A switching loss evaluation method and system for H7 current source rectifier

By simplifying the equivalent circuit to simulate the switching action of H7-CSR, the high cost and long-term problems of switching loss evaluation of H7-CSR rectifier are solved, and the accurate evaluation of switching losses is achieved, avoiding conduction and spuriousness in traditional methods Loss coupling.

CN116087663BActive Publication Date: 2024-11-29STATE GRID SHANDONG ELECTRIC POWER CO
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202310117703.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-15
Publication Date
2024-11-29
Estimated Expiration
2043-02-15

AI Technical Summary

Technical Problem

The existing H7-CSR rectifier switch loss evaluation method requires overall testing of physical prototypes, which is high cost, long cycles and difficult to accurately analyze switch losses. The traditional methods include conduction loss and stray losses, making it difficult to independently evaluate switch losses.

Method used

Switch loss simplifies the equivalent circuit, simulates the switching action of H7-CSR by selecting the switching loss test points, builds an equivalent test circuit of the BUCK-type step-down chopper structure, and evaluates the overall switching loss according to the modulation strategy and the voltage value of the test point. .

Benefits of technology

A low-cost and fast switching loss assessment is achieved, avoiding the coupling of conduction loss and stray loss, and obtaining accurate analysis results of switching loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116087663B_ABST
    Figure CN116087663B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of switching loss evaluation of rectifiers, and provides a switching loss evaluation method and system for an H7 current source rectifier. The evaluation method determines the actual number of switching loss test points and the voltage value corresponding to each switching loss test point according to the modulation strategy executed by the H7 current source rectifier; based on the voltage value corresponding to each switching loss test point, a switching loss equivalent test circuit is built to simulate the switching action during the modulation process of the H7 current source rectifier, and the switching loss at the corresponding switching loss test point is obtained; based on the switching loss at each switching loss test point and the setting conditions of the modulation strategy, the overall switching loss evaluation result of a single modulation cycle of the H7 current source rectifier is obtained. The switching loss level of the H7 current source rectifier can be reasonably evaluated, and it has the advantages of being simple and easy to implement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of switch loss evaluation of rectifiers, and in particular relates to a switch loss evaluation method and system for an H7 current source rectifier. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] Power electronic rectifiers can be divided into voltage source rectifiers (VSR) and current source rectifiers (CSR) according to the form of electrical energy on the DC side. Compared with VSR, CSR has advantages such as inrush current limiting capability and smaller AC filtering parameters. It is currently used in data center power supplies, electric vehicle charging piles, offshore wind power and other fields.

[0004] However, the power conversion efficiency of CSR is relatively low, and this phenomenon has always been one of the core issues of concern in the industry. In recent years, the academic community has proposed the H7-CSR topology solution to address this issue, which can theoretically reduce the power loss of CSR and thus improve the energy conversion efficiency.

[0005] Power loss is a core parameter that is crucial to the performance of the rectifier, and mainly includes conduction loss and switching loss. The H7-CSR has very little change in conduction loss during operation, but it can rely on appropriate modulation strategies to make its busbar series switch (S7) bear almost all the switching losses of the rectifier. Therefore, by configuring S7 as a high-performance power device, the switching loss of the entire rectifier can be effectively reduced in theory, and the purpose of improving efficiency can be achieved at a lower cost. It should be noted that due to the high discreteness and nonlinearity of the action characteristics of the power switch, it is difficult for various existing simulation software to accurately and quantitatively characterize the parameter performance of the actual equipment, especially in the actual industry related to the field of power electronics, the performance evaluation of the rectifier can usually only be based on actual measurement results. Considering that the input of the rectifier is a changing alternating current, it is difficult for its circuit to test the power loss of the device at a single power point. Therefore, in order to evaluate the power loss of the entire H7-CSR, the existing technical solution needs to rely on a physical prototype and conduct a real overall test. Reliable data on power loss can only be obtained by subtracting the output power from the input power. This evaluation method requires the manufacture of a prototype, which is costly, has a long implementation cycle, and has complicated steps. In addition, the power loss obtained includes multiple components such as conduction loss, switching loss, and circuit stray loss, making it difficult to conduct independent and accurate analysis of the switching loss. Summary of the invention

