A test system and control method suitable for high-voltage cascade energy storage converter

The isolated DC/DC power module simulates the characteristics of the battery cluster to provide test power for the high-voltage cascade energy storage converter, which solves the problems of large size, high cost and safety hazards of the existing test system, and achieves efficient and convenient testing and debugging. , promoting the development of high-voltage energy storage systems.

CN115112976BActive Publication Date: 2024-10-01SOUTHERN POWER GRID PEAK LOAD & FREQUENCY REGULATION GENERATING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210725446.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-24
Publication Date
2024-10-01
Estimated Expiration
2042-06-24

AI Technical Summary

Technical Problem

Existing high-voltage cascaded energy storage converters lack convenient and efficient testing methods. Traditional testing systems are large in size, high in cost, and have safety hazards, and are difficult to adapt to various input power sources.

Method used

A test system is designed that uses an isolated DC/DC power module to provide a direct voltage source and tests the high-voltage cascade energy storage converter by simulating the operating characteristics of the battery cluster. It adopts a modular high-frequency topology to achieve different voltages. and current power supply, and coordinates with the unit controller through the main controller to achieve mode matching and fault protection.

Benefits of technology

It significantly improves the adaptability and efficiency of the test system, reduces test costs, enables debugging and performance testing of high-voltage energy storage systems without battery clusters, and improves safety performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115112976B_ABST
    Figure CN115112976B_ABST
Patent Text Reader

Abstract

The invention discloses a test system and a control method for a high-voltage cascade energy storage converter. The system adapts to different power supply scenarios through different electrical connection modes, and completes the whole machine test of the high-voltage cascade energy storage converter without a battery cluster. The test system comprises n isolated DC / DC power modules, each module is composed of a dual active full bridge composed of two full bridges and a high-frequency isolation transformer, and a bidirectional DC / DC conversion function is realized. The connection with different input power sources such as module-level DC, high-voltage DC, and low-voltage DC is realized through direct connection, series connection, and parallel connection of a DC interface on one side of the isolated DCDC power module, and the DC interface on the other side of the power module is connected to the DC side of the power module of the high-voltage cascade energy storage converter to be tested. The main controller is connected to each DCDC power module through communication, so as to realize different operation mode control of the power module under different electrical connection modes, and module-level output characteristic control simulating battery characteristics.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power electronics technology and power quality control technology, and in particular relates to a test system suitable for a high-voltage cascade energy storage converter and a control method thereof. Background Art

[0002] With the proposal of the "dual carbon" goal, the proportion of new energy such as wind power and solar energy in the power supply is rapidly increasing. However, new energy power generation is discontinuous, unstable and uncontrollable. The large-scale integration of new energy into the power grid will have a serious impact on the safe and stable operation of the power grid. Applying energy storage to the field of power transmission and distribution, participating in frequency regulation, voltage support, peak regulation, spare capacity reactive support, alleviating line congestion, delaying the expansion and upgrading of power transmission and distribution, and serving as a DC power supply for substations can effectively alleviate a series of problems caused by the connection of new energy to the grid. With the continuous development of battery technology and converters, energy storage systems consisting of batteries and their supporting converters have been widely used in power systems.

[0003] In the prior art, energy storage converters are mainly divided into low-voltage energy storage converters and high-voltage energy storage converters. With the widespread application of low-voltage energy storage converter solutions in large-capacity energy storage systems, the shortcomings of the battery cells caused by multiple parallel batteries, the slow response speed caused by the need for multiple parallel connections to form a large-capacity energy storage system, and the low system efficiency caused by multi-stage conversion are becoming more and more prominent. High-voltage cascade energy storage converters have become the development trend of energy storage converters in the future with their advantages of battery cluster access without parallel connection, large single-machine capacity, and high direct grid connection efficiency.

[0004] At present, the research on high-voltage cascade energy storage converters is mainly focused on improving the power density and optimizing the control of the converters. There is a lack of sufficient research on convenient and efficient testing methods for high-voltage cascade energy storage converters. However, the current high-voltage cascade energy storage system has a high input voltage and a large single-unit capacity. It requires multiple battery clusters in high-voltage suspension to build a complete bidirectional charging and discharging test system for high-voltage energy storage converters. It can be seen that the required testing conditions are harsh, the volume is large, and the cost is high. More importantly, there are major safety hazards in directly testing the newly developed energy storage converter with batteries. Therefore, the development and mass application of high-voltage cascade energy storage systems have an urgent need for a test system that is not connected to the battery and can adapt to various input power supplies. Summary of the invention

[0005] In order to solve the deficiencies in the prior art, the purpose of the present invention is to provide a test system and a control method suitable for a high-voltage cascade energy storage converter. Each power module of the high-voltage cascade energy storage converter is provided with a direct voltage source by an isolated DC / DC power module, and the DC port of the DC / DC power module simulates the direct voltage source of a battery cluster to realize various functional tests of the high-voltage cascade energy storage converter.

[0006] The present invention adopts the following technical solution.

[0007] On one hand, the present invention proposes a test system suitable for a high-voltage cascade energy storage converter, wherein the high-voltage cascade energy storage converter to be tested includes a three-phase bridge arm, each phase bridge arm includes n power modules, and each power module includes an AC side and a DC side. The AC sides of the n power modules on each phase bridge arm are connected in series and then connected to the corresponding phase of the AC side of the high-voltage cascade energy storage converter to be tested through an inductor.

[0008] The test system includes a three-phase bridge arm, and each phase bridge arm includes n isolated DC / DC power modules; wherein each isolated DC / DC power module includes a first DC side and a second DC side;

[0009] The first DC side of each isolated DC / DC power module is connected to the DC side of each power module of the high-voltage cascade energy storage converter to be tested;

[0010] When the test system is used for the whole-machine pair-drag test of the high-voltage cascade energy storage converter to be tested, the second DC side of each isolated DC / DC power module is connected to the DC side of each power module of the accompanying high-voltage cascade energy storage converter;

[0011] When the test system is used to provide a low-voltage, high-current DC source for the high-voltage cascade energy storage converter to be tested, the second DC sides of the n isolated DC / DC power modules on the three-phase bridge arm are connected in parallel and then connected to the low-voltage, high-current DC source; wherein a voltage less than or equal to 1 kV is considered low voltage;

[0012] When the test system is used to provide a high-voltage and low-current DC source for the high-voltage cascade energy storage converter to be tested, the second DC sides of the n isolated DC / DC power modules on the three-phase bridge arm are connected in series in sequence and then connected to the high-voltage and low-current DC source; wherein a voltage greater than or equal to 5kV is considered a high voltage.

