A method for in-situ leaching of low-permeability, high-carbonate sandstone uranium ore
By performing carbon dioxide precarbonization and then injecting oxygen in a low permeability and high carbonate sandstone uranium ore, the low permeability and low uranium concentration in the local leaching of low permeability sandstone uranium ore are solved, the low permeability and low uranium concentration are solved. The problem of this has achieved efficient and economical uranium mining.
Patent Information
- Application Number
- CN202211409329.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-11
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-11-11
AI Technical Summary
低渗透砂岩铀矿在地浸开采时由于渗透性低、抽液量小、水位下降急剧、注液压力高且浸出液中铀浓度偏低,导致开采不经济,缺乏有效开发方法。
By first injecting carbon dioxide into low-permeability, highly carbonate-type sandstone uranium ore for pre-carbonation, the concentration of bicarbonate ion in the aquifer is improved, the permeability of the ore layer is improved, and then oxygen is injected to improve groundwater oxidation, using carbon dioxide+ The staged oxygen injection method is used for in-situ leaching and mining.
The injection volume and uranium concentration of low-permeability sandstone uranium ore are increased, the injection pressure is reduced, efficient and economical mining is achieved, and the leaching cycle is shortened, and production costs are reduced.
Smart Images

Figure CN115898359B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, and in particular to an in-situ leaching mining method for low-permeability, high-carbonate sandstone uranium ore. Background Art
[0002] At present, the production capacity provided by in-situ leaching uranium mining accounts for more than 90% of my country's total natural uranium production capacity. However, my country's low-permeability sandstone uranium resources account for more than 70% of the country's uranium resources. How to successfully develop these low-permeability sandstone uranium mines will become an urgent problem to be solved in the field of in-situ leaching uranium mining.
[0003] At present, my country's in-situ leaching uranium mining technology is mainly aimed at sandstone uranium mines with good permeability. For example, the permeability coefficient of most sandstone uranium mines being mined in the Yili Basin in Xinjiang is greater than 0.5m / d; the permeability coefficient of the Bayan Ula deposit in Inner Mongolia is 1-10m / d. Due to the low permeability coefficient (less than 0.1m / d) of low-permeability sandstone uranium mines, in-situ leaching often leads to small drilling fluid extraction, sharp drop in groundwater level, and increased injection pressure. At the same time, due to the insufficient dissolution of uranium minerals by the leaching agent, the uranium concentration in the leachate during in-situ leaching of low-permeability sandstone uranium mines is also low. Therefore, in-situ leaching of low-permeability sandstone uranium mines is not economical at present, and there is no precedent for mining low-permeability sandstone uranium mines in China. Summary of the invention
[0004] In view of this, the object of the present invention is to provide an in-situ leaching mining method for low-permeability, high-carbonate sandstone uranium ore. The method provided by the present invention can efficiently mine low-permeability, high-carbonate sandstone uranium ore.
[0005] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:
[0006] The present invention provides an in-situ leaching mining method for low-permeability, high-carbonate sandstone uranium ore, which is characterized by comprising the following steps:
[0007] (1) injecting carbon dioxide into a low-permeability, high-carbonate sandstone uranium ore-bearing aquifer through an injection hole for pre-carbonation until the concentration of bicarbonate ions in the water of the aquifer is greater than or equal to 2.0 g / L, injecting oxygen into the aquifer through the injection hole while continuously injecting carbon dioxide, and extracting the resulting leachate through a liquid extraction hole;
[0008] (2) When the concentration of bicarbonate ions in the mineral-bearing aquifer water drops to less than 2.0 g / L, the injection of oxygen is stopped, and then carbon dioxide injection, oxygen injection and leachate extraction are cyclically performed in the mineral-bearing aquifer according to the method of step (1).
[0009] Preferably, the permeability coefficient of the low-permeability, high-carbonate sandstone uranium ore is less than 0.1 m / d, and the carbonate content is greater than 5%; the initial concentration of bicarbonate ions in the water of the mineral-bearing aquifer is 0.1-0.4 g / L.
[0010] Preferably, the injection pressure of the carbon dioxide is 0.8-1.0 MPa.
[0011] Preferably, during the carbon dioxide injection process, a dissolving device is provided in the injection hole to stir the water in the injection hole.
[0012] Preferably, the pre-carbonation time is 15 to 30 days.
