A lifting device for a motor vehicle bogie and a method for positioning a locking hole lifting point of the bogie

By designing the lifting sling of the motor vehicle bogie and utilizing the hook device and camera positioning technology, the stable lifting of the motor vehicle bogie is achieved, which solves the problem of unstable lifting points in the existing technology and improves lifting efficiency and safety. sex.

CN115057341BActive Publication Date: 2024-10-11CHENGDU AERONAUTIC POLYTECHNIC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210642418.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-08
Publication Date
2024-10-11
Estimated Expiration
2042-06-08

AI Technical Summary

Technical Problem

The existing motor vehicle bogie lifting method has unstable lifting points, resulting in low lifting efficiency and high safety hazards, and there is a lack of professional lifting spreaders.

Method used

A lifting sling for the motor vehicle bogie is designed, including a hanger and multiple sets of hook devices. The camera captures the position of the motor vehicle bogie to determine the spatial three-dimensional position coordinates of the keyhole lifting point, and uses the moment of the heavy disk to automatically Control the lowering and retracting of the hook to achieve stable positioning and automatic operation of the hook.

Benefits of technology

It improves the stability and efficiency of the lifting spreader, ensures that the hook is always located on the bogie axle during the lifting process, solves the problem of unstable lifting points, and improves safety and movement efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115057341B_ABST
    Figure CN115057341B_ABST
Patent Text Reader

Abstract

The present invention discloses a lifting sling for a motor vehicle bogie and a method for locating the locking hole lifting point of the bogie. The hook device is installed on the hanger, and the hook device can move back and forth on the hanger. The motor vehicle bogie is photographed by two sets of cameras, and the spatial three-dimensional position coordinates of the locking hole lifting point of the bogie are found by the bogie locking hole lifting point positioning method. The hook device moves to the top of the bogie to lift the bogie. The present invention makes the lifting sling structure stable through the coordination of various structures, and the movement of the weight disc makes the center of gravity of the device of the present invention stable. The present invention solves the problem of unstable lifting points in the existing motor vehicle bogie lifting method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of lifting and hoisting equipment, and specifically to a lifting and hoisting equipment for a high-speed train bogie and a method for positioning the bogie locking hole lifting point. Background Technology

[0002] Currently, the common methods for lifting bogies in high-speed trains involve binding steel wire ropes together and then threading a hook (or ring) through the ropes to complete the lifting operation, or directly lifting certain parts of the bogie using the hook (or ring). This method is not only inefficient, but the instability of the lifting points can also cause impacts that affect the bogie's structural integrity. The lack of specialized lifting equipment leads to inefficient bogie movement, and the wire rope binding process before lifting also presents safety hazards. Summary of the Invention

[0003] In view of the above-mentioned shortcomings in the prior art, the present invention provides a lifting hoist and a bogie lock hole lifting point positioning method for EMU bogies, which solves the problem of unstable lifting points in the existing EMU bogie lifting methods.

[0004] In order to achieve the above-mentioned objectives, the technical solution adopted by the present invention is as follows: a lifting device for a train bogie, comprising: a lifting frame and multiple sets of hook devices;

[0005] The multiple sets of hook devices are slidably connected to the hanger; the hanger includes: a first main beam, a second main beam, a balance beam, a first end beam, and a second end beam;

[0006] One end of the first end beam is fixedly connected to one end of the first main beam, and the other end is fixedly connected to one end of the second main beam; one end of the balance beam is fixedly connected to the middle part of the first main beam, and the other end is fixedly connected to the middle part of the second main beam; one end of the second end beam is fixedly connected to the other end of the first main beam, and the other end is fixedly connected to the other end of the second main beam.

[0007] Furthermore, the hook device includes: a hook, a thrust guide rod, a first transmission guide rod, a second transmission guide rod, a pawl, a ratchet, a drive shaft, a transmission disc, a third transmission rod, a support guide rod, a weight disc, a connecting guide rod, a limit block, and a support boss;

[0008] One end of the hook is hinged to one end of the thrust guide rod and one end of the connecting guide rod, respectively; one end of the first transmission guide rod is movably connected to the other end of the thrust guide rod, and its other end is movably connected to one end of the second transmission guide rod; one end of the pawl is connected to the second transmission guide rod, and its other end contacts the ratchet; a pair of transmission gears are fitted on the drive shaft, which drives the transmission disc to rotate; one end of the third transmission rod is movably connected to the transmission disc, and its other end is movably connected to the support guide rod; one end of the support guide rod is movably connected to the support boss, and its other end is fixedly connected to the weight disc; the limiting block is fixedly connected to the support boss; the other end of the connecting guide rod and the third transmission rod are hinged at the same point on the support guide rod.

