Interconnection method and system of heavy-haul railway virtual marshaling train control system

By setting a switching zone and sending grouping commands in heavy-duty railways, virtual grouping between trains and front cars is realized, the problems of improving train operation efficiency and transportation capacity in railway traffic are solved, and the interconnection between virtual grouping and existing line systems is realized. , reduces operating costs and enhances the availability of virtual marshalling systems.

CN115535037BActive Publication Date: 2024-11-05CASCO SIGNAL LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211085799.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-06
Publication Date
2024-11-05
Estimated Expiration
2042-09-06

AI Technical Summary

Technical Problem

In the field of railway transportation, the existing technology cannot effectively improve the efficiency and transportation capacity of trains, especially in heavy-duty railways, and it is impossible to utilize existing infrastructure by increasing the number of train marshallings, and there is a lack of virtual marshalling technology and interconnected applications. .

Method used

By setting a switching area in the heavy-duty railway, the ground equipment information switching is completed, and the grouping command is sent according to the train marshaling plan, the virtual grouping of the train and the front vehicle is realized, the interconnection between the existing lines and the virtual grouping lines is realized, and different signals are dynamically switched. System standard.

Benefits of technology

It improves train operation efficiency and transportation capacity, shortens train tracking intervals, reduces operating costs, and seamless switching between virtual marshalling and existing line systems without stopping, enhancing the availability of virtual marshalling systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115535037B_ABST
    Figure CN115535037B_ABST
Patent Text Reader

Abstract

The present invention discloses an interconnection method and system of a heavy-duty railway virtual marshaling train control system, the method comprising: determining a switching area between an existing line and a virtual marshaling line for switching ground equipment; when a train travels to the range of the switching area, switching the control right of the ground equipment; after the switching of the control right of the ground equipment is completed, the ground equipment of the virtual marshaling line sends a marshaling command to the on-board equipment of the train, and the on-board equipment performs virtual marshaling on the train corresponding to the on-board equipment and the preceding car in the marshaling according to the marshaling command. The present invention can realize the switching of different standard signal systems and can improve the train operation efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of railway transportation technology, and in particular to an interconnection method and system for a heavy-load railway virtual marshaling train control system, as well as a storage medium and electronic equipment. Background Art

[0002] The development of my country's heavy-haul railway technology is limited by the existing 850m and 1050m line yard lengths. It is impossible to increase the transportation capacity by increasing the number of train sets. On the basis of maximizing the use of existing infrastructure, breaking the constraint of the existing signal block system that the preceding train is stationary, and taking safety as the premise, two or more adjacent trains are virtually grouped to form an "integrated train group" to complete train operation control and transportation organization. This can significantly shorten the safety protection distance of trains in the train group and shorten the tracking interval of trains, thereby realizing the improvement of line transportation capacity.

[0003] At present, research on virtual train marshaling has been carried out in the fields of road transportation and rail transportation at home and abroad, and on-site actual vehicle verification has been carried out in the field of urban rail transportation. However, in the field of railway transportation, especially in the field of heavy-load railways, there is no precedent for applying virtual marshaling technology and interconnecting virtual line systems with existing line systems. Summary of the invention

[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent. To this end, the first object of the present invention is to provide an interconnection method of a heavy-duty railway virtual marshaling train control system to achieve the switching of different standard signal systems and improve the train operation efficiency.

[0005] The second object of the present invention is to provide an interconnection system for a heavy-haul railway virtual marshaling train control system.

[0006] A third object of the present invention is to provide a computer-readable storage medium.

[0007] A fourth object of the present invention is to provide an electronic device.

