Method for forming tunnel surrounding rock bearing ring
By forming a bearing ring around the surrounding rock with anchor bolts and adjusting the anchor bolt density, the problem of large deformation of the surrounding rock in the tunnel was solved, enhancing the stability and safety of the tunnel.
Patent Information
- Application Number
- CN202210869366.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-22
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-07-22
AI Technical Summary
During tunnel construction, high ground stress caused severe deformation in soft rock tunnels, making it difficult for existing support structures to guarantee long-term safety and effectiveness.
A bearing ring for the surrounding rock is formed by anchor bolts. Prestress is applied to the surrounding rock using the anchor bolts, and the anchor bolt density is adjusted by measuring the elastic longitudinal wave velocity to form the final bearing ring for the tunnel surrounding rock.
It effectively solved the problem of large deformation in compressional soft rock tunnels, and enhanced the stability and safety of the surrounding rock of the tunnel.
Smart Images

Figure CN115370402B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of civil engineering technology, and in particular to a method for forming a tunnel surrounding rock bearing ring. Background Art
[0002] When constructing tunnels, high geostress phenomena often occur in deep or great buried strata. Coupled with the influence of the soft rock squeezing effect, high geostress squeezing soft rock tunnels will experience serious large deformation problems. If only passive support of the support structure is relied upon, it is difficult to ensure the safety and effectiveness of the support structure under long-term stress. Therefore, when tunnels pass through such complex geological construction, in order to maintain the stability of the tunnel surrounding rock, how to solve the problem of large deformation of soft rock tunnels is an urgent problem to be solved. Summary of the invention
[0003] The main purpose of the present application is to provide a method for forming a tunnel surrounding rock bearing ring to solve the problem of large deformation of squeezing soft rock tunnels.
[0004] In order to achieve the above-mentioned purpose, the present application provides a surrounding rock deformation control method. The method comprises: determining the anchor rod length and anchor rod spacing according to the rock uniaxial compressive strength of the tunnel surrounding rock and the excavation width of the tunnel; installing the anchor rod according to the anchor rod length and the anchor rod spacing, so that the anchor rod applies prestress to the surrounding rock to form a pending surrounding rock bearing ring; measuring the first elastic longitudinal wave velocity of the pending surrounding rock bearing ring; determining whether to increase the installation density of the anchor rod according to the first elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity to form the final tunnel surrounding rock bearing ring. Optionally, determining the anchor rod length and anchor rod spacing according to the rock uniaxial compressive strength of the tunnel surrounding rock and the excavation width of the tunnel comprises: determining the anchor rod length according to the rock uniaxial compressive strength of the tunnel surrounding rock and the excavation width of the tunnel; determining the longitudinal spacing and radial spacing of the anchor rod according to the rock uniaxial compressive strength of the tunnel surrounding rock, the excavation width of the tunnel and the anchor rod length.
[0005] Optionally, the anchor rod applies prestress to the surrounding rock to form a surrounding rock bearing ring to be determined, including: each anchor rod applies prestress to the surrounding rock to form a conical compression zone associated with each anchor rod; two adjacent conical compression zones partially overlap to form an overlapping compression zone; a continuous compression zone is formed based on all overlapping compression zones to form a surrounding rock bearing ring to be determined.
[0006] Optionally, each anchor applies prestress to the surrounding rock to form a conical compression zone associated with each anchor, including: both ends of each anchor applies pressure to the surrounding rock at a diffusion angle toward the middle of the anchor to form a conical compression zone associated with each anchor.
[0007] Optionally, forming a continuous compression zone based on all overlapping compression zones to form a pending surrounding rock bearing ring includes: using the prestress and passive support force of anchor rods to enable the continuous compression zone to form a pending surrounding rock bearing ring under a three-way compression state.