[0013] The first DC side of the isolated DC / DC power module includes a first DC positive port and a first DC negative port; the DC side of each power module includes a DC positive port and a DC negative port;

[0014] The first DC positive port of each isolated DC / DC power module is connected to the DC positive port of each power module of the high-voltage cascade energy storage converter to be tested, and the first DC negative port of each isolated DC / DC power module is connected to the DC negative port of each power module of the high-voltage cascade energy storage converter to be tested.

[0015] The second DC side of the isolated DC / DC power module includes a second DC positive port and a second DC negative port;

[0016] When the test system is used for the whole-machine pair-drag test of the high-voltage cascade energy storage converter to be tested, the second DC positive port of each isolated DC / DC power module is connected to the DC positive port of each power module of the high-voltage cascade energy storage converter to be tested, and the second DC negative port of each isolated DC / DC power module is connected to the DC negative port of each power module of the high-voltage cascade energy storage converter to be tested.

[0017] When the test system is used to provide a low-voltage, high-current DC source for a high-voltage cascade energy storage converter to be tested, the second DC positive ports of the n isolated DC / DC power modules on each phase bridge arm are connected in parallel and connected to the positive electrode of the low-voltage, high-current DC source, and the second DC negative ports of the n isolated DC / DC power modules on each phase bridge arm are connected in parallel and connected to the negative electrode of the low-voltage, high-current DC source.

[0018] When the test system is used to provide a high-voltage and low-current DC source for the high-voltage cascade energy storage converter to be tested, the second DC positive port of the first isolated DC / DC power module on the A-phase bridge arm is connected to the positive pole of the high-voltage and low-current DC source, and the second DC negative port of the n-th isolated DC / DC power module on the C-phase bridge arm is connected to the negative pole of the high-voltage and low-current DC source; the second DC negative port of the previous isolated DC / DC power module on each phase bridge arm is connected to the second DC positive port of the next isolated DC / DC power module; and the second DC negative port of the n-th isolated DC / DC power module on the A-phase bridge arm is connected to the second DC positive port of the first isolated DC / DC power module on the B-phase bridge arm, and the second DC negative port of the n-th isolated DC / DC power module on the B-phase bridge arm is connected to the second DC positive port of the first isolated DC / DC power module on the C-phase bridge arm.

[0019] The test system includes: a DC source interface circuit; the DC source interface circuit includes a DC source positive electrode interface circuit and a DC source negative electrode interface circuit; wherein the DC source positive electrode interface circuit and the DC source negative electrode interface circuit adopt the same circuit structure, and both include: a DC switch, a pre-charging contactor, and a pre-charging resistor;

[0020] In the DC source positive electrode interface circuit, one end of the DC switch is connected to the positive electrode of the DC source, the other end of the DC switch is connected to one end of the pre-charging contactor and one end of the pre-charging resistor, and the other end of the pre-charging contactor and the other end of the pre-charging resistor are connected to the second DC positive electrode port of the isolated DC / DC power module;

[0021] In the DC source negative electrode interface circuit, one end of the DC switch is connected to the negative electrode of the DC source, the other end of the DC switch is connected to one end of the pre-charging contactor and one end of the pre-charging resistor, and the other end of the pre-charging contactor and the other end of the pre-charging resistor are connected to the second DC negative electrode port of the isolated DC / DC power module.

[0022] The test system includes: a main controller; the main controller communicates with each power module using optical fiber media, the main controller is used to control the power module to realize different operating modes under different electrical connection modes, and is also used to control the module-level output characteristics of the power module to simulate battery characteristics, and is used to obtain the electrical operating status and fault information of the power module; the main controller communicates with the main controller of the high-voltage energy storage converter to be tested to realize coordinated start and stop, mode matching, and fault protection interlocking;

[0023] The main controller receives external virtual battery control instructions and battery energy voltage curve point table, and calculates the voltage command value of each unit in this control cycle according to the virtual battery control instructions, current virtual battery status, module sampling value, and battery energy voltage curve point table.

[0024] The test system also includes 3n unit controllers; a single power module of the high-voltage cascade energy storage converter to be tested corresponds to a single unit controller;

[0025] The main controller sends the calculated voltage command value of each unit in this control cycle to each unit controller;

[0026] The unit controller executes the secondary voltage control mode of the power module and can sample the voltage and current at both ends of the power module. In the secondary voltage control mode of the power module, the unit controller generates a power command based on the voltage command value of the main controller, the sampled voltage of the power module and the sampled current of the power module, and then generates a control pulse based on the modulation strategy to achieve the secondary voltage of the power module running at the voltage command value.

[0027] The unit controller uploads the voltage and current sampling values ​​at both ends of the power module to the main controller.

[0028] The isolated DC / DC power module adopts a dual active bridge topology, with electrical isolation between the first DC side and the second DC side;

[0029] The isolated DC / DC power module includes: a primary side interface circuit, a primary side full-bridge circuit, a high-frequency isolation circuit, a secondary side full-bridge circuit, a current sharing circuit, and a secondary side switch circuit; the first DC side is connected to the primary side interface circuit, the primary side interface circuit is connected to the primary side full-bridge circuit, the primary side full-bridge circuit is connected to the secondary side full-bridge circuit through the high-frequency isolation circuit, the secondary side full-bridge circuit is connected to the secondary side switch circuit through the current sharing circuit, and the secondary side switch circuit is connected to the second DC side;

[0030] Among them, the primary interface circuit includes a first DC fuse and a first DC contactor connected in series; the primary full-bridge circuit and the secondary full-bridge circuit adopt the same circuit structure, the primary full-bridge circuit includes a first full-bridge circuit composed of 4 switch tubes and a primary support capacitor connected in parallel with the first full-bridge circuit; the secondary full-bridge circuit includes a second full-bridge circuit composed of 4 switch tubes and a secondary support capacitor connected in parallel with the second full-bridge circuit; the high-frequency isolation circuit includes: an inductor, a first DC blocking capacitor, a second DC blocking capacitor and a high-frequency isolation transformer; the current balancing circuit includes a current limiting inductor and a buffer capacitor; the secondary switch circuit includes a second DC fuse and a second DC contactor;

[0031] The first DC positive port of the isolated DC / DC power module is connected to one end of the first DC fuse, the other end of the first DC fuse is connected to one end of the first DC contactor, the other end of the first DC contactor is connected to the positive end of the primary support capacitor and the first input end of the first full-bridge circuit, the negative end of the primary support capacitor is connected to the first DC negative port of the isolated DC / DC power module, the first DC negative port of the isolated DC / DC power module, and the second input end of the first full-bridge circuit; the positive output end of the first full-bridge circuit is connected to one end of the inductor, the negative output end of the first full-bridge circuit is connected to one end of the first DC blocking capacitor, the other end of the inductor is connected to one end of the primary winding of the high-frequency isolation transformer, the other end of the first DC blocking capacitor is connected to the other end of the primary winding of the high-frequency isolation transformer T; one end of the secondary winding of the high-frequency isolation transformer T is connected to the second The positive output end of the full-bridge circuit is connected, the other end of the secondary winding of the high-frequency isolation transformer T is connected to one end of the second DC blocking capacitor, the other end of the second DC blocking capacitor is connected to the negative output end of the second full-bridge circuit, and one end of the primary winding of the high-frequency isolation transformer and one end of the secondary winding of the high-frequency isolation transformer are the same-name terminals; the first input end of the second full-bridge circuit is connected to the positive end of the secondary support capacitor and one end of the current limiting inductor, the second input end of the second full-bridge circuit is connected to the negative end of the secondary support capacitor, one end of the buffer capacitor, and the second DC negative port of the isolated DC / DC power module, the other end of the buffer capacitor is connected to the other end of the current limiting inductor and one end of the second DC contactor; the other end of the second DC contactor is connected to one end of the second DC fuse, and the other end of the second DC fuse is connected to the second DC positive port of the isolated DC / DC power module.

