Self-adjusting storage and hoisting method of fan blades

Through the automatic adjustment of the integrated device for adaptive working conditions between the blades and the lifting device for the leaf root storage, the difficulty and safety hazards of posture adjustment during the lifting of wind turbine blades are solved, and efficient and safe lifting operations are achieved.

CN115215192BActive Publication Date: 2024-11-12中国电建集团贵州工程有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202210835875.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-15
Publication Date
2024-11-12
Estimated Expiration
2042-07-15

Smart Images

  • Figure CN115215192B_ABST
    Figure CN115215192B_ABST
Patent Text Reader

Abstract

The present invention provides a method for self-adjusting storage and hoisting of fan blades, comprising the following steps: assembling an inter-blade working condition self-adaptive integrated device; assembling a blade root storage hoisting device; placing the inter-blade working condition self-adaptive integrated device and the blade root storage hoisting device, and placing the blades; buckling the assembled upper half of the rotating drum on the lower half of the rotating drum and fixing it; first hoisting the inter-blade working condition self-adaptive integrated device, automatically adjusting the blades from a horizontal state to a side-standing state, and then hoisting them at the same time, when the blades are installed, the crane slightly loosens the hook, and moves the inter-blade working condition self-adaptive integrated device and the blade root storage hoisting device below a certain distance, so that the device is separated from the blade, and then the device moves along the long axis of the blade, and finally detaches from the blade. The present invention completely solves the problem of flipping and adjusting the side-standing posture of the blade without external intervention; the transportation, storage and hoisting of the blades only require one set of devices, which are simple to operate, directly hoisted, and the device is fully automatically realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wind turbine blade hoisting, and in particular to a self-adjusting storage and hoisting method for wind turbine blades. Background Art

[0002] When the wind turbine blades are transported to the site, they need to be placed in the equipment stacking area according to the manufacturer's or design institute's plan for subsequent hoisting. To ensure the safety of blade storage, the blades are usually stored horizontally, that is, the blades are placed on a dedicated storage bracket and stored in a flat position, so as to minimize the center of gravity height of the blades during storage and reduce the windward area of ​​the blades, thereby reducing the lateral force, bending moment, torque and overturning force generated by the wind when the blades are stored.

[0003] When the blades enter the hoisting stage, in order to make full use of the blades' own stiffness to increase the stability of the hoisting, the blades need to be transformed from a horizontal state to a sideways state, and the inter-blade support device and blade root support device originally used to support the blades need to be replaced with an inter-blade hoisting device and a blade root hoisting device before the blade hoisting operation can be carried out.

[0004] To complete the above steps, it is necessary to have: a set of blade root support devices, a set of inter-blade support devices, a set of blade root hoisting devices, and a set of inter-blade hoisting devices, and it is necessary to adjust the blades by lifting them sideways and flipping them under the influence of wind. In addition, the special tools need to be replaced 4 times during the posture adjustment process. The operation is difficult, the operation steps are cumbersome, and they are greatly affected by the outside world and have a large randomness of external influences. Especially when lifting by multiple machines in complex terrain, the operation is very limited, the difficulty is doubled, the safety hazards of equipment and personnel are huge, and the coordination requirements for lifting by multiple machines are extremely high. Moreover, due to the influence of wind, undesirable situations often occur: when the lifting operation is being carried out after the tooling is replaced, the lifting operation cannot be carried out due to the increase in wind force. The blades must be put back on the ground and hoisted again after the wind speed decreases. At this time, the above posture adjustments such as sideways flipping and their reverse processes must be repeated. The better the wind resources, the more likely the above rework events will occur, the work is cumbersome, and it affects the operation events and personal and equipment safety. It can be seen that the above problems belong to major technical difficulties in this field. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides a self-adjusting storage and hoisting method for fan blades.

[0006] The present invention is achieved through the following technical solutions.

[0007] The self-adjusting storage and hoisting method for fan blades provided by the present invention adopts an inter-blade working condition adaptive integrated device and a blade root storage and hoisting device, and the method comprises the following steps:

[0008] Step 1: Assemble the inter-blade working condition adaptive integrated device; assemble the blade root storage and hoisting device;

[0009] Step 2: According to the marking of the center of gravity of the wind turbine blades by the wind turbine equipment manufacturer, place the inter-blade working condition adaptive integrated device, the blade root storage and hoisting device, and place the blades; buckle the assembled upper half of the rotating drum onto the lower half of the rotating drum and fix it;

[0010] Step 3: During the hoisting operation, first hoist the integrated device for self-adapting working conditions between blades, automatically adjust the blades from a horizontal position to a sideways position, and then lift them at the same time. When the blades are installed, loosen the hook of the crane slightly, store the integrated device for self-adapting working conditions between blades and the blade roots at a certain distance below the hoisting device, separate the device from the blades, and then move the device along the long axis of the blades and finally detach from the blades.

