The roof pre-split blasting method based on axial segmented seams solves the problem of difficulty in weakening the elastic energy of roof rupture in the prevention and treatment of roof-type rockbursts. The blasting crack range is expanded through segmented seam construction and the secondary mining disturbance is reduced. The elastic performance during this period improves the effect of preventing and controlling rockbursts.

CN115930709BActive Publication Date: 2024-10-29中煤能源研究院有限责任公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211505194.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-28
Publication Date
2024-10-29
Estimated Expiration
2042-11-28

AI Technical Summary

Technical Problem

In the prevention and control of roof-type rockbursts, it is difficult for the existing technology to effectively weaken the elastic energy of the hard roof when it breaks, resulting in poor prevention and control of rockbursts.

Method used

The roof pre-split blasting method based on axial segmented cracks is adopted. The blasting target rock formation is selected by collecting sample working face data and microseismic event distribution characteristic maps. Roof crack detection holes with different inclinations are constructed and the suspended roof line is inferred to determine the blasting hole parameters. and segmented seam cutting parameters to form multiple blasting holes and carry out segmented seam cutting construction, and finally fill the holes with explosives for detonation.

Benefits of technology

It can effectively reduce the elastic energy of the exposed roof rupture of the airway tunnel during the secondary mining disturbance, expand the blast crack range, improve the prevention and control effect of ground pressure impact, and reduce the occurrence of impact conditions in the airway tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115930709B_ABST
    Figure CN115930709B_ABST
Patent Text Reader

Abstract

The roof pre-splitting blasting method based on axial segmented slits disclosed in the present invention is characterized in that a blasting target rock layer for segmented slits is selected, and a blasting hole K is determined by the blasting target rock layer. i Parameters and blast hole segmentation parameters, based on blast hole K i The blast hole K is obtained by constructing the blast hole by using the parameters and the blast hole segment cutting parameters. i The blasting hole is cut in sections, and the final blasting hole K i The roof pre-splitting blasting method based on axial segmented slits of the present invention can effectively reduce the elastic energy generated by the rupture of the exposed roof of the empty tunnel during the secondary mining disturbance, and reduce the occurrence of impact conditions in the empty tunnel induced by the rupture of the roof.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of roof type rock burst prevention and control, and in particular relates to a roof pre-splitting blasting method based on axial segmented slits. Background Art

[0002] Rock burst is one of the main disasters faced by deep and medium-depth coal mining. There are many ways to classify rock burst. According to the different types of coal and rock instability, rock burst can be divided into coal compression type, roof fracture type and fault dislocation type. Among them, the key to preventing and controlling roof fracture type rock burst is how to effectively weaken the elastic energy released when the hard roof breaks. At present, measures such as roof hydraulic fracturing, roof pre-splitting blasting, and long-distance segmented hydraulic fracturing have played a positive role in preventing and controlling roof type rock burst.

[0003] It has been verified in practice that the roof pre-splitting blasting is relatively effective in the prevention and control of roof-type rock burst. In the practice of rock burst prevention and control, it was found that the purpose of roof pre-splitting blasting based on rock burst prevention and control is not to cut off the key rock strata, but to form blasting cracks in the key rock strata, and rely on the pressure of the overlying rock strata during the working face recovery to cause the key layer rock strata to rupture. The more blasting cracks are produced, the lower the elastic energy released during splitting, and the more conducive to rock burst prevention and control. Therefore, the key to roof pre-splitting blasting based on rock burst prevention and control is to maximize the degree of rock rupture in the key layer through blasting. Therefore, how to cause the blasting cracks to expand to a larger range along the angle that is conducive to improving the blasting effect is the key to improving the effect of preventing and controlling rock burst. Summary of the invention

[0004] The purpose of the present invention is to provide a roof pre-splitting blasting method based on axial segmented slits, which can effectively reduce the elastic energy generated by the rupture of the exposed roof of the empty tunnel during the secondary mining disturbance, and reduce the occurrence of impact conditions in the empty tunnel induced by roof rupture.

[0005] The technical solution adopted by the present invention is to select the blasting target rock layer for implementing the segmented slit based on the roof pre-splitting blasting method of axial segmented slit, and determine the blasting hole K through the blasting target rock layer. i Parameters and blast hole segmentation parameters, based on blast hole K i The blast hole K is obtained by constructing the blast hole by using the parameters and the blast hole segment cutting parameters. i The blasting hole is cut in sections, and the final blasting hole K i The internal charge detonates.