[0008] Optionally, the anchor rod is a solid anchor rod, and the installation of the anchor rod is carried out according to the anchor rod length and the anchor rod spacing, so that the anchor rod applies prestress to the surrounding rock to form a pending surrounding rock bearing ring, which includes: drilling the tunnel surrounding rock according to the anchor rod length and the anchor rod spacing to obtain a mounting hole; inserting an anchor rod with the anchor rod length into the mounting hole, with a gap between the anchor rod and the surrounding rock around the mounting hole; applying resin to the gap to anchor the anchoring section of the anchor rod located at the end of the anchor rod extending into the mounting hole to the tunnel surrounding rock; installing a grouting plug against the resin in the mounting hole; grouting the gap to bond and fix the free section of the anchor rod to the tunnel surrounding rock, wherein the free section is the portion of the anchor rod located in the mounting hole except the anchoring section; tensioning the anchor rod through the end of the anchor rod exposed from the mounting hole using a torque wrench to apply prestress; installing a nut and a washer at the end of the anchor rod exposed from the mounting hole to lock the anchor rod.
[0009] Optionally, the anchor rod is a hollow anchor rod and a plurality of overflow holes are provided on the peripheral wall of the hollow anchor rod. The installation of the anchor rod is carried out according to the anchor rod length and the anchor rod spacing so that the anchor rod applies prestress to the surrounding rock to form a surrounding rock bearing ring to be determined, which includes: drilling a hole in the tunnel surrounding rock according to the anchor rod length and the anchor rod spacing to obtain an installation hole; inserting an anchor rod having the anchor rod length into the installation hole, with a gap between the anchor rod and the surrounding rock around the installation hole; applying resin to the gap to fix the anchoring section of the anchor rod at one end thereof that penetrates into the installation hole to the tunnel surrounding rock. Anchoring; installing a grouting plug against the resin in the mounting hole; tensioning the anchor rod through the end of the anchor rod exposed from the mounting hole by using a torque wrench to apply prestress; installing a nut and a washer on the end of the anchor rod exposed from the mounting hole to lock the anchor rod; grouting into the hollow anchor rod through the end of the hollow anchor rod exposed from the mounting hole, and filling the gap with grout through the overflow hole of the hollow anchor rod to bond and fix the free section of the anchor rod to the tunnel surrounding rock, wherein the free section is the portion of the anchor rod located in the mounting hole except the anchoring section.
[0010] Optionally, measuring the first elastic longitudinal wave velocity of the pending surrounding rock bearing ring includes: measuring the first elastic longitudinal wave velocity of the pending surrounding rock bearing ring by means of a loose circle tester.
[0011] Optionally, based on the first elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity, determining whether to increase the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring includes: if the first elastic longitudinal wave velocity is greater than or equal to the preset elastic longitudinal wave velocity, determining the undetermined surrounding rock bearing ring as the final tunnel surrounding rock bearing ring; if the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, increasing the installation density of the anchor rods to form the final tunnel surrounding rock bearing ring.
[0012] Optionally, if the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, increasing the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring includes: if the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, installing additional anchor rods at the middle position between two adjacent anchor rods according to the radial spacing and longitudinal spacing of the anchor rods, so that the additional anchor rods apply the prestress to the surrounding rock to form a denser surrounding rock bearing ring; measuring the second elastic longitudinal wave velocity of the denser surrounding rock bearing ring; determining whether to increase the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring according to the second elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity.
[0013] According to the technical solution of the present application, a load-bearing ring can be actively formed by anchor rods using shallow surrounding rock, and whether the load-bearing ring meets the requirements can be judged by the elastic longitudinal wave velocity and finally formed by adjusting the density of the anchor rods, thereby effectively solving the problem of large deformation of squeezing soft rock tunnels. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:
[0015] Figure 1 is a flow chart of a method for forming a tunnel surrounding rock bearing ring according to an embodiment of the present application;
[0016] Figure 2 is a schematic diagram of the structure after a single anchor rod is installed according to an embodiment of the present application;
[0017] Figure 3 is a schematic diagram of prestressing of a single anchor rod after installation according to an embodiment of the present application;
[0018] Figure 4 is a schematic diagram of the interaction between the anchor rod and the surrounding rock according to an embodiment of the present application;
[0019] Figure 5 It is a schematic diagram of a tunnel surrounding rock bearing ring according to an embodiment of the present application. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.
[0021] The specific implementation of the present application is described in detail below with reference to the accompanying drawings.
