A hydrogeological engineering underground river drilling equipment
By introducing lifting mechanisms and adjustable length lifting columns into the underground river drilling equipment of hydrogeological engineering, combined with side drilling components and sampling components, the problems of easy breakage and single function of the drill pipe are solved, realizing deep drilling and high accuracy Sampling function.
Patent Information
- Application Number
- CN202211535098.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-02
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-12-02
AI Technical Summary
The existing hydrogeological engineering underground river drilling device is prone to break when drilling deep, making it difficult to drill to deeper, and has a single function, so it is impossible to drill and sample at the same time.
An underground river drilling equipment including a lifting mechanism and an adjustable length lifting column is designed. Combined with a side drilling assembly and a sampling assembly, the depth drop and sampling function of the main drilling assembly is realized, and the lifting column is moved by a mechanical transmission, and the drilling is carried out. Side drilling assembly and sampling assembly are used for sampling during the hole process.
It effectively solves the problem of excessive length and easy breakage of drilling rod, realizes the ability to drill to a deeper place, and ensures the accuracy and independence of the sampling function through the use of sampling components, and avoids water sample mixing.
Smart Images

Figure CN115898389B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of geological engineering, and in particular relates to underground river drilling equipment for hydrogeological engineering. Background Art
[0002] Hydrogeology is a branch of geology, referring to the various changes and movements of groundwater in nature. It mainly studies the distribution and formation of groundwater, the physical properties and chemical composition of groundwater, groundwater resources and their rational utilization, the adverse effects of groundwater on engineering construction and mining and their prevention and control, etc.
[0003] Engineering geological drilling is an important method to obtain accurate geological data under the surface. Drilling equipment is often used in geological surveys. The existing drilling equipment is composed of a derrick, a drilling rig, a drill rod, a drill tool, a water pump, etc. It mainly uses a rotary drill tool and a water circulation method. The drilling process is to install the drill tool on a hollow drill rod, and the drill rig drives the drill tool to rotate through the drill rod. The rock is driven by the rotation of the drill bit. During the drilling process, the mud pump continuously delivers water. The water enters the drill rod through the water joint on the drill rod and is sprayed onto the drill bit of the drill tool. The water plays a role in discharging rock powder and cooling.
[0004] After searching, the announcement number CN114059927A, the announcement date 2022.02.18 discloses a portable underground river drilling device suitable for hydrogeological engineering, including two substrates one, several substrates two and a sedimentation box, the sedimentation box is located above the two substrates one, the left and right ends of the several substrates two are respectively fixedly connected to the upper surface of the two substrates one, the lower surface of the sedimentation box is fixedly connected to its upper surface close to the substrate two, and the upper surfaces of the two substrates one on the front side of the sedimentation box are fixedly installed with a support base. At the same time, the rotation of the centering drill bit can turn up the sedimentation debris under the centering drill bit through the arc-shaped fan blades, and cooperate with the arc-shaped notch to more easily enter the inside of the road dredging groove, thereby effectively solving the problem that the existing hydrological drilling device needs to occupy a large volume during construction, and at the same time, it is necessary to set up a matching mud cleaning equipment during the drilling process, resulting in a relatively complicated hydrological drilling operation.
[0005] The patent has the following shortcomings:
[0006] 1. When the drilling device reaches a deep depth, the drill rod is too long and easily breaks due to high-speed rotation, making it difficult to drill to a deeper depth;
[0007] 2. The drilling device has a single function and is difficult to integrate with the sampling equipment, so it is difficult to perform drilling and sampling at the same time.
[0008] Therefore, the existing drilling devices cannot meet the needs in actual use, so there is an urgent need for improved technologies in the market to solve the above problems. Summary of the invention
[0009] The object of the present invention is to provide an underground river drilling equipment for hydrogeological engineering. By arranging a lifting mechanism and a lifting column with adjustable length, the main drilling component can be lowered to a deep depth. By arranging a side drilling component and a sampling component, the equipment has a sampling function, which solves the problem that the existing drilling device is difficult to drill to a deeper depth, has a single function, and is difficult to integrate with the sampling equipment.
