Steel-concrete beam, manufacturing method and installation node thereof, node construction method

By designing the steel box concrete frame beam, using the combined structure of the steel box and concrete shell, filling with foaming materials and steel cages, combining prefabrication and grouting technology, the major problem of steel mixed frame beams is solved, and lightweight and rapid assembly is achieved construction improves construction efficiency and safety.

CN116163471BActive Publication Date: 2024-11-15HUNAN HUACHENG TESTING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310218446.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-25
Publication Date
2024-11-15
Estimated Expiration
2043-04-25

AI Technical Summary

Technical Problem

The existing steel-concrete frame beams have a large weight and are difficult to achieve prefabricated construction, and there is a need for lightweight design and rapid construction.

Method used

Design a steel-concrete beam structure, using a combination of steel box and concrete shell, the hollow structure is filled with high-strength fast-coagulated concrete blocks and lightweight foaming materials, and the shell is equipped with waist reinforcement, stirrups and straight reinforcement, and prefabricated components and grouting connection technology Carry out rapid assembly construction.

Benefits of technology

The lightweight goal of steel-mixed beams is achieved, the self-weight is reduced, the bending strength and construction efficiency are improved, the risks and costs of high-altitude operations are avoided, and the connection points with high stiffness and strength are provided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116163471B_ABST
    Figure CN116163471B_ABST
Patent Text Reader

Abstract

The present invention discloses a steel-concrete beam, a manufacturing method and an installation node and a node construction method, which solve the problem that the existing steel-concrete frame beam itself has a large self-weight and cannot be constructed in an assembled manner. The steel-concrete beam can also be called a steel box beam or a steel box concrete beam. The beam structure includes two combined elements: a steel box and a concrete shell. The steel box is a hollow structure composed of a main section and an installation section, and is filled with a lightweight foam material; and waist reinforcement, stirrups and straight reinforcement are arranged in the concrete shell. The outer periphery of the steel box of this technology is covered with the outer shell of the steel-concrete structure, and the inner cavity is filled with a foam body. Therefore, there is no need to separately perform anti-corrosion treatment on the inner and outer surfaces of the steel box, and the goal of reducing the self-weight is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of steel-concrete frame beams and their construction technology, specifically a new type of steel-concrete beam and its manufacturing and construction technology. Background Art

[0002] As the main horizontal beam that carries the weight of a building, it can be divided into steel beams and reinforced concrete beams according to different forming processes. Steel beams can be divided into I-beams, steel box beams, light steel beams, etc. according to different cross-sections. Such steel beams need to be coated with anti-corrosion paint on the outside to play an anti-corrosion role. For example, an I-beam is a steel beam with an I-shaped cross-section composed of upper and lower wing plates and a web plate.

[0003] Steel beams and reinforced concrete beams each have their own advantages and disadvantages. For example, the construction speed of steel beams is much faster than that of reinforced concrete beams, and their seismic performance is better than that of reinforced concrete beams. However, the stiffness and bending resistance of steel beams are worse than those of reinforced concrete beams.

[0004] Based on the advantages and disadvantages of the above two types of beams, a new type of steel-concrete frame beam implementation technology has emerged in this industry. For example, CN207892030U discloses a steel-concrete frame beam hanging formwork casting construction structure, which includes prefabricated steel, steel mesh, formwork, and suspension connectors. The formwork includes a beam side formwork and a beam bottom formwork; the prefabricated steel is an I-shaped steel, which is fixed to the construction site through support columns on both sides. The steel mesh is welded and fixed to the periphery of the prefabricated steel. The screw connection seats on both sides of the prefabricated steel are connected to one end of the tension screw, and the tension screw is sleeved with a limiting sleeve. The other end of the tension screw passes through the beam side formwork and is locked and fixed to the main ribs on the outer side of the beam side formwork by nuts; an upper fixed bracket is arranged above each support block on the top of the prefabricated steel, and the upper fixed bracket is fixedly connected to the corresponding lower fixed bracket through a suspension connector. The lower fixed bracket supports the beam bottom formwork above, and the beam bottom formwork and the two beam side formworks are combined to form a casting cavity, and concrete is poured into the casting cavity, that is, the construction of the steel-concrete frame beam is completed. This technology adopts on-site construction and the structure after forming is referenced Figure 1 Compared with traditional reinforced concrete beams, this structure has many structural properties such as earthquake resistance, compression resistance, bending resistance, fire resistance, and moisture resistance. Therefore, it has an extremely important application market.

[0005] However, during the implementation process, our unit found that the following problems still exist:

[0006] Figure 1In the steel-concrete frame beam described in the above, more than 90% of the space is occupied by C45 concrete, which has a high density and thus has a large self-weight, which is more than twice the self-weight of the steel structure beam. It is necessary to carry out lightweight design and construction. Lightweight design is one of the main indicators of current design. The so-called lightweight design means to reduce the weight as much as possible while meeting the basic building strength.

