A prefabricated cabin foundation with integrated pile foundation and foundation and its construction method
Through the dry construction method of prefabricated cabin foundation integrating pile foundation and foundation, and using the assembly technology of slot-type embedded parts and cup-shaped buckles, the problems of long construction period of energy storage power stations and wet work affected by winter are solved, and the problem is achieved Fast and stable foundation installation improves construction efficiency and finished product quality.
Patent Information
- Application Number
- CN202211601655.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-13
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-12-13
AI Technical Summary
The construction period of existing energy storage power stations is long, and wet operations are easily affected by winter construction, resulting in rising costs and unstable quality of finished products.
The pile foundation and foundation are integrated into the prefabricated cabin foundation. Through the combination of prefabricated piles and prefabricated wall panels, the assembly technology of slotted embedded parts and cup-shaped buckles is used to form a dry operation infrastructure, combining channel steel beams and C-shaped steel Skeleton for quick installation and fixation.
It effectively prevents wet work from being affected by winter, shortens the construction period, improves the quality of finished products, reduces costs, and significantly improves economic and social benefits.
Smart Images

Figure CN115787697B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of prefabricated cabin foundations, and in particular relates to a prefabricated cabin foundation integrating pile foundation and foundation and a construction method thereof. Background Art
[0002] In outdoor energy storage power stations, there are a large number of finished prefabricated cabins, such as energy storage battery cabins, PCS and booster cabins, AC system cabins, secondary equipment cabins, and prefabricated cabins for power distribution devices. These cabins are highly integrated and are prefabricated in the factory and transported to the construction site by trailer trucks and installed on the equipment foundation. Due to transportation restrictions, the volume of these cabins is relatively fixed, generally in the form of a rectangular block. Since the construction period of energy storage power stations is short, generally within half a year, this places high demands on the overall construction period of the project. For conventional cast-in-place reinforced concrete foundations, the maintenance period is relatively long, generally 30 days; and wet operations are easily affected by the environment. In winter construction sites, the preparation, pouring, and maintenance of cast-in-place concrete on site are limited, which not only causes cost increases, but also the quality of the finished products produced is unstable. At present, the foundation of prefabricated energy storage cabins in engineering still mainly uses cast-in-place reinforced concrete foundations, which cannot avoid the problems of winter construction and long construction period. Summary of the invention
[0003] In order to solve the existing problems of long construction period and wet operations being affected by winter construction.
[0004] The technical solution of the present invention is as follows:
[0005] A prefabricated cabin foundation integrating pile foundation and base, comprising prefabricated piles and prefabricated wall panels, a cabin connecting embedded part is arranged on the top of the prefabricated pile, adjacent prefabricated piles are connected by a channel steel beam, facing surfaces of adjacent prefabricated piles are respectively provided with a slot-type embedded part, the opening of the slot-type embedded part is provided with a welding opening, the slot-type embedded part is fixedly connected with a cup-shaped buckle, two ends of the channel steel beam are respectively fixedly connected with the cup-shaped buckles on the facing surfaces of adjacent prefabricated piles on both sides, and the prefabricated wall panels are fixed to the outer side surface of the channel steel beam.
[0006] Preferably, a snap-on interface with an I-shaped cross-section is fixedly connected to the side of the channel steel beam, and a slot for inserting the snap-on interface is provided on the side of the cup-shaped snap-on facing the snap-on interface, and the cup-shaped snap-on is fixedly connected to the snap-on interface by bolts.
[0007] Preferably, a slot-type embedded component is fixed to one end of the cup-shaped buckle facing away from the notch, and an insert plate for inserting into the slot-type embedded component is provided at one end of the cup-shaped buckle facing the slot-type embedded component.
[0008] Preferably, a C-shaped steel frame is fixedly connected inside the channel steel beam to form a keel.
[0009] Preferably, the C-shaped steel frame on the channel steel beam and the prefabricated wall panel is provided with through holes at corresponding positions, the through holes are connected with rivets, and the channel steel beam is fixedly connected to the prefabricated wall panel via the rivets fixed on the through holes.
[0010] Preferably, a wall panel foot guard is fixedly connected to the bottom end of the prefabricated wall panel.
[0011] Preferably, the prefabricated wall panels are provided with wall sealing seams.
[0012] A method for constructing the above-mentioned novel dry-operation energy storage prefabricated cabin foundation, the specific steps are as follows:
[0013] Step 1: Prefabricate prefabricated piles according to geological conditions, and embed cabin connecting embedded parts and slot-type embedded parts during the prefabrication process;
[0014] Step 2: Determine the axis position of the precast pile according to the size of the cabin, use the pile driving equipment to drive the precast pile, and after driving the pile to the appropriate elevation, place the cup-shaped clip in the slot-type embedded part. After reaching the preset height, install the pre-welded channel steel beam and clip interface B;
[0015] Step 3: The bolts are passed through the through bolt holes, and the bolt heads are pressed against the non-through bolt holes and gradually tightened, and the two ends of the channel steel beam are gradually locked until the channel steel beam and the precast pile are integrally tied;
[0016] Step 4: Weld the slot-type embedded parts and the cup-shaped buckles to fix the position through the welding port, and weld the C-shaped steel frame to the channel steel beam to form a keel;
[0017] Step 5: Make a groove in the foundation where the wall panel is to be installed, compact the soil at the base, and install the wall panel foot guard. Place the bottom of the prefabricated wall panel in the slot of the wall panel foot guard;
[0018] Step 6: Use rivets to fix the prefabricated wall panels to the keel and weld the prefabricated cabin to the cabin body connecting embedded parts.