[0032] On the other hand, the present invention also proposes a control method for a test system suitable for a high-voltage cascade energy storage converter, comprising:

[0033] Step 1: Collect the DC voltage U of the first DC side of the i-th power module dc1i and DC current I dc1i , DC voltage U of the second DC side dc2i and DC current I dc2i, where i = 1, 2, ..., n;

[0034] Step 2: Calculate the virtual battery energy state within the control period according to the sampling value in step 1, satisfying the following relationship:

[0035] E i (T) = E i (0)+U dc1i I dc1i T

[0036] In the formula,

[0037] E i (T) is the virtual battery energy state of the i-th power module in the control period T,

[0038] E i (0) is the virtual battery energy state of the i-th power module in the previous control cycle,

[0039] T is the control period;

[0040] Step 3, according to E i (T) and the battery energy voltage curve point table, look up the table to obtain the voltage command value U of the i-th power module refi , and determine U according to the external input test target refi ; Among them, the external input test target includes adjusting the voltage and current state of a single power module;

[0041] Step 4: Set the voltage command value U of each power module refi Send it to each unit controller;

[0042] Step 5: Each unit controller generates a power command P for each power module according to the voltage control strategy. refi ; According to the power instruction P refi Using modulation algorithm to obtain control pulses;

[0043] Step 6: Each power module executes a control pulse to implement command voltage tracking control on a controlled port, wherein the controlled port includes the first DC side and / or the second DC side.

[0044] The beneficial effect of the present invention is that, compared with the prior art, the test system proposed by the present invention can simulate the working characteristics of the battery cluster to provide a test power supply for the high-voltage cascade energy storage converter, including simulating the voltage source characteristics of the battery cluster in a normal state and simulating the difference in module voltage when the consistency of the battery cluster is poor; different connection modes and control modes of the power module can be used to realize the access of power supplies with different voltages and currents, especially when the DCDC power module is running independently, two sets of high-voltage cascade energy storage converters are connected to test two sets of equipment at the same time, which significantly improves the adaptability and test efficiency of the test system; the test system adopts a modular high-frequency topological structure, which can effectively improve the compactness of the test system and the convenience of fault maintenance; it can communicate with the high-voltage cascade energy storage converter to be tested, realize coordinated operation control such as mode matching and fault chain, and improve test efficiency and safety performance. Therefore, this test system can complete the debugging and performance testing of cascade energy storage converters of various topological structures without the condition of a battery cluster, reducing the cost of batch application testing and promoting the development of high-voltage energy storage systems. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 It is a schematic diagram of a power module of a high-voltage cascade energy storage converter according to an embodiment of the present invention;

[0046] Figure 2 is a schematic diagram of an isolated DC / DC power module in an embodiment of the present invention;

[0047] 1-primary side interface circuit; 2-primary side full bridge circuit; 3-high frequency isolation circuit; 4-secondary side full bridge circuit; 5-current balancing circuit; 6-secondary side switch circuit;

[0048] DC1-first DC side; DC2-second DC side; Idc1-first DC side current; Idc2-second DC side current;

[0049] Fu1-first DC fuse; KM1-first DC contactor;

[0050] Fu2-second DC fuse; KM2-second DC contactor;

[0051] FB1-first full-bridge circuit; FB2-second full-bridge circuit;

[0052] C1-primary side support capacitor; C2-secondary side support capacitor; Cs1-first DC blocking capacitor; Cs2-second DC blocking capacitor; Cf-buffer capacitor; Ls-inductor; Lf-current limiting inductor;

[0053] Figure 3 Schematic diagram of modulation principle of isolated DC / DC power module in an embodiment of the present invention;

[0054] Figure 4It is a schematic diagram of a towing test of a high-voltage cascade energy storage system formed by independent operation of DC / DC modules in an embodiment of the present invention;

[0055] Figure 5 Schematic diagram of a test system in which DC / DC modules are connected in parallel and operated as a low-voltage DC source as a power source in an embodiment of the present invention;

[0056] Figure 6 Schematic diagram of a test system in which DC / DC modules are operated in series to form a high-voltage DC source as a power source in an embodiment of the present invention;

[0057] Figure 7 is a flow chart of the virtual battery voltage control software in an embodiment of the present invention;

[0058] Figure 8 1 is a block diagram of module voltage control in an embodiment of the present invention. DETAILED DESCRIPTION

[0059] The present application is further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present application.

[0060] On the one hand, the present invention provides a test system suitable for a high-voltage cascade energy storage converter. The high-voltage cascade energy storage converter to be tested includes a three-phase bridge arm, each phase bridge arm includes n power modules, and the power modules of the high-voltage cascade energy storage converter are as follows: Figure 1 As shown, each power module includes an AC side AC and a DC side DC.

[0061] Each power module also includes a DC interface circuit, a full-bridge circuit, and L and C filter circuits. The DC side DC is connected to the battery cluster, and the AC side AC is connected in series with the AC side of other power modules and then connected to the high-voltage AC system. Among them, the DC interface circuit includes two parallel branches, the first branch includes a DC contactor KM and a filter inductor L connected in series, and the second branch includes a DC side pre-charging contactor K0 and a resistor R connected in series; the full-bridge circuit includes a full-bridge FB composed of 4 switching tubes and a primary side support capacitor C1 connected in parallel with the full-bridge FB.

[0062] The test system includes a three-phase bridge arm, and each phase bridge arm includes n isolated DC / DC power modules; Figure 2 Each of the isolated DC / DC power modules shown includes a first DC side DC1 and a second DC side DC2.

[0063] The isolated DC / DC power module adopts a dual active bridge topology, and the first DC side DC1 is electrically isolated from the second DC side DC2.

