Gas-liquid linkage filling system and filling method for full tailings-waste rock-rod grinding paste

By using a tailings-waste rock-rock grinding paste gas-liquid linkage filling system, the high-pressure air and water linkage control of slurry transportation solves the problems of water inflow and pipe blockage in the downhole filling system, and achieves efficient and safe filling operations.

CN115217520BActive Publication Date: 2024-11-22UNIV OF SCI & TECH BEIJING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210853433.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-08
Publication Date
2024-11-22
Estimated Expiration
2042-07-08

AI Technical Summary

Technical Problem

Existing paste filling systems suffer from problems such as severe water inflow into goaf areas, uneven filling concentration, and pipe blockage during downhole filling, affecting the safety and efficiency of downhole operations.

Method used

The system employs a combined tailings-waste rock-rock grinding paste gas-liquid linkage filling system. This system uses high-pressure air and water linkage to control the slurry delivery within the pipeline, combined with an automated control system, to ensure the quality and safety of the filling material.

Benefits of technology

It reduces downhole environmental pollution, improves filling quality and transportation efficiency, reduces manual operation, and lowers infrastructure construction costs and operational difficulties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115217520B_ABST
    Figure CN115217520B_ABST
Patent Text Reader

Abstract

The present invention provides a gas-liquid linkage filling system and filling method for all tailings-waste rock-rod grinding paste, which belongs to the technical field of mine paste filling. The system includes a central control room of a surface filling station, a paste thickener, an overflow water bin, a consolidation powder bin, a cement bin, a binder mixing barrel, a mortar mixing barrel, a waste rock bin, a rod grinding bin, a transmission belt, a filling and conveying pipeline, a compressed air oil-water separation pump and a high-pressure water pump for generating conveying power, and a filling pipeline. The system utilizes existing underground tunnels and filling networks, which can reduce the investment in the basic construction of the filling system. At the same time, the system adopts wind and water linkage to clean the filling pipeline, which avoids a large amount of water used for cleaning the pipeline from flowing into the goaf, solves the problem of serious water accumulation in the goaf, and can effectively improve the underground working environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine paste filling, in particular to a gas-liquid linkage filling system and a filling method for a full tailings-waste rock-rod grinding paste. Background Art

[0002] The whole tailings-waste rock-rod mill paste filling system is to dehydrate and thicken the lower concentration whole tailings slurry selected by the concentrator, and then fully mix and stir it with the excavation waste rock after crushing and screening in the mine and the wind sand after the rod mill process to prepare a toothpaste-like slurry with non-stratification and non-segregation characteristics. Through the computer control of the surface filling station technicians and the cooperation of the underground workers, the paste is transported to the underground mining position. On the one hand, the paste filling system relieves the storage pressure of surface tailings, waste rock and other tailings, improves the utilization rate of tailings storage capacity, reduces the risk rate of dam breach, and even reduces the engineering construction of the mine's tailings pond; on the other hand, the filling body after the paste solidifies meets the strength of the supporting underground surrounding rock, which can effectively solve the problem of surface collapse and improve the safety and recovery rate of underground operations.

[0003] In the paste filling system, the slurry concentration is high, the materials are evenly mixed, and the tailings particles are fully in contact with the binder. Only by adding a small amount of cementitious material, the effects of not easy to block the pipe, high strength and less water seepage can be achieved. In addition, the paste filling system lifts the waste rock generated by underground excavation to the surface, and after crushing and screening, it is prepared into the slurry required for filling and transported to the underground filling operation surface through pipelines. The whole process is based on the joint operation of the surface highly automated filling station and the underground filling effect feedback. This method reduces the working time of underground workers and reduces the risks of underground operations.