[0022] The present application provides a method for forming a tunnel surrounding rock bearing ring. Figure 1 , Figure 1 1 is a flow chart of a method for forming a tunnel surrounding rock bearing ring according to an embodiment of the present application. Figure 1 As shown in , the method includes the following steps S101-S104. Step S101: Determine the anchor rod length and anchor rod spacing according to the uniaxial compressive strength of the tunnel surrounding rock and the excavation width of the tunnel. Step S102: According to the anchor rod length and the anchor rod spacing, install the anchor rod so that the anchor rod applies prestress to the surrounding rock to form a pending surrounding rock bearing ring. Step S103: Measure the first elastic longitudinal wave velocity of the pending surrounding rock bearing ring. Step S104: Determine whether to increase the installation density of the anchor rod to form the final tunnel surrounding rock bearing ring based on the first elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity.
[0023] Through the tunnel surrounding rock bearing ring forming method of the present application, the bearing ring can be actively formed by anchor rods using shallow surrounding rock, and the elastic longitudinal wave velocity can be used to judge whether the bearing ring meets the requirements and the bearing ring can be finally formed by adjusting the anchor rod density, thereby effectively solving the large deformation problem of squeezing soft rock tunnels.
[0024] In step S101, the anchor rod length and anchor rod spacing may be determined according to the uniaxial compressive strength of the rock surrounding the tunnel and the excavation width of the tunnel.
[0025] According to the embodiment of the present application, in order to form the bearing ring of the tunnel surrounding rock, it is necessary to install anchor rods on the surrounding rock, thereby determining the length and installation interval of the anchor rods. Therefore, the length and installation interval of the anchor rods can be determined by the uniaxial compressive strength of the tunnel surrounding rock and the excavation width of the tunnel.
[0026] Furthermore, determining the anchor rod length and anchor rod spacing according to the uniaxial compressive strength of the tunnel surrounding rock and the excavation width of the tunnel may include: determining the anchor rod length according to the uniaxial compressive strength of the tunnel surrounding rock and the excavation width of the tunnel; determining the longitudinal spacing and radial spacing of the anchor rods according to the uniaxial compressive strength of the tunnel surrounding rock, the excavation width of the tunnel and the anchor rod length.
[0027] Specifically, the anchor rod length and the longitudinal spacing and radial spacing of the anchor rods may be determined with reference to the parameter correspondence in Table 1 below.
[0028]
[0029] Table 1
[0030] It can be seen from Table 1 that according to the uniaxial compressive strength of the rock surrounding the tunnel, the soft rock below 30MPa is divided into three categories: 5-10MPa, 10-20MPa, and 20-30MPa. For different types of soft rock, the corresponding anchor length L can be determined according to the tunnel excavation width W, and the corresponding anchor setting interval, i.e., radial interval and longitudinal interval, can be determined according to the anchor length L. Among them, the longitudinal interval refers to the interval of the anchor along the tunnel direction, and the radial interval refers to the interval of the anchor along the radial section of the tunnel.
[0031] In step S102, the anchor rods may be installed according to the anchor rod lengths and the anchor rod intervals, so that the anchor rods apply prestress to the surrounding rock to form a surrounding rock bearing ring to be determined.
[0032] According to the embodiment of the present application, after the anchor rod length and anchor rod interval are determined, the anchor rods of the length are installed according to the interval. After installation, the anchor rods apply prestress to the surrounding rock, thereby forming a surrounding rock bearing ring. Since the surrounding rock bearing ring still needs a final judgment to determine whether it meets the requirements, the surrounding rock bearing ring is a pending surrounding rock bearing ring.
[0033] Two embodiments of the prestressed installation of the anchor rod will be described in detail below.
