A device and method for determining the damaged area of surrounding rock blasting excavation
By setting up vibration sensors for multiple measurement holes on the hole wall and using the modified blasting vibration velocity propagation model, the problem of complex measurement error and operation in the surrounding rock blasting excavation damage area under the height difference is solved, and surrounding rock damage is achieved Accurate measurement and automated analysis are suitable for harsh environments.
Patent Information
- Application Number
- CN202210730579.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-24
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-06-24
AI Technical Summary
The prior art determines the errors in the damage area of surrounding rock blasting excavation under large height differences, and the traditional methods are complex and time-consuming to operate, making it difficult to obtain effective monitoring data in harsh environments.
By opening multiple measurement holes on the hole wall, setting up series vibration sensors along the depth direction of the measurement holes, using the modified blasting vibration speed propagation model, the degree of rock damage is calculated, and the data is automatically collected and analyzed by the industrial control machine to achieve real-time Accurate damage area determination.
Accurately characterize the boundary line of surrounding rock damage, improve the reflection of the propagation law of blasting vibration speed, simplify operations, reduce data processing complexity, can be used normally in harsh environments, and realize the range of damage areas and damage levels of automated output.
Smart Images

Figure CN115112771B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tunnel construction, and in particular to a device and a method for determining a surrounding rock blasting excavation damage zone. Background Art
[0002] Since blasting excavation is a common method for underground cavern excavation, and drilling and blasting construction often causes blasting vibration disturbance in the rock mass, the scope of excavation damage has always been a hot topic for scholars to study. Therefore, it is particularly important to monitor the vibration velocity induced by tunnel drilling and blasting construction and determine the excavation damage area.
[0003] The problems existing in the prior art are: 1. When there is a large height difference between the explosion center and the monitoring point, there is a large error in the prediction of the particle vibration velocity, which cannot correctly reflect the propagation law of seismic waves; 2. Traditional methods for determining the excavation damage area include acoustic wave detection, rock sample CT scanning or nuclear magnetic resonance, which are complicated to operate and time-consuming; 3. Traditional blasting vibration velocity monitoring requires a complex and tedious process of installation, debugging, and monitoring, and if vibration velocity monitoring in the measuring hole is to be achieved, a velocity sensor must be artificially implanted, which is difficult to achieve and cannot obtain effective monitoring data under harsh test conditions.
[0004] In summary, there is an urgent need for a device and method for measuring the damaged area of surrounding rock blasting excavation to solve the problems of how to perform measurement under large height differences and the cumbersome monitoring operation in the prior art. Summary of the invention
[0005] The purpose of the present invention is to provide a device and method for measuring the damage area of surrounding rock blasting excavation, so as to solve the problem of how to measure and monitor the cumbersome operation under large height difference in the prior art. The specific technical solution is as follows:
[0006] A method for determining a damaged area of surrounding rock blasting excavation comprises the following steps:
[0007] Step S1: a measuring hole is opened on the cave wall, and a plurality of vibration sensors connected in series are arranged in the measuring hole along the depth direction of the measuring hole;
[0008] Step S2: obtaining the measured speeds at different hole depths during blasting according to the data of multiple vibration sensors, obtaining the boundary position of the excavation damage zone in the direction of the measured hole depth according to the measured speed, obtaining multiple boundary positions from multiple measured holes, and the connecting line of the multiple boundary positions is the boundary line between the excavation damage zone and the original rock;
[0009] Step S3: obtaining a modified blasting vibration velocity propagation model according to the data of the vibration sensor;
[0010] Step S4: Based on the blasting vibration velocity propagation model, the predicted velocity at the same position as the vibration sensor is obtained, and the degree of rock damage at different positions in the excavation damage zone is obtained according to the ratio of the measured velocity to the predicted velocity.
[0011] The above technical solution is preferably that in step S1, a plurality of measuring holes are opened on the cave wall, and the depths of the plurality of measuring holes are all 5-10 m.
[0012] The above technical solution is preferred, in step S2,
[0013] Calculate the difference ΔV' between the peak velocities measured by two adjacent vibration sensors in the measuring hole, as shown in formula 1):
[0014] ΔV'=V' i -V' i+1 1);
[0015] Among them, V' i represents the peak velocity of the i-th vibration sensor; the position of the i-th or i+1-th vibration sensor corresponding to the largest ΔV' in the measuring hole is taken as the boundary position of the excavation damage zone.
