Coal distribution, storage and feeding method, device, equipment and medium for improving boiler flexibility
By predicting the electricity load and coal quality parameters and adjusting the coal delivery strategy of the boiler, the problem of low load and unstable combustion of the boiler is solved, the combustion stability and efficiency are improved, and the flexibility of the boiler is enhanced.
Patent Information
- Application Number
- CN202211153430.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-21
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-09-21
AI Technical Summary
Boilers are prone to unstable combustion under low load operating conditions, which affects flexibility and efficiency. The poor matching of coal quality and combustion characteristics lead to unstable combustion.
By obtaining the historical electricity load and coal quality parameters of the boiler, using the pre-trained electricity load cycle prediction model and the boiler optimal combustion strategy coupling model, the target optimal combustion status is determined, and the coal delivery and storage are adjusted according to the real-time combustion status is adjusted according to the real-time combustion status. Strategy to match coal quality and electricity load and optimize combustion.
It improves the combustion stability and efficiency of the boiler, ensures the optimal combustion performance under different loads and coal quality conditions, and enhances the flexibility and responsiveness of the boiler.
Smart Images

Figure CN115685898B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of boiler combustion control, and in particular to a method, device, equipment and medium for transporting, distributing and storing coal for improving boiler flexibility. Background Art
[0002] For coal-fired power plants, under the current requirements of environmental protection and energy conservation, new energy sources such as solar energy and wind energy are largely connected to the grid for consumption, and the proportion of new energy in the grid is increasing day by day. However, new energy sources are highly volatile and intermittent, and do not have peak-shaving characteristics. Thermal power is currently the only flexible resource that can achieve large-scale economic deep and rapid deep peak-shaving, but during the flexible peak-shaving process of the unit, the unit will often be in a low-load operation state. In this state, the amount of pulverized coal entering the boiler furnace is reduced, the furnace temperature is reduced, and the boiler is prone to unstable combustion at low load.
[0003] At present, coal-fired power is facing the characteristics of flexibility, economy, safety and environmental protection. Boiler flexibility is a major demand of the industry and the country, and intelligent coal-fired power generation is an inevitable trend of coal-fired power generation. Flexible thermal power requires stable combustion of boilers at low loads and rapid dynamic response combustion of boilers under variable loads. From the coal yard to the boiler, coal undergoes processes such as coal loading, coal blending, and combustion. The combustion efficiency and stable operation of the boiler in a coal-fired power plant are directly related to the quality of the coal and its combustion characteristics. The time and space matching of the fuel system and the combustion system is difficult, which seriously restricts the flexibility of the boiler. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a method, device, equipment and medium for transporting, distributing and storing coal that can improve the flexibility of the boiler, aiming to solve at least one of the above-mentioned technical problems.
[0005] The technical solution of the present invention to solve the above technical problems is as follows: a method for transporting, distributing and storing coal to improve the flexibility of boilers, the method comprising:
[0006] Obtain the historical power load of the boiler, and predict the predicted power load corresponding to the set time period based on the historical power load and the pre-trained power load cycle prediction model;
[0007] Acquiring coal quality related parameters of the coal powder, and determining the current coal quality of the coal powder entering the furnace according to the coal quality related parameters;
[0008] According to the predicted power load and the current coal quality entering the furnace, the target optimal combustion condition of the boiler is determined by a pre-trained boiler optimal combustion strategy coupling model, wherein the boiler optimal combustion strategy coupling model is obtained by training based on different power loads, different coal qualities and different optimal combustion conditions;
[0009] Determining the real-time combustion status of the boiler according to the predicted power load and the current coal quality entering the boiler;
[0010] According to the real-time combustion conditions and the target optimal combustion conditions, the current coal transportation, distribution, storage and supply strategy is adjusted so that the adjusted coal quality and electricity load match the target optimal combustion conditions. The current coal transportation, distribution, storage and supply strategy includes at least one of the current coal transportation strategy, the current coal blending strategy, the current coal storage strategy and the current coal supply strategy.
[0011] The beneficial effects of the present invention are as follows: in the present application scheme, the real-time combustion condition of the boiler is determined based on the predicted power load of the boiler and the current coal quality entering the boiler. According to the target optimal combustion condition and the real-time combustion condition of the boiler, the current coal distribution and storage strategy is adjusted to optimize combustion and improve combustion stability and combustion efficiency.
[0012] Based on the above technical solution, the present invention can also be improved as follows.
[0013] Furthermore, the above-mentioned adjusting the current coal transportation, distribution, storage and supply strategy according to the real-time combustion status and the target optimal combustion status includes:
[0014] When the real-time combustion condition does not match the target optimal combustion condition, the target coal quality and target electricity load corresponding to the target optimal combustion condition are determined, and the current coal transportation, distribution, storage and supply strategy is adjusted according to the target coal quality and target electricity load.
[0015] The beneficial effect of adopting the above further scheme is that when the real-time combustion condition does not match the target optimal combustion condition, the target coal quality and target power load can be used as the basis for adjustment to adjust the coal quality and coal quantity to improve combustion stability and combustion efficiency.
[0016] Furthermore, the method further comprises:
[0017] Obtaining the combustion parameters of the pulverized coal over a period of time through a coal dynamic visualization monitoring system;
[0018] The above-mentioned method of determining the current coal quality of the pulverized coal entering the furnace according to the coal quality related parameters includes:
[0019] The current coal quality of the pulverized coal entering the furnace is determined according to the combustion parameters and the coal quality related parameters.