[0009] The beneficial effects of the above-mentioned further scheme are as follows: When the lifting device lifts the load, and when the lifting device is above the bogie, the load disc is biased towards the center point of the lifting device, and the hook of the lifting device is in an outward-raised state. During the vertical lowering process of the lifting device perpendicular to the bogie, the impact thrust generated by the contact between the thrust guide rod and the upper surface of the bogie to be lifted pushes the first transmission guide rod, which drives the second transmission guide rod and the pawl on the second transmission guide rod. The pawl and ratchet can only move in one direction, thereby driving the hinged drive shaft. There is a pair of transmission gear pairs on the drive shaft, which drive the transmission disc to rotate. The third transmission rod hinged to the transmission disc pulls the support guide rod connected to the load disc to rotate to the extreme position away from the center of the lifting device. Since the torque generated by the load disc is greater than the torque generated by the hook, the hook is automatically lowered at this time, and the hook is located at the lifting point of the bogie axle. In this way, the hook can be automatically completed from the raised state to the positioned and lowered state.

[0010] When the lifting device lowers the load, during the vertical descent, the impact thrust generated by the re-contact of the thrust guide rod with the upper surface of the bogie to be lifted pushes the first transmission guide rod, causing the second transmission guide rod and its pawl to disengage. The ratchet's arrangement causes it to move in the opposite direction, thereby driving the installed drive shaft. A pair of transmission gears on the drive shaft drives the coaxially mounted transmission disc to rotate. The third transmission rod, hinged to the transmission disc, pushes the support guide rod connecting the load disc to rotate to its extreme position biased towards the center of the lifting device. Since the torque generated by the load disc is greater than the torque generated by the hook, the hook automatically retracts, completing the unloading operation. This automatically completes the process of the hook transitioning from the lifting state to the detached, raised state from the bogie.

[0011] Furthermore, it also includes: a first camera and a second camera;

[0012] The first camera is fixed on the first end beam; the second camera is fixed on the second end beam.

[0013] The beneficial effect of the above-mentioned further solution is that by using two cameras to capture the position of the train bogie, it is easier to determine the spatial three-dimensional position coordinates of the bogie lock hole suspension point.

[0014] A method for positioning the bogie locking hole lifting point of a lifting hoist for a high-speed train bogie, comprising the following steps:

[0015] S1. Construct an image set of the train bogie;

[0016] S2. Train the target extraction model using the image set to obtain the trained target extraction model;

[0017] S3. The trained target extraction model is used to process the bogie image of the train to be processed to obtain the feature image;

[0018] S4. Detect bogie lock hole suspension points from the feature image to obtain the target image of the bogie lock hole suspension points;

[0019] S5. Dehaze the target image of the bogie lock hole suspension point to obtain a dehazed image;

[0020] S6. Outline the bogie lock hole suspension points in the defogging image;

[0021] S7. Mark the outline of the bogie lock hole suspension point in the image of the EMU bogie to be processed, and calculate the spatial three-dimensional position coordinates of the bogie lock hole suspension point.

[0022] Further, the target extraction model in step S2 includes: Focus layer, CBL1 layer, CSP1 layer, Densel layer, CBL2 layer, CSP2 layer, Dense2 layer, CBL3 layer, SPP layer, CSP3 layer, CBL4 layer, first upsampling layer, CBL5 layer, CBL6 layer, CBL7 layer, convolutional layer Conv1, CBL8 layer, second upsampling layer, attention module GAM1, attention module GAM2, attention module GAM3, CBL9 layer, CBL10 layer, convolutional layer Conv2, convolutional layer Conv3, CBL11 layer, third upsampling layer, CBL12 layer, and CBL13 layer;