[0016] The above technical solution is preferred, in step S3,
[0017] The modified blasting vibration velocity propagation model is shown in formula 2), which is as follows:
[0018]
[0019] Where V is the peak velocity of particle vibration caused by the explosion; R is the straight-line distance between the explosion center and the vibration sensor; H gc is the height difference between the vibration sensor and the explosion center; K represents the coefficient related to geological conditions and surrounding rock characteristics; α and β represent the blasting attenuation coefficient and the elevation influence coefficient respectively; Q0 is the total amount of explosives used in the current blasting section;
[0020] In the above technical solution, K, α and β are obtained by multivariate function curve fitting, as shown in Formula 3):
[0021]
[0022] Among them, R n represents the distance between the nth vibration sensor in the measuring hole and the explosion center of the tunnel face; R0 represents the radius length of the tunnel; H gc Indicates the height difference between the vibration sensor in the measuring hole and the explosion center of the tunnel face; H bx Indicates the distance between the measuring hole and the explosion center of the tunnel face; L n It represents the vertical distance between the nth vibration sensor in the measuring hole and the hole mouth; L0 represents the horizontal distance between the measuring hole and the tunnel face.
[0023] The above technical solutions are preferred, select L n Calculate K, α, and β based on the data from the vibration sensor that is 3-5 meters away or more.
[0024] The above technical solution is preferred, in step S4, the rock damage degree at different positions of the excavated damage area is obtained by formula 4), and formula 4) is as follows:
[0025]
[0026] Among them, V1 represents the blasting vibration velocity measured by vibration sensor i in the excavation damage area; V2 represents the predicted velocity at the same position as vibration sensor i obtained based on the blasting vibration velocity propagation model; the rules for determining the degree of rock damage are as follows:
[0027] When D ≥ 1, the rock mass at the hole depth corresponding to vibration sensor i is slightly damaged;
[0028] When 0.75≤D<1, the rock mass at the hole depth position corresponding to vibration sensor i is slightly damaged;
[0029] When 0.25≤D<0.75, the rock mass at the hole depth corresponding to vibration sensor i is damaged;
[0030] When D < 0.25, the rock mass at the hole depth corresponding to the vibration sensor i is severely damaged.
[0031] The above technical solution is preferably based on the modified blasting vibration velocity propagation model to guide the construction, as shown in Formula 5):
[0032]
[0033] Where R' represents the distance between the building and the explosion center of the tunnel face; H' gc Indicates the height difference between the building and the explosion center of the tunnel face; V max Indicates the safe allowable standard value of blasting vibration; Q max Indicates the maximum charge amount of the current tunnel face.
[0034] A device for determining a damaged area caused by blasting excavation of surrounding rock is used to implement a method for determining a damaged area caused by blasting excavation of surrounding rock. The device for determining a damaged area caused by blasting excavation of surrounding rock comprises a vibration sensor, a modulator and an industrial control computer; a plurality of groups of vibration sensors connected in series are arranged in the measuring hole at equal intervals along the hole depth direction of the measuring hole, and the vibration sensors are used to monitor the blasting vibration speed; the industrial control computer is connected to the plurality of groups of vibration sensors through the modulator.
[0035] The application of the technical solution of the present invention has the following beneficial effects:
[0036] (1) The method of determining the surrounding rock blasting excavation damage zone of the present invention can obtain the boundary position of the excavation damage zone and the original rock through the data of the vibration sensor, that is, it can obtain the boundary line of the surrounding rock damage, so as to characterize the influence of the excavation blasting vibration on the surrounding rock. In addition, the method of the present invention introduces a modified blasting vibration velocity propagation model, which solves the problem that the propagation law of seismic waves cannot be correctly reflected when there is a large height difference between the blasting center and the monitoring point. That is, the modified blasting vibration velocity propagation model can more accurately characterize the dynamic response of the actual blasting vibration to the surrounding rock, and can derive the degree of rock damage at different positions in the excavation damage zone based on the predicted speed of the blasting vibration velocity propagation model, so as to facilitate subsequent reinforcement or other construction according to the degree of damage.