[0020] The beneficial effect of adopting the above further scheme is that when determining the current coal quality entering the furnace, not only the coal quality related parameters are taken into account, but also the combustion parameters corresponding to the coal powder of this coal quality during combustion are taken into account, which can make the current coal quality entering the furnace more accurately determined.
[0021] Furthermore, the coal quality related parameters include coal powder volatilization, coal powder ash content and coal powder water content. According to the coal quality related parameters, the combustion parameters include combustion calorific value, combustion rate, burnout temperature, fly ash carbon content and combustion pollutant generation.
[0022] The beneficial effect of adopting the above further scheme is that various coal quality related parameters and different combustion parameters are fully considered, which further makes the current coal quality entering the furnace determined more accurately.
[0023] Furthermore, the above-mentioned boiler optimal combustion strategy coupling model includes a first database and a second database, wherein the first database includes the correspondence between different power loads, different coal qualities and different optimal combustion characteristics, and the second database includes the correspondence between different optimal combustion characteristics and different optimal combustion conditions;
[0024] The above-mentioned method determines the target optimal combustion condition according to the predicted power load and the current coal quality entering the furnace through the pre-trained boiler optimal combustion strategy coupling model, including:
[0025] According to the predicted power load and the current coal quality entering the furnace, the target optimal combustion characteristics of the boiler are determined through the first database;
[0026] According to the target optimal combustion characteristics, the target optimal combustion state of the boiler is determined through the second database.
[0027] The beneficial effect of adopting the above-mentioned further scheme is that the first database and the second database are established in advance. In the process of determining the target optimal combustion condition, based on the first database and the second database, the influence of the power load and the current coal quality entering the furnace on the combustion characteristics, and the influence of the combustion characteristics on the combustion condition can be taken into account, so that the determined target optimal combustion condition can be more accurate.
[0028] Furthermore, the method further comprises:
[0029] If the real-time combustion condition matches the target optimal combustion condition, the predicted power load, the current coal quality entering the furnace and the target optimal combustion characteristics are stored in the first database.
[0030] The beneficial effect of adopting the above further scheme is that if the real-time combustion condition matches the target optimal combustion condition, it means that the real-time combustion condition at this time is the optimal combustion condition, and the predicted power load, the current coal quality entering the furnace and the target optimal combustion characteristic data can be stored in the first database for updating the boiler optimal combustion strategy coupling model.
[0031] Furthermore, the above-mentioned acquisition of the coal quality related parameters of the coal powder includes:
[0032] The coal quality related parameters of the coal powder are obtained through the Raman coal quality online monitoring system.
[0033] The beneficial effect of adopting the above further scheme is that the coal quality in the coal yard can be monitored in real time by the online monitoring device of the Raman coal quality online monitoring system, and real-time high-precision measurement of all coal components can be achieved.
[0034] In a second aspect, in order to solve the above technical problems, the present invention also provides a coal distribution storage device for improving the flexibility of the boiler, the device comprising:
[0035] The power load prediction module is used to obtain the historical power load of the boiler and predict the predicted power load corresponding to the set time period based on the historical power load and the pre-trained power load cycle prediction model;
[0036] A coal quality determination module, used for obtaining coal quality related parameters of the coal powder, and determining the current coal quality of the coal powder entering the furnace according to the coal quality related parameters;
[0037] a target optimal combustion condition determination module, for determining the target optimal combustion condition of the boiler according to the predicted power load and the current coal quality entering the furnace, through a pre-trained boiler optimal combustion strategy coupling model, wherein the boiler optimal combustion strategy coupling model is obtained by training based on different power loads, different coal qualities and different optimal combustion conditions;
[0038] A real-time combustion status determination module, used to determine the real-time combustion status of the boiler according to the predicted power load and the current coal quality entering the furnace;
[0039] An adjustment module is used to adjust the current coal transportation, distribution, storage and supply strategy according to the real-time combustion condition and the target optimal combustion condition so that the adjusted coal quality and power load match the target optimal combustion condition, and the current coal transportation, distribution, storage and supply strategy includes at least one of the current coal transportation strategy, the current coal blending strategy, the current coal storage strategy and the current coal supply strategy.
[0040] In the third aspect, in order to solve the above-mentioned technical problems, the present invention also provides an electronic device, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, a method of coal distribution and storage for improving boiler flexibility of the present application is implemented.
[0041] In a fourth aspect, in order to solve the above-mentioned technical problem, the present invention further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, a method of coal distribution, storage and supply for improving boiler flexibility is implemented in the present application.
[0042] Additional aspects and advantages of the present application will be partially given in the following description, which will become apparent from the following description, or will be understood through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for describing the embodiments of the present invention are briefly introduced below.
