Safety monitoring, early warning and disposal system based on digital twin and big data
Through digital twins and big data technology, a construction project monitoring information model and safety monitoring and early warning platform are built, which solves the problem of single functions of the existing system, realizes the intuitive display of monitoring point locations and the timeliness of early warning responses, and improves engineering safety management and decision-making accuracy.
Patent Information
- Application Number
- CN202211410201.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-11
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-11-11
AI Technical Summary
The existing construction project safety monitoring system has a single function and cannot intuitively reflect the location of the monitoring point. The early warning response is insufficient, and it is difficult to conduct efficient early warning treatment, which affects the quality of the project and personnel safety.
Adopt a security monitoring, early warning and disposal system based on digital twins and big data. A digital twin model for monitoring information is built through BIM and GIS, setting early warning thresholds and mechanisms, automatically triggering early warnings, intuitively displaying early warning parts and values, and assisting them through big data algorithms. Decision-making, update monitoring information database.
It has achieved comprehensive control over project safety, improved the timeliness of early warning responses, can automatically analyze the causes of early warning and recommend disposal plans, and formed a dynamically updated monitoring information database, which has improved the accuracy of subsequent decisions.
Smart Images

Figure CN115731678B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of construction project safety monitoring, and specifically to the management, early warning, disposal and auxiliary decision-making of engineering safety monitoring based on digital twin and big data technology, and the generation and updating of engineering safety monitoring information database. Background Art
[0002] Safety monitoring is crucial during the construction and operation periods of construction projects, and is related to the safety and quality of construction projects. At this stage, the functions of mainstream safety monitoring systems are still relatively simple. They can only push monitoring data, and some have relatively simple early warning reminders. They cannot intuitively reflect the location of each measuring point in the project, nor can they perform early warning disposal and cause analysis. This will lead to insufficient comprehensive control over project safety, insufficient timeliness of monitoring and early warning response, difficulty in finding the cause of the early warning, and difficulty in performing early warning disposal with the highest efficiency, which is not conducive to the guarantee of project quality and safety and personnel life safety. Summary of the invention
[0003] In order to solve the problems existing in the prior art, the present invention provides a safety monitoring, early warning and disposal system based on digital twins and big data, which can reflect the monitoring data in real time and intuitively, provide timely warnings, and assist in decision-making based on big data.
[0004] The technical solution adopted by the present invention is:
[0005] A safety monitoring, early warning and disposal system based on digital twins and big data includes a digital twin model of construction project monitoring information, a safety monitoring and early warning platform, and a monitoring information database; the digital twin model of construction project monitoring information is constructed by combining BIM modeling with GIS scenarios, and the digital twin model of construction project monitoring information is used to intuitively display the specific information and location of each monitoring point; the safety monitoring and early warning platform is connected to the digital twin model of construction project monitoring information, sets monitoring and early warning thresholds according to different types of monitoring data, and sets an early warning mechanism, automatically triggers the early warning mechanism according to the early warning level, and sends early warning reminders to different personnel. The safety monitoring and early warning platform intuitively displays the location and value of the early warning through the digital twin model of construction project monitoring information, which is used to set the early warning mechanism, send early warning reminders, and online collaboratively deal with early warning hazards; the monitoring information database stores early warning causes and disposal measures according to the monitoring type classification, receives data from the safety monitoring and early warning platform, and the safety monitoring and early warning platform feeds back the confirmed early warning causes and disposal measures to the monitoring information database. The safety monitoring and early warning platform calculates the probability of occurrence of each possible early warning cause through a big data algorithm, and updates the evolutionary monitoring information database.
[0006] Furthermore, the digital twin model of construction project monitoring information includes monitoring type, location, monitoring value, and information elements such as buildings and surrounding topography. Monitoring types include vibration monitoring, displacement monitoring, stress monitoring, tilt monitoring, crack monitoring, penetration monitoring and other types according to the actual project. They are marked and displayed in the digital twin model of construction project monitoring information according to the actual buried location and type, and are associated with the monitoring value of the safety monitoring and early warning platform. Different states are displayed according to whether the real-time monitoring value reaches the early warning threshold. If the early warning threshold is not reached, the monitoring point is green; if it reaches the third-level early warning but does not reach the second-level early warning, the monitoring point turns yellow; if it reaches the second-level early warning but does not reach the third-level early warning, the monitoring point turns orange; if it reaches the first-level early warning threshold, the monitoring point turns red.