[0007] Secondly, the above construction process uses a series of steps such as hoisting, which requires on-site pouring construction. The current pouring requires the erection of large-scale scaffolding and pouring formwork. This process is high-altitude work with high risks and costs, which is contrary to the currently advocated prefabricated construction technology. Therefore, it is necessary to design a new beam structure that can adapt to the prefabricated rapid construction process and propose a solution. Summary of the invention

[0008] In order to address the deficiencies in the prior art, the present invention provides a steel-concrete beam, an installation node and a construction method thereof, which solve the problem that the existing steel-concrete frame beams are heavy and cannot be assembled for construction, provide a high-strength steel-concrete beam that has the characteristics of assembly construction and is light, and propose a preliminary manufacturing plan for the steel-concrete beam.

[0009] The technical solution adopted by the present invention to solve the technical problem is:

[0010] A steel-concrete beam, which can also be called a steel box beam or a steel box concrete beam, has a structure comprising two major components, a steel box and a concrete shell. The main points of the invention are described below.

[0011] The middle main body section of the steel box is a hollow structure with a rectangular cross section composed of an upper wing plate, a lower wing plate and two web plates. The mounting sections at both ends of the steel box are π-shaped sockets with a π-shaped cross section composed of an upper wing plate and two web plates. The effective length of the mounting section is not less than 40 cm. The hollow structure is divided into three parts by two symmetrically arranged partitions, wherein the hollow structures at both ends are filled with high-strength quick-setting concrete blocks, and the hollow structure in the middle is filled with lightweight foaming materials; at least one threaded hole is arranged on the upper wing plate of the π-shaped socket, and a tightening bolt is installed in the threaded hole;

[0012] The outer side of the main section is covered with a concrete shell, the thickness of the concrete shell is not less than 5 cm, and the optimal thickness is between 8 cm and 10 cm, taking into account both strength and fire resistance, and the steel box and the hollow structure covered by it occupy not less than 60% of the space in the beam section, and waist reinforcement, stirrups and straight reinforcement are arranged in the concrete shell, wherein the waist reinforcement is welded and fixed to the steel box, the straight reinforcement is tied to the waist reinforcement and arranged along the length direction of the steel box, and the two ends of the straight reinforcement extend to the installation section and occupy at least one-third of the length of the installation section, and the stirrups are multiple, enclosed outside the steel box and make the waist reinforcement, stirrups and straight reinforcement bundled into a steel cage;

[0013] The end surfaces at both ends of the length direction of the concrete shell are roughened surfaces.

[0014] Furthermore, the side edges of the wing plates in the steel box extend to the outside of the web plates.

[0015] Furthermore, the lightweight foam material is one of polystyrene foam particles, polystyrene foam material or foamed cement.

[0016] Furthermore, the cement used in the concrete shell is one of the series of grades C25 to C35.

[0017] The manufacturing method of the steel-concrete beam is carried out in a prefabrication yard and is characterized in that:

[0018] S1, steel box welding, laser cutting and blanking of the web and wing plates according to the drawing size, and welding the main web between the upper wing plate and the lower wing plate, wherein the upper wing plate is aligned with the main web at both ends, and the lower wing plate is set in the middle, and double-sided welding is adopted. After welding, the welding slag is removed. During the welding process, the vertical relationship between the upper and lower wing plates and the main web is maintained, and then the secondary web is set parallel to the main web and aligned at both ends, and single-sided through welding is welded on the outer side of the secondary web; with the two ends of the lower wing plate as the reference, the partition is placed after being translated at least 20 cm into the steel box, and the surrounding of the partition is welded firmly to the inner wall of the wing plate and the web plate;

[0019] S2, injecting a lightweight foam material into the hollow structure of the box through the injection port on the partition, the lightweight foam material has fluidity, until there is continuous lightweight foam material discharged from the partition on the other side, the injection port and the exhaust port on the partition are blocked, and the excess lightweight foam material on the outside of the partition is removed; then the outside of the partition is filled with high-strength quick-setting concrete, and after completion, it is cured for 24 hours;

[0020] S3, welding waist reinforcement on the outside of the box body and tying straight reinforcement and stirrups. After tying, the box body and the outer attached steel cage are hoisted into the prefabricated formwork, and cushion blocks are set to keep the steel box in a relatively fixed position in the prefabricated formwork. Then, concrete is poured and the formwork is removed after curing until it is qualified.

[0021] S4, after demoulding, roughening the end faces of both ends of the concrete shell in the length direction.

[0022] The steel-concrete beam installation node includes a steel-concrete beam and a steel-concrete column, and a corbel is fixedly installed on the steel-concrete column, and is characterized in that:

[0023] The steel-concrete beam comprises a steel box and a concrete shell, wherein the middle main body section of the steel box is a hollow structure with a rectangular cross section composed of an upper wing plate, a lower wing plate and two web plates, and the mounting sections at both ends of the steel box are π-shaped sockets composed of an upper wing plate and two web plates, and the effective length of the mounting section is not less than 40 cm, and the hollow structure is divided into three parts by two symmetrically arranged partitions, wherein the hollow structures at both ends are filled with high-strength quick-setting concrete blocks, and the hollow structure in the middle is filled with lightweight foaming materials; at least one threaded hole is arranged on the upper wing plate of the π-shaped socket, and a tightening bolt is inserted into the threaded hole;