[0011] The step one, assembling the inter-blade working condition adaptive integrated device includes: ① installing the side roller shaft, the middle roller shaft, and the welding rear support plate on the inter-blade base; installing the lifting plate and the lifting cover plate in place and tightening them; installing the gear set; assembling the lower half of the rotating drum; assembling the upper half of the rotating drum; ② placing the lower half of the rotating drum on the side roller shaft and the middle roller shaft, and the support plate passes through a cross groove; ③ installing the rear contour plate, the middle limit roller shaft, and the side limit roller shaft.

[0012] When assembling the lower half of the drum, install the lower support frame, the front lower support plate, and the front lower contour plate; pass the front lower limit stud on the front lower contour plate through the front lower support plate and screw it into the corresponding matching nut; screw the front lower jacking bolt into the front lower support plate, and adjust the jacking height of the front lower contour plate by the front lower jacking bolt so that the position and deflection angle of the front lower contour plate are suitable for the thickness change shape between the blades, and then fix the matching nut.

[0013] When assembling the upper half of the drum, install the upper support frame, the front upper support plate, and the front upper contour plate; pass the front upper limit stud on the front upper contour plate through the front upper support plate and screw it into the corresponding matching nut; screw the front upper lifting bolt into the front upper support plate, and adjust the lifting height of the front upper contour plate by the front upper lifting bolt so that the position and deflection angle of the front upper contour plate are suitable for the thickness change shape between the blades, and then fix the matching nut.

[0014] When installing the rear contour plate, pass the rear limit stud through the rear support plate, install the matching nut, screw the rear jacking bolt into the rear contour plate, adjust the jacking height of the rear contour plate by the jacking bolt, make the position and deflection angle of the rear contour plate suitable for the shape of the blade, and then fix the matching nut.

[0015] In the second step, the assembled upper half of the rotating drum is buckled on the lower half of the rotating drum and fixed, so that the limit pin on the lower half of the rotating drum is inserted into the corresponding pin hole on the upper half of the rotating drum, the connecting boss on the lower half of the rotating drum coincides with the matching surface on the upper half of the rotating drum, and then connected by bolts.

[0016] The step one, assembling the blade root storage hoisting device includes: ① installing the load distribution mechanism, first completing the assembly with the load distribution slide, and then completing the rotational connection between the load distribution mechanism and the two sides of the blade root base; ② installing type one sling roller, type two sling roller, type three sling roller, and type four sling roller in four groups, and simultaneously installing the annular flexible sling.

[0017] When installing the load distribution mechanism, insert the four load distribution sliders into the corresponding load distribution slide grooves respectively, and assemble the corresponding limit blocks; put the balance plate on the mounting round table, and install the load distribution round table into the sliding groove; connect the limit cover plate with the mounting round table; connect the load distribution bracket with the load distribution slider.

[0018] The beneficial effects of the present invention are:

[0019] The present invention solves major technical problems in the field. (1) The problem of adjusting the side-standing posture of blades is completely solved without external intervention; (2) The transportation, storage (or water transportation) and lifting of blades only require one set of equipment, which is simple to operate and can be directly lifted without disassembling the lifting device or lifting by multiple machines for posture adjustment. It is completely realized automatically by the device; (2) Even if it is necessary to rework due to strong winds, just loosen the hook and put down the device, and the device automatically adjusts the state of the blade to a horizontal storage state; (3) The blade root storage and lifting device can adapt to blade roots of different diameters, tapers, and shapes; it can automatically balance the bearing capacity of two annular flexible slings to prevent damage due to excessive local stress on the equipment, and the slings can provide support without affecting the rotation of the blade root during posture adjustment; it is convenient to detach from the blade after the operation is completed; (4) The integrated device for adaptive working conditions between blades can adapt to wind turbine blades of different sizes and structural forms; no additional power is required, and self-service can be achieved only by the lifting force. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is the installation diagram of the inter-blade base roller of the inter-blade working condition adaptive integrated device of the present invention.

[0021] Figure 2 It is the installation diagram of the lifting cover plate and the lifting plate of the present invention.

[0022] Figure 3 It is the gear set installation diagram of the present invention.

[0023] Figure 4 It is the lower half assembly diagram of the rotating drum of the present invention.

[0024] Figure 5 It is an assembly diagram of the upper half of the rotating drum of the present invention.

[0025] Figure 6 The present invention is a combination of the lower half of the drum and the base between the blades Figure 1 .

[0026] Figure 7 The present invention is a combination of the lower half of the drum and the base between the blades Figure 2 .

[0027] Figure 8 It is the installation diagram of the rear profile plate of the present invention.

[0028] Fig. 9 It is the installation diagram of the limiting roller shaft of the present invention.

[0029] Fig.10 It is a blade placement diagram of the present invention.

[0030] Fig.11 It is a storage and operation state diagram of the inter-blade operating condition adaptive integrated device of the present invention.

[0031] Fig.12 The invention discloses a self-adaptive integrated device for inter-blade working conditions. Figure 1 .

