A jaw crusher frame casting tool and process method

By using a combination of split-structure tooling and wedge iron fastening rings, the problems of unsightly appearance and shrinkage cracks in jaw crusher frame casting are solved, production efficiency and casting accuracy are improved, and efficient molding of castings is achieved. .

CN115430810BActive Publication Date: 2024-10-11LUOYANG XINGRONG IND
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202211142176.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-20
Publication Date
2024-10-11
Estimated Expiration
2042-09-20

AI Technical Summary

Technical Problem

The existing jaw crusher frame casting method has problems such as external sand core blockage resulting in unsightly appearance, shrinkage crack defects and low production efficiency.

Method used

The split-structure tooling is used, including the bottom plate, side plates, end plates and fastening rings. Through the cooperation of the wedge iron fastening ring and the sand core, an integrated sand box is formed, which reduces the sand core assembly steps and material usage, and improves the surface of the casting. Smoothness and tightness.

Benefits of technology

It effectively avoids shrinkage cracks in castings, improves production efficiency and the appearance of castings, saves the usage of molding sand and molding time, and ensures accurate dimensions of castings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115430810B_ABST
    Figure CN115430810B_ABST
Patent Text Reader

Abstract

The present invention introduces a jaw crusher frame casting tooling and process method, including a bottom plate, two side plates, two end plates, two fastening rings and a plurality of wedges; the bottom plate, two side plates and two end plates together form a split-type sand box with an open upper end; two fastening rings are respectively sleeved on the upper and lower ends of the sand box, and a plurality of wedges are respectively arranged between the two fastening rings and the two side plates and the two end plates. The inner cavity core box of the present invention adopts an integral core box without a bottom plate, which not only saves molding sand, but also can avoid crack defects caused by insufficient yield during the shrinkage and solidification process of the casting; there is an integral core box on each of the four sides of the outer core box, and there is no trace of core assembly on each side. The core assembly and casting are directly on the steel bottom plate, and the ground level accuracy is high; after adopting the special tooling, the fastening ring and the sand core are supported by a hard point, which enhances the fastening force of the four sides of the mold, reduces the box expansion rate of the casting, reduces the amount of molten steel, and ensures the precision of the casting size.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of casting, and in particular to a tooling and a process method for casting a jaw crusher frame. Background Art

[0002] Jaw crusher is a large category of crushing equipment, which simulates the movement of the two jaws of animals to complete the material crushing operation; it is widely used in the crushing of various ores and bulk materials in the mining, smelting, building materials, highways, railways, water conservancy and chemical industries; the frame is one of the two major components of the jaw crusher, and is the body shell of the jaw crusher. It is a box-like thin-walled structural part, which is subject to large forces and has high requirements for surface quality. The general casting method is that the base is facing upward, and a riser is set on each base; the inner cavity is divided into blocks and the outer shape is divided into blocks; after the sand core is assembled, a sand box is put on the outside and the sand is filled tightly. This method has the following problems: the external sand core is divided into blocks, resulting in an unsightly outer contour of the casting, traces at the block, and steps caused by the core misalignment; the casting is prone to shrinkage cracks; after the sand core is assembled, it is put on with a suitable sand box, and then the sand is filled between the assembled sand core and the sand box to be compacted and hardened. The sand consumption is relatively large, the molding time is long, and the production efficiency is low. Summary of the invention

[0003] The purpose of the present invention is to overcome the deficiencies of the prior art and provide a jaw crusher frame casting tool and process method, which can save molding raw materials, effectively solve casting crack defects and improve production efficiency.

[0004] The technical solution adopted by the present invention is:

[0005] A jaw crusher frame casting tooling, comprising a bottom plate, two side plates, two end plates, two fastening rings and a plurality of wedges;

[0006] The bottom plate is a rectangular plate, the two side plates are relatively arranged on both sides of the bottom plate in the length direction, the two end plates are relatively arranged at the two ends between the two side plates, and the bottom plate, the two side plates and the two end plates together form a split-type sand box with an open upper end; the upper and lower sides of the two ends of the side plates are symmetrically provided with hangers; the fastening ring is a square ring structure, and the two fastening rings are respectively mounted on the upper and lower ends of the sand box, the lower fastening ring is located on the lower side of the lower hangers of the two side plates, and the upper fastening ring is placed on the upper hangers of the two side plates, and a number of wedges are respectively arranged between the two fastening rings and the two side plates and the two end plates.

[0007] Specifically, the outer surfaces of the bottom plate, side plate and end plate are crisscrossed with a number of reinforcing ribs, and there are through holes with a diameter of 30-80 mm between each reinforcing rib of the side plate and the end plate. The fastening point of the wedge iron on the side plate is at the intersection of the reinforcing ribs.

