A building scaffold for preventing building materials from falling
By integrating power mechanism, ash connection assembly and cleaning assembly on the building scaffolding, the automatic transportation of building materials and automatic cleaning of wall materials are achieved, which solves the problems of inconvenient material transfer and piles of wall corner materials during construction, and improves construction safety and resource utilization efficiency.
Patent Information
- Application Number
- CN202211462919.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-17
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-11-17
AI Technical Summary
During the construction process of existing scaffolding, there is inconvenience in the transmission and cleaning of building materials, which can easily lead to material drop, increase the labor intensity and safety hazards of staff, and the accumulation of cement in the corners of the wall requires manual cleaning, which wastes resources.
A building scaffolding including a placing box, power mechanism, ash connection assembly and cleaning assembly was designed. The building materials are automatically transported and stored through the power mechanism. The ash connection assembly realizes automatic collection and cleaning of wall materials, and the cleaning assembly realizes self-cleaning function. , protective frames provide safety support.
It reduces the workload of staff, improves construction safety, avoids material drops and wall corner materials accumulation, simplifies the construction process, and reduces resource waste.
Smart Images

Figure CN115787989B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of scaffolds, and in particular to a building scaffold for preventing building materials from falling. Background Art
[0002] Scaffolding is a working platform set up to ensure the smooth progress of each construction process. It can be divided into external scaffolding and internal scaffolding according to the location of the erection. It can be divided into wooden scaffolding, bamboo scaffolding and steel pipe scaffolding according to different materials. It can be divided into pole scaffolding, bridge scaffolding, portal scaffolding, suspended scaffolding, hanging scaffolding, cantilever scaffolding and climbing scaffolding according to the structural form.
[0003] The scaffolding structure in the prior art has a relatively simple function. Workers need to manually transfer bricks and other materials to the scaffolding. The bricks piled on the scaffolding take up a large space, are inconvenient to take, and are easy to fall and injure workers. When workers plaster the walls, some cement falls off the wall and accumulates in the corners, causing a waste of resources. The cement accumulated in the corners needs to be manually cleaned by the workers, increasing the workload of the workers.
[0004] Therefore, a building scaffold that prevents building materials from falling is needed to solve the above problems. Summary of the invention
[0005] In order to solve the above problems, that is, to solve the problems that bricks and other materials need to be manually transferred to the scaffolding, bricks are piled up on the scaffolding, taking up a large space, being inconvenient to take, and easily falling and injuring workers, part of cement falls off the wall and piles up in the corners, causing waste of resources, and the cement piled up in the corners needs to be manually cleaned by workers, increasing the workload of workers, the present invention provides a building scaffolding that prevents building materials from falling.
[0006] The scaffolding of claim 1, wherein the top of the frame is fixedly provided with a standing plate, the middle of the frame is fixedly provided with a placing plate, two first sliding bars are fixedly provided between the placing plate and the standing plate, the two first sliding bars are slidably connected to a slide frame, and the slide frame slides up and down along the first sliding bar under the driving of a power mechanism, and the slide frame is fixedly connected to a placing box, the top of the placing box is rotatably provided with a cover plate, the inside of the placing box is slidably connected with a push plate, the front side of the push plate is fixedly connected with a first connecting plate that penetrates through the outside of the placing box, a first tension spring is fixedly provided between the first connecting plate and the placing box, the bottom of the right side of the placing box is fixedly connected with a connecting frame, a slide plate is slidably provided on the connecting frame, a gear rod is fixedly connected to the right side of the slide plate, and a second tension spring is fixedly provided between the slide plate and the placing box;
[0007] A vertical plate is fixedly installed on the standing plate, a receiving groove is opened on the left side of the vertical plate, a support plate is slidably installed in the receiving groove, a first rack is fixedly connected to the right side of the support plate, a transmission gear is rotatably installed on the right side of the vertical plate, a connecting block is slidably installed inside the vertical plate, a pedal is fixedly connected to the rear side of the connecting block, a first spring is fixedly installed on the bottom end of the pedal, a second rack is fixedly connected to the right side of the connecting block, and a dust collecting component is provided at the bottom of the standing plate.