[0006] In order to solve at least one technical problem existing in the above-mentioned background technology, the present invention provides a switching loss evaluation method and system for an H7 current source rectifier, which relies on the simplified equivalent circuit of the switching loss under study and simulates the switching action of the H7-CSR through the selected switching loss test points, so as to reasonably evaluate the switching loss level of the H7-CSR, and has the advantages of being simple and easy to implement.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] A first aspect of the present invention provides a method for evaluating switching losses of an H7 current source rectifier, comprising the following steps:

[0009] According to the modulation strategy implemented by the H7 current source rectifier, the actual number of switching loss test points and the voltage value corresponding to each switching loss test point are determined;

[0010] Based on the voltage values ​​corresponding to each switching loss test point, a switching loss equivalent test circuit is built to simulate the switching action of the H7 current source rectifier during modulation, and the switching loss at the corresponding switching loss test point is obtained;

[0011] Based on the switching loss at each switching loss test point and the setting conditions of the modulation strategy, the overall switching loss evaluation results of the H7 current source rectifier in a single modulation cycle are obtained.

[0012] As an implementation method, when the H7 current source rectifier implements a five-segment space vector modulation strategy, the space vector state of the H7 current source rectifier and its corresponding switch combination are as follows:

[0013] When the space vector corresponding to the H7 current source rectifier is in state 1 I0, the corresponding switch combination is: the seventh power switch tube S7 is disconnected;

[0014] When the space vector corresponding to the H7 current source rectifier is in state 2 I1, the corresponding switch combination is: the first power switch tube S1, the second power switch tube S2, and the seventh power switch tube S7 are turned on, and the third power switch tube S3, the fourth power switch tube S4, the fifth switch tube S5, and the sixth power switch tube S6 are turned off;

[0015] When the space vector corresponding to the H7 current source rectifier is state three I2, the corresponding switch combination is: the second power switch tube S2, the third power switch tube S3, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the fourth power switch tube S4, the fifth switch tube S5, and the sixth power switch tube S6 are turned off;

[0016] When the space vector corresponding to the H7 current source rectifier is state four I3, the corresponding switch combination is: the third power switch tube S3, the fourth power switch tube S4, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the fifth switch tube S5, and the sixth power switch tube S6 are turned off;

[0017] When the space vector corresponding to the H7 current source rectifier is state five I4, the corresponding switch combination is: the fourth power switch tube S4, the fifth power switch tube S5, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the third switch tube S3, and the sixth power switch tube S6 are turned off;

[0018] When the space vector corresponding to the H7 current source rectifier is in state six I5, the corresponding switch combination is: the fifth power switch tube S5, the sixth power switch tube S6, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the third switch tube S3, and the fourth power switch tube S4 are turned off;

[0019] When the space vector corresponding to the H7 current source rectifier is state seven I6, the corresponding switch combination is: the first power switch tube S1, the sixth power switch tube S6, and the seventh power switch tube S7 are turned on, and the second power switch tube S2, the third power switch tube S3, the fourth switch tube S4, and the fifth power switch tube S5 are turned off.

[0020] As an implementation method, when S7 is disconnected, no current flows through the six power switches in the rectifier bridge, the switching operations of S1 to S6 can be completed under the zero current state, the switching loss of S1 to S6 is close to zero, and the switching loss of S7 represents the switching loss of the entire H7 current source rectifier.

[0021] As an implementation manner, the actual number of the switching loss test points and the voltage value corresponding to each switching loss test point can be expressed as:

[0022]

[0023] Among them, E n is the voltage value of the nth switching loss test point, U i is the effective value of the phase voltage of the AC power supply, T s is the modulation period, f1 is the operating frequency of the input power supply of H7-CSR, and Z is an integer set.

[0024] As an implementation method, the constructed switching loss equivalent test circuit adopts a BUCK-type step-down chopper structure, specifically including: a variable power supply, a seventh power switch tube, a freewheeling diode, an inductor and a load. The seventh power switch tube and the inductor are connected in series on the DC bus, one end of the freewheeling diode is connected between the seventh power switch tube and the inductor, and the other end is connected to the negative end of the DC bus, and the inductor is connected to the DC load.