[0064] like Figure 2The isolated DC / DC power module includes: a primary side interface circuit 1, a primary side full bridge circuit 2, a high-frequency isolation circuit 3, a secondary side full bridge circuit 4, a current equalizing circuit 5, and a secondary side switch circuit 6; the first DC side DC1 is connected to the primary side interface circuit 1, the primary side interface circuit 1 is connected to the primary side full bridge circuit 2, the primary side full bridge circuit 2 is connected to the secondary side full bridge circuit 4 through the high-frequency isolation circuit 3, the secondary side full bridge circuit 4 is connected to the secondary side switch circuit 6 through the current equalizing circuit 5, and the secondary side switch circuit 6 is connected to the second DC side DC2.

[0065] Among them, the primary interface circuit 1 includes a first DC fuse Fu1 and a first DC contactor KM1 connected in series; the primary full-bridge circuit 2 and the secondary full-bridge circuit 4 adopt the same circuit structure, the primary full-bridge circuit 2 includes a first full-bridge circuit FB1 composed of 4 switching tubes and a primary support capacitor C1 connected in parallel with the first full-bridge circuit FB1; the secondary full-bridge circuit 4 includes a second full-bridge circuit FB2 composed of 4 switching tubes and a secondary support capacitor C2 connected in parallel with the second full-bridge circuit FB2; the high-frequency isolation circuit 3 includes: an inductor Ls, a first DC blocking capacitor Cs1, a second DC blocking capacitor Cs2 and a high-frequency isolation transformer T; the current balancing circuit 5 includes a current limiting inductor Lf and a buffer capacitor Cf; the secondary switch circuit includes a second DC fuse Fu2 and a second DC contactor KM2.

[0066] The first DC positive port of the isolated DC / DC power module is connected to one end of the first DC fuse Fu1, the other end of the first DC fuse Fu1 is connected to one end of the first DC contactor KM1, the other end of the first DC contactor KM1 is connected to the positive end of the primary support capacitor C1 and the first input end of the first full-bridge circuit FB1, the negative end of the primary support capacitor C1 is connected to the first DC negative port of the isolated DC / DC power module, the first DC negative port of the isolated DC / DC power module, and the second input end of the first full-bridge circuit FB1; the positive output end of the first full-bridge circuit FB1 is connected to one end of the inductor Ls, the negative output end of the first full-bridge circuit FB1 is connected to one end of the first DC blocking capacitor Cs1, the other end of the inductor Ls is connected to one end of the primary winding of the high-frequency isolation transformer T, and the other end of the first DC blocking capacitor Cs1 is connected to the other end of the primary winding of the high-frequency isolation transformer T; one end of the secondary winding of the high-frequency isolation transformer T is connected to the second full-bridge The positive output end of the circuit FB2 is connected, the other end of the secondary winding of the high-frequency isolation transformer T is connected to one end of the second DC blocking capacitor Cs2, the other end of the second DC blocking capacitor Cs2 is connected to the negative output end of the second full-bridge circuit FB2, and one end of the primary winding of the high-frequency isolation transformer T and one end of the secondary winding of the high-frequency isolation transformer T are the same-name terminals; the first input end of the second full-bridge circuit FB2 is connected to the positive terminal of the secondary support capacitor C2 and one end of the current limiting inductor Lf, the second input end of the second full-bridge circuit FB2 is connected to the negative terminal of the secondary support capacitor C2, one end of the buffer capacitor Cf, and the second DC negative port of the isolated DC / DC power module, the other end of the buffer capacitor Cf is connected to the other end of the current limiting inductor Lf and one end of the second DC contactor KM2; the other end of the second DC contactor KM2 is connected to one end of the second DC fuse Fu2, and the other end of the second DC fuse Fu2 is connected to the second DC positive port of the isolated DC / DC power module.

[0067] The first DC contactor and the second DC contactor in the primary interface circuit and the secondary switch circuit are used to connect and disconnect the DC port with the external circuit. The first DC fuse and the second DC fuse in the primary interface circuit and the secondary switch circuit are used for backup cut-off protection when the port is overcurrent.

[0068] The four switching devices in the first full-bridge circuit and the second full-bridge circuit are turned on and off alternately according to the two diagonal switching devices, and the full-bridge outputs an alternating square wave, and the primary side support capacitor and the secondary side support capacitor are used as energy buffer devices to keep the DC port voltage stable.

[0069] In the high-frequency isolation circuit, the high-frequency isolation transformer is used for electrical isolation and insulation, the inductor is used to limit the current rise rate, and the first DC blocking capacitor and the second DC blocking capacitor are used to isolate the DC component of the AC circuit to avoid transformer magnetic saturation.

[0070] The current limiting inductor in the current sharing circuit is used for current sharing between modules when multiple modules are connected in parallel, and the buffer capacitor serves as a freewheeling buffer path for the inductor current when the output circuit is suddenly disconnected.

[0071] The isolated DC / DC power module uses a certain modulation method to control the voltage and current of the power module. The modulation principle is as follows: Figure 3 As shown in the figure, the power flow direction of the two DC ports is controlled by controlling the phase shift angle δ0 of the AC square wave voltage output by the primary and secondary full bridges. For example, when the primary square wave leads the secondary square wave, the power flows from the primary to the secondary side, and vice versa.

[0072] The first DC side of the isolated DC / DC power module includes a first DC positive port and a first DC negative port; the DC side of each power module includes a DC positive port and a DC negative port; the second DC side of the isolated DC / DC power module includes a second DC positive port and a second DC negative port.

[0073] like Figures 4 to 6 The AC side of the n power modules on each phase bridge arm is connected in series and then connected to the corresponding phase of the AC side of the high-voltage cascade energy storage converter to be tested through inductance. Figure 4 , when the test system is used for the whole-machine drag test of the high-voltage cascade energy storage converter to be tested, on the A-phase bridge arm, one end of the AC side of the first power module SMA1, the second power module SMA2, ... the nth power module SMAn of the high-voltage cascade energy storage converter to be tested is connected to the A-phase of the AC side of the high-voltage cascade energy storage converter to be tested through the first inductor L1, and the wiring of the other two phases is the same; and the other ends of the n power modules of the high-voltage cascade energy storage converter to be tested on the three-phase bridge arm after being connected in series are all connected to the same point N1. Similarly, on the A-phase bridge arm, one end of the AC side of the first power module SMU1, the second power module SMU2, ... the nth power module SMUn of the accompanying high-voltage cascade energy storage converter to be tested is connected to the A-phase of the AC side of the accompanying high-voltage cascade energy storage converter to be tested through the second inductor L2, and the wiring of the other two phases is the same; and the other ends of the n power modules of the accompanying high-voltage cascade energy storage converter to be tested on the three-phase bridge arm after being connected in series are all connected to the same point N2.