[0044] Figure 1 A schematic flow chart of a method for transporting, distributing and storing coal to improve boiler flexibility provided by one embodiment of the present invention;
[0045] Figure 2 A structural block diagram of a method for transporting, distributing, storing and supplying coal to improve boiler flexibility provided by an embodiment of the present invention;
[0046] Figure 3 A structural block diagram of a load forecasting module provided by an embodiment of the present invention;
[0047] Figure 4 A structural block diagram of a coal quality-load-combustion strategy association module provided by an embodiment of the present invention;
[0048] Figure 5 A structural block diagram of a coal flow and coal quality detection module provided by an embodiment of the present invention;
[0049] Figure 6 A structural block diagram of a coal distribution and storage strategy generation module provided by an embodiment of the present invention;
[0050] Figure 7 A schematic diagram of power load prediction for the next 24 hours provided by an embodiment of the present invention;
[0051] Figure 8 A schematic diagram of the coal quality of each coal seam in each coal bunker provided by an embodiment of the present invention;
[0052] Fig. 9 A schematic diagram of the structure of a coal distribution and storage device for improving boiler flexibility provided by an embodiment of the present invention;
[0053] Fig.10 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0054] The principles and features of the present invention are described below. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0055] The technical solution of the present invention and how the technical solution of the present invention solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present invention will be described below in conjunction with the accompanying drawings.
[0056] The solution provided by the embodiment of the present invention can be applied to any application scenario where coal needs to be transported, distributed and stored to the boiler. The solution provided by the embodiment of the present invention can be executed by any electronic device, for example, it can be a user's terminal device, including at least one of the following: a smart phone, a tablet computer, a laptop computer, a desktop computer, a smart speaker, a smart watch, a smart TV, and a smart car device.
[0057] The embodiment of the present invention provides a possible implementation method, such as Figure 1 As shown, a flow chart of a method for transporting, distributing, storing and supplying coal to improve boiler flexibility is provided. The scheme can be executed by any electronic device, for example, a terminal device, or a terminal device and a server. For the convenience of description, the method provided by the embodiment of the present invention will be described below by taking the terminal device as the execution subject as an example. Figure 1 The method may include the following steps:
[0058] Step S110, obtaining the historical power load of the boiler, and predicting the predicted power load corresponding to the set time period according to the historical power load and the pre-trained power load cycle prediction model;
[0059] Step S120, obtaining the coal quality related parameters of the pulverized coal, and determining the current coal quality of the pulverized coal entering the furnace according to the coal quality related parameters;
[0060] Step S130, determining the target optimal combustion state of the boiler through a pre-trained boiler optimal combustion strategy coupling model according to the predicted power load and the current coal quality entering the furnace, wherein the boiler optimal combustion strategy coupling model is obtained through training based on different power loads, different coal qualities and different optimal combustion states;
[0061] Step S140, determining the real-time combustion status of the boiler according to the predicted power load and the current coal quality entering the boiler;
[0062] Step S150, according to the real-time combustion condition and the target optimal combustion condition, adjust the current coal transportation, distribution, storage and supply strategy so that the adjusted coal quality and power load match the target optimal combustion condition, and the current coal transportation, distribution, storage and supply strategy includes at least one of the current coal transportation strategy, the current coal blending strategy, the current coal storage strategy and the current coal supply strategy.
[0063] Through the method of the present invention, the real-time combustion condition of the boiler is determined based on the predicted power load of the boiler and the current coal quality entering the boiler. According to the target optimal combustion condition and the real-time combustion condition of the boiler, the current coal transportation, distribution, storage and supply strategy is adjusted to optimize combustion and improve combustion stability and combustion efficiency.
[0064] The scheme of the present invention is further described below in conjunction with the following specific embodiments. In this embodiment, before describing the method for transporting, distributing and storing coal to improve the flexibility of the boiler, first, see Figures 2 to 4 , pre-trained electricity load cycle prediction model and boiler optimal combustion strategy coupling model, where the input of the electricity load cycle prediction model is the historical electricity load data of the boiler, and the output is the predicted electricity load, and the input of the boiler optimal combustion strategy coupling model is the electricity load and coal quality, and the output is the optimal combustion condition corresponding to the electricity load and coal quality, that is, the target optimal combustion condition.
[0065] Among them, see Figure 3 The electricity load cycle prediction model can be determined based on historical electricity load data, and the historical electricity load data can be stored in a historical electricity load database. The electricity load in the next 24 hours can be predicted based on the electricity load cycle prediction model. During the training process of the electricity load cycle prediction model, the data in the electricity load database can come from the DCS system. The electricity load database can include the actual dispatching load in each historical period. The model is trained based on the data in the electricity load database. The predicted real-time electricity load output by the model is compared with the actual dispatching load to determine the first loss value. When the first loss value meets the training end condition, that is, when the error requirement is met, the trained electricity load cycle prediction model can be obtained. The predicted electricity load obtained by the model can be used to adjust the transmission, distribution, storage and coal supply strategy, that is, the predicted electricity load is input into the transmission, distribution, storage and coal supply controller, and the coal quality and coal quantity entering the furnace are adjusted by the transmission, distribution, storage and coal supply controller, that is, Figure 3 The real-time optimization, control and adjustment of the coal flow and coal quality of the furnace are shown in . If the first loss value does not meet the training end condition, that is, does not meet the error requirement, the model parameters can be adjusted, and the model can be feedback optimized based on the adjusted model parameters until the first loss value meets the training end condition.
[0066] Among them, see Figure 2 and Figure 4 The boiler optimal combustion strategy coupling model is obtained by training the optimal combustion conditions under different power loads and different coal qualities. The training process is the same as the principle of the power load cycle prediction model mentioned above, so it will not be repeated here. Figure 2 The dispatch load shown), different coal qualities ( Figure 2 The optimal combustion characteristics under the coal quality shown in Figure 2 The boiler combustion characteristics shown in ) are used to build a coal quality-load-boiler combustion characteristics association database, which may also be referred to as the first database below. The optimal combustion strategy coupling model is obtained based on the data training in the first database, that is, Figure 2 and Figure 4 The coupled model of optimal combustion strategy based on coal quality and load is shown in .