[0024] The outer side of the main section is covered with a concrete shell, the minimum thickness of the concrete shell is not less than 5 cm, and the optimal thickness is between 8 cm and 10 cm, taking into account both strength and fire resistance, and the steel box and the hollow structure covered by it occupy not less than 60% of the space in the beam section, and waist reinforcement, stirrups and straight reinforcement are arranged in the concrete shell, wherein the waist reinforcement is welded and fixed to the steel box, the straight reinforcement is bundled on the waist reinforcement and arranged along the length direction of the steel box, and the two ends of the straight reinforcement extend to the installation section and occupy at least one-third of the length of the installation section, and the stirrups are multiple, enclosed outside the steel box and the waist reinforcement, stirrups and straight reinforcement are bundled into a steel cage;

[0025] and both end surfaces of the concrete shell in the length direction are roughened surfaces;

[0026] The π-shaped socket is inserted into the corbel and is sleeved with a slipform sleeve. The end of the steel-concrete beam and the steel-concrete column are non-contact fitted and have a gap of at least 3 cm. High-density micro-expansion mortar is arranged in the gap between the π-shaped socket, the corbel and the slipform sleeve to form a rigid connection area. The strength of the rigid connection area is greater than the strength of the steel-concrete beam body.

[0027] The construction method of the steel-concrete beam node is characterized by:

[0028] Step S1, hoisting the steel-concrete beam to the top of the installation point by a crane, slowly lowering the height of the steel-concrete beam so that the π-shaped sockets at both ends are connected to the brackets, and fine-tuning the state and position of the steel-concrete beam by adjusting the tightening bolts on the wing plates on the π-shaped sockets;

[0029] Step S2, grouting, sliding the sliding sleeve along the length direction of the steel-concrete beam until the end is tightly fitted with the steel-concrete column, and fixing the sliding sleeve with a wedge-shaped locking block. After installation, grouting is performed from the grouting port below the sliding sleeve to the grouting space through a grouting device until grouting is continuously and stably discharged from the grouting port at the top of the sliding sleeve;

[0030] Step S3, after the curing is qualified, the grouting slurry solidifies and fixes the π-shaped socket and the corbel into one, and the wedge-shaped locking block can be removed, and the sliding formwork sleeve does not need to be removed.

[0031] Furthermore, each slipform sleeve is provided with four wedge-shaped locking blocks, and correspondingly, four wedge-shaped grooves are provided on the side of the concrete shell of the steel-concrete beam. The wedge-shaped grooves gradually wedge from the middle of the beam to both ends and cooperate with the wedge-shaped locking blocks.

[0032] Furthermore, three thick steel plates are passed through the steel-concrete column. The thick steel plates are arranged vertically and are spaced 3 to 5 centimeters apart. Steel pins are arranged between the three thick steel plates. After passing through, the thick steel plates are welded to the steel-concrete column to form two symmetrically arranged corbels.

[0033] The beneficial effects of the present invention are:

[0034] Through the implementation of this technology, the polystyrene foam in the steel box concrete frame beam occupies about one-third to one-quarter of the cross-sectional space, which reduces the self-weight of the steel box concrete frame beam by about one-quarter on the original basis, achieving the goal of lightweight. In addition, by replacing a thick web with two thin webs, the amount of steel used remains basically unchanged, and the double web structural design also enhances the bending strength of the steel box beam.

[0035] The outer periphery of the steel box of this technology is covered with a steel-concrete structure shell, and the inner cavity is filled with a foam body, so there is no need to perform separate anti-corrosion treatment on the inner and outer surfaces of the steel box.

[0036] The steel-concrete beam structure uses prefabricated components, which are quickly connected by hoisting and grouting at the construction site. It is a construction technology that can be quickly assembled and constructed without the use of electric welding.

[0037] The node after construction has high rigidity and strength, and the connection strength at the node is strong due to the strength of the beam body, making the installation node highly reliable.

[0038] The difficulty of installation is reduced. This technology uses grouting connection technology to achieve installation when there is a large installation error between the beam and the corbel, such as an error in the lateral or height direction. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a cross-sectional view of a steel-concrete beam in the prior art.

[0040] Figure 2 It is a cross-sectional view of the steel-concrete beam in the present invention.

[0041] Figure 3 It is a three-dimensional diagram of the steel-concrete beam in the present invention.

[0042] Figure 4 for Figure 3 Local structure diagram of .

[0043] Figure 5 It is a horizontal cross-sectional view of the center line of the steel-concrete beam in the present invention.

[0044] Figure 6 This is a three-dimensional structural diagram of the steel box.

[0045] Figure 7 It is the horizontal section view of the steel box column.

[0046] Figure 8 This is a three-dimensional diagram of the steel box column.

[0047] Fig. 9 Schematic diagram of the process of inserting the installation section of the steel box girder into the corbel.

[0048] Fig.10 Schematic diagram of the process of the sliding sleeve sliding and moving to the installation section.