[0008] To achieve the above object, the present invention is implemented through the following technical solutions:

[0009] A method for interconnecting a heavy-haul railway virtual marshaling train control system, comprising:

[0010] Determine the switching area between the existing line and the virtual marshaling line for the switching of ground equipment;

[0011] When the train reaches the switching area, the control right of the ground equipment is switched;

[0012] After the control of the ground equipment is switched, the ground equipment of the virtual marshaling line sends a marshaling command to the on-board equipment of the train, and the on-board equipment virtually marshales the train corresponding to the on-board equipment with the preceding train in the marshaling according to the marshaling command.

[0013] Optionally, the step of determining a switching area between an existing line and a virtual marshaling line for switching ground equipment includes:

[0014] A ground equipment switching transponder group is set in the overlapping co-management area of ​​the virtual marshaling line and the existing line, and the area where the ground equipment switching transponder group is located is set as a switching area for ground equipment switching.

[0015] Optionally, when the train travels into the range of the switching area, the control right of the ground equipment is handed over and switched through the on-board equipment of the train.

[0016] Optionally, the step of performing a handover of control of the ground equipment by the onboard equipment of the train includes:

[0017] When the train travels to the switching area, the radio block center equipment of the existing line sends a ground equipment switching command to the on-board equipment of the train;

[0018] The on-board device receives the switching command of the ground device, and sends a communication session establishment request instruction to the resource management device of the virtual marshaling line, and after receiving the communication session establishment request instruction, the resource management device establishes a communication session with the on-board device;

[0019] When the train runs to completely pass through the switching area, the ground equipment control authority switching information is exchanged through the established communication session.

[0020] Optionally, after the control of the ground equipment is handed over, the method further includes:

[0021] The on-vehicle device terminates the communication connection with the radio block center device, and exchanges driving safety data with the resource management device through the communication session to complete the ground device switching.

[0022] Optionally, the method further includes:

[0023] When the train travels to the jurisdiction boundary of the existing management system corresponding to the existing line, the radio block center equipment starts to exchange ground equipment switching information with the resource management equipment.

[0024] Optionally, after completing the ground equipment switching, the method further includes:

[0025] The resource management device sends line resource information;

[0026] The on-board equipment receives the line resource information and monitors the running status of the train according to the line resource information.

[0027] Optionally, after the ground device switching is completed and before the resource management device sends a grouping command to the vehicle-mounted device, the method further includes:

[0028] The resource management device obtains a train marshaling plan, checks the train running line conditions according to the train marshaling plan, and sends a marshaling command to the on-board device after checking that the train running line conditions meet the train marshaling conditions.

[0029] Optionally, before the on-board device virtually groups the train corresponding to the on-board device with the preceding train in the group according to the grouping command, the method further includes:

[0030] The on-board device also determines whether the train meets the marshaling conditions according to the marshaling command, and when the train meets the marshaling conditions, virtually marshalls the train with the preceding train in the marshaling.

[0031] Optionally, the step of the on-board device virtually grouping the train corresponding to the on-board device with a preceding train in the group according to the grouping command comprises:

[0032] If the on-board device is an on-board device in the first train in the train group to be marshaled, the on-board device determines that the train meets the marshaling establishment conditions and notifies the trains in the group to prepare for marshaling;

[0033] The on-board equipment establishes inter-vehicle communication between the train and the preceding train in the train formation, and exchanges train operation information through the inter-vehicle communication;

[0034] The on-board device calculates a movement authorization end point based on a relative position according to the operation information of the train and the operation information of the preceding vehicle of the train, and virtually groups the train with the preceding vehicle.

[0035] Optionally, the on-board equipment completes the virtual formation of the train and the vehicle ahead of it in a manner that shortens the tracking distance between the train and the vehicle ahead of it and reaches a preset value.

[0036] Optionally, the operation information includes speed, acceleration and real-time position information of the train.

[0037] Optionally, the on-board equipment that determines whether a train meets the marshaling conditions according to the marshaling command is the on-board equipment in the first train in the train group to be marshaled.