[0013] Preferably, the injection pressure of the oxygen is 0.6-1.5 MPa or the maximum pressure that the injection system can withstand.
[0014] Preferably, the method for setting the injection hole and the extraction hole is:
[0015] For low-permeability, high-carbonate sandstone uranium deposits, drilling construction is carried out and filters are lowered. According to the thickness of the ore layer and the calcareous interlayer in the mineral-bearing aquifer, as well as the relative position of the ore layer and the calcareous interlayer, the formed boreholes are determined as injection holes and / or extraction holes.
[0016] Preferably, when the calcareous interlayer in the mineral-bearing aquifer is located inside the mineral layer and has a thickness of less than 0.2 m, the length of the filter is the same as the thickness of the mineral layer, and the drilled hole formed at this time serves as a liquid injection hole or a liquid extraction hole;
[0017] When the calcareous interlayer is located inside the ore layer and has a thickness greater than or equal to 0.2 meters, the length of the filter is the same as the thickness of the ore layer. The drilled hole formed at this time serves as an injection hole, or the filter is lengthened to serve as a pumping hole.
[0018] Preferably, when the calcareous interlayer in the mineral-bearing aquifer is not inside the mineral layer but has an overlapping part with the mineral layer, when the thickness of the overlapping part is greater than or equal to the thickness of the mineral layer, the length of the filter is the same as the thickness of the mineral layer, and the drill hole formed at this time is used as an injection hole after permeability enhancement treatment; when the thickness of the overlapping part is less than 0.2 meters, the length of the filter is the same as the thickness of the mineral layer, and the drill hole formed at this time is used as an injection hole or a liquid extraction hole; when the thickness of the overlapping part is greater than or equal to 0.2 meters and less than the thickness of the mineral layer, the length of the filter is the same as the thickness of the mineral layer, and the drill hole formed at this time is used as an injection hole, or the filter is increased in length and used as a liquid extraction hole.
[0019] Preferably, the permeability enhancement treatment is high-energy gas fracturing or hydraulic fracturing.
[0020] The present invention provides an in-situ leaching mining method for low-permeability, high-carbonate sandstone uranium ore, comprising the following steps: (1) injecting carbon dioxide into a low-permeability, high-carbonate sandstone uranium ore-bearing aquifer through an injection hole for pre-carbonation until the concentration of bicarbonate ions in the water of the mineral-bearing aquifer is greater than or equal to 2.0 g / L, injecting oxygen into the mineral-bearing aquifer through the injection hole while continuously injecting carbon dioxide, and extracting the obtained leachate through a liquid extraction hole; (2) when the concentration of bicarbonate ions in the water of the mineral-bearing aquifer drops to less than 2.0 g / L, stopping injecting oxygen, and then cyclically performing the operations of injecting carbon dioxide, injecting oxygen and extracting leachate into the mineral-bearing aquifer according to the method of step (1). The present invention first injects carbon dioxide into the mineral-bearing aquifer to effectively increase the bicarbonate ion concentration in the ore layer water. The pre-carbonation of groundwater before formal leaching will cause a large amount of carbonate minerals in the low-permeability sandstone uranium ore to dissolve, thereby increasing the porosity of the ore, effectively improving the permeability of the ore layer, providing good conditions for uranium leaching, and no need to supplement bicarbonate; then oxygen is injected to increase the oxidizability of groundwater to achieve uranium leaching. The present invention adopts an in-situ leaching mining method of carbon dioxide pre-carbonation and carbon dioxide + oxygen leaching in stages, which can quickly increase the amount of pumped injection liquid and uranium concentration in the in-situ leaching mining of low-permeability, high-carbonate sandstone uranium ore, reduce the injection pressure, and achieve efficient and economical in-situ leaching mining of low-permeability, high-carbonate sandstone uranium ore, and can shorten the leaching cycle and reduce production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the lowering of the filter when the calcium interlayer is located inside the ore layer and the thickness is less than 0.2 meters in the present invention;
[0022] Figure 2 It is a schematic diagram of the lowering of the filter when the calcium interlayer is located inside the ore layer and the thickness is greater than or equal to 0.2 meters in the present invention;
[0023] Figure 3 It is a schematic diagram of the lowering of the filter when the calcareous interlayer is not inside the ore layer but has an overlapping portion with the ore layer (the thickness of the overlapping portion is greater than or equal to the thickness of the ore layer) in the present invention;
[0024] Figure 4 The curves showing the changes of bicarbonate ion concentration and uranium leaching rate over time when CO2 and O2 are injected in stages in Example 1;
[0025] Figure 5 This is the curve of bicarbonate ion concentration and uranium leaching rate changing with time when CO2 and O2 are injected simultaneously in Comparative Example 1. DETAILED DESCRIPTION
[0026] The present invention provides an in-situ leaching mining method for low-permeability, high-carbonate sandstone uranium ore, comprising the following steps:
[0027] (1) injecting carbon dioxide into a low-permeability, high-carbonate sandstone uranium ore-bearing aquifer through an injection hole for pre-carbonation until the concentration of bicarbonate ions in the water of the aquifer is greater than or equal to 2.0 g / L, injecting oxygen into the aquifer through the injection hole while continuously injecting carbon dioxide, and extracting the resulting leachate through a liquid extraction hole;
[0028] (2) When the concentration of bicarbonate ions in the mineral-bearing aquifer water drops to less than 2.0 g / L, the injection of oxygen is stopped, and then carbon dioxide injection, oxygen injection and leachate extraction are cyclically performed in the mineral-bearing aquifer according to the method of step (1).
