An electrical performance testing device suitable for a variety of products

By designing automated electrical performance testing equipment, we solve the problems of low detection efficiency and poor versatility of pyrotechnics, achieve efficient and rapid detection of a variety of products, reduce the probability of missed detection and wrong detection, have a wide range of applications and high detection efficiency. , simple structure.

CN115267386BActive Publication Date: 2024-10-01JIANGSU AUTOMATION RESEARCH INSTITUTE +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210830167.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-15
Publication Date
2024-10-01
Estimated Expiration
2042-07-15

AI Technical Summary

Technical Problem

The existing electrical performance testing process in the field of pyrotechnics relies on manual testing, which is inefficient and often misses inspections. It cannot meet the needs of automated production lines for accurate and rapid product testing. Moreover, the existing equipment is not very versatile and cannot support the types of products. less.

Method used

An electrical performance testing equipment including a loading unit, a testing unit, a protective support unit and a control unit is designed. Through automated loading, isolation and detection, the relay module is used to control the detection circuit to realize the electrical performance testing of a variety of products. , automatically record and transmit data, reducing manual intervention.

Benefits of technology

It achieves efficient and fast electrical performance testing, reduces the probability of missed detection and wrong detection, has a wide range of applications, high detection efficiency, simple structure, novel design, and easy installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115267386B_ABST
    Figure CN115267386B_ABST
Patent Text Reader

Abstract

The present invention discloses an electrical performance testing device suitable for a variety of products, the device includes a loading unit, which is used to automatically transfer the product to be tested to the loading position, waiting for subsequent testing; a test unit, which is used to automatically detect the electrical performance of the product, and automatically record the test results and transmit them to the control unit; a protective support unit, which is used as a support device for the entire device, and when the device performs electrical performance testing on the product, it is used to isolate the product from the outside world; a control unit, which is used to realize the control of the device and the transmission and processing of data by running a built-in program. The device of the present invention is used to replace manual measurement, and the electrical performance testing process is controlled by an industrial computer program. It has the advantages of simple structure, high detection efficiency, multiple types of measured products, and automatic recording of detection data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of initiating device detection, in particular to an electrical performance detection device suitable for various products. Background Art

[0002] At present, the electrical performance testing process for products related to pyrotechnics is mostly manual testing and manual data recording, which is slow and inefficient, and there are cases of misrecording and missed detection, which cannot meet the needs of automated production lines for accurate and rapid product testing. Some domestic manufacturers have conducted research on electrical performance testing of products in the field of pyrotechnics and have achieved certain results, but most of the current testing equipment supports a small number of product types and is not very versatile. Summary of the invention

[0003] The purpose of the present invention is to provide a testing system that can reduce the dependence on manual labor, and at the same time be compatible with a variety of products of different specifications, automatically record test data, and efficiently and quickly complete the comprehensive test of the electrical performance of the product.

[0004] The technical solution to achieve the purpose of the present invention is: an electrical performance testing device suitable for a variety of products, the device comprising a feeding unit, a testing unit, a protective support unit and a control unit;

[0005] The loading unit is used to automatically transfer the product to be tested to the loading position to wait for subsequent testing;

[0006] The test unit is used to automatically detect the electrical properties of the product, and automatically record the test results and transmit them to the control unit;

[0007] The protection support unit is used as a support device for the entire device and is used to isolate the product from the outside world when the device performs electrical performance testing on the product;

[0008] The control unit is used to control the device and transmit and process data by running the built-in program.

[0009] Furthermore, the protective support unit includes an explosion-proof detection cabinet, a cabinet door cylinder and a base. The test unit is in the explosion-proof detection cabinet. The cabinet door cylinder is used to open or close the cabinet door of the explosion-proof detection cabinet, so that the product is isolated from the outside world when the equipment performs electrical performance testing on the product; the base is used to support the loading unit; the control unit includes an explosion-proof electric control cabinet, which realizes the control of the equipment and the transmission and processing of data by running the built-in program.

[0010] Furthermore, the loading unit includes a turntable, a motor, a cam divider, a lifting cylinder and an in-place detection sensor; the cam divider, the lifting cylinder and the in-place detection sensor are installed and fixed on the base, and the turntable is installed on the cam divider. Driven by the motor, the cam divider drives the turntable to rotate, and moves the product to be tested placed on the turntable to the testing station; after the product to be tested arrives at the testing station, the lifting cylinder lifts the product to be tested and disengages it from the turntable, and the in-place detection sensor is used to determine whether the lifting cylinder is lifted into place, if not, the explosion-proof electric control cabinet sends an alarm signal; if so, the transfer mechanism in the explosion-proof testing cabinet is started to move the product to be tested on the testing station to the testing unit.