[0038] To achieve the above-mentioned object, the second aspect of the present invention provides an interconnection system of a heavy-haul railway virtual marshaling train control system, comprising:

[0039] A determination module, used to determine a switching area between an existing line and a virtual marshaling line for switching of ground equipment;

[0040] A switching module, connected to the determining module, and configured to switch the control right of the ground equipment when the train travels to the range where the switching area is located;

[0041] A marshaling module is connected to the switching module. The marshaling module is used to receive a marshaling command after the control right of the ground equipment is switched, and to virtually marshal the train with the preceding train in the marshaling according to the marshaling command.

[0042] To achieve the above-mentioned purpose, the third aspect of the present invention provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned interconnection method of the heavy-load railway virtual marshaling train control system is implemented.

[0043] To achieve the above-mentioned purpose, the fourth aspect of the present invention provides an electronic device, including a processor and a memory, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the above-mentioned interconnection method of the heavy-load railway virtual marshaling train control system is implemented.

[0044] The present invention has at least the following technical effects:

[0045] (1) The present invention sets a switching area between the existing line and the virtual marshaling line, completes the switching of ground equipment information when the train travels into the switching area, sends a marshaling command according to the train marshaling plan after the ground equipment information is switched, and completes the virtual marshaling of the train through the marshaling command, thereby effectively realizing the interconnection and interoperability of the existing line train control system and the virtual marshaling train control system, improving the transportation capacity of the cross-line operation of the freight railway, and enabling the train group to operate in a virtual marshaling mode that shortens the vehicle tracking distance, thereby improving the overall operation efficiency of the train operation system.

[0046] (2) After the heavy-load railway adopts the virtual marshaling train control system, the present invention can share the common ground equipment resources and existing train on-board equipment to achieve interconnection with the existing train control system, thereby effectively reducing the overall construction and operation costs of the train operation system.

[0047] (3) The present invention can realize the interconnection and intercommunication between the virtual marshaling train control system and the existing line train control system without stopping the train, realize the seamless switching between the virtual marshaling train control system and the existing train control system, enhance the availability of the virtual marshaling train control system, and facilitate the promotion and application of the virtual marshaling train control system.

[0048] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Figure 1 A flow chart of an interconnection method of a heavy-haul railway virtual marshaling train control system provided by an embodiment of the present invention;

[0050] Figure 2 A schematic diagram of the setting of a ground equipment switching transponder provided by an embodiment of the present invention;

[0051] Figure 3 A working principle diagram of an interconnection system of a heavy-haul railway virtual marshaling train control system provided by an embodiment of the present invention;

[0052] Figure 4 A schematic diagram of an interconnection application scenario of a heavy-haul railway virtual marshaling train control system provided in the first embodiment of the present invention;

[0053] Figure 5 A schematic diagram of interconnection interfaces of a heavy-haul railway virtual marshaling train control system provided by an embodiment of the present invention;

[0054] Figure 6-Figure 7 A schematic diagram of an interconnection application scenario of a heavy-haul railway virtual marshaling train control system provided by an embodiment of the present invention;

[0055] Figure 8 A schematic diagram of the overall information flow of a heavy-haul railway virtual marshaling train control system provided by an embodiment of the present invention;

[0056] Fig. 9 A structural block diagram of an interconnection system of a heavy-haul railway virtual marshaling train control system provided in one embodiment of the present invention. DETAILED DESCRIPTION

[0057] The present embodiment is described in detail below, and examples of the embodiment are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0058] In order to solve the technical problems in the background technology, the present invention provides a method for sharing resources in the common line area, saving costs, and improving the efficiency of train operation, that is, a method for interconnecting and interoperating a virtual marshaling train control system with an existing line train control system on a heavy-haul railway. On the basis of being compatible with the existing heavy-haul railway signal system format, the present invention ensures the interconnection and interoperability between the operating line using virtual marshaling and the existing line, by designing the system switching area and switching timing, and according to the marshaling plan and marshaling command issued by the dispatching center, the switching between ground equipment of different signal systems and between ground equipment and on-board equipment can be completed, thereby dynamically realizing the switching of different signal system formats.