[0034] According to one embodiment, referring to Figure 2 , Figure 2 Schematic diagram of the structure of a single anchor rod after installation according to an embodiment of the present application. Figure 2As shown, the anchor rod 1 is a solid anchor rod. According to the anchor rod length and the anchor rod interval, the installation of the anchor rod 1 is implemented so that the anchor rod 1 applies prestress to the surrounding rock to form a surrounding rock bearing ring to be determined. The method may include: drilling a hole in the tunnel surrounding rock according to the anchor rod length and the anchor rod interval to obtain an installation hole; inserting the anchor rod 1 having the anchor rod length into the installation hole, with a gap between the anchor rod 1 and the surrounding rock around the installation hole; applying resin 13 to the gap to connect the anchoring section 11 of the anchor rod 1 at one end thereof that penetrates into the installation hole with the tunnel. The invention relates to a method for anchoring the anchor rod 1 to the surrounding rock; installing a grouting plug 17 against the resin 13 in the mounting hole; grouting the gap, preferably injecting cement grout 14, to bond and fix the free section 12 of the anchor rod 1 to the tunnel surrounding rock, wherein the free section 12 is the portion of the anchor rod 1 located in the mounting hole except the anchoring section 11; tensioning the anchor rod 1 through the end of the anchor rod 1 exposed from the mounting hole with a torque wrench to apply prestress; installing a nut 15 and a washer 16 at the end of the anchor rod exposed from the mounting hole to lock the anchor rod 1.
[0035] It is worth noting that grouting is to bond the free section of the anchor rod to the surrounding rock of the tunnel, and the cement slurry will solidify after the nut and the pad are installed.
[0036] According to another embodiment not shown, the anchor rod is a hollow anchor rod and a plurality of overflow holes are provided on the peripheral wall of the hollow anchor rod. According to the anchor rod length and the anchor rod spacing, the installation of the anchor rod is implemented so that the anchor rod applies prestress to the surrounding rock to form a surrounding rock bearing ring to be determined, which may include: drilling a hole in the tunnel surrounding rock according to the anchor rod length and the anchor rod spacing to obtain an installation hole; inserting an anchor rod having the anchor rod length into the installation hole, with a gap between the anchor rod and the surrounding rock around the installation hole; applying resin to the gap to connect the anchoring section of the anchor rod at one end thereof that penetrates into the installation hole with the surrounding rock; The invention relates to an anchoring method for tunnel surrounding rock; installing a grouting plug against resin in the mounting hole; tensioning the anchor rod through the end of the anchor rod exposed from the mounting hole by using a torque wrench to apply prestress; installing a nut and a washer at the end of the anchor rod exposed from the mounting hole to lock the anchor rod; grouting is injected into the hollow anchor rod through the end of the hollow anchor rod exposed from the mounting hole, and grout is filled into the gap through the overflow hole of the hollow anchor rod to bond and fix the free section of the anchor rod to the tunnel surrounding rock, wherein the free section is the portion of the anchor rod other than the anchoring section located in the mounting hole.
[0037] It is worth noting that since the anchoring section at one end of the anchor rod is anchored together with the surrounding rock, when the anchor rod is tensioned by applying a torque wrench to the other end of the anchor rod, the screw head and the anchoring section at the nut and pad of the anchor rod will apply prestress to the surrounding rock.
[0038] By installing the anchor rods prestressed in the above two embodiments, a surrounding rock bearing ring to be determined can be formed. The principle of forming a surrounding rock bearing ring to be determined by the anchor rods installed in this way will be mainly described below.
[0039] Specifically, the anchor rod applies prestress to the surrounding rock to form a surrounding rock bearing ring to be determined, which may include: each anchor rod applies prestress to the surrounding rock to form a conical compression zone associated with each anchor rod; two adjacent conical compression zones partially overlap to form an overlapping compression zone; a continuous compression belt is formed based on all overlapping compression zones to form a surrounding rock bearing ring to be determined.
[0040] According to an embodiment of the present disclosure, each anchor applies prestress to the surrounding rock to form a conical compression zone associated with each anchor, which may include: both ends of each anchor apply pressure to the surrounding rock at a diffusion angle toward the middle of the anchor to form a conical compression zone associated with each anchor. Forming a continuous compression zone based on all overlapping compression zones to form a pending surrounding rock bearing ring may include: through the prestress and the passive support force of the anchor, the continuous compression zone forms a pending surrounding rock bearing ring under three-way compression.
[0041] The following will refer to Figures 3 to 5 Describe in detail, Figure 3 is a schematic diagram of prestressing of a single anchor rod after installation according to an embodiment of the present application; Figure 4 is a schematic diagram of the interaction between the anchor rod and the surrounding rock according to an embodiment of the present application; Figure 5 It is a schematic diagram of a tunnel surrounding rock bearing ring according to an embodiment of the present application.