[0004] At present, sand silos, cement silos, mortar mixing barrels, binder mixing barrels and belt transport channels are built on the surface, and the filling slurry is pumped or transported by gravity through drilled pipes to the underground filling operation surface. This method is suitable for mining companies with good surface construction conditions and mining technology conditions, but there are also problems such as high infrastructure costs, large demand for operators, and long filling time. In addition, when the underground goaf is large, it is generally faced with the problem of too small filling multiples. If the filling concentration is low, it is easy to cause serious water accumulation in the filling goaf. If the filling concentration is too high, it is easy to cause difficulties in filling and transportation operations, and even cause pipe blockage accidents, affecting normal production. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a gas-liquid linkage filling system and filling method for a full tailings-waste rock-rod grinding paste. The use of the gas-liquid linkage filling system for the full tailings-waste rock-rod grinding paste provided by the present invention can prevent a large amount of water from flowing into the filling operation surface, and can ensure the quality of the filling body under the premise of smoothly conveying the slurry, reduce the degree of environmental pollution underground, and improve underground working conditions.

[0006] The system includes the control room of the surface filling station, paste thickener, overflow water bin, consolidation powder bin, cement bin, binder mixing barrel, mortar mixing barrel, waste rock bin, rod grinding bin, transmission belt, filling and conveying pipeline, compressed air oil-water separation pump and high-pressure water pump and corresponding filling pipeline;

[0007] The discharge ports of the cement silo and the consolidation powder silo are directly connected to the binder mixing barrel, the overflow water silo is connected to the paste thickener to recover the clarified overflow water, the paste thickener is connected to the mortar mixing barrel, the aggregates discharged from the waste rock silo and the rod grinding silo are transported to the mortar mixing barrel via a transmission belt, the binder mixing barrel is connected to the mortar mixing barrel through the binder delivery pipeline; the mortar mixing barrel is connected to the goaf working surface through the filling delivery pipeline, the compressed air oil-water separation pump and the high-pressure water pump are connected to the filling delivery pipeline through the high-pressure air duct and the high-pressure water pipe respectively.

[0008] Among them, the surface filling station's control room, paste thickener, overflow water bin, consolidation powder bin, cement bin, binder mixing barrel, mortar mixing barrel, waste stone bin, rod grinding bin, transmission belt, and binder delivery pipeline are located on the ground; the compressed air oil-water separation pump and high-pressure water pump are located underground.

[0009] An air duct stop valve is provided on the high-pressure air duct, and a water pipe stop valve is provided on the high-pressure water pipe.

[0010] A slurry pump is installed on the pipeline between the paste thickener and the mortar mixing barrel.

[0011] The high-pressure air duct is made of seamless steel pipe; when the high-pressure air duct meets the requirements of stable air blowing, the compressed air oil-water separation pump will no longer blow air into the filling and conveying pipeline.

[0012] The high-pressure water pipe is made of seamless steel pipe; when the high-pressure water pipe meets the requirements of the wet filling and conveying pipeline, the high-pressure water pipe will no longer pressurize water into the filling and conveying pipeline to prevent excessive water in the filling operation area due to excessive water pressure.

[0013] The filling and conveying pipeline is made of wear-resistant seamless steel pipe. A mortar stop valve is installed in front of the junction between the filling and conveying pipeline and the high-pressure air duct and high-pressure water pipe. When the compressed air oil-water separation pump stops blowing air into the filling pipeline and the high-pressure water pump stops pressing water into the filling and conveying pipeline, open the mortar stop valve for filling.

[0014] The compressed air oil-water separation pump and high-pressure water pump regularly (usually every 3 days) clean the filling and conveying pipeline with high-pressure air and high-pressure water.