[0008] The above-mentioned building scaffolding for preventing building materials from falling, the power mechanism includes a driving motor and a first threaded rod, the driving motor is fixedly installed on the placement plate, the first threaded rod is rotatably installed between the standing plate and the placement plate, the first threaded rod is meshed with the power output shaft of the driving motor through a bevel gear set, and the slide is threadedly connected to the first threaded rod.
[0009] The above-mentioned building scaffolding for preventing building materials from falling, the ash receiving assembly includes a second threaded rod, a first ash receiving plate and a second ash receiving plate, the second threaded rod is rotatably installed at the bottom of the standing plate, and the bottom of the standing plate is fixedly installed with two second sliding rods, the first ash receiving plate is threadedly connected to the second threaded rod and can slide along the two second sliding rods, the second ash receiving plate is slidably installed in the first ash receiving plate, the bottom of the second ash receiving plate is fixedly connected with a second connecting plate, a second spring is fixedly installed between the second connecting plate and the first ash receiving plate, a first transmission belt is installed between the front end of the second threaded rod and the power output shaft of the driving motor, and a cleaning assembly located above the ash receiving assembly is provided at the bottom of the standing plate.
[0010] The above-mentioned building scaffolding for preventing building materials from falling, the cleaning component includes a brush roller and a scraper, the brush roller is rotatably installed at the bottom of the stand plate, the bottom of the stand plate is rotatably installed with a transmission shaft, the right end of the transmission shaft is meshed with the second threaded rod through a bevel gear set, a second transmission belt is installed between the brush roller and the transmission shaft, the scraper is rotatably installed at the bottom of the stand plate, and a plurality of third springs are fixedly installed between the scraper and the stand plate.
[0011] The above-mentioned building scaffolding for preventing building materials from falling has an ash collecting hopper located below the ash receiving assembly fixedly connected to the middle part of the frame, an ash pushing plate is slidably connected to the inside of the ash collecting hopper, a pushing handle is fixedly connected to the rear side of the ash pushing plate, an ash guiding groove is fixedly installed at the bottom of the ash collecting hopper, and an ash bucket is placed on the placement plate.
[0012] In the above-mentioned building scaffold for preventing building materials from falling, the left side of the placement box is slidably connected to the limit pin, a third tension spring is fixedly connected between the limit pin and the placement box, and the left side of the cover plate is fixedly connected to the limit seat.
[0013] In the above-mentioned building scaffold for preventing building materials from falling, protection frames are fixedly installed on both left and right sides of the top of the standing board, and a storage basket is arranged on the protection frame.
[0014] The beneficial effects of the present invention are:
[0015] 1. The present invention places bricks in the placement box in sequence, and the driving assembly drives the placement box to move upward to transport the bricks to the station board, without the need for manual delivery or throwing by workers, thereby reducing the workload of workers and saving labor. The bricks transported to the station board are placed in the placement box in order, avoiding the risk of bricks falling or tripping workers due to disorderly accumulation of bricks on the station board;
[0016] By stepping on the pedal downward, the pedal drives the second rack to move downward, and the second rack drives the first rack upward through the transmission gear, so that the pallet and the bricks on it move upward. When the pedal is stepped on to the bottom, the upper half of the brick extends out of the accommodating groove, and the staff takes it; after taking it, release the pedal, the first spring pushes the pedal upward, and the first rack drives the pallet downward. When the pedal pallet returns to its original position, it is ready for the next use. The staff only needs to step on the pedal to slide the bricks out of the storage box one by one. The operation is simple and convenient for the staff to take it. It solves the problem of bricks falling when taking it due to accumulation, improves the safety of the working process, and eliminates safety hazards in the working process.
[0017] 2. In the present invention, during the upward movement of the placement box, the driving motor drives the first ash receiving plate and the second ash receiving plate to slide out from under the standing plate through the first transmission belt and the second threaded rod until the placement box rises to the highest point. Under the push of the second spring, the second ash receiving plate and the wall are kept in close contact. When the wall is painted or other operations are performed, cement and other materials that fall off the wall will fall onto the first ash receiving plate and the second ash receiving plate, thereby solving the problem of cement and other materials falling and accumulating in the corners of the wall, and achieving the effect of keeping the corners clean. After the construction is completed, there is no need to clean the corners, thereby reducing the workload of the staff and simplifying the work process.