[0059] The following describes the interconnection method and system of the heavy-haul railway virtual marshaling train control system of this embodiment with reference to the accompanying drawings.

[0060] Figure 1 A flowchart of an interconnection method of a heavy-haul railway virtual marshaling train control system provided by an embodiment of the present invention. Figure 1 As shown, the method includes:

[0061] Step S1: Determine a switching area between an existing line and a virtual marshaling line for switching ground equipment.

[0062] The step of determining a switching area between an existing line and a virtual marshaling line for switching ground equipment includes:

[0063] A ground equipment switching transponder group is set in the overlapping co-management area of ​​the virtual marshaling line and the existing line, and the area where the ground equipment switching transponder group is located is set as a switching area for ground equipment switching.

[0064] Specifically, Figure 2 As shown, a ground equipment switching transponder group can be set outside the station exit in the co-management area where the virtual marshalling line and the existing line overlap, as a switching area for communication switching between the on-board equipment and the ground equipment, wherein the existing line is the line where the existing line station 1, the interconnected common line station, the existing line station 3, and the existing line station 4 are located, and the virtual marshalling line is the line where the interconnected common line station, the virtual marshalling station 2, and the virtual marshalling station 3 are located.

[0065] In this embodiment, the on-board equipment in the virtual marshaling train control system adopts the train operation mode of the existing line train control system to leave the station while maintaining communication with the ground equipment of the existing line train control system, and then completes the handover and switching between the on-board equipment and the existing ground equipment and the virtual marshaling line ground equipment in the switching area.

[0066] The virtual marshaling train control system includes onboard equipment and ground equipment, and the existing line train control system mainly includes the onboard equipment and corresponding ground equipment. Figure 3As shown, the on-board equipment mainly includes the on-board ATP (Automatic Train Protection) host and ATO (Automatic Train Operation) host, wireless communication radio, transponder receiving antenna, Beidou satellite receiver, speed sensor, driving console human-machine interface DMI, train tail EOT, etc. The ground equipment of the existing line train control system mainly includes: the existing system dispatching centralized CTC (Centralized Traffic Control System), the existing system CTC station extension, the existing system interlocking equipment and the existing system wireless block center. The ground equipment in the virtual marshaling train control system includes: virtual marshaling dispatching centralized CTC equipment, virtual marshaling resource management system RMU (Resource Management Update), object controller equipment and virtual marshaling CTC station extension.

[0067] Step S2: When the train reaches the switching area, the control of the ground equipment is switched.

[0068] Specifically, before the train reaches the range of the switching area, when the train reaches the jurisdiction boundary of the existing management system corresponding to the existing line, the radio block center equipment starts to exchange ground equipment switching information with the resource management equipment.

[0069] like Figure 4 As shown, the first train in the train group drives out of the exit of the interconnected common line station in the existing mode. When the train driving permit terminus reaches the jurisdiction boundary of the existing system, step ① is executed, and the radio block center of the existing system starts to exchange ground equipment switching information with the virtual marshaling system RMU equipment, that is, the above-mentioned virtual marshaling resource management system RMU.

[0070] Furthermore, when the train reaches the switching area, the control of the ground equipment can be handed over and switched through the train's onboard equipment.

[0071] In this embodiment, a set of vehicle-mounted equipment can be used to adapt to the ground equipment of the virtual marshaling line and the ground equipment of the existing line respectively. Figure 5 This is a schematic diagram of the interface relationship between existing line equipment and virtual marshaling system equipment provided by an embodiment of the present invention. Figure 5 As shown, the on-board equipment interacts with the two sets of system ground equipment simultaneously in the switching area. The two sets of system ground equipment can complete the relevant information exchange through the on-board equipment and complete the handover and switching of the control of the ground equipment.