[0019] The present invention has the following beneficial effects: prefabricated reinforced concrete piles are pressed into foundation soil, and slot-type embedded parts are pre-embedded in the top of the column, and the foundation beams are assembled using cup-shaped buckles, and the surrounding foundation walls are installed using the foundation beam skeleton to form a prefabricated cabin foundation; this solution can be used in energy storage stations, substations or industrial buildings and other equipment projects using prefabricated cabins, and can effectively avoid the phenomenon that wet operations are affected by winter construction and the quality of finished products is difficult to guarantee; at the same time, since there is no need for concrete maintenance, the construction period can be effectively shortened, and the economic and social benefits are significant. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A perspective view of the present invention;
[0021] Figure 2 A top view of the present invention;
[0022] Figure 3 for Figure 2 A partial enlarged schematic diagram of label E;
[0023] Figure 4 is a three-dimensional diagram of a prefabricated pile of the present invention;
[0024] Figure 5 It is a schematic diagram of the overall structure of the slot-type embedded component of the present invention;
[0025] Figure 6 It is a schematic diagram of the overall structure of the cup-shaped buckle of the present invention;
[0026] Figure 7 is a side view of the cup-shaped buckle of the present invention;
[0027] Figure 8 It is a schematic diagram of the overall structure of the channel steel beam and the buckle interface of the present invention;
[0028] Fig. 9 It is a schematic diagram of the overall structure of the wall panel foot guard of the present invention;
[0029] Fig.10 is a cross-sectional view between the prefabricated piles of the present invention;
[0030] In the figure: 1-precast piles, 2-precast wall panels, 3-cabin connection embedded parts, 4-channel steel beams, 5-slot embedded parts, 6-cup-shaped buckles, 7-bolts, 8-buckle interfaces, 9-welding ports, 10-wall sealing seams, 11-C-shaped steel frame, 12-rivets, 13-through bolt holes, 14-non-through bolt holes, 15-wall panel foot guards. DETAILED DESCRIPTION
[0031] The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0032] See also Figure 1-10 A prefabricated cabin foundation integrating pile foundation and base, comprising a prefabricated pile 1 and a prefabricated wall panel 2, a cabin connecting embedded part 3 is provided on the top of the prefabricated pile 1, adjacent prefabricated piles 1 are connected by a channel steel beam 4, and a slot-type embedded part 5 is provided on the facing surfaces of adjacent prefabricated piles respectively, and a welding opening 9 is provided at the opening of the slot-type embedded part 5, and the slot-type embedded part 5 is fixedly connected with a cup-shaped buckle 6, and both ends of the channel steel beam 4 are respectively fixedly connected with the cup-shaped buckles 6 on the facing surfaces of adjacent prefabricated piles 1 on both sides, and the prefabricated wall panel 2 is fixed to the outer side of the channel steel beam 4.
[0033] During production, first, prepare the materials, make the slot-type embedded parts 5 and the cabin connecting embedded parts 3, set the forming mold according to the size of the prefabricated pile 1, tie the steel cage, embed the slot-type embedded parts 5 and the cabin connecting embedded parts 3; pour the reinforced concrete, cure the concrete, and remove the mold after reaching the strength.
[0034] In a specific embodiment of the present invention, a snap-on interface 8 with an I-shaped cross-section is fixedly connected to the side of the channel steel beam 4, and a slot for inserting the snap-on interface 8 is provided on the side of the cup-shaped snap-on 6 facing the snap-on interface 8, and the cup-shaped snap-on 6 is fixedly connected to the snap-on interface 8 by bolts 7.
[0035] In a specific embodiment of the present invention, a slot-type embedded component 5 is fixed to one end of the cup-shaped buckle 6 away from the notch, and an insert plate for inserting the slot-type embedded component 5 is provided at one end of the cup-shaped buckle 6 facing the slot-type embedded component 5 .
[0036] In a specific embodiment of the present invention, a C-shaped steel frame 11 is fixedly connected inside the channel steel beam 4 to form a keel.
[0037] In a specific embodiment of the present invention, the C-shaped steel frame 11 on the channel steel beam 4 and the prefabricated wall panel 2 is provided with through holes with corresponding positions, and the through holes are connected with rivets 12. The channel steel beam 4 is fixedly connected to the prefabricated wall panel 2 through the rivets 12 fixed on the through holes.
[0038] In a specific embodiment of the present invention, a wall panel foot guard 15 is fixedly connected to the bottom end of the prefabricated wall panel 2 .
[0039] In a specific embodiment of the present invention, the prefabricated wall panel 2 is provided with a wall sealing seam.