[0006] The present invention is also characterized in that

[0007] The following steps are included:

[0008] Step 1, collect data of sample working faces or data of adjacent working faces, draw a vertical distribution characteristic map of microseismic events, and select the target rock layer for blasting according to the vertical distribution characteristic map of microseismic events;

[0009] Step 2: construct several roof crack detection holes with different inclination angles according to the thickness of the target rock layer for blasting selected in step 1, and connect the abnormal points of water return in the roof crack detection holes, and the connecting line is the estimated hanging roof line;

[0010] Step 3: According to the roof crack detection holes in step 2 and the estimated hanging roof line, the number of blasting holes i and the inclination angle α are obtained. i , hole spacing, hole depth L i and the length of the charge section X i Parameters;

[0011] Step 4: blast hole K according to step 3 i Parameters to obtain the blast hole segmented slit length Z ij , parameters of the number and position relationship of the blast hole segmented cuts;

[0012] Step 5, performing construction according to blast hole parameters and blast hole segmentation slotting parameters;

[0013] Step 6, loading explosives into the completed blasting hole and detonating it.

[0014] The sample working face data in step 1 are the stratigraphic data of geological exploration drilling holes and roof core sampling holes, and the adjacent working face data are the microseismic monitoring data during mining.

[0015] In step 1, the target blasting rock layer is selected to be 15m to 60m above the coal mining layer. Multiple target blasting rock layers are selected and recorded as M. n , along the sample working surface vertically from top to bottom n = 1, 2, 3...n, the thickness of each blasting target rock layer is H Mn .

[0016] The number of blasting holes i in step 3 is blasting hole K i Cover all blasting target rock layers M n ; Blasting hole inclination angle α i The blast hole inclination angle is 30°~60°, and the blast hole inclination angle α i Not less than the inclination angle of the adjacent roof crack detection hole 5 where cracks exist; the adjacent blasting hole K i The straight-line distance shall not be less than 8m.

[0017] The depth of the blast hole in step 3 is L i The distance from the estimated hanging top line 6 is not less than 5m, and does not exceed the vertical distance to the highest blasting target rock layer M1;

[0018] Blast hole K i The length of the charging section X iThe calculation formula is shown in Formula 1.

[0019] X i ≤(L i ×sina i -3 / 4×Y) / sina i (1);

[0020] Where, L i K is the blast hole i The blast hole depth, Y is the width of the coal pillar in the section, a i K is the blast hole i The inclination angle;

[0021] Blast hole K i The charging section covers all blasting target rock layers M n , and the vertical height h from the bottom of the charging section to the top plate of the tunnel shall not be less than 15m.

[0022] The length of the blast hole cut in step 4 is Z ij is the length of the charging section X i The target rock layer M for segmented cutting n , as shown in formula 2;

[0023] Z ij =H Mn / Sina i (2);

[0024] In the formula, i represents the i-th blasting hole, j represents the j-th segmented cut section in the i-th blasting hole, and a i K is the blast hole i The inclination angle.

[0025] In step 4, the number of slits in each blast hole segment is K i The number of segmented cuts in the inner blast hole is 4, and the 4 segmented cuts in the blast hole are along the blast hole K. i The radial angle between them is 90°, and the relative blasting hole segmented slits are grouped together. The direction of the segmented slits of one group of blasting holes is parallel to the direction of the gob-side tunnel, and the direction of the segmented slits of the other group of blasting holes is perpendicular to the direction of the gob-side tunnel.

[0026] Step 5 Adjacent construction blasting hole K i The spacing is 10m to 15m.

[0027] The beneficial effects of the present invention are:

[0028] (1) The roof pre-splitting blasting method of the present invention guides and focuses the blasting energy of explosives by pre-constructing slits in key layers in the blasting hole. On the one hand, it guides the expansion direction of the blasting slit toward a direction that is conducive to increasing the spacing between blastholes. On the other hand, it expands the expansion range of the slits, reduces the elastic energy generated by the rupture of the exposed roof along the empty tunnel during the secondary mining disturbance, and is beneficial to the prevention and control of rock burst in the empty tunnel.