[0011] Furthermore, the test unit includes a workpiece fixture, a test base, a probe board, an electrical performance tester and the transfer mechanism; the workpiece fixture includes a fixture base and a probe seat installed on the base, and the cables on the product are connected one-to-one with the pointers on the probe seat; the transfer mechanism and the test base are both installed in an explosion-proof testing cabinet, the probe board is installed on the test base, and is connected to the electrical performance tester through cables and relay modules; the workpiece fixture is used to support and place the product to be tested, and is placed on the turntable through a pin-hole combination; when the test unit is ready for testing, the workpiece fixture is transferred to the test base through the cooperation of the transfer mechanism and the lifting cylinder of the loading unit, the cabinet door cylinder is extended, driving the cabinet door to close the explosion-proof testing cabinet, and after the probe seat on the workpiece fixture contacts the probe board, the electrical performance tester starts to perform electrical performance testing on the product, and transmits the test data to the explosion-proof electric control cabinet for storage.

[0012] Furthermore, the number of pointers on the probe seat is greater than the maximum number of cables of the product.

[0013] Furthermore, the transfer mechanism includes a lifting cylinder, a transfer cylinder, a transfer bracket and a positioning pin; the transfer bracket is installed in the explosion-proof detection cabinet, and the lifting cylinder, the transfer cylinder and the positioning pin are installed on the transfer bracket; the lifting cylinder and the transfer cylinder are arranged vertically, and are guided by a guide rail slider to control the up and down movement and the forward and backward movement of the transfer mechanism respectively, so as to cover the range where the workpiece fixture and the test base are located;

[0014] When the in-place detection sensor triggers the transfer mechanism to start, the transfer cylinder drives the entire transfer mechanism to extend out from the explosion-proof test cabinet, the lifting cylinder drives the positioning pin to descend, and combines with the positioning pin hole on the fixture base, and then the transfer cylinder retracts, and the workpiece fixture is moved from the turntable to the test base in the explosion-proof test cabinet through the positioning pin; after the electrical performance tester sends a signal that the test is completed, the cabinet door cylinder retracts, driving the cabinet door to open the explosion-proof test cabinet, the transfer cylinder extends out, and moves the workpiece fixture from the test base to the turntable through the positioning pin, and the lifting cylinder drives the positioning pin to rise and releases the positioning pin hole of the fixture base.

[0015] An electrical performance testing method for various products based on the electrical performance testing device comprises the following steps:

[0016] Step 1: manually place the product to be tested in several workpiece fixtures on the turntable, connect the cable of the product to the probe seat, press the ready switch, and send a signal of preparation completion to the flameproof electric control cabinet;

[0017] Step 2, start the motor, drive the cam divider to drive the turntable to rotate, and move the product to be tested to the testing station; the lifting cylinder lifts the workpiece fixture and disengages it from the turntable. The in-place detection sensor determines whether the lifting cylinder is in place. If not, the explosion-proof electric control cabinet sends an alarm signal; if so, the transfer mechanism in the explosion-proof detection cabinet is started;

[0018] Step 3: The transfer cylinder drives the transfer mechanism to extend out of the explosion-proof test cabinet, and the lifting cylinder drives the positioning pin to descend and engage with the positioning pin hole on the fixture base; the transfer cylinder retracts, and the workpiece fixture is moved from the turntable to the test base in the explosion-proof test cabinet through the positioning pin;

[0019] Step 4: The cabinet door cylinder extends out, driving the cabinet door to close the explosion-proof test cabinet; the probe seat on the workpiece fixture is connected to the probe plate, the circuit is connected, and the electrical performance tester performs electrical performance testing on the product according to the program written according to the test method, and transmits the test data to the explosion-proof electric control cabinet for storage;

[0020] Step 5: After the electrical performance tester sends a signal indicating that the test is completed, the cabinet door cylinder retracts, driving the cabinet door to open the explosion-proof test cabinet; the transfer cylinder extends, and the workpiece fixture is moved from the test base to the turntable through the positioning pin; the lifting cylinder drives the positioning pin to rise and releases the positioning pin hole of the fixture base;

[0021] Step 6: The transfer mechanism is reset, and the lifting cylinder is lowered at the same time, so that the workpiece fixture falls back onto the turntable;

[0022] Step 7: The motor starts and drives the cam divider to rotate the turntable, moving the next product to be tested to the testing station, and then looping steps 1 to 6 until all products have been tested.