[0072] The steps of handing over the control of the ground equipment through the onboard equipment of the train include:

[0073] When the train reaches the switching area, the radio block center equipment of the existing line sends a ground equipment switching command to the on-board equipment of the train; the on-board equipment receives the ground equipment switching command and sends a communication session establishment request instruction to the resource management equipment of the virtual marshaling line. After receiving the communication session establishment request instruction, the resource management equipment establishes a communication session with the on-board equipment; when the train completely crosses the switching area, the ground equipment control right switching information is exchanged through the established communication session.

[0074] After the control right of the ground equipment is handed over, the method further includes: the vehicle-mounted equipment terminates the communication connection with the radio block center equipment, and exchanges driving safety data with the resource management equipment through the communication session to complete the switching of the ground equipment.

[0075] Specifically, Figure 4 As shown in the figure, when the first train runs to the ground equipment switching transponder group, step ② is executed, the existing system radio block center sends a ground equipment switching command to the onboard equipment, and then step ③ is executed, the onboard equipment of the first train calls the virtual marshaling system RMU equipment and establishes a communication session, so as to exchange the ground equipment control right switching information through the established communication session. Figure 6 As shown, when the first train completely passes the ground equipment switching transponder group, step ④ is executed, and the ground equipment of the two systems interact with each other to switch the control rights. Further, step ⑤ is executed, that is, the on-board equipment of the first train terminates the communication connection with the existing system radio block center, maintains connection with the virtual marshaling system RMU equipment, and exchanges driving safety data to complete the ground equipment switching. When the first on-board equipment completes the ground equipment switching, the control rights switching of all trains in the train group and the interaction of driving safety data are completed in accordance with steps ①-⑤.

[0076] After the ground equipment switching is completed, the method further includes: the resource management device sends line resource information; the on-board device receives the line resource information, and monitors the running status of the train according to the line resource information.

[0077] Specifically, after all trains in the entire train group leave the interconnected common line station in the existing mode, the train group completes the switching with the ground equipment in the switching area. The train monitors the safe operation of the train based on the line resource information provided by the virtual marshaling system RMU equipment, and then the train group switches to the virtual marshaling mode according to the marshaling plan.

[0078] Step S3: After the control right of the ground equipment is switched, the ground equipment of the virtual marshaling line sends a marshaling command to the on-board equipment of the train, and the on-board equipment virtually marshales the train corresponding to the on-board equipment with the trains in the marshaling according to the marshaling command.

[0079] After completing the switching of the ground equipment, before the resource management device, i.e., the ground equipment of the virtual marshaling line, sends a marshaling command to the on-board equipment, the method also includes: the resource management device obtains the train marshaling plan, and checks the train running line conditions according to the train marshaling plan, and sends a marshaling command to the on-board equipment after checking that the train running line conditions meet the train marshaling conditions.

[0080] Specifically, Figure 7 As shown, a further executable step ⑥ is that the virtual marshaling dispatching centralized CTC device sends the train marshaling plan to the virtual marshaling system RMU device. The virtual marshaling system RMU device checks the train running line status according to the train marshaling plan and executes step ⑦ to send a virtual marshaling command to the train group.

[0081] Before the on-board device virtually marshals the train corresponding to the on-board device with the preceding car in the marshalling according to the marshalling command, the method further includes: the on-board device also determines whether the train meets the marshalling conditions according to the marshalling command, and when the train meets the marshalling conditions, virtually marshals the train with the preceding car in the marshalling. The on-board device in the first train in the train group to be marshaled according to the marshalling command runs forward at the maximum speed according to the line conditions and the train condition.

[0082] In this embodiment, after all on-board equipment in the overall train group of the virtual marshaling train control system completes the communication switch with the ground equipment, the first car in the overall running train group can check the virtual marshaling establishment conditions and prepare to switch to the virtual marshaling mode according to the marshaling plan and marshaling commands issued by the ground equipment of the virtual marshaling train control system.

