A construction site sewage filtering and purification device

By designing a construction site sewage filtration and purification device that includes disassembly and water discharge components, the existing device has solved the problems of complex structure, single function and solid metal blockage, and effective sewage filtration and purification are achieved, extending the device life and Improves purification effect.

CN115557585BActive Publication Date: 2025-02-25DONGGUAN HENGAN ELECTRICAL MAINTENANCE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210795878.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-07
Publication Date
2025-02-25
Estimated Expiration
2042-07-07

AI Technical Summary

Technical Problem

The existing construction site sewage purification device has a complex structure and a single function, and solid metals are prone to blockage and damage, reducing service life and effect.

Method used

A construction site sewage filtration purification device for construction sites including support frames, filter boxes, sliders, filter drums, disassembly components and water discharge components is designed. Through the design of disassembly components and water discharge components, residues are easily cleaned and liquid materials are used. Polyaluminum chloride reacts with wastewater for purification.

Benefits of technology

Effective filtration and purification of construction site sewage is achieved, blockage and damage caused by solid metals is avoided, the service life of the device is extended, and the purification effect is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115557585B_ABST
    Figure CN115557585B_ABST
Patent Text Reader

Abstract

The present invention relates to a purification device, and in particular to a construction site sewage filtering and purification device. The present invention provides a construction site sewage filtering and purification device that is convenient for cleaning residues. The present invention provides such a construction site sewage filtering and purification device, comprising: a filter box is arranged in the upper part of a support frame, first sliders are slidably arranged in the upper parts of the front and rear sides of the filter box, a filter barrel is welded between the two first sliders, the filter barrel can filter sewage, and circular holes are evenly spaced in the lower part of the filter barrel, and a disassembly component capable of disassembling the filter barrel is arranged on the filter box. The staff pours the sewage into the filter box, and the filter barrel filters the sewage. The staff can discharge the filtered sewage by stepping down on the pedal, and the staff can disassemble the filter barrel by controlling the handle, which is convenient for the staff to clean the residues remaining in the filter barrel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a purification device, in particular to a construction site sewage filtering and purification device. Background Art

[0002] During the construction process, construction sites will generate a large amount of sewage. The sources of sewage are also many, such as sewage generated by the washing of a large number of construction trucks, rainwater, sewage generated by cleaning equipment, etc. The sewage is usually mixed with mortar, mud, stones and a small amount of screws and other solids, and sewage treatment is required before discharge.

[0003] The construction site sewage purification devices currently on the market not only have complex structures and single functions, but also solid metals such as iron nails mixed in the sewage can easily cause blockage and damage to the entire device, reducing the service life of the device and affecting the use effect of the device.

[0004] Therefore, it is necessary to design a construction site sewage filtering and purification device that is convenient for cleaning up the residue. Summary of the invention

[0005] In order to overcome the shortcomings of complex structure, single function, and solid metals such as iron nails mixed in sewage that easily cause clogging and damage to the entire device, reduce the service life of the device, and affect the use effect of the device, the technical problem of the present invention is: to provide a construction site sewage filtering and purification device that is convenient for cleaning up residues.

[0006] A construction site sewage filtering and purification device comprises a support frame, a filter box, a first slider, a filter barrel, a disassembly component and a drain component, wherein the filter box is arranged at the upper part of the support frame, the first sliders are slidably arranged at the upper parts of the front and rear sides of the filter box, a filter barrel is welded between the two first sliders, the filter barrel can filter sewage, circular holes are evenly spaced at the lower part of the filter barrel, a disassembly component capable of disassembling the filter barrel is arranged on the filter box, and a drain component capable of draining water is arranged at the lower part of the support frame.

[0007] Furthermore, the disassembly assembly includes: a first fixed seat, an L-shaped plate, a handle, a mounting rod, a fixed block, a first rotating shaft, a clamping plate, a first elastic member, a first guide rod, a top block, and a second elastic member. First fixed seats are welded on the upper left and right sides of the filter box, an L-shaped plate is welded symmetrically on the top of the filter drum, a handle is welded between the front and rear sides of the two L-shaped plates, a mounting rod is provided on the side of the bottom of the two L-shaped plates away from each other, the mounting rod is slidably matched with the first fixed seat, fixed blocks are provided on the lower front and rear sides of the two mounting rods, a first rotating shaft is provided on the four fixed blocks, a clamping plate is rotatably provided in the middle of the four first rotating shafts, a first elastic member is connected between the lower parts of the two mounting rods and the two adjacent clamping plates, a first guide rod is slidably provided on the lower parts of the front and rear sides of the two first fixed seats, a top block is welded on the adjacent ends of the two adjacent first guide rods, and a second elastic member is connected between the two first fixed seats and the two adjacent first guide rods.