[0032] Fig.13 The invention discloses a self-adaptive integrated device for inter-blade working conditions. Figure 2 .

[0033] Fig.14 The invention discloses a self-adaptive integrated device for inter-blade working conditions. Figure 3 .

[0034] Fig.15 The present invention is a separation device for the inter-blade working condition self-adaptive integration Figure 1 .

[0035] Fig.16 The present invention is a separation device for the inter-blade working condition self-adaptive integration Figure 2 .

[0036] Fig.17 The invention discloses a load distribution slide block installation diagram of a blade root storage and hoisting device.

[0037] Fig.18 It is an installation diagram of the balance board of the present invention.

[0038] Fig.19 It is the installation diagram of the load distribution bracket of the present invention.

[0039] Fig. 20 It is the arrangement diagram of the endless flexible sling of the present invention.

[0040] Fig.21 It is a state diagram of the blade root storage (or surface transportation) of the present invention.

[0041] Fig. 22 It is a diagram of the blade root hoisting state of the present invention.

[0042] Fig.23 This is a detachment diagram of the blade root operating condition adaptive integrated device of the present invention.

[0043] In the figure:

[0044] 1-inter-blade base; 2-lower half of the drum; 3-upper half of the drum; 4-lifting cover plate; 5-lifting plate; 6-gear set; 7-middle limit roller; 8-side roller; 9-middle roller; 10-side limit roller; 11-rear support plate; 12-rear contour plate; 13-boss slide; 14-type cross groove; 15-lower support frame; 16-front lower support plate; 17-front lower contour plate; 18-gear teeth; 19-upper support frame; 20-front Upper support plate; 21-front upper contour plate; 22-type II boss; 23-rack; 24-inter-blade lifting ear; 25-type II cross groove; 26-type III cross groove; 27-rear limit stud; 28-rear jacking bolt; 29-front lower limit stud; 30-front lower jacking bolt; 31-front upper limit stud; 32-front upper jacking bolt; 33-connecting boss; 34-limit pin; 35-matching surface; 36-type I boss; 37-groove;

[0045] 101-blade root base; 102-load distribution mechanism; 103-annular flexible sling; 104-type one sling roller; 105-type two sling roller; 106-type three sling roller; 107-type four sling roller; 108-blade root lifting ear; 109-load distribution slide; 110-limiting round table; 111-mounting round table; 112-limiting block; 113-load distribution slider; 114-balancing plate; 115-limiting cover plate; 116-load distribution bracket; 117-load distribution round table; 118-sliding groove. DETAILED DESCRIPTION

[0046] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.

[0047] like Figures 1 to 23 Shown is a schematic diagram of the steps of the present invention:

[0048] The present invention provides a method for self-adjusting storage and hoisting of fan blades, which adopts an inter-blade working condition adaptive integrated device and a blade root storage and hoisting device. The method comprises the following steps:

[0049] Step 1: Assemble the inter-blade working condition adaptive integrated device; assemble the blade root storage and hoisting device;

[0050] Step 2: According to the mark of the center of gravity of the wind turbine blades by the wind turbine equipment manufacturer, place the inter-blade working condition adaptive integrated device, the blade root storage and hoisting device, and place the blades; buckle the assembled upper half 3 of the rotating drum onto the lower half 2 of the rotating drum and fix it;

[0051] Step 3: During the hoisting operation, first hoist the inter-blade working condition adaptive integrated device, automatically adjust the blade from horizontal to sideways, and then hoist at the same time. When the blade is installed, the crane slightly loosens the hook, and stores the inter-blade working condition adaptive integrated device and the blade root a certain distance below the hoisting device, so that the device is separated from the blade, and then the device moves along the long axis of the blade and finally detaches from the blade. (See Figures 11 to 16 , Figures 21 to 23 )

[0052] The present invention completely solves the problem of adjusting the sideways posture of blades by combining an integrated device for self-adapting working conditions between blades and a blade root storage and hoisting device, without the need for external intervention; the transportation, storage (or surface transportation) and hoisting of blades only require one set of devices, which are simple to operate and can be directly lifted without disassembling the lifting device or lifting with multiple machines for posture adjustment, which can be completely achieved automatically by the device; even if strong winds are encountered for rework, the hook can be directly released to lower the device, and the device automatically adjusts the state of the blades to a horizontal storage state; the blade root storage and hoisting device can adapt to blade roots of different diameters, tapers, and shapes; it can automatically balance the bearing capacity of two annular flexible slings 103 to prevent damage to the equipment due to excessive local stress, and the slings can provide support force without affecting the rotation of the blade root during posture adjustment; it is convenient to detach from the blade after the operation is completed; the integrated device for self-adapting working conditions between blades can adapt to wind turbine blades of different sizes and structural forms; no additional power is required, and self-service can be achieved only by the hoisting force.