[0010] To solve the above technical problems, the present invention is achieved through the following technical solutions:
[0011] The present invention discloses a hydrogeological engineering underground river drilling equipment, comprising a box, a main drilling assembly, a lifting column, a lifting mechanism and a mounting frame, wherein the main drilling assembly is fixed to the lower end of the box, and the box is fixed to the lower end of the lifting column; the lifting mechanism is fixed to the mounting frame and drives the lifting column to move vertically by mechanical transmission, and the lifting column moves through the mounting frame, and the mounting frame is fixed to the frame of the drilling equipment; the equipment also comprises a side drilling assembly and a sampling assembly; the side drilling assembly and the sampling assembly are both arranged at the upper end of the box, the side drilling assembly is used for drilling sampling holes on the inner wall of the borehole, and the sampling assembly is used for collecting water samples seeping from the sampling holes.
[0012] Furthermore, the main drilling assembly includes a main drill bit, a main drill rod and a first motor; the main drill bit is fixed to the bottom end of the main drill rod, the top end of the main drill rod is fixedly connected to the output shaft of the first motor, and the first motor is fixed to the inner lower end of the box.
[0013] Furthermore, a high-definition camera, a controller module, a GPS positioning module and a support rod are fixed to the bottom of the box, and a water level sensor is fixed to the bottom end of the support rod; auxiliary lighting lamps are fixed to the four corners of the bottom of the box.
[0014] Furthermore, the lifting column is composed of a plurality of column units fixedly spliced end to end; a second mounting plate is provided at the top and bottom ends of the column unit, and the second mounting plates between the upper and lower adjacent column units are fixedly connected by fasteners; a rack is fixed on the side of the column unit.
[0015] Furthermore, a connecting column is fixed at the top center of the box body, and a first mounting plate is arranged at the top end of the connecting column; the second mounting plate at the bottom end of the lowest column unit is fixedly connected to the first mounting plate by fasteners.
[0016] Furthermore, the lifting mechanism includes a second motor, a gear and an L-shaped guide rail; the gear is fixedly sleeved on the output shaft of the second motor, and the second motor is fixed in the mounting frame; the gear is meshed with the rack; four L-shaped guide rails are provided, and the four L-shaped guide rails are respectively slidably matched with the four corners of the column unit, and the four L-shaped guide rails are all passed through and fixed on the top plate of the mounting frame.
[0017] Furthermore, the side drilling assembly includes an electric push rod, a Z-shaped plate, a third motor, a side drill rod and a side drill bit; the cylinder body of the electric push rod is fixed on the fixed plate inside the box body, the piston rod end of the electric push rod is fixedly connected to one end of the Z-shaped plate, the third motor is fixed to the other end of the Z-shaped plate, the output shaft of the third motor is fixedly connected to one end of the side drill rod, and the side drill bit is fixed to the other end of the side drill rod; a water outlet hole is arranged on the side drill rod, and a water inlet hole is arranged on the side drill bit.
[0018] Furthermore, the sampling assembly includes a rotating joint; the rotating joint is sleeved on the side drill rod at the water outlet and is rotatably connected to the side drill rod; the rotating joint is fixed to the bottom of the Z-shaped plate through a bracket, and a water pipe connector is provided at the bottom of the rotating joint.
[0019] Furthermore, the sampling assembly also includes a hose, a sampling pump, a multi-way connector, a water pipe and a sampling barrel; the water pipe connector is connected to the inlet of the sampling pump through a hose, and the outlet of the sampling pump is connected to the multi-way connector through a pipeline; six sampling barrels are provided, all fixed on the partition plate inside the box body, and the six sampling barrels are respectively connected to the multi-way connector through their own water pipes, and each water pipe is provided with a solenoid valve.
[0020] The present invention has the following beneficial effects:
[0021] 1. The present invention provides a lifting mechanism and a lifting column with adjustable length, so that the main drilling assembly can be lowered to a deep depth, and the overall length of the lifting column can be spliced based on on-site needs, thereby solving the problem in the prior art that when drilling to a deep depth, the drill rod is too long and easily breaks due to high-speed rotation, making it difficult to drill to a deeper depth.
[0022] 2. The present invention provides a side drilling component and a sampling component so that the device has a sampling function, can take water samples at different heights, and has high sampling accuracy, which can avoid mixing of water samples at different sampling points. When in use, first drill a hole horizontally through the side drilling component, then extract the seeped water sample through the sampling component, and then sample at the next location. When sampling, the position is controlled by the GPS positioning module.