[0025] As an implementation method, the test of switching loss at each switching loss test point includes the following steps:

[0026] Set the power supply voltage according to the voltage value corresponding to each switch loss test point, keep S7 closed and turned on, and test the first input power and the first output power corresponding to the switch loss test point at this time;

[0027] Based on the first input power and the first output power corresponding to the switch loss test point at this time, the conduction loss of S7 is obtained;

[0028] S7 is set to operate at a normal switching frequency under the five-stage SVM, and the second input power and the second output power at this time are measured;

[0029] A switching loss value of S7 at the test point is obtained based on the second input power, the second output power and the conduction loss of S7.

[0030] As an implementation method, the overall switching loss evaluation result of the H7 current source rectifier in a single modulation cycle is:

[0031]

[0032] Where N is the total number of switching loss test points within 1 / 12 AC cycle, P ls,n is the switching loss value of S7 at each test point, f1 is the operating frequency of the input power supply of H7 current source rectifier, T s is the modulation period.

[0033] A second aspect of the present invention provides a switching loss evaluation system for an H7 current source rectifier, comprising:

[0034] A modulation module, used for determining the actual number of switching loss test points and the voltage value corresponding to each switching loss test point according to the modulation strategy executed by the H7 current source rectifier;

[0035] The equivalent circuit module is used to build a switching loss equivalent test circuit based on the voltage value corresponding to each switching loss test point, simulate the switching action during the modulation process of the H7 current source rectifier, and obtain the switching loss at the corresponding switching loss test point;

[0036] The switching loss evaluation module is used to obtain the overall switching loss evaluation result of a single modulation cycle of the H7 current source rectifier based on the switching loss at each switching loss test point and the setting conditions of the modulation strategy.

[0037] As an implementation mode, in the equivalent circuit module, the constructed switching loss equivalent test circuit adopts a BUCK-type step-down chopper structure, specifically including: a variable power supply, a seventh power switch tube, a freewheeling diode, an inductor and a load. The seventh power switch tube and the inductor are connected in series on the DC bus, one end of the freewheeling diode is connected between the seventh power switch tube and the inductor, and the other end is connected to the negative end of the DC bus, and the inductor is connected to the DC load.

[0038] As an implementation manner, in the switching loss evaluation module, the test of the switching loss at each switching loss test point includes the following steps:

[0039] Set the power supply voltage according to the voltage value corresponding to each switch loss test point, keep S7 closed and turned on, and test the first input power and the first output power corresponding to the switch loss test point at this time;

[0040] Based on the first input power and the first output power corresponding to the switch loss test point at this time, the conduction loss of S7 is obtained;

[0041] S7 is set to operate at a normal switching frequency under the five-stage SVM, and the second input power and the second output power at this time are measured;

[0042] A switching loss value of S7 at the test point is obtained based on the second input power, the second output power and the conduction loss of S7.

[0043] Compared with the prior art, the present invention has the following beneficial effects:

[0044] 1. The present invention determines the actual number of switching loss test points and the voltage value corresponding to each switching loss test point by using the modulation strategy executed by the H7 current source rectifier; based on the voltage value corresponding to each switching loss test point, a switching loss equivalent test circuit is constructed, which has low cost and does not require the production of a complete circuit prototype. The equivalent test can be completed with a simplified circuit.

[0045] 2. The present invention can quickly evaluate the overall switching loss based on limited test points, which is fast and convenient and has a short project implementation cycle.

[0046] 3. The present invention can directly obtain the switching loss of S7 at each test point. The final evaluation result is equivalent to the weighted average of the switching loss data of each test point. The final result does not contain conduction loss and stray loss. Therefore, a more accurate analysis of the switching loss can be performed. The evaluation result avoids the coupling of conduction loss and circuit stray loss in traditional test results.

[0047] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0049] Figure 1 This is a schematic diagram of the topological structure of H7-CSR in Embodiment 1 of the present invention;

[0050] Figure 2 This is a flow chart of a method for evaluating switching losses of an H7 current source rectifier according to an embodiment of the present invention;

[0051] Figure 3 This is a schematic diagram of the H7-CSR space vector in the first embodiment of the present invention;

[0052] Figure 4 It is a single modulation period vector state action model of the five-segment space vector debugging strategy of the first embodiment of the present invention;

[0053] Figure 5(a)-Figure 5(b) 5( a ) is a schematic diagram of the flow path of H7-CSR in two different non-zero vector states according to the first embodiment of the present invention; wherein FIG. 5( a ) is the flow path in the non-zero vector state I1, and FIG. 5( b ) is the flow path in the non-zero vector state I6;

[0054] Figure 6 Schematic diagram of the flow path of H7-CSR in the zero vector state in the first embodiment of the present invention;

[0055] Figure 7 This is a switching loss equivalent test circuit of H7-CSR according to the first embodiment of the present invention. DETAILED DESCRIPTION

[0056] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0057] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0058] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0059] Embodiment 1

[0060] like Figure 1 The figure shows the H7-CSR structure topology diagram, which includes an inductor L, seven fully controlled power switches S1, S2, S3, S4, S5, S6, S7 and seven power diodes D1, D2, D3, D4, D5, D6, D7.