[0008] Specifically, the inner ring surface of the fastening ring is provided with an inclination for easy cooperation with the wedge iron.

[0009] Specifically, the base plate and the fastening ring are also provided with hanging handles on both sides in the width direction.

[0010] A jaw crusher frame casting process method, the specific steps are:

[0011] Step 1: Make a model according to the frame structure of the jaw crusher: the bottom of the outer contour of the box frame is facing upward, and an external core box is made on each of the four sides. The four external core boxes are all integral core boxes, and the upper and lower end surfaces are covered with parts. The upper and lower sand intake is controlled at 100-300mm. The height of the four external core boxes is consistent, and the back sanding surface is flat; the inner cavity of the frame is made into an integral inner cavity core box, the height is equal to the outer core box, and the inner cavity core box does not have a bottom plate;

[0012] Step 2: Place the bottom plate of the tooling on the ground, adjust the level, place the inner core box on the center of the bottom plate and pound the sand directly, and set the pouring system in the inner sand core. After the inner sand core is made, it will no longer be lifted and moved, and will be directly used as the core assembly position; at the same time, four outer sand cores will be made based on four outer core boxes;

[0013] Step 3: Assemble the four external sand cores on the bottom plate around the inner sand core according to the drawing requirements;

[0014] Step 4: Put the lower fastening ring on the outside of the assembled sand core and place it on the bottom plate. Place two side plates and two end plates between the lower fastening ring and the four sides of the external sand core, respectively, and fit the back of the sand core. Put the upper fastening ring on the outside of the side plates and the end plates, and support the upper fastening ring on the hanging handles on the upper parts of the two side plates.

[0015] Step 5: Lift the lower fastening ring through the pad to the position close to the lower hanger of the two side plates, add wedges between the inner side of the upper and lower fastening rings and the side plates and end plates, tighten the wedges one by one, fit the core head of the external sand core with the core head of the inner sand core, and tighten the assembled sand core;

[0016] Step 6: Place the riser sleeve at the riser seat according to the process requirements, and fill sand around the riser sleeve for hardening;

[0017] Step 7: Place the iron weight on the sand mold according to the process requirements and then pour.

[0018] Specifically, risers are arranged at corresponding footing positions on the four external sand cores, and the riser seat is bounded by the riser center, with half of the riser seat close to the inner cavity being rectangular, and half of the riser seat away from the inner cavity being elliptical or circular.

[0019] Specifically, the pouring system is of stepped type, and the cross-sectional ratio of the pouring hole: straight runner: horizontal runner: inner runner is 1:1.8:2:2.

[0020] Specifically, the sand layer on the surface of the inner cavity core box is controlled to be 30-120 mm, the rest is filled with dry sand, and new sand is used around the gate pipe to be 100-150 mm.

[0021] Specifically, 3 to 5 wedges are respectively arranged between the two fastening rings and the two side plates, and 2 to 3 wedges are respectively arranged between the two fastening rings and the two end plates.

[0022] Due to the adoption of the above-mentioned technical solution, the present invention has the following advantages:

[0023] The inner cavity core box of the present invention adopts an integral core box without a bottom plate. The integral core box is used to make sand cores directly at the molding station without considering transportation. Since it is no longer transported and the transportation strength is not considered, only a very thin surface sand layer is used on the surface, and dry sand is filled inside, which not only saves molding sand, but also can avoid crack defects caused by insufficient yield during the shrinkage and solidification process of the casting; there is an integral core box on each of the four sides of the outer core box, and there is no core assembly mark on each side. The core assembly and pouring are directly on the steel bottom plate, with high ground accuracy, the height of the sand cores on the four sides of the outer periphery is consistent, and there is no misalignment mark in the height direction. The overall appearance of the casting is flat and beautiful; after adopting the special tooling, the fastening ring and the sand core are supported by hard points, which enhances the fastening force of the four sides of the casting mold, reduces the box expansion rate of the casting, reduces the amount of molten steel, ensures the accuracy of the casting size, and the outer side of the assembled sand core no longer needs to be filled with sand, which saves raw materials for molding. There is no need to fill sand, compact, and harden during the molding process, the molding speed is improved, the sand cleaning speed of the casting in the later stage is improved, the production efficiency is improved, and it is beneficial to reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a top view schematic diagram of the casting tool and sand core after being assembled according to the present invention.

[0025] Figure 2 It is a side view schematic diagram of the present invention.

[0026] Figure 3 It is a partial cross-sectional schematic diagram of the other side of the present invention.