[0008] Furthermore, the water discharge assembly includes: a second fixed seat, a second slider, a first baffle, a second guide rod, a third elastic member, a third fixed seat, a third slider, a stepping plate and a first top plate, second fixed seats are welded on the lower parts of the left and right sides of the support frame, second sliders are slidably arranged on the front sides of the two second fixed seats, a first baffle is arranged between the two second sliders, a circular through hole is opened on the front side of the top of the first baffle, and the backward movement of the first baffle will cause the filter box to be directly above the circular through hole on the front side of the top of the first baffle, second guide rods are arranged between the front and rear sides of the two second fixed seats, the two second guide rods slidably penetrate the adjacent second sliders, the two second fixed seats are connected with a third elastic member between the adjacent second sliders, the third fixed seat is symmetrically welded on the front side of the bottom of the support frame, the third slider is slidably arranged on the upper parts of the rear sides of the two third fixed seats, a stepping plate is welded between the rear side walls of the two third sliders, and the first top plate is symmetrically arranged on the rear side of the stepping plate, and the downward sliding of the stepping plate will drive the first top plate to move downward and contact and cooperate with the second slider.

[0009] Furthermore, it also includes: a material storage box, a one-way valve, a second top plate, a fourth elastic member, a material delivery pipe, a second rotating shaft, a material storage block, a fourth fixed seat, a third rotating shaft, a first shift block and a bevel gear. The material storage box is welded on the front side of the upper part of the support frame, and the one-way valve is welded on the upper front side of the material storage box. The second top plate is slidably arranged in the material storage box, and a fourth elastic member is connected between the bottom of the material storage box and the bottom end surface of the second top plate. The upper rear side of the material storage box is connected with a material delivery pipe, and the material delivery pipe is connected with the filter box. The second rotating shaft is rotatably arranged in the material delivery pipe, and the material storage block is arranged in the middle of the second rotating shaft. The material storage block is inside the material delivery pipe, and four semicircular grooves are evenly spaced at the edge of the material storage block. A fourth fixed seat is arranged in the middle of the front side of the filter box, and the third rotating shaft is rotatably arranged on the fourth fixed seat. The third rotating shaft is rotatably connected to the fourth fixed seat, and the first shift block is welded on the rear end of the third rotating shaft. A bevel gear is arranged at one end of the third rotating shaft close to the second rotating shaft, and the two bevel gears mesh with each other.

[0010] Furthermore, it also includes: a fifth fixed seat, a first protective cover, a first fixed ring, a first servo motor, a fourth rotating shaft, a mounting plate, a stirring rod and a second shift block. The fifth fixed seat is welded on the lower part of the filter box, the first protective cover is arranged in the fifth fixed seat, the first fixed ring is arranged in the first protective cover, the first servo motor is arranged on the inner ring of the two first fixed rings, the first servo motor can provide a power source, the fourth rotating shaft is arranged on the bottom end of the output shaft of the first servo motor through a coupling, the second shift block is arranged on the lower part of the fourth rotating shaft, the second shift block is slidably connected to the filter box, the mounting plate is welded on the bottom end of the fourth rotating shaft, and eight stirring rods are welded on the bottom of the mounting plate at even intervals.

[0011] Furthermore, it also includes: a third guide rod, a fourth slider, a second baffle, a fifth elastic member and a push rod. Second baffles are slidably arranged on the rear sides of the left and right side walls of the storage box, and the second baffles can block the liquid polyaluminium chloride. Fourth sliders are arranged in front and behind the two second baffles, and third guide rods are arranged on the opposite sides of the two fourth sliders. The two third guide rods both slide through the storage box, and a fifth elastic member is connected between the two fourth sliders and the storage box. Push rods are welded on the left and right sides of the pedal plate. The downward movement of the pedal plate drives the two push rods to move downward and contact the two second baffles.

[0012] Furthermore, it also includes: a second protective cover, a second fixed ring, a second servo motor, a fifth rotating shaft and a vortex plate. The second protective cover is arranged on the outside of the filter drum, the second fixed ring is arranged inside the second protective cover, the second servo motor is arranged on the inner ring of the two second fixed rings, the second servo motor can provide a power source, the fifth rotating shaft is arranged on the top end of the output shaft of the second servo motor through a coupling, the vortex plate is arranged on the top end of the fifth rotating shaft, and the vortex plate is located inside the filter drum.

[0013] Furthermore, a layer of anti-slip pad is arranged on the handle.

[0014] From the above description of the structure of the present invention, it can be seen that the design starting point, concept and advantages of the present invention are: 1. The staff pours the sewage into the filter box, and the filter barrel filters the sewage. The staff can drain the filtered sewage by stepping down on the pedal. The staff can disassemble the filter barrel by controlling the handle, which is convenient for the staff to clean up the residue remaining in the filter barrel.