[0083] In one embodiment of the present invention, the on-board device performs a step of virtually marshaling the train corresponding to the on-board device with the preceding car in the marshaling according to the marshaling command, including: if the on-board device is the on-board device in the first train in the train group to be marshaled, the on-board device determines that the train meets the marshaling establishment conditions, and notifies the trains in the marshaling to prepare for marshaling; the on-board device establishes vehicle-to-vehicle communication between the train and the preceding car in the marshaling, and exchanges train operation information through vehicle-to-vehicle communication; the on-board device calculates the mobile authorization end point based on the relative position according to the operation information of the train and the operation information of the preceding car of the train, and virtually marshales the train with the preceding car in the marshaling. Among them, the on-board device completes the virtual marshaling of the train and the preceding car in the marshaling by shortening the tracking distance between the train and the preceding car and reaching a preset value. In this embodiment, the operation information includes the speed, acceleration and real-time position information of the train.

[0084] Specifically, Figure 7As shown, after the first car running in the train group meets the marshaling conditions according to the marshaling command, the trains in the train group can establish a car-to-car communication connection between the cars, and exchange train operation information such as the speed, acceleration and real-time position information of the train through the established car-to-car communication, and execute step ⑧, that is, according to the current operation information of the train and the current operation information of the train's front car, the train and the front car in the marshaling are virtually marshaled. The specific train can track the front train in the virtual marshaling mode and gradually shorten the tracking distance with the front car. When the current and rear cars maintain a stable running interval and run in coordination with virtual marshaling, dynamic marshaling of the interconnected interval can be achieved.

[0085] In this embodiment, the vehicles in the overall train group exchange operation information through vehicle-to-vehicle communication, and after the mode conversion conditions are met, they switch to the virtual marshaling mode, thereby completing the dynamic conversion of the virtual marshaling collaborative operation mode of the train group in the interconnected section. It should be noted that the virtual marshaling train control system in this embodiment has the function of cross-line operation from the existing line to the virtual marshaling line, and also has the function of cross-line operation from the virtual marshaling line to the existing line. Therefore, the virtual marshaling train control system in this embodiment can complete the switching of ground equipment without stopping the train in the switching section, and complete the virtual marshaling of the train group, thereby realizing the switching of different signal systems and improving the train operation efficiency.

[0086] As a specific example, Figure 8 As shown, CTC can send the train plan to the existing system radio block center and the virtual marshaling resource management system RMU, i.e., the virtual marshaling system resource management center. When the first train in the train group runs to the ground equipment switching transponder group, the existing system radio block center and the virtual marshaling resource management system RMU complete the ground equipment switching through the onboard equipment according to the train plan. After the onboard equipment completes the ground equipment switching, the onboard equipment terminates the communication with the ground equipment of the existing train control system. The ground equipment of the virtual marshaling train control system timely issues the marshaling command to the onboard equipment CC1 and the onboard equipment CC2 in the entire train group according to the marshaling plan issued by CTC. The onboard equipment CC1 and the onboard equipment CC2 establish communication between cars according to the marshaling command and complete the dynamic marshaling.

[0087] Fig. 9 This is a structural block diagram of the interconnection system of the heavy-haul railway virtual marshaling train control system provided by one embodiment of the present invention. Fig. 9As shown, the interconnection system 10 of the heavy-duty railway virtual marshaling train control system includes a determination module 11, a switching module 12 and a marshaling module 13. Among them, the determination module 11 is used to determine the switching area between the existing line and the virtual marshaling line for the switching of ground equipment; the switching module 12 is connected to the determination module 11, and the switching module 12 is used to switch the control right of the ground equipment when the train travels to the range of the switching area; the marshaling module 13 is connected to the switching module 12, and the marshaling module 13 is used to receive the marshaling command after the switching of the control right of the ground equipment is completed, and to virtually marshall the train with the preceding car in the marshaling according to the marshaling command.