[0061] In this rectifier bridge structure, each bridge arm is composed of a power switch connected in series with a power diode. The upper bridge arms are {S1, D1}, {S3, D3}, {S5, D5}, and the lower bridge arms are {S4, D4}, {S6, D6}, {S2, D2}. S7 and L are connected in series to the DC bus. S7 is connected to the rectifier bridge, and L is connected to the DC load. D7 is a freewheeling diode, one end of which is connected between S7 and the inductor L, and the other end is connected to the negative end of the DC bus.

[0062] like Figure 2 As shown, this embodiment provides a switching loss evaluation method for an H7 current source rectifier, comprising the following steps:

[0063] Step 1: According to the modulation strategy implemented by the H7 current source rectifier, determine the actual number of switching loss test points and the voltage value corresponding to each switching loss test point;

[0064] Step 2: Based on the voltage values ​​corresponding to each switching loss test point, build a switching loss equivalent test circuit to simulate the switching action during the modulation process of the H7 current source rectifier to obtain the switching loss at the corresponding switching loss test point;

[0065] Step 3: Based on the switching loss at each switching loss test point and the set conditions of the modulation strategy, the overall switching loss evaluation results of the H7 current source rectifier in a single modulation cycle are obtained.

[0066] This embodiment takes H7-CSR executing a five-segment space vector modulation (SVM) strategy as an example to explain the specific principles and operation process.

[0067] The space vector diagram of H7-CSR is as follows Figure 3As shown, it contains 6 sectors in total, which are composed of 6 non-zero vectors and 1 zero vector. The space vector states of H7-CSR and their corresponding switch combinations are as follows, which is shown in Table 1.

[0068] When the space vector corresponding to the H7 current source rectifier is in state 1 I0, the corresponding switch combination is: the seventh power switch tube S7 is disconnected;

[0069] When the space vector corresponding to the H7 current source rectifier is in state 2 I1, the corresponding switch combination is: the first power switch tube S1, the second power switch tube S2, and the seventh power switch tube S7 are turned on, and the third power switch tube S3, the fourth power switch tube S4, the fifth switch tube S5, and the sixth power switch tube S6 are turned off;

[0070] When the space vector corresponding to the H7 current source rectifier is state three I2, the corresponding switch combination is: the second power switch tube S2, the third power switch tube S3, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the fourth power switch tube S4, the fifth switch tube S5, and the sixth power switch tube S6 are turned off;

[0071] When the space vector corresponding to the H7 current source rectifier is state four I3, the corresponding switch combination is: the third power switch tube S3, the fourth power switch tube S4, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the fifth switch tube S5, and the sixth power switch tube S6 are turned off;

[0072] When the space vector corresponding to the H7 current source rectifier is state five I4, the corresponding switch combination is: the fourth power switch tube S4, the fifth power switch tube S5, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the third switch tube S3, and the sixth power switch tube S6 are turned off;

[0073] When the space vector corresponding to the H7 current source rectifier is in state six I5, the corresponding switch combination is: the fifth power switch tube S5, the sixth power switch tube S6, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the third switch tube S3, and the fourth power switch tube S4 are turned off;

[0074] When the space vector corresponding to the H7 current source rectifier is state seven I6, the corresponding switch combination is: the first power switch tube S1, the sixth power switch tube S6, and the seventh power switch tube S7 are turned on, and the second power switch tube S2, the third power switch tube S3, the fourth switch tube S4, and the fifth power switch tube S5 are turned off.