[0029] (2) The roof pre-splitting blasting method of the present invention is only constructed for the target blasting layer, which can not only improve the efficiency of the segmented cutting operation, but also improve the crack expansion effect on the target blasting layer; and the four cutting directions are grouped in pairs, one group of cutting directions is along the direction of the tunnel, and the other group is perpendicular to the direction of the tunnel, which is beneficial to weaken the mine pressure near the tail of the working face while weakening the dynamic load disturbance of the empty tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic flow diagram of the roof pre-splitting blasting method based on axial segmented slits of the present invention;

[0031] Figure 2 It is a characteristic diagram of vertical distribution of average energy of microseismic events of the roof pre-splitting blasting method based on axial segmented slits of the present invention;

[0032] Figure 3 It is a characteristic diagram of vertical distribution of the accumulated energy of microseismic events of the roof pre-splitting blasting method based on axial segmented slits of the present invention;

[0033] Figure 4 It is a schematic diagram of the distribution of roof crack detection holes in the roof pre-splitting blasting method based on axial segmented slits of the present invention;

[0034] Figure 5 It is a schematic diagram of the inferred hanging roof line structure of the roof pre-splitting blasting method based on axial segmented slits of the present invention;

[0035] Figure 6 It is a schematic diagram of blasting hole parameters in the roof pre-splitting blasting method based on axial segmented slits of the present invention;

[0036] Figure 7 It is a schematic diagram of the segmented slotting parameters of the blasting hole in the roof pre-splitting blasting method based on axial segmented slotting of the present invention;

[0037] Figure 8 yes Figure 7 Cross-sectional view from perspective A;

[0038] Fig. 9 yes Figure 7 Cross-sectional view from perspective B.

[0039] In the figure, 1. sample working face, 2. adjacent working face, 3. section coal pillar, 4. empty tunnel, 5. roof crack detection hole, 6. inferred roof line, 7. blasting hole K1, 8. blasting hole K2, 9. abnormal backwater point. DETAILED DESCRIPTION

[0040] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0041] The specific process of the roof pre-splitting blasting method based on axial segmented slits of the present invention is as follows: Figure 1 As shown in FIG. 1 , the target rock layer for blasting is selected to implement segmented cutting, and the blasting hole K is determined by the target rock layer for blasting. i Parameters and blast hole segmentation parameters, based on blast hole K i The blast hole K is obtained by constructing the blast hole by using the parameters and the blast hole segment cutting parameters. i The blasting hole is cut in sections, and the final blasting hole K i The internal charge detonates.

[0042] The specific steps are:

[0043] Step 1, collect data of sample working face 1 or data of adjacent working face 2, draw a vertical distribution characteristic map of microseismic events, and select the target rock layer for blasting according to the vertical distribution characteristic map of microseismic events;

[0044] The data of sample working face 1 are the stratigraphic data of geological exploration drilling holes and roof core sampling holes, and the data of adjacent working face 2 are the microseismic monitoring data during mining; the blasting target rock layer is selected to be 15m to 60m above the coal mining seam, and multiple blasting target rock layers are selected, which are recorded as M n , along the sample working surface 1 vertically from top to bottom n = 1, 2, 3...n, the thickness of each blasting target rock layer is H Mn .

[0045] Step 2, according to the thickness of the blasting target rock layer selected in step 1, construct a number of roof crack detection holes 5 with different inclination angles, connect the abnormal water return points 9 in the roof crack detection holes 5, and the connecting line is the estimated hanging roof line 6;

[0046] Step 3: According to the roof crack detection hole 5 and the estimated hanging top line 6 in step 2, the number of blasting holes i and the inclination angle α are obtained. i , hole spacing, hole depth L i and the length of the charge section X i Parameters;

[0047] The number of blast holes i is the number of blast holes K i Cover all blasting target rock layers M n The blast hole inclination angle α i The blast hole inclination angle is 30°~60°, and the blast hole inclination angle α iNot less than the inclination angle of the adjacent roof crack detection hole 5 where cracks exist; the adjacent blasting hole K i The straight-line distance shall not be less than 8m.

[0048] Blasting hole depth L i The distance from the estimated hanging top line 6 is not less than 5m, and does not exceed the vertical distance to the highest blasting target rock layer M1;

[0049] Blast hole K i The length of the charging section X i The calculation formula is shown in Formula 1.

[0050] X i ≤(L i ×sina i -3 / 4×Y) / sina i (1);

[0051] Where, L i K is the blast hole i The blast hole depth is Y, the width of the coal pillar (3) in the section, and a i K is the blast hole i The inclination angle of the blast hole K i The charging section covers all blasting target rock layers M n , and the vertical height h from the bottom of the charging section to the top plate of the tunnel shall not be less than 15m.

[0052] Step 4: blast hole K according to step 3 i Parameters to obtain the blast hole segmented slit length Z ij , parameters of the number and position relationship of the blast hole segmented cuts;

[0053] Blasting hole cutting length Z ij is the length of the charging section X i The target rock layer M for segmented cutting n , as shown in formula 2;

[0054] Z ij =H Mn / Sina i (2);

[0055] In the formula, i represents the i-th blasting hole, j represents the j-th segmented cut section in the i-th blasting hole, and a i K is the blast hole i The inclination angle.