[0029] First, the method for setting the liquid injection hole and the liquid extraction hole in the present invention is specifically described.
[0030] In the present invention, the method for setting the injection holes and extraction holes is preferably: drilling construction is carried out on the low-permeability, high-carbonate sandstone uranium ore and a filter is lowered, and the formed boreholes are determined as injection holes and / or extraction holes according to the thickness of the ore layer and the calcareous interlayer in the mineral-bearing aquifer and the relative position of the ore layer and the calcareous interlayer.
[0031] The present invention does not have any special instructions for the drilling construction method, and the drilling construction method familiar to those skilled in the art can be used. The present invention has no special requirements for the filter, and the filter familiar to those skilled in the art can be used. The present invention specifically determines the thickness of the ore layer and the calcareous interlayer in the mineral-bearing aquifer and the relative position of the ore layer and the calcareous interlayer based on the results of geophysical well logging interpretation and core logging. In the present invention, when the calcareous interlayer in the mineral-bearing aquifer is located inside the ore layer and has a thickness of less than 0.2 meters (when the calcareous interlayer is thin), the length of the filter is preferably the same as the thickness of the ore layer. The borehole formed at this time serves as an injection hole or a pumping hole, such as Figure 1 When the calcium interlayer is located inside the ore layer (such as located in the upper, middle or lower part of the ore layer) and the thickness is greater than or equal to 0.2 meters, the length of the filter is preferably the same as the thickness of the ore layer. The drilled hole formed at this time is used as a liquid injection hole, or the filter is increased in length and used as a liquid extraction hole, such as Figure 2 In the present invention, the increased length of the filter can ensure the amount of liquid pumped, and the length of the portion of the filter that exceeds the thickness of the ore layer is preferably not greater than the thickness of the calcareous interlayer.
[0032] In the present invention, when the calcium interlayer in the mineral-bearing aquifer is not inside the mineral layer but has an overlapping portion with the mineral layer, and when the thickness of the overlapping portion is greater than or equal to the mineral layer thickness, the length of the filter is preferably the same as the mineral layer thickness. At this time, the drilled hole formed is used as a liquid injection hole after the permeability enhancement treatment. Since the permeability of the calcium interlayer is extremely low, the hole is not suitable as a liquid extraction hole. Figure 3 As shown; when the thickness of the overlapping part is less than 0.2 meters, the length of the filter is preferably the same as the thickness of the ore layer, and the drill hole formed at this time serves as an injection hole or a liquid extraction hole; when the thickness of the overlapping part is greater than or equal to 0.2 meters and less than the thickness of the ore layer, the length of the filter is preferably the same as the thickness of the ore layer, and the drill hole formed at this time serves as a liquid injection hole, or the length of the filter is increased to serve as a liquid extraction hole, and the length of the part of the filter that exceeds the thickness of the ore layer is preferably not greater than the thickness of the calcareous interlayer. In the present invention, the permeability enhancement treatment is preferably high-energy gas fracturing or hydraulic fracturing, and the high-energy gas can be high-energy CO2, N2 and other gases released by the combustion of gunpowder or propellant; the dense cementing layer structure of the calcareous interlayer is destroyed by the permeability enhancement treatment, and a dense crack network is formed in the calcareous interlayer, thereby improving the permeability of the calcareous interlayer.
