Flexible intelligent assembly and testing line for gearbox accumulator and its working method
By designing a flexible intelligent assembly test line for transmission accumulators, combined with automated equipment and robot handling, the problem of time-consuming and labor-intensive assembly test and high energy consumption in the existing technology is solved, and a compact, reasonable, safe and reliable test line is achieved, improving Assembled efficiency and accuracy, reducing energy consumption.
Patent Information
- Application Number
- CN202211093276.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-08
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-09-08
AI Technical Summary
The assembly test of existing transmission accumulators has problems such as time-consuming and labor-intensive labor, large energy consumption, large space occupation, poor equipment safety and low assembly accuracy, especially the low efficiency of nitrogen-charged and pressure-mounted structure, large energy loss and not environmentally friendly.
A flexible intelligent assembly test line for transmission accumulator was designed, using piston pre-installed station, piston loading conveying line, piston detection NG buffer line, piston detection fuel injection mechanism, laser marking machine, tank loading The conveying line, offline packaging system and nitrogen filling and pressure-loading mechanism combine with robot handling and automation equipment to achieve compact and reasonable structural design, improve the degree of automation and safety, and reduce energy consumption.
It realizes an assembly test line with compact and reasonable structure, safe and reliable, high working efficiency and low energy consumption, improves assembly accuracy and equipment safety, reduces energy losses, and improves space utilization.
Smart Images

Figure CN115533511B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a test line and a working method thereof, in particular to a gearbox accumulator flexible intelligent assembly test line and a working method thereof, and belongs to the field of gearbox accumulator assembly test. Background Art
[0002] The existing assembly and testing of gearbox accumulators has the following defects: 1) Manual assembly is time-consuming and labor-intensive, increasing labor costs; 2) The cycle of the nitrogen filling and pressing station in the accumulator is long and energy-intensive; 3) The entire assembly and testing station occupies a large area and has low space utilization.
[0003] Some nitrogen-filled press-fit structures in existing assembly and testing lines also have the following defects: the piston, tank body and retaining ring are manually loaded separately, which is inefficient, has poor assembly accuracy, occupies a large space for the equipment, fills the entire press-fit mechanism with nitrogen, has a large energy loss, is not environmentally friendly and energy-saving, and has poor equipment safety.
[0004] Therefore, it is particularly necessary to provide a flexible and intelligent assembly and testing line for gearbox accumulators with compact and reasonable structural design, safety and reliability, high working efficiency, high degree of automation and low energy consumption. Summary of the invention
[0005] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art and to provide a gearbox accumulator flexible intelligent assembly and testing line and a working method thereof which have compact and reasonable structural design, safety and reliability, high working efficiency, high degree of automation, low energy consumption and convenient operation.
[0006] The technical solution adopted by the present invention to solve the above problems is: the gearbox accumulator flexible intelligent assembly and testing line includes a piston pre-installation station, a piston feeding conveyor line, a piston detection NG buffer line, a piston detection oil injection mechanism, a laser marking machine, a tank feeding conveyor line, a downline packaging system and a large bottom plate arranged on the ground, wherein the piston pre-installation station is arranged at the front end of the piston feeding conveyor line, the piston detection oil injection mechanism is arranged at the rear end of the piston feeding conveyor line, the piston feeding conveyor line is arranged in parallel with the piston detection NG buffer line, the piston pre-installation station, the piston feeding conveyor line, the piston detection NG buffer line, the tank feeding conveyor line and the downline packaging system are all connected to the large bottom plate, characterized in that: it also includes a nitrogen filling press-fitting mechanism, a detection turntable mechanism and a robot transporter, the nitrogen filling press-fitting mechanism is arranged on one side of the piston detection oil injection mechanism, the robot transporter is arranged between the detection turntable mechanism, the laser marking machine and the piston detection oil injection mechanism, the piston detection oil injection mechanism, the nitrogen filling press-fitting mechanism, the detection turntable mechanism, the robot transporter and the laser marking machine are all installed on the large bottom plate; the nitrogen filling press-fitting mechanism includes a nitrogen filling main structure, an active The piston loading structure and the tank loading and unloading structure are installed on the upper side of the nitrogen charging main structure, and the tank loading and unloading structure is installed on the front side of the nitrogen charging main structure; the nitrogen charging main structure includes a press frame, a servo press, a retaining spring pressure head assembly, a piston sealing assembly, a tank empty position sealing assembly, a piston sealing assembly locking mechanism, a retaining spring in-place visual detection camera, a nitrogen charging main body guide rail and a piston moving cylinder, the servo press is installed on the press frame, the retaining spring pressure head assembly is installed on the nitrogen charging main body guide rail, the nitrogen charging main body guide rail is installed on the press frame, and the piston moving cylinder is installed on the press On the frame, the piston sealing assembly is installed on the nitrogen filling main body guide rail, the piston moving cylinder is connected to the piston sealing assembly, the tank empty position sealing assembly, the piston sealing assembly locking mechanism, and the retaining spring in-place visual inspection camera are all installed on the press frame; the inspection turntable mechanism includes a turntable, a retaining spring measurement structure, a performance inspection structure, a cleaning structure, a thread visual inspection structure and a turntable tooling rotation structure, the retaining spring measurement structure and the cleaning structure are both installed on the turntable, the performance inspection structure and the thread visual inspection structure are arranged on one side of the turntable, and the turntable tooling rotation structure is arranged below the turntable.