[0018] 3. In the present invention, when the second threaded rod rotates in the opposite direction, the first ash receiving plate and the second ash receiving plate retract to the bottom of the standing plate. During this process, the third spring makes the bottom end of the scraper always in close contact with the first ash receiving plate or the second ash receiving plate, so as to scrape the materials on the first ash receiving plate and the second ash receiving plate. The second threaded rod drives the brush roller to rotate through the transmission shaft and the second transmission belt, and the brush roller cleans the first ash receiving plate and the second ash receiving plate, so that the first ash receiving plate and the second ash receiving plate are kept in a relatively clean state, and the residual materials are effectively prevented from adhering to the first ash receiving plate or the second ash receiving plate. The placement box can perform self-cleaning every time it moves downward, so as to effectively avoid excessive accumulation of materials on the first ash receiving plate and the second ash receiving plate, so that the first ash receiving plate and the second ash receiving plate are always kept in a relatively clean state.
[0019] 4. In the present invention, during the retraction of the first ash receiving plate and the second ash receiving plate, the scraped and swept materials fall into the ash collecting hopper. The ash pushing plate is pushed by the push handle to push the materials in the ash collecting hopper into the ash barrel through the ash guide groove, thereby realizing unified collection of materials, facilitating the staff to handle the materials, preventing the materials from falling everywhere, and keeping the working environment clean.
[0020] 5. The present invention provides a protective frame for workers to support and effectively prevent them from falling from the standing board, thereby improving the safety of the working process. Workers can store tools in the storage basket and store the tools in a unified manner to prevent tools from being randomly placed on the standing board and causing them to fall or trip up workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 The overall structure of the present invention is shown in FIG. Figure 1 ;
[0022] Figure 2 The overall structure of the present invention is shown in FIG. Figure 2 ;
[0023] Figure 3 It is a structural schematic diagram of the placement box in the present invention;
[0024] Figure 4 It is a schematic diagram of the position of the slide in the present invention;
[0025] Figure 5 It is a schematic diagram of the coordination of the first rack, the transmission gear and the second rack in the present invention;
[0026] Figure 6 It is a schematic diagram of the position of the support plate in the present invention;
[0027] Figure 7 It is a schematic diagram of the cross-sectional structure of the neutral plate of the present invention;
[0028] Figure 8 The cross-sectional structure of the present invention is shown in FIG. Figure 1 ;
[0029] Fig. 9 For the present invention Figure 8 The enlarged schematic diagram of point A in the middle;
[0030] Fig.10 is a schematic diagram of the position of the second connecting plate in the present invention;
[0031] Fig.11 It is a schematic diagram of the structure of the brush roller and the scraper in the present invention;
[0032] Fig.12 The cross-sectional structure of the present invention is shown in FIG. Figure 2 ;
[0033] Fig.13 It is a schematic diagram of the position of the limit pin in the present invention.