[0023] 3. The present invention provides a high-definition camera and auxiliary lighting so that the device has the function of underground photography and can capture underground topography, making it convenient for staff to analyze underground conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0025] Figure 1 It is a three-dimensional schematic diagram of the overall structure;
[0026] Figure 2 It is a schematic diagram of the structure of the box bottom and the main drilling assembly;
[0027] Figure 3 This is a schematic diagram of the connection between the box and the lifting column;
[0028] Figure 4 It is a schematic diagram of the connection between the lifting column and the lifting mechanism;
[0029] Figure 5 It is a schematic diagram of the connection between the side drilling assembly and the sampling assembly;
[0030] Figure 6 It is an enlarged schematic diagram of the local structure of the side drilling assembly;
[0031] Figure 7 Schematic diagram of the sampling component structure.
[0032] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0033] 1. Box; 2. Main drilling assembly; 3. Lifting column; 4. Lifting mechanism; 5. Mounting frame; 6. Side drilling assembly; 7. Sampling assembly; 11. High-definition camera; 12. Auxiliary lighting; 13. Controller module; 14. GPS positioning module; 15. Support rod; 16. Water level sensor; 17. Divider plate; 18. Fixing plate; 19. Connecting column; 110. First mounting plate; 21. Main drill bit; 22. Main drill rod; 23. First motor; 31. Column unit element; 32, second mounting plate; 33, rack; 41, second motor; 42, gear; 43, L-shaped guide rail; 61, electric push rod; 62, Z-shaped plate; 63, third motor; 64, side drill rod; 65, side drill bit; 71, rotary joint; 72, hose; 73, sampling pump; 74, multi-way connector; 75, water pipe; 76, sampling tube; 77, solenoid valve; 641, water outlet; 651, water inlet; 711, bracket; 712, water pipe connector. DETAILED DESCRIPTION
[0034] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0035] See also Figure 1As shown, the present invention is a hydrogeological engineering underground river drilling equipment, including a box body 1, a main drilling assembly 2, a lifting column 3, a lifting mechanism 4 and a mounting frame 5, the main drilling assembly 2 is fixed to the lower end of the box body 1, and the box body 1 is fixed to the lower end of the lifting column 3; the lifting mechanism 4 is fixed on the mounting frame 5 and drives the lifting column 3 to move vertically by mechanical transmission, and the lifting column 3 moves through the mounting frame 5, and the mounting frame 5 is fixed on the frame of the drilling equipment; it also includes a side drilling assembly 6 and a sampling assembly 7; the side drilling assembly 6 and the sampling assembly 7 are both arranged at the upper end of the inner part of the box body 1, the side drilling assembly 6 is used to drill sampling holes on the inner wall of the borehole, and the sampling assembly 7 is used to collect water samples seeping from the sampling holes.
[0036] Among them Figure 2 As shown, the main drilling assembly 2 includes a main drill bit 21, a main drill rod 22 and a first motor 23; the main drill bit 21 is fixed to the bottom end of the main drill rod 22, the top end of the main drill rod 22 is fixedly connected to the output shaft of the first motor 23, and the first motor 23 is fixed to the inner lower end of the box body 1; a high-definition camera 11, a controller module 13, a GPS positioning module 14 and a support rod 15 are respectively fixed to the bottom of the box body 1, and a water level sensor 16 is fixed to the bottom end of the support rod 15; auxiliary lighting lamps 12 are fixed at the four corners of the bottom of the box body 1.
[0037] Among them Figure 3 As shown, the lifting column 3 is composed of a plurality of column units 31 fixedly spliced end to end; a second mounting plate 32 is provided at the top and bottom of the column unit 31, and the second mounting plates 32 between the upper and lower adjacent column units 31 are fixedly connected by fasteners; a rack 33 is fixed to the side of the column unit 31; a connecting column 19 is fixed to the top center of the box body 1, and a first mounting plate 110 is provided at the top of the connecting column 19; the second mounting plate 32 at the bottom end of the lowest column unit 31 is fixedly connected to the first mounting plate 110 by fasteners.
[0038] Among them Figure 4 As shown, the lifting mechanism 4 includes a second motor 41, a gear 42 and an L-shaped guide rail 43; the gear 42 is fixedly sleeved on the output shaft of the second motor 41, and the second motor 41 is fixed in the mounting frame 5; the gear 42 is meshed with the rack 33; four L-shaped guide rails 43 are provided, and the four L-shaped guide rails 43 are respectively slidably matched with the four corners of the column unit 31, and the four L-shaped guide rails 43 are all passed through and fixed on the top plate of the mounting frame 5.
