A linear tunnel excavation method using a single guide tube

By adopting the linear excavation method of a single guide pipe in tunnel construction and utilizing the design of a single steel pipe and a combined pipe body, the problems of small steel pipe space and poor geological conditions are solved, and more efficient construction and waterproofing effects are achieved, which is suitable for various geological conditions.

CN115492598BActive Publication Date: 2024-10-29CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211185749.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-27
Publication Date
2024-10-29
Estimated Expiration
2042-09-27

AI Technical Summary

Technical Problem

The existing technology has problems such as small steel pipe space, difficulty in cutting, difficulty in arc concrete pouring, waste of project investment, and insufficient construction accuracy and waterproofing when the water pressure is high and the geological conditions are poor in the construction of shallow-buried long-span underground tunnels.

Method used

A linear tunnel excavation method using a single guide pipe is used. A single steel pipe is used as the pilot pipe. The combined pipe body includes an interlocking jacking pipe and a guide pipe, which are arranged linearly along the tunnel contour. After the jacking is completed, the tunnel is cut and connected to form a whole. The ground is frozen or injected. Grout reinforcement improves formation stability and avoids waterproofing failure.

Benefits of technology

It improves the welding quality of steel structures, reduces cutting workload, reduces the risk of construction errors, enhances waterproof reliability, is suitable for various geological conditions, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115492598B_ABST
    Figure CN115492598B_ABST
Patent Text Reader

Abstract

The present invention provides a linear tunnel excavation method using a single guide pipe, comprising: S1, a combined pipe body adopts a single steel pipe as a guide pipe, the combined pipe body comprises an interlocking jacking pipe body and a guide pipe, the interlocking jacking pipe body is fixedly connected to the guide pipe, and the front of the guide pipe is connected to the single guide pipe constructed earlier; S2, an interlocking pipe curtain comprises a plurality of combined pipe bodies, and each of the combined pipe bodies is linearly arranged along the tunnel contour; S3, after all the combined pipe bodies on the tunnel contour are jacked, adjacent steel pipes of two adjacent groups of combined pipe bodies are cut and opened, and the openings are connected with steel plates, so that each group of separate combined pipe bodies is connected into a whole.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of tunnel engineering, can be applied to the construction of large-span underground structures such as dark-digging municipal tunnels and subway stations, and specifically relates to a linear tunnel excavation method of a single guide tube. Background Art

[0002] The commonly used dark excavation method for shallow large-span tunnels has many construction blocks, complex procedures, large deformation of the support structure, and large ground settlement. In order to solve the construction difficulties of conventional shallow large-span dark excavation tunnels, methods such as pipe curtain structure method and pile-type pipe curtain structure have been proposed. The pipe curtain structure method is to arrange large-diameter (diameter is generally greater than 1.8m, to meet the space for workers to enter and operate) steel pipes around the tunnel before tunnel excavation, and then enter the steel pipes to cut the steel pipes, cast annular reinforced concrete structure, and form a reinforced concrete lining with sufficient rigidity before tunnel excavation, and then excavate to form a tunnel. This existing technology has actual use cases, but there are the following problems during use:

[0003] (1) The steel pipe space is small, and it is difficult to manually enter and cut the steel pipe, tie the steel bars, and pour concrete. It is difficult to ensure the quality of the lining;

[0004] (2) The diameter of the steel pipe is large, which exceeds the support stiffness requirements of certain span tunnels, resulting in a certain amount of waste;

[0005] (3) It is difficult to pour concrete in the arc-shaped area inside and outside the circular steel pipe, and this part of the structure is difficult to bear, which wastes the project investment.