[0040] A method for constructing the novel dry-operation energy storage prefabricated cabin foundation as described above, the specific steps are as follows:
[0041] Step 1: prefabricate the prefabricated pile 1 according to the geological conditions, and embed the cabin connecting embedded parts 3 and the slot-type embedded parts 5 during the prefabrication process;
[0042] Step 2: Determine the axis position of the precast pile 1 according to the size of the cabin, use the pile driving equipment to press the precast pile 1, and after the pile is pressed to a suitable elevation, place the cup-shaped buckle 6 in the slot-type embedded part 5, and after reaching the preset height, install the pre-welded channel steel beam 4 and buckle interface 8;
[0043] Step 3: The bolt 7 passes through the through bolt hole 13, and the head of the bolt 7 is gradually tightened against the non-through bolt hole 14, and the two ends of the channel steel beam 4 are gradually locked until the channel steel beam 4 is integrally tied to the precast pile 1;
[0044] Step 4: Weld the slot-type embedded parts 5 and the cup-shaped buckles 6 through the welding openings 9 to fix the position of the channel steel beam 4, and weld the C-shaped steel frame 11 to the channel steel beam 4 to form a keel;
[0045] Step 5: Grooving the foundation at the installation location of the prefabricated wall panel, compacting the base soil, installing the wall panel foot guard 15, and placing the bottom end of the prefabricated wall panel 2 in the slot of the wall panel foot guard 15;
[0046] Step 6: Use rivets 12 to fix the prefabricated wall panels 2 on the keel, and weld the prefabricated cabin to the cabin body connecting embedded parts 3.
[0047] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A prefabricated cabin foundation integrating pile foundation and foundation, characterized in that: It comprises prefabricated piles and prefabricated wall panels, wherein a cabin connecting embedded part is arranged on the top of the prefabricated piles, adjacent prefabricated piles are connected by a channel steel beam, and adjacent prefabricated piles are respectively provided with a slot-type embedded part on the facing surfaces thereof, and a welding opening is arranged at the opening of the slot-type embedded part, and the slot-type embedded part is fixedly connected with a cup-shaped buckle, and the two ends of the channel steel beam are respectively fixedly connected with the cup-shaped buckles on the facing surfaces of adjacent prefabricated piles on both sides, and the prefabricated wall panels are fixed to the outer side surface of the channel steel beam; A buckle interface with an I-shaped cross section is fixedly connected to the side of the channel steel beam, and a notch for inserting the buckle interface is provided on the side of the cup-shaped buckle facing the buckle interface, and the cup-shaped buckle is fixedly connected to the buckle interface by bolts; The end of the cup-shaped buckle facing away from the notch is fixed with a slot-type embedded part, and the end of the cup-shaped buckle facing the slot-type embedded part is provided with an inserting plate inserted into the slot-type embedded part; A C-shaped steel frame is fixedly connected inside the channel steel beam to form a keel; The C-shaped steel frame on the channel steel beam and the prefabricated wall panel is provided with through holes at corresponding positions, and rivets are connected to the through holes. The channel steel beam is fixedly connected to the prefabricated wall panel through the rivets fixed on the through holes; The bottom end of the prefabricated wall panel is fixedly connected with a wall panel foot guard.
2. The prefabricated cabin foundation integrating pile foundation and foundation according to claim 1, characterized in that: Wall sealing is provided on the prefabricated wall panels.
3. A method for constructing a prefabricated cabin foundation with integrated pile foundation and foundation as claimed in claim 1, characterized in that: The specific steps are as follows: Step 1: Prefabricate prefabricated piles according to geological conditions, and embed cabin connecting embedded parts and slot-type embedded parts during the prefabrication process; Step 2: Determine the axis position of the precast pile according to the size of the cabin, use the pile driving equipment to press the precast pile, and after the pile is pressed to the appropriate elevation, place the cup-shaped clip in the slot-type embedded part. After reaching the preset height, install the pre-welded channel steel beam and clip interface; Step 3: The bolts are passed through the through bolt holes, and the bolt heads are pressed against the non-through bolt holes and gradually tightened, and the two ends of the channel steel beam are gradually locked until the channel steel beam and the precast pile are integrally tied; Step 4: Weld the slot-type embedded parts and the cup-shaped buckles to fix the position through the welding port, and weld the C-shaped steel frame to the channel steel beam to form a keel; Step 5: Make a groove in the foundation where the wall panel is to be installed, compact the soil at the base, install the wall panel foot guard, and place the bottom of the prefabricated wall panel in the slot of the wall panel foot guard; Step 6: Use rivets to fix the prefabricated wall panels to the keel and weld the prefabricated cabin to the cabin body connecting embedded parts.
Citation Information
Patent Citations
Prefabricated prestressed concrete frame inserting and connecting integrated high pile bearing platform foundation
CN103924611A
Building foundation provided with wallboards
CN209742069U
Power station assembly type equipment foundation
CN209873854U
Assembled ground ring beam for assembled house
CN211037026U
Prefabricated cabin foundation
CN214219725U