[0037] (2) The device for determining the damage zone of surrounding rock blasting excavation of the present invention has the following advantages: 1. It is simple and easy to use, and can measure the blasting vibration velocity in the measuring hole in real time and accurately, and realize automatic output of the blasting vibration velocity propagation model, determine the range of the excavation damage zone and classify the damage level of the excavation damage zone; 2. It is convenient to operate, and the data is automatically collected and can be uploaded to the cloud platform. The user can manage the test results online, eliminating the need for data copying and manual processing; 3. The device of the present invention has the advantages of small environmental interference and high precision. It can be used normally even in harsh environments, and only needs to use a tablet or industrial computer to receive data. It is simple to operate and can be reused.
[0038] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0040] In the attached picture:
[0041] Figure 1 is a schematic diagram of the device for measuring the surrounding rock blasting excavation damage zone in this embodiment being arranged in a measuring hole;
[0042] Figure 2 is a schematic diagram of a plurality of vibration sensors connected in series in this embodiment;
[0043] Figure 3 Schematic diagram of the distance between the vibration sensor of this embodiment and the orifice and the explosion center;
[0044] Figure 4 is a diagram of the propagation model of blasting vibration velocity of the measuring hole in this embodiment;
[0045] Figure 5Schematic diagram of the layout of four groups of measuring holes in this embodiment;
[0046] Figure 6 is a schematic diagram of the excavation damage area of this embodiment;
[0047] Among them, 1. Multiple vibration sensors connected in series; 1.1. Vibration sensor; 2. Modulator; 3. Industrial computer; 4. Communication cable; 5. Auxiliary rod; 6. Hole measurement; 6.1. Bottom of hole; 7. Face; 8. Explosion center; 9. Peak velocity of blasting vibration of vibration sensor beyond 3m deep; 10. Prediction velocity of blasting vibration velocity propagation model; 11. Blasting vibration velocity propagation model; 12. Peak velocity of blasting vibration of vibration sensor within 3m deep; 13. Boundary line between excavation damage area and original rock; 14. Severe damage area; 15. Moderate damage area; 16. Slight damage area; 17. Slight damage area. DETAILED DESCRIPTION
[0048] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
[0049] Example:
[0050] A method for determining the damage area of surrounding rock blasting excavation, such as Figures 1 to 6 As shown, the following steps are included:
[0051] Step S1, such as Figure 1 As shown: a measuring hole 6 is opened on the cave wall, and a plurality of vibration sensors 1 connected in series are arranged in the measuring hole along the depth direction of the measuring hole (in this embodiment, the vibration sensors are preferably optical fiber vibration sensors, and the number is n);
[0052] Step S1.1, such as Figure 5 and Figure 6 As shown: multiple measuring holes are opened on the tunnel wall. In this embodiment, four measuring holes are preferably opened. In this embodiment, the following are preferred for the four measuring holes: 1. The four measuring holes are arranged on the tunnel walls on both sides of the tunnel in pairs, and the shortest horizontal distance between the measuring holes and the tunnel face is 5-10m; 2. The depth of the four measuring holes is 5-10m (for example, 7m); 3. The four measuring holes are preferably horizontal holes, or are perpendicular to the tunnel wall. The four measuring holes in this embodiment are respectively recorded as measuring hole A, measuring hole B, measuring hole C and measuring hole D.
[0053] Step S1.2, such as Figure 2 As shown: multiple groups of vibration sensors are connected in series through communication cables 4, and vibration data of the surrounding rock is obtained through vibration sensors 1.1. In this embodiment, multiple groups of vibration sensors are preferably arranged at equal intervals in a group of measuring holes, and the last vibration sensor is located at the bottom of the measuring hole 6.1, and the distance between two adjacent groups of vibration sensors is 3-10cm.