[0056] The number of slits in each blast hole segment is K i The number of segmented cuts in the inner blast hole is 4, and the 4 segmented cuts in the blast hole are along the blast hole K. iThe radial angle between them is 90°, and the segmented slits of the relative blasting holes are grouped together. The direction of the segmented slits of one group of blasting holes is parallel to the direction of the gob-side tunnel 4, and the direction of the segmented slits of the other group of blasting holes is perpendicular to the direction of the gob-side tunnel 4.

[0057] Step 5: Construction is performed according to the blast hole parameters and the blast hole segmentation parameters; a blast hole K is constructed every p meters on the goaf side of the air tunnel 4. i , p is 10m~15m, then for each blast hole K i Use professional mechanical cutting device to carry out segmented cutting construction.

[0058] Step 6, loading explosives into the completed blasting hole and detonating it.

[0059] Example

[0060] Step 1, collect the stratigraphic data of the geological exploration drilling holes and the roof coring holes of the sample working face 1 in the mine. Since the roof coring holes in the mine are relatively accurate, the stratigraphic data collected through the roof coring holes are used to draw the vertical distribution characteristic map of microseismic events. The stratigraphic data collected through the roof coring holes are shown in Table 1;

[0061] Table 1 Formation data of top plate core hole

[0062]

[0063] like Figure 2 and Figure 3 As shown in the figure, after the cumulative mining of 60 m, the vertical distribution characteristic diagram of the average energy and cumulative energy of the microseismic events in the mined section of the sample working face 1 was drawn, and the microseismic densely distributed rock layer within 15-60 m above the main mining coal seam was selected as the blasting target rock layer, that is, Figure 2 and Figure 3 The medium-fine sandstone with a thickness of 7.8m at 48.2m to 56m from the top plate, the medium sandstone with a thickness of 4.9m at 43.4m to 48.2m from the top plate, the siltstone with a thickness of 7.6m at 30.7m to 38.3m from the top plate, and the siltstone with a thickness of 9.9m at 15.4m to 25.3m from the top plate are respectively counted as M1, M2, M3, and M4. The thickness of each blasting target rock layer is H M1 =7.8m, H M2 =4.9m, H M3 =7.6m, H M4 =9.9m.

[0064] Step 2, such as Figure 4 and Figure 5As shown, according to the height of the target rock layer for blasting, a plurality of roof crack detection holes 5 with different inclination angles are constructed in the empty tunnel 4 of the sample working face 1; the development of borehole cracks is detected by means of borehole peeping, and the positions of the abnormal water return points 9 of each borehole are connected to each other, which is called the inferred hanging roof line 6.

[0065] Step 3, such as Figure 6 As shown, based on the detection results of step 2, the blast hole inclination angle α i The value range is 35-60°. Two blasting holes are arranged within this angle range, namely blasting hole K17 and blasting hole K28, which can meet the requirement that the minimum straight-line distance E between the charging sections of the two blasting holes is not less than 8m. Therefore, the number of blasting holes i=2, and the inclination angles of the blasting holes α1=35° and α2=55°.

[0066] Since the blast hole depth L i The distance should be at least 5m from the estimated hanging top line 6, and should not exceed the vertical distance to the highest blasting target layer M1 above the top plate, so the blasting hole depths L1 = 40m and L2 = 57m.

[0067] Substitute Y = 25m, L1 = 37m, L2 = 57m, α1 = 35°, α2 = 55° into the charge section length X i In the formula,

[0068] X1≤(37×sin35°-3 / 4×25) / sin35°;

[0069] X2≤(57×sin55°-3 / 4×25) / sin55°;

[0070] Calculation shows that X1=13m, X2=25m.

[0071] Step 4, such as Figure 7 As shown, based on the detection results of step 2 and the blasting hole parameters obtained in step 3, the blasting hole segmented slot length Z11 of blasting hole K17 is equal to H M4 / Sina1=9.9 / Sin35°=17m, the length of the first blast hole segment cut Z21=H of blast hole K28 M3 / Sina2=7.6 / Sin55°=9m, the length of the second section blast hole segmented slot Z22=(H M1+ H M1 ) / Sina2=(7.8+4.9) / Sin55°=15.5m.

[0072] like Figure 8 and Fig. 9As shown, the number of segmented slits of blast hole K17 is 4, and the angle between the 4 segmented slits on the radial section of blast hole K17 is 90°. Two opposite segmented slits form a group, and there are two groups in total, one group of segmented slits is along the direction of the air tunnel 4, and the other group of segmented slits is perpendicular to the direction of the air tunnel 4. Blasting hole K28 is the same.