[0042] like Figure 3 As shown in FIG. 1 , both ends of a single anchor rod 1 apply prestress P to the surrounding rock at a diffusion angle 2θ, thereby forming a conical compression zone 2. The diffusion angle 2θ is determined according to the hardness of the rock around the anchor rod. Figure 3 is a cross-sectional view, Figure 3 The conical compression zone 2 in the figure is conical. In fact, the conical compression zone 2 is a three-dimensional area in the shape of a cone. Figure 4 As shown, an overlapping area is generated between two adjacent conical compression zones 2, thereby forming a continuous compression zone 3. The interior of the continuous compression zone 3 is subjected to stress in three directions by the prestress P and the passive support force F of the anchor rod, that is, Figure 4 The radial stress σ shown in r , radial stress σ rAs well as the longitudinal stress along the tunnel direction not shown in the figure, the continuous compression belt 3 forms a pending surrounding rock bearing ring under three-way compression, thereby effectively enhancing the self-bearing capacity of the surrounding rock, wherein the passive support force of the anchor rod is the axial force of the anchor rod increased during the coordinated deformation process between the anchor rod and the surrounding rock. It should be understood that for the sake of clarity, Figure 4 Only three conical compression zones 2 are shown, and the radial stress σ r and radial stress σ r Not present in the continuous compression belt 3 shown. Figure 5 As shown, there is a supporting structure 7 around the tunnel clearance 5, and the other side of the supporting structure 7 is a shallow surrounding rock 4 with anchor rods 1 installed, so as to form a surrounding rock bearing ring 6.
[0043] In step S103, the first elastic longitudinal wave velocity of the undetermined surrounding rock bearing ring may be measured.
[0044] According to an embodiment of the present application, after the pending surrounding rock bearing ring is formed, it is necessary to measure the elastic longitudinal wave velocity of the pending surrounding rock bearing ring to determine whether the bearing capacity of the bearing ring meets the requirements.
[0045] Further, measuring the first elastic longitudinal wave velocity of the undetermined surrounding rock bearing ring may include: measuring the first elastic longitudinal wave velocity of the undetermined surrounding rock bearing ring by a loose circle tester. In addition to the loose circle tester, of course, any other instrument suitable for measuring elastic longitudinal wave velocity can also be used to measure the bearing ring, which is not limited here.
[0046] In step S104, it can be determined whether to increase the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring according to the first elastic longitudinal wave velocity and a preset elastic longitudinal wave velocity.
[0047] According to an embodiment of the present application, after measuring the elastic longitudinal wave velocity of the pending surrounding rock bearing ring, the elastic longitudinal wave velocity can be compared with the preset elastic longitudinal wave velocity to determine whether the pending surrounding rock bearing ring meets the requirements, and then determine whether additional anchors are needed to form a final tunnel surrounding rock bearing ring that meets the requirements. Among them, referring to Table 1 given in the description of step S101 above, it can be seen that the preset elastic longitudinal wave velocity is different corresponding to different parameters such as the uniaxial compressive strength of the rock.
[0048] Specifically, according to the first elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity, determining whether to increase the installation density of the anchor rods to form the final tunnel surrounding rock bearing ring may include: if the first elastic longitudinal wave velocity is greater than or equal to the preset elastic longitudinal wave velocity, determining the undetermined surrounding rock bearing ring as the final tunnel surrounding rock bearing ring; if the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, increasing the installation density of the anchor rods to form the final tunnel surrounding rock bearing ring.
[0049] In this embodiment, for example, when the uniaxial compressive strength of the rock is 5 to 10 MPa, the corresponding preset elastic longitudinal wave velocity is 2.0 km / s. Therefore, only when the elastic longitudinal wave velocity measured for the undetermined surrounding rock bearing ring is greater than or equal to 2.0 km / s, the undetermined surrounding rock bearing ring is the final surrounding rock bearing ring. When the measured elastic longitudinal wave velocity is less than 2.0 km / s, it indicates that the undetermined surrounding rock bearing ring does not meet the requirements and the installation density of the anchor rods needs to be increased to form the final tunnel surrounding rock bearing ring.