[0007] Preferably, the assembly test line of the present invention further comprises an automatic discharging mechanism for retaining springs, and the automatic discharging mechanism for retaining springs is installed on one side of the nitrogen filling main structure in the nitrogen filling and pressing mechanism.
[0008] Preferably, the nitrogen-filling main structure of the present invention further comprises a force sensor, which is arranged below the pressure head of the servo press; the force sensor is used to monitor the pressing force of the retaining spring.
[0009] Preferably, the nitrogen charging main structure of the present invention further comprises a nitrogen charging head locking mechanism, and the retaining spring pressure head assembly is provided with a nitrogen charging head locking mechanism to prevent the nitrogen charging head from rebounding and causing safety hazards.
[0010] The working method of the gearbox accumulator flexible intelligent assembly and testing line of this embodiment is characterized by: the specific steps are as follows:
[0011] (S1) After the piston is pre-installed in place at the pre-installation station, it is transported to the piston feeding conveyor line and then to the piston inspection and oil injection mechanism for leak detection and oil injection;
[0012] (S2) The tank body on the piston feeding conveyor line is transported to the front end for automatic assembly through the tank body feeding conveyor line. After the assembly is completed, it is transported by the robot transporter and placed on the inspection turntable mechanism for oil injection and inspection;
[0013] The above (S1) and (S2) work synchronously;
[0014] (S3) The piston is moved from the piston detection and oil injection mechanism to the nitrogen filling and pressing mechanism through a robot transporter, the retaining spring is automatically discharged through the retaining spring automatic discharging mechanism and then tightened, and then the piston, tank body and retaining spring are nitrogen filled and pressed through the nitrogen filling and pressing mechanism;
[0015] (S4) The piston, the tank body and the retaining ring after nitrogen filling and press-fitting are moved back to the inspection turntable mechanism by a robot transporter for inspection;
[0016] (S5) After the inspection is completed, the robot transporter is used to carry the product to the laser marking machine for marking;
[0017] (S6) The products are then transported to the offline packaging system by a robot transporter for packaging and offline processing.
[0018] Compared with the prior art, the present invention has the following advantages and effects: (1) The overall structural design is compact and reasonable, the energy loss of the nitrogen filling and pressing mechanism is small, it is environmentally friendly and energy-saving, the equipment safety is good, the overall safety and reliability, the degree of automation is high, and the energy consumption of the robot-assisted equipment is low; (2) The cycle is fast, the work efficiency is high, the energy consumption is low, and the operation is convenient; (3) The jaw retraction structure prevents the retaining spring from causing wear, thus meeting the use requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present invention.
[0020] Figure 2 It is a structural schematic diagram of the nitrogen filling and pressing mechanism in an embodiment of the present invention.
[0021] Figure 3 It is a structural schematic diagram of the nitrogen filling main structure in an embodiment of the present invention.
[0022] Figure 4 It is a schematic structural diagram of the detection turntable mechanism in an embodiment of the present invention.