[0067] In the process of training the boiler optimal combustion strategy coupling model, a coal quality database composed of different coal qualities, a power grid dispatching load database composed of different power loads, and a coal quality-load-boiler combustion characteristics correlation database with optimal combustion characteristics are involved. The data in the above databases can all be obtained from the DCS system.
[0068] After establishing the above two models, the coal distribution and storage method for improving boiler flexibility provided in this embodiment is described. The method may include the following steps:
[0069] Step S110, obtaining the historical power load of the boiler, and predicting the predicted power load corresponding to the set time period based on the historical power load and the pre-trained power load cycle prediction model.
[0070] The power load cycle prediction model obtained by the above training can be used to preset the predicted power load corresponding to the set time period. The set time period can be 24 hours after the current time or the next 24 hours. The historical power load refers to the power load for a period of time before the current time.
[0071] Step S120, obtaining the coal quality related parameters of the pulverized coal, and determining the current coal quality of the pulverized coal entering the furnace according to the coal quality related parameters.
[0072] Among them, see Figure 5 The above coal quality related parameters can be obtained through the Raman coal quality online monitoring system. The Raman coal quality online monitoring system is used for online monitoring devices to monitor the coal quality of the coal yard in real time, realize real-time high-precision measurement of all coal components, and transmit the coal quality related parameters to the DCS operating system in real time for reference by operators, so as to realize online dynamic visualization of the coal quality of the power plant. The above coal quality related parameters include but are not limited to the pulverized coal volatilization, pulverized coal ash content and pulverized coal water content.
[0073] Optionally, the specific implementation process of obtaining coal quality related parameters through the Raman coal quality online monitoring system is: the Raman spectrometer generates a Raman spectrum of the raw coal on the coal conveyor belt, and analyzes the Raman spectrum of the raw coal, and generates Raman spectrum characteristic parameters of the raw coal. Based on the above Raman spectrum and Raman spectrum characteristic parameters of the raw coal, the real-time coal quality of the raw coal on the coal conveyor belt, that is, the current coal quality entering the furnace, is obtained through a coal quality prediction model.
[0074] Optionally, the method further includes: obtaining the combustion parameters of the pulverized coal within a period of time through a coal dynamic visualization monitoring system; then the above step S120, determining the current quality of the pulverized coal entering the furnace according to the coal quality related parameters, includes:
[0075] The current coal quality of the pulverized coal entering the furnace is determined according to the combustion parameters and the coal quality related parameters.
[0076] Among them, the coal flow dynamic visualization monitoring system is based on the Raman coal quality online monitoring system, and is combined with the coal flow dynamic visualization monitoring system based on the radio frequency Internet of Things to realize the online real-time monitoring of the coal quantity of multiple coal bunkers and coal types in the boiler and the coal quality of the coal seam, wherein the combustion parameters include but are not limited to the combustion calorific value, combustion rate, burnout temperature, fly ash carbon content and combustion pollutant generation; the coal flow dynamic visualization monitoring system can realize the tracking of coal of known coal quality. Based on the combustion parameters and the coal quality related parameters, the periodic change characteristics of the coal flow and coal quality can be analyzed, and then the coal flow and the coal quality of each coal bunker layer can be analyzed according to the periodic change characteristics of the coal flow and coal quality, and the current coal quality entering the furnace can be determined according to the coal flow and the coal quality of each coal bunker layer.
[0077] Step S130, according to the predicted power load and the current coal quality entering the furnace, the target optimal combustion condition of the boiler is determined through a pre-trained boiler optimal combustion strategy coupling model, wherein the boiler optimal combustion strategy coupling model is trained based on different power loads, different coal qualities and different optimal combustion conditions.
[0078] Optionally, the above-mentioned boiler optimal combustion strategy coupling model includes a first database and a second database, the above-mentioned first database includes the corresponding relationship between different power loads, different coal qualities and different optimal combustion characteristics, and the above-mentioned second database includes the corresponding relationship between different optimal combustion characteristics and different optimal combustion conditions;
[0079] The above-mentioned method of determining the target optimal combustion state of the boiler according to the predicted power load and the current coal quality entering the furnace through the pre-trained boiler optimal combustion strategy coupling model includes:
[0080] According to the predicted power load and the current coal quality entering the furnace, the target optimal combustion characteristics of the boiler are determined through the first database;
[0081] According to the target optimal combustion characteristics, the target optimal combustion state of the boiler is determined through the second database, that is, the output of the boiler optimal combustion strategy coupling model is the target optimal combustion state of the boiler. For details, see Figure 2 Schematic diagram of the training process of the boiler optimal combustion strategy coupling model shown.
[0082] Step S140, determining the real-time combustion status of the boiler according to the predicted power load and the current coal quality entering the boiler;
[0083] Step S150, according to the real-time combustion condition and the target optimal combustion condition, adjust the current coal transportation, distribution, storage and supply strategy so that the adjusted coal quality and power load match the target optimal combustion condition, and the current coal transportation, distribution, storage and supply strategy includes at least one of the current coal transportation strategy, the current coal blending strategy, the current coal storage strategy and the current coal supply strategy.