[0023] The input of the Focus layer serves as the input of the target extraction model, and its output is connected to the input of the CBL1 layer. The input of the CSP1 layer is connected to the output of the CBL1 layer, and its output is connected to the input of the Densel layer. The output of the Densel layer is connected to the input of the CBL2 layer and the first input of the attention module GAM3. The input of the CSP2 layer is connected to the output of the CBL2 layer, and its output is connected to the input of the Dense2 layer. The output of the Dense2 layer is connected to the input of the CBL3 layer and the first input of the attention module GAM2. The input of the SPP layer is connected to the output of the CBL3 layer, and its output is connected to the input of the CSP3 layer and the input of the CBL5 layer. The output of the CSP3 layer is connected to the input of the CBL4 layer. The input of the first upsampling layer is connected to the output of the CBL4 layer, and its output is connected to the second input of the attention module GAM1. The first input of the attention module GAM1 is connected to the output of the CBL5 layer, and its output is connected to the input of the CBL6 layer. The output of CBL6 is connected to the input of CBL7 and CBL8, respectively; the output of CBL7 is connected to the input of Conv1; the output of CBL8 is connected to the input of the second upsampling layer; the second input of the attention module GAM2 is connected to the output of the second upsampling layer, and its output is connected to the input of CBL9; the output of CBL9 is connected to the input of CBL10 and CBL11, respectively; the output of CBL10 is connected to... The input of convolutional layer Conv2 is connected; the input of the third upsampling layer is connected to the output of CBL11 layer, and its output is connected to the second input of attention module GAM3; the input of CBL12 layer is connected to the output of attention module GAM3, and its output is connected to the input of CBL13 layer; the output of CBL13 layer is connected to the input of convolutional layer Conv3; the outputs of convolutional layers Conv1, Conv2, and Conv3 serve as the outputs of the target extraction model.

[0024] The beneficial effects of the above-mentioned further solutions are as follows: The present invention adds Densel layer and Dense2 layer after CSP1 layer and CSP2 layer, which enables the target extraction model to extract inconspicuous features, and introduces attention module GAM3 to reconstruct intermediate feature data, fully extract features, and give higher attention to important features.

[0025] Furthermore, the attention modules GAM1, GAM2, and GAM3 each include: a convolutional layer Conv4, a CBL14 layer, a CBL15 layer, a CBL16 layer, a weighted global average pooling layer WGAP, a global max pooling layer GMP, and an adder;

[0026] The input of the convolutional layer Conv4 is connected to the inputs of layers CBL15, CBL16, the weighted global average pooling layer WGAP, and the global max pooling layer GMP, respectively, and its output is connected to the input of layer CBL14. The output of layer CBL14 is connected to the inputs of layers CBL15, CBL16, WGAP, and GMP, respectively. The output of layer CBL15 is connected to the input of layer CBL16. The input terminals of the CBL16 layer are connected to the input terminals of the weighted global average pooling layer (WGAP) and the global maximum pooling layer (GMP); the output terminals of the CBL16 layer are connected to the input terminals of the weighted global average pooling layer (WGAP) and the global maximum pooling layer (GMP), respectively; the first input terminal of the adder is connected to the output terminal of the weighted global average pooling layer (WGAP), its second input terminal is connected to the output terminal of the global maximum pooling layer (GMP), and its output terminal serves as the output terminal of attention module GAM1, attention module GAM2, or attention module GAM3.

[0027] The beneficial effects of the above-mentioned further scheme are as follows: the data input to the attention module is sequentially input into subsequent layers to prevent feature loss during feature extraction; a weighted global average pooling layer (WGAP) is introduced to aggregate the feature data in the global range; and a global max pooling layer (GMP) is used to retain salient features. The combination of the weighted global average pooling layer (WGAP) and the global max pooling layer (GMP) can reduce the number of parameters while retaining features to the greatest extent.

[0028] Furthermore, step S7 includes the following sub-steps:

[0029] S71. Process the grayscale of the dehazed image to obtain a grayscale feature image;

[0030] S72. Based on the gray values ​​of the gray-scale feature image, obtain three feature gray values;

[0031] S73. Center each point on the feature gray value;

[0032] S74. Calculate the difference between the gray values ​​in the neighborhood of the center point and the characteristic gray value of the center point.

[0033] S75. When the difference is less than the grayscale threshold, replace the grayscale value in the neighborhood with the grayscale value of the feature.

[0034] S76. Use the grayscale value in the neighborhood after replacement as the new center point, and jump to step S74 until all replaceable grayscale values ​​are found.

[0035] S77. Set all gray values ​​except those of the center point to 0 to obtain the initial contour image;

[0036] S78. Using each gray value in the initial contour map as the center point, when the gray values ​​in the 8 neighborhoods of the center point are consistent with the gray value of the center point, set the gray value of the center point to 0 to obtain the contour of the bogie lock hole suspension point.