[0027] In the figure: 1-bottom plate, 2-side plate, 3-end plate, 4-fastening ring, 5-wedge, 6-hanger, 7-reinforcement rib, 8-through hole, 9-external sand core, 10-inner cavity sand core, 11-casting system, 12-riser. DETAILED DESCRIPTION

[0028] The present invention will be further explained below in conjunction with the accompanying drawings and embodiments, which should not be used to limit the protection scope of the present invention. The purpose of disclosing the present invention is to protect all technical improvements within the scope of the present invention.

[0029] Combined with Figure 1-3 The frame casting tool of a jaw crusher shown in the figure comprises a bottom plate 1, two side plates 2, two end plates 3, two fastening rings 4 and a plurality of wedges 5.

[0030] The bottom plate 1 is a rectangular plate, the two side plates 2 are relatively arranged on both sides of the bottom plate 1 in the length direction, and the two end plates 3 are relatively arranged at the two ends between the two side plates 2. The bottom plate 1, the two side plates 2 and the two end plates 3 together form a sand box with a split structure with an open upper end; the upper and lower sides of the two ends of the side plates 2 are symmetrically provided with hangers 6; the fastening ring 4 is a square ring structure, and the two fastening rings 4 are respectively sleeved on the upper and lower ends of the sand box, the lower fastening ring 4 is located on the lower side of the lower hangers 6 of the two side plates 2, and the upper fastening ring 4 is placed on the upper hangers 6 of the two side plates 2, and the inner ring surface of the fastening ring 4 is provided with an inclination that is convenient for matching with the wedge 5; a number of wedges 5 are respectively arranged between the two fastening rings 4 and the two side plates 2 and the two end plates 3; hangers 6 are also respectively arranged on the two side edges of the bottom plate 1 and the fastening ring 4 in the width direction.

[0031] Preferably, a plurality of reinforcing ribs 7 are crisscrossed on the outer sides of the bottom plate 1 , the side plate 2 , and the end plate 3 , and a through hole 8 with a diameter of 30-80 mm is provided between each grid of the reinforcing ribs 7 of the side plate 2 and the end plate 3 , and the fastening point of the wedge iron 5 on the side plate 2 is at the intersection of the reinforcing ribs 7 .

[0032] A jaw crusher frame casting process method, the specific steps are:

[0033] Step 1: Make a model according to the frame structure of the jaw crusher: the bottom of the outer contour of the box frame is facing upward, and an external core box is made on each of the four sides. The four external core boxes are all integral core boxes, and the upper and lower end faces are covered with parts. The upper and lower sand intake is controlled at 100-300mm. The four external core boxes are of the same height, and the back sanded surface is flat; the inner cavity of the frame is made into an integral inner cavity core box, and the height is equal to that of the external core box 9, and the inner cavity core box does not have a bottom plate.

[0034] Step 2: Place the bottom plate 1 of the tooling on the ground, adjust the level, place the inner cavity core box on the center of the bottom plate 1 and directly pound sand, the surface sand layer of the inner cavity core box is controlled to be 30-120mm, and the rest is filled with dry sand; the pouring system 11 is arranged in the inner cavity sand core 10, the pouring system 11 is stepped, and 100-150mm of new sand is used around the gate pipe; the cross-sectional ratio of the pouring system 11 is 1:1.8:2:2:2; after the inner cavity sand core 10 is manufactured, it is no longer lifted and moved, and is directly used as the core assembly position; at the same time, four external sand cores 9 are manufactured based on four external core boxes, and risers 12 are arranged at the corresponding foot positions on the four external sand cores 9, and the riser seat is bounded by the center of the riser 12, and the half close to the inner cavity is rectangular, and the half away from the inner cavity is elliptical or circular.

[0035] Step 3: As required by the drawing, assemble four external sand cores 9 on the bottom plate 1 around the inner sand core 10 .

[0036] Step 4: Put the lower fastening ring 4 on the outside of the assembled sand core and place it on the bottom plate 1. Place two side plates 2 and two end plates 3 between the lower fastening ring 4 and the four sides of the external sand core 9, respectively, in close contact with the back of the sand core. Put the upper fastening ring 4 on the outside of the side plates 2 and the end plates 3. The upper fastening ring 4 is supported on the hanging handles 6 on the upper part of the two side plates 2.

[0037] Step 5: Lift the lower fastening ring 4 to the position of the hanger 6 near the lower part of the two side plates 2 through the pad, set 3-5 wedges 5 between the two fastening rings 4 and the two side plates 2 respectively, set 2-3 wedges 5 between the two fastening rings 4 and the two end plates 3 respectively, tighten the wedges 5 one by one, fit the core head of the external sand core 9 with the core head of the inner cavity sand core 10, and tighten the assembled sand core.

[0038] Step 6: Place the riser sleeve at the riser seat according to the process requirements, and fill sand around the riser sleeve to harden it.

[0039] Step 7: Place the iron weight on the sand mold according to the process requirements and then pour.