[0084] See also Figure 6 , the coal distribution and storage strategy generation module determines the real-time combustion status of the boiler according to the optimal combustion coupling strategy model based on coal flow and coal quality. That is, after determining the target optimal combustion status of the boiler, the best matching scheme corresponding to the predicted power load and the current coal quality entering the furnace can be matched, that is, the optimal combustion strategy under the conditions of predicted power load and the current coal quality entering the furnace. Based on the optimal combustion strategy, the current coal distribution and storage strategy is guided. Specifically, the above-mentioned adjustment of the current coal distribution and storage strategy according to the real-time combustion status and the target optimal combustion status includes:
[0085] When the real-time combustion condition does not match the target optimal combustion condition, the target coal quality and target electricity load corresponding to the target optimal combustion condition are determined, and the current coal transportation, distribution, storage and supply strategy is adjusted according to the target coal quality and target electricity load.
[0086] Among them, the real-time combustion status refers to the combustion status corresponding to the current distribution and storage coal supply strategy, and the target optimal combustion status refers to the combustion status corresponding to the optimal combustion strategy. The optimal combustion strategy mainly refers to the optimal combustion of the boiler under a certain coal quality and coal quantity conditions under known scheduling conditions. This strategy is mainly reflected in the coal quality adjustment and coal quantity adjustment made for different scheduling loads (electricity load). In other words, based on the target coal quality and target electricity load, through Figure 2 The coal supply controller shown in the figure adjusts the coal quality and coal quantity corresponding to the current coal supply strategy ( Figure 2 ). Specifically, the raw coal grabbing device or coal conveyor belt of the coal yard can be controlled according to the coal distribution and storage control strategy information (e.g., target coal quality and target power load) through the coal distribution and storage controller to adjust the coal quality of each coal bunker and each coal seam. After adjusting the current coal quality entering the furnace, the real-time coal flow and the coal quality of each coal bunker and each coal seam can be optimized according to the adjusted coal quality entering the furnace, that is, the coal quality of the transported coal is updated in real time, and the influence of the current coal quality entering the furnace on the combustion condition is continuously judged based on the updated coal quality during the coal burning process in the boiler.
[0087] If the real-time combustion condition matches the target optimal combustion condition, the predicted power load, the current coal quality entering the furnace and the target optimal combustion characteristics are stored in the first database for updating the first database. This processing process corresponds to Figure 2 The furnace combustion shown in is imported into DCS to enrich the coal quality-load-combustion characteristic association database, and the boiler optimal combustion strategy coupling model can also be updated according to the first database.
[0088] It should be noted that, when adjusting the current coal transportation, distribution, storage and coal feeding strategy according to the real-time combustion condition and the target optimal combustion condition, the coal transportation strategy for adjusting the current coal transportation strategy, the coal blending strategy for adjusting the current coal blending strategy, the coal storage strategy for adjusting the current coal storage strategy and the coal feeding strategy for adjusting the current coal feeding strategy can be first determined according to the real-time combustion condition and the target optimal combustion condition, and then the current coal transportation strategy, the current coal blending strategy, the current coal storage strategy and the current coal feeding strategy can be adjusted respectively through the coal transportation and distribution controller.
[0089] The above step S110, the construction of the historical power load database and the power load cycle prediction model can be Figure 2 The load prediction module in the embodiment is realized by high-precision measurement of all components of the above coal, and the periodic change characteristics of coal flow and coal quality and the coal quality of each coal bunker and coal seam are obtained in real time; the above step S120 can be Figure 2 The coal flow and coal quality detection module in the above step S130, the training of the optimal combustion coupling strategy model, and the construction of the coal quality-load-combustion characteristic database can be achieved by Figure 2 The coal quality-load-combustion strategy association module in the embodiment of the present invention can be realized by Figure 2 The coal distribution, storage and supply strategy generation module shown in the figure is implemented, that is, the target optimal combustion condition of the boiler is judged according to the optimal combustion coupling strategy model based on coal flow and coal quality, and the coal distribution, storage and supply strategy is generated to guide and control the coal flow and coal quality detection module to optimize the adjustment of coal distribution, storage and supply.
[0090] The load prediction module, coal flow and coal quality detection module, coal quality-load-combustion strategy association module and coal distribution and storage strategy generation module mentioned above maintain real-time dynamic optimization and adjustment during system operation.
[0091] The power load cycle prediction model and the optimal combustion coupling strategy model based on coal quality and load are constructed through the power load database and the coal quality-load-combustion characteristic association database. The Raman spectroscopy coal quality online monitoring system is coupled with the coal flow dynamic visualization monitoring system based on the radio frequency Internet of Things to realize the online real-time monitoring of the amount of each type of coal in the boiler's multiple coal bunkers and the coal quality of the coal seams, and the dynamic visualization of the entire process of coal transportation, distribution, storage and supply in the power plant. The system generates coal transportation, coal blending and coal storage plans based on the amount of each type of coal in the multiple coal bunkers and the coal quality of the coal seams, and combines the real-time load-real-time coal flow and coal quality of the furnace to generate a coal supply strategy that matches the optimal combustion of the boiler. By judging the combustion status of the boiler, the coal transportation and distribution controller is guided to control the coal transportation, distribution, storage and supply adjustment of the coal flow and coal quality detection module to optimize combustion.
