sealing pipe. When the shape memory polyurethane tube is lower than the shape recovery temperature, it is restored from an elastic body to a rigid body, so that it can perform the sealing work on the next gas extraction borehole, thereby realizing reuse.
[0012] Furthermore, the length of the PVC sealing tube is 13 to 14 meters, and the length of the shape memory polyurethane tube is 5 to 7 meters. The use of such a length of the PVC sealing tube can ensure that it extends into the required depth of the gas extraction borehole. In addition, the use of such a length of the shape memory polyurethane tube can ensure the length of the sealing section when plugging the gas extraction borehole, and finally ensure the sealing effect of the gas extraction borehole.
[0013] Furthermore, the front end of the shape memory polyurethane tube is 0.4-0.7 m away from the end of the front section of the PVC sealing tube. Setting this distance facilitates the installation of a rubber head at the front end of the shape memory polyurethane tube to ensure a sealed and fixed connection between the shape memory polyurethane tube and the PVC sealing tube.
[0014] Furthermore, the length of the flower tube is 4.5-5 m. With this length, the heat transfer efficiency of the subsequent heating of the shape memory polyurethane tube can be improved, while the overall supporting performance of the PVC sealing tube will not be greatly affected.
[0015] Furthermore, the heat-resistant temperature of the PVC sealing tube is 80-90°C, the maximum pressure of the flower tube is 30-40MPa, and the maximum pressure of the solid tube is 45-55MPa. With such parameters, it is ensured that the PVC sealing tube will not be deformed when heated, and at the same time, the maximum pressure value of the flower tube and the solid tube can withstand the extrusion force generated by the subsequent shape memory polyurethane tube to restore its shape, ensuring that the PVC sealing tube will not be deformed.
[0016] Compared with the prior art, the present invention utilizes the function of shape memory polyurethane tube to restore shape and become a rigid body when the temperature is lower than the shape recovery temperature, and to change from a rigid body to an elastic body when the temperature is higher than the shape recovery temperature, and uses it in the sealing process of gas extraction boreholes, specifically: select a shape memory polyurethane tube with an outer diameter larger than the diameter of the gas extraction borehole, and seal and fix it to the front section of the PVC sealing tube through a rubber head, and before sealing the hole (that is, before the shape memory polyurethane tube enters the gas extraction borehole), heat the shape memory polyurethane tube to make it change from a rigid body to an elastic body when it exceeds the shape recovery temperature, and then put it into the gas extraction borehole together with the PVC sealing tube, and as the temperature decreases, it will be lower than the shape recovery temperature. The shape memory polyurethane tube begins to recover to its original shape by using the memory function. Since its outer diameter is larger than the borehole, it squeezes the borehole wall during the recovery process, increasing the static friction between the two, until a rigid body is formed to press and fix the shape memory polyurethane tube and the borehole wall of the gas extraction borehole, so that the static friction between the two reaches the maximum value, and the fixed-point and fixed-length sealing of the borehole is completed. Subsequently, gas extraction can be carried out through the PVC sealing tube; when the gas extraction is completed, a high-temperature disturbance transmitter is inserted into the PVC sealing tube for heating to make the shape memory polyurethane tube change from a rigid body to an elastic body again. At this time, it can be extracted from the gas extraction borehole together with the PVC sealing tube, completing the recovery process for subsequent reuse. The present invention does not require a grouting sealing process, and can have the advantages of simple sealing process operation, short sealing time, low sealing cost, and recyclable reuse under the premise of ensuring the sealing quality, and has wide practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the layout of the present invention.
[0018] In the figure: 1. Coal seam; 2. Gas extraction drilling hole; 3. PVC sealing pipe; 4. High-temperature disturbance equipment; 5. Rubber variable head; 6. Shape memory polyurethane tube; 7. High-temperature disturbance transmitter. DETAILED DESCRIPTION
[0019] The present invention will be further described below.