[0023] Compared with the prior art, the present invention has the following significant advantages:

[0024] (1) The present invention has a simple structure, novel design and is easy to install.

[0025] (2) The present invention controls the detection circuit through a relay module, so that multiple electrical properties of multiple groups of the same product can be tested in sequence after one power-on, without the need for manual intervention in the test process, and the detection efficiency is high.

[0026] (3) It is compatible with the electrical performance testing of a variety of products and has a wide range of applications.

[0027] (4) The present invention can automatically record and upload detection data, effectively reducing the probability of missed detection and false detection.

[0028] The present invention is further described in detail below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the structure of the device of the present invention.

[0030] Figure 2 It is a left view of the equipment of the present invention (excluding the flameproof electric control cabinet).

[0031] Figure 3 This is the structural diagram of the transfer mechanism and test module.

[0032] Figure 4 This is the workpiece fixture structure diagram.

[0033] Figure 5 This is the detection principle diagram.

[0034] The accompanying drawings are denoted as follows: 1, explosion-proof testing cabinet 2, cabinet door cylinder 3, workpiece fixture 3.1, fixture base 3.2, probe seat 4, turntable 5, motor 6, cam divider 7, base 8, electrical performance tester 9, explosion-proof electric control cabinet 10, test base 11, probe plate 12, transfer mechanism 12.1, lifting cylinder 12.2, transfer cylinder 12.3 transfer bracket 12.4, positioning pin 13, lifting cylinder 14, and in-place detection sensor. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0036] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0037] In one embodiment, in combination Figures 1 to 4 , provides an electrical performance testing device suitable for a variety of products, the device includes a feeding unit, a testing unit, a protective support unit and a control unit;

[0038] The protective support unit includes an explosion-proof detection cabinet 1, a cabinet door cylinder 2 and a base 7. The test unit is in the explosion-proof detection cabinet 1. The cabinet door cylinder 2 is used to open or close the cabinet door of the explosion-proof detection cabinet 1, so that the product is isolated from the outside world when the equipment performs electrical performance testing on the product; the base 7 is used to support the feeding unit; the control unit mainly includes a PLC controller, an industrial computer, a signal transmission line, a display screen, etc., which are all integrated in the explosion-proof electric control cabinet 9, and the control of the equipment and the transmission and processing of data are realized by running the built-in program.

[0039] The feeding unit includes a turntable 4, a motor 5, a cam divider 6, a lifting cylinder 13 and an in-place detection sensor 14; the cam divider 6, the lifting cylinder 13 and the in-place detection sensor 14 are fixed on the base 7, and the turntable 4 is installed on the cam divider 6. Under the drive of the motor 5, the cam divider 6 drives the turntable 4 to rotate, and moves the product to be tested placed on the turntable 4 to the detection station; after the product to be tested arrives at the detection station, the lifting cylinder 13 lifts the product to be tested and disengages from the turntable 4, and the in-place detection sensor 14 is used to determine whether the lifting cylinder 13 is lifted into place. If not, the explosion-proof electric control cabinet 9 sends an alarm signal; if so, the transfer mechanism 12 in the explosion-proof detection cabinet 1 is started to move the product to be tested on the detection station to the test unit.

[0040] The test unit includes a workpiece fixture 3, a test base 10, a probe plate 11, an electrical performance tester 8 and the transfer mechanism 12; the workpiece fixture 3 includes a fixture base 3.1 and a probe seat 3.2 installed on the base, and the cables on the product are connected one by one with the pointers on the probe seat 3.2; the transfer mechanism 12 and the test base 10 are both installed in the explosion-proof test cabinet 1, the probe plate 11 is installed on the test base 10, and is connected to the electrical performance tester 8 through cables and relay modules; the workpiece fixture 3 is used to support and place the product to be tested, and is placed on the turntable 4 through a pin-hole combination; when the test unit is ready for testing, the workpiece fixture 3 is transferred to the test base 10 through the transfer mechanism 12 and the lifting cylinder 13 of the feeding unit, the cabinet door cylinder 2 is extended, and the cabinet door is driven to close the explosion-proof test cabinet 1. After the probe seat 3.2 on the workpiece fixture contacts the probe plate 11, the electrical performance tester 8 starts to perform electrical performance testing on the product, and transmits the test data to the flameproof electric control cabinet 9 for storage.