[0092] In order to better illustrate and understand the principle of the method provided by the present invention, the scheme of the present invention is described below in conjunction with an optional specific embodiment. It should be noted that the specific implementation of each step in the specific embodiment should not be understood as a limitation to the scheme of the present invention. On the basis of the principle of the scheme provided by the present invention, other implementations that can be thought of by those skilled in the art should also be considered within the scope of protection of the present invention.
[0093] As an example, a 600MW unit in Hubei Province is taken as a research object to further illustrate a method and system for transporting, distributing, storing and supplying coal suitable for low-load stable combustion provided by the present invention.
[0094] The DCS system exports the historical power load database, builds a power load cycle prediction model based on the historical power load database, and predicts the power load in the next 24 hours. The power load prediction for the next 24 hours is as follows: Figure 7 The coal in the coal yard is conveyed to the pulverizing system by a belt. The belt is equipped with a Raman coal quality online detection device and a coal flow dynamic visualization detection system. The coal quality data of each coal bunker and each coal seam are as follows: Figure 8 As shown, through Figure 8 The various types of coal contained in each of coal bunkers 1, 2, 3 and 4 are displayed. The coal quality information of the above 8 types of coal is shown in Table 1.
[0095] Table 1 Coal types and qualities in coal bunkers
[0096]
[0097]
[0098] The system formulates the optimal combustion strategy for boilers in the next 24 hours based on the coal quality-load-boiler combustion characteristics association database based on the optimal combustion characteristics, the 24-hour predicted power load, and the coal quality of each coal bunker and coal seam. Based on the optimal combustion coupling strategy model based on coal quality and load, the optimal coal feeding method under any power load is ensured, and stable combustion of boilers at low loads and rapid dynamic response combustion of boilers under variable loads are achieved.
[0099] When the actual dispatching load is compared with the predicted power load and does not meet the error requirements, the actual power load will be fed back to optimize the power load cycle prediction model. If the error requirements are met, the coal distribution and storage controller will be guided to control the coal distribution. When the real-time load-real-time coal flow and coal quality entering the furnace cannot match the optimal combustion condition of the boiler, the system will generate a combustion optimization strategy, adjust the air door opening and generate a coal distribution and storage strategy to guide the coal distribution controller to control the coal flow and coal quality detection module's coal distribution and storage adjustment.
[0100] Based on Figure 1 Based on the same principle as the method shown in , the embodiment of the present invention also provides a coal distribution storage device 20 for improving the flexibility of the boiler, such as Fig. 9 As shown in , the coal distribution storage device 20 for improving boiler flexibility may include an electricity load prediction module 210, a coal quality determination module 220, a target optimal combustion condition determination module 230, a real-time combustion condition determination module 240 and an adjustment module 250, wherein:
[0101] The power load prediction module 210 is used to obtain the historical power load of the boiler and predict the predicted power load corresponding to the set time period based on the historical power load and the pre-trained power load cycle prediction model;
[0102] A coal quality determination module 220, configured to obtain coal quality related parameters of the pulverized coal, and determine the current coal quality of the pulverized coal entering the furnace according to the coal quality related parameters;
[0103] The target optimal combustion condition determination module 230 is used to determine the target optimal combustion condition of the boiler according to the predicted power load and the current coal quality entering the furnace through a pre-trained boiler optimal combustion strategy coupling model. The target optimal combustion condition determination module 230 said boiler optimal combustion strategy coupling model is obtained by training based on different power loads, different coal qualities and different optimal combustion conditions;
[0104] A real-time combustion status determination module 240 is used to determine the real-time combustion status of the boiler according to the predicted power load and the current coal quality entering the furnace;
[0105] The adjustment module 250 is used to adjust the current coal transportation, distribution, storage and supply strategy according to the real-time combustion condition and the target optimal combustion condition so that the adjusted coal quality and power load match the target optimal combustion condition. The current coal transportation, distribution, storage and supply strategy includes at least one of the current coal transportation strategy, the current coal blending strategy, the current coal storage strategy and the current coal supply strategy.
[0106] Optionally, when the adjustment module 250 adjusts the current coal distribution and storage strategy according to the real-time combustion status and the target optimal combustion status, it is specifically used to:
[0107] When the real-time combustion condition does not match the target optimal combustion condition, the target coal quality and target electricity load corresponding to the target optimal combustion condition are determined, and the current coal transportation, distribution, storage and supply strategy is adjusted according to the target coal quality and target electricity load.
[0108] Optionally, the device further comprises:
[0109] A combustion parameter determination module, used for obtaining the combustion parameters of the pulverized coal over a period of time through a coal dynamic visualization monitoring system;
[0110] The coal quality determination module 220 is specifically used to determine the current coal quality of the coal powder entering the furnace according to the coal quality related parameters:
[0111] According to the combustion parameters and the coal quality related parameters, the current coal quality of the coal powder entering the furnace is determined.
[0112] Optionally, the above-mentioned coal quality related parameters include coal powder volatilization, coal powder ash content and coal powder water content. According to the coal quality related parameters, the combustion parameters include combustion calorific value, combustion rate, burnout temperature, fly ash carbon content and combustion pollutant generation.