[0053] ( Figures 1 to 16 ) The step 1, assembling the inter-blade working condition adaptive integrated device includes: ① installing the side roller shaft 8, the middle roller shaft 9, and the welding rear support plate 11 on the inter-blade base 1; installing the lifting plate 5 and the lifting cover plate 4 in place and tightening them; installing the gear set 6; assembling the lower half of the drum 2; assembling the upper half of the drum 3 (the inter-blade base is as shown in FIG. Figures 1 to 3 , the lower half of the drum Figure 4 , the upper half of the drum Figure 5 ) ;② The lower half of the drum 2 is placed on the side roller shaft 8 and the middle roller shaft 9, and the support plate passes through a cross groove 14 (such as Figure 6 , 7 );③ Install the rear contour plate 12, the middle limit roller 7, the side limit roller 10 (such as Figure 8 , 9 ).

[0054] (See Figure 4) When assembling the lower half 2 of the drum, install the lower support frame 15, the front lower support plate 16, and the front lower contour plate 17; pass the front lower limit stud 29 on the front lower contour plate 17 through the front lower support plate 16 and screw it into the corresponding matching nut; screw the front lower jacking bolt 30 into the front lower support plate 16, adjust the jacking height of the front lower contour plate 17 by the front lower jacking bolt 30, so that the position and deflection angle of the front lower contour plate 17 are suitable for the thickness change shape between the blades, and then fix the matching nut. The posture of the front lower contour plate 17 can be adjusted and fixed by the front lower limit stud 29 and the front lower jacking bolt 30 to adapt to different blades.

[0055] (See Figure 5 ) When assembling the upper half 3 of the drum, install the upper support frame 19, the front upper support plate 20, and the front upper contour plate 21; pass the front upper limit stud 31 on the front upper contour plate 21 through the front upper support plate 20 and screw it into the corresponding matching nut; screw the front upper jacking bolt 32 into the front upper support plate 20, and adjust the jacking height of the front upper contour plate 21 by the front upper jacking bolt 32 so that the position and deflection angle of the front upper contour plate 21 are suitable for the thickness change shape between the blades, and then fix the matching nut. The posture of the front upper contour plate 21 can be adjusted and fixed by the front upper limit stud 31 and the front upper jacking bolt 32 to adapt to different blades.

[0056] (See Figures 8 to 10 16) When installing the rear profile plate 12, the rear limit stud 27 is passed through the rear support plate 11, and the matching nut is installed. The rear jacking bolt 28 is screwed into the rear profile plate 12, and the jacking height of the rear profile plate 12 is adjusted by the jacking bolt so that the position and deflection angle of the rear profile plate 12 are suitable for the shape between the blades, and then the matching nut is fixed. The posture of the rear profile plate 12 can be adjusted and fixed by the cooperation of the rear limit stud 27 and the rear jacking bolt 28 to adapt to different blades.

[0057] (See Figure 4 , 5 11) In step 2, the assembled upper drum 3 is buckled on the lower drum 2 and fixed, so that the limit pin 34 on the lower drum 2 is inserted into the corresponding pin hole of the upper drum 3, and the connecting boss 33 on the lower drum 2 coincides with the matching surface 35 on the upper drum 3, and then connected by bolts. The structure is tight, not easy to fall off during rotation, strong bearing capacity, easy installation, and accurate positioning.

[0058] ( Figures 17 to 23 ) The step 1, assembling the blade root storage hoisting device includes: ① installing the load distribution mechanism 102, first completing the assembly with the load distribution chute 109, and then completing the rotation connection between the load distribution mechanism 102 and the two sides of the blade root base 101 (see Figures 17 to 19) ; ② Install the first type sling roller 104, the second type sling roller 105, the third type sling roller 106, and the fourth type sling roller 107 in four groups, and simultaneously install the annular flexible sling 103 (see Fig. 20 ).

[0059] (See Figures 17 to 19 ) When installing the load distribution mechanism 102, insert the four load distribution sliders 113 into the corresponding load distribution slide grooves 109 respectively, and assemble the corresponding limit blocks 112; put the balance plate 114 on the mounting truncated table 111, and install the load distribution truncated table 117 into the sliding groove 118; connect the limit cover plate 115 with the mounting truncated table 111; and connect the load distribution bracket 116 with the load distribution slider 113. When the three-type sling rollers 106 corresponding to the two annular flexible slings 103 are subjected to inconsistent forces, the load distribution bracket 116 and the load distribution slider 113 on the side with greater force move up, and rotate and slide in the sliding groove 118 of the balance plate 114 through the load distribution truncated table 117, and no structural interference will occur; at the same time, the balance plate 114 is driven to rotate around the mounting truncated table 111, so that the load distribution bracket 116 and the load distribution slider 113 on the other side move down, so that the two annular flexible slings 103 are subjected to the same supporting force.