[0033] The general principle of setting the injection holes and the extraction holes in the present invention is that the filter section cannot be entirely composed of calcareous interlayers with extremely low permeability, and non-densely cemented sandstone uranium ore must be left in this section to reserve a leaching channel to ensure that the solution can flow between the injection and extraction holes.
[0034] The in-situ leaching mining method for low-permeability, high-carbonate sandstone uranium ore provided by the present invention is described in detail below.
[0035] The present invention injects carbon dioxide into the ore-bearing aquifer of low-permeability, high-carbonate sandstone uranium ore through the injection hole for pre-carbonation until the concentration of bicarbonate ions in the ore-bearing aquifer is greater than or equal to 2.0 g / L. In the present invention, the permeability coefficient of the low-permeability, high-carbonate sandstone uranium ore is preferably less than 0.1 m / d, and the carbonate content (in terms of CO2) is preferably greater than 5%; the initial concentration of bicarbonate ions in the water of the ore-bearing aquifer is preferably 0.1-0.4 g / L, more preferably 0.3 g / L. In the present invention, the injection pressure of the carbon dioxide is preferably 0.8-1.0 MPa. During the injection of the carbon dioxide, the present invention preferably provides a dissolving device in the injection hole to stir the water in the injection hole so that the carbon dioxide concentration in the water in the injection hole is evenly distributed vertically; the present invention has no special requirements for the dissolving device, and a device that can help dissolution and is well known to those skilled in the art can be used, such as a stirring paddle. At the same time, during the carbon dioxide injection process, the wellheads of all boreholes are closed to maintain the injection of carbon dioxide continuously and stably to prevent carbon dioxide from escaping. In the present invention, the time of the pre-carbonation is preferably 15 to 30 days; the specific operation of the pre-carbonation is preferably: injecting carbon dioxide into the ore-bearing aquifer of the low-permeability, high-carbonate sandstone uranium mine through the injection hole, and pumping liquid through the pumping hole at the same time, cyclically pumping liquid and injecting carbon dioxide (i.e., starting the pumping and injection cycle), the process lasts for 15 to 30 days, until the concentration of bicarbonate ions in the ore layer water is greater than or equal to 2.0g / L; the pumping and injection cycle can accelerate the flow rate of groundwater (carbon dioxide dissolves in water to generate carbonic acid, which can accelerate the flow of carbonic acid), thereby improving the rate at which carbon dioxide dissolves the calcareous interlayer.
[0036] After completing the pre-carbonation, the present invention injects oxygen into the mineral-bearing aquifer through the injection hole while continuously injecting carbon dioxide, and at the same time extracts the obtained leachate through the extraction hole. In the present invention, the injection pressure of the carbon dioxide is the same as that of the above-mentioned technical solution, which will not be repeated here; the injection pressure of the oxygen is preferably 0.6-1.5MPa or preferably the maximum bearing pressure of the injection system. In the present invention, the extraction of the leachate is specifically achieved by a submersible pump arranged deep in the borehole. In the present invention, the operation cycle of extracting the obtained leachate and injecting oxygen through the extraction hole is carried out (i.e., the extraction and injection cycle is started).
[0037] When the concentration of bicarbonate ions in the mineral-bearing aquifer water drops to less than 2.0 g / L, the present invention stops injecting oxygen and then cyclically performs the operations of carbon dioxide injection, oxygen injection and leachate extraction according to the above method.