[0006] The interlocking pipe-roof is a newly proposed tunnel structure that can be widely used in the construction of tunnels using the build-before-cut method. The existing technology only has a fully interlocking pipe-roof structure. The process flow of the fully interlocking pipe-roof structure is shown in the attached figure. Figures 1 to 3As shown, during the construction of the interlocking jacking pipe, firstly, a pilot pipe 1 is constructed at the designated position of the design, and the pilot pipe 1 is a closed round pipe. Then, between two adjacent pilot pipes, an interlocking jacking pipe machine 3 is used to construct an interlocking jacking pipe body 5, one end of which is welded to the open primary fixed joint guide pipe 2-1 to form a fixed joint 4-1, and the other end is inserted into the primary movable joint guide pipe 2-2 with a movable joint 4-2. With the advancement of the interlocking jacking pipe body 5, the primary fixed joint guide pipe 2-1, and the primary movable joint guide pipe 2-2, the pilot pipe 1 is pushed out section by section. Then, an interlocking jacking pipe body 5 is constructed on the other side of the primary movable joint guide pipe 2-2, one end of which is welded to the secondary guide pipe 2-3 to form a fixed joint 4-1, and the other end is inserted into the primary movable joint guide pipe 2-2 with a movable joint 4-2; the other side of the secondary guide pipe 2-3 is a movable joint 4-2, and the interlocking jacking pipe body 5 constructed previously is inserted into it. As the interlocking jacking pipe body 5, the secondary guide pipe 2-3 and the primary flexible joint guide pipe 2-2 at the right end are pushed forward, the previously constructed primary flexible joint guide pipe 2-2 is pushed out section by section. This cycle is repeated to form a row of pile-type pipe curtain structures with steel pipes fully interlocked. After the jacking is completed, the combined pipe bodies on both sides can be connected into a whole by welding steel plates in the guide pipe.

[0007] The above existing construction methods completely avoid cutting steel pipes and also avoid the risk of failure of soil reinforcement and water stopping between pipes. However, when the water pressure is high and the tunnel section size is limited and it is impossible to arrange continuous bite jacking pipes, the following problems exist:

[0008] (1) When the geological conditions are poor, especially when the jacking pipe encounters uneven soft and hard formations, it will be difficult to control the construction accuracy of the pilot pipe, resulting in large errors in the construction of the pilot pipe, and there is a risk that the combined pipe body will be stuck or the waterproofing of the live joint will fail;

[0009] (2) The reliability of the longitudinal waterproofness of the flexible joint in the prior art has not been verified by examples, and there is a risk of waterproof failure under high water pressure. Summary of the invention

[0010] The purpose of the present invention is to overcome the defects of the prior art and provide a linear tunnel excavation method using a single guide tube. The present invention at least solves some of the problems in the prior art.

[0011] The present invention is achieved in that:

[0012] The present invention provides a linear tunnel excavation method using a single guide tube, comprising:

[0013] S1. The combined pipe body adopts a single steel pipe as a pilot pipe. The combined pipe body includes a bite-top pipe body and a guide pipe. The bite-top pipe body is fixedly connected to the guide pipe, and the front of the guide pipe is connected to the single pilot pipe constructed earlier;

[0014] S2. The occlusal tube curtain includes a plurality of combined tube bodies, each of which is arranged linearly along the tunnel contour according to the design, and the linear length of the combined tube body can be the entire tunnel contour or a partial section of the contour;

[0015] S3. After all the combined pipe bodies on the tunnel contour are pushed in, adjacent steel pipes of two adjacent groups of combined pipe bodies are cut open and connected with steel plates at the openings so that each group of separate combined pipe bodies is connected into a whole.

[0016] Further, in S1, the guide tube is arranged in the middle or at both ends of the combined tube body.

[0017] Furthermore, in S1, a partition support is provided at the bite point in the combined tube body.

[0018] Furthermore, in S2, due to the limitation of the tunnel section size, independent steel pipes are used for connection at the position where the entire combined pipe body cannot be arranged, and the extension direction of the independent steel pipe is the same as the extension direction of the combined pipe body.

[0019] Further, in S3, the opening is connected by two steel plates, and a steel pipe column is arranged between the two steel plates.

[0020] Furthermore, in S3, when the stratum between the combined pipe bodies is stable, the pipe bodies can be directly cut and the steel plates welded; when the stratum between the combined pipe bodies is unstable or water-permeable, the stability of the stratum should be improved first, and then the pipe bodies are cut and the steel plates are welded.

[0021] Furthermore, the stability of the stratum is improved by using a ground freezing method or a grouting reinforcement method.

[0022] The present invention has the following beneficial effects:

[0023] 1. Compared with the existing pipe-roof structure, the interlocking pipe group of the present invention can be prefabricated in the factory, which improves the welding quality of the steel structure and reduces the workload of cutting steel pipes, making the construction easier and improving the work efficiency.

[0024] 2. Compared with the existing fully engaged pile-row combined pipe curtain structure, the present invention avoids the risk of the combined pipe body being stuck when the construction accuracy of the pilot pipes on both sides is poorly controlled.