[0050] Furthermore, if the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, increasing the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring may include: if the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, installing additional anchor rods at the middle position between two adjacent anchor rods according to the radial spacing and longitudinal spacing of the anchor rods, so that the additional anchor rods apply the prestress to the surrounding rock to form a denser surrounding rock bearing ring; measuring the second elastic longitudinal wave velocity of the denser surrounding rock bearing ring; determining whether to increase the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring according to the second elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity.
[0051] In this embodiment, as shown in Table 1, for example, when the uniaxial compressive strength of the rock is 5 to 10 MPa, the corresponding anchor rod setting interval is 0.5L×0.5L, and the corresponding preset elastic longitudinal wave velocity is 2.0 km / s. If the measured elastic longitudinal wave velocity is less than 2.0 km / s, additional anchor rods can be added so that the longitudinal spacing and / or radial spacing of the anchor rods are halved, for example, 0.25L×0.5L, 0.5L×0.25L or 0.25L×0.25L. It is worth noting that for the same range of rock uniaxial compressive strength, the smaller the anchor rod setting interval, the greater the elastic longitudinal wave velocity measured for the bearing ring. Of course, the additional anchor rods can also be installed using the method described in step S102. After the additional anchor rods are installed, the elastic longitudinal wave velocity of the formed bearing ring can be measured as described in step S103. Finally, as described in step S104, the elastic longitudinal wave velocity is compared with the preset elastic velocity to form the final tunnel surrounding rock bearing ring. From the above, it can be seen that this cycle is repeated until a final tunnel surrounding rock bearing ring that meets the requirements is formed.
[0052] The embodiments of the present application are introduced in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and core idea of the present application. At the same time, for general technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
[0053] It should be understood that the terms "first" and "second", etc. in the claims, specification and drawings of the present application are used to distinguish different objects, rather than to describe a specific order. The terms "include" and "comprise" used in the specification and claims of the present application indicate the presence of the described features, wholes, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or their collections.
[0054] It should also be understood that the terms used in this application specification are only for the purpose of describing specific embodiments and are not intended to limit the present application. As used in this application specification and claims, unless the context clearly indicates otherwise, the singular forms of "a", "an" and "the" are intended to include plural forms. It should also be further understood that the term "and / or" used in this application specification and claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes these combinations.
[0055] The embodiments of the present application are described in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and its core idea of the present application. At the same time, changes or deformations made by those skilled in the art based on the ideas of the present application, the specific implementation methods and the scope of application of the present application, all belong to the scope of protection of the present application. In summary, the content of this specification should not be construed as a limitation on the present application.
Claims
1. A method for forming a tunnel surrounding rock bearing ring, wherein: The method comprises: Determine the anchor rod length and anchor rod spacing according to the uniaxial compressive strength of the rock surrounding the tunnel and the excavation width of the tunnel; According to the anchor rod length and the anchor rod interval, the anchor rod is installed so that the anchor rod applies prestress to the tunnel surrounding rock to form a surrounding rock bearing ring to be determined; Measuring the first elastic longitudinal wave velocity of the undetermined surrounding rock bearing ring; According to the first elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity, determining whether to increase the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring, The anchor bolts apply prestress to the tunnel surrounding rock to form a surrounding rock bearing ring to be determined, including: each anchor bolt applies prestress to the tunnel surrounding rock to form a conical compression zone associated with each anchor bolt; two adjacent conical compression zones partially overlap to form an overlapping compression zone; a continuous compression zone is formed based on all overlapping compression zones to form a surrounding rock bearing ring to be determined, Each anchor applies prestress to the tunnel surrounding rock to form a conical compression zone associated with each anchor, including: both ends of each anchor apply pressure to the tunnel surrounding rock at a diffusion angle toward the middle of the anchor to form a conical compression zone associated with each anchor. According to the first elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity, determining whether to increase the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring includes: if the first elastic longitudinal wave velocity is greater than or equal to the preset elastic longitudinal wave velocity, determining the undetermined surrounding rock bearing ring as the final tunnel surrounding rock bearing ring; if the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, increasing the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring, If the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, the installation density of the anchor rods is increased to form a final tunnel surrounding rock bearing ring, including: if the first elastic longitudinal wave velocity is less than the preset elastic longitudinal wave velocity, additional anchor rods are installed at the middle position between two adjacent anchor rods according to the radial spacing and longitudinal spacing of the anchor rods, so that the additional anchor rods apply the prestress to the tunnel surrounding rock to form a denser surrounding rock bearing ring; the second elastic longitudinal wave velocity of the denser surrounding rock bearing ring is measured; according to the second elastic longitudinal wave velocity and the preset elastic longitudinal wave velocity, it is determined whether to increase the installation density of the anchor rods to form a final tunnel surrounding rock bearing ring.