[0034] In the figure: 1-frame; 2-station board; 3-placement board; 4-first slide bar; 5-slide; 6-placement box; 7-cover plate; 8-push plate; 9-first connecting plate; 10-first tension spring; 11-connecting frame; 12-slide plate; 13-gear lever; 14-second tension spring; 15-vertical plate; 16-accommodating groove; 17-support plate; 18-first rack; 19-transmission gear; 20-connecting block; 21-pedal; 22-first spring; 23-second rack; 24-driving motor; 25-first thread Rod; 26-second threaded rod; 27-first ash receiving plate; 28-second ash receiving plate; 29-second sliding rod; 30-second connecting plate; 31-second spring; 32-first transmission belt; 33-brush roller; 34-scraper; 35-transmission shaft; 36-second transmission belt; 37-third spring; 38-ash collecting hopper; 39-ash pushing plate; 40-push handle; 41-ash guiding groove; 42-ash bucket; 43-limiting pin; 44-third tension spring; 45-limiting seat; 46-protective frame; 47-storage basket. DETAILED DESCRIPTION
[0035] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0036] The embodiment of the present invention discloses a building scaffold for preventing building materials from falling. Figure 1-7As shown, it includes a frame 1, a non-slip pad is fixedly installed on the bottom of the frame 1 to effectively prevent the frame 1 from sliding, a standing plate 2 is fixedly installed on the top of the frame 1, a placement plate 3 is fixedly installed in the middle of the frame 1, two first sliding rods 4 are fixedly installed between the placement plate 3 and the standing plate 2, and a slide 5 is slidably connected to the two first sliding rods 4 together. The slide 5 slides up and down along the first sliding rod 4 under the drive of the power mechanism, and the left and right ends of the slide 5 are fixedly connected with a first sliding sleeve, and the two first sliding sleeves are respectively sleeved on the first sliding rod 4 on the corresponding sides, and a first threaded sleeve is fixedly connected to the middle of the slide 5, and the first threaded sleeve is threadedly connected to the power mechanism, and a placement box 6 is fixedly connected to the slide 5. The placement box The right side of 6 is in an open state, a cover plate 7 is rotatably installed on the top of the placement box 6, a push plate 8 is slidably connected to the inside of the placement box 6, a first connecting plate 9 that penetrates the outside of the placement box 6 is fixedly connected to the front side of the push plate 8, a first tension spring 10 is fixedly installed between the first connecting plate 9 and the placement box 6, a connecting frame 11 is fixedly connected to the bottom of the right side of the placement box 6, a slide plate 12 is slidably installed on the connecting frame 11, a first guide column is fixedly connected between the connecting frame 11 and the placement box 6, the slide plate 12 can slide up and down along the first guide column, a gear lever 13 that is close to the right side of the placement box 6 is fixedly connected to the right side of the slide plate 12, and a second tension spring 14 is fixedly installed between the slide plate 12 and the placement box 6;
[0037] A vertical plate 15 is fixedly installed on the standing plate 2, a receiving groove 16 is provided on the left side of the vertical plate 15, a support plate 17 is slidably installed in the receiving groove 16, a first rack 18 close to the right side of the vertical plate 15 is fixedly connected to the right side of the support plate 17, a transmission gear 19 is rotatably installed on the right side of the vertical plate 15, the first rack 18 and the transmission gear 19 are meshed, a connecting block 20 is slidably installed inside the vertical plate 15, a pedal 21 located behind the vertical plate 15 is fixedly connected to the rear side of the connecting block 20, a first spring 22 is fixedly installed on the bottom end of the pedal 21, the right side of the connecting block 20 is fixedly connected to a second rack 23 close to the right side of the vertical plate 15, the second rack 23 is meshed with the transmission gear 19, and a dust receiving component is provided at the bottom of the standing plate 2;
[0038] In the initial state, the second tension spring 14 pulls the slide plate 12 to slide upward along the first guide column. At this time, the lever 13 moves upward and blocks the opening on the right side of the placement box 6. The staff uses the driving assembly to lower the placement box 6 to the bottom, pulls the first connecting plate 9 to the left, and moves the push plate 8 to the left side of the placement box 6. At this time, the first tension spring 10 is in a stretched state, and the bricks are placed in the placement box 6 in sequence. The first connecting plate 9 is released, and the first tension spring 10 will drive the push plate 8 to squeeze the bricks to the right, so that the bricks are pressed against the left side of the lever 13, and the cover plate 7 is covered;