[0025] 3. Compared with the existing fully interlocking pile-row combined pipe-curtain structure, the connections between the steel pipes in the present invention are all welded, avoiding the risk of waterproof failure of the movable end joints. Water stopping during the construction period is achieved by freezing or grouting, and the reliability is relatively high.

[0026] 4. The present invention adopts circular jacking pipe excavation, and a single pilot pipe can be applied to various geological conditions and has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 This is a cross-sectional diagram of the existing pilot pipe construction;

[0029] Figure 2 It is a cross-sectional schematic diagram of the construction of a guide pipe in a fully engaged pile-row pipe-roof structure (the engaged jacking pipe body is in a box shape as an example, and may also be in an engaged circular shape);

[0030] Figure 3 It is a cross-sectional diagram of the construction of the primary guide pipe and the secondary guide pipe of the existing fully engaged pile-row pipe curtain structure (the engaged jacking pipe body takes a box shape as an example, and can also be an engaged circular shape);

[0031] Figure 4 A schematic diagram of the arrangement of a single pilot tube provided in an embodiment of the present invention (taking a three-tube bite as an example);

[0032] Figure 5 A schematic diagram of the arrangement of the combined pipe bodies provided by an embodiment of the present invention along the tunnel contour (taking three pipes interlocking and arranging a whole ring along the tunnel contour as an example, partial arrangement is also possible);

[0033] Figure 6 Schematic diagram of the arrangement of the combined pipe body along the tunnel contour provided by an embodiment of the present invention (taking three pipes interlocking and partially arranged along the tunnel contour as an example)

[0034] Figure 7 A schematic diagram of the reinforcement of the stratum between the combined pipe bodies provided in an embodiment of the present invention;

[0035] Figure 8 A schematic diagram of a construction error correction measure provided by an embodiment of the present invention (taking three pipes interlocking and the guide pipe being located in the middle pipe position as an example);

[0036] Fig. 9 A schematic diagram of the connection and support of adjacent steel pipes provided in an embodiment of the present invention (taking three pipes interlocking and one independent steel pipe as an example);

[0037] Fig.10 A schematic diagram of the plan layout of the pilot pipe and independent steel pipe jacking provided in an embodiment of the present invention;

[0038] Fig.11 A schematic diagram of the planar layout of the combined pipe body jacking provided in an embodiment of the present invention (taking three-pipe bite as an example);

[0039] Fig.12 A schematic diagram of the connection between the combined pipe body and the pilot pipe and the planar layout of the pipe jacking machine provided in an embodiment of the present invention (taking three pipes interlocking and the pilot pipe located in the middle as an example).

[0040] In the figure: guide pipe 1, guide pipe 2, primary fixed joint guide pipe 2-1, primary flexible joint guide pipe 2-2, secondary guide pipe 2-3, interlocking jacking machine 3, fixed joint 4-1, flexible joint 4-2, interlocking jacking pipe body 5, independent steel pipe 6, steel plate 7, steel pipe column 8, partition support 9, pin 10, concrete 11, stratum reinforcement area 12, steel pipe cutting range 13, pipe segment design position 14, pipe segment position after error 15, starting working shaft 16, receiving working shaft 17, jacking direction 18, transition section steel pipe 19, jacking machine cutter head 20, jacking machine body 21, connection 22. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] like Figure 4-Figure 12 The embodiment of the present invention provides a linear tunnel excavation method of a single guide pipe, including: S1, a combined pipe body adopts a single steel pipe as a guide pipe 1, the combined pipe body includes an interlocking top pipe body 5 and a guide pipe 2, the interlocking top pipe body 5 is welded with the guide pipe 2 to form a fixed joint 4-1, and the front of the guide pipe 2 is connected to the single guide pipe 1 constructed earlier; S2, the interlocking pipe curtain includes a plurality of combined pipe bodies, each of which is arranged linearly along the tunnel contour according to the design, the linear length of the combined pipe body can be the entire tunnel contour or a partial section of the contour, and the number of pipe bodies of each combined pipe body can be different; S3, after all the combined pipe bodies on the tunnel contour are pushed in, adjacent steel pipes of two adjacent groups of combined pipe bodies are cut and opened, and the openings are connected with steel plates 7, so that each group of separate combined pipe bodies is connected into a whole.