[0039] When the lifting mechanism 4 is used, the second motor 41 is started, the second motor 41 drives the gear 42 to rotate, the gear 42 drives the rack 33 to move, and the rack 33 drives the entire lifting column 3 to move along the L-shaped guide rail 43, so that the main drilling assembly 2 can be lifted and lowered. By setting the lifting mechanism 4 and the lifting column 3 with adjustable length, the main drilling assembly 2 can be lowered to a deep depth, and the overall length of the lifting column 3 can be spliced based on on-site needs, which solves the problem in the prior art that when drilling to a deep depth, the drill rod is too long and easily broken due to high-speed rotation, making it difficult to drill to a deeper depth.
[0040] Among them Figures 5 to 6 As shown, the side drilling assembly 6 includes an electric push rod 61, a Z-shaped plate 62, a third motor 63, a side drilling rod 64 and a side drilling bit 65; the cylinder body of the electric push rod 61 is fixed on the fixed plate 18 inside the box body 1, the piston rod end of the electric push rod 61 is fixedly connected to one end of the Z-shaped plate 62, the third motor 63 is fixed to the other end of the Z-shaped plate 62, the output shaft of the third motor 63 is fixedly connected to one end of the side drilling rod 64, and the other end of the side drilling rod 64 is fixed with a side drilling bit 65; the side drilling rod 64 is provided with a water outlet hole 641, and the side drilling bit 65 is provided with a water inlet hole 651.
[0041] Among them Figures 6 to 7 As shown, the sampling assembly 7 includes a rotary joint 71; the rotary joint 71 is sleeved on the side drilling rod 64 at the water outlet 641 and is rotatably connected to the side drilling rod 64; the rotary joint 71 is fixed to the bottom of the Z-shaped plate 62 through a bracket 711, and a water pipe connector 712 is provided at the bottom of the rotary joint 71; the sampling assembly 7 also includes a hose 72, a sampling pump 73, a multi-way connector 74, a water pipe 75 and a sampling cylinder 76; the water pipe connector 712 is connected to the inlet of the sampling pump 73 through the hose 72, and the outlet of the sampling pump 73 is connected to the multi-way connector 74 through a pipeline; six sampling cylinders 76 are provided, all of which are fixed on the partition plate 17 inside the box body 1, and the six sampling cylinders 76 are respectively connected to the multi-way connector 74 through their own water pipes 75, and each water pipe 75 is provided with a solenoid valve 77.
[0042] When sampling, the third motor 63 is started, and the third motor 63 drives the side drill rod 64 and the side drill bit 65 to rotate at high speed, and the Z-type plate 62 and the third motor 63 are driven to move outward through the electric push rod 61 to perform side drilling. After the drilling is completed, the side drill bit 65 stops rotating, and the sampling pump 73 is started. The seeping water sample enters the side drill bit 65 through the water inlet hole 651, and is discharged through the water outlet hole 641 of the side drill rod 64, and then flows through the hose 72, the sampling pump 73, the multi-way connector 74, and the water pipe 75, and finally flows into the corresponding sampling tube 76. By arranging the side drilling component 6 and the sampling component 7, the device has a sampling function, can take water samples at different heights, and has high sampling accuracy, and can avoid mixing of water samples at different sampling points.
[0043] The operation of this embodiment is as follows:
[0044] S1: Based on the drilling depth, a suitable number of column units 31 are fixedly assembled into a lifting column 3;
[0045] S2: starting the main drilling assembly 2 to drill a hole, and at the same time driving the main drilling assembly 2 to gradually descend through the lifting mechanism 4;
[0046] S3: While drilling, water can be pumped downwards through a clean water pump, and the water enters the main drill rod 22 through the lifting column 3, and finally sprayed out from the main drill bit 21 to cool the main drill bit 21 and discharge rock powder. The water level is detected by the water level sensor 16. When the water level reaches the set value, the mud pump is started to extract and filter the groundwater generated during the drilling process, wherein the water delivery and pumping components are both implemented using existing technologies;
[0047] S4: While drilling, the underground topography is photographed by a high-definition camera 11 and an auxiliary lighting lamp 12 to facilitate the staff to analyze the underground conditions;
[0048] S5: The descent position is constantly controlled by the GPS positioning module 14. When the sampling position is reached, the side drilling component 6 cooperates with the sampling component 7 to extract the seepage water sample and then go to the next location for sampling.
[0049] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions recorded in the aforementioned embodiments, any equivalent replacement of some of the technical features therein, and any modification, equivalent replacement, and improvement made are all within the protection scope of the present invention.