2. The method for forming a tunnel surrounding rock bearing ring according to claim 1, wherein: Determining the anchor length and anchor spacing according to the uniaxial compressive strength of the surrounding rock of the tunnel and the excavation width of the tunnel includes: Determine the length of the anchor rod according to the uniaxial compressive strength of the rock surrounding the tunnel and the excavation width of the tunnel; The longitudinal spacing and radial spacing of the anchor rods are determined according to the uniaxial compressive strength of the rock surrounding the tunnel, the excavation width of the tunnel and the length of the anchor rods.
3. The method for forming a tunnel surrounding rock bearing ring according to claim 1, wherein: The continuous compression zone is formed based on all the overlapping compression zones to form the undetermined surrounding rock bearing ring including: The prestress and the passive support force of the anchor rod enable the continuous compression belt to form a pending surrounding rock bearing ring under a three-way compression state.
4. The method for forming a tunnel surrounding rock bearing ring according to claim 1, wherein: The anchor rod is a solid anchor rod. The installation of the anchor rod is carried out according to the length of the anchor rod and the anchor rod interval, so that the anchor rod applies prestress to the tunnel surrounding rock to form a surrounding rock bearing ring to be determined, including: Drilling holes in the tunnel surrounding rock according to the anchor rod length and the anchor rod interval to obtain installation holes; Inserting an anchor rod having the anchor rod length into the mounting hole, with a gap between the anchor rod and the tunnel surrounding rock around the mounting hole; Applying resin to the gap to anchor the anchoring section of the anchor rod at one end thereof extending into the installation hole to the tunnel surrounding rock; installing a grout stopper against the resin in the mounting hole; Grouting the gap to bond and fix the free section of the anchor rod to the tunnel surrounding rock, wherein the free section is the portion of the anchor rod located in the mounting hole except the anchoring section; Using a torque wrench to tension the anchor rod through the end of the anchor rod exposed from the mounting hole to apply prestress; A nut and a washer are mounted on one end of the anchor rod that is exposed from the mounting hole to lock the anchor rod.
5. The method for forming a tunnel surrounding rock bearing ring according to claim 1, wherein: The anchor rod is a hollow anchor rod and has a plurality of grouting holes on the peripheral wall of the hollow anchor rod. The anchor rod is installed according to the length of the anchor rod and the anchor rod interval so that the anchor rod applies prestress to the tunnel surrounding rock to form a surrounding rock bearing ring to be determined, which includes: Drilling holes in the tunnel surrounding rock according to the anchor rod length and the anchor rod interval to obtain installation holes; Inserting an anchor rod having the anchor rod length into the mounting hole, with a gap between the anchor rod and the tunnel surrounding rock around the mounting hole; Applying resin to the gap to anchor the anchoring section of the anchor rod at one end thereof extending into the installation hole to the tunnel surrounding rock; installing a grout stopper against the resin in the mounting hole; Using a torque wrench to tension the anchor rod through the end of the anchor rod exposed from the mounting hole to apply prestress; Installing a nut and a washer on the end of the anchor rod exposed from the mounting hole to lock the anchor rod; Grouting is injected into the hollow anchor rod through one end of the hollow anchor rod exposed from the mounting hole, and grout is filled into the gap through the overflow hole of the hollow anchor rod to bond and fix the free section of the anchor rod to the tunnel surrounding rock, wherein the free section is the portion of the anchor rod located in the mounting hole except the anchoring section.
6. The method for forming a tunnel surrounding rock bearing ring according to claim 1, wherein: Measuring the first elastic longitudinal wave velocity of the undetermined surrounding rock bearing ring includes: The first elastic longitudinal wave velocity of the undetermined surrounding rock bearing ring is measured by a loose circle tester.