[0040] The parts not described in detail in this invention are prior art.

[0041] The embodiments selected herein for the purpose of disclosing the invention are currently considered to be suitable, but it should be understood that the invention is intended to include all changes and modifications of the embodiments that fall within the scope of the concept and invention.

Claims

1. A process for casting a tooling for a jaw crusher frame, characterized in that: The tooling includes a bottom plate, two side plates, two end plates, two fastening rings and a plurality of wedges; The bottom plate is a rectangular plate, the two side plates are relatively arranged on both sides of the bottom plate in the length direction, the two end plates are relatively arranged at the two ends between the two side plates, and the bottom plate, the two side plates and the two end plates together form a split-type sand box with an open upper end; the sides of the two ends of the side plates are symmetrically provided with hanging handles at the upper and lower ends; the fastening ring is a square ring structure, the two fastening rings are respectively sleeved on the upper and lower ends of the sand box, the lower fastening ring is located at the lower side of the lower hanging handles of the two side plates, and the upper fastening ring is placed on the upper hanging handles of the two side plates, and a plurality of wedges are respectively arranged between the two fastening rings and the two side plates and the two end plates; The specific steps of the process are: Step 1: Make a model according to the frame structure of the jaw crusher: the bottom of the outer contour of the box frame is facing upward, and an external core box is made on each of the four sides. The four external core boxes are all integral core boxes, and the upper and lower end surfaces are covered with parts. The upper and lower sand intake is controlled at 100-300mm. The height of the four external core boxes is consistent, and the back sanding surface is flat; the inner cavity of the frame is made into an integral inner cavity core box, the height is equal to the outer core box, and the inner cavity core box does not have a bottom plate; Step 2: Place the bottom plate of the tooling on the ground, adjust the level, place the inner core box on the center of the bottom plate and pound the sand directly, and set the pouring system in the inner sand core. After the inner sand core is made, it will no longer be lifted and moved, and will be directly used as the core assembly position; at the same time, four outer sand cores will be made based on four outer core boxes; Step 3: Assemble the four external sand cores on the bottom plate around the inner sand core according to the drawing requirements; Step 4: Put the lower fastening ring on the outside of the assembled sand core and place it on the bottom plate. Place two side plates and two end plates between the lower fastening ring and the four sides of the external sand core, respectively, and fit the back of the sand core. Put the upper fastening ring on the outside of the side plates and the end plates, and support the upper fastening ring on the hanging handles on the upper parts of the two side plates. Step 5: Lift the lower fastening ring through the pad to the position close to the lower hanger of the two side plates, add wedges between the inner side of the upper and lower fastening rings and the side plates and end plates, tighten the wedges one by one, fit the core head of the external sand core with the core head of the inner sand core, and tighten the assembled sand core; Step 6: Place the riser sleeve at the riser seat according to the process requirements, and fill sand around the riser sleeve for hardening; Step 7: Place the iron weight on the sand mold according to the process requirements and then pour.

2. The process method of using a jaw crusher frame casting tooling according to claim 1 is characterized in that: The outer surfaces of the bottom plate, side plate and end plate are all crisscrossed with a number of reinforcing ribs, and there are through holes with a diameter of 30-80mm between each reinforcing rib of the side plate and the end plate. The fastening point of the wedge iron on the side plate is at the intersection of the reinforcing ribs.

3. The process method of using a jaw crusher frame casting tooling according to claim 1 is characterized in that: The inner ring surface of the fastening ring is provided with an inclination for easy cooperation with the wedge iron.

4. The process method of using a jaw crusher frame casting tooling according to claim 1 is characterized in that: A group of hanging handles are also respectively arranged on both sides of the bottom plate in the width direction.

5. The process method of using a jaw crusher frame casting tooling according to claim 1 is characterized in that: The four external sand cores are all provided with risers at the corresponding footing positions. The riser seat is bounded by the riser center, with the half close to the inner cavity being rectangular and the half away from the inner cavity being elliptical or circular.

6. The process method of using a jaw crusher frame casting tooling according to claim 1 is characterized in that: The pouring system is of stepped type, and the cross-sectional ratio of the pouring hole: straight runner: horizontal runner: inner runner is 1:1.8:2:

2.

7. The process method of using a jaw crusher frame casting tooling according to claim 1 is characterized in that: The sand layer on the surface of the inner cavity core box is controlled to be 30-120 mm, and the rest is filled with dry sand, and new sand of 100-150 mm is used around the gate pipe.

8. The process method of using a jaw crusher frame casting tooling according to claim 1 is characterized in that: The wedge irons are arranged 3-5 between the two fastening rings and the two side plates, and 2-3 between the two fastening rings and the two end plates.

Citation Information

Cited By

  • Rack casting process

    CN120460686A