[0038] Low-permeability sandstone uranium deposits are often rich in carbonate minerals such as calcite and siderite. For example, the low-permeability sandstone uranium deposits in the Ordos Basin contain several layers of dense calcareous interlayers in the aquifers. These calcareous interlayers are dense and have a much higher degree of carbonate cementation than normal sandstone. Their thickness ranges from tens of centimeters to several meters. The dense calcareous cementation layer is the direct cause of the high content of carbonate minerals in the ore and is also one of the reasons for the low permeability of the ore layer. When the carbonate content in the ore exceeds 2%, if the acid in-situ leaching uranium process is used, sulfuric acid reacts with carbonates to form calcium sulfate precipitation to block the ore layer, which will further reduce the permeability of the ore layer. Therefore, CO2+O2 neutral leaching method is generally used for ores with high carbonate content. When uranium is mined in situ, CO2 and O2 are often injected into the ore layer simultaneously. Through the pumping cycle, the leaching agent enters the ore layer, reacts and dissolves uranyl ions, and is brought to the surface for recovery with the extracted liquid. However, when the concentration of bicarbonate ions in the groundwater is low, simply injecting CO2 cannot increase the concentration of HCO3 in the groundwater. - The concentration is sufficient to create an environment where uranium can be leached smoothly. At this time, additional bicarbonate is often required, which increases production costs. Since CO2+O2 neutral leaching has a lower reaction intensity than acid leaching, the leaching cycle is often longer when facing low-permeability sandstone uranium mines, and the uranium concentration in the leachate is low at the beginning of leaching. The present invention pre-carbonates the groundwater before formal leaching, which can dissolve a large amount of carbonate minerals in the low-permeability sandstone uranium mine, increase the porosity of the ore, and effectively improve the permeability of the ore layer. After pre-carbonation, the HCO3 in the groundwater - The concentration can be increased from the background value of about 0.3g / L to more than 2.0g / L, providing good conditions for the next step of uranium leaching; and then oxygen is injected to improve the oxidizability of groundwater to achieve uranium leaching. The present invention adopts an in-situ leaching mining method of carbon dioxide pre-carbonation and phased injection of carbon dioxide + oxygen leaching, which can quickly increase the amount of pumped liquid and uranium concentration in the in-situ leaching of low-permeability sandstone uranium mines without significantly changing the CO2+O2 neutral leaching process and without additional supplementation of bicarbonate (the present invention has a higher water volume in the early stage of mining for low-permeability sandstone uranium mines, and a higher concentration of uranium can be achieved in the leaching solution after injecting O2), thereby achieving efficient and economical in-situ leaching of low-permeability sandstone uranium mines. Compared with the conventional CO2+O2 leaching process of simultaneously injecting CO2 and O2 into the ore layer, the present invention can greatly shorten the time when the uranium concentration peak in the leaching solution appears by pre-carbonating the mineral-bearing aquifer, and a higher concentration can appear at the beginning of leaching.
[0039] The in-situ leaching method for low-permeability, high-carbonate sandstone uranium ore provided by the present invention is described in detail below in conjunction with the embodiments, but they should not be construed as limiting the scope of protection of the present invention.
[0040] Example 1
[0041] The target low-permeability ore layer contains high-calcium and high-carbonate sandstone uranium ore, with a carbonate content (in terms of CO2) of 6-15%. The ore layer water is a low-bicarbonate environment, HCO3 - The concentration is about 0.3 g / L, and pumping tests show that the permeability absorption coefficient of the mineral-bearing aquifer is only 0.065 m / d.
[0042] Indoor pressure leaching test shows that after 0.8MPa CO2 is dissolved into the mineral layer water and stirred in an autoclave for 2 days, the HCO3 in the solution - The concentration increased from 0.3 g / L to 2.3 g / L, indicating the dissolution of carbonate formed when carbonates in the ore are dissolved by CO2 into the mineral water.
[0043] The implementation steps of on-site in-situ leaching mining are as follows:
[0044] Step 1: Normal drilling process. After reaching the target layer and taking cores, start logging and record the cores. According to the geophysical logging interpretation and core recording results, determine the thickness of the mineral layer and the calcareous interlayer in the aquifer and the relative position of the mineral layer and the calcareous interlayer.
[0045] Step 2: According to the results of geophysical interpretation and core logging, and in accordance with the principle that the filter sections cannot all be extremely low-permeability calcareous interlayers, determine the length and position of the borehole filter, complete the well drilling of the in-situ leaching uranium borehole, build the on-site pressurized injection and pumping system, complete the pumping test and tracer test, and determine the length and position of the borehole filter as follows:
[0046] When the calcareous interlayer in the mineral-bearing aquifer is located inside the mineral layer and has a thickness of less than 0.2 m, the length of the filter is the same as the thickness of the mineral layer, and the drilled hole formed at this time serves as a liquid injection hole or a liquid extraction hole;
[0047] When the calcareous interlayer is located inside the ore layer and has a thickness greater than or equal to 0.2 meters, the length of the filter is the same as the thickness of the ore layer, and the drilled hole formed at this time is used as a liquid injection hole, or the filter is increased in length to serve as a liquid extraction hole;
[0048] The calcareous interlayer in the mineral-bearing aquifer is not inside the mineral layer but has an overlapping part with the mineral layer. When the thickness of the overlapping part is greater than or equal to the thickness of the mineral layer, the length of the filter is the same as the thickness of the mineral layer. The drill hole formed at this time is used as an injection hole after permeability enhancement treatment (high-energy gas fracturing or hydraulic fracturing); when the thickness of the overlapping part is less than 0.2 meters, the length of the filter is the same as the thickness of the mineral layer. The drill hole formed at this time is used as an injection hole or a liquid extraction hole; when the thickness of the overlapping part is greater than or equal to 0.2 meters and less than the thickness of the mineral layer, the length of the filter is the same as the thickness of the mineral layer. The drill hole formed at this time is used as an injection hole, or the filter is increased in length and used as a liquid extraction hole.