[0023] Figure 5It is a structural schematic diagram of the automatic discharging mechanism of the retaining spring in an embodiment of the present invention.
[0024] In the figure: piston pre-installation station 1, piston feeding conveyor line 2, piston detection NG buffer line 3, piston detection injection mechanism 4, nitrogen filling and pressing mechanism 5, detection turntable mechanism 6, robot transporter 7, laser marking machine 8, tank feeding conveyor line 9, offline packaging system 10, large bottom plate 11, automatic discharging mechanism of retaining spring 12, and jaw retraction structure 121;
[0025] Nitrogen charging and pressing mechanism 5: nitrogen charging main body structure 51, piston loading structure 52, tank loading and unloading structure 53;
[0026] Nitrogen charging main structure 51: press frame 510, servo press 511, snap ring pressure head assembly 512, piston sealing assembly 513, tank empty position sealing assembly 514, piston sealing assembly locking mechanism 515, snap ring in-position visual detection camera 516, nitrogen charging main body guide rail 517, piston moving cylinder 518, pressure sensor 519, force sensor 520, grating ruler 521, nitrogen switch valve 522; nitrogen charging pressure head locking mechanism 512-1;
[0027] Detection turntable mechanism 6: turntable 61, retaining spring measuring structure 62, performance detection structure 63, cleaning structure 64, thread visual detection structure 65, turntable tooling rotation structure 66. DETAILED DESCRIPTION
[0028] The present invention will be further described in detail below with reference to the accompanying drawings and by way of examples. The following examples are intended to explain the present invention but the present invention is not limited to the following examples.
[0029] Example
[0030] See also Figures 1 to 5 The flexible intelligent assembly and testing line for the gearbox accumulator in this embodiment includes a piston pre-installation station 1, a piston feeding conveyor line 2, a piston detection NG buffer line 3, a piston detection injection mechanism 4, a nitrogen filling and pressing mechanism 5, a detection turntable mechanism 6, a robot transporter 7, a laser marking machine 8, a tank feeding conveyor line 9, a downline packaging system 10, a large bottom plate 11 and a retaining spring automatic discharging mechanism 12 arranged on the ground, the piston pre-installation station 1 is arranged at the front end of the piston feeding conveyor line 2, the piston detection injection mechanism 4 is arranged at the rear end of the piston feeding conveyor line 2, the piston feeding conveyor line 2 is arranged in parallel with the piston detection NG buffer line 3, and the piston pre-installation station 1, the piston feeding conveyor line 2, the piston detection NG buffer line 3, the tank feeding conveyor line 9 and the downline packaging system 10 are all connected to the large bottom plate 11.
[0031] The nitrogen charging and pressing mechanism 5 in this embodiment is arranged on one side of the piston detection and oil injection mechanism 4, the robot transporter 7 is arranged between the detection turntable mechanism 6, the laser marking machine 8, and the piston detection and oil injection mechanism 4, the automatic retaining spring discharge mechanism 12 is installed on the nitrogen charging and pressing mechanism 5, and the piston detection and oil injection mechanism 4, the nitrogen charging and pressing mechanism 5, the detection turntable mechanism 6, the robot transporter 7 and the laser marking machine 8 are all installed on the large base plate 11.
[0032] The defects of the existing nitrogen-filled press-fitting structure are: the piston, tank body and retaining ring are manually loaded separately, which is inefficient, has poor assembly accuracy, occupies a large space, and nitrogen fills the entire press-fitting mechanism, resulting in large energy loss, is not environmentally friendly and energy-saving, and has poor equipment safety.
[0033] The nitrogen charging press-fitting mechanism 5 in this embodiment includes a nitrogen charging main structure 51, a piston loading structure 52 and a tank loading and unloading structure 53. The piston loading structure 52 is installed on the upper side of the nitrogen charging main structure 51, the retaining spring automatic discharging mechanism 12 is installed on one side of the nitrogen charging main structure 51, and the tank loading and unloading structure 53 is installed on the front side of the nitrogen charging main structure 51.