Claims
1. A hydrogeological engineering underground river drilling equipment, comprising a housing (1), a main drilling assembly (2), a lifting column (3), a lifting mechanism (4) and a mounting frame (5), characterized in that: The main drilling assembly (2) is fixed to the lower end of the box (1), and the box (1) is fixed to the lower end of the lifting column (3); The lifting mechanism (4) is fixed on the mounting frame (5) and drives the lifting column (3) to move vertically by mechanical transmission, and the lifting column (3) moves through the mounting frame (5), and the mounting frame (5) is fixed on the frame of the drilling equipment; Also included is a side drilling assembly (6) and a sampling assembly (7); The side drilling assembly (6) and the sampling assembly (7) are both arranged at the upper end of the interior of the housing (1); the side drilling assembly (6) is used to drill a sampling hole on the inner wall of the borehole, and the sampling assembly (7) is used to collect water samples seeping from the sampling hole; The sidetracking assembly (6) comprises an electric push rod (61), a Z-shaped plate (62), a third motor (63), a sidetracking rod (64) and a sidetracking bit (65); The cylinder body of the electric push rod (61) is fixed on a fixed plate (18) inside the box (1); the piston rod end of the electric push rod (61) is fixedly connected to one end of the Z-shaped plate (62); the third motor (63) is fixed to the other end of the Z-shaped plate (62); the output shaft of the third motor (63) is fixedly connected to one end of the sidetracking rod (64); and the sidetracking bit (65) is fixed to the other end of the sidetracking rod (64); The side drilling rod (64) is provided with a water outlet hole (641), and the side drilling head (65) is provided with a water inlet hole (651); The sampling assembly (7) comprises a rotary joint (71); The rotary joint (71) is sleeved on the sidetracking rod (64) at the water outlet hole (641) and is rotationally connected to the sidetracking rod (64); The rotating joint (71) is fixed to the bottom of the Z-shaped plate (62) via a bracket (711), and a water pipe connector (712) is provided at the bottom of the rotating joint (71); The sampling assembly (7) further comprises a hose (72), a sampling pump (73), a multi-way connector (74), a water pipe (75) and a sampling tube (76); The water pipe connector (712) is connected to the inlet of the sampling pump (73) via the hose (72), and the outlet of the sampling pump (73) is connected to the multi-way connector (74) via a pipeline; Six sampling tubes (76) are provided, each of which is fixed on a partition plate (17) inside the box (1). The six sampling tubes (76) are connected to the multi-way connector (74) via respective water pipes (75), and each of the water pipes (75) is provided with a solenoid valve (77).
2. The hydrogeological engineering underground river drilling equipment according to claim 1, characterized in that: The main drilling assembly (2) comprises a main drill bit (21), a main drill rod (22) and a first motor (23); The main drill bit (21) is fixed to the bottom end of the main drill rod (22), the top end of the main drill rod (22) is fixedly connected to the output shaft of the first motor (23), and the first motor (23) is fixed to the lower end inside the box (1).
3. The hydrogeological engineering underground river drilling equipment according to claim 1, characterized in that: A high-definition camera (11), a controller module (13), a GPS positioning module (14) and a support rod (15) are fixed to the bottom of the box (1), and a water level sensor (16) is fixed to the bottom end of the support rod (15); Auxiliary lighting lamps (12) are fixed at the four corners of the bottom of the box body (1).
4. The hydrogeological engineering underground river drilling equipment according to claim 1, characterized in that: The lifting column (3) is composed of a plurality of column units (31) fixedly spliced end to end; A second mounting plate (32) is provided at the top and bottom ends of the column unit (31), and the second mounting plates (32) between upper and lower adjacent column units (31) are fixedly connected by fasteners; A rack (33) is fixed to the side surface of the column unit (31).
5. The hydrogeological engineering underground river drilling equipment according to claim 4, characterized in that: A connecting column (19) is fixed at the top center of the box body (1), and a first mounting plate (110) is provided at the top end of the connecting column (19); The second mounting plate (32) at the bottom end of the lowest column unit (31) is fixedly connected to the first mounting plate (110) via fasteners.
6. The hydrogeological engineering underground river drilling equipment according to claim 4, characterized in that: The lifting mechanism (4) comprises a second motor (41), a gear (42) and an L-shaped guide rail (43); The gear (42) is fixedly sleeved on the output shaft of the second motor (41), and the second motor (41) is fixed in the mounting frame (5); The gear (42) is meshed with the rack (33); Four L-shaped guide rails (43) are provided, and the four L-shaped guide rails (43) are respectively slidably matched with the four corners of the column unit (31), and the four L-shaped guide rails (43) are all passed through and fixed on the top plate of the mounting frame (5).