[0054] Step S2, such as Figure 6 As shown: the measured speed at different hole depths during blasting is obtained according to the data of multiple vibration sensors, and the boundary position of the excavation damage zone in the depth direction of the measured hole is obtained according to the measured speed. Multiple measured holes yield multiple boundary positions, and the line connecting the multiple boundary positions is the boundary line 13 between the excavation damage zone and the original rock; the excavation damage zone here refers to the area disturbed by blasting in actual construction, and the original rock refers to the area not disturbed by blasting in actual construction, as follows:
[0055] Since blasting can cause damage to the surrounding rock, after the tunnel blasting, the surrounding rock is damaged and the medium is broken, which will cause a significant attenuation of the blasting seismic wave. Therefore, in the modified blasting vibration velocity propagation model, the particle sum peak vibration velocity should be greater than the blasting measured value. The maximum peak velocity of each vibration sensor is extracted, and the change of the peak velocity of each vibration sensor in each measuring hole is analyzed. If the measuring hole is not affected by the blasting, the velocity should be a continuously changing curve with the depth of the measuring hole; therefore, the mutation point with large attenuation in the velocity data (i.e., the velocity sudden drop point) is regarded as the boundary position between the excavation damage zone and the original rock. By connecting multiple measuring holes and multiple boundary positions obtained by the vibration sensors in the measuring holes, the boundary line between the excavation damage zone and the original rock can be obtained, so as to characterize the influence of the excavation blasting vibration on the surrounding rock; the determination of the boundary position is specifically shown in formula 1):
[0056] Calculate the difference ΔV' between the peak velocities of two adjacent vibration sensors in the measuring hole;
[0057] ΔV'=V' i -V' i+1 1);
[0058] Among them, V' i Indicates the peak velocity of the i-th vibration sensor; the position of the i-th or i+1-th vibration sensor corresponding to the maximum ΔV' calculated by all the vibration sensors in the measuring hole is taken as the dividing position (that is, in the two adjacent groups of vibration sensors with the largest velocity difference, the position of one group of vibration sensors in the two groups is arbitrarily taken as the dividing position); i<n.
[0059] Step S3: Obtain a modified blasting vibration velocity propagation model based on the data of the vibration sensor, as follows:
[0060] Step S3.1, such as Figures 3 to 5 As shown: The blasting vibration velocity propagation model of the measuring hole is shown in formula 2), which is as follows:
[0061]
[0062] Where V is the peak velocity of particle vibration caused by the explosion; R is the straight-line distance between the explosion center and the vibration sensor; H gcis the height difference between the vibration sensor (in this embodiment, the center point of the vibration sensor is defined as the measuring point or monitoring point) and the explosion center; K represents the coefficient related to the geological conditions and surrounding rock characteristics; α and β represent the blasting attenuation coefficient and the elevation influence coefficient respectively; Q0 is the total amount of explosives used in the current blasting section;
[0063] Step S3.2, such as Figure 4 As shown: K, α and β are obtained by multivariate function curve fitting, as shown in formula 3):
[0064]
[0065] Among them, R n represents the distance between the nth vibration sensor in the measuring hole and the explosion center of the tunnel face; R0 represents the radius length of the tunnel; H gc Indicates the height difference between the vibration sensor in the measuring hole and the explosion center of the tunnel face; H bx Indicates the distance between the measuring hole and the explosion center of the tunnel face; L n represents the vertical distance between the nth vibration sensor in the measuring hole and the hole opening (i.e., the hole opening of the measuring hole); L0 represents the horizontal distance between the measuring hole and the tunnel face; in this step, L is preferably selected n K, α and β are calculated based on the data of vibration sensors greater than or equal to 3-5 meters away. That is, because the depth of the tunnel excavation damage zone in the hole depth direction is generally less than 3 meters, the surrounding rock outside the hole depth of 3m is less damaged by the blasting load. In this embodiment, the data outside 3m (i.e., L n The peak vibration velocity of the vibration sensor with a height greater than 3 meters is taken as the effective data to characterize the dynamic response characteristics of the original rock under blasting load.
[0066] This embodiment provides an example of calculating K, α and β. Taking hole A as an example, based on equation 2) and equation 3), equation 3.1) is obtained:
[0067]
[0068] Wherein, the superscript A represents the measuring hole A, for example Indicates the distance between the measuring hole A and the explosion center 8 of the tunnel face 7; α A , β A , K A They represent the blasting attenuation coefficient, the elevation influence coefficient, and the coefficient related to the geological conditions and surrounding rock characteristics, respectively. The superscript A only represents the measuring hole A;
[0069] Similarly, according to equation 2), equation 3) and equation 3.1), the modified blasting vibration velocity propagation model of other measuring holes can be obtained;
[0070] Step S4: Based on the blasting vibration velocity propagation model 11, the predicted velocity at the same position as the vibration sensor is obtained, and according to the ratio of the measured velocity to the predicted velocity, the degree of rock damage at different positions in the excavation damage area is obtained, as follows:
[0071] Step S4.1: Based on the blasting vibration velocity propagation model of the measured hole, the predicted velocity at the same position (i.e., the same location point) as the vibration sensor (i.e., vibration sensor i) is obtained. The predicted velocity is obtained as follows: Figure 4 As shown ( Figure 4 The reference numeral 10 in the figure indicates the predicted speed of the blasting vibration velocity propagation model). By inputting the distance between the vibration sensor i and the explosion center of the tunnel face, the predicted speed at the same position as the vibration sensor i can be obtained from the blasting vibration velocity propagation model.