[0075] Table 1 Space vector states and switch combinations of H7-CSR

[0076] Space Vector Switch combination <![CDATA[I0]]> <![CDATA[S7 Disconnected]]> <![CDATA[I1]]> <![CDATA[S1, S2, and S7 are conducting, and the rest are off]]> <![CDATA[I2]]> <![CDATA[S2, S3, and S7 are conducting, and the rest are off]]> <![CDATA[I3]]> <![CDATA[S3, S4, and S7 are conducting, and the rest are off]]> <![CDATA[I4]]> <![CDATA[S4, S5, and S7 are conducting, and the rest are off]]> <![CDATA[I5]]> <![CDATA[S5, S6, and S7 are conducting, and the rest are off]]> <![CDATA[I6]]> <![CDATA[S1, S6, and S7 are conducting, and the rest are off]]>

[0077] When the rectifier is in normal operating mode, the reference vector will rotate counterclockwise between the sectors around the center point.

[0078] In step 1, according to the modulation strategy specifically implemented by H7-CSR, the number of switching actions of S7 within one-twelfth of the AC cycle is determined, and the switching loss test point to be measured is selected.

[0079] In the five-stage SVM strategy, the vector state action model within a standard modulation cycle is as follows: Figure 4 As shown, Figure 4 The five-segment space vector debugging strategy of H7-CSR in a single modulation cycle is demonstrated. s is the modulation period; A and B represent two different non-zero vector states, respectively, and N represents the zero vector state. The corresponding space vector selection rules are shown in Table 2.

[0080] Table 2. Space vector selection method for H7-CSR five-stage SVM

[0081]

[0082]

[0083] Take the single modulation cycle segment where the reference vector runs in the first sector as an example. At this time, the reference vector is composed of I1, I6 and I0. The H7-CSR circuit flow paths corresponding to the I1 and I6 states are shown in Figures 5(a) and 5(b), while the circuit flow path of the zero vector I0 is shown in Figure 6 shown.

[0084] It can be seen that when S7 is disconnected, no current flows through the six power switches in the rectifier bridge, and the switching operations of S1 to S6 can be completed in the zero current state, and their switching losses are close to zero. Therefore, it can be considered that the switching losses of H7-CSR are all borne by S7.

[0085] In step 2, the switching loss equivalent test circuit of S7 is used to simulate the switching action during the H7-CSR modulation process, and the power loss is measured at each selected switching loss test point.

[0086] Based on the above explanation and analysis, it can be seen that during the operation of H7-CSR, the switching loss of S7 represents the switching loss of the entire H7-CSR. Therefore, the switching loss of H7-CSR can be studied by relying on a simplified equivalent circuit. The circuit adopts a BUCK-type step-down chopper structure. The topology is as follows: Figure 7As shown. Where, E is a variable power supply, representing the instantaneous voltage loaded on the DC bus, which is equivalent to the instantaneous value of the input line voltage on the AC side.

[0087] During the switching loss evaluation of H7-CSR under the five-stage SVM:

[0088] Since the input power of H7-CSR is symmetrical three-phase AC, assuming its operating frequency is f1, the theoretical conversion frequency of the variable power supply E is 12f1. Therefore, it is only necessary to study 1 / 12 AC cycle to complete the evaluation of switching loss.

[0089] If the modulation period of the five-stage SVM is T s It can be seen that in 1 / 12 of the AC cycle, 1 / (12f1T s ) modulation cycles, S7 is turned on and off twice in each modulation cycle. Therefore, the actual number of switching loss test points is 1 / (6f1T s ), the voltage value corresponding to each switching loss test point can be expressed as:

[0090]

[0091] Among them, U i is the effective value of the phase voltage of the AC power supply, E n is the voltage value of the nth switching loss test point, and Z is an integer set.

[0092] Based on the above steps, build Figure 7 The switching loss equivalent test circuit shown in the figure should be consistent with the corresponding components of the H7-CSR to be evaluated. Among them, E is a variable power supply, which represents the voltage loaded on the DC bus, and its value is equal to the instantaneous value of the input line voltage on the AC side. The remaining components in the circuit are the same as the corresponding components in the actual main circuit.

[0093] When testing the nth switching loss test point, first, the power supply voltage E should be set according to formula (1): n Then, keep S7 closed and conduct, and test the input power P ci,n And the output power P co,n , and then the conduction loss P of S7 can be obtained lc,n , as shown in formula (2).

[0094] P lc,n =P ci,n -P co,n (2)

[0095] Next, set S7 to operate at the normal switching frequency under the five-stage SVM and measure the input power P si,nAnd the output power P so,n .

[0096] Finally, the switching loss value P of S7 at this test point can be obtained. ls,n , as shown in formula (3).