[0060] The inter-blade operating condition adaptive integrated device adopted by the present invention comprises:

[0061] The inter-blade base 1 has an intermediate limiting roller shaft 7 at the bottom, and side roller shafts 8 and intermediate roller shafts 9 are provided on both sides of the intermediate limiting roller shaft 7, and a side limiting roller shaft 10 is provided obliquely above the side roller shaft 8; a gear set 6 is installed on one side of the inter-blade base 1, and a rear contour plate 12 is connected to the other side through a rear support plate 11; boss slide grooves 13 are provided on both sides of the inter-blade base 1;

[0062] The lower half 2 of the rotating drum is placed on the side roller shaft 8 and the middle roller shaft 9, and is inscribed with the middle limit roller shaft 7 and the side limit roller shaft 10; one side of the lower half 2 of the rotating drum is provided with a cross groove 14 through which the rear support plate 11 can pass, and the other side is fixed with a front lower support plate 16 through a lower support frame 15, and the front lower support plate 16 is connected with a front lower contour plate 17;

[0063] The upper half 3 of the rotating drum is buckled and connected with the lower half 2 of the rotating drum, and gear teeth 18 are continuously provided on the upper half 3 of the rotating drum, and the gear teeth 18 cooperate with the gear set 6; the upper half 3 of the rotating drum is fixed with a front upper support plate 20 through an upper support frame 19, and the front upper support plate 20 is connected with a front upper contour plate 21, and the front upper contour plate 21 is opposite to the front lower contour plate 17;

[0064] The lifting cover plate 4 and the lifting plate 5 are interlocked and connected to each other, and a second-type boss 22 passing through the boss slide groove 13 is provided between the lower part of the lifting plate 5 and the lifting cover plate 4; the lifting plate 5 is provided with: an inter-leaf lifting ear 24, a rack 23 cooperating with the gear set 6, a second-type cross groove 25 and a third-type cross groove 26 that enable the rear support plate 11 to pass through.

[0065] Assemble in the following order: ①, inter-blade base 1—install side roller shaft 8, middle roller shaft 9, and support plate 11 after welding; make the support plate pass through the type II cross groove 25, the type III cross groove 26, and the type II boss 22 pass through the boss slide 13, install and tighten the lifting plate 5 and lifting cover plate 4 on one side to form a lifting mechanism on one side; make the installation structure of the gear set 6 pass through the corresponding type II cross groove 25 in the other lifting plate 5, and the type II boss 22 pass through the boss slide 13, install and tighten the lifting plate 5 and lifting cover plate 4 on the other side to form a lifting mechanism on the other side; assemble the gear set 6; 1. The lower half of the drum 2 - assemble the lower support frame 15, the front lower support plate 16, and the front lower contour plate 17; the upper half of the drum 3 - assemble the upper support frame 19, the front upper support plate 20, and the front upper contour plate 21; 2. Place the assembled lower half of the drum 2 into the inter-blade base 1, pass the support plate through the first-type cross groove 14, and place the lower half of the drum 2 on the side roller shaft 8 and the middle roller shaft 9; 3. Assemble the rear contour plate 12, the middle limit roller shaft 7, and the side limit roller shaft 10; 4. After placing the inter-blade part of the fan blades on the rear contour plate 12 and the front lower contour plate 17, buckle the assembled upper half of the drum 3 on the lower half of the drum 2 and fix it.

[0066] Working principle: After assembly, the blades are in a horizontal storage state. When hoisting, you only need to hang the sling on the inter-blade lifting lug 24. During the lifting process, the lifting plate 5 rises, the rack 23 drives the gear to rotate, and the gear drives the lower half 2 and the upper half 3 of the rotating drum to rotate, so that the blades are adjusted from a horizontal state to a sideways state without any external intervention. When the blades are installed in place and firmly connected to the hub, the crane is slightly unhooked, and the inter-blade working condition adaptive integrated device is slightly displaced downward by a certain distance, that is, separated from the blade, and then the device moves along the long axis of the blade and finally detaches from the blade, completing the transition from storage (transportation) state to hoisting and then to detachment, completely automatically without the need for unnecessary external intervention.

[0067] It also includes a roller support, and the middle limit roller 7, the side roller 8, the middle roller 9, and the side limit roller 10 are respectively installed on the inter-leaf base 1 through the roller support. It is easy to install and improve the stability of the roller. At the same time, the stability of the inter-leaf base 1 can be improved through the roller support.

[0068] The gear set 6 includes a small gear and two large gears on both sides of the small gear coaxially. The small gear cooperates with the rack 23, and the large gear cooperates with the gear 18. The forces are symmetrical. When hoisting, the lifting plate 5 drives the small gear through the rack 23, and the large gear drives the lower half 2 and the upper half 3 of the rotating drum through the gear 18. By designing and calculating the diameter relationship between the large and small gears and the gear 18, and the relationship between the diameter relationship and the length of the rack 23, it is convenient to control the rotation amplitude of the lower half 2 and the upper half 3 of the rotating drum.

[0069] The gear set 6, gear teeth 18 and rack 23 can make the lower half 2 and upper half 3 of the drum deflect 90 degrees by cooperation, and the type-one cross groove 14 can allow the lower half 2 of the drum to deflect 90 degrees at most. The blades can just turn over between 0 and 90 degrees. When the drum mechanism rotates within the range of 90 degrees, the type-one cross groove 14 provides space for the rear support plate 11 and forms a limit structure to prevent excessive deflection.