[0049] Fig.11 This is a schematic diagram of the grouting operation of the grouting space inside the slipform sleeve after the steel-concrete beam is installed in place.

[0050] Fig.12 This is a schematic diagram of the completed steel-concrete beam installation.

[0051] Fig.13 It is a horizontal section view of the installation node.

[0052] Fig.14 It is a vertical cross-sectional view of the installation node.

[0053] Fig.15 It is a schematic cross-sectional view of the steel-concrete beam in the second embodiment.

[0054] Fig.16 It is a cross-sectional view of the steel-concrete composite beam in Example 3.

[0055] In the figure:

[0056] 100 steel box, 110 steel box cavity, 120 partition, 130 high-strength anti-shear block, 140 sliding sleeve,

[0057] 200 main section, 210 upper wing plate, 220 lower wing plate, 230 belly plate,

[0058] 300 installation section, 310 tightening bolt, 320 π-shaped socket,

[0059] 400 foam,

[0060] 500 concrete shell, 510 waist reinforcement, 520 stirrups, 530 straight reinforcement, 531 straight reinforcement connection section, 540 wedge-shaped groove, 550 wedge-shaped locking block,

[0061] 600 grouting space, 610 grouting port, 620 grouting port,

[0062] 700 steel box column, 710 corbel, 720 steel pin. DETAILED DESCRIPTION

[0063] The main objects involved in this implementation technology are beams and columns. Among them, according to the coordinate state of the building, the up and down direction refers to the gravity direction, that is, the vertical direction. Correspondingly, the installation direction of the column is the vertical direction, that is, the up and down direction, and the installation direction of the beam is the horizontal direction, that is, perpendicular to the column.

[0064] In conjunction with the instruction manual Figures 2 to 13 , the implementation process and structural characteristics of this technology are explained in detail.

[0065] In this embodiment 1, dimension 1, the steel-concrete beam uses a steel box as the inner core and reinforced concrete as the outer shell, which can also be called a steel box beam, and is described from the inside out. Dimension 2, the cross-sectional structure of the steel-concrete beam is different in different sections along the length direction, and a comparative description is used.

[0066] According to the different materials used, through analysis, the steel-concrete beam in this embodiment is a steel-concrete structure composed of a steel box and its internal filling, and a reinforced concrete shell, wherein the concrete is C25 concrete or C30 concrete, and the steel cage is formed by waist reinforcement, stirrups, and straight reinforcement, and there are welding fixing points between the waist reinforcement and the steel box.

[0067] The main structure of the steel box is divided into sections along the length direction of the beam, including the main section and the installation section, wherein the installation section is of fixed length and is located at both ends of the length direction of the steel box. The main section is the main part of the beam that is subjected to stress. It is more convenient to describe by dividing the steel box into the main section and the installation section.

[0068] The steel box 100 mentioned above spans the installation section 300, the main section 200 and the installation section 300 along the length direction. The steel box has different installation and expression forms in the main section and the installation section. The presence of the steel box in the main section 200 is reflected by the upper wing plate 210, the lower wing plate 220 and the two webs 230. The webs are divided into main webs and secondary webs, and the hollow structure of the U-shaped or rectangular structure composed of two wing plates and two webs. The hollow structure means that the inside is hollow. The hollow structure is filled with polystyrene particles or polystyrene foam 400, which is densely filled to reduce the dead weight of the beam. The steel box itself has stronger stability than steel (such as I-beam, angle steel, square tube), so the stability of the beam is better.

[0069] The steel box in the installation section is composed of an upper wing plate and two web plates, and the cross-section is a π-shaped profile.

[0070] In this embodiment, the thickness of the two webs 230 is significantly smaller than the thickness of the original web. Specifically, the thickness of the main web is about half of the thickness of the original web, and the thickness of the secondary web is about half of the thickness of the original web. The two and the wing plate form a U-shaped or rectangular cross-sectional structure. The steel box has a larger space occupancy on a larger cross-section. When the steel box has the same weight as the original I-beam, the steel box with a large space has better bending resistance and a more stable state than the original I-beam.

[0071] In this embodiment, the thickness of the two wing plates is significantly smaller than the thickness of the original I-beam wing plates. Specifically, the thickness of the wing plates is approximately one-half of the thickness of the original wing plates.

[0072] At the same weight, the steel box has a larger proportion, for example, Figure 2 The steel box and the internal space it covers account for about 65% of the space in the beam. Fig.15 The proportion shown in is about 80%. Through this setting, the proportion of the steel box in the beam is greatly increased. The density of the foaming material in the steel box is one percent of the density of traditional C25 concrete. Through this filling, the air inside the steel box is discharged, and by mixing oxygen adsorbent and desiccant in the foaming material, the corrosion protection of the steel box without spraying is achieved.

[0073] The above concrete covers the outside of the main section of the steel box to form a protective shell, which also has the function of heat insulation. The outside refers to the concrete shell 500 which is evenly arranged on the outer surface of the steel box beam and is designed with basically equal thickness. The concrete is a prefabricated structure, which is formed in the prefabrication field and can be industrialized to meet the requirements of factory prefabrication and assembly construction.