[0015] 2. The staff connects the one-way valve to the container pipe containing liquid polyaluminium chloride. The staff can transport the liquid polyaluminium chloride by turning the first shift block, so that the liquid polyaluminium chloride reacts with the sewage in the filter box for purification.

[0016] 3. The staff starts the first servo motor. The staff controls the output shaft of the first servo motor to rotate so that the stirring rod rotates to stir the sewage and the liquid polyaluminium chloride, so that the sewage and the liquid polyaluminium chloride are fully mixed to improve the purification efficiency.

[0017] 4. The staff steps on the pedal downward to realize the displacement of the first baffle to release water, and at the same time can drive the two push rods to move downward. The downward movement of the two push rods can realize the sliding of the two second baffles towards each other in the storage box, and the two second baffles can block the liquid polyaluminium chloride. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.

[0019] Figure 2 It is a schematic diagram of a first partial cross-sectional structure of the present invention.

[0020] Figure 3 It is a partial three-dimensional structural schematic diagram of the disassembly assembly of the present invention.

[0021] Figure 4 It is an enlarged view of A of the present invention.

[0022] Figure 5 It is a partial three-dimensional structural schematic diagram of the water discharge component of the present invention.

[0023] Figure 6 It is a partial cross-sectional structural schematic diagram of the water discharge component of the present invention.

[0024] Figure 7 It is a partial three-dimensional structural schematic diagram of the present invention.

[0025] Figure 8 It is a schematic diagram of a second partial cross-sectional structure of the present invention.

[0026] Fig. 9 It is a schematic diagram of a third partial cross-sectional structure of the present invention.

[0027] Fig.10 It is a schematic diagram of a fourth partial cross-sectional structure of the present invention.

[0028] Fig.11 It is an enlarged view of B of the present invention.

[0029] Fig.12 It is a schematic diagram of a fifth partial cross-sectional structure of the present invention.

[0030] In the above drawings: 1: support frame, 2: filter box, 3: first slider, 4: filter barrel, 5: disassembly component, 501: first fixed seat, 502: L-shaped plate, 503: handle, 504: mounting rod, 505: fixed block, 506: first rotating shaft, 507: card plate, 508: first elastic member, 509: first guide rod, 5010: top block, 5011: second elastic member, 6: water discharge component, 601: second fixed seat, 602: second slider, 603: first baffle, 604: second guide rod, 605: third elastic member, 606: third fixed seat, 607: third slider, 608: pedal, 609: first top plate, 7: storage Material box, 8: one-way valve, 9: second top plate, 10: fourth elastic member, 11: material conveying pipe, 12: second rotating shaft, 13: material storage block, 14: fourth fixed seat, 15: third rotating shaft, 16: first shift block, 17: bevel gear, 18: fifth fixed seat, 19: first protective cover, 20: first fixed ring, 21: first servo motor, 22: fourth rotating shaft, 23: mounting plate, 24: stirring rod, 25: second shift block, 26: third guide rod, 27: fourth sliding block, 28: second baffle, 29: fifth elastic member, 30: top rod, 31: second protective cover, 32: second fixed ring, 33: second servo motor, 34: fifth rotating shaft, 35: vortex plate. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] Example 1

[0033] like Figure 1-Figure 6As shown, a construction site sewage filtering and purification device includes a support frame 1, a filter box 2, a first slider 3, a filter barrel 4, a disassembly component 5 and a drain component 6. The filter box 2 is arranged on the upper part of the support frame 1, and the first sliders 3 are slidably arranged on the upper parts of the front and rear sides of the filter box 2. A filter barrel 4 is welded between the two first sliders 3. The filter barrel 4 can filter sewage. Circular holes are evenly spaced in the lower part of the filter barrel 4. A disassembly component 5 capable of disassembling the filter barrel 4 is arranged on the filter box 2, and a drain component 6 capable of draining water is arranged at the lower part of the support frame 1.