[0015] The filling method using the filling system comprises the following steps:

[0016] S1: The low-concentration full tailings slurry of the concentrator is transported to the paste thickener through a slurry pump to prepare a high-concentration full tailings slurry;

[0017] S2: Cement and consolidation powder are discharged from the cement silo and consolidation powder silo into the binder mixing barrel through the discharge port, water is added to form binder slurry, and then transported to the mortar mixing barrel through the surface filling pipeline; high-concentration full tailings slurry (mass concentration is generally not less than 55%) is transported to the mortar mixing barrel through the surface filling pipeline; at the same time, waste rock aggregate and rod-ground sand aggregate are transported from the waste rock silo and rod-ground sand silo to the mortar mixing barrel through the transmission belt for full mixing;

[0018] S3: During the mixing process of the mortar mixing barrel, the mortar stop valve and the water pipe stop valve on the high-pressure water pipe are opened, the air pipe stop valve on the high-pressure air pipe is closed, and high-pressure air is blown into the filling pipe. According to the senses of the on-site workers at the filling pipe mouth underground, it is determined whether the air blowing in the pipe is uniform. At the same time, after the pressure gauge value of the compressed air oil-water separation pump is stable, the air blowing is stopped and the air pipe stop valve is opened;

[0019] S4: Close the stop valve on the water pipe and inject water into the pipe. After the inner wall of the pipe is fully moistened according to the filling strength and transportation conditions, stop injecting water and open the stop valve of the water pipe;

[0020] S5: Close the mortar stop valve under the mortar mixing barrel and the air duct stop valve on the high-pressure air duct in turn, and according to the filling intensity and conveying conditions, convey the paste slurry by gravity or by using the high-pressure air as the power. After the filling is completed, open the mortar stop valve and the air duct stop valve;

[0021] S6: After the filling process is completed, the water pipe stop valve is closed, water is injected into the filling pipe, and the data of the flow monitor on the high-pressure water pipe is transmitted to the central control room of the surface filling station, and the water used for cleaning the pipe is boosted by high-pressure wind;

[0022] S7: Open the water pipe stop valve and at the same time, close the air duct stop valve, use high-pressure air to push the remaining water in the pipe until the pipe is clean, and then open the air duct stop valve.

[0023] As mentioned above, the filling method adopts a distributed control system DCS automatic control system to ensure the normal and stable operation of the entire tailings paste filling system and achieve precise control of the filling effect.

[0024] The mass fractions of cement, consolidation powder and water in the S2 binder mixing barrel are in the range of 17%~18%, 70%~72% and 9%~11% respectively; the mass concentration of the high-concentration whole tailings slurry is not less than 55% to ensure the underflow concentration; the mass ratio of binder solids in the mortar mixing barrel: solids in high-concentration whole tailings slurry: waste rock solids: rod grinding solids = (31~33): (23~25): (23~25): (19~21).

[0025] Paste thickener accident treatment slurry enters the mortar mixing barrel: the clarified overflow water flows back to the overflow water tank to adjust the paste concentration or clean the paste thickener.

[0026] Reasonably adjust the tailings usage based on the mine tailings output rate and tailings utilization rate; determine the deployment and construction of the underground filling system based on the ore body's direction, tendency, inclination and accompanying conditions, combined with infrastructure conditions and mining methods.

[0027] The beneficial effects of the above technical solution of the present invention are as follows:

[0028] (1) The filling system of the present invention can be expanded and constructed based on the existing tunnels of the mine, thereby reducing the investment in the basic construction of the filling system, reducing the difficulty of management and maintenance, and reducing operating costs.

[0029] (2) The filling system of the present invention adopts wind and water linkage to clean the filling pipe, which avoids a large amount of water used for cleaning the pipe from flowing into the goaf, solves the problem of serious water accumulation in the goaf, and improves the underground working environment.

[0030] (3) The filling system of the present invention uses high-pressure air to assist in conveying the filling paste slurry, which solves the pipe blockage problem caused by high filling concentration and achieves a balance between conveying concentration and filling quality.

[0031] (4) The filling system of the present invention has a high degree of automation, and the operation of the central control room is simple and efficient, which reduces the workload of manual operation, improves the safety of workers, and ensures the filling efficiency of the mine. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic structural diagram of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste of the present invention.