[0020] like Figure 1 As shown, Figure 1 The left side is the front patent description, and the specific steps of the present invention are:
[0021] A. Determine the drilling position according to the coal seam 1 conditions, and construct the gas extraction borehole 2 according to the design requirements;
[0022] B. Select a PVC sealing tube 3 with an outer diameter of 0.5 to 0.7 times the diameter of the gas extraction borehole 2, and select a shape memory polyurethane tube 6 with an outer diameter of 1.1 to 1.2 times the diameter of the gas extraction borehole 2. The inner diameter of the shape memory polyurethane tube 6 is slightly larger than the outer diameter of the PVC sealing tube 3. The length of the PVC sealing tube 3 is 13 to 14 m, and the length of the shape memory polyurethane tube 6 is 5 to 7 m. The use of a PVC sealing tube 3 of this length can ensure that it extends to the required depth in the gas extraction borehole 2. In addition, the use of a shape memory polyurethane tube 6 of this length can ensure the length of its sealing section when the gas extraction borehole 2 is sealed, and finally ensure the sealing effect of the gas extraction borehole 2; the PVC sealing tube 3 is coaxially composed of a flower tube and a solid tube, the flower tube is located at the front section of the PVC sealing tube 3, the shape memory polyurethane tube 6 is sleeved on the outside of the PVC sealing tube 3, and the shape memory polyurethane tube 6 is located at the front section of the PVC sealing tube 3; rubber heads 5 are installed at the front and rear ends of the shape memory polyurethane tube 6, and the shape memory polyurethane tube 6 is sealed and fixedly connected to the outer wall of the PVC sealing tube 3 through the rubber heads 5; the shape recovery temperature of the shape memory polyurethane tube 6 is 40-50°C; the front end of the shape memory polyurethane tube 6 is 0.4-0.7m away from the end of the front section of the PVC sealing tube 3. This distance is set to facilitate the installation of the rubber head 5 at the front end of the shape memory polyurethane tube 6, ensuring the sealed and fixed connection between the shape memory polyurethane tube 6 and the PVC sealing tube 3; the length of the flower tube is 4.5 to 5 meters. This length can improve the heat transfer efficiency of the subsequent heating of the shape memory polyurethane tube, while not having a significant impact on the overall supporting performance of the PVC sealing tube 3.
[0023] C. Heat the shape memory polyurethane tube 6 to a temperature of 55-60°C. At this time, the shape memory polyurethane tube 6 changes from a rigid body to an elastic body. The outer diameter of the shape memory polyurethane tube 6 is pressed and deformed to reduce its outer diameter until the outer diameter of the shape memory polyurethane tube 6 is smaller than the diameter of the gas extraction borehole 2. Then, the front section of the PVC sealing tube 3 is sent together with the shape memory polyurethane tube 6 into the gas extraction borehole 2 to a certain depth, and the end of the rear section of the PVC sealing tube 3 is outside the gas extraction borehole 2; the heat-resistant temperature of the PVC sealing tube is 80-90°C, the maximum pressure that the flower tube can withstand is 30-40MPa, and the maximum pressure that the real tube can withstand is 45-55MPa. Using this parameter, it is ensured that the PVC sealing tube will not be deformed during heating. At the same time, the maximum pressure value of the flower tube and the real tube can withstand the extrusion force generated by the subsequent shape memory polyurethane tube to restore its shape, ensuring that the PVC sealing tube will not be deformed.
[0024] D. After the shape memory polyurethane tube 6 enters the gas extraction borehole 2, wait for a period of time. When the temperature of the shape memory polyurethane tube 6 is lower than 40°C, the outer diameter of the shape memory polyurethane tube 6 gradually recovers to the original diameter. At this time, the shape memory polyurethane tube 6 recovers from an elastomer to a rigid body. Since the outer diameter of the shape memory polyurethane tube 6 is 1.1 to 1.2 times the borehole diameter, it squeezes the borehole wall during the recovery process until a rigid body is formed so that the shape memory polyurethane tube 6 and the borehole wall of the gas extraction borehole 2 are pressed and fixed. At this time, the shape memory polyurethane tube 6 blocks the gap between the PVC sealing tube 3 and the gas extraction borehole 2, that is, the grouting-free fixed-point sealing is completed. Finally, the end of the rear section of the PVC sealing tube 3 is connected to the gas extraction system to extract gas from the gas extraction borehole 2;
[0025] E. After the gas extraction work is completed in the gas extraction borehole 2, the gas extraction system is separated from the end of the rear section of the PVC sealing tube 3, and then the high-temperature disturbance transmitter 7 is extended into the front section of the PVC sealing tube 3 through the end of the rear section of the PVC sealing tube 3 and the high-temperature disturbance device 4 is turned on. The temperature of the high-temperature disturbance transmitter 7 is adjusted by the high-temperature disturbance device 4 so that the heating temperature is 60-80°C. The heat is transferred to the shape memory polyurethane tube 6 through the through holes on the flower tube and part of the solid tube. Due to the increase in temperature, the shape memory polyurethane tube 6 changes from a rigid body to an elastic body again. The squeezing pressure of the shape memory polyurethane tube 6 on the gas extraction borehole 2 is rapidly reduced, and then a pulling force is applied to the PVC sealing tube 3 outside the gas extraction borehole 2. Since the shape memory polyurethane tube 6 is fixedly connected to the PVC sealing tube 3 through the rubber head 5 and it is an elastomer at this time, the shape memory polyurethane tube 6 can be pulled out together with the PVC sealing tube 3. When the shape memory polyurethane tube 6 is lower than the shape recovery temperature, it is restored to a rigid body by the elastomer, so that it can seal the next gas extraction borehole 2, thereby realizing repeated use.
[0026] The above-mentioned PVC sealing tube 3, shape memory polyurethane tube 6, high temperature disturbance device 4, high temperature disturbance transmitter head 7 and rubber variable head 5 are all existing components or equipment and can be directly purchased on the market; among them, the shape memory polyurethane tube 6 is made of thermosensitive shape memory polyurethane, which has the function of restoring shape and becoming a rigid body when the temperature is lower than the shape recovery temperature, and has the function of changing from a rigid body to an elastic body when the temperature is higher than the shape recovery temperature.