[0043] In S1, the guide tube 2 is arranged in the middle or at both ends of the combined tube body. Preferably, the guide tube 2 is arranged in the middle of the combined tube body. In S1, a partition support 9 is provided at the bite point in the combined tube body to improve the structural reliability.

[0044] like Figure 5In S2, due to the limitation of tunnel section size, independent steel pipe 6 is used to connect the positions where the entire combined pipe body cannot be arranged. The extension direction of the independent steel pipe 6 is the same as that of the combined pipe body. The size of the independent steel pipe 6 should be consistent with that of the pilot pipe as much as possible to facilitate construction. The pilot pipe 1 and the independent steel pipe 6 (if any) are pushed in first, and then the subsequent combined pipe body is pushed in.

[0045] In S3, the opening is connected by two steel plates, and steel pipe columns 8 are set between the steel plates 7 on the inner and outer sides. After the steel plates 7 are welded, steel pipe columns 8 are immediately added between the steel plates to support the steel plates. In S3, when the stratum between the combined pipe body is stable, the pipe body can be directly cut and the steel plates 7 can be welded; when the stratum between the combined pipe body is unstable or water-permeable, the stratum stability should be improved by freezing the stratum or grouting reinforcement, and then the pipe body should be cut and the steel plates 7 should be welded to prevent the risk of stratum instability and water permeability during construction.

[0046] Aiming at the problems existing in the existing fully interlocked pipe-roof structure under specific conditions, the present invention proposes a construction positioning method of the interlocked pipe-roof and a cutting and connection method between the interlocked jacking pipe and the adjacent pipe body, which can reduce the influence of the pilot pipe construction error on the combined pipe body jacking construction, and use auxiliary measures such as freezing to solve the water-stopping problem between a small number of pipes, thereby improving the safety and reliability of the construction method. The specific technical scheme is as follows:

[0047] The combined pipe body of the interlocking pipe curtain uses a single steel pipe as the pilot pipe 1. Figure 4 As shown, the guide pipe 2 can be located in the middle or at both ends of the combined pipe body, and the front of the guide pipe 2 is connected to the pre-constructed single pilot pipe 1. From the perspective of force balance during jacking construction and connectivity of the vertical interlocking cutterhead excavation chamber, it is more advantageous to arrange the guide pipe 2 in the middle of the combined pipe body.

[0048] Compared with the existing fully interlocked combined pipe curtain, the present invention uses a single steel pipe as the pilot pipe 1, which has the following advantages:

[0049] It can reduce the mutual interference between the interlocking cutter discs, especially when the pilot pipe 1 is arranged in the middle of the combined pipe body, it can reduce the muddy water and soil flow in the excavation chamber;

[0050] It can reduce the uneven force when the pipe group is pushed forward;

[0051] The structure of the guide tube 2 can be simplified. The guide tube 2 is connected to the bite-top tube body 5 through a fixed joint 4-1. The combined tube body includes the bite-top tube body 5 and the guide tube 2. Partitions and other structures can be set at the overlap to improve structural reliability.

[0052] However, when a single steel pipe is used as the pilot pipe 1, there may be an error in the rotation of the combined pipe body around the pilot pipe position when the combined pipe body is pushed forward, resulting in a change in the gap between two adjacent combined pipe bodies. For such errors, the solution of the present invention is:

[0053] like Figure 5 , increase the gap D between pipes to adapt to the needs of construction errors;

[0054] As attached Figure 7 As shown, the soil between adjacent pipe groups is reinforced to meet the construction requirements of larger errors; Figure 7 A ground reinforcement area 12 and a steel pipe cutting range 13 are shown.

[0055] As attached Figure 8 As shown, adjacent steel pipes are cut open and connected with steel plates. The setting of the cutout and the connecting steel plate 7 should accommodate the original structural dimensions and the position of the steel pipe after the error occurs. Figure 8 It shows the steel pipe cutting range 13, the connecting steel plate 7, the pipe section design position 14, and the pipe section position after the error occurs 15.

[0056] The position of the combined pipe body is arranged reasonably, and the position where the steel pipe needs to be cut is set at a relatively flat part of the structural contour, so as to minimize the soil exposed after cutting the steel pipe and reduce the span of the connecting steel plate 7.