[0033] Among them: 1- Central control room of surface filling station; 2- Consolidation powder silo; 3- Paste thickener; 4- Waste rock silo; 5- Rod grinding silo; 6- Transmission belt; 7- Slurry pump; 8- Binder mixing barrel; 9- Cement silo; 10- Mortar stop valve; 11- Air duct stop valve; 12- High-pressure air duct; 13- Compressed air oil-water separation pump; 14- High-pressure water pipe; 15- Goaf working surface; 16- Water pipe stop valve; 17- Mortar mixing barrel; 18- Binder delivery pipeline; 19- Overflow water silo; 20- High-pressure water pump; 21- Flow monitor. DETAILED DESCRIPTION

[0034] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, a detailed description will be given below with reference to the accompanying drawings and specific embodiments.

[0035] In view of the actual conditions of serious underground environmental pollution, low filling slurry concentration and poor filling quality in existing mine filling and mining, the present invention provides a gas-liquid linkage filling system and filling method of full tailings-waste rock-rod grinding paste. The filling system utilizes wind and water linkage to control the slurry transportation process in the pipeline, has a high degree of automation, can avoid a large amount of water flowing into the filling goaf, and ensure the quality of the filling body.

[0036] like Figure 1 As shown, the system includes a control room 1 of a surface filling station, a paste thickener 3, an overflow water bin 19, a consolidation powder bin 2, a cement bin 9, a binder mixing barrel 8, a mortar mixing barrel 17, a waste rock bin 4, a rod grinding bin 5, a transmission belt 6, a binder delivery pipeline 18, a compressed air oil-water separation pump 13 and a high-pressure water pump 20 and corresponding filling pipelines; wherein a flow monitor 21 is installed on the high-pressure water pipe;

[0037] The discharge ports of the cement silo 9 and the consolidation powder silo 2 are directly connected to the binder mixing barrel 8, the overflow water silo 19 is connected to the paste thickener 3 to recover clarified overflow water, the paste thickener 3 is connected to the mortar mixing barrel 17, the aggregates discharged from the waste rock silo 4 and the rod grinding silo 5 are transported to the mortar mixing barrel 17 via the transmission belt 6, the binder mixing barrel 8 is connected to the mortar mixing barrel 17 through the binder delivery pipeline 18; the mortar mixing barrel 17 is connected to the goaf working surface 15 through the filling and delivery pipeline, and the compressed air oil-water separation pump 13 and the high-pressure water pump 20 are connected to the filling and delivery pipeline through the high-pressure air duct 12 and the high-pressure water pipe 14 respectively.

[0038] Among them, the control room 1 of the surface filling station, the paste thickener 3, the overflow water bin 19, the consolidation powder bin 2, the cement bin 9, the binder mixing barrel 8, the mortar mixing barrel 17, the waste stone bin 4, the rod grinding bin 5, the transmission belt 6, and the binder delivery pipeline 18 are located on the ground; the compressed air oil-water separation pump 13 and the high-pressure water pump 20 are located underground.

[0039] An air duct stop valve 11 is provided on the high-pressure air duct 12 , and a water duct stop valve 16 is provided on the high-pressure water duct 14 .

[0040] A slurry pump 7 is provided on the pipeline between the paste thickener 3 and the mortar mixing barrel 17 .

[0041] The high-pressure air duct 12 is made of seamless steel pipe; when the high-pressure air duct meets the requirement of stable blowing, the compressed air oil-water separation pump 13 no longer blows air into the filling and conveying pipeline.

[0042] The high-pressure water pipe 14 is made of seamless steel pipe; when the high-pressure water pipe 14 meets the requirements of the wet filling and conveying pipeline 18, the high-pressure water pipe 14 will no longer pressurize water into the filling and conveying pipeline to prevent excessive water in the filling operation area due to excessive water pressure.

[0043] The filling and conveying pipeline is made of wear-resistant seamless steel pipe. A mortar stop valve 10 is installed in front of the intersection between the filling and conveying pipeline and the high-pressure air pipe 12 and the high-pressure water pipe 14. When the compressed air oil-water separation pump 13 stops blowing air into the filling pipeline and the high-pressure water pump 20 stops pressing water into the filling and conveying pipeline, the mortar stop valve 10 is opened for filling.