[0049] Step 3: All holes are used as injection holes, and CO2 is injected at a pressure of 0.8-1.0 MPa to pre-carbonate the groundwater. At the same time, the extraction step of the extraction holes is started to increase the flow rate of groundwater and accelerate the pre-carbonation process. During this process, the wellheads of all boreholes are closed, and the injection of CO2 is maintained continuously and stably to prevent CO2 from escaping. The injection is continued for 15-30 days.
[0050] Step 4: After 15 to 30 days of pre-carbonation, monitor the HCO3 of the pumped liquid - Concentration changes, when HCO3 - The concentration exceeds 2.0 g / L, and the groundwater pre-carbonation is terminated; if the HCO3 - If the concentration is lower than 2.0 g / L, continue to maintain CO2 injection and monitor every 3 days until the CO2 concentration in the pumped liquid reaches 2.0 g / L.
[0051] Step 5: When the CO2 concentration in the pumped liquid reaches 2.0g / L, the O2 injection system is activated and the CO2+O2 pumping and injection cycle is started. The carbon dioxide injection pressure is maintained at 0.8-1.0MPa, and the oxygen injection pressure is maintained at 1.5MPa (or the maximum pressure of the injection system). The uranium (U) concentration, pH value, dissolved oxygen concentration, and HCO3 in the pumped liquid are monitored. - concentration, maintain the pH value of the pumped liquid at 7-8, the dissolved oxygen concentration exceeds 300 mg / L, and HCO3 - The concentration is above 2.0g / L to ensure that the uranium concentration is high.
[0052] Step 6: When HCO3 - When the concentration is less than 2.0 g / L, stop injecting oxygen and repeat the operations from step 3 to step 5.
[0053] Comparative Example 1
[0054] The basic conditions of the test deposit are the same as those of Implementation Case 1.
[0055] The implementation steps of on-site in-situ leaching mining are as follows:
[0056] Step 1: Normal drilling process. After reaching the target layer and taking cores, start logging and record the cores. According to the geophysical logging interpretation and core recording results, determine the thickness of the mineral layer and the calcareous interlayer in the aquifer and the relative position of the mineral layer and the calcareous interlayer.
[0057] Step 2: Based on the geophysical interpretation and core logging results, and in accordance with the principle that not all filter sections are calcareous interlayers with extremely low permeability, determine the length and position of the borehole filter, complete the well drilling of in situ leaching uranium, build an on-site pressurized injection and pumping system, and complete the pumping test and tracer test.
[0058] Step 3: Enable the CO2+O2 synchronous injection system and start the CO2+O2 extraction and injection cycle. The carbon dioxide injection pressure is maintained at 0.8-1.0MPa, and the oxygen injection pressure is maintained at 1.5MPa (or the maximum pressure of the injection system).
[0059] In order to verify the effect of the leaching mining method of the present invention, for the high carbonate ore studied in Example 1, leaching tests were conducted by adding CO2 and O2 in stages (Example 1) and by injecting CO2 and O2 simultaneously (Comparative Example 1), and the leaching effects of the two were compared. The results are as follows: Figure 4 and Figure 5 As shown, Figure 4 The curves of bicarbonate ion concentration and uranium leaching rate changing with time when CO2 and O2 are injected in stages in Example 1 are as follows: Figure 5 This is the curve of bicarbonate ion concentration and uranium leaching rate changing with time when CO2 and O2 are injected simultaneously in Comparative Example 1.