[0057] When the guide pipe 2 is arranged in the middle of the combined pipe body, the rotation direction and rotation speed of the pipe jacking machine cutter head 20 can also be adjusted to reduce or correct the rotation of the combined pipe body around the pilot pipe position during jacking.

[0058] The combined pipe bodies are arranged at intervals along the tunnel contour, and the clear distance between each group of adjacent steel pipes should meet the requirements of the installation and construction error of the starting and receiving ring frames. Figure 5 As shown, the entire set of pile-type combined pipe bodies cannot be arranged due to the limitation of the cross-sectional size. They can be connected with independent steel pipes 6 of appropriate diameter. The size of the independent steel pipes 6 should be as consistent as possible with the pilot pipe to facilitate construction.

[0059] The adjacent steel pipes of two adjacent groups of combined pipe bodies are cut open and connected with steel plates 7 to connect each group of separate combined pipe bodies into a complete ring. Steel pipe columns 8 are arranged between the steel plates 7 on both sides to support the steel plates.

[0060] When the ground between adjacent combined pipe bodies is stable, the pipe bodies can be directly cut, the steel plates 7 can be welded and connected, and the steel pipe columns 8 can be erected.

[0061] When the stratum between the combined pipe bodies is unstable or permeable, ground freezing method, grouting reinforcement and other methods can be used to improve the stability of the stratum and prevent the risk of stratum instability and water seepage during construction.

[0062] After the combined pipe body along the tunnel contour is connected upward as a whole, concrete is poured into the steel pipe to form a steel-concrete composite structure as a tunnel pre-support structure.

[0063] In the combined pipe body, partition supports 9 are arranged between the overlapping steel pipes, and pins 10 can be arranged on the pipe wall to increase the bonding performance between the steel pipe wall and the concrete 11.

[0064] Under the protection of the above structure, the soil in the tunnel is excavated to form a tunnel structure.

[0065] Generally, according to the requirements of the tunneling machinery, a starting working well 16 and a receiving working well 17 are required to be set up as the working wells for assembling, starting and receiving the combined pipe curtain and the pipe jacking machine. However, with the emergence of the retractable cutter head, the receiving working well 14 is not a necessary requirement, and the specific requirements should be determined in combination with the requirements of the mechanical equipment. In the present invention, since it is necessary to receive the pilot pipe 1, a receiving working well 17 needs to be set up. Fig.10 and Fig.11 The arrow in the figure represents the jacking direction 18.

[0066] Furthermore, the specific prefabricated composite pipe body along the tunnel contour is determined according to the tunnel contour, tunnel structure design requirements, steel pipe combination form and other conditions. Fig. 9 As shown, a partition support 9 is provided at the joint of the combined pipe body, and structures such as pins 10 can be provided on the inner wall of the steel pipe to improve the bonding performance between the steel pipe and the internal concrete 11.

[0067] The cutterhead arrangement of the combined pipe jacking machine is determined according to the position of the guide pipe 2. The interlocking pipe jacking machine 3 uses a circular cutterhead for rotary excavation, and tools such as rollers can be configured on the cutterhead to meet the requirements of excavation in various strata. The excavation diameter of the circular cutterhead should be determined comprehensively based on the minimum height of the pipe curtain structure to be formed, the bedrock excavation and cutter replacement requirements of the small diameter cutterhead, the mud replacement, grouting, and monitoring of the tunnel construction, etc. Generally, the same cutterhead diameter should be used to reduce the types of machinery, but if there are special requirements, excavation cutterheads of different diameters can also be used locally.

[0068] Take the three-pipe interlocking and the guide pipe located in the middle pipe position as an example for explanation. Correspondingly, the cutter heads of the combined pipe jacking machine are located at the pipe positions on both sides, and the cutter heads are separated and not overlapped, which is conducive to the layout of the excavation bin and the slag bin of the mechanical equipment. A transition section steel pipe 19 of the guide pipe 2 is set at the position corresponding to the pipe jacking machine. Grooves are opened on both sides of the steel pipe to adapt to the size and rotation requirements of the cutter head of the pipe jacking machine, and the cutter head 20 of the pipe jacking machine is embedded. The front of the transition section steel pipe 19 is connected to the first constructed guide pipe 1. The combined pipe body is connected to the rear of the combined pipe jacking machine, and it is pushed forward section by section. At the same time, the front guide pipe 1 is pushed out section by section and received in the receiving working shaft 17. Fig.12 Also shown are the jacking direction 18, the jacking machine body 21, and the connection 22 between the pilot pipe 1 and the transition section steel pipe 19.