[0074] Waist bars 510, stirrups 520, and straight bars 530 are embedded in the concrete shell 500, wherein the waist bars 510 are welded and fixed to the outer surface of the steel box, and are arranged relatively loosely along the length direction of the steel box, for example, at intervals of about 0.6 meters. The straight bars 530 are bundled on the waist bars, and the bundle is used to arrange the straight bars along the length direction of the steel box. Then, there are multiple stirrups, which are enclosed on the periphery of the steel box and are arranged relatively tightly along the length direction of the steel box, for example, at intervals of 30 centimeters. A steel cage is formed between the three by binding, and the above-mentioned steel cage is enclosed on the outside of the steel box, forming a covering layer of a steel-concrete structure with concrete. The covering layer of the steel-concrete structure forms the main structure of the beam together with the steel box. The beam is the invented main structure of the steel-concrete beam, which has the comprehensive performance advantages of pressure bearing, light weight, fire resistance, and earthquake resistance.

[0075] The above-mentioned waist reinforcement and stirrups are all embedded in the concrete shell 500, and most of the straight reinforcement 530 is embedded in the concrete shell. Both ends of the straight reinforcement extend out and extend to at least one-third of the installation section to form a straight reinforcement connecting section 531. Optimally, a 90-degree bend is set at the end of the straight reinforcement and located at the installation section to improve the grip with the secondary grouting slurry.

[0076] In this embodiment, the thickness of the concrete shell does not exceed 10 cm, and the effective thickness is not less than 5 cm, which effectively reduces the dead weight and maintains sufficient fire resistance.

[0077] Furthermore, the concrete shell may have uniform wall thickness around the steel box, or may have non-uniform wall thickness. For example, the wall thickness on the upper side of the steel box is much thicker than the wall thickness of the other three side walls, so as to give full play to the characteristics of concrete that it is resistant to compression (stress) but not to tension (stress).

[0078] The steel-concrete structure covering layer forms dense protection on the outer periphery of the steel box, and has an anti-corrosion effect. At the same time, the covering layer also has a heat insulation effect, and the open flame resistance of the beam body is significantly improved, which will play a positive role when a fire occurs in the building and endangers the safety of the frame beam.

[0079] The covering layer of the steel-concrete structure does not cover the installation section, and roughening is provided at the vertical interface to improve the bonding effect of the secondary grouting. After the secondary grouting operation, the installation section is also covered and has anti-corrosion and fire-proof properties.

[0080] The above-mentioned installation section 300 has a different structure from the main section. The difference between the two is not only reflected in the difference in the steel-concrete covering layer structure, but also in the steel box structure. In this installation section, the lower wing plate on the lower side of the steel box is omitted in an omitted design. Specifically, the lower wing plate is no longer set 10 cm outside the concrete end face, that is, the overall length of the lower wing plate is less than the length of the upper wing plate. In this way, in this installation section, the vertical section of the steel box (when the beam is installed horizontally) is a π-shaped section, which is conducive to the rapid installation of the beam. For the convenience of description, this structure is called a π-shaped socket, and the function and mechanism of the π-shaped socket will be reflected in the installation stage.

[0081] One or two jacking bolts 310 are installed on the upper wing plate of the above-mentioned installation section 300. The jacking bolts are installed vertically in the threaded holes of the upper wing plate from top to bottom. The lower ends of the jacking bolts are tightened on the corbels. The horizontal height of the installation section can be slightly adjusted by the jacking bolts, which makes the installation of the steel-concrete beam convenient. The jacking bolts are auxiliary. When the inner cavity is filled with mortar, the mortar fills the space between the installation section and the corbel, improving and reducing the force on the jacking bolts.

[0082] After the installation section and the bracket are snap-fitted, a gap of at least 3 cm is formed between the end of the installation section and the steel box column. The existence of this gap makes it possible for mortar to form on the flow path. In other words, there is a non-fitting structure between the end of the installation section and the steel box column. After the mortar is filled, the installation section and the steel box column are non-fitted, and there is no direct contact between the two. This structure can also reduce the heat conduction between the beam and the column.

[0083] In the above steel box girder, in order to ensure the sealing and stability of the foam material, partitions 120 are fixed at both ends of the steel box inner cavity 110, and the area between the two fixed partitions is a foam material filling space, and the foam material is filled inside. On the outside of the partition, a space of about 10 to 20 cm long is reserved, and the space is filled with high-strength quick-setting concrete to form a high-strength anti-shear block 130. The high-strength anti-shear block 130 spans the above-mentioned installation section and part of the main section, and locally strengthens the steel box here to improve the local strength.