[0034] like Figure 3-Figure 4 As shown, the disassembly assembly 5 includes a first fixed seat 501, an L-shaped plate 502, a handle 503, a mounting rod 504, a fixed block 505, a first rotating shaft 506, a clamping plate 507, a first elastic member 508, a first guide rod 509, a top block 5010, and a second elastic member 5011. The first fixed seat 501 is welded to the upper part of the left and right sides of the filter box 2, and the L-shaped plates 502 are welded symmetrically on the top of the filter drum 4. The handles 503 are welded between the front and rear sides of the two L-shaped plates 502. A layer of anti-slip pad is arranged on the handles 503. The bottom of the two L-shaped plates 502 is provided with mounting rods 504 on the side away from each other. The mounting rods 504 and the first fixed seat 501 are welded to the upper part of the left and right sides of the filter box 2. The fixed seat 501 is slidably matched, and the lower parts of the front and rear sides of the two installation rods 504 are each provided with a fixed block 505, and the four fixed blocks 505 are each provided with a first rotating shaft 506, and the middle parts of the four first rotating shafts 506 are each rotatably provided with a clamping plate 507, and the lower parts of the two installation rods 504 and the two adjacent clamping plates 507 are each connected with a first elastic member 508, and the lower parts of the front and rear sides of the two first fixed seats 501 are each slidably provided with a first guide rod 509, and the adjacent ends of the two adjacent first guide rods 509 are each welded with a top block 5010, and the two first fixed seats 501 and the two adjacent first guide rods 509 are each connected with a second elastic member 5011.

[0035] like Figure 5-Figure 6As shown, the water discharge assembly 6 includes a second fixed seat 601, a second slider 602, a first baffle 603, a second guide rod 604, a third elastic member 605, a third fixed seat 606, a third slider 607, a pedal 608 and a first top plate 609. The second fixed seats 601 are welded to the lower parts of the left and right sides of the support frame 1, and the second sliders 602 are slidably arranged on the front sides of the two second fixed seats 601. A first baffle 603 is arranged between the two second sliders 602. A circular through hole is opened on the front side of the top of the first baffle 603. The backward movement of the first baffle 603 will make the filter box 2 be directly above the circular through hole on the front side of the top of the first baffle 603. The two second A second guide rod 604 is arranged between the front and rear sides of the fixed seat 601, and the two second guide rods 604 are slidably inserted into the adjacent second sliders 602. A third elastic member 605 is connected between the two second fixed seats 601 and the adjacent second sliders 602. A third fixed seat 606 is welded symmetrically on the front side of the bottom of the support frame 1, and a third slider 607 is slidably arranged on the upper rear side of the two third fixed seats 606. A pedal plate 608 is welded between the rear side walls of the two third sliders 607, and a first top plate 609 is symmetrically arranged on the rear side of the pedal plate 608. The downward sliding of the pedal plate 608 will drive the first top plate 609 to move downward and contact and cooperate with the second slider 602.

[0036] When it is necessary to filter the sewage on the construction site, the staff pours the sewage into the filter box 2, and the filter barrel 4 filters the sewage. The filtered sewage falls to the bottom of the filter box 2 through the evenly spaced circular holes in the lower part of the filter barrel 4. The first baffle 603 blocks the sewage in the filter box 2. The staff steps on the pedal 608 downward, and the pedal 608 drives the two third sliders 607 to slide downward between the rear sides of the third fixed seat 606. The pedal 608 slides downward and drives the two first top plates 609 to move downward. The two first top plates 609 move downward and drive the two second sliders 602 to slide backward in the second fixed seat 601, so that the third elastic member 605 is compressed. The two second sliders 602 slide backward and drive the first baffle 603 to move backward at the same time. The first baffle plate 603 moves, and the circular through hole on the front side of the top of the first baffle plate 603 is located directly below the filter box 2, so that the filtered sewage in the filter box 2 can be discharged. The filtered sewage is collected by the staff in a container placed directly below the filter box 2 through the circular through hole on the front side of the top of the first baffle plate 603. After the sewage is collected, the staff member's foot moves upward and disengages from the pedal plate 608, so that the two third elastic members 605 are reset and drive the two second sliders 602 to slide forward and reset on the second fixed seat 601. The two second sliders 602 slide forward and drive the two first top plates 609 to move forward and reset. The two first top plates 609 move forward to cause the pedal plate 608 to move upward. The pedal plate 608 moves upward and drives the two third sliders 607 on the adjacent third fixed seat The rear side of 606 slides upward to reset, and then the staff holds two adjacent first guide rods 509 and slides toward each other. The two first guide rods 509 slide toward each other and drive the adjacent top blocks 5010 to move toward each other, so that the two second elastic members 5011 are compressed. The two top blocks 5010 move toward each other and drive the two adjacent clamping plates 507 to rotate toward each other, so that the first elastic member 508 is compressed. Then the staff pulls the two handles 503 to move upward, and the two handles 503 move upward and drive the two L-shaped plates 502 to move upward. The two L-shaped plates 502 move upward and drive the filter barrel 4 to move upward and separate from the filter box 2. The filter barrel 4 moves upward and drives the two first sliders 3 to slide upward in the filter box 2. The two L-shaped plates 502 move upward. When the filter drum 4 is moved, the mounting rod 504, the fixing block 505, the first rotating shaft 506, the clamping plate 507 and the first elastic member 508 are driven upward, so that the staff can conveniently handle the larger residues remaining in the filter drum 4. When the mounting rod 504 is out of contact with the first fixing seat 501, the staff releases the first guide rod 509, so that the second elastic member 5011 is reset and drives the two adjacent first guide rods 509 to slide back to reset. After the larger residues in the filter drum 4 are processed, the staff pulls the two handles 503 to move downward. The downward movement of the two handles 503 drives the two L-shaped plates 502 and the filter drum 4 to move downward. The downward movement of the filter drum 4 drives the two first sliding blocks 3 to slide downward and reset in the filter box 2.When the two L-shaped plates 502 move downward, they drive the two mounting rods 504 to slide downward on the adjacent first fixed seats 501. The two mounting rods 504 slide downward to respectively cause the adjacent two card plates 507 to rotate toward each other, and the two first elastic members 508 are compressed. When the two mounting rods 504 slide downward, they cause the adjacent two top blocks 5010 to move backwards and reset. When the first rotating shaft 506 passes through the first fixed seat 501, the adjacent two card plates 507 begin to rotate backwards and reset under the action of the first elastic member 508. When the two card plates 507 are reset, they squeeze the two top blocks 5010 to move backwards and drive the two first guide rods 509 to slide backwards and reset. Finally, the two top blocks 5010 re-fix the card plates 507, and then the two second elastic members 5011 are compressed again. A layer of anti-skid pad is provided on the handle 503 to increase the friction between the staff's hand and the handle 503 to prevent slipping.