[0113] Optionally, the boiler optimal combustion strategy coupling model includes a first database and a second database, wherein the first database includes corresponding relationships between different power loads, different coal qualities and different optimal combustion characteristics, and the second database includes corresponding relationships between different optimal combustion characteristics and different optimal combustion conditions;
[0114] The above-mentioned target optimal combustion condition determination module 230 is specifically used to determine the target optimal combustion condition of the boiler according to the predicted power load and the current coal quality entering the furnace through the pre-trained boiler optimal combustion strategy coupling model:
[0115] According to the predicted power load and the current coal quality entering the furnace, the target optimal combustion characteristics of the boiler are determined through the first database;
[0116] According to the target optimal combustion characteristics, the target optimal combustion state of the boiler is determined through the second database.
[0117] Optionally, the device further comprises:
[0118] A data storage module is used to store the predicted power load, the current coal quality entering the furnace and the target optimal combustion characteristics into the first database when the real-time combustion status matches the target optimal combustion status.
[0119] Optionally, when acquiring the coal quality related parameters of the pulverized coal, the power load prediction module 210 is specifically used to:
[0120] The coal quality related parameters of the coal powder are obtained through the Raman coal quality online monitoring system.
[0121] The coal distribution, storage and supply device for improving boiler flexibility of the embodiment of the present invention can execute the coal distribution, storage and supply method for improving boiler flexibility provided by the embodiment of the present invention, and the implementation principle is similar. The actions performed by each module and unit in the coal distribution, storage and supply device for improving boiler flexibility in each embodiment of the present invention correspond to the steps in the coal distribution, storage and supply method for improving boiler flexibility in each embodiment of the present invention. For the detailed functional description of each module of the coal distribution, storage and supply device for improving boiler flexibility, please refer to the description in the corresponding coal distribution, storage and supply method for improving boiler flexibility shown in the previous text, and will not be repeated here.
[0122] Among them, the above-mentioned coal transportation, distribution, storage and feeding device for improving boiler flexibility can be a computer program (including program code) running in a computer device. For example, the coal transportation, distribution, storage and feeding device for improving boiler flexibility is an application software; the device can be used to execute the corresponding steps in the method provided in an embodiment of the present invention.
[0123] In some embodiments, the coal distribution, storage and feeding device for improving boiler flexibility provided in an embodiment of the present invention can be implemented in a combination of software and hardware. As an example, the coal distribution, storage and feeding device for improving boiler flexibility provided in an embodiment of the present invention can be a processor in the form of a hardware decoding processor, which is programmed to execute the coal distribution, storage and feeding method for improving boiler flexibility provided in an embodiment of the present invention. For example, the processor in the form of a hardware decoding processor can adopt one or more application specific integrated circuits (ASIC, Application Specific Integrated Circuit), DSP, programmable logic device (PLD, Programmable Logic Device), complex programmable logic device (CPLD, Complex Programmable Logic Device), field programmable gate array (FPGA, Field-Programmable Gate Array) or other electronic components.
[0124] In other embodiments, the coal distribution storage device for improving boiler flexibility provided by the embodiments of the present invention can be implemented in a software manner. Fig. 9 A coal distribution, storage and supply device for improving boiler flexibility stored in a memory is shown, which can be software in the form of programs and plug-ins, and includes a series of modules, including an electricity load prediction module 210, a coal quality determination module 220, a target optimal combustion condition determination module 230, a real-time combustion condition determination module 240 and an adjustment module 250, which are used to implement the coal distribution, storage and supply method for improving boiler flexibility provided in an embodiment of the present invention.
[0125] The modules involved in the embodiments of the present invention may be implemented by software or hardware, wherein the name of a module does not limit the module itself in some cases.
[0126] Based on the same principle as the method shown in the embodiments of the present invention, an electronic device is also provided in the embodiments of the present invention, which may include but is not limited to: a processor and a memory; the memory is used to store a computer program; the processor is used to execute the method shown in any embodiment of the present invention by calling the computer program.
[0127] In an alternative embodiment, an electronic device is provided, such as Fig.10 As shown, Fig.10The electronic device 4000 shown includes: a processor 4001 and a memory 4003. The processor 4001 and the memory 4003 are connected, such as through a bus 4002. Optionally, the electronic device 4000 may also include a transceiver 4004, which may be used for data interaction between the electronic device and other electronic devices, such as data transmission and / or data reception. It should be noted that in actual applications, the transceiver 4004 is not limited to one, and the structure of the electronic device 4000 does not constitute a limitation on the embodiments of the present invention.
[0128] Processor 4001 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of the present invention. Processor 4001 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0129] The bus 4002 may include a path to transmit information between the above components. The bus 4002 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 4002 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Fig.10 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0130] The memory 4003 can be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited to this.
[0131] The memory 4003 is used to store the application code (computer program) for executing the solution of the present invention, and the execution is controlled by the processor 4001. The processor 4001 is used to execute the application code stored in the memory 4003 to implement the content shown in the above method embodiment.
[0132] The electronic device may also be a terminal device. Fig.10 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.
[0133] An embodiment of the present invention provides a computer-readable storage medium, on which a computer program is stored. When the computer-readable storage medium is run on a computer, the computer can execute the corresponding contents of the aforementioned method embodiment.
[0134] According to another aspect of the present invention, a computer program product or a computer program is also provided, the computer program product or the computer program comprising computer instructions, the computer instructions being stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device executes the coal distribution and storage method for improving boiler flexibility provided in the implementation of the above-mentioned various embodiments.
[0135] Computer program code for performing the operations of the present invention may be written in one or more programming languages, or a combination thereof, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., through the Internet using an Internet service provider).