[0084] A specific and detailed embodiment:

[0085] The specific manufacturing process of the steel box girder is as follows: First, weld the main web between the upper wing plate and the lower wing plate, and make the main web close to the left side. Double-sided welding is used for welding, and the welding slag is removed. During the above welding process, the vertical relationship between the upper and lower wing plates and the main web is maintained. Then, the secondary web is set parallel to the main web and set on the right side of the upper and lower wing plates. The main web and the secondary web are opposite and parallel. On the outside, the secondary web is welded by a single-sided through-welding process to complete the welding of the secondary web with the upper and lower wing plates. And the welding of the partition, the welding position of the partition is located at the boundary line between the installation section and the main section and is at least 20 cm translated into the main section, so that the partition is welded to the wing plate and the web on all sides. The partition is provided with a foam material injection port or exhaust port. After welding is completed, a desiccant is placed in the hollow structure composed of two wing plates and two web plates and left to stand for several hours. Finally, the inner cavity of the main body section between the two partitions is filled with polystyrene particles or polystyrene foam through a foaming device. The filling process is accompanied by the discharge of air inside the cavity.

[0086] The overall length of the above-mentioned lower wing plate is smaller than that of the upper wing plate and is centrally arranged so that the steel box forms a π-shaped π-shaped socket at both ends. The π-shaped socket is used to achieve quick connection with the bull leg to achieve initial positioning.

[0087] Then the steel cage is bundled and the steel box with the steel cage is placed in the casting mold box. For example, by setting a pad, the steel box is kept in a relatively fixed position in the mold box, and then the C25 concrete is poured. After the mold is removed, the profile of the steel-concrete beam is as follows: Figure 3 As shown.

[0088] The main section of the steel box beam has a flat facade and is rectangular in shape. In appearance, it is no different from a traditional prefabricated beam. Generally speaking, the height of the beam is larger than the horizontal size so as to have a sufficiently small deflection and a high bending resistance.

[0089] Furthermore, at both ends of the steel box beam, a wedge-shaped groove 540 is provided on the side of the concrete shell 500 near the interface between the installation section and the main section. The wedge-shaped groove is in a gradually wedge-shaped style from the middle of the beam to both ends, and cooperates with the wedge-shaped locking block 550 to fix the sliding sleeve.

[0090] The above process is completed in the prefabricated component factory.

[0091] The above-mentioned sliding formwork sleeve is a thin iron sheet template with a rectangular ring profile that is attached to the steel box girder of the main section. The movement method is sliding, so the thin iron sheet template is defined as a sliding formwork sleeve 140. The thin iron sheet template only plays a role in the installation stage and is used as the external template in the grouting process. This point will be explained in detail in the specific construction stage.

[0092] A detailed construction process: First, the steel box column is designed during the installation process. The steel box column is equipped with a corbel. In this embodiment, as an exemplary method, the corbel adopts a through-type design. Specifically, three thick steel plates are inserted into the steel box column 700. The thick steel plates are arranged vertically and are spaced 3 to 5 cm apart. The three thick steel plates are arranged one by one, and after passing through, the thick steel plates are welded to the steel box column to form two symmetrically arranged corbels 710.

[0093] In the above-mentioned corbel, a steel pin 720 is arranged between the three thick steel plates, and the steel pin connects the corbel as a whole. The corbel is matched with the π-shaped sockets with a π-shaped cross section at both ends of the above-mentioned steel box girder. Specifically, the installation section of the steel box girder is inserted into the corbel from top to bottom, and the steel box girder is leveled and more finely adjusted through the adjustment bolts on the installation section.

[0094] In the above process, the steel box girder is hoisted using hoisting equipment to lift the steel box girder to a suitable height, and both ends of the steel box girder are installed.

[0095] After installation, the sliding formwork sleeve on the steel box beam is slid and moved to the installation section. The sliding formwork sleeve is significantly longer than the installation section in the beam length direction, so that there is a partial overlap between the sliding formwork sleeve and the installation section. This partial overlap makes the installation of the sliding formwork sleeve convenient. A wedge-shaped groove is provided at the edge of the overlapping area with the above-mentioned sliding formwork sleeve on the concrete side of the steel box beam. The sliding formwork sleeve is securely fixed in the above-mentioned position through the wedge-shaped locking principle of the wedge block.

[0096] After installation, the grouting slurry is used to grout the grouting space 600 inside the sliding sleeve. Specifically, the grouting port 610 is located at the low point of the sliding sleeve, and the grouting port 620 is located at the top of the sliding sleeve. The grouting material is filled in a gradually climbing manner from bottom to top, effectively avoiding insufficient grouting density and the existence of gaps. After the grouting is completed, the pressure is maintained and cured until hardened to complete the fixed connection between the two ends of the steel box beam and the steel box column.

[0097] The above-mentioned grouting material has a micro-expansion property, for example, a micro-expansion cement mortar, during the solidification process of the slurry, the slurry has a certain expansion tendency, which is conducive to forming expansion stress in the internal cavity, thereby improving the bonding strength of the beam-column connection node.

[0098] The connection structure forms a fixed connection in a wrapped state by separating the above-mentioned corbel structure and the installation section with filled expansion mortar, and prevents the steel plates, steel nails, etc. from leaking out. The overall outline is consistent with the beam outline, and has a good appearance. After the construction is completed, the steel does not leak out, and there is no need to perform anti-corrosion technology, so it is free of anti-corrosion treatment.

[0099] The above-mentioned sliding mold sleeve does not need to be demolded.

[0100] When the construction process requires demoulding, it can also be effectively removed.