[0037] Example 2

[0038] like Figure 7-Figure 8 As shown, on the basis of Example 1, it also includes a storage box 7, a one-way valve 8, a second top plate 9, a fourth elastic member 10, a feed pipe 11, a second rotating shaft 12, a storage block 13, a fourth fixed seat 14, a third rotating shaft 15, a first shift block 16 and a bevel gear 17. The storage box 7 is welded to the front side of the upper part of the support frame 1, and the one-way valve 8 is welded to the upper front part of the storage box 7. The second top plate 9 is slidably arranged in the storage box 7, and the fourth elastic member 10 is connected between the bottom of the storage box 7 and the bottom end surface of the second top plate 9. The upper rear part of the storage box 7 is connected to the feed pipe 11, and the feed pipe 11 is connected to the filter box 2, a second rotating shaft 12 is rotatably arranged in the material conveying pipe 11, a material storage block 13 is arranged in the middle of the second rotating shaft 12, the material storage block 13 is inside the material conveying pipe 11, and four semicircular grooves are evenly spaced at the edge of the material storage block 13, a fourth fixed seat 14 is arranged in the middle of the front side of the filter box 2, a third rotating shaft 15 is rotatably arranged on the fourth fixed seat 14, the third rotating shaft 15 is rotatably connected to the fourth fixed seat 14, a first shifting block 16 is welded to the rear end of the third rotating shaft 15, and a bevel gear 17 is arranged at one end of the third rotating shaft 15 close to the second rotating shaft 12, and the two bevel gears 17 are meshed with each other.

[0039] The staff rotates the first shift block 16 to rotate the third rotating shaft 15, and the rotation of the third rotating shaft 15 drives the two bevel gears 17 to mesh and rotate, and the meshing and rotation of the two bevel gears 17 drives the second rotating shaft 12 to rotate, and the rotation of the second rotating shaft 12 drives the storage block 13 to rotate. The staff connects the one-way valve 8 to the container pipeline filled with liquid polyaluminium chloride, and the liquid polyaluminium chloride enters the storage box 7 through the one-way valve 8 and falls to the second top plate 9. The fourth elastic member 10 drives the second top plate 9 to move upward, and the second top plate 9 moves upward to drive the liquid polyaluminium chloride to move downward into the delivery In the material pipe 11, the liquid polyaluminium chloride is stored in four semicircular grooves evenly spaced on the storage block 13. Due to the inclination angle of the feed pipe 11, the staff rotates the first shift block 16 to realize the rotation of the storage block 13, and at the same time, can drive the liquid polyaluminium chloride to move downward into the filter box 2 to contact and react with the sewage, which can achieve the effect of sewage purification. After the sewage purification is completed, the staff stops rotating the first shift block 16, and then the staff disconnects the one-way valve 8 from the container pipeline containing liquid polyaluminium chloride to stop conveying the liquid polyaluminium chloride.