[0097] P ls,n =P si,n -P so,n -P lc,n (3)

[0098] Based on the above steps, the switching loss measurement and recording of each test point are completed. Based on the setting conditions of the five-stage SVM, the switching loss evaluation results of the overall H7-CSR single modulation cycle can be obtained through data aggregation. loss-sw , and its evaluation method is shown in formula (4).

[0099]

[0100] Where N is the total number of switching loss test points within 1 / 12 AC cycle.

[0101] By following the above steps, the switching loss evaluation of the H7-CSR can be completed.

[0102] The advantage of the above scheme is that the switching loss of S7 can be directly obtained at each test point, and the final evaluation result is equivalent to the weighted average of the switching loss data of each test point, and the final result does not contain conduction loss and stray loss. Therefore, a more accurate analysis can be made on the switching loss, and the evaluation result avoids the coupling of conduction loss and circuit stray loss in traditional test results.

[0103] Embodiment 2

[0104] This embodiment provides a switching loss evaluation system for an H7 current source rectifier, including:

[0105] A modulation module, used for determining the actual number of switching loss test points and the voltage value corresponding to each switching loss test point according to the modulation strategy executed by the H7 current source rectifier;

[0106] The equivalent circuit module is used to build a switching loss equivalent test circuit based on the voltage value corresponding to each switching loss test point, simulate the switching action during the modulation process of the H7 current source rectifier, and obtain the switching loss at the corresponding switching loss test point;

[0107] The switching loss evaluation module is used to obtain the overall switching loss evaluation result of a single modulation cycle of the H7 current source rectifier based on the switching loss at each switching loss test point and the setting conditions of the modulation strategy.

[0108] Among them, in the equivalent circuit module, the constructed switching loss equivalent test circuit adopts a BUCK type step-down chopper structure, specifically including: a variable power supply, a seventh power switch tube, a freewheeling diode, an inductor and a load. The seventh power switch tube and the inductor are connected in series on the DC bus, one end of the freewheeling diode is connected between the seventh power switch tube and the inductor, and the other end is connected to the negative end of the DC bus, and the inductor is connected to the DC load.

[0109] Wherein, in the switching loss evaluation module, the test of the switching loss at each switching loss test point comprises the following steps:

[0110] Set the power supply voltage according to the voltage value corresponding to each switch loss test point, keep S7 closed and turned on, and test the first input power and the first output power corresponding to the switch loss test point at this time;

[0111] Based on the first input power and the first output power corresponding to the switch loss test point at this time, the conduction loss of S7 is obtained;

[0112] S7 is set to operate at a normal switching frequency under the five-stage SVM, and the second input power and the second output power at this time are measured;

[0113] A switching loss value of S7 at the test point is obtained based on the second input power, the second output power and the conduction loss of S7.