[0039] The placement box 6 is moved upward by the driving assembly. During the upward movement of the placement box 6, the top of the shift rod 13 first contacts the bottom of the vertical plate 15, and the shift rod 13 stops moving upward. At this time, the placement box 6 continues to move upward, and the right side of the placement box 6 is in close contact with the left side of the vertical plate 15. When the bottom of the placement box 6 and the vertical plate 15 are in the same horizontal plane, the shift rod 13 no longer limits the bricks. The push plate 8 pushes the rightmost brick into the support plate 17 in the accommodating groove 16 under the tension of the first tension spring 10. The staff steps on the pedal 21 downward, and the first spring 22 is in a compressed state. During the downward movement of the pedal 21, the pedal 21 drives the second rack 23 to move downward through the connecting block 20, and the second rack 23 drives the transmission gear The wheel 19 rotates, and the first rack 18 moves upward under the meshing action of the transmission gear 19, thereby driving the support plate 17 and the bricks thereon to move upward. When the pedal 21 is stepped on to the bottom, the upper half of the brick extends out of the receiving groove 16, and the staff takes it out; after taking it out, the pedal 21 is released, and the first spring 22 pushes the pedal 21 to move upward. The pedal 21 drives the second rack 23 to move upward through the connecting block 20, and the second rack 23 drives the transmission gear 19 to rotate in the opposite direction. At this time, the first rack 18 moves downward under the meshing action of the transmission gear 19, thereby driving the support plate 17 to move downward. When the first spring 22 pushes the pedal 21 to the highest point, the support plate 17 moves to the bottom of the receiving groove 16, ready for the next use;
[0040] Bricks can be placed in the placement box 6 and transported to the standing board 2 through the driving mechanism. There is no need for manual delivery or throwing by the staff, which reduces the workload of the staff and saves labor. The bricks transported to the standing board 2 are placed in the placement box 6 in an orderly manner, avoiding the risk of bricks falling or tripping the staff due to disorderly accumulation of bricks on the standing board 2. The staff only needs to step on the pedal 21 to slide the bricks out of the placement box 6 one by one. The operation is simple and convenient for the staff to take them. It solves the problem of bricks falling when taking them due to accumulation, improves the safety of the working process, and eliminates safety hazards in the working process.
[0041] like Figure 1 As shown, the power mechanism includes a driving motor 24 and a first threaded rod 25, the driving motor 24 is fixedly installed on the placement plate 3, the first threaded rod 25 is rotatably installed between the standing plate 2 and the placement plate 3, the first threaded rod 25 is meshed with the power output shaft of the driving motor 24 through a bevel gear set, the slide 5 is threadedly connected to the first threaded rod 25, and the first threaded sleeve is threadedly connected to the first threaded rod 25; the staff starts the driving motor 24, the driving motor 24 drives the first threaded rod 25 to rotate, and the first threaded rod 25 can drive the slide 5 to move up and down through the first threaded sleeve.
[0042] like Figure 2 and Figure 8-10 As shown, the ash receiving assembly includes a second threaded rod 26, a first ash receiving plate 27 and a second ash receiving plate 28, the second threaded rod 26 is rotatably mounted on the bottom of the standing plate 2, and two second sliding rods 29 are fixedly mounted on the bottom of the standing plate 2, the first ash receiving plate 27 is threadedly connected to the second threaded rod 26 and can slide along the two second sliding rods 29, the top of the first ash receiving plate 27 is fixedly connected with a second threaded sleeve, the second threaded sleeve is threadedly connected to the second threaded rod 26, the left and right sides of the top of the first ash receiving plate 27 are fixedly connected with a group of second sliding sleeves, each group of second sliding sleeves is sleeved on the second sliding rod 29 on the corresponding side, the The second ash receiving plate 28 is slidably installed in the first ash receiving plate 27, and the bottom of the second ash receiving plate 28 is fixedly connected with a second connecting plate 30 that penetrates the bottom of the first ash receiving plate 27, and a second spring 31 is fixedly installed between the second connecting plate 30 and the first ash receiving plate 27. A rubber strip is provided on the rear side of the second ash receiving plate 28, and the rubber strip can be deformed under the extrusion effect, so that the second ash receiving plate 28 and the wall surface are more closely fitted. A first transmission belt 32 is installed between the front end of the second threaded rod 26 and the power output shaft of the driving motor 24, and a cleaning component located above the ash receiving component is provided at the bottom of the standing plate 2;
[0043] The staff places the scaffolding next to the wall. When the placement box 6 is located at the bottom of the first threaded rod 25, the first ash receiving plate 27 and the second ash receiving plate 28 are both located below the standing plate 2. During the upward movement of the placement box 6, the driving motor 24 drives the second threaded rod 26 to rotate through the first transmission belt 32. At this time, the second threaded rod 26 will drive the first ash receiving plate 27 and the second ash receiving plate 28 to slide out from under the standing plate 2 until the placement box 6 rises to the highest point. The first ash receiving plate 27 slides to the limit distance, and under the push of the second spring 31, the second ash receiving plate 28 and the wall always maintain close contact. When the wall is painted, cement and other materials that fall off the wall will fall onto the first ash receiving plate 27 and the second ash receiving plate 28, which solves the problem of cement and other materials falling and accumulating in the corners of the wall, and achieves the effect of keeping the corners clean. After the construction is completed, there is no need to clean the corners, which reduces the workload of the staff and simplifies the work process.