[0041] Here, the relay module is connected to the electrical performance tester through the common terminal. The relay module controls the opening and closing of each relay to determine the connection and disconnection of different circuits. In the relay module, one probe corresponds to two relays respectively, automatically realizing the connection and disconnection function between any two cables on the product.

[0042] Based on the electrical performance testing principles of different products, that is, the order in which the cables of different products are connected to each other, the corresponding relays are controlled to open and close in sequence. The electrical performance tester automatically records the on / off status, voltage, current, resistance and other information between the cables, and uploads it to the explosion-proof electric control cabinet for storage.

[0043] Here, the fixture base is compatible with products of various specifications and is provided with positioning holes to facilitate the docking of the positioning pins on the transfer mechanism. The probe seat contains multiple sets of probe contacts and wiring modules.

[0044] Here, the number of pointers on the probe seat 3.2 is greater than the maximum number of cables of the product.

[0045] The transfer mechanism 12 includes a lifting cylinder 12.1, a transfer cylinder 12.2, a transfer bracket 12.3 and a positioning pin 12.4; the transfer bracket 12.3 is installed in the explosion-proof detection cabinet 1, and the lifting cylinder 12.1, the transfer cylinder 12.2 and the positioning pin 12.4 are installed on the transfer bracket 12.3; the lifting cylinder 12.1 and the transfer cylinder 12.2 are arranged vertically, and are guided by guide rail sliders to control the up and down movement and the forward and backward movement of the transfer mechanism respectively, so as to cover the range where the workpiece fixture and the test base are located; when the in-place detection sensor 14 triggers the transfer mechanism 12 to start, the transfer cylinder 12.2 drives the entire transfer mechanism 12 from the explosion-proof detection The cabinet 1 extends out, the lifting cylinder 12.1 drives the positioning pin 12.4 to descend, and combines with the positioning pin hole on the fixture base 3.1, and then the transfer cylinder 12.2 retracts, and the workpiece fixture 3 is moved from the turntable 4 to the test base 10 in the explosion-proof detection cabinet 1 through the positioning pin 12.4; after the electrical performance tester 8 sends a signal that the test is completed, the cabinet door cylinder 2 retracts, driving the cabinet door to open the explosion-proof detection cabinet 1, and the transfer cylinder 12.2 extends out, and moves the workpiece fixture 3 from the test base 10 to the turntable 4 through the positioning pin 12.4, and the lifting cylinder 12.1 drives the positioning pin 12.4 to rise and release from the positioning pin hole of the fixture base 3.1.

[0046] Figure 5 The figure shows the schematic diagram of the product's electrical performance testing. Workers connect the cables that come with the product to the probes on the probe holder one by one. After the probe holder is connected to the probe board, the test circuit is connected. Each circuit corresponds to two sets of relays. The program controls the on and off of the relays to determine the connection between the circuit and the common end, thereby realizing the function of automatic connection and disconnection between cables.

[0047] As a specific example, in one of the embodiments, the present invention is further verified and explained. The product itself comes with three cables, and the electrical performance test requires that the three cables be tested for open circuits in pairs. The electrical performance testing equipment applicable to various products is used to complete the relevant tests, and the specific operation steps are as follows:

[0048] 1) Place the products to be tested in groups of 10 on the workpiece fixture on the turntable, and connect the cables (numbered 1, 2, 3) that come with the products to the probe holders respectively; then set the product testing program by operating the flameproof electric control cabinet, and send out a signal that the preparation is complete.

[0049] 2) The motor starts, and the cam divider drives the turntable to rotate, moving the product to be tested to the testing station; the lifting cylinder lifts the workpiece fixture and disengages it from the turntable. The in-place detection sensor determines whether the lifting cylinder is in place. If not, the explosion-proof electric control cabinet sends an alarm signal; if so, the transfer mechanism in the explosion-proof detection cabinet is ready to start.

[0050] 3) The transfer cylinder drives the transfer mechanism to extend out from the explosion-proof test cabinet, and the lifting cylinder drives the positioning pin to descend and engage with the positioning pin hole on the fixture base; the transfer cylinder retracts, and the workpiece fixture is moved from the turntable to the test base in the explosion-proof test cabinet through the positioning pin.