[0040] like Fig. 9 As shown, it also includes a fifth fixed seat 18, a first protective cover 19, a first fixed ring 20, a first servo motor 21, a fourth rotating shaft 22, a mounting plate 23, a stirring rod 24 and a second shifting block 25. The fifth fixed seat 18 is welded to the lower part of the filter box 2, the first protective cover 19 is arranged in the fifth fixed seat 18, the first fixed ring 20 is arranged in the first protective cover 19, the first servo motor 21 is arranged on the inner ring of the two first fixed rings 20, the first servo motor 21 can provide a power source, the fourth rotating shaft 22 is arranged at the bottom end of the output shaft of the first servo motor 21 through a coupling, the second shifting block 25 is arranged at the lower part of the fourth rotating shaft 22, the second shifting block 25 is slidably connected to the filter box 2, the bottom end of the fourth rotating shaft 22 is welded to the mounting plate 23, and eight stirring rods 24 are welded to the bottom of the mounting plate 23 at even intervals.

[0041] When the staff rotates the first shift block 16 to allow the liquid polyaluminium chloride to enter the filter box 2 to react with the sewage, the staff starts the first servo motor 21, and the staff controls the output shaft of the first servo motor 21 to rotate. The rotation of the output shaft of the first servo motor 21 drives the fourth shaft 22 to rotate, and the rotation of the fourth shaft 22 drives the mounting plate 23 to rotate. The rotation of the mounting plate 23 drives the stirring rod 24 to rotate to stir the sewage and the liquid polyaluminium chloride in the filter box 2, so that the sewage and the liquid polyaluminium chloride are fully mixed. The rotation of the fourth shaft 22 can also drive the second shift block 25 to rotate. After the sewage purification is completed, the staff can turn off the first servo motor 21.

[0042] like Figure 10-11As shown, it also includes a third guide rod 26, a fourth slider 27, a second baffle 28, a fifth elastic member 29 and a push rod 30. The second baffles 28 are slidably arranged on the rear sides of the left and right side walls of the storage box 7. The second baffles 28 can block the liquid polyaluminium chloride. The fourth sliders 27 are arranged in front and behind the two second baffles 28. The third guide rods 26 are arranged on the opposite sides of the two fourth sliders 27. The two third guide rods 26 are slidably penetrate the storage box 7. The fifth elastic member 29 is connected between the two fourth sliders 27 and the storage box 7. Push rods 30 are welded on the left and right sides of the pedal plate 608. The downward movement of the pedal plate 608 drives the two push rods 30 to move downward and contact the two second baffles 28.

[0043] When the staff member rotates the first shift block 16 to allow the liquid polyaluminium chloride to enter the filter box 2 to react with the sewage, the staff member steps on the pedal 608 downward, and the pedal 608 moves downward to drive the two third sliders 607 to slide downward between the rear sides of the third fixed seat 606, and the pedal 608 slides downward to drive the two first top plates 609 to move downward, and the two first top plates 609 move downward to drive the two second sliders 602 to slide backward in the second fixed seat 601, so that the third elastic member 605 is compressed, and the second slider 602 slides backward to drive the first baffle plate 607 to slide downward. 603 moves backward. At this time, the circular through hole on the front side of the top of the first baffle 603 is directly below the filter box 2, and the filtered sewage in the filter box 2 can be discharged. The filtered sewage is collected by the staff in a container directly below the filter box 2 through the circular through hole on the front side of the top of the first baffle 603. The pedal 608 moves downward and drives the two push rods 30 to move downward. The push rod 30 moves downward and drives the two second baffles 28 to slide toward each other in the storage box 7. The two second baffles 28 can block the liquid polyaluminium chloride. Then the staff stops rotating the first baffle 608. A block 16 is shifted, and the first protective cover 19 can protect the first servo motor 21. The staff disconnects the one-way valve 8 from the container pipeline containing liquid polyaluminium chloride to stop the delivery of liquid polyaluminium chloride. The two second baffles 28 slide towards each other and can drive the two fourth sliders 27 to move towards each other. The two fourth sliders 27 move towards each other and drive the two third guide rods 26 to slide towards each other, so that the fifth elastic member 29 is compressed. After the water discharge operation is completed, the staff's foot moves upward and disengages from the pedal 608, so that the two third elastic members 605 are reset and drive The two second sliders 602 slide forward and reset on the second fixed seat 601, and the two second sliders 602 slide forward and drive the two first top plates 609 to move forward and reset. The two first top plates 609 move forward and drive the pedal plate 608 to move upward. The pedal plate 608 moves upward and drives the two third sliders 607 to slide upward and reset on the rear side of the adjacent third fixed seat 606. The pedal plate 608 moves upward and drives the top rod 30 to move upward and reset, so that the fifth elastic member 29 is reset and drives the third guide rod 26, the fourth slider 27 and the second baffle 28 to move in the opposite directions and reset.