[0044] The compressed air oil-water separation pump 13 and the high-pressure water pump 20 regularly (usually every three days) clean the filling and conveying pipeline with high-pressure air and high-pressure water.

[0045] The filling method of the filling system comprises the following steps:

[0046] S1: The low-concentration full tailings slurry of the ore dressing plant is transported to the paste thickener 3 through a slurry pump to prepare a high-concentration full tailings slurry;

[0047] S2: Cement and consolidation powder are discharged from the cement silo 9 and the consolidation powder silo 2 into the binder mixing barrel 8 through the discharge port, and water is added to form a binder slurry. The mass ratio of cement, consolidation powder and water is controlled to be about 1:4:0.6, and the slurry is transported to the mortar mixing barrel 17 through the surface filling pipeline; at the same time, the low-concentration tailings slurry produced by the ore dressing plant is dehydrated by the paste thickener 3 to produce a high-concentration tailings slurry (the mass concentration generally reaches 55%) that meets the requirements, and the mass ratio of the binder slurry composed of cement and consolidation powder to the high-concentration tailings slurry is controlled to be 1:4, and the slurry is transported to the mortar mixing barrel 17 through the surface filling pipeline; at the same time, the waste rock aggregate and the rod-grinded sand aggregate are transported from the waste rock silo 4 and the rod-grinded sand silo 5 to the mortar mixing barrel 17 through the transmission belt 6 for sufficient mixing;

[0048] S3: During the mixing process of the mortar mixing barrel 17, the mortar stop valve 10 and the water pipe stop valve 16 on the high-pressure water pipe 14 are opened, and the air pipe stop valve 11 on the high-pressure air pipe 12 is closed, and high-pressure air is blown into the filling pipe. According to the senses of the workers at the filling pipe mouth underground (such as listening to the sound, feeling with hands, etc.), it is determined whether the air blowing in the pipe is uniform. At the same time, after the pressure gauge value of the compressed air oil-water separation pump 13 is stable, the air blowing is stopped and the air pipe stop valve 11 is opened;

[0049] S4: Close the stop valve 16 on the water pipe, inject water into the pipe, and after the inner wall of the pipe is fully moistened according to the filling strength and transportation conditions, stop injecting water and open the stop valve 16 on the water pipe;

[0050] S5: Close the mortar stop valve 10 under the mortar mixing barrel 17 and the air duct stop valve 11 on the high-pressure air duct in turn, and according to the filling intensity and conveying conditions, convey the paste slurry by gravity or by using the high-pressure air as the power to convey the filling. After the filling is completed, open the mortar stop valve 10 and the air duct stop valve 11;

[0051] S6: After the filling process is completed, the water pipe stop valve 16 is closed, water is injected into the filling pipe, and the data of the flow monitor is transmitted to the central control room of the surface filling station, and high-pressure wind is used to boost the water used to clean the pipe;

[0052] S7: Open the water pipe stop valve 16 and at the same time, close the air duct stop valve 11, use high-pressure wind to push the remaining water in the pipe until the pipe is clean, and then open the air duct stop valve 11.

[0053] The specific application examples are as follows: There is currently one filling and mixing station in the corresponding mining area. After the 1# and 2# gravity systems are completed and put into operation, the 3# gravity system will be expanded later to take charge of the F 17 Edom and F 17 The filling task of the 450,000 m / a underground goaf in the west mine is all transported by gravity through high-concentration fine sand pipelines. The 1# and 2# systems share a belt conveyor. The 3# system, which was expanded and put into use later, is a separate filling system. The design capacity of each filling system is 80m 3 / h.

[0054] Production capacity is 100~110m 3 / h, with a volume of 700m 3 The mine consists of two horizontal sand silos, one 450t consolidation powder silo, two 200t cement silos, a central control room, a high-level water tank, φ245mm boreholes and φ100mm transmission pipes. The filling material of the three mining areas has always been waste rock rod grinding cement filling.