[0037] The beneficial effects of the above-mentioned further solution are as follows: Considering that the gray values ​​of different parts of an object appear different on a grayscale image, this invention selects three different feature gray values ​​to characterize the outline of the object. Taking the location of each feature gray value as the center point, the gray values ​​are diffused outwards. Values ​​close to the center point are assigned to the corresponding range, and gray values ​​that do not belong to the corresponding range are set to 0. The initial outline image is found. When the gray value in the eight neighborhoods of the center point is consistent with the gray value of the center point, it indicates that the outline is thick. With the center point value being 0, the edge outline can be filtered out.

[0038] In summary, the beneficial effects of this invention are as follows: This invention designs a lifting device specifically for EMU bogies. The hook device is installed on a lifting frame and can move back and forth on the frame. The EMU bogie is captured by two sets of cameras, and the three-dimensional spatial coordinates of the bogie locking hole lifting point are found using a bogie locking hole lifting point positioning method. The hook device moves to directly above the bogie and lifts it. Through the coordination of various structures, this invention ensures the stability of the lifting device structure, and the movement of the weight disk stabilizes the center of gravity of the device. This invention solves the problem of unstable lifting points in existing EMU bogie lifting methods. Attached Figure Description

[0039] Figure 1 This is a top view of a lifting device for a high-speed train bogie;

[0040] Figure 2 This is a schematic diagram of the hook device.

[0041] Figure 3 for Figure 2 Detailed structural diagram on the left side;

[0042] Figure 4 for Figure 2 Detailed structural diagram on the right side;

[0043] Figure 5 A schematic diagram of the target extraction model;

[0044] Figure 6 A schematic diagram of the attention module;

[0045] Among them, 1. First main beam; 2. Second main beam; 3. Balance beam; 4. First end beam; 5. Second end beam; 6. First camera; 7. Second camera; 8. Hook device; 801. Hook; 802. Thrust guide rod; 803. First transmission guide rod; 804. Second transmission guide rod; 805. Pawl; 806. Ratchet; 807. Drive shaft; 808. Transmission disc; 809. Third transmission rod; 810. Support guide rod; 811. Weight disc; 812. Connecting guide rod; 813. Limiting block; 814. Support boss. Detailed Implementation

[0046] The specific embodiments of the present invention are described below to enable those skilled in the art to understand the present invention. However, it should be understood that the present invention is not limited to the scope of the specific embodiments. For those skilled in the art, various changes are obvious as long as they are within the spirit and scope of the present invention as defined and determined by the appended claims. All inventions utilizing the concept of the present invention are protected.

[0047] like Figure 1 As shown, a lifting device for a train bogie includes: a lifting frame and multiple sets of hook devices 8;

[0048] The multiple sets of hook devices 8 are slidably connected to the hanger; the hanger includes: a first main beam 1, a second main beam 2, a balance beam 3, a first end beam 4, and a second end beam 5;

[0049] One end of the first end beam 4 is fixedly connected to one end of the first main beam 1, and the other end is fixedly connected to one end of the second main beam 2; one end of the balance beam 3 is fixedly connected to the middle part of the first main beam 1, and the other end is fixedly connected to the middle part of the second main beam 2; one end of the second end beam 5 is fixedly connected to the other end of the first main beam 1, and the other end is fixedly connected to the other end of the second main beam 2.

[0050] like Figures 2-4 As shown, the hook device 8 includes: a hook 801, a thrust guide rod 802, a first transmission guide rod 803, a second transmission guide rod 804, a pawl 805, a ratchet 806, a drive shaft 807, a transmission disc 808, a third transmission rod 809, a support guide rod 810, a weight disc 811, a connecting guide rod 812, a limiting block 813, and a support boss 814;

[0051] One end of the hook 801 is hinged to one end of the thrust guide rod 802 and one end of the connecting guide rod 812 respectively; one end of the first transmission guide rod 803 is movably connected to the other end of the thrust guide rod 802, and its other end is movably connected to one end of the second transmission guide rod 804; one end of the pawl 805 is connected to the second transmission guide rod 804, and its other end is in contact with the ratchet 806; a pair of transmission gear pairs are fitted on the drive shaft 807, which drives the transmission disc 808 to rotate; one end of the third transmission rod 809 is movably connected to the transmission disc 808, and its other end is movably connected to the support guide rod 810; one end of the support guide rod 810 is movably connected to the support boss 814, and its other end is fixedly connected to the weight disc 811; the limiting block 813 is fixedly connected to the support boss 814; the other end of the connecting guide rod 812 and the third transmission rod 809 are hinged at the same point on the support guide rod 810.