[0069] After all the combined pipes on the tunnel profile are pushed in, the soil between adjacent steel pipes is treated according to the ground conditions. When the ground stability is poor and the ground water content is high, the soil between the pipes can be reinforced or water-stopped by grouting, freezing, etc.; when the soil between the pipes can be relatively stable, the corresponding positions of the two adjacent steel pipes are cut and connected by steel plate welding. After the steel plate welding is completed, the steel pipe support between the steel plates is immediately added. In order to reduce the impact of cutting steel pipes on the overall structure, steel pipe cutting and support can be done in sections.

[0070] After the construction of the tunnel pre-support structure is completed, the internal strata of the tunnel can be excavated to form the tunnel frame, and the structural waterproof layer, secondary lining and internal structure can be constructed according to the structural design plan to complete the tunnel construction. Generally, the ring-shaped pre-support structure can meet the bearing requirements and can also serve as a permanent structure without secondary lining; it can also be constructed in the pre-support structure according to the requirements of structural durability and safety.

[0071] The above only describes the basic principles of the present invention, and does not limit the structure and construction method of the present invention to any specific shape, size, layout, excavation method, or material. Therefore, all corresponding modifications and equivalents that may be used are within the scope of the patent applied for by the present invention.

[0072] The present invention provides a linear excavation method for a tunnel with a single guide pipe, wherein a occlusal pipe curtain adopts a single top pipe constructed in advance as a guide pipe; the guide pipe can correspond to any position in a combined pipe curtain; the combination number N of each group of steel pipes is an integer greater than or equal to 1, and the combination numbers of each group of pipe curtains can be different; the steel pipes of two adjacent groups of combined pipe curtains are connected by cutting the steel pipes at corresponding positions, welding connecting steel plates, and adding steel column supports between the connecting steel plates, so that the combined pipe curtain forms an integral steel structure; when the stratum of the occlusal pipe curtain is unstable or permeable, the stratum outside the pipe at that position needs to be reinforced, and the selection of the reinforcement method is uncertain.

[0073] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0074] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A linear tunnel excavation method using a single guide tube, characterized in that: include: S1. The combined pipe body uses a single steel pipe as a pilot pipe. The combined pipe body includes a bite-jointed top pipe body and a guide pipe. The bite-jointed top pipe body and the guide pipe are welded to form a fixed joint. The front of the guide pipe is connected to the single pilot pipe constructed earlier. The guide pipe is arranged in the middle of the combined pipe body. The bite in the combined pipe body is provided with a partition support to improve the structural reliability. S2. The interlocking pipe curtain includes a number of combined pipe bodies, each of which is arranged linearly along the tunnel contour according to the design. The linear length of the combined pipe body is the entire tunnel contour or a partial section of the contour, and the number of pipe bodies of each combined pipe body is different; the combined pipe bodies are arranged at intervals along the tunnel contour, and the net distance between each group of adjacent steel pipes should meet the requirements of the installation and construction errors of the starting and receiving ring frames. Due to the limitation of the tunnel section size, independent steel pipes are used for connection at the position where the entire combined pipe body cannot be arranged, and the extension direction of the independent steel pipe is the same as that of the combined pipe body; the size of the independent steel pipe is consistent with that of the pilot pipe, which is convenient for construction; the pilot pipe and the independent steel pipe are first pushed in, and then the subsequent combined pipe body is pushed in; S3. After all the combined pipe bodies on the tunnel contour are jacked, the adjacent steel pipes of two adjacent groups of combined pipe bodies are cut and opened, and the openings are connected with steel plates to connect each group of separate combined pipe bodies into a whole; the openings are connected by two steel plates, and steel pipe columns are set between the two steel plates; when the stratum between the combined pipe bodies is stable, the pipe bodies are directly cut and the steel plates are welded; when the stratum between the combined pipe bodies is unstable or permeable, the stratum freezing method or grouting reinforcement method is used to improve the stability of the stratum, and then the pipe bodies are cut and the steel plates are welded.

Citation Information

Patent Citations

  • Pipe roof construction method

    CN109488314A

  • Orientation construction method for occluded jacking pipe group construction

    CN114704270A