[0070] It also includes a rear limit stud 27 and a rear jacking bolt 28. The rear limit stud 27 is fixed on the rear contour plate 12 and arranged along the long axis direction of the rear contour plate 12. The rear jacking bolt 28 is screwed to the rear support plate 11 and arranged on both sides of the rear limit stud 27. Through the cooperation of the rear limit stud 27 and the rear jacking bolt 28, the posture of the rear contour plate 12 can be adjusted and fixed to adapt to different blades.

[0071] It also includes a front lower limit stud 29 and a front lower lifting bolt 30, which are screwed to the front lower support plate 16 and arranged in multiple rows along the short axis direction of the front lower contour plate 17. The front lower limit stud 29 is fixed to the front lower contour plate 17, and the front lower limit stud 29 is located on both sides of each row of the front lower lifting bolts 30. Through the front lower limit stud 29 and the front lower lifting bolt 30, the posture of the front lower contour plate 17 can be adjusted and fixed to adapt to different blades.

[0072] It also includes a front upper limit stud 31 and a front upper lifting bolt 32, which are screwed to the front upper support plate 20 and arranged in multiple rows along the short axis direction of the front upper contour plate 21. The front upper limit stud 31 is fixed to the front upper contour plate 21, and the front upper limit stud 31 is located on both sides of each row of front upper lifting bolts 32. Through the front upper limit stud 31 and the front upper lifting bolt 32, the posture of the front upper contour plate 21 can be adjusted and fixed to adapt to different blades.

[0073] The notch of the lower drum 2 is provided with a connecting boss 33 and a stop pin 34 on both sides, and the upper drum 3 is provided with a matching surface 35 on both sides. The connecting boss 33 overlaps with the matching surface 35 and is connected by bolts, and the upper drum 3 is provided with a pin hole that matches the stop pin 34. This makes the structure tight and easy to install.

[0074] The lifting plate 5 is provided with a first-type boss 36 on the upper part, and the lifting cover plate 4 is provided with a groove 37 corresponding to the first-type boss 36 and the second-type boss 22. The first-type boss 36 and the second-type boss 22 extend into the groove 37 and are connected by bolts, so that the structure is tight, strong and easy to install.

[0075] The blade root storage and hoisting device used in the present invention comprises:

[0076] The blade root base 101 has four type-four sling rollers 107 symmetrically arranged on both sides of the bottom, and a type-three sling roller 106, a type-two sling roller 105, and a type-one sling roller 104 are arranged in sequence above the type-four sling roller 107; blade root lifting ears 108 and load distribution chutes 109 are symmetrically arranged on both sides of the blade root base 101;

[0077] The load distribution mechanism 102 is rotatably connected to the middle of both sides of the blade root base 101 and is slidably connected to the load distribution chute 109. The three-type sling roller 106 is provided at the part where the load distribution mechanism 102 is slidably connected to the load distribution chute 109.

[0078] Two annular flexible slings 103 are arranged front and back. The annular flexible slings 103 are wound up from the lower side of the type-4 sling roller 107, then wound down from the upper side of the type-1 sling roller 104, then wound up from the lower side of the type-3 sling roller 106, and finally wound down from the upper side of the type-2 sling roller 105.

[0079] Assemble in the following order: ① Install the load distribution mechanism 102, first complete the assembly with the load distribution chute 109, and then complete the rotational connection between the load distribution mechanism 102 and the two sides of the blade root base 101; ② Install type 1 sling roller 104, type 2 sling roller 105, type 3 sling roller 106, type 4 sling roller 107 in four groups, and simultaneously install the annular flexible sling 103.

[0080] Principle: According to the marking of the center of gravity of the wind turbine blade by the wind turbine equipment manufacturer, a certain part of the root of the wind turbine blade is placed on the root storage and lifting device. When the force on a certain annular flexible sling 103 is greater than that on another annular flexible sling 103, the load distribution mechanism 102 on the side with greater force will be forced to tilt up along the load distribution chute 109, so that the three-type sling roller 106 on this side moves up, and the force on the annular flexible sling 103 is reduced; at the same time, the load distribution mechanism 102 rotates to make the other side move down along the load distribution chute 109, so that the three-type sling roller 106 on this side moves down, and the force on the annular flexible sling 103 increases; thereby forcing the two annular flexible slings 103 to bear the same supporting force. When the blade is flipped sideways or other posture adjustments are made (the flipping can be done through the inter-blade working condition adaptive integrated device, and the inter-blade part of the blade rotates around the long axis of the blade under the drive of the inter-blade working condition adaptive integrated device), the blade root rotates together, and the annular flexible sling 103 can rotate together with the support of the sling roller, which not only ensures the support force provided to the blade root, but also does not hinder the automatic adjustment of the blade posture. When the blade is installed in place and firmly connected to the hub, the crane slightly loosens the hook, and the blade root storage and lifting device slightly moves downward a certain distance. At this time, the device is separated from the blade, and then the device moves along the long axis of the blade and finally detaches from the blade, completing the transition from storage (transportation) state to lifting and then to detachment, which is completely automatic and does not require external intervention.