[0074] Specifically, the high-voltage cascade energy storage converter to be tested includes a first AC grid-connected switch QF1, a first pre-charging contactor QC1 and a first pre-charging resistor R1, wherein one end of the first AC grid-connected switch QF1 is connected to the first AC side AC1, the other end of the first AC grid-connected switch QF1 is connected to one end of the first pre-charging contactor QC1 and one end of the first pre-charging resistor R1, and the other end of the first pre-charging contactor QC1 and the other end of the first pre-charging resistor R1 are both connected to one end of the first inductor L1; the accompanying high-voltage cascade energy storage converter includes a second AC grid-connected switch QF2, a second pre-charging contactor QC2 and a second pre-charging resistor R2, wherein one end of the second AC grid-connected switch QF2 is connected to the second AC side AC2, the other end of the second AC grid-connected switch QF2 is connected to one end of the second pre-charging contactor QC2 and one end of the second pre-charging resistor R2, and the other end of the second pre-charging contactor QC2 and the other end of the second pre-charging resistor R2 are both connected to one end of the second inductor L2.

[0075] The first DC side of each isolated DC / DC power module is connected to the DC side of each power module of the high-voltage cascade energy storage converter to be tested; in this embodiment, the first isolated DC / DC power module on the A-phase bridge arm and the first power module of the high-voltage cascade energy storage converter to be tested are used as examples for explanation, and the rest of the wiring is the same, that is, the first DC side DC1 of the first isolated DC / DC power module DMA1 on the A-phase bridge arm is connected to the DC side of the first power module SMA1 on the A-phase bridge arm of the high-voltage cascade energy storage converter to be tested.

[0076] Specifically, on the A-phase bridge arm, the first DC positive port of the first isolated DC / DC power module DMA1 is connected to the DC positive port of the first power module SMA1 of the high-voltage cascade energy storage converter to be tested, and the first DC negative port of the first isolated DC / DC power module DMA1 is connected to the DC negative port of the first power module SMA1 of the high-voltage cascade energy storage converter to be tested. The rest of the wiring is the same.

[0077] like Figure 4 When the test system is used for the whole-machine drag test of the high-voltage cascade energy storage converter to be tested, the second DC side of each isolated DC / DC power module is connected to the DC side of each power module of the high-voltage cascade energy storage converter to be tested; in this embodiment, the first isolated DC / DC power module on the A-phase bridge arm and the first power module of the high-voltage cascade energy storage converter to be tested are used as examples for explanation, and the rest of the wiring is the same, that is, the second DC side DC2 of the first isolated DC / DC power module DMA1 on the A-phase bridge arm is connected to the DC side of the first power module SMU1 on the A-phase bridge arm of the high-voltage cascade energy storage converter to be tested.

[0078] Specifically, on the A-phase bridge arm, the second DC positive port of the first isolated DC / DC power module DMA1 is connected to the DC positive port of the first power module SMU1 of the accompanying high-voltage cascade energy storage converter, and the second DC negative port of the first isolated DC / DC power module DMA1 is connected to the DC negative port of the first power module SMU1 of the accompanying high-voltage cascade energy storage converter. The rest of the wiring is the same.

[0079] like Figure 5 When the test system is used to provide a low-voltage, high-current DC source for the high-voltage cascade energy storage converter to be tested, the second DC sides of the n isolated DC / DC power modules on the three-phase bridge arm are connected in parallel and then connected to the low-voltage, high-current DC source; in this embodiment, the A-phase bridge arm is taken as an example for explanation, and the rest of the wiring is the same, that is, the second DC side of the first isolated DC / DC power module DMA1 on the A-phase bridge arm, the second DC side of the second isolated DC / DC power module DMA2, ... and the second DC side of the nth isolated DC / DC power module DMAn are connected in parallel and then connected to the low-voltage, high-current DC source.

[0080] Specifically, the second DC positive port of the first isolated DC / DC power module DMA1 on the A phase bridge arm, the second DC positive port of the second isolated DC / DC power module DMA2, ... the second DC positive port of the nth isolated DC / DC power module DMAn are connected in parallel and connected to the positive pole DC+ of a low-voltage and high-current DC source; the wiring of the other two phases is the same.

[0081] Specifically, the second DC negative port of the first isolated DC / DC power module DMA1 on the A phase bridge arm, the second DC negative port of the second isolated DC / DC power module DMA2,... the second DC negative port of the nth isolated DC / DC power module DMAn are connected in parallel and connected to the negative pole DC- of the low-voltage and high-current DC source; the wiring of the other two phases is the same.

[0082] And, if Figure 5 As shown, when the test system is used to provide a low-voltage, high-current DC source for the high-voltage cascade energy storage converter to be tested, on the A-phase bridge arm, one end of the AC side of the first power module SMA1, the second power module SMA2, ... the nth power module SMAn of the high-voltage cascade energy storage converter to be tested is connected to the A-phase of the AC side of the high-voltage cascade energy storage converter to be tested through the first inductor L1, and the other two phases are connected in series; and the other ends of the n power modules of the high-voltage cascade energy storage converter to be tested on the three-phase bridge arm are all connected to the same point N1. Among them, the voltage less than or equal to 1kV is low voltage, and the current size is determined by the power.

[0083] When the test system is used to provide a low-voltage, high-current DC source for the high-voltage cascade energy storage converter to be tested, the second DC sides of the n isolated DC / DC power modules on the three-phase bridge arm are connected in parallel and then connected to the low-voltage, high-current DC source; wherein, a voltage greater than or equal to 5kV is a high voltage, and the current size is determined by the power.

[0084] like Figure 6 , when the test system is used to provide a high-voltage, low-current DC source for the high-voltage cascade energy storage converter to be tested, the second DC sides of the n isolated DC / DC power modules on the three-phase bridge arm are connected in series in sequence and then connected to the high-voltage, low-current DC source. In this embodiment, the second DC positive port of the first isolated DC / DC power module DMA1 on the A-phase bridge arm is connected to the positive pole DC+ of the high-voltage, low-current DC source, and the second DC negative port of the nth isolated DC / DC power module DMCn on the C-phase bridge arm is connected to the negative pole DC- of the high-voltage, low-current DC source; the A-phase bridge arm is used as an example for explanation, and the rest of the wiring is the same, that is, the second DC negative port of the first isolated DC / DC power module DMA1 is connected to the second DC positive port of the second isolated DC / DC power module DMA2, and so on, the n-1th isolated DC / DC power module DMCn is connected to the negative pole DC- of the high-voltage, low-current DC source. The second DC negative port of the isolated DC / DC power module DMAn-1 is connected to the second DC positive port of the nth isolated DC / DC power module DMAn; and the second DC negative port of the nth isolated DC / DC power module DMAn on the A-phase bridge arm is connected to the second DC positive port of the first isolated DC / DC power module DMB1 on the B-phase bridge arm, and the second DC negative port of the nth isolated DC / DC power module DMBn on the B-phase bridge arm is connected to the second DC positive port of the first isolated DC / DC power module DMC1 on the C-phase bridge arm.