[0052] When the lifting device lifts the load, and when the lifting device is above the bogie, the load disc 811 is biased towards the center point of the lifting device, and the hook 801 of the lifting device is in an outward-raised state. During the vertical lowering process of the lifting device perpendicular to the bogie, the impact thrust generated by the contact between the thrust guide rod 802 and the upper surface of the bogie to be lifted pushes the first transmission guide rod 803, which drives the second transmission guide rod 804 and the pawl 805 on the second transmission guide rod 804. The pawl 805 and the ratchet 806 can only move in one direction, thereby driving the hinged drive shaft 807. The drive shaft 807 has a pair of transmission gears, which drive the transmission disc 808 to rotate. The third transmission rod 809, hinged to the transmission disc 808, pulls the support guide rod 810 connected to the load disc 811 to rotate to the extreme position away from the center of the lifting device. Because the torque generated by the heavy object disc 811 is greater than the torque generated by the hook 801, the hook 801 automatically lowers at this time, and is now located at the bogie axle lifting point. This automatically completes the transition of the hook 801 from the raised state to the positioned and lowered state.

[0053] When the lifting device lowers the load, during the vertical descent, the impact thrust generated by the re-contact of the thrust guide rod 802 with the upper surface of the bogie to be lifted pushes the first transmission guide rod 803, causing the second transmission guide rod 804 and the pawl 805 on the second transmission guide rod 804 to disengage. The ratchet 806 is configured to move in the opposite direction, thereby driving the installed drive shaft 807. A pair of transmission gears on the drive shaft 807 drives the coaxially mounted transmission disc 808 to rotate. The third transmission rod 809, hinged to the transmission disc 808, pushes the support guide rod 810 connecting the load disc 811 to rotate to its extreme position biased towards the center of the lifting device. Since the torque generated by the load disc 811 is greater than the torque generated by the hook 801, the hook 801 automatically retracts, completing the unloading operation. This automatically completes the process of the hook moving from the lifting state to the state of detaching from the bogie and raising the hook.

[0054] The present invention also includes: a first camera 6 and a second camera 7;

[0055] The first camera 6 is fixed to the first end beam 4; the second camera 7 is fixed to the second end beam 5. By using the two cameras to capture the position of the train bogie, it is easier to determine the spatial three-dimensional position coordinates of the bogie lock hole suspension points.

[0056] A method for positioning the bogie locking hole lifting point of a lifting hoist for a high-speed train bogie, comprising the following steps:

[0057] S1. Construct an image set of the train bogie;

[0058] S2. Train the target extraction model using the image set to obtain the trained target extraction model;

[0059] S3. The trained target extraction model is used to process the bogie image of the train to be processed to obtain the feature image;

[0060] S4. Detect bogie lock hole suspension points from the feature image to obtain the target image of the bogie lock hole suspension points;

[0061] S5. Dehaze the target image of the bogie lock hole suspension point to obtain a dehazed image;

[0062] S6. Outline the bogie lock hole suspension points in the defogging image;

[0063] S7. Mark the outline of the bogie lock hole suspension point in the image of the EMU bogie to be processed, and calculate the spatial three-dimensional position coordinates of the bogie lock hole suspension point.

[0064] like Figure 5As shown, the target extraction model in step S2 includes: Focus layer, CBL1 layer, CSP1 layer, Densel layer, CBL2 layer, CSP2 layer, Dense2 layer, CBL3 layer, SPP layer, CSP3 layer, CBL4 layer, first upsampling layer, CBL5 layer, CBL6 layer, CBL7 layer, convolutional layer Conv1, CBL8 layer, second upsampling layer, attention module GAM1, attention module GAM2, attention module GAM3, CBL9 layer, CBL10 layer, convolutional layer Conv2, convolutional layer Conv3, CBL11 layer, third upsampling layer, CBL12 layer, and CBL13 layer;