[0060] Depend on Figure 4 It can be seen that during the leaching process, bicarbonate ions will be continuously consumed. When the bicarbonate ion concentration drops from the initial >2g / L to 1.5g / L, the corresponding uranium leaching rate growth trend will decline; then CO2 pre-carbonation and CO2+O2 leaching are continuously carried out in stages, and the bicarbonate ion concentration in the solution is replenished to >2g / L at any time, and the leaching rate curve will reappear an upward trend. After continuously introducing CO2 to replenish the consumed bicarbonate ion concentration, the uranium leaching rate in the entire leaching cycle reached 67%, of which it exceeded 50% on the 10th day.
[0061] In the experiment of simultaneous injection of CO2 and O2 in Comparative Example 1 ( Figure 5 ), since O2 can oxidize minerals in the ore to release substances that consume bicarbonate ions (such as O2 oxidation of pyrite FeS2 in the ore will generate sulfuric acid, which reacts with bicarbonate), the bicarbonate concentration shows a downward trend (lower than 2g / L in the later period), and the uranium leaching rate in the comparative test has a slow upward trend, with the highest being only about 24.7%. The leaching rate of the leaching process with the addition of CO2 and O2 in stages is 2 to 3 times that of the leaching process with the simultaneous injection of CO2 and O2.
[0062] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for in-situ leaching of low-permeability, high-carbonate sandstone uranium ore, characterized in that: The following steps are involved: (1) injecting carbon dioxide into a low-permeability, high-carbonate sandstone uranium ore-bearing aquifer for pre-carbonation through an injection hole until the concentration of bicarbonate ions in the water of the ore-bearing aquifer is greater than or equal to 2.0 g / L, injecting oxygen into the ore-bearing aquifer through the injection hole while continuously injecting carbon dioxide, and extracting the resulting leaching solution through the extraction hole; the permeability coefficient of the low-permeability, high-carbonate sandstone uranium ore is less than 0.1 m / d, and the carbonate content is greater than 5%; the initial concentration of bicarbonate ions in the water of the ore-bearing aquifer is 0.1-0.3 g / L; the injection pressure of the carbon dioxide is 0.8-1.0 MPa; the injection pressure of the oxygen is 0.6-1.5 MPa or the maximum pressure of the injection system; (2) when the concentration of bicarbonate ions in the mineral-bearing aquifer water drops to less than 2.0 g / L, stop injecting oxygen, and then cyclically inject carbon dioxide, inject oxygen, and extract leachate into the mineral-bearing aquifer according to the method of step (1); During the injection of carbon dioxide, a dissolving device is provided in the injection hole to stir the water in the injection hole; The method for setting the injection hole and the extraction hole is as follows: Drilling is performed on low-permeability, high-carbonate sandstone uranium deposits and filters are lowered. The drilled holes formed are determined as injection holes and / or extraction holes according to the thickness of the ore layer and the calcareous interlayer in the ore-bearing aquifer, as well as the relative positions of the ore layer and the calcareous interlayer; When the calcareous interlayer in the mineral-bearing aquifer is located inside the mineral layer and has a thickness of less than 0.2 m, the length of the filter is the same as the thickness of the mineral layer, and the drilled hole formed at this time serves as a liquid injection hole or a liquid extraction hole; When the calcareous interlayer is located inside the ore layer and has a thickness greater than or equal to 0.2 meters, the length of the filter is the same as the thickness of the ore layer, and the drilled hole formed at this time is used as a liquid injection hole, or the filter is increased in length to serve as a liquid extraction hole; When the calcareous interlayer in the mineral-bearing aquifer is not inside the mineral layer but has an overlapping portion with the mineral layer, when the thickness of the overlapping portion is greater than or equal to the mineral layer thickness, the length of the filter is the same as the mineral layer thickness, and the drill hole formed at this time is used as a liquid injection hole after permeability enhancement treatment; when the thickness of the overlapping portion is less than 0.2 meters, the length of the filter is the same as the mineral layer thickness, and the drill hole formed at this time is used as a liquid injection hole or a liquid extraction hole; when the thickness of the overlapping portion is greater than or equal to 0.2 meters and less than the mineral layer thickness, the length of the filter is the same as the mineral layer thickness, and the drill hole formed at this time is used as a liquid injection hole, or the filter is increased in length and used as a liquid extraction hole; The permeability enhancement treatment is high-energy gas fracturing or hydraulic fracturing.
2. The method according to claim 1, characterized in that: The pre-carbonation time is 15 to 30 days.