[0073] Step 5, construct blasting hole K17 and blasting hole K28 10 meters apart on the goaf side of the air-link tunnel 4, and then use a professional mechanical cutting device to perform segmented cutting construction in blasting hole K17 and blasting hole K28.

[0074] Step 6, charge and detonate in accordance with relevant national regulations on underground blasting operations in coal mines.

Claims

1. A roof pre-splitting blasting method based on axial segmented slits, characterized in that: Select the target rock layer for blasting by segmented cutting, and determine the blasting hole K by blasting the target rock layer. i Parameters and blast hole segmentation parameters, based on blast hole K i The blast hole K is obtained by constructing the blast hole by using the parameters and the blast hole segment cutting parameters. i The blasting hole is cut in sections, and the final blasting hole K i Internal charge detonation; The following steps are included: Step 1, collecting data of a sample working face (1) or data of a neighboring working face (2), drawing a vertical distribution characteristic map of microseismic events, and selecting a target rock layer for blasting according to the vertical distribution characteristic map of microseismic events; Step 2, according to the thickness of the target rock layer for blasting selected in step 1, construct a number of roof crack detection holes (5) with different inclination angles, connect the abnormal water return points (9) in the roof crack detection holes (5), and the connecting line is the estimated hanging roof line (6); Step 3, according to the roof crack detection hole (5) and the estimated hanging roof line (6) in step 2, the number of blasting holes i and the inclination angle α are obtained. i , hole spacing, hole depth L i and the length of the charge section X i Parameters; Step 4: blast hole K according to step 3 i Parameters to obtain the blast hole segmented slit length Z ij , parameters of the number and position relationship of the blast hole segmented cuts; Step 5, performing construction according to blast hole parameters and blast hole segmentation slotting parameters; Step 6, loading explosives into the completed blasting hole and detonating it; In step 1, the target blasting rock layer is selected to be 15m to 60m above the coal mining layer, and multiple target blasting rock layers are selected, denoted as M n , along the sample working surface (1) vertically from top to bottom n = 1, 2, 3 ... n, the thickness of each blasting target rock layer is H Mn ; The number of blasting holes i in step 3 is blasting hole K i Cover all blasting target rock layers M n ; Blasting hole inclination angle α i The blast hole inclination angle is 30°~60°, and the blast hole inclination angle α i Not less than the inclination angle of the adjacent roof crack detection hole (5) where cracks exist; the adjacent blasting hole K i The straight-line distance is not less than 8m; The blast hole depth L in step 3 i The distance from the estimated hanging top line (6) is not less than 5m, and does not exceed the vertical distance to the highest blasting target rock layer M1; Blast hole K i The length of the charging section X i The calculation formula is shown in Formula 1. X i ≤(L i ×sina i -3 / 4×Y) / sina i (1); Where, L i K is the blast hole i The blast hole depth is Y, the width of the coal pillar (3) in the section, and a i K is the blast hole i The inclination angle; Blast hole K i The charging section covers all blasting target rock layers M n , and the vertical height h between the bottom of the charging section and the top plate of the tunnel shall not be less than 15m; The blast hole cut length Z in step 4 ij is the length of the charging section X i The target rock layer M for segmented cutting n , as shown in formula 2; With ij =H Mn / Son i (2); In the formula, i represents the i-th blasting hole, j represents the j-th segmented cut section in the i-th blasting hole, and a i K is the blast hole i The inclination angle; In step 4, the number of slits in each blast hole segment is K. i The number of segmented cuts in the inner blast hole is 4, and the 4 segmented cuts in the blast hole are along the blast hole K. i The radial angle between the blast holes is 90°, and the slits of the blast holes are grouped together. The slits of the blast holes of one group are parallel to the direction of the gob-side tunnel (4), and the slits of the blast holes of the other group are perpendicular to the direction of the gob-side tunnel (4). The adjacent blast hole K in step 5 is constructed i The spacing is 10m to 15m.

2. The roof pre-splitting blasting method based on axial segmented slits according to claim 1 is characterized in that: The sample working face (1) data in step 1 are stratigraphic data of geological exploration drilling holes and roof core sampling holes, and the adjacent working face (2) data are microseismic monitoring data during mining.

Citation Information

Patent Citations

  • Perforation arrangement method for simultaneously presplitting lateral roof and trend roof of coal mine roadway

    CN113446004A

  • Roof presplitting blasting method for goaf roadway of rock burst mine

    CN113739655A