[0081] The middle of both sides of the blade root base 101 are provided with coaxial limiting truncated platforms 110 and mounting truncated platforms 111. The limiting truncated platforms 110 are larger than the mounting truncated platforms 111. The load distribution mechanism 102 is rotatably connected to the mounting truncated platforms 111. The rotating part of the load distribution mechanism 102 does not contact the blade root base 101, so as to avoid friction that causes poor rotation.

[0082] The load distribution mechanism 102 includes a limit block 112, a load distribution slider 113, a balance plate 114, a limit cover plate 115, and a load distribution bracket 116. The load distribution slider 113 is arranged on the load distribution slide groove 109, and the limit block 112 is arranged on the outer side of the blade root base 101 and is fixedly connected to the load distribution slider 113; the middle part of the balance plate 114 is sleeved on the mounting round table 111, and the limit cover plate 115 covers the balance plate 114 and is fixedly connected to the mounting round table 111; the balance plate 114 is symmetrically provided with long sliding grooves 118 at both ends, and the end face of the load distribution slider 113 is provided with a load distribution round table 117 tangent to the sliding groove 118, and the load distribution bracket 116 covers the balance plate 114 and is fixedly connected to the load distribution slider 113; the load distribution bracket 116 is installed with a three-type sling roller 106.

[0083] The limiting cover plate 115 is provided with a cover plate square boss, and the mounting round table 111 is provided with a square groove correspondingly, and the cover plate square boss extends into the square groove and is fixed by bolts. The stability is good, and the bolts are prevented from loosening due to the rotation of the limiting cover plate 115, thereby improving safety.

[0084] The load distribution bracket 116 is provided with a bracket square boss, and the load distribution round table 117 is correspondingly provided with a square groove, and the bracket square boss extends into the square groove and is fixed by bolts, so as to prevent the bolts from being directly stressed and prevent the load distribution bracket 116 from rotating, thereby improving safety.

Claims

1. A method for self-adjusting storage and hoisting of fan blades, characterized in that: The steps include: Step 1: Assemble the inter-blade working condition adaptive integrated device; assemble the blade root storage and hoisting device; Step 2: According to the marking of the center of gravity of the wind turbine blades by the wind turbine equipment manufacturer, place the inter-blade working condition adaptive integrated device and the blade root storage and hoisting device, and place the blades; buckle the assembled upper half of the rotating drum (3) onto the lower half of the rotating drum (2) and fix it; Step 3: During the hoisting operation, first hoist the inter-blade working condition self-adaptive integrated device, automatically adjust the blade from a horizontal position to a sideways position, and then hoist it at the same time. When the blade is installed, the crane slightly loosens the hook, stores the inter-blade working condition self-adaptive integrated device and the blade root a certain distance below the hoisting device, separates the device from the blade, and then moves the device along the long axis of the blade and finally detaches from the blade; The inter-blade operating condition adaptive integrated device comprises: The inter-blade base (1) has an intermediate limiting roller shaft (7) at the bottom, side roller shafts (8) and intermediate roller shafts (9) are provided on both sides of the intermediate limiting roller shaft (7), and side limiting roller shafts (10) are provided obliquely above the side roller shaft (8); a gear set (6) is provided on one side of the inter-blade base (1), and a rear contour plate (12) is connected to the other side via a rear support plate (11); boss slide grooves (13) are provided on both sides of the inter-blade base (1); The lower half (2) of the rotating drum is placed on the side roller shaft (8) and the middle roller shaft (9), and is inscribed with the middle limit roller shaft (7) and the side limit roller shaft (10); one side of the lower half (2) of the rotating drum is provided with a cross groove (14) through which the rear support plate (11) can pass, and the other side is fixed with a front lower support plate (16) through a lower support frame (15), and the front lower support plate (16) is connected to a front lower contour plate (17); The upper half (3) of the rotating drum is buckled and connected with the lower half (2) of the rotating drum, and gear teeth (18) are continuously provided on the rotating drum, and the gear teeth (18) cooperate with the gear set (6); the upper half (3) of the rotating drum is fixed with a front upper support plate (20) through an upper support frame (19), and the front upper support plate (20) is connected with a front upper contour plate (21), and the front upper contour plate (21) is opposite to the front lower contour plate (17); A lifting cover plate (4) and a lifting plate (5) are mutually buckled and connected, and a second-type boss (22) passing through the boss slide groove (13) is provided between the lower part of the lifting plate (5) and the lifting cover plate (4); the lifting plate (5) is provided with: an inter-leaf lifting ear (24), a rack (23) matched with the gear set (6), a second-type cross groove (25) and a third-type cross groove (26) that can allow the rear support plate (11) to pass through; The blade root storage and hoisting device comprises: A blade root base (101) has four type-four sling rollers (107) symmetrically arranged on both sides of the bottom, and a type-three sling roller (106), a type-two sling roller (105), and a type-one sling roller (104) are arranged in sequence above the type-four sling roller (107); blade root lifting ears (108) and load distribution chutes (109) are symmetrically arranged on both sides of the blade root base (101); The load distribution mechanism (102) is rotatably connected to the middle of both sides of the blade root base (101) and is slidably connected to the load distribution chute (109). The three-type sling roller (106) is arranged at the portion where the load distribution mechanism (102) and the load distribution chute (109) are slidably connected. Two annular flexible slings (103) are arranged front and back, the annular flexible sling (103) is wound up from the lower side of the fourth type sling roller (107), then wound down from the upper side of the first type sling roller (104), then wound up from the lower side of the third type sling roller (106), and finally wound down from the upper side of the second type sling roller (105).