[0051] 4) The door cylinder extends, driving the door to close the explosion-proof test cabinet; the probe seat on the workpiece fixture is connected to the probe plate, and the circuit is connected, such as Figure 5 As shown, in the relay module, k1 and j2 are closed, and the other relays are disconnected, forming a separate circuit connecting cable 1 and cable 2. At this time, the electrical performance tester is started to measure whether the circuit is open and record the test results; then k1 and j3 in the relay module are controlled to be closed in turn, and the other relays are disconnected; k2 and j3 are closed, and the other relays are disconnected, forming separate circuits for cable 1 and cable 3, and separate circuits for cable 2 and cable 3, respectively, and the circuit continuity is detected by the electrical performance tester and the test results are recorded.

[0052] 5) After the electrical performance tester sends a signal that the test is completed, the cabinet door cylinder retracts, driving the cabinet door to open the explosion-proof test cabinet; the transfer cylinder extends, and the workpiece fixture is moved from the test base to the turntable through the positioning pin. The lifting cylinder drives the positioning pin to rise and releases the positioning pin hole of the fixture base;

[0053] 6) The transfer mechanism is reset, and the lifting cylinder is lowered at the same time, so that the workpiece fixture falls back onto the turntable;

[0054] 7) The motor starts, and the cam divider drives the turntable to rotate, moving the next product to be tested to the testing station and repeating steps 1 to 6 until all products have been tested.

[0055] The device of the present invention is used to replace manual measurement and controls the electrical performance detection process through an industrial computer program. It has the advantages of simple structure, high detection efficiency, multiple types of measured products, automatic recording of detection data, etc.

[0056] The above embodiments are only for illustrating the technical idea of ​​the present invention, and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the present invention.

Claims

1. An electrical performance testing device suitable for a variety of products, characterized in that: The device includes a feeding unit, a testing unit, a protection support unit and a control unit; The loading unit is used to automatically transfer the product to be tested to the loading position to wait for subsequent testing; The test unit is used to automatically detect the electrical properties of the product, and automatically record the test results and transmit them to the control unit; The protection support unit is used as a support device for the entire device and is used to isolate the product from the outside world when the device performs electrical performance testing on the product; The control unit is used to control the device and transmit and process data by running a built-in program; The loading unit comprises a rotary disk (4), a motor (5), a cam divider (6), a lifting cylinder (13) and an in-place detection sensor (14); the cam divider (6), the lifting cylinder (13) and the in-place detection sensor (14) are fixedly mounted on a base (7); the rotary disk (4) is mounted on the cam divider (6); under the drive of the motor (5), the cam divider (6) drives the rotary disk (4) to rotate, and moves the product to be tested placed on the rotary disk (4) to the testing station; after the product to be tested arrives at the testing station, the lifting cylinder (13) lifts the product to be tested and disengages it from the rotary disk (4); the in-place detection sensor (14) is used to determine whether the lifting cylinder (13) is lifted into place; if not, the flameproof electric control cabinet (9) sends an alarm signal; if yes, the transfer mechanism (12) in the explosion-proof testing cabinet (1) is started to move the product to be tested on the testing station to the testing unit; The test unit comprises a workpiece fixture (3), a test base (10), a probe plate (11), an electrical performance tester (8) and the transfer mechanism (12); the workpiece fixture (3) comprises a fixture base (3.1) and a probe seat (3.2) mounted on the base, and the cables on the product are connected to the pointers on the probe seat (3.2) in a one-to-one correspondence; the transfer mechanism (12) and the test base (10) are both installed in an explosion-proof test cabinet (1), the probe plate (11) is installed on the test base (10), and is connected to the electrical performance tester (8) through cables and a relay module. The workpiece fixture (3) is used to support and place the product to be tested, and is placed on the turntable (4) by means of a pin-hole combination; when the test unit is ready for testing, the workpiece fixture (3) is transferred to the test base (10) through the cooperation of the transfer mechanism (12) and the lifting cylinder (13) of the loading unit, and the cabinet door cylinder (2) is extended to drive the cabinet door to close the explosion-proof test cabinet (1), and after the probe seat (3.2) on the workpiece fixture contacts the probe plate (11), the electrical performance tester (8) starts to perform electrical performance testing on the product, and transmits the test data to the flameproof electric control cabinet (9) for storage; The transfer mechanism (12) comprises a lifting cylinder (12.1), a transfer cylinder (12.2), a transfer bracket (12.3) and a positioning pin (12.4); the transfer bracket (12.3) is installed in the explosion-proof detection cabinet (1), and the lifting cylinder (12.1), the transfer cylinder (12.2) and the positioning pin (12.4) are installed on the transfer bracket (12.3); the lifting cylinder (12.1) and the transfer cylinder (12.2) are arranged vertically, and are guided by guide rail sliders to control the up-and-down movement and the forward-and-backward movement of the transfer mechanism respectively, so as to cover the range where the workpiece fixture and the test base are located; when the in-position detection sensor (14) triggers the transfer mechanism (12) to start, the transfer cylinder (12.2) drives the entire transfer mechanism (12) from the explosion-proof detection cabinet (1) to the test base. The lifting cylinder (12.1) extends outward, and the positioning pin (12.4) is driven down by the lifting cylinder (12.1) to engage with the positioning pin hole on the fixture base (3.1). Then, the transfer cylinder (12.2) retracts and moves the workpiece fixture (3) from the rotary disk (4) to the test base (10) in the explosion-proof test cabinet (1) through the positioning pin (12.4). After the electrical performance tester (8) sends a signal that the test is completed, the cabinet door cylinder (2) retracts and drives the cabinet door to open the explosion-proof test cabinet (1). The transfer cylinder (12.2) extends out and moves the workpiece fixture (3) from the test base (10) to the rotary disk (4) through the positioning pin (12.4). The lifting cylinder (12.1) drives the positioning pin (12.4) to rise and release from the positioning pin hole of the fixture base (3.1).