[0065] The input of the Focus layer serves as the input of the target extraction model, and its output is connected to the input of the CBL1 layer. The input of the CSP1 layer is connected to the output of the CBL1 layer, and its output is connected to the input of the Densel layer. The output of the Densel layer is connected to the input of the CBL2 layer and the first input of the attention module GAM3. The input of the CSP2 layer is connected to the output of the CBL2 layer, and its output is connected to the input of the Dense2 layer. The output of the Dense2 layer is connected to the input of the CBL3 layer and the first input of the attention module GAM2. The input of the SPP layer is connected to the output of the CBL3 layer, and its output is connected to the input of the CSP3 layer and the input of the CBL5 layer. The output of the CSP3 layer is connected to the input of the CBL4 layer. The input of the first upsampling layer is connected to the output of the CBL4 layer, and its output is connected to the second input of the attention module GAM1. The first input of the attention module GAM1 is connected to the output of the CBL5 layer, and its output is connected to the input of the CBL6 layer. The output of CBL6 is connected to the input of CBL7 and CBL8, respectively; the output of CBL7 is connected to the input of Conv1; the output of CBL8 is connected to the input of the second upsampling layer; the second input of the attention module GAM2 is connected to the output of the second upsampling layer, and its output is connected to the input of CBL9; the output of CBL9 is connected to the input of CBL10 and CBL11, respectively; the output of CBL10 is connected to... The input of convolutional layer Conv2 is connected; the input of the third upsampling layer is connected to the output of CBL11 layer, and its output is connected to the second input of attention module GAM3; the input of CBL12 layer is connected to the output of attention module GAM3, and its output is connected to the input of CBL13 layer; the output of CBL13 layer is connected to the input of convolutional layer Conv3; the outputs of convolutional layers Conv1, Conv2, and Conv3 serve as the outputs of the target extraction model.

[0066] This invention adds Densel and Dense2 layers after CSP1 and CSP2 layers, enabling the target extraction model to extract less obvious features. It also introduces the attention module GAM3 to reconstruct intermediate feature data, fully extract features, and give higher attention to important features.

[0067] like Figure 6As shown, the attention modules GAM1, GAM2 and GAM3 each include: a convolutional layer Conv4, a CBL14 layer, a CBL15 layer, a CBL16 layer, a weighted global average pooling layer WGAP, a global max pooling layer GMP and an adder;

[0068] The input of the convolutional layer Conv4 is connected to the inputs of layers CBL15, CBL16, the weighted global average pooling layer WGAP, and the global max pooling layer GMP, respectively, and its output is connected to the input of layer CBL14. The output of layer CBL14 is connected to the inputs of layers CBL15, CBL16, WGAP, and GMP, respectively. The output of layer CBL15 is connected to the input of layer CBL16. The input terminals of the CBL16 layer are connected to the input terminals of the weighted global average pooling layer (WGAP) and the global maximum pooling layer (GMP); the output terminals of the CBL16 layer are connected to the input terminals of the weighted global average pooling layer (WGAP) and the global maximum pooling layer (GMP), respectively; the first input terminal of the adder is connected to the output terminal of the weighted global average pooling layer (WGAP), its second input terminal is connected to the output terminal of the global maximum pooling layer (GMP), and its output terminal serves as the output terminal of attention module GAM1, attention module GAM2, or attention module GAM3.

[0069] The data input to the attention module is sequentially fed into subsequent layers to prevent feature loss during feature extraction. A weighted global average pooling layer (WGAP) is introduced to aggregate the feature data globally, and then a global max pooling layer (GMP) is used to retain salient features. The combination of the weighted global average pooling layer (WGAP) and the global max pooling layer (GMP) reduces the number of parameters while retaining features to the greatest extent.

[0070] Step S7 includes the following sub-steps:

[0071] S71. Process the grayscale of the dehazed image to obtain a grayscale feature image;

[0072] S72. Based on the gray values ​​of the gray-scale feature image, obtain three feature gray values;

[0073] S73. Center each point on the feature gray value;

[0074] S74. Calculate the difference between the gray values ​​in the neighborhood of the center point and the characteristic gray value of the center point.

[0075] S75. When the difference is less than the grayscale threshold, replace the grayscale value in the neighborhood with the grayscale value of the feature.

[0076] S76. Use the grayscale value in the neighborhood after replacement as the new center point, and jump to step S74 until all replaceable grayscale values ​​are found.

[0077] S77. Set all gray values ​​except those of the center point to 0 to obtain the initial contour image;

[0078] S78. Using each gray value in the initial contour map as the center point, when the gray values ​​in the 8 neighborhoods of the center point are consistent with the gray value of the center point, set the gray value of the center point to 0 to obtain the contour of the bogie lock hole suspension point.

[0079] Considering that the gray values ​​of different parts of an object appear differently on a grayscale image, this invention selects three different feature gray values ​​to characterize the outline of the object. Taking the location of each feature gray value as the center point, the gray values ​​are diffused outwards. Values ​​close to the center point are assigned to its range, while gray values ​​not belonging to the range are set to 0. An initial outline image is found. When the gray values ​​in the eight neighborhoods of the center point are consistent with the gray value of the center point, it indicates that the outline is thick. With a value of 0 for the center point, the edge outline can be filtered out.