[0027] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for sealing gas extraction boreholes without grouting. It is characterized in that The specific steps are: A. Determine the drilling location according to the coal seam conditions and construct the gas extraction borehole according to the design requirements; B. Select a PVC sealing tube with an outer diameter of 0.5 to 0.7 times the diameter of the gas extraction borehole, and select a shape memory polyurethane tube with an outer diameter of 1.1 to 1.2 times the diameter of the gas extraction borehole. The inner diameter of the shape memory polyurethane tube is slightly larger than the outer diameter of the PVC sealing tube, and the length of the shape memory polyurethane tube is 1 / 3 to 1 / 2 of the length of the PVC sealing tube. The PVC sealing tube is coaxially composed of a flower tube and a solid tube. The flower tube is located at the front section of the PVC sealing tube. The shape memory polyurethane tube is sleeved outside the PVC sealing tube, and the shape memory polyurethane tube is located at the front section of the PVC sealing tube; rubber heads are installed at the front and rear ends of the shape memory polyurethane tube, and the shape memory polyurethane tube is sealed and fixedly connected to the outer wall of the PVC sealing tube through the rubber head; the shape recovery temperature of the shape memory polyurethane tube is 40 to 50°C; C. The shape memory polyurethane tube is heated to a temperature of 55-60° C. At this time, the shape memory polyurethane tube changes from a rigid body to an elastic body, and the outer wall of the shape memory polyurethane tube is pressed and deformed to reduce its outer diameter until the outer diameter of the shape memory polyurethane tube is smaller than the diameter of the gas extraction borehole. Then, the front section of the PVC sealing tube is sent together with the shape memory polyurethane tube into the gas extraction borehole to a certain depth, and the end of the rear section of the PVC sealing tube is outside the gas extraction borehole; D. After the shape memory polyurethane tube enters the gas extraction borehole, wait for a period of time. When the temperature of the shape memory polyurethane tube is lower than 40°C, the outer diameter of the shape memory polyurethane tube gradually recovers to the original diameter. At this time, the shape memory polyurethane tube recovers from an elastic body to a rigid body. Since the outer diameter of the shape memory polyurethane tube is 1.1 to 1.2 times the borehole diameter, it squeezes the borehole wall during the recovery process until a rigid body is formed so that the shape memory polyurethane tube and the borehole wall of the gas extraction borehole are pressed and fixed. At this time, the shape memory polyurethane tube blocks the gap between the PVC sealing tube and the gas extraction borehole, that is, the grouting-free fixed-point sealing is completed. Finally, the end of the rear section of the PVC sealing tube is connected to the gas extraction system to extract gas from the gas extraction borehole; E. After the gas extraction work of the gas extraction borehole is completed, the gas extraction system is separated from the end of the rear section of the PVC sealing pipe, and then the high-temperature disturbance transmitter is extended into the front section of the PVC sealing pipe through the end of the rear section of the PVC sealing pipe and the high-temperature disturbance device is turned on. The temperature of the high-temperature disturbance transmitter is adjusted by the high-temperature disturbance device so that the heating temperature is 60-80°C. The heat is transferred to the shape memory polyurethane tube through the through holes on the flower tube and part of the solid tube. Due to the increase in temperature, the shape memory polyurethane tube is changed from a rigid body to an elastic body again, and the extrusion force of the shape memory polyurethane tube on the gas extraction borehole is rapidly reduced. Then, a tensile force is applied to the PVC sealing pipe outside the gas extraction borehole. Since the shape memory polyurethane tube is fixedly connected to the PVC sealing pipe through the rubber head, and it is an elastic body at this time, the shape memory polyurethane tube can be pulled out together with the PVC sealing pipe. When the shape memory polyurethane tube is lower than the shape recovery temperature, it is restored from an elastic body to a rigid body, so that it can perform the sealing work on the next gas extraction borehole, thereby realizing reuse.
2. The method for sealing a gas extraction borehole without grouting according to claim 1, It is characterized in that The length of the PVC sealing tube is 13-14 m, and the length of the shape memory polyurethane tube is 5-7 m.
3. The method for sealing a gas extraction borehole without grouting according to claim 1, It is characterized in that The front end of the shape memory polyurethane tube is 0.4-0.7 m away from the end of the front section of the PVC sealing tube.
4. The method for sealing a gas extraction borehole without grouting according to claim 1, It is characterized in that The length of the flower tube is 4.5 to 5 m.
5. The method for sealing a gas extraction borehole without grouting according to claim 1, It is characterized in that The heat-resistant temperature of the PVC sealing pipe is 80-90°C, the maximum pressure that the flower pipe can withstand is 30-40MPa, and the maximum pressure that the solid pipe can withstand is 45-55MPa.