[0085] And, if Figure 6 As shown, when the test system is used to provide a low-voltage and high-current DC source for the high-voltage cascade energy storage converter to be tested, on the A-phase bridge arm, one end of the AC side of the first power module SMA1, the second power module SMA2, ... the nth power module SMAn of the high-voltage cascade energy storage converter to be tested is connected in series to the AC side phase A of the high-voltage cascade energy storage converter to be tested through the first inductor L1, and the wiring of the other two phases is the same; and the other ends of the n power modules of the high-voltage cascade energy storage converter to be tested on the three-phase bridge arm are all connected to the same point N1.

[0086] The test system includes: a DC source interface circuit; the DC source interface circuit includes a DC source positive electrode interface circuit and a DC source negative electrode interface circuit; wherein the DC source positive electrode interface circuit and the DC source negative electrode interface circuit adopt the same circuit structure, and both include: a DC switch, a pre-charging contactor, and a pre-charging resistor;

[0087] In the DC source positive electrode interface circuit, one end of the DC switch is connected to the positive electrode of the DC source, the other end of the DC switch is connected to one end of the pre-charging contactor and one end of the pre-charging resistor, and the other end of the pre-charging contactor and the other end of the pre-charging resistor are connected to the second DC positive electrode port of the isolated DC / DC power module;

[0088] In the DC source negative electrode interface circuit, one end of the DC switch is connected to the negative electrode of the DC source, the other end of the DC switch is connected to one end of the pre-charging contactor and one end of the pre-charging resistor, and the other end of the pre-charging contactor and the other end of the pre-charging resistor are connected to the second DC negative electrode port of the isolated DC / DC power module.

[0089] The test system includes: a main controller; the main controller communicates with each power module using optical fiber media, the main controller is used to control the power module to realize different operating modes under different electrical connection modes, and is also used to control the module-level output characteristics of the power module to simulate battery characteristics, and is used to obtain the electrical operating status and fault information of the power module; the main controller communicates with the main controller of the high-voltage energy storage converter to be tested to realize coordinated start and stop, mode matching, and fault protection interlocking;

[0090] The main controller receives external virtual battery control instructions and battery energy voltage curve point table, and calculates the voltage command value of each unit in this control cycle according to the virtual battery control instructions, current virtual battery status, module sampling value, and battery energy voltage curve point table.

[0091] The test system also includes 3n unit controllers; a single power module of the high-voltage cascade energy storage converter to be tested corresponds to a single unit controller;

[0092] The main controller sends the calculated voltage command value of each unit in this control cycle to each unit controller;

[0093] The unit controller executes the secondary voltage control mode of the power module and can sample the voltage and current at both ends of the power module. In the secondary voltage control mode of the power module, the unit controller generates a power command based on the voltage command value of the main controller, the sampled voltage of the power module and the sampled current of the power module, and then generates a control pulse based on the modulation strategy to achieve the secondary voltage of the power module running at the voltage command value.

[0094] The unit controller uploads the voltage and current sampling values ​​at both ends of the power module to the main controller.

[0095] The test system proposed in the present invention adopts a modular high-frequency topological structure, which can effectively improve the compactness of the test system and the convenience of fault maintenance; it can communicate with the high-voltage cascade energy storage converter to be tested, realize coordinated operation control such as mode matching and fault chaining, and improve test efficiency and safety performance.

[0096] Virtual battery voltage control software flow is as follows Figure 7 As shown, including:

[0097] Step S1, virtual battery control generates voltage instructions for each isolated DC / DC power module;

[0098] Step S2, sending a voltage command to an isolated DC / DC power module;

[0099] Step S3, the isolated DC / DC power module collects the DC voltage Udc1 and the DC current signal Idc1 of the DC1 port, and collects the DC voltage Udc2 and the DC current signal Idc2 of the DC2 port; wherein, when one end of the two side ports of the isolated DC / DC power module is used as input, the other end is used as output;

[0100] Step S4, the isolated DC / DC power module executes the control pulse and sends the collected signals of step S3 to the main controller;

[0101] Step S5, executing the control instruction to control the output of the isolated DC / DC power module to be in a constant voltage mode, a constant current mode, or a constant power mode to simulate the output characteristics of the battery.

[0102] It can be seen that the test system proposed in this application can simulate the working characteristics of the battery cluster to provide test power for the high-voltage cascade energy storage converter through software control of the isolated DC / DC power module, including simulating the voltage source characteristics of the battery cluster under normal conditions and simulating the difference in module voltage when the consistency of the battery cluster is poor. And through the different connection methods and control methods between the isolated DC / DC power module and the power module of the device to be tested, the access to different power supply conditions is realized, especially when the DCDC power module is running independently, connecting 2 sets of high-voltage cascade energy storage converters to test 2 sets of equipment at the same time, which significantly improves the adaptability and test efficiency of the test system.

[0103] On the other hand, the present invention also proposes a control method for a test system suitable for a high-voltage cascade energy storage converter, comprising:

[0104] Step 1: Collect the DC voltage U of the first DC side of the i-th power module dc1i and DC current I dc1i , DC voltage U of the second DC side dc2i and DC current I dc2i , where i = 1, 2, ..., n;

[0105] Step 2: Calculate the virtual battery energy state within the control period according to the sampling value in step 1, satisfying the following relationship:

[0106] Ei (T) = E i (0)+U dc1i I dc1i T

[0107] In the formula,

[0108] E i (T) is the virtual battery energy state of the i-th power module in the control period T,

[0109] E i (0) is the virtual battery energy state of the i-th power module in the previous control cycle,

[0110] T is the control period;

[0111] Step 3, according to E i (T) and the battery energy voltage curve point table, look up the table to obtain the voltage command value U of the i-th power module refi , and determine U according to the external input test target refi ; Among them, the external input test target includes adjusting the voltage and current state of a single power module;

[0112] Step 4: Set the voltage command value U of each power module refi Send it to each unit controller;

[0113] Step 5: Each unit controller generates a power command P for each power module according to the voltage control strategy. refi ; According to the power instruction P refi Using modulation algorithm to obtain control pulses;

[0114] Step 6: Each power module executes a control pulse to implement command voltage tracking control on a controlled port, wherein the controlled port includes the first DC side and / or the second DC side.

[0115] The module voltage control process in the embodiment is as follows Figure 8 shown.