[0080] This invention designs a lifting device specifically for EMU bogies. A hook device 8 is mounted on a lifting frame and can move back and forth within the frame. The EMU bogie is captured by two sets of cameras, and the three-dimensional spatial coordinates of the bogie's locking hole lifting point are determined using a bogie locking hole lifting point positioning method. The hook device 8 then moves to directly above the bogie to lift it. Through the coordination of various structures, this invention ensures the stability of the lifting device structure. The movement of the weight disk 811 stabilizes the center of gravity of the device. This invention solves the problem of unstable lifting points in existing EMU bogie lifting methods.

Claims

1. A method for locating the locking hole lifting point of a lifting device of a motor vehicle bogie, It is characterized in that A lifting device for a motor vehicle bogie, comprising: a hanger and a plurality of hook devices (8); The multiple groups of hook devices (8) are slidably connected to the hanger; the hanger comprises: a first main beam (1), a second main beam (2), a balance beam (3), a first end beam (4) and a second end beam (5); One end of the first end beam (4) is fixedly connected to one end of the first main beam (1), and the other end thereof is fixedly connected to one end of the second main beam (2); one end of the balance beam (3) is fixedly connected to the middle part of the first main beam (1), and the other end thereof is fixedly connected to the middle part of the second main beam (2); one end of the second end beam (5) is fixedly connected to the other end of the first main beam (1), and the other end thereof is fixedly connected to the other end of the second main beam (2); The hook device (8) comprises: a hook (801), a thrust guide rod (802), a first transmission guide rod (803), a second transmission guide rod (804), a pawl (805), a ratchet wheel (806), a driving shaft (807), a transmission disc (808), a third transmission rod (809), a support guide rod (810), a weight disc (811), a connecting guide rod (812), a limit stopper (813) and a support boss (814); One end of the hook (801) is hinged to one end of the thrust guide rod (802) and one end of the connecting guide rod (812) respectively; one end of the first transmission guide rod (803) is movably connected to the other end of the thrust guide rod (802), and the other end of the first transmission guide rod (803) is movably connected to one end of the second transmission guide rod (804); one end of the ratchet pawl (805) is connected to the second transmission guide rod (804), and the other end of the ratchet pawl (805) is in contact with the ratchet wheel (806); a pair of transmission gear pairs are sleeved on the driving shaft (807), and the transmission gear pairs drive the transmission The disc (808) rotates; one end of the third transmission rod (809) is movably connected to the transmission disc (808), and the other end thereof is movably connected to the support guide rod (810); one end of the support guide rod (810) is movably connected to the support boss (814), and the other end thereof is fixedly connected to the weight disc (811); the limit stopper (813) is fixedly connected to the support boss (814); the other end of the connecting guide rod (812) and the third transmission rod (809) are hinged at the same point of the support guide rod (810); It also includes: a first camera (6) and a second camera (7); The first camera (6) is fixed on the first end beam (4); the second camera (7) is fixed on the second end beam (5); The method comprises the following steps: S1, constructing an image set of a motor vehicle bogie; S2, using the image set to train the target extraction model to obtain a trained target extraction model; S3, using the trained target extraction model to process the EMU bogie image to be processed to obtain a feature image; S4, detecting the bogie lock hole hanging point on the feature image to obtain the bogie lock hole hanging point target image; S5, defogging the target image of the bogie lock hole hanging point to obtain a defogging image; S6, outlining the outline of the bogie lock hole hanging point in the defogging image; S7, marking the outline of the bogie lock hole hanging point in the motor vehicle bogie image to be processed, and calculating the spatial three-dimensional position coordinates of the bogie lock hole hanging point; The target extraction model in step S2 includes: Focus layer, CBL1 layer, CSP1 layer, Densel layer, CBL2 layer, CSP2 layer, Dense2 layer, CBL3 layer, SPP layer, CSP3 layer, CBL4 layer, first upsampling layer, CBL5 layer, CBL6 layer, CBL7 layer, convolution layer Conv1, CBL8 layer, second upsampling layer, attention module GAM1, attention module GAM2, attention module GAM3, CBL9 layer, CBL10 layer, convolution layer Conv2, convolution layer Conv3, CBL11 layer, third upsampling layer, CBL12 layer and CBL13 layer; The input end of the Focus layer serves as the input end of the target extraction model, and its output end is connected to the input end of the CBL1 layer; the input end of the CSP1 layer is connected to the output end of the CBL1 layer, and its output end is connected to the input end of the Densel layer; the output end of the Densel layer is respectively connected to the input end of the CBL2 layer and the first input end of the attention module GAM3; the input end of the CSP2 layer is connected to the output end of the CBL2 layer, and its output end is connected to the input end of the Dense2 layer; the output end of the Dense2 layer is respectively connected to the input end of the CBL3 layer and the first input end of the attention module GAM2; the input end of the SPP layer is connected to the output end of the CBL3 layer, and its output end is respectively connected to the input end of the CSP3 layer and the input end of the CBL5 layer; the output end of the CSP3 layer is connected to the input end of the CBL4 layer; the input end of the first upsampling layer is connected to the output end of the CBL4 layer, and its output end is connected to the second input end of the attention module GAM1; the first input end of the attention module GAM1 is connected to the output end of the CBL5 layer, and its output end is connected to the input end of the CBL6 layer The output end of the CBL6 layer is connected to the input end of the CBL7 layer and the input end of the CBL8 layer respectively; the output end of the CBL7 layer is connected to the input end of the convolution layer Conv1; the output end of the CBL8 layer is connected to the input end of the second upsampling layer; the second input end of the attention module GAM2 is connected to the output end of the second upsampling layer, and its output end is connected to the input end of the CBL9 layer; the output end of the CBL9 layer is connected to the input end of the CBL10 layer and the input end of the CBL11 layer respectively; the output end of the CBL10 layer is connected to The input end of the convolution layer Conv2 is connected; the input end of the third upsampling layer is connected to the output end of the CBL11 layer, and its output end is connected to the second input end of the attention module GAM3; the input end of the CBL12 layer is connected to the output end of the attention module GAM3, and its output end is connected to the input end of the CBL13 layer; the output end of the CBL13 layer is connected to the input end of the convolution layer Conv3; the output end of the convolution layer Conv1, the output end of the convolution layer Conv2 and the output end of the convolution layer Conv3 serve as the output end of the target extraction model; The step S7 comprises the following sub-steps: S71, grayscale processing the defogging image to obtain a grayscale feature image; S72, obtaining three characteristic grayscale values ​​according to the grayscale value of the grayscale characteristic image; S73, taking the characteristic gray value as the center point respectively; S74, calculating the difference between the grayscale value in the neighborhood of the center point and the characteristic grayscale value of the center point; S75, when the difference is less than the grayscale threshold, the characteristic grayscale value replaces the grayscale value in the neighborhood; S76, taking the gray value in the neighborhood after replacement as the new center point, and jumping to step S74, until all gray values ​​that can be replaced are found; S77, setting all gray values ​​except the center point to 0 to obtain an initial contour map; S78, taking each gray value in the initial contour map as the center point, when the gray values ​​in the 8 neighborhoods of the center point are consistent with the gray value of the center point, setting the gray value of the center point to 0, and obtaining the contour of the bogie lock hole hanging point.