[0055] The filling system pipeline network, the filling pipeline system of the three mining areas consists of two parts of the pipeline network east of F17 and west of F17. The pipeline system east of F17 is surface mixing station → filling inclined shaft → filling borehole → 1200m level underground → filling return air shaft-underground mining area. The pipeline system west of Fr is: mixing station → filling borehole > 1400m horizontal mining area > 1350m horizontal mining area → filling borehole → 1450m horizontal mining area. In order to ensure the safety and reliability of filling pipes, extend the service cycle, and reduce material costs, after long-term testing, ceramic lining and molybdenum-chromium alloy φ133mm wear-resistant material pipes are currently widely used.

[0056] The one-button filling process of wind and water linkage is: start the air blowing → start the water flow and lubrication → slurry filling → stop the water flow → stop the air blowing. The specific process is: first blow high-pressure air into the filling pipe and wait for the wind speed and pressure in the pipe to stabilize, then inject water into the pipe for 3 minutes, with a water injection volume of about 5.3m 3 (High-pressure full pipe water injection volume 106m 3 / h); Once again, after the filling process is completed, water is injected into the filling pipe, and high-pressure wind is used to boost the water used to clean the pipe. The flow monitor data is transmitted to the central control room. The longest time is 8 minutes, and the water injection volume is about 14.1m 3(High-pressure full pipe water injection volume 106m 3 / h), and finally, blow high-pressure air into the pipeline for 2-5 minutes while turning off the water, and close the lower slurry port of the mixing barrel, and use high-pressure air to push the water until the pipeline is clean.

[0057] The mine filling system has its own characteristics. Its filling process technology includes high-concentration fine sand pipeline gravity conveying cementing filling, high-concentration tailings pipeline gravity conveying cementing filling, full tailings paste pumping cementing filling and underground waste manual mixing road bottoming backfilling cementing filling. The materials of the filling system are prepared by the mine itself, including rod grinding processing, tailings storage, etc.

[0058] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A filling method of a gas-liquid linkage filling system of a full tailings-waste rock-rod grinding paste, characterized in that: The filling system involved in the filling method includes a central control room of a surface filling station, a paste thickener, an overflow water bin, a consolidation powder bin, a cement bin, a binder mixing barrel, a mortar mixing barrel, a waste rock bin, a rod grinding bin, a transmission belt, a filling and conveying pipeline, a compressed air oil-water separation pump and a high-pressure water pump and corresponding filling pipelines; The discharge ports of the cement silo and the consolidation powder silo are directly connected to the binder mixing barrel, the overflow water silo is connected to the paste thickener to recover the clarified overflow water, the paste thickener is connected to the mortar mixing barrel, the aggregates discharged from the waste rock silo and the rod grinding silo are transported to the mortar mixing barrel via a transmission belt, the binder mixing barrel is connected to the mortar mixing barrel via a binder delivery pipeline; the mortar mixing barrel is connected to the working surface of the goaf through a filling delivery pipeline, and the compressed air oil-water separation pump and the high-pressure water pump are connected to the filling delivery pipeline through a high-pressure air duct and a high-pressure water pipe respectively; The filling method comprises the following steps: S1: The low-concentration full tailings slurry of the concentrator is transported to the paste thickener through a slurry pump to prepare a high-concentration full tailings slurry; S2: Cement and consolidation powder are discharged from the cement silo and consolidation powder silo into the binder mixing barrel through the discharge port, water is added to form binder slurry, and then transported to the mortar mixing barrel through the surface filling pipeline; high-concentration full tailings slurry is transported to the mortar mixing barrel through the surface filling pipeline; at the same time, waste rock aggregate and rod-ground sand aggregate are transported from the waste rock silo and rod-ground sand silo to the mortar mixing barrel through the transmission belt for full mixing; S3: During the mixing process of the mortar mixing barrel, the mortar stop valve and the water pipe stop valve on the high-pressure water pipe are opened, the air pipe stop valve on the high-pressure air pipe is closed, and high-pressure air is blown into the filling pipe. According to the senses of the on-site workers at the filling pipe mouth underground, it is determined whether the air blowing in the pipe is uniform. At the same time, after the pressure gauge value of the compressed air oil-water separation pump is stable, the air blowing is stopped and the air pipe stop valve is opened; S4: Close the stop valve on the water pipe and inject water into the pipe. After the inner wall of the pipe is fully moistened according to the filling strength and transportation conditions, stop injecting water and open the stop valve of the water pipe; S5: Close the mortar stop valve under the mortar mixing barrel and the air duct stop valve on the high-pressure air duct in turn, and according to the filling intensity and conveying conditions, convey the paste slurry by gravity or by using the high-pressure air as the power. After the filling is completed, open the mortar stop valve and the air duct stop valve; S6: After the filling process is completed, the water pipe stop valve is closed, water is injected into the filling pipe, and the data of the flow monitor on the high-pressure water pipe is transmitted to the central control room of the surface filling station, and the water used for cleaning the pipe is boosted by high-pressure wind; S7: Open the water pipe stop valve and at the same time, close the air duct stop valve, use high-pressure air to push the remaining water in the pipe until the pipe is clean, and then open the air duct stop valve.