[0136] It should be understood that the flow charts and block diagrams in the accompanying drawings illustrate the possible implementation architecture, functions and operations of the method and computer program product according to various embodiments of the present invention. In this regard, each box in the flow chart or block diagram can represent a module, a program segment, or a part of a code, and the module, the program segment, or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a sequence different from that marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flow chart, and the combination of the boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0137] The computer-readable storage medium provided by the embodiment of the present invention may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination thereof. More specific examples of computer-readable storage media may include, but are not limited to, an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction execution system, device, or device.
[0138] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device executes the method shown in the above embodiment.
[0139] The above description is only a preferred embodiment of the present invention and an explanation of the technical principles used. Those skilled in the art should understand that the disclosure scope involved in the present invention is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in the present invention (but not limited to) by each other.
Claims
1. A method for transporting, distributing and storing coal to improve boiler flexibility, characterized in that: The following steps are involved: Obtain the historical power load of the boiler, and predict the predicted power load corresponding to the set time period based on the historical power load and the pre-trained power load cycle prediction model; Acquiring coal quality related parameters of the pulverized coal, and determining the current coal quality of the pulverized coal entering the furnace according to the coal quality related parameters; According to the predicted power load and the current coal quality entering the furnace, the target optimal combustion condition of the boiler is determined by a pre-trained boiler optimal combustion strategy coupling model, wherein the boiler optimal combustion strategy coupling model is obtained by training based on different power loads, different coal qualities and different optimal combustion conditions; Determining the real-time combustion status of the boiler according to the predicted power load and the current coal quality entering the boiler; According to the real-time combustion condition and the target optimal combustion condition, the current coal transportation, distribution, storage and supply strategy is adjusted so that the adjusted coal quality and power load match the target optimal combustion condition, wherein the current coal transportation, distribution, storage and supply strategy includes at least one of the current coal transportation strategy, the current coal blending strategy, the current coal storage strategy and the current coal supply strategy; The step of adjusting the current coal transportation, distribution, storage and supply strategy according to the real-time combustion status and the target optimal combustion status includes: When the real-time combustion condition does not match the target optimal combustion condition, determining the target coal quality and target electricity load corresponding to the target optimal combustion condition, and adjusting the current coal transportation, distribution, storage and supply strategy according to the target coal quality and target electricity load; The boiler optimal combustion strategy coupling model includes a first database and a second database, wherein the first database includes the corresponding relationships between different power loads, different coal qualities and different optimal combustion characteristics, and the second database includes the corresponding relationships between different optimal combustion characteristics and different optimal combustion conditions; The method of determining the target optimal combustion state of the boiler according to the predicted power load and the current coal quality fed into the furnace by using a pre-trained boiler optimal combustion strategy coupling model includes: According to the predicted power load and the current coal quality entering the furnace, the target optimal combustion characteristics of the boiler are determined through the first database; According to the target optimal combustion characteristics, the target optimal combustion state of the boiler is determined through the second database.
2. The method according to claim 1, characterized in that The method further comprises: Obtaining the combustion parameters of the pulverized coal over a period of time through a coal dynamic visualization monitoring system; The step of determining the current quality of the pulverized coal entering the furnace according to the coal quality related parameters includes: The current coal quality of the pulverized coal entering the furnace is determined according to the combustion parameters and the coal quality related parameters.
3. The method according to claim 2, characterized in that The coal quality related parameters include coal powder volatilization, coal powder ash content and coal powder water content. According to the coal quality related parameters, the combustion parameters include combustion calorific value, combustion rate, burnout temperature, fly ash carbon content and combustion pollutant generation.
4. The method according to claim 1, characterized in that: The method further comprises: If the real-time combustion condition matches the target optimal combustion condition, the predicted power load, the current coal quality entering the furnace and the target optimal combustion characteristics are stored in the first database.
5. The method according to claim 1, characterized in that The obtaining of the coal quality related parameters of the coal powder includes: The coal quality related parameters of the coal powder are obtained through a Raman coal quality online monitoring system.
6. A coal transportation, distribution, storage and supply device for improving boiler flexibility based on the coal transportation, distribution, storage and supply method for improving boiler flexibility according to claim 1, characterized in that: include: The power load prediction module is used to obtain the historical power load of the boiler and predict the predicted power load corresponding to the set time period based on the historical power load and the pre-trained power load cycle prediction model; A coal quality determination module, used to obtain coal quality related parameters of the pulverized coal, and determine the current coal quality of the pulverized coal entering the furnace according to the coal quality related parameters; a target optimal combustion condition determination module, for determining the target optimal combustion condition of the boiler according to the predicted power load and the current coal quality entering the furnace, through a pre-trained boiler optimal combustion strategy coupling model, wherein the boiler optimal combustion strategy coupling model is obtained by training based on different power loads, different coal qualities and different optimal combustion conditions; A real-time combustion status determination module, used to determine the real-time combustion status of the boiler according to the predicted power load and the current coal quality entering the furnace; An adjustment module is used to adjust the current coal transportation, distribution, storage and supply strategy according to the real-time combustion condition and the target optimal combustion condition so that the adjusted coal quality and power load match the target optimal combustion condition, and the current coal transportation, distribution, storage and supply strategy includes at least one of the current coal transportation strategy, the current coal blending strategy, the current coal storage strategy and the current coal supply strategy.
7. An electronic device, characterized in that: The method comprises a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method according to any one of claims 1 to 5 when executing the computer program.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.