[0044] like Fig.12 As shown, it also includes a second protective cover 31, a second fixing ring 32, a second servo motor 33, a fifth rotating shaft 34 and a vortex plate 35. The second protective cover 31 is arranged outside the filter drum 4, and the second fixing ring 32 is arranged inside the second protective cover 31. The second servo motor 33 is arranged on the inner ring of the two second fixing rings 32. The second servo motor 33 can provide a power source. The top end of the output shaft of the second servo motor 33 is arranged with a fifth rotating shaft 34 through a coupling. The top end of the fifth rotating shaft 34 is arranged with a vortex plate 35. The vortex plate 35 is inside the filter drum 4.

[0045] The staff starts the second servo motor 33, and controls the output shaft of the second servo motor 33 to rotate. The rotation of the output shaft of the second servo motor 33 drives the fifth shaft 34 to rotate, and the rotation of the fifth shaft 34 drives the vortex plate 35 to rotate. Then the staff pours the sewage into the filter box 2 for filtration. The vortex generated when the vortex plate 35 rotates can accelerate the filtration of the sewage by the filter barrel 4. When the vortex plate 35 rotates, it can also make the residue remaining in the evenly spaced circular holes in the lower part of the filter barrel 4 float out, which is convenient for the staff to deal with the residue after purification. After completing the sewage filtration, the staff turns off the second servo motor 33, and the second protective cover 31 can protect the second servo motor 33.

[0046] Although the present disclosure has been described with respect to only a limited number of embodiments, those skilled in the art having benefit of this disclosure will appreciate that various other embodiments can be devised without departing from the scope of the present invention. Accordingly, the scope of the present invention should be limited only by the appended claims.

Claims

1. A construction site sewage filtering and purification device, characterized in that it includes: A support frame (1), a filter box (2), a first slider (3), a filter barrel (4), a disassembly component (5) and a water discharge component (6) are provided. The filter box (2) is provided at the upper part of the support frame (1). The first sliders (3) are slidably provided at the upper parts of the front and rear sides of the filter box (2). A filter barrel (4) is welded between the two first sliders (3). The filter barrel (4) is capable of filtering sewage. Round holes are evenly spaced at the lower part of the filter barrel (4). A disassembly component (5) capable of disassembling the filter barrel (4) is provided on the filter box (2). A water discharge component (6) capable of draining water is provided at the lower part of the support frame (1). The disassembly assembly (5) comprises a first fixing seat (501), an L-shaped plate (502), a handle (503), a mounting rod (504), a fixing block (505), a first rotating shaft (506), a clamping plate (507), a first elastic member (508), a first guide rod (509), a top block (5010), and a second elastic member (5011). The first fixing seats (501) are welded to the upper parts of the left and right sides of the filter box (2). The L-shaped plates (502) are welded to the top of the filter drum (4) symmetrically. The handles (503) are welded between the front and rear sides of the two L-shaped plates (502). The mounting rods (504) are arranged on the sides of the bottoms of the two L-shaped plates (502) away from each other. The mounting rods (504) are connected to the first fixing seat (501). 1) Sliding fit, the lower parts of the front and rear sides of the two mounting rods (504) are each provided with a fixing block (505), the four fixing blocks (505) are each provided with a first rotating shaft (506), the middle parts of the four first rotating shafts (506) are each rotatably provided with a clamping plate (507), the lower parts of the two mounting rods (504) are each connected with two adjacent clamping plates (507) with a first elastic member (508), the lower parts of the front and rear sides of the two first fixing seats (501) are each slidably provided with a first guide rod (509), the adjacent ends of the two adjacent first guide rods (509) are each welded with a top block (5010), and the two first fixing seats (501) are each connected with the two adjacent first guide rods (509) with a second elastic member (5011); The water discharge assembly (6) comprises a second fixed seat (601), a second slider (602), a first baffle (603), a second guide rod (604), a third elastic member (605), a third fixed seat (606), a third slider (607), a stepping plate (608) and a first top plate (609). The second fixed seats (601) are welded to the lower parts of the left and right sides of the support frame (1). The front sides of the two second fixed seats (601) are slidably provided with second sliders (602). The first baffle (603) is provided between the two second sliders (602). A circular through hole is provided on the front side of the top of the first baffle (603). When the first baffle (603) moves backward, the filter box (2) is located directly above the circular through hole on the front side of the top of the first baffle (603). The two second A second guide rod (604) is arranged between the front and rear sides of the fixing seat (601), the two second guide rods (604) are slidably inserted into the adjacent second sliders (602), the two second fixing seats (601) are connected to the adjacent second sliders (602) with a third elastic member (605), a third fixing seat (606) is symmetrically welded to the front side of the bottom of the support frame (1), a third slider (607) is slidably arranged on the upper part of the rear side of the two third fixing seats (606), a stepping plate (608) is welded between the rear side walls of the two third sliders (607), and a first top plate (609) is symmetrically arranged on the rear side of the stepping plate (608), and the downward sliding of the stepping plate (608) drives the first top plate (609) to move downward to contact and cooperate with the second slider (602).