[0034] The working process of the nitrogen charging and pressing mechanism 5 in this embodiment is as follows: step 1) the tank body is loaded to the lower part of the nitrogen charging main structure 51 through the tank body loading and unloading structure 53, and the accumulator assembly after being pressed through the nitrogen charging main structure 51 is moved out to the detection turntable mechanism 6; step 2) the piston is moved to the middle part of the nitrogen charging main structure 51 through the piston loading structure 52; step 3) the retaining ring is automatically tightened through the retaining ring automatic discharging mechanism 12 to the upper part of the nitrogen charging main structure 51; the above steps 1), 2), and 3) are completed simultaneously; nitrogen charging and pressing are performed through the nitrogen charging and pressing mechanism 5.
[0035] The nitrogen charging main structure 51 in this embodiment includes a press frame 510, a servo press 511, a retaining spring pressure head assembly 512, a piston sealing assembly 513, a tank empty space sealing assembly 514, a piston sealing assembly locking mechanism 515, a retaining spring in-situ visual detection camera 516, a nitrogen charging main body guide rail 517 and a piston moving cylinder 518. The servo press 511 is installed on the press frame 510, the retaining spring pressure head assembly 512 is installed on the nitrogen charging main body guide rail 517, the nitrogen charging main body guide rail 517 is installed on the press frame 510, the piston moving cylinder 518 is installed on the press frame 510, the piston sealing assembly 513 is installed on the nitrogen charging main body guide rail 517, the piston moving cylinder 518 is connected to the piston sealing assembly 513, and the tank empty space sealing assembly 514, the piston sealing assembly locking mechanism 515, and the retaining spring in-situ visual detection camera 516 are all installed on the press frame 510.
[0036] The force sensor 520 in this embodiment is disposed below the pressing head of the servo press 511 ; the force sensor 520 is used to monitor the pressing force of the retaining spring.
[0037] In this embodiment, a nitrogen filling pressure head locking mechanism 512 - 1 is provided on the retaining spring pressure head assembly 512 to prevent the nitrogen filling pressure head from rebounding and causing safety hazards.
[0038] The nitrogen switch valve 522 in this embodiment is opened, and nitrogen is filled into the tank empty space sealing component 514, which is monitored by the pressure sensor 519. When the set value is reached, the nitrogen switch valve 522 is closed.
[0039] The pressure sensor 519 in this embodiment is used to monitor whether the nitrogen filling pressure is qualified; the grating ruler 521 is used to monitor the displacement of the press-fit
[0040] The working process of the nitrogen filling main structure 51 in this embodiment is as follows: S1) the piston sealing assembly 513 is connected to the tank empty space sealing assembly 514 through the piston moving cylinder 518, and then the piston sealing assembly locking mechanism 515 is extended to lock the piston sealing assembly 513 and the tank empty space sealing assembly 514; S2) the retaining spring pressure head assembly 512 is lowered to the set height in the piston sealing assembly 513 through the servo press 511; S3) the nitrogen switch valve 522 is opened to fill the tank empty space sealing assembly 514 with nitrogen. Through monitoring by the pressure sensor 519, when the set value is reached, the nitrogen switch valve 522 is closed; S4) the nitrogen filling pressure head locking mechanism 512-1 is reset, and the servo press 511 continues to descend, pressing the piston and the retaining spring into the tank body and pressing them into place; S5) the servo press 511 rises, resetting the retaining spring pressure head assembly 512, resetting the piston sealing assembly locking mechanism 515, and resetting the piston sealing assembly 513 through the piston moving cylinder 518; before S2), the retaining spring in-place visual inspection camera 516 detects whether the retaining spring is in place.
[0041] The detection turntable mechanism 6 in this embodiment includes a turntable 61, a retaining spring measuring structure 62, a performance detection structure 63, a cleaning structure 64, a thread visual detection structure 65 and a turntable tooling rotation structure 66. The retaining spring measuring structure 62 and the cleaning structure 64 are both installed on the turntable 61, the performance detection structure 63 and the thread visual detection structure 65 are arranged on one side of the turntable 61, and the turntable tooling rotation structure 66 is arranged below the turntable 61.
[0042] In this embodiment, when the cleaning structure 64 and the thread visual inspection structure 65 are working, the corresponding tooling is rotated by the turntable tooling rotating structure 66 .
[0043] In this embodiment, the thread visual detection structure 65 adopts line scanning.