[0101] The beam-column installation node structure formed by construction is as follows:

[0102] The steel-concrete beam comprises a main body section in the middle and installation sections at both ends, wherein the π-shaped socket 320 of the installation section is plugged into the corbel, and the self-limiting of the installation section is achieved through the upper wing plate of the installation section and the web plates on both sides, and high-density micro-expansion mortar is grouted in the space between the π-shaped socket, the corbel and the slip sleeve. After curing, the mortar solidifies and fixes the π-shaped socket and the corbel into one.

[0103] In conjunction with the instruction manual Fig.13 and Fig.14 In this node, the installation section has a π-shaped socket (the end of the steel box), a corbel composed of vertical plates, and high-density mortar to form a rigid connection area, which forms an integrated structure after connection. This grouting connection construction process forms a rigid connection point between beams and columns, and the connection point has an overlapping area in the length direction, which significantly improves the local strength, and the local strength is significantly greater than the strength of the beam body. When an earthquake occurs, the beam body participates in energy consumption and effectively avoids fracture damage at the node.

[0104] During the construction of this installation node, no electric welding is used, no flames are generated, and no damage is caused to the steel surface. After installation, the secondary anti-corrosion treatment process is eliminated.

[0105] During the construction process of this installation node, steel rivets are not used for connection. Compared with the steel rivet connection process, the grouting process is more flexible and convenient, as well as has better weather resistance and does not cause corrosion damage.

[0106] Embodiment 2

[0107] One of the purposes of the present invention is a lightweight steel-concrete beam, in which a steel box is filled with polyurethane foam material or similar foam material along the length direction of the beam, and an oxygen adsorbent is mixed in the foam material, and the foam material supplements the internal space of the steel box to form an internal cover and isolate oxygen to form an anti-corrosion filling; concrete is coated on the outside of the steel box, and waist reinforcement, stirrups and straight reinforcement are also arranged in the concrete, wherein the waist reinforcement is welded to the four directions of the steel box and is perpendicular to the surface of the steel box, and straight reinforcement is tied to the waist reinforcement, wherein the straight reinforcement is arranged along the length direction of the beam, and the straight reinforcement extends to the installation section and covers at least one-third of the length of the installation section, and the bends are reasonably arranged; the waist reinforcement, stirrups and straight reinforcement adopt threaded steel of a smaller specification; the contour covered by the steel box section accounts for 80% of the steel-concrete beam section, reference Fig.15 The steel box in this embodiment has a larger cross-section, and the lightweight effect is more obvious.

[0108] Embodiment 3

[0109] refer to Fig.16 The steel-concrete beam is in the form of a composite beam, that is, this embodiment describes the production process of the technology in composite beams.

[0110] In this structure, the beams are modified according to the production requirements of composite beams, so that this technology can be applied not only to the production of general prefabricated beams, but also to the production of composite beams.

[0111] A construction process for a composite beam comprises the following steps: on the basis of the construction of the first embodiment, a composite plate is placed on the top of the composite beam, and steel bars are tied and cast-in-place concrete is poured on the composite beam and the composite plate to form a cast-in-place layer.

[0112] The embodiments described above are merely descriptions of preferred implementations of the present invention and are not intended to limit the scope of the present invention. Without departing from the spirit of the present invention, various modifications and improvements to the present invention by relevant technical personnel in the field should fall within the scope of protection determined by the claims of the present invention.

Claims

1. A steel-concrete beam, comprising a steel box and a concrete shell, characterized in that: The middle main body section of the steel box is a hollow structure with a rectangular cross section composed of an upper wing plate, a lower wing plate and two web plates. The mounting sections at both ends of the steel box are π-shaped sockets with a π-shaped cross section composed of an upper wing plate and two web plates. The effective length of the mounting section is not less than 40 cm. The hollow structure is divided into three parts by two symmetrically arranged partitions, wherein the hollow structures at both ends are filled with high-strength quick-setting concrete blocks, and the hollow structure in the middle is filled with lightweight foaming materials; at least one threaded hole is arranged on the upper wing plate of the π-shaped socket, and a tightening bolt is installed in the threaded hole; The outer side of the main section is covered with a concrete shell, the thickness of the concrete shell is not less than 5 cm, and the steel box and the hollow structure covered by it occupy not less than 60% of the space in the beam section, and waist reinforcement, stirrups and straight reinforcement are arranged in the concrete shell, wherein the waist reinforcement is welded and fixed to the steel box, the straight reinforcement is tied to the waist reinforcement and arranged along the length direction of the steel box, and the two ends of the straight reinforcement extend to the installation section and occupy at least one-third of the length of the installation section, and the stirrups are multiple, enclosed outside the steel box and the waist reinforcement, stirrups and straight reinforcement are bundled into a steel cage; And the end surfaces at both ends of the length direction of the concrete shell are roughened surfaces.

2. The steel-concrete beam according to claim 1, characterized in that: The side edges of the wing plates in the steel box extend to the outside of the web plates.

3. The steel-concrete beam according to claim 1, characterized in that: The lightweight foam material is one of polystyrene foam material or foam cement.