[0088] Specifically, the overlapping and co-managed area of ​​the virtual marshaling line and the existing line can be determined by the determination module 11, and the ground equipment switching transponder group can be set in the overlapping and co-managed area to determine the switching area for the ground equipment switching between the existing line and the virtual marshaling line. When the train in the train group travels to the switching area, the determination module 11 issues a determination instruction for the train to travel to the switching area. After receiving the determination instruction, the switching module 12 confirms that the train has traveled to the switching area, and then switches the control right of the ground equipment through the on-board equipment, and issues a ground equipment switching completion instruction. After receiving the ground equipment switching completion instruction, the marshaling module 13 confirms that the switching of the ground equipment control right is completed, and receives the marshaling command sent by the virtual marshaling resource management system RMU according to the marshaling plan issued by the virtual marshaling dispatching centralized CTC device, and then performs virtual marshaling of the corresponding train with the preceding car in the marshaling according to the marshaling command, thereby completing the dynamic completion of the virtual marshaling collaborative operation mode conversion of the train group in the interconnection section.

[0089] It should be noted that the specific implementation method of the interconnection and intercommunication system of the heavy-haul railway virtual marshaling train control system of this embodiment can refer to the specific implementation method of the interconnection and intercommunication method of the heavy-haul railway virtual marshaling train control system mentioned above. To avoid redundancy, it will not be repeated here.

[0090] Furthermore, the present invention also provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the above-mentioned interconnection method of the heavy-duty railway virtual marshaling train control system is implemented.

[0091] Furthermore, the present invention also provides an electronic device, including a processor and a memory, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the above-mentioned interconnection method of the heavy-load railway virtual marshaling train control system is implemented.

[0092] In summary, on the basis of being compatible with the existing heavy-haul railway signal system system, the present invention can ensure the interconnection and intercommunication between the operating line adopting virtual marshaling and the existing line by designing the system switching area, switching timing, and according to the marshaling plan and marshaling command issued by the dispatching center, the switching between the ground equipment of different signal systems and between the ground equipment and the on-board equipment can be completed, so that the switching of different signal system systems can be dynamically realized, the transportation capacity of the freight railway cross-line operation can be improved, and the train group can be operated in a virtual marshaling mode that shortens the running distance of the trains, thereby improving the overall operation efficiency of the train operation system; in addition, after the heavy-haul railway adopts the virtual marshaling train control system, the present invention can realize the interconnection and intercommunication with the existing train control system through the shared line ground equipment resources and the existing train on-board equipment, thereby effectively reducing the construction and operation costs of the train operation system as a whole; and the present invention can realize the interconnection and intercommunication between the virtual marshaling train control system and the existing line train control system without stopping, realize the seamless switching between the virtual marshaling train control system and the existing train control system, enhance the availability of the virtual marshaling train control system, and be conducive to the promotion and application of the virtual marshaling train control system.

[0093] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0094] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.

Claims

1. A method for interconnecting and communicating a heavy-haul railway virtual marshaling train control system, characterized in that: include: A ground equipment switching transponder group is set in the overlapping and co-managed area of ​​the virtual marshaling line and the existing line, and the area where the ground equipment switching transponder group is located is set as a switching area for ground equipment switching; When the train travels to the switching area, the radio block center equipment of the existing line sends a ground equipment switching command to the on-board equipment of the train; the on-board equipment receives the ground equipment switching command and sends a communication session establishment request instruction to the resource management equipment of the virtual marshaling line, and after receiving the communication session establishment request instruction, the resource management equipment establishes a communication session with the on-board equipment; when the train travels to completely cross the switching area, the ground equipment control right switching information is exchanged through the established communication session; After the control of the ground equipment is switched, the ground equipment of the virtual marshaling line sends a marshaling command to the on-board equipment of the train, and the on-board equipment virtually marshales the train corresponding to the on-board equipment with the preceding train in the marshaling according to the marshaling command.

2. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 1, characterized in that: After the control right of the ground equipment is handed over, the method further includes: The on-vehicle device terminates the communication connection with the radio block center device, and exchanges driving safety data with the resource management device through the communication session to complete the ground device switching.

3. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 2, characterized in that: The method further comprises: When the train travels to the jurisdiction boundary of the existing management system corresponding to the existing line, the radio block center equipment starts to exchange ground equipment switching information with the resource management equipment.

4. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 3, characterized in that: After completing the ground equipment switching, the method further includes: The resource management device sends line resource information; The on-board equipment receives the line resource information and monitors the running status of the train according to the line resource information.

5. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 4, characterized in that: After the ground equipment switching is completed and before the resource management device sends a marshaling command to the vehicle-mounted equipment, the method further includes: The resource management device obtains a train marshaling plan, checks the train running line conditions according to the train marshaling plan, and sends a marshaling command to the on-board device after checking that the train running line conditions meet the train marshaling conditions.

6. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 5, characterized in that: Before the on-board device virtually groups the train corresponding to the on-board device with the preceding train in the group according to the grouping command, the method further includes: The on-board device also determines whether the train meets the marshaling conditions according to the marshaling command, and when the train meets the marshaling conditions, virtually marshalls the train with the preceding train in the marshaling.

7. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 6, characterized in that: The step of the on-board device virtually marshaling the train corresponding to the on-board device with the preceding train in the marshaling according to the marshaling command comprises: If the on-board device is an on-board device in the first train in the train group to be marshaled, the on-board device determines that the train meets the marshaling establishment conditions and notifies the trains in the group to prepare for marshaling; The on-board equipment establishes inter-vehicle communication between the train and the preceding vehicle in the formation, and exchanges train operation information through the inter-vehicle communication; The on-board device calculates a movement authorization end point based on a relative position according to the operation information of the train and the operation information of the preceding vehicle of the train, and virtually groups the train with the preceding vehicle.

8. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 7, characterized in that: The on-board equipment completes the virtual formation of the train and its preceding vehicle in a manner that shortens the tracking distance between the train and its preceding vehicle and reaches a preset value.

9. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 7, characterized in that: The train operation information includes the speed, acceleration and real-time position information of the train.

10. The interconnection method of the heavy-haul railway virtual marshaling train control system according to claim 6, characterized in that: The on-board equipment that determines whether a train meets the marshaling conditions according to the marshaling order is the on-board equipment in the first train in the train group to be marshaled.

11. An interconnection system for a heavy-haul railway virtual marshaling train control system, characterized in that: include: A determination module configured to set a ground equipment switching transponder group in an overlapping co-management area of ​​the virtual marshaling line and the existing line, and set the area where the ground equipment switching transponder group is located as a switching area for ground equipment switching; A switching module is configured such that when the train travels to the switching area, the radio block center equipment of the existing line sends a ground equipment switching command to the on-board equipment of the train; the on-board equipment receives the ground equipment switching command and sends a communication session establishment request instruction to the resource management equipment of the virtual marshaling line, and after receiving the communication session establishment request instruction, the resource management equipment establishes a communication session with the on-board equipment; when the train travels to completely cross the switching area, the ground equipment control right switching information is exchanged through the established communication session; The marshaling module is configured such that after the control right of the ground equipment is switched, the ground equipment of the virtual marshaling line sends a marshaling command to the on-board equipment of the train, and the on-board equipment virtually marshales the train corresponding to the on-board equipment with the preceding train in the marshaling according to the marshaling command.

12. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the interconnection method of the heavy-haul railway virtual marshaling train control system according to any one of claims 1 to 10 is implemented.

13. An electronic device, characterized in that: It comprises a processor and a memory, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the interconnection method of the heavy-load railway virtual marshaling train control system as described in any one of claims 1 to 10 is implemented.