[0114] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for evaluating switching losses of an H7 current source rectifier, characterized in that: The steps include: According to the modulation strategy implemented by the H7 current source rectifier, the actual number of switching loss test points and the voltage value corresponding to each switching loss test point are determined; Based on the voltage values ​​corresponding to each switching loss test point, a switching loss equivalent test circuit is built to simulate the switching action of the H7 current source rectifier during modulation, and the switching loss at the corresponding switching loss test point is obtained; Based on the switching loss at each switching loss test point and the setting conditions of the modulation strategy, the overall switching loss evaluation results of the H7 current source rectifier in a single modulation cycle are obtained; The constructed switching loss equivalent test circuit adopts a BUCK-type step-down chopper structure, specifically including: a variable power supply, a seventh power switch tube, a freewheeling diode, an inductor and a load, wherein the seventh power switch tube and the inductor are connected in series on the DC bus, one end of the freewheeling diode is connected between the seventh power switch tube and the inductor, and the other end is connected to the negative end of the DC bus, and the inductor is connected to the DC load; in the rectifier bridge structure, each bridge arm is composed of a power switch connected in series with a power diode, and the upper bridge arms are respectively {S1, D1}, {S3, D3}, {S5, D5}, and the lower bridge arms are respectively {S4, D4}, {S6, D6}, {S2, D2}, S7 and L are connected in series on the DC bus, and S7 is connected to the rectifier bridge; When the H7 current source rectifier implements the five-segment space vector modulation strategy, the space vector state of the H7 current source rectifier and its corresponding switch combination are as follows: When the space vector corresponding to the H7 current source rectifier is in state 1 I0, the corresponding switch combination is: the seventh power switch tube S7 is disconnected; When the space vector corresponding to the H7 current source rectifier is in state 2 I1, the corresponding switch combination is: the first power switch tube S1, the second power switch tube S2, and the seventh power switch tube S7 are turned on, and the third power switch tube S3, the fourth power switch tube S4, the fifth switch tube S5, and the sixth power switch tube S6 are turned off; When the space vector corresponding to the H7 current source rectifier is state three I2, the corresponding switch combination is: the second power switch tube S2, the third power switch tube S3, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the fourth power switch tube S4, the fifth switch tube S5, and the sixth power switch tube S6 are turned off; When the space vector corresponding to the H7 current source rectifier is state four I3, the corresponding switch combination is: the third power switch tube S3, the fourth power switch tube S4, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the fifth switch tube S5, and the sixth power switch tube S6 are turned off; When the space vector corresponding to the H7 current source rectifier is state five I4, the corresponding switch combination is: the fourth power switch tube S4, the fifth power switch tube S5, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the third switch tube S3, and the sixth power switch tube S6 are turned off; When the space vector corresponding to the H7 current source rectifier is in state six I5, the corresponding switch combination is: the fifth power switch tube S5, the sixth power switch tube S6, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the third switch tube S3, and the fourth power switch tube S4 are turned off; When the space vector corresponding to the H7 current source rectifier is state seven I6, the corresponding switch combination is: the first power switch tube S1, the sixth power switch tube S6, and the seventh power switch tube S7 are turned on, and the second power switch tube S2, the third power switch tube S3, the fourth switch tube S4, and the fifth power switch tube S5 are turned off; When S7 is disconnected, no current flows through the six power switches in the rectifier bridge. The switching operations of S1 to S6 are all completed under the zero current state. The switching loss of S1 to S6 is approximately zero. The switching loss of S7 represents the switching loss of the entire H7 current source rectifier.

2. A method for evaluating switching losses of an H7 current source rectifier as claimed in claim 1, characterized in that: The actual number of the switching loss test points and the voltage values ​​corresponding to the respective switching loss test points are expressed as: in, E n It is n The voltage value of the switching loss test point, U i is the effective value of the phase voltage of the AC power supply, T s is the modulation period, f 1 is the operating frequency of the input power supply of the H7 current source rectifier, and Z is an integer set.

3. The method for evaluating switching loss of an H7 current source rectifier according to claim 1, characterized in that: The switching loss test at each switching loss test point includes the following steps: Set the power supply voltage according to the voltage value corresponding to each switch loss test point, keep S7 closed and turned on, and test the first input power and the first output power corresponding to the switch loss test point at this time; Based on the first input power and the first output power corresponding to the switch loss test point at this time, the conduction loss of S7 is obtained; S7 is set to operate at a normal switching frequency under the five-stage SVM, and the second input power and the second output power at this time are measured; A switching loss value of S7 at the test point is obtained based on the second input power, the second output power and the conduction loss of S7.

4. The method for evaluating switching loss of an H7 current source rectifier according to claim 1, characterized in that: The overall switching loss evaluation results of the H7 current source rectifier in a single modulation cycle are: in, N is the total number of switching loss test points within 1 / 12 AC cycle, P ls,n is the switching loss value of S7 at various test points, f 1 is the operating frequency of the input power supply of the H7 current source rectifier, Ts is the modulation period.