[0044] When the driving mechanism drives the placement box 6 to move downward, the driving motor 24 drives the second threaded rod 26 to rotate in the opposite direction. At this time, the first ash receiving plate 27 and the second ash receiving plate 28 will retract to the bottom of the standing plate 2. During the retraction of the first ash receiving plate 27 and the second ash receiving plate 28, the cleaning component will automatically clean the first ash receiving plate 27 and the second ash receiving plate 28. The degree of automation is high. The placement box 6 can perform self-cleaning every time it moves downward, which effectively avoids excessive accumulation of materials on the first ash receiving plate 27 and the second ash receiving plate 28, so that the first ash receiving plate 27 and the second ash receiving plate 28 always remain in a relatively clean state.
[0045] like Figure 2 , Figure 8 , Fig. 9 and Fig.11 As shown, the cleaning assembly includes a brush roller 33 and a scraper 34, the brush roller 33 is rotatably mounted on the bottom of the station board 2, a transmission shaft 35 is rotatably mounted on the bottom of the station board 2, the right end of the transmission shaft 35 is meshed with the second threaded rod 26 through a bevel gear set, a second transmission belt 36 is installed between the left end of the brush roller 33 and the left end of the transmission shaft 35, the scraper 34 is rotatably mounted on the bottom of the station board 2, and a plurality of third springs 37 are fixedly installed between the scraper 34 and the station board 2;
[0046] When the second threaded rod 26 rotates in the opposite direction, the first dust receiving plate 27 and the second dust receiving plate 28 retract to the bottom of the standing plate 2. During this process, multiple third springs 37 press down the scraper 34, so that the bottom end of the scraper 34 is always in close contact with the first dust receiving plate 27 or the second dust receiving plate 28, so that the scraper 34 is used to scrape the material on the first dust receiving plate 27 and the second dust receiving plate 28. At the same time, the second threaded rod 26 drives the transmission shaft 35 to rotate, and the transmission shaft 35 drives the brush roller 33 to rotate through the second transmission belt 36. The brush roller 33 cleans the first dust receiving plate 27 and the second dust receiving plate 28, so that the first dust receiving plate 27 and the second dust receiving plate 28 remain in a relatively clean state, effectively preventing material residue from adhering to the first dust receiving plate 27 or the second dust receiving plate 28.
[0047] like Figure 1 , Figure 2 and Fig.12 As shown, the middle part of the frame 1 is fixedly connected with an ash collecting hopper 38 located below the ash receiving assembly, the interior of the ash collecting hopper 38 is slidably connected with an ash pushing plate 39, the rear side of the ash pushing plate 39 is fixedly connected with a pushing handle 40, the bottom of the ash collecting hopper 38 is fixedly installed with an ash guiding groove 41, and an ash bucket 42 is placed on the placement plate 3;
[0048] During the retraction of the first ash receiving plate 27 and the second ash receiving plate 28, the scraper 34 and the brush roller 33 scrape and clean the materials accumulated thereon, and the scraped and cleaned materials will fall into the ash collecting hopper 38 below them. When the materials in the ash collecting hopper 38 are accumulated more, the ash pushing plate 39 is pushed by the pushing handle 40 to push the materials in the ash collecting hopper 38 into the ash barrel 42 through the ash guiding groove 41, so as to realize the unified collection of materials, facilitate the staff to handle the materials, avoid the materials from falling everywhere, and keep the working environment clean.