[0072] Step S4.2, such as Figure 4 As shown: According to the ratio of the measured speed and the predicted speed at the location of the vibration sensor i, the rock damage degree at the location of the vibration sensor i in the excavation damage area is obtained, as shown in formula 4):
[0073]
[0074] V1 represents the blasting vibration velocity measured by vibration sensor i in the excavation damage area (i.e. within a hole depth of 3m); V2 represents the predicted velocity at the same position as vibration sensor i obtained based on the blasting vibration velocity propagation model; the rules for determining the degree of rock damage are as follows:
[0075] When D ≥ 1, the rock mass at the hole depth corresponding to vibration sensor i is slightly damaged;
[0076] When 0.75≤D<1, the rock mass at the hole depth position corresponding to vibration sensor i is slightly damaged;
[0077] When 0.25≤D<0.75, the rock mass at the hole depth corresponding to vibration sensor i is damaged;
[0078] When D < 0.25, the rock mass at the hole depth corresponding to the vibration sensor i is severely damaged.
[0079] In this embodiment, according to the rock mass damage degree judgment rule, the four measuring holes respectively read the D value of each vibration sensor within the hole depth of 3m and automatically evaluate the damage degree. Finally, the four measuring holes will form four different degrees of damage areas in the excavation damage area (the depth of the excavation damage area is generally within 3m), that is, Figure 6As shown: slightly damaged area 17, micro-damaged area 16, moderately damaged area 15, and severely damaged area 14, the areas with the same damage degree of the four measuring holes are linearly connected in sequence, and finally the damaged excavation area with damage degree classification is obtained, which can guide the support construction of the tunnel, for example, the rock mass in the severely damaged area is reinforced.
[0080] In the method of this embodiment, it is preferred to guide the construction based on the modified blasting vibration velocity propagation model. Specifically, if a certain building (structure) is to be guaranteed not to be affected by blasting vibration, when calculating the maximum charge of the tunnel face blasting, the input parameters (specifically, input to the industrial computer) can be combined with formula 5), and the input parameters are R', H' gc and V max , the industrial computer can output the maximum charge Q of the current face max , as shown in Formula 5):
[0081]
[0082] Where R' represents the distance between the building and the explosion center of the tunnel face; H' gc Indicates the height difference between the building and the explosion center of the tunnel face; V max Indicates the safe allowable standard value of blasting vibration, V max For details, please refer to the "Safety Regulations for Blasting of the People's Republic of China" (GB6722-2014).
[0083] This embodiment also discloses a device for determining a damaged area of surrounding rock blasting excavation, which is used to implement a method for determining a damaged area of surrounding rock blasting excavation. The device for determining a damaged area of surrounding rock blasting excavation comprises a vibration sensor 1.1, a modulator 2 and an industrial computer 3; n groups of vibration sensors connected in series are arranged in the measuring hole at equal intervals along the hole depth direction, and the vibration sensors are used to monitor the blasting vibration speed; the industrial computer is connected to multiple groups of vibration sensors through the modulator, as follows:
[0084] N vibration sensors are connected in series at equal intervals through a communication cable, and a modulator (fiber optic vibration sensor) is connected to the communication cable. The fiber optic modulator transmits the output signal to an industrial computer, which can be used to establish a blasting vibration velocity propagation model and determine the scope of the excavation damage zone and the degree of damage to the rock mass.
[0085] Preferably in this embodiment, the vibration sensor is surrounded by a counterweight lead block.
[0086] In the present embodiment, preferably, a device for measuring the damaged area caused by blasting excavation of surrounding rock is provided in each measuring hole of the present embodiment, and further preferably, a plurality of devices for measuring the damaged area caused by blasting excavation of surrounding rock share a group of industrial control computers.
[0087] Preferably, in this embodiment, the device of this embodiment further comprises an auxiliary rod 5, and the auxiliary rod is used to deliver the n vibration sensors connected in series into the measuring hole.