[0044] Most of the existing retaining spring contraction structures adopt a guide cone sleeve structure. The disadvantages of this structure are: the cone sleeve is easy to wear, and iron filings are easy to be generated during the pressing process, which affects the product quality and clean appearance.
[0045] In this embodiment, a clamping jaw retracting structure 121 is provided on the clamping spring automatic discharging mechanism 12 ; the clamping jaw retracting structure 121 prevents the clamping spring from being worn.
[0046] The working process of the gearbox accumulator flexible intelligent assembly test line in this embodiment is as follows:
[0047] (S1) After the piston is pre-installed in place at the pre-installation station 1, it is transported to the piston feeding conveyor line 2 and then to the piston inspection and oil injection mechanism 4 for leak detection and oil injection.
[0048] (S2) The tank body on the piston feeding conveyor line 2 is transported to the front end through the tank body feeding conveyor line 9 for automatic assembly. After the assembly is completed, it is transported by the robot transporter 7 and placed on the inspection turntable mechanism 6 for oil injection and inspection; the above (S1) and (S2) work synchronously.
[0049] (S3) The piston is moved from the piston detection oil injection mechanism 4 to the nitrogen filling and pressing mechanism 5 through the robot transporter 7, the retaining spring is automatically discharged through the retaining spring automatic discharging mechanism 12 and then tightened, and then the piston, the tank body and the retaining spring are nitrogen filled and pressed through the nitrogen filling and pressing mechanism 5.
[0050] (S4) The piston, tank body and retaining ring after nitrogen filling and press-fitting are moved back to the inspection turntable mechanism 6 by the robot transporter 7 for inspection; the inspection items include whether the retaining ring is assembled in place; accumulator performance inspection; force displacement curve and hysteresis inspection; thread knock inspection; product cleaning and other aspects.
[0051] (S5) After the inspection is completed, the robot transporter 7 is used to carry out marking processing on the laser marking machine 8.
[0052] ( S6 ) The products are then transported to the offline packaging system 10 by the robot transporter 7 for packaging and offline processing.
[0053] Through the above description, those skilled in the art can already implement it.
[0054] In addition, it should be noted that the shapes and names of the parts and components of the specific embodiments described in this specification may be different, and the above content described in this specification is only an example of the structure of the present invention. All equivalent changes or simple changes made based on the structure, features and principles described in the patent concept of the present invention are included in the protection scope of the patent of the present invention. Technicians in the technical field of the present invention can make various modifications or supplements to the specific embodiments described or replace them in a similar manner, as long as they do not deviate from the structure of the present invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
Claims
1. A flexible intelligent assembly and testing line for a gearbox accumulator, comprising a piston pre-installation station (1), a piston loading conveyor line (2), a piston detection NG buffer line (3), a piston detection oil injection mechanism (4), a laser marking machine (8), a tank loading conveyor line (9), a downline packaging system (10) and a large base plate (11) arranged on the ground, wherein the piston pre-installation station (1) is arranged at the front end of the piston loading conveyor line (2), the piston detection oil injection mechanism (4) is arranged at the rear end of the piston loading conveyor line (2), the piston loading conveyor line (2) and the piston detection NG buffer line (3) are arranged in parallel, the piston pre-installation station (1), the piston loading conveyor line (2), the piston detection NG buffer line (3), the tank loading conveyor line (9) and the downline packaging system (10) are all connected to the large base plate (11), and characterized in that: The invention also comprises a nitrogen charging and pressing mechanism (5), a detection turntable mechanism (6) and a robot transporter (7); the nitrogen charging and pressing mechanism (5) is arranged on one side of the piston detection oil injection mechanism (4); the robot transporter (7) is arranged between the detection turntable mechanism (6), a laser marking machine (8) and the piston detection oil injection mechanism (4); the piston detection oil injection mechanism (4), the nitrogen charging and pressing mechanism (5), the detection turntable mechanism (6), the robot transporter (7) and the laser marking machine (8) are all installed on a large base plate (11); the nitrogen charging and pressing mechanism (5) comprises a nitrogen charging main structure (51), The piston loading structure (52) and the tank loading and unloading structure (53) are installed on the upper