5. A switching loss evaluation system for an H7 current source rectifier, characterized in that: include: A modulation module, used for determining the actual number of switching loss test points and the voltage value corresponding to each switching loss test point according to the modulation strategy executed by the H7 current source rectifier; The equivalent circuit module is used to build a switching loss equivalent test circuit based on the voltage value corresponding to each switching loss test point, simulate the switching action during the modulation process of the H7 current source rectifier, and obtain the switching loss at the corresponding switching loss test point; A switching loss evaluation module is used to obtain the overall switching loss evaluation result of a single modulation cycle of the H7 current source rectifier based on the switching loss at each switching loss test point and the setting conditions of the modulation strategy; The constructed switching loss equivalent test circuit adopts a BUCK-type step-down chopper structure, specifically including: a variable power supply, a seventh power switch tube, a freewheeling diode, an inductor and a load, wherein the seventh power switch tube and the inductor are connected in series on the DC bus, one end of the freewheeling diode is connected between the seventh power switch tube and the inductor, and the other end is connected to the negative end of the DC bus, and the inductor is connected to the DC load; in the rectifier bridge structure, each bridge arm is composed of a power switch connected in series with a power diode, and the upper bridge arms are respectively {S1, D1}, {S3, D3}, {S5, D5}, and the lower bridge arms are respectively {S4, D4}, {S6, D6}, {S2, D2}, S7 and L are connected in series on the DC bus, and S7 is connected to the rectifier bridge; When the H7 current source rectifier implements the five-segment space vector modulation strategy, the space vector state of the H7 current source rectifier and its corresponding switch combination are as follows: When the space vector corresponding to the H7 current source rectifier is in state 1 I0, the corresponding switch combination is: the seventh power switch tube S7 is disconnected; When the space vector corresponding to the H7 current source rectifier is in state 2 I1, the corresponding switch combination is: the first power switch tube S1, the second power switch tube S2, and the seventh power switch tube S7 are turned on, and the third power switch tube S3, the fourth power switch tube S4, the fifth switch tube S5, and the sixth power switch tube S6 are turned off; When the space vector corresponding to the H7 current source rectifier is state three I2, the corresponding switch combination is: the second power switch tube S2, the third power switch tube S3, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the fourth power switch tube S4, the fifth switch tube S5, and the sixth power switch tube S6 are turned off; When the space vector corresponding to the H7 current source rectifier is state four I3, the corresponding switch combination is: the third power switch tube S3, the fourth power switch tube S4, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the fifth switch tube S5, and the sixth power switch tube S6 are turned off; When the space vector corresponding to the H7 current source rectifier is state five I4, the corresponding switch combination is: the fourth power switch tube S4, the fifth power switch tube S5, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the third switch tube S3, and the sixth power switch tube S6 are turned off; When the space vector corresponding to the H7 current source rectifier is in state six I5, the corresponding switch combination is: the fifth power switch tube S5, the sixth power switch tube S6, and the seventh power switch tube S7 are turned on, and the first power switch tube S1, the second power switch tube S2, the third switch tube S3, and the fourth power switch tube S4 are turned off; When the space vector corresponding to the H7 current source rectifier is state seven I6, the corresponding switch combination is: the first power switch tube S1, the sixth power switch tube S6, and the seventh power switch tube S7 are turned on, and the second power switch tube S2, the third power switch tube S3, the fourth switch tube S4, and the fifth power switch tube S5 are turned off; When S7 is disconnected, no current flows through the six power switches in the rectifier bridge. The switching operations of S1 to S6 are all completed under the zero current state. The switching loss of S1 to S6 is approximately zero. The switching loss of S7 represents the switching loss of the entire H7 current source rectifier.

6. A switching loss evaluation system for an H7 current source rectifier as claimed in claim 5, characterized in that: The actual number of the switching loss test points and the voltage values ​​corresponding to the respective switching loss test points are expressed as: in, E n It is n The voltage value of the switching loss test point, U i is the effective value of the phase voltage of the AC power supply, T s is the modulation period, f 1 is the operating frequency of the input power supply of the H7 current source rectifier, and Z is an integer set.

7. A switching loss evaluation system for an H7 current source rectifier as claimed in claim 5, characterized in that: In the switching loss evaluation module, the switching loss test at each switching loss test point includes the following steps: Set the power supply voltage according to the voltage value corresponding to each switch loss test point, keep S7 closed and turned on, and test the first input power and the first output power corresponding to the switch loss test point at this time; Based on the first input power and the first output power corresponding to the switch loss test point at this time, the conduction loss of S7 is obtained; S7 is set to operate at a normal switching frequency under the five-stage SVM, and the second input power and the second output power at this time are measured; A switching loss value of S7 at the test point is obtained based on the second input power, the second output power and the conduction loss of S7.

8. A switching loss evaluation system for an H7 current source rectifier as claimed in claim 5, characterized in that: The overall switching loss evaluation results of the H7 current source rectifier in a single modulation cycle are: in, N is the total number of switching loss test points within 1 / 12 AC cycle, P ls,n is the switching loss value of S7 at various test points, f 1 is the operating frequency of the input power supply of the H7 current source rectifier, Ts is the modulation period.