4. The steel-concrete beam according to claim 1, characterized in that: The cement used in the concrete shell is one of the series of grades C25 to C35.

5. The method for manufacturing a steel-concrete beam according to any one of claims 1 to 4, wherein the manufacturing process is carried out in a prefabrication yard, characterized in that: S1, steel box welding, laser cutting and blanking of the web and wing plates according to the drawing size, and welding the main web between the upper wing plate and the lower wing plate, wherein the upper wing plate is aligned with the main web at both ends, and the lower wing plate is set in the middle, and double-sided welding is adopted. After welding, the welding slag is removed. During the welding process, the vertical relationship between the upper and lower wing plates and the main web is maintained, and then the secondary web is set parallel to the main web and aligned at both ends, and single-sided through welding is welded on the outer side of the secondary web; with the two ends of the lower wing plate as the reference, the partition is placed after being translated at least 20 cm into the steel box, and the surrounding of the partition is welded firmly to the inner wall of the wing plate and the web plate; S2, injecting a lightweight foam material into the hollow structure of the box through the injection port on the partition, the lightweight foam material has fluidity, until there is continuous lightweight foam material discharged from the partition on the other side, the injection port and the exhaust port on the partition are blocked, and the excess lightweight foam material on the outside of the partition is removed; then the outside of the partition is filled with high-strength quick-setting concrete, and after completion, it is cured for 24 hours; S3, welding waist reinforcement on the outside of the box body and tying straight reinforcement and stirrups. After tying, the box body and the outer attached steel cage are hoisted into the prefabricated formwork, and cushion blocks are set to keep the steel box in a relatively fixed position in the prefabricated formwork. Then, concrete is poured and the formwork is removed after curing until it is qualified. S4, after demoulding, roughening the end faces of both ends of the concrete shell in the length direction.

6. A steel-concrete beam installation node, which includes a steel-concrete beam and a steel-concrete column, on which a corbel is fixedly installed, characterized in that: The steel-concrete beam comprises a steel box and a concrete shell, wherein the middle main body section of the steel box is a hollow structure with a rectangular cross section composed of an upper wing plate, a lower wing plate and two web plates, and the mounting sections at both ends of the steel box are π-shaped sockets composed of an upper wing plate and two web plates, and the effective length of the mounting section is not less than 40 cm, and the hollow structure is divided into three parts by two symmetrically arranged partitions, wherein the hollow structures at both ends are filled with high-strength quick-setting concrete blocks, and the hollow structure in the middle is filled with lightweight foaming materials; at least one threaded hole is arranged on the upper wing plate of the π-shaped socket, and a tightening bolt is inserted into the threaded hole; The outer side of the main section is covered with a concrete shell, the minimum thickness of the concrete shell is not less than 5 cm, and the steel box and the hollow structure covered by it occupy not less than 60% of the space in the beam section, and waist reinforcement, stirrups and straight reinforcement are arranged in the concrete shell, wherein the waist reinforcement is welded and fixed to the steel box, the straight reinforcement is tied to the waist reinforcement and arranged along the length direction of the steel box, and the two ends of the straight reinforcement extend to the installation section and occupy at least one-third of the length of the installation section, and the stirrups are multiple, enclosed outside the steel box and the waist reinforcement, stirrups and straight reinforcement are bundled into a steel cage; and both end surfaces of the concrete shell in the length direction are roughened surfaces; The π-shaped socket is inserted into the corbel and is sleeved with a slipform sleeve. The end of the steel-concrete beam and the steel-concrete column are non-contact fitted and have a gap of at least 3 cm. High-density micro-expansion mortar is arranged in the gap between the π-shaped socket, the corbel and the slipform sleeve to form a rigid connection area. The strength of the rigid connection area is greater than the strength of the steel-concrete beam body.

7. The construction method of the steel-concrete beam installation node according to claim 6, characterized in that: Step S1, hoisting the steel-concrete beam to the top of the installation point by a crane, slowly lowering the height of the steel-concrete beam so that the π-shaped sockets at both ends are connected to the brackets, and fine-tuning the state and position of the steel-concrete beam by adjusting the tightening bolts on the wing plates on the π-shaped sockets; Step S2, grouting, sliding the sliding sleeve along the length direction of the steel-concrete beam until the end is tightly fitted with the steel-concrete column, and fixing the sliding sleeve with a wedge-shaped locking block. After installation, grouting is performed from the grouting port below the sliding sleeve to the grouting space through a grouting device until grouting is continuously and stably discharged from the grouting port at the top of the sliding sleeve; Step S3, after the curing is qualified, the grouting slurry solidifies and fixes the π-shaped socket and the corbel into one, and the wedge-shaped locking block can be removed, and the sliding formwork sleeve does not need to be removed.

8. The construction method of the steel-concrete beam installation node according to claim 7, characterized in that: Three thick steel plates are passed through the steel-concrete column. The thick steel plates are arranged vertically and are spaced 3 to 5 cm apart. Steel pins are arranged between the three thick steel plates. After passing through, the thick steel plates are welded to the steel-concrete column to form two symmetrically arranged corbels.