side of the nitrogen charging main structure (51), and the tank loading and unloading structure (53) is installed on the front side of the nitrogen charging main structure (51); the nitrogen charging main structure (51) comprises a press frame (510), a servo press (511), a retaining spring pressure head assembly (512), a piston sealing assembly (513), a tank empty position sealing assembly (514), a piston sealing assembly locking mechanism (515), a retaining spring in-situ visual detection camera (516), a nitrogen charging main body guide rail (517) and a piston displacement assembly (516). The servo press (511) is mounted on a press frame (510), the retaining spring pressure head assembly (512) is mounted on a nitrogen charging main body guide rail (517), the nitrogen charging main body guide rail (517) is mounted on the press frame (510), the piston moving cylinder (518) is mounted on the press frame (510), the piston sealing assembly (513) is mounted on the nitrogen charging main body guide rail (517), the piston moving cylinder (518) is connected to the piston sealing assembly (513), the tank empty position sealing assembly (514), the piston sealing assembly locking mechanism (515), the retaining spring The in-situ visual inspection cameras (516) are all installed on the press frame (510); the inspection turntable mechanism (6) comprises a turntable (61), a spring measuring structure (62), a performance inspection structure (63), a cleaning structure (64), a thread visual inspection structure (65) and a turntable tooling rotating structure (66); the spring measuring structure (62) and the cleaning structure (64) are all installed on the turntable (61); the performance inspection structure (63) and the thread visual inspection structure (65) are arranged on one side of the turntable (61); and the turntable tooling rotating structure (66) is arranged below the turntable (61).
2. The gearbox accumulator flexible intelligent assembly and testing line according to claim 1 is characterized in that: The assembly test line also includes an automatic discharging mechanism (12) for retaining springs, wherein the automatic discharging mechanism (12) for retaining springs is installed on one side of a nitrogen filling main structure (51) in the nitrogen filling press-fitting mechanism (5).
3. The gearbox accumulator flexible intelligent assembly and testing line according to claim 1 is characterized by: The nitrogen-filling main structure (51) further comprises a force sensor (520), wherein the force sensor (520) is arranged below the pressure head of the servo press (511).
4. The gearbox accumulator flexible intelligent assembly and testing line according to claim 1 is characterized in that: The nitrogen charging main body structure (51) further comprises a nitrogen charging pressure head locking mechanism (512-1), and the nitrogen charging pressure head locking mechanism (512-1) is provided on the clamping spring pressure head assembly (512).
5. A working method of a gearbox accumulator flexible intelligent assembly and testing line, using the gearbox accumulator flexible intelligent assembly and testing line according to any one of claims 1 to 4, characterized in that: The specific steps are as follows: (S1) After the piston is pre-installed in place at the piston pre-installation station (1), it is transported to the piston feeding conveyor line (2) and then to the piston inspection and oil injection mechanism (4) for leak detection and oil injection; (S2) The tank body on the piston feeding conveyor line (2) is transported to the front end for automatic assembly via the tank body feeding conveyor line (9). After the assembly is completed, the tank body is transported by the robot transporter (7) and placed on the inspection turntable mechanism (6) for oil injection and inspection; The above (S1) and (S2) work synchronously; (S3) The piston is moved from the piston detection oil injection mechanism (4) to the nitrogen filling and pressing mechanism (5) by the robot transporter (7), the retaining spring is automatically discharged by the retaining spring automatic discharging mechanism (12) and then tightened, and then the piston, the tank body and the retaining spring are nitrogen filled and pressed by the nitrogen filling and pressing mechanism (5); (S4) The piston, the tank body and the retaining ring after nitrogen filling and press-fitting are moved back to the inspection turntable mechanism (6) by the robot transporter (7) for inspection; (S5) After the inspection is completed, the product is transferred to a laser marking machine (8) through a robot transporter (7) for marking; (S6) The products are then transported to the offline packaging system (10) by a robot transporter (7) for packaging and offline processing.
Citation Information
Patent Citations
Steel ball assembly detecting device of sleeve adapter
CN107363515A
Special tool for simultaneous press fitting of checks rings on two sides of electromagnetic valve energy accumulator
CN109227093A
Automatic assembling equipment for snap rings of gearbox energy accumulator
CN112171226A
Automatic glue brushing device for annular part and glue brushing method thereof
CN113828470A
Bearing pressing machine