[0088] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for determining the damaged area of surrounding rock blasting excavation, characterized in that: The steps include: Step S1: a measuring hole is opened on the cave wall, and a plurality of vibration sensors connected in series are arranged in the measuring hole along the depth direction of the measuring hole; Step S2: obtaining the measured speeds at different hole depths during blasting according to the data of multiple vibration sensors, obtaining the boundary position of the excavation damage zone in the direction of the measured hole depth according to the measured speed, obtaining multiple boundary positions from multiple measured holes, and the connecting line of the multiple boundary positions is the boundary line between the excavation damage zone and the original rock; Step S3: obtaining a modified blasting vibration velocity propagation model according to the data of the vibration sensor; In step S3, the modified blasting vibration velocity propagation model is shown in formula 2), which is as follows: Where V is the peak velocity of particle vibration caused by the explosion; R is the straight-line distance between the explosion center and the vibration sensor; H gc is the height difference between the vibration sensor and the explosion center; K represents the coefficient related to geological conditions and surrounding rock characteristics; α and β represent the blasting attenuation coefficient and the elevation influence coefficient respectively; Q0 is the total amount of explosives used in the current blasting section; K, α and β are obtained by multivariate function curve fitting, as shown in formula 3): Among them, R n represents the distance between the nth vibration sensor in the measuring hole and the explosion center of the tunnel face; R0 represents the radius length of the tunnel; H gc Indicates the height difference between the vibration sensor in the measuring hole and the explosion center of the tunnel face; H bx Indicates the distance between the measuring hole and the explosion center of the tunnel face; L n It represents the vertical distance between the nth vibration sensor in the measuring hole and the hole mouth; L0 represents the horizontal distance between the measuring hole and the tunnel face; Select L n Calculate K, α and β based on the data of the vibration sensor greater than or equal to 3-5 meters away; The construction is guided by the modified blasting vibration velocity propagation model, as shown in Formula 5): Where R' represents the distance between the building and the explosion center of the tunnel face; H' gc Indicates the height difference between the building and the explosion center of the tunnel face; V max Indicates the safe allowable standard value of blasting vibration; Q max Indicates the maximum charge amount of the current face; Step S4: obtaining the predicted velocity at the same position as the vibration sensor based on the blasting vibration velocity propagation model, and obtaining the degree of rock damage at different positions in the excavation damage zone according to the ratio of the measured velocity to the predicted velocity; The rock damage degree at different positions in the excavation damage zone is obtained by formula (4), which is as follows: Among them, V1 represents the blasting vibration velocity measured by vibration sensor i in the excavation damage area; V2 represents the predicted velocity at the same position as vibration sensor i obtained based on the modified blasting vibration velocity propagation model; the rules for determining the degree of rock damage are as follows: When D ≥ 1, the rock mass at the hole depth corresponding to vibration sensor i is slightly damaged; When 0.75≤D<1, the rock mass at the hole depth position corresponding to vibration sensor i is slightly damaged; When 0.25≤D<0.75, the rock mass at the hole depth corresponding to vibration sensor i is damaged; When D < 0.25, the rock mass at the hole depth corresponding to the vibration sensor i is severely damaged.
2. The method for determining the damaged area of surrounding rock blasting excavation according to claim 1, characterized in that: In the step S1, a plurality of measuring holes are opened on the cave wall, and the depth of the plurality of measuring holes is 5-10 m.
3. The method for determining the damaged area of surrounding rock blasting excavation according to claim 1 or 2, characterized in that: In step S2, the difference ΔV' between the peak velocities measured by two adjacent vibration sensors in the measuring hole is calculated, as shown in formula 1): ΔV'=V i '-V i ' +1 1); Among them, V i ' represents the peak velocity of the i-th vibration sensor; the position of the i-th or i+1-th vibration sensor corresponding to the largest ΔV' in the measuring hole is taken as the boundary position of the excavation damage zone.
4. A device for measuring the damaged area of surrounding rock blasting excavation, used to implement the method for measuring the damaged area of surrounding rock blasting excavation as described in claim 1, the device for measuring the damaged area of surrounding rock blasting excavation comprises a vibration sensor, a modulator and an industrial computer; a plurality of groups of vibration sensors connected in series are arranged equidistantly in the measuring hole along the hole depth direction of the measuring hole, and the vibration sensors are used to monitor the blasting vibration speed; the industrial computer is connected to the plurality of groups of vibration sensors through the modulator.