2. The method for self-adjusting storage and hoisting of fan blades according to claim 1, characterized in that: The step 1, assembling the inter-blade working condition self-adaptive integrated device, comprises: ① installing the side roller shaft (8), the middle roller shaft (9), and welding the rear support plate (11) on the inter-blade base (1); installing the lifting plate (5) and the lifting cover plate (4) in place and tightening them; installing the gear set (6); assembling the lower half of the rotating drum (2); assembling the upper half of the rotating drum (3); ② placing the lower half of the rotating drum (2) on the side roller shaft (8) and the middle roller shaft (9), and the rear support plate (11) passes through a cross groove (14); ③ installing the rear contour plate (12), the middle limit roller shaft (7), and the side limit roller shaft (10).

3. The method for self-adjusting storage and hoisting of fan blades according to claim 2, characterized in that: When assembling the lower half (2) of the drum, install the lower support frame (15), the front lower support plate (16), and the front lower contour plate (17); pass the front lower limit stud (29) on the front lower contour plate (17) through the front lower support plate (16) and screw it into the corresponding matching nut; screw the front lower lifting bolt (30) into the front lower support plate (16), and adjust the lifting height of the front lower contour plate (17) by the front lower lifting bolt (30) so that the position and deflection angle of the front lower contour plate (17) are suitable for the thickness change shape between the blades, and then fix the matching nut.

4. The method for self-adjusting storage and hoisting of fan blades according to claim 2, characterized in that: When assembling the upper half (3) of the drum, the upper support frame (19), the front upper support plate (20), and the front upper contour plate (21) are installed; the front upper limit stud (31) on the front upper contour plate (21) is passed through the front upper support plate (20) and screwed into the corresponding matching nut; the front upper lifting bolt (32) is screwed into the front upper support plate (20), and the lifting height of the front upper contour plate (21) is adjusted by the front upper lifting bolt (32) so that the position and deflection angle of the front upper contour plate (21) are suitable for the thickness change shape between the blades, and then the matching nut is fixed.

5. The method for self-adjusting storage and hoisting of fan blades according to claim 2, characterized in that: When installing the rear profile plate (12), the rear limit stud (27) is passed through the rear support plate (11), the matching nut is installed, the rear jacking bolt (28) is screwed into the rear profile plate (12), and the jacking height of the rear profile plate (12) is adjusted by the jacking bolt so that the position and deflection angle of the rear profile plate (12) are suitable for the shape of the blade, and then the matching nut is fixed.

6. The method for self-adjusting storage and hoisting of fan blades according to claim 1, characterized in that: In the second step, the assembled upper drum (3) is buckled onto the lower drum (2) and fixed, so that the limit pin (34) on the lower drum (2) is inserted into the corresponding pin hole of the upper drum (3), the connecting boss (33) on the lower drum (2) coincides with the matching surface (35) on the upper drum (3), and then connected by bolts.

7. The method for self-adjusting storage and hoisting of fan blades according to claim 1, characterized in that: The step 1, assembling the blade root storage hoisting device, includes: ① installing the load distribution mechanism (102), first completing the assembly with the load distribution chute (109), and then completing the rotational connection between the load distribution mechanism (102) and the two sides of the blade root base (101); ② installing the first type sling roller (104), the second type sling roller (105), the third type sling roller (106), and the fourth type sling roller (107) in four groups, and simultaneously installing the annular flexible sling (103).

8. The method for self-adjusting storage and hoisting of fan blades according to claim 7, characterized in that: When installing the load distribution mechanism (102), four load distribution sliders (113) are respectively inserted into corresponding load distribution slide grooves (109), and corresponding limit blocks (112) are assembled; the balance plate (114) is sleeved on the mounting round table (111), and the load distribution round table (117) is installed in the sliding groove (118); the limit cover plate (115) is connected to the mounting round table (111); and the load distribution bracket (116) is connected to the load distribution slider (113).

Citation Information

Cited By

  • Self-adaptive clamping structure of fan blade mounting equipment

    CN223634821U