2. The electrical performance testing equipment adapted to various products according to claim 1 is characterized in that: The protective support unit comprises an explosion-proof detection cabinet (1), a cabinet door cylinder (2) and a base (7); the test unit is located in the explosion-proof detection cabinet (1); the cabinet door cylinder (2) is used to open or close the cabinet door of the explosion-proof detection cabinet (1), so that when the device performs electrical performance testing on the product, the product is isolated from the outside world; the base (7) is used to support the loading unit; the control unit comprises an explosion-proof electric control cabinet (9), which realizes the control of the device and the transmission and processing of data by running a built-in program.

3. The electrical performance testing equipment adapted to various products according to claim 1 is characterized in that: The number of pointers on the probe seat (3.2) is greater than the maximum number of cables of the product.

4. An electrical performance testing method for various products based on the electrical performance testing device according to any one of claims 1 to 3, characterized in that: The method comprises the following steps: Step 1: manually place the product to be tested in a plurality of workpiece fixtures (3) on the rotary table, connect the cable of the product to the probe seat (3.2), press the preparation switch, and send a signal of preparation completion to the flameproof electric control cabinet (9); Step 2, start the motor (5), drive the cam divider (6) to drive the rotary disk (4) to rotate, and move the product to be tested to the testing station; the lifting cylinder (13) lifts the workpiece fixture (3) and disengages it from the rotary disk (4); the in-place detection sensor (14) determines whether the lifting cylinder (13) is lifted into place, if not, the flameproof electric control cabinet (9) sends an alarm signal; if yes, the transfer mechanism (12) in the explosion-proof detection cabinet (1) is started; Step 3: The transfer cylinder (12.2) drives the transfer mechanism (12) to extend out from the explosion-proof test cabinet (1), and the lifting cylinder (12.1) drives the positioning pin (12.4) to descend and engage with the positioning pin hole on the fixture base (3.1); the transfer cylinder (12.2) retracts and moves the workpiece fixture (3) from the rotary disk (4) to the test base (10) in the explosion-proof test cabinet (1) through the positioning pin (12.4); Step 4, the cabinet door cylinder (2) extends, driving the cabinet door to close the explosion-proof test cabinet (1); the probe seat (3.2) on the workpiece fixture (3) is connected to the probe plate (11), the circuit is connected, and the electrical performance tester (8) performs electrical performance testing on the product according to the program written according to the testing method, and transmits the test data to the flameproof electric control cabinet (9) for storage; Step 5, after the electrical performance tester (8) sends a signal indicating that the test is completed, the cabinet door cylinder (2) retracts, driving the cabinet door to open the explosion-proof test cabinet (1); the transfer cylinder (12.2) extends, and moves the workpiece fixture (3) from the test base (10) to the turntable (4) through the positioning pin (12.4); the lifting cylinder (12.1) drives the positioning pin (12.4) to rise, and releases the positioning pin hole of the fixture base (3.1); Step 6, the transfer mechanism (12) is reset, and the lifting cylinder (13) is lowered at the same time, so that the workpiece fixture (3) falls back onto the turntable (4); Step 7, the motor (5) is started, driving the cam divider (6) to drive the turntable (4) to rotate, and the next product to be tested is moved to the testing station, and then steps 1 to 6 are repeated until all products are tested.