[0007] Furthermore, the safety monitoring and early warning platform includes three modules: data acquisition module, early warning threshold setting module, and early warning disposal module. The data acquisition module is divided into two types: automatic acquisition module and manual acquisition module according to the actual project. The automatic acquisition module is directly connected to the monitoring equipment, and the monitoring data is automatically read into the safety monitoring and early warning platform; the manual acquisition module requires a dedicated person to record the monitoring data regularly and input it into the safety monitoring and early warning platform. The early warning threshold setting module is a threshold management module for different monitoring types. In the early warning threshold setting module, the early warning thresholds of different monitoring types can be set and managed. The early warning disposal module is a module for all parties to conduct early warning analysis, remote collaboration, early warning disposal and process approval when an early warning occurs. The auxiliary decision-making function of the safety monitoring and early warning platform exists in the early warning analysis part of the early warning disposal module.
[0008] Furthermore, the monitoring information database adopts big data statistics and feedback training, combined with the confirmation of causes and measures in the safety monitoring and early warning platform, and continuously trains and evolves the database. This continuously updated database can also assist in decision-making on warning causes and disposal measures.
[0009] Furthermore, the safety monitoring and early warning platform has a built-in initial monitoring information database, which is the initial state of the monitoring information database and includes some warning reasons and some disposal measures of some monitoring types, as well as the corresponding occurrence probabilities. The warning reasons and disposal measures in the initial monitoring information database are mapped and associated in a many-to-many manner, and one warning reason can be associated with multiple disposal measures, and multiple warning reasons can also be associated with one disposal measure.
[0010] Furthermore, the security monitoring and early warning platform automatically pushes possible warning reasons and corresponding disposal measures after a warning occurs. The warning reasons are sorted according to possibility, and the number of occurrences and probability of each warning reason are noted.
[0011] Furthermore, the security monitoring and early warning platform supports auxiliary decision-making and online collaboration. Relevant responsible personnel can refer to the warning causes and disposal measures for auxiliary decision-making, and remotely and online collaboratively confirm the warning causes and disposal measures.
[0012] The beneficial effects of the present invention are:
[0013] The present invention can intuitively reflect the position of each monitoring point in the project, and improve the overall comprehensive control of project safety; when a safety hazard occurs, it can automatically calculate whether the warning standard is met in a timely manner, and push the warning information to the relevant responsible persons as soon as possible, so as to improve the timeliness of the warning response; it can assist in decision-making, automatically analyze the cause of the warning and recommend warning disposal plans, realize online viewing of the location of the warning point and online collaborative warning disposal; it can form a monitoring information database with dynamically updated warning causes and disposal measures, and improve the accuracy of subsequent auxiliary decision-making. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a logic block diagram of the present invention;
[0015] Figure 2 This is the structural diagram of the digital twin model for construction project monitoring information;
[0016] Figure 3 This is the structural diagram of the security monitoring and early warning platform;
[0017] Figure 4 This is the structural diagram of the monitoring information database.
[0018] In the figure: 1- digital twin model of construction project monitoring information; 2- safety monitoring and early warning platform; 3- monitoring information database; 21- data acquisition module, 22- early warning threshold setting module, 23- early warning disposal module. DETAILED DESCRIPTION
[0019] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described below in conjunction with specific embodiments. However, it should be understood that the drawings are only used for exemplary description and cannot be construed as limiting the present invention.
[0020] like Figures 1 to 4 As shown, the safety monitoring, early warning and disposal system based on digital twins and big data of the present invention includes a digital twin model 1 of construction project monitoring information, a safety monitoring and early warning platform 2, and a monitoring information database 3.
[0021] The digital twin model 1 of construction project monitoring information includes monitoring type, location, monitoring value, and information elements such as buildings and surrounding terrain. The monitoring types include vibration monitoring, displacement monitoring, stress monitoring, tilt monitoring, crack monitoring, penetration monitoring and other types according to the actual project. They are marked and displayed in the digital twin model according to the actual buried location and type, and are associated with the monitoring value of the safety monitoring and early warning platform. Different states are displayed according to whether the real-time monitoring value reaches the early warning threshold. If the early warning threshold is not reached, the monitoring point is green; if it reaches the third-level early warning but not the second-level early warning, the monitoring point turns yellow; if it reaches the second-level early warning but not the third-level early warning, the monitoring point turns orange; if it reaches the first-level early warning threshold, the monitoring point turns red.