2. The method for locating the locking hole lifting point of the lifting device of the motor vehicle bogie according to claim 1, It is characterized in that The attention module GAM1, the attention module GAM2 and the attention module GAM3 all include: a convolution layer Conv4, a CBL14 layer, a CBL15 layer, a CBL16 layer, a weighted global average pooling layer WGAP, a global maximum pooling layer GMP and an adder; The input end of the convolutional layer Conv4 is respectively connected to the input end of the CBL15 layer, the input end of the CBL16 layer, the input end of the weighted global average pooling layer WGAP, and the input end of the global maximum pooling layer GMP, and its output end is connected to the input end of the CBL14 layer; the output end of the CBL14 layer is respectively connected to the input end of the CBL15 layer, the input end of the CBL16 layer, the input end of the weighted global average pooling layer WGAP, and the input end of the global maximum pooling layer GMP; the output end of the CBL15 layer is respectively connected to the input end of the CBL16 layer The input end of the CBL16 layer is connected to the input end of the weighted global average pooling layer WGAP and the input end of the global maximum pooling layer GMP; the output end of the CBL16 layer is respectively connected to the input end of the weighted global average pooling layer WGAP and the input end of the global maximum pooling layer GMP; the first input end of the adder is connected to the output end of the weighted global average pooling layer WGAP, the second input end is connected to the output end of the global maximum pooling layer GMP, and the output end serves as the output end of the attention module GAM1, the attention module GAM2 or the attention module GAM3.