[0116] The whole machine pair-drag test process of the high-voltage cascade energy storage converter to be tested is as follows:

[0117] Step A1, after completing the wiring, close the second AC grid-connected switch QF2 of the high-voltage cascade energy storage converter to start charging the power module of the high-voltage cascade energy storage converter;

[0118] Step A2, after reaching the power module charging threshold, the second pre-charging contactor QC2 is closed, the module enters controllable charging, and the voltage of the power module gradually increases;

[0119] Step A3, unlocking after the voltage of the power module reaches the target voltage, closing the DC side pre-charging contactor K0 in the power module of the high-voltage cascade energy storage converter to be tested;

[0120] Step A4, the second DC side DC2 of the isolated DC / DC power module is powered on and closed, and the second DC contactor KM2 in the secondary switch circuit;

[0121] Step A5, after the voltage of the isolated DC / DC power module reaches the target voltage, close the DC contactor KM in the power module of the high-voltage cascade energy storage converter to be tested;

[0122] Step A6, the isolated DC / DC power module is unlocked, and the voltage of the first DC side DC1 reaches a set value, closing the first DC contactor KM1 in the primary side interface circuit;

[0123] Step A7, the DC side of the power module of the high-voltage cascade energy storage converter to be tested is powered, and the DC side pre-charging contactor K0 in the power module of the high-voltage cascade energy storage converter to be tested is closed in sequence, and after the pre-charging is completed, the DC contactor KM in the power module of the high-voltage cascade energy storage converter to be tested is closed;

[0124] Step A8: After all power modules of the high-voltage cascade energy storage converter to be tested are fully charged, the high-voltage cascade energy storage converter to be tested is unlocked according to a preset control mode and connected to the grid with the second AC side AC2;

[0125] Step A9, then set the operating power and other parameters of the high-voltage cascade energy storage converter to be tested according to the required operating mode, and perform the test according to the established test plan.

[0126] At this time, one set of two high-voltage cascade energy storage converters is used for charging operation, and the other set is used for discharging operation. The first AC side AC1 and the second AC side AC2 of the two sets of high-voltage cascade energy storage converters can be directly connected in parallel to form a pair-drag test system, and the AC power supply only needs to meet the active power loss of the two converters and the test system.

[0127] Therefore, this test system can complete the debugging and performance testing of cascaded energy storage inverters of various topologies without the need for a battery cluster, reducing the cost of batch application testing and promoting the development of high-voltage energy storage systems.

[0128] The applicant of the present invention has made a detailed explanation and description of the implementation examples of the present invention in conjunction with the drawings in the specification. However, those skilled in the art should understand that the above implementation examples are only preferred implementation schemes of the present invention, and the detailed description is only to help readers better understand the spirit of the present invention, but not to limit the scope of protection of the present invention. On the contrary, any improvements or modifications based on the inventive spirit of the present invention should fall within the scope of protection of the present invention.

Claims

1. A test system for a high-voltage cascade energy storage converter, wherein the high-voltage cascade energy storage converter to be tested comprises a three-phase bridge arm, each phase bridge arm comprises n power modules, each power module comprises an AC side and a DC side, wherein the AC sides of the n power modules on each phase bridge arm are connected in series and then connected to the corresponding phase of the AC side of the high-voltage cascade energy storage converter to be tested through an inductor, characterized in that: The test system comprises a three-phase bridge arm, each phase bridge arm comprises n isolated DC / DC power modules; wherein each isolated DC / DC power module comprises a first DC side and a second DC side; The first DC side of each isolated DC / DC power module is connected to the DC side of each power module of the high-voltage cascade energy storage converter to be tested; When the test system is used for a whole-machine pair-drag test of a high-voltage cascade energy storage converter to be tested, the second DC side of each isolated DC / DC power module is connected to the DC side of each power module of the accompanying high-voltage cascade energy storage converter; When the test system is used to provide a low-voltage, high-current DC source for the high-voltage cascade energy storage converter to be tested, the second DC sides of the n isolated DC / DC power modules on the three-phase bridge arm are connected in parallel and then connected to the low-voltage, high-current DC source; wherein a voltage less than or equal to 1 kV is a low voltage; When the test system is used to provide a high-voltage and low-current DC source for the high-voltage cascade energy storage converter to be tested, the second DC sides of the n isolated DC / DC power modules on the three-phase bridge arm are connected in series in sequence and then connected to the high-voltage and low-current DC source; wherein a voltage greater than or equal to 5 kV is considered a high voltage.

2. The test system for high-voltage cascade energy storage converter according to claim 1, characterized in that: The first DC side of the isolated DC / DC power module includes a first DC positive port and a first DC negative port; the DC side of each power module includes a DC positive port and a DC negative port; The first DC positive port of each isolated DC / DC power module is connected to the DC positive port of each power module of the high-voltage cascade energy storage converter to be tested, and the first DC negative port of each isolated DC / DC power module is connected to the DC negative port of each power module of the high-voltage cascade energy storage converter to be tested.

3. The test system for high-voltage cascade energy storage converter according to claim 2, characterized in that: The second DC side of the isolated DC / DC power module includes a second DC positive electrode port and a second DC negative electrode port; When the test system is used for a whole-machine pair-drag test of a high-voltage cascade energy storage converter to be tested, the second DC positive port of each isolated DC / DC power module is connected to the DC positive port of each power module of the high-voltage cascade energy storage converter to be tested, and the second DC negative port of each isolated DC / DC power module is connected to the DC negative port of each power module of the high-voltage cascade energy storage converter to be tested.

4. The test system for high-voltage cascade energy storage converter according to claim 3, characterized in that: When the test system is used to provide a low-voltage, high-current DC source for a high-voltage cascade energy storage converter to be tested, the second DC positive ports of the n isolated DC / DC power modules on each phase bridge arm are connected in parallel and connected to the positive electrode of the low-voltage, high-current DC source, and the second DC negative ports of the n isolated DC / DC power modules on each phase bridge arm are connected in parallel and connected to the negative electrode of the low-voltage, high-current DC source.

5. The test system for high-voltage cascade energy storage converter according to claim 3, characterized in that: When the test system is used to provide a high-voltage and low-current DC source for a high-voltage cascade energy storage converter to be tested, the second DC positive port of the first isolated DC / DC power module on the A-phase bridge arm is connected to the positive electrode of the high-voltage and low-current DC source, and the second DC negative port of the n-th isolated DC / DC power module on the C-phase bridge arm is connected to the negative electrode of the high-voltage and low-current DC source; the second DC negative port of the previous isolated DC / DC power module on each phase bridge arm is connected to the second DC positive port of the next isolated DC / DC power module; and the second DC negative port of the n-th isolated DC / DC power module on the A-phase bridge arm is connected to the second DC positive port of the first isolated DC / DC power module on the B-phase bridge arm, and the second DC negative port of the n-th isolated DC / DC power module on the B-phase bridge arm is connected to the second DC positive port of the first isolated DC / DC power module on the C-phase bridge arm.