[0049] like Fig.13As shown, the left side of the placement box 6 is slidably connected to a limit pin 43, and a third tension spring 44 is fixedly connected between the limit pin 43 and the placement box 6. The left side of the cover plate 7 is fixedly connected to a limit seat 45. The staff can open the cover plate 7 to store bricks in the placement box 6 by pulling the limit pin 43 to the left. When the storage is completed, the cover plate 7 is closed, and the third tension spring 44 pulls the limit pin 43 to automatically snap into the limit seat 45, thereby limiting the cover plate 7 to prevent the cover plate 7 from rotating during use, thereby improving the stability of the device.
[0050] like Figure 1 As shown, protective frames 46 are fixedly installed on the left and right sides of the top of the standing board 2, and a storage basket 47 is arranged on the protective frame 46. The protective frame 46 can be used for support of the staff, effectively preventing the staff from falling from the standing board 2, thereby improving the safety of the working process. The staff can store the tools in the storage basket 47 and store the tools in a unified manner to prevent the tools from being randomly placed on the standing board 2 and causing them to fall or trip the staff.
[0051] Working process: the staff moves the push plate 8 to the left side of the placement box 6, places the bricks into the placement box 6, the first tension spring 10 drives the push plate 8 to squeeze the bricks to the right, so that the bricks are pressed against the left side of the stop rod 13, and the cover plate 7 is covered. The placement box 6 moves upward through the driving assembly. During this process, the stop rod 13 stops moving under the resistance of the vertical plate 15. When the bottom of the placement box 6 and the vertical plate 15 are at the same horizontal plane, the stop rod 13 no longer limits the bricks, and the push plate 8 pushes the rightmost brick onto the support plate 17 in the accommodating groove 16. In the process of the placement box 6 moving upward, the second threaded rod 26 drives the first ash receiving plate 27 and the second ash receiving plate 28 to slide out from under the standing plate 2. When the placement box 6 rises to the highest point, the second ash receiving plate 28 is in close contact with the wall.
[0052] The staff steps on the pedal 21 downward, and the pedal 21 drives the second rack 23 to move downward through the connecting block 20, and the second rack 23 drives the first rack 18 to move upward through the transmission gear 19, so that the support plate 17 and the bricks thereon move upward. When the pedal 21 is stepped on to the bottom, the upper half of the bricks extend out of the receiving groove 16, and the staff can take them out. After taking them out, the pedal 21 is released, and under the thrust of the first spring 22, the support plate 17 moves to the bottom of the receiving groove 16, ready for the next use.
[0053] When the placement box 6 moves downward, the driving motor 24 drives the second threaded rod 26 to reverse, and the first ash receiving plate 27 and the second ash receiving plate 28 will retract to the bottom of the standing plate 2. During this process, the third spring 37 presses the scraper 34 downward so that the bottom end of the scraper 34 is always in close contact with the first ash receiving plate 27 or the second ash receiving plate 28, so that the scraper 34 is used to scrape the material on the first ash receiving plate 27 and the second ash receiving plate 28. At the same time, the second threaded rod 26 drives the transmission shaft 35 to rotate, and the transmission shaft 35 drives the brush roller 33 to rotate through the second transmission belt 36. The brush roller 33 cleans the first ash receiving plate 27 and the second ash receiving plate 28, and the scraped and cleaned materials will fall into the ash collecting hopper 38. When the material in the ash collecting hopper 38 is accumulated more, the ash pushing plate 39 is pushed to push the material in the ash collecting hopper 38 into the ash barrel 42 through the ash guide groove 41.
[0054] It should be noted that in the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for the convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0055] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0056] The term "comprise" or any other similar term is intended to cover a non-exclusive inclusion, such that a process, article, or apparatus / device that includes a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, article, or apparatus / device.