[0022] The safety monitoring and early warning platform 2 includes three modules: data acquisition module 21, early warning threshold setting module 22, and early warning disposal module 23. The data acquisition module 21 is divided into two types: automatic acquisition module and manual acquisition module according to the actual project. The automatic acquisition module is directly connected to the monitoring equipment, and the monitoring data is automatically read into the safety monitoring and early warning platform 2; the manual acquisition module requires a dedicated person to regularly record the monitoring data and input it into the safety monitoring and early warning platform 2. The early warning threshold setting module 22 is a threshold management module for different monitoring types. In the early warning threshold setting module 22, the early warning thresholds of different monitoring types can be set and managed. The early warning disposal module 23 is a module for all parties to conduct early warning analysis, remote collaboration, early warning disposal and process approval when an early warning occurs. The auxiliary decision-making function of the safety monitoring and early warning platform 2 exists in the early warning analysis part of the early warning disposal module 23. Taking the excessive stress of a certain anchor rod at the opening as an example, the data of the anchor rod stress meter is transmitted to the data acquisition module 21 of the safety monitoring and early warning platform 2 in real time, compared with the early warning threshold, and displayed in the digital twin model according to whether the early warning threshold and the early warning level are reached, and the relevant responsible personnel are reminded by SMS. Relevant responsible personnel can view the location of the early warning monitoring point in the project in the digital twin model, and conduct early warning analysis to assist decision-making. There are two types of anchor stress over-limit early warning reasons and corresponding disposal measures automatically pushed by the platform, namely: 1. The early warning reason is that the anchor stress increases instantaneously due to blasting and excavation. The corresponding disposal measures are to strengthen monitoring and pay attention to the placement of explosives during blasting to avoid excessive disturbance to the slope rock mass; 2. The early warning reason is cracks or sliding surfaces in the rock mass. The corresponding disposal measures are to strengthen support or pre-excavate the sliding surface. Relevant responsible personnel can remotely collaborate online to select a warning reason and disposal measure, or add a new warning reason and disposal measure based on the actual project. After negotiation and confirmation, the early warning disposal process is carried out: after the construction unit fills in the warning reason, disposal measures and feedbacks the disposal situation, the process is initiated. After approval by the supervisor and confirmation by the owner, the early warning disposal is completed. The early warning display of the monitoring point in the digital twin model is cancelled and restored to normal display.
[0023] The monitoring information database 3 is classified and graded according to the monitoring type and warning level. Different warning levels of each type of monitoring correspond to corresponding warning reasons and disposal measures. In the initial state of the monitoring information database 3, some possible warning reasons and disposal measures are built-in. With the use of the safety monitoring and early warning platform 2, the database can be expanded and the accuracy of the cause prediction can be improved. Taking the anchor stress monitoring of a tunnel entrance as an example, there are two initial built-in warning reasons and disposal measures in its three-level warning database. The initial setting times of each are 1 time, and the probability is 50%, as follows: 1. The warning reason is that the anchor stress increases instantaneously due to blasting and excavation. The corresponding disposal measures are to strengthen monitoring and pay attention to the placement of explosives during blasting to avoid excessive disturbance to the slope rock mass (times 1, probability 50%, hereinafter referred to as "cause measure 1"); 2. The warning reason is that cracks or sliding surfaces appear in the rock mass. The corresponding disposal measures are to strengthen support or pre-excavate the sliding surface (times 1, probability 50%, hereinafter referred to as "cause measure 2"). After the safety monitoring and early warning platform 2 was put into use, there were 3 three-level anchor stress warnings, of which 2 warnings were handled by cause measure 1, and the cause and measure of 1 warning were newly added items: 3. The cause of the warning was the failure of the anchor stress gauge, and the corresponding disposal measure was to remove or repair the anchor stress gauge (hereinafter referred to as "cause measure 3"). After data statistics, the causes and measures of the three-level anchor stress warnings in the database are: cause measure 1, 3 times, probability 60%; cause measure 2, 1 time, probability 20%; cause measure 3, 1 time, probability 20%. After long-term and multiple feedback training, the monitoring information database 3 will be continuously updated and have higher and higher auxiliary decision-making accuracy.