6. The test system for high-voltage cascade energy storage converter according to claim 2, characterized in that: The test system comprises: a DC source interface circuit; the DC source interface circuit comprises a DC source positive electrode interface circuit and a DC source negative electrode interface circuit; wherein the DC source positive electrode interface circuit and the DC source negative electrode interface circuit adopt the same circuit structure, and both comprise: a DC switch, a pre-charging contactor, and a pre-charging resistor; In the DC source positive electrode interface circuit, one end of the DC switch is connected to the positive electrode of the DC source, the other end of the DC switch is connected to one end of the pre-charging contactor and one end of the pre-charging resistor, and the other end of the pre-charging contactor and the other end of the pre-charging resistor are connected to the second DC positive electrode port of the isolated DC / DC power module; In the DC source negative electrode interface circuit, one end of the DC switch is connected to the negative electrode of the DC source, the other end of the DC switch is connected to one end of the pre-charging contactor and one end of the pre-charging resistor, and the other end of the pre-charging contactor and the other end of the pre-charging resistor are connected to the second DC negative electrode port of the isolated DC / DC power module.

7. The test system for high-voltage cascade energy storage converter according to claim 1, characterized in that: The test system comprises: a main controller; the main controller communicates with each power module using an optical fiber medium, the main controller is used to control the power module to realize different operation modes under different electrical connection modes, and is also used to control the module-level output characteristics of the power module to realize the simulation of battery characteristics, and is used to obtain the electrical operation state and fault information of the power module; the main controller communicates with the main controller of the high-voltage energy storage converter to be tested to realize coordinated start and stop, mode matching, and fault protection interlocking; The main controller receives external virtual battery control instructions and battery energy voltage curve point table, and calculates the voltage command value of each unit in this control cycle according to the virtual battery control instructions, current virtual battery status, module sampling value, and battery energy voltage curve point table.

8. The test system for high-voltage cascade energy storage converter according to claim 7, characterized in that: The test system also includes 3n unit controllers; a single power module of the high-voltage cascade energy storage converter to be tested corresponds to a single unit controller; The main controller sends the calculated voltage command value of each unit in this control cycle to each unit controller; The unit controller executes the secondary voltage control mode of the power module and can sample the voltage and current at both ends of the power module. In the secondary voltage control mode of the power module, the unit controller generates a power command based on the voltage command value of the main controller, the sampled voltage of the power module and the sampled current of the power module, and then generates a control pulse based on the modulation strategy to achieve the secondary voltage of the power module running at the voltage command value. The unit controller uploads the voltage and current sampling values ​​at both ends of the power module to the main controller.

9. The test system for high-voltage cascade energy storage converter according to claim 1, characterized in that: The isolated DC / DC power module adopts a dual active bridge topology, with electrical isolation between the first DC side and the second DC side; The isolated DC / DC power module includes: a primary side interface circuit, a primary side full-bridge circuit, a high-frequency isolation circuit, a secondary side full-bridge circuit, a current sharing circuit, and a secondary side switch circuit; the first DC side is connected to the primary side interface circuit, the primary side interface circuit is connected to the primary side full-bridge circuit, the primary side full-bridge circuit is connected to the secondary side full-bridge circuit through the high-frequency isolation circuit, the secondary side full-bridge circuit is connected to the secondary side switch circuit through the current sharing circuit, and the secondary side switch circuit is connected to the second DC side; Among them, the primary interface circuit includes a first DC fuse and a first DC contactor connected in series; the primary full-bridge circuit and the secondary full-bridge circuit adopt the same circuit structure, the primary full-bridge circuit includes a first full-bridge circuit composed of 4 switch tubes and a primary support capacitor connected in parallel with the first full-bridge circuit; the secondary full-bridge circuit includes a second full-bridge circuit composed of 4 switch tubes and a secondary support capacitor connected in parallel with the second full-bridge circuit; the high-frequency isolation circuit includes: an inductor, a first DC blocking capacitor, a second DC blocking capacitor and a high-frequency isolation transformer; the current balancing circuit includes a current limiting inductor and a buffer capacitor; the secondary switch circuit includes a second DC fuse and a second DC contactor; The first DC positive port of the isolated DC / DC power module is connected to one end of the first DC fuse, the other end of the first DC fuse is connected to one end of the first DC contactor, the other end of the first DC contactor is connected to the positive end of the primary support capacitor and the first input end of the first full-bridge circuit, the negative end of the primary support capacitor is connected to the first DC negative port of the isolated DC / DC power module, the first DC negative port of the isolated DC / DC power module, and the second input end of the first full-bridge circuit; the positive output end of the first full-bridge circuit is connected to one end of the inductor, the negative output end of the first full-bridge circuit is connected to one end of the first DC blocking capacitor, the other end of the inductor is connected to one end of the primary winding of the high-frequency isolation transformer, the other end of the first DC blocking capacitor is connected to the other end of the primary winding of the high-frequency isolation transformer T; one end of the secondary winding of the high-frequency isolation transformer T is connected to the second The positive output end of the full-bridge circuit is connected, the other end of the secondary winding of the high-frequency isolation transformer T is connected to one end of the second DC blocking capacitor, the other end of the second DC blocking capacitor is connected to the negative output end of the second full-bridge circuit, and one end of the primary winding of the high-frequency isolation transformer and one end of the secondary winding of the high-frequency isolation transformer are the same-name terminals; the first input end of the second full-bridge circuit is connected to the positive end of the secondary support capacitor and one end of the current limiting inductor, the second input end of the second full-bridge circuit is connected to the negative end of the secondary support capacitor, one end of the buffer capacitor, and the second DC negative port of the isolated DC / DC power module, the other end of the buffer capacitor is connected to the other end of the current limiting inductor and one end of the second DC contactor; the other end of the second DC contactor is connected to one end of the second DC fuse, and the other end of the second DC fuse is connected to the second DC positive port of the isolated DC / DC power module.

10. A control method implemented by a test system suitable for a high-voltage cascade energy storage converter according to any one of claims 1 to 9, characterized in that: The control method comprises: Step 1: Collect the DC voltage U of the first DC side of the i-th power module dchi and DC current I dchi , DC voltage U of the second DC side dchi and DC current I dchi , where i = 1, 2, ..., n; Step 2: Calculate the virtual battery energy state within the control period according to the sampling value in step 1, satisfying the following relationship: E i (T)=E i (0)+U dc1i I dc1i T In the formula, E i (T) is the virtual battery energy state of the i-th power module in the control period T, E i (0) is the virtual battery energy state of the i-th power module in the previous control cycle, T is the control period; Step 3, according to E i (T) and the battery energy voltage curve point table, look up the table to obtain the voltage command value U of the i-th power module refi , and determine U according to the external input test target refi ; Among them, the external input test target includes adjusting the voltage and current state of a single power module; Step 4: Set the voltage command value U of each power module refi Send it to each unit controller; Step 5: Each unit controller generates a power command P for each power module according to the voltage control strategy. refi ; According to the power instruction P refi Using modulation algorithm to obtain control pulses; Step 6: Each power module executes a control pulse to implement command voltage tracking control on a controlled port, wherein the controlled port includes the first DC side and / or the second DC side.