2. The filling method of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste according to claim 1 is characterized in that: The control room, paste thickener, overflow water bin, consolidation powder bin, cement bin, binder mixing barrel, mortar mixing barrel, waste stone bin, rod grinding bin, transmission belt, and binder delivery pipeline of the surface filling station are located on the ground; the compressed air oil-water separation pump and high-pressure water pump are located underground.

3. The filling method of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste according to claim 1 is characterized in that: An air duct stop valve is arranged on the high-pressure air duct, and a water duct stop valve is arranged on the high-pressure water pipe.

4. The filling method of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste according to claim 1 is characterized in that: A slurry pump is arranged on the pipeline between the paste thickener and the mortar mixing barrel.

5. The filling method of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste according to claim 1 is characterized in that: The high-pressure air duct is made of seamless steel pipe; when the high-pressure air duct meets the requirements of stable air blowing, the compressed air oil-water separation pump no longer blows air into the filling and conveying pipeline.

6. The filling method of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste according to claim 1 is characterized in that: The high-pressure water pipe is made of seamless steel pipe; when the high-pressure water pipe meets the requirements of the wet filling and conveying pipeline, the high-pressure water pipe will no longer pressurize water into the filling and conveying pipeline to prevent excessive water in the filling operation area due to excessive water pressure.

7. The filling method of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste according to claim 1 is characterized in that: The filling and conveying pipeline is made of wear-resistant seamless steel pipe. A mortar stop valve is installed in front of the junction between the filling and conveying pipeline and the high-pressure air pipe and the high-pressure water pipe. When the compressed air oil-water separation pump stops blowing air into the filling pipeline and the high-pressure water pump stops pressing water into the filling and conveying pipeline, the mortar stop valve is opened for filling.

8. The filling method of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste according to claim 1 is characterized in that: The compressed air oil-water separation pump and the high-pressure water pump clean the filling and conveying pipeline with high-pressure air and high-pressure water every 3 days.

9. The filling method of the gas-liquid linkage filling system of the full tailings-waste rock-rod grinding paste according to claim 1 is characterized in that: The mass fractions of cement, consolidation powder and water in the S2 binder mixing barrel are in the range of 17%-18%, 70%-72% and 9%-11% respectively; the mass concentration of the high-concentration full tailings slurry is not less than 55% to ensure the underflow concentration; In the mortar mixing barrel, the mass ratio of binder solids: solids in high-concentration whole tailings slurry: waste rock solids: rod grinding solids is (31~33):(23~25):(23~25):(19~21).