[0057] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. A building scaffold for preventing building materials from falling, characterized in that: The invention comprises a frame (1), a standing plate (2) is fixedly mounted on the top of the frame (1), a placement plate (3) is fixedly mounted on the middle of the frame (1), two first sliding bars (4) are fixedly mounted between the placement plate (3) and the standing plate (2), a slide frame (5) is slidably connected to the two first sliding bars (4), the slide frame (5) slides up and down along the first sliding bars (4) under the drive of a power mechanism, a placement box (6) is fixedly connected to the slide frame (5), a cover plate (7) is rotatably mounted on the top of the placement box (6), and the placement box (6) is ) is slidably connected to a push plate (8) inside, the front side of the push plate (8) is fixedly connected to a first connecting plate (9) extending through the outside of the placement box (6), a first tension spring (10) is fixedly installed between the first connecting plate (9) and the placement box (6), a connecting frame (11) is fixedly connected to the bottom of the right side of the placement box (6), a slide plate (12) is slidably installed on the connecting frame (11), a gear lever (13) is fixedly connected to the right side of the slide plate (12), and a second tension spring (14) is fixedly installed between the slide plate (12) and the placement box (6); A vertical plate (15) is fixedly mounted on the standing plate (2), a receiving groove (16) is provided on the left side of the vertical plate (15), a support plate (17) is slidably mounted in the receiving groove (16), a first rack (18) is fixedly connected to the right side of the support plate (17), a transmission gear (19) is rotatably mounted on the right side of the vertical plate (15), a connecting block (20) is slidably mounted inside the vertical plate (15), a pedal (21) is fixedly connected to the rear side of the connecting block (20), a first spring (22) is fixedly mounted on the bottom end of the pedal (21), a second rack (23) is fixedly connected to the right side of the connecting block (20), and an ash receiving assembly is provided at the bottom of the standing plate (2); The power mechanism comprises a drive motor (24) and a first threaded rod (25), wherein the drive motor (24) is fixedly mounted on the placement plate (3), the first threaded rod (25) is rotatably mounted between the station plate (2) and the placement plate (3), the first threaded rod (25) is meshed with a power output shaft of the drive motor (24) via a bevel gear set, and the slide (5) is threadedly connected to the first threaded rod (25); The ash receiving assembly comprises a second threaded rod (26), a first ash receiving plate (27) and a second ash receiving plate (28); the second threaded rod (26) is rotatably mounted on the bottom of the standing plate (2); two second sliding rods (29) are fixedly mounted on the bottom of the standing plate (2); the first ash receiving plate (27) is threadedly connected to the second threaded rod (26) and can slide along the two second sliding rods (29); the second ash receiving plate (28) is slidably mounted in the first ash receiving plate (27); a second connecting plate (30) is fixedly connected to the bottom of the second ash receiving plate (28); a second spring (31) is fixedly mounted between the second connecting plate (30) and the first ash receiving plate (27); a first transmission belt (32) is mounted between the front end of the second threaded rod (26) and the power output shaft of the driving motor (24); and a cleaning assembly located above the ash receiving assembly is provided at the bottom of the standing plate (2); The cleaning assembly comprises a brush roller (33) and a scraper (34); the brush roller (33) is rotatably mounted on the bottom of the station plate (2); a transmission shaft (35) is rotatably mounted on the bottom of the station plate (2); the right end of the transmission shaft (35) is meshed with a second threaded rod (26) via a bevel gear set; a second transmission belt (36) is mounted between the brush roller (33) and the transmission shaft (35); the scraper (34) is rotatably mounted on the bottom of the station plate (2); and a plurality of third springs (37) are fixedly mounted between the scraper (34) and the station plate (2); An ash collecting hopper (38) located below the ash receiving assembly is fixedly connected to the middle of the frame (1); an ash pushing plate (39) is slidably connected to the interior of the ash collecting hopper (38); a pushing handle (40) is fixedly connected to the rear side of the ash pushing plate (39); an ash guiding groove (41) is fixedly installed at the bottom of the ash collecting hopper (38); and an ash bucket (42) is placed on the placement plate (3).
2. A construction scaffold for preventing construction materials from falling according to claim 1, characterized in that: The left side of the placement box (6) is slidably connected to a limit pin (43), a third tension spring (44) is fixedly connected between the limit pin (43) and the placement box (6), and the left side of the cover plate (7) is fixedly connected to a limit seat (45).
3. A construction scaffold for preventing construction materials from falling according to claim 1, characterized in that: Protective frames (46) are fixedly mounted on both left and right sides of the top of the standing board (2), and a storage basket (47) is provided on the protective frame (46).