2. A construction site sewage filtering and purification device according to claim 1, characterized in that: The support frame (1) further comprises a material storage box (7), a one-way valve (8), a second top plate (9), a fourth elastic member (10), a material delivery pipe (11), a second rotating shaft (12), a material storage block (13), a fourth fixed seat (14), a third rotating shaft (15), a first shifting block (16) and a bevel gear (17). The material storage box (7) is welded to the front side of the upper part of the support frame (1), a one-way valve (8) is welded to the upper part of the front side of the material storage box (7), a second top plate (9) is slidably arranged in the material storage box (7), a fourth elastic member (10) is connected between the bottom of the material storage box (7) and the bottom end surface of the second top plate (9), a material delivery pipe (11) is connected to the upper part of the rear side of the material storage box (7), and the material delivery pipe (11) is connected to the filter box (2). A second rotating shaft (12) is rotatably arranged in the material conveying pipe (11), a material storage block (13) is arranged in the middle of the second rotating shaft (12), the material storage block (13) is located in the material conveying pipe (11), and four semicircular grooves are evenly spaced on the edge of the material storage block (13), a fourth fixed seat (14) is arranged in the middle of the front side of the filter box (2), a third rotating shaft (15) is rotatably arranged on the fourth fixed seat (14), the third rotating shaft (15) is rotatably connected to the fourth fixed seat (14), a first shifting block (16) is welded to the rear end of the third rotating shaft (15), and a bevel gear (17) is arranged at one end of the third rotating shaft (15) close to the second rotating shaft (12), and the two bevel gears (17) are meshed with each other.

3. A construction site sewage filtering and purification device according to claim 2, characterized in that: The invention also comprises a fifth fixing seat (18), a first protective cover (19), a first fixing ring (20), a first servo motor (21), a fourth rotating shaft (22), a mounting plate (23), a stirring rod (24) and a second shifting block (25). The fifth fixing seat (18) is welded to the lower part of the filter box (2). The first protective cover (19) is arranged in the fifth fixing seat (18). The first fixing ring (20) is arranged in the first protective cover (19). The first servo motor (21) is arranged in the inner ring of the two first fixing rings (20). The first servo motor (21) can provide a power source. The fourth rotating shaft (22) is arranged at the bottom end of the output shaft of the first servo motor (21) through a coupling. The second shifting block (25) is arranged at the bottom of the fourth rotating shaft (22). The second shifting block (25) is connected to the filter box (2) in a sliding manner. The mounting plate (23) is welded to the bottom end of the fourth rotating shaft (22). Eight stirring rods (24) are welded at the bottom of the mounting plate (23) at even intervals.

4. A construction site sewage filtering and purification device according to claim 3, characterized in that: The invention also comprises a third guide rod (26), a fourth slider (27), a second baffle plate (28), a fifth elastic member (29) and a push rod (30). The second baffle plates (28) are slidably arranged on the rear sides of the left and right side walls of the storage box (7). The second baffle plates (28) can block the liquid polyaluminium chloride. The second baffle plates (28) are arranged in front and behind the two second baffle plates (28). The third guide rod (26) is arranged on the opposite side of the two fourth sliders (27). The two third guide rods (26) are slidably penetrate the storage box (7). The fifth elastic member (29) is connected between the two fourth sliders (27) and the storage box (7). Push rods (30) are welded on the left and right sides of the step plate (608). The step plate (608) moves downward to drive the two push rods (30) to move downward and contact the two second baffle plates (28).

5. A construction site sewage filtering and purification device according to claim 4, characterized in that: The invention also comprises a second protective cover (31), a second fixing ring (32), a second servo motor (33), a fifth rotating shaft (34) and a vortex plate (35); the second protective cover (31) is arranged outside the filter drum (4); the second fixing ring (32) is arranged inside the second protective cover (31); the second servo motor (33) is arranged inside the two second fixing rings (32); the second servo motor (33) can provide a power source; the fifth rotating shaft (34) is arranged at the top end of the output shaft of the second servo motor (33) via a coupling; the vortex plate (35) is arranged at the top end of the fifth rotating shaft (34); and the vortex plate (35) is located inside the filter drum (4).

6. A construction site sewage filtering and purification device according to claim 1, characterized in that: A layer of anti-slip pad is provided on the handle (503).

Citation Information

Patent Citations

  • Large-particle solid-liquid separation device for sewage treatment

    CN114377446A

  • Full-automatic intelligent sewage treatment equipment and treatment process thereof

    CN114409123A