[0024] The above embodiments describe the present invention in conjunction with the accompanying drawings, but this should not be understood as limiting the patent scope of the present invention. It should be pointed out that for ordinary technicians in this field, without departing from the concept of the present invention, the technical solutions obtained by equivalent replacement or equivalent transformation methods all belong to the protection scope of the present invention.
Claims
1. Safety monitoring, early warning and disposal system based on digital twins and big data, Features: It includes a digital twin model of construction project monitoring information, a safety monitoring and early warning platform, and a monitoring information database; the digital twin model of construction project monitoring information is constructed by combining BIM modeling with GIS scenarios, and the digital twin model of construction project monitoring information is used to intuitively display the specific information and location of each monitoring point; the safety monitoring and early warning platform is connected to the digital twin model of construction project monitoring information, sets monitoring and early warning thresholds according to different types of monitoring data, and sets an early warning mechanism, automatically triggers the early warning mechanism according to the early warning level, and sends early warning reminders to different personnel. The safety monitoring and early warning platform intuitively displays the location and value of the early warning through the digital twin model of construction project monitoring information, which is used to set the early warning mechanism, send early warning reminders, and coordinate online disposal of early warning hazards; The monitoring information database stores the warning reasons and disposal measures according to the monitoring type classification, receives the data of the safety monitoring and early warning platform, and the safety monitoring and early warning platform feeds back the confirmed warning reasons and disposal measures to the monitoring information database. The safety monitoring and early warning platform calculates the probability of occurrence of each possible warning reason through a big data algorithm and updates the evolutionary monitoring information database; The digital twin model of construction engineering monitoring information includes the type, location, monitoring value of monitoring, and information elements of the building and surrounding terrain and geomorphology; the monitoring type includes vibration monitoring, displacement monitoring, stress monitoring, tilt monitoring, crack monitoring, and penetration monitoring according to the actual project, and is marked and displayed in the digital twin model of construction engineering monitoring information according to the actual buried location and type, and is associated with the monitoring value of the safety monitoring and early warning platform, and different states are displayed according to whether the real-time monitoring value reaches the early warning threshold: if the early warning threshold is not reached, the monitoring point is green; if the third-level early warning is reached but the second-level early warning is not reached, the monitoring point becomes yellow; if the second-level early warning is reached but the third-level early warning is not reached, the monitoring point becomes orange; if the first-level early warning threshold is reached, the monitoring point becomes red; The safety monitoring and early warning platform includes three modules: data acquisition module, early warning threshold setting module, and early warning disposal module; the data acquisition module is divided into automatic acquisition module and manual acquisition module according to the actual project; the automatic acquisition module is directly connected to the monitoring equipment, and the monitoring data is automatically read into the safety monitoring and early warning platform; the manual acquisition module requires a dedicated person to record the monitoring data regularly and input it into the safety monitoring and early warning platform; the early warning threshold setting module is a threshold management module for different monitoring types, in which the early warning thresholds of different monitoring types can be set and managed; the early warning disposal module is a module for all parties to perform early warning analysis, remote collaboration, early warning disposal and process approval when an early warning occurs; the auxiliary decision-making function of the safety monitoring and early warning platform exists in the early warning analysis part of the early warning disposal module; The monitoring information database adopts big data statistics and feedback training, combined with the confirmation of causes and measures in the safety monitoring and early warning platform, and continuously trains and evolves the database to assist in decision-making on early warning causes and disposal measures; The safety monitoring and early warning platform has a built-in initial monitoring information database, which is the initial state of the monitoring information database and includes some warning reasons and some disposal measures of some monitoring types, as well as corresponding occurrence probabilities; the warning reasons and disposal measures in the initial monitoring information database are mapped and associated in a many-to-many manner, with one warning reason being associated with multiple disposal measures, or multiple warning reasons being associated with one disposal measure; After an early warning occurs, the security monitoring and early warning platform automatically pushes possible early warning causes and corresponding disposal measures, sorts the early warning causes by probability, and notes the number and probability of occurrence of each early warning cause; The security monitoring and early warning platform supports auxiliary decision-making and online collaboration. Relevant responsible personnel refer to the warning causes and disposal measures for auxiliary decision-making, and remotely collaborate online to confirm the warning causes and disposal measures.