A new high-position air intake pipe design method and device based on main + auxiliary dual transport pipelines

Through the main and secondary dual transportation pipeline design, the pipeline transportation capacity curve is calculated using sensors and fitted neural network models, and the pipeline with the largest transportation capacity is selected for gas transportation, which solves the problem of low gas intake rate under a single pipeline design and achieves high efficiency , accurate gas transportation.

CN116227351BActive Publication Date: 2024-11-05陕西海鹰汽车部件有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310207976.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-06
Publication Date
2024-11-05
Estimated Expiration
2043-03-06

AI Technical Summary

Technical Problem

The existing single-pipe design has a low gas intake rate during peak periods, resulting in too long waiting time and cannot meet the high-efficiency gas transportation needs.

Method used

The main and secondary dual transportation pipeline design is adopted, and the real-time pressure change and transportation per unit time are obtained through preset sensors. The numerical curve of the transportation capacity of each pipeline is calculated using the fitted neural network model, and the curve is adjusted through the tuning algorithm to select the transportation capacity. The largest pipeline for gas transport.

Benefits of technology

It realizes high efficiency of gas transportation, reduces waiting time, simplifies operating procedures, and improves the accuracy of real-time pressure changes in the pipeline and the comparable transportation capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116227351B_ABST
    Figure CN116227351B_ABST
Patent Text Reader

Abstract

The present invention relates to artificial intelligence technology, and discloses a novel high-level air intake pipe design method based on main + secondary dual transport pipelines, including: obtaining the storage pressure of the target gas, and obtaining the transport volume per unit time of the main pipeline and calculating the real-time pressure change; obtaining the pipeline data of each pipeline, selecting one of the secondary pipelines as the target pipeline one by one, and using a fitting neural network model to calculate the transport capacity numerical curve of the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change; mapping all transport capacity numerical curves to the same coordinate system, and performing numerical micro-corrections; calculating the transport capacity numerical curve with the largest mean transport capacity, and opening the corresponding secondary pipeline to transport the target gas together with the main pipeline. The present invention also proposes a novel high-level air intake pipe design device based on main + secondary dual transport pipelines. The present invention can improve the efficiency of pipeline air intake.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of artificial intelligence technology, and in particular to a novel high-position air intake pipe design method and device based on a main+auxiliary dual transport pipeline. Background Art

[0002] As society enters a rapidly developing modern life, people are increasingly looking forward to living in a highly efficient and time-free manner. In order to increase the gas transportation rate in the pipeline and save the waiting time of gas users, a dual-pipeline air intake design of main + auxiliary pipelines is needed to increase the gas transportation rate in the pipeline and reduce the pipeline air intake time.

[0003] Existing pipeline gas transportation usually only uses a single pipeline for transportation and intake. In real life, when there is a large demand for gas, such as when a car is refueled with natural gas at a service station, it often takes a while for a single pipeline to intake gas. During the peak period of gas refueling, it takes a long time to wait. Therefore, the single-pipeline intake solution has a low rate and a long time. Summary of the invention

[0004] The present invention provides a novel high-position air intake pipe design method and device based on a main+auxiliary dual transport pipeline, the main purpose of which is to solve the problem of low air intake rate during pipeline operation.

[0005] To achieve the above object, the present invention provides a novel high-position air intake pipe design method based on a main + auxiliary dual transport pipeline, comprising:

[0006] Using a preset sensor to obtain in real time the storage pressure of the target gas, and the transport volume per unit time of the target gas when the preset main pipeline transports the target gas;

[0007] Calculating a real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline;

[0008] Obtaining pipeline data of each pipeline in a preset sub-pipeline set, selecting one of the sub-pipelines in the sub-pipeline set as a target pipeline one by one, and using a preset fitting neural network model to calculate a transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change;

[0009] Mapping the transport capacity numerical curves corresponding to all the secondary pipelines into the same coordinate system, and performing numerical micro-correction on each of the transport capacity numerical curves through a preset tuning algorithm to obtain a set of standard curves;

[0010] A transport capacity numerical curve with the maximum mean transport capacity is calculated according to the standard curve set, and a secondary pipeline corresponding to the maximum transport capacity numerical curve is opened to transport the target gas together with the main pipeline.

[0011] Optionally, the calculating the real-time pressure change of the target gas by using a preset pressure change formula includes:

[0012]

[0013] Among them, ΔP is the real-time pressure change, P0 is the standard pressure, Sp is the transportation volume per unit time, v is the pipeline volume of the main pipeline, t1 is the transportation time at a certain moment, and t2 is the transportation time different from t1.

[0014] Optionally, the calculation of the transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened by using a preset fitting neural network model according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change includes:

[0015] Processing the pipeline data, the storage pressure and the real-time pressure variation, and using the processed data to determine a curve label corresponding to the transport capacity value curve through the fitting neural network model;

[0016] Calculating the matching degree between the curve label and the preset numerical curve label, and determining the numerical curve label corresponding to the maximum matching degree as the target label;

[0017] The target tag is used to draw a corresponding transport capacity value curve according to a drawing function preset in a MATLAB toolbox.

[0018] Optionally, the processing of the pipeline data, the storage pressure and the real-time pressure variation, and determining a curve label corresponding to the transport capacity value curve by using the processed data through the fitting neural network model includes:

[0019] Encoding the pipeline data, the stored pressure and the real-time pressure variation to obtain data coding, pressure coding and variation coding;

[0020] The data code, the pressure code and the variation code are fused to obtain a fused code;

[0021] Performing convolution and pooling processing on the fusion code to obtain a low-dimensional feature code of the fusion code;

[0022] Mapping the low-dimensional feature semantics to a pre-constructed high-dimensional space using a preset mapping function to obtain a high-dimensional feature encoding;

[0023] The high-dimensional feature encoding is screened using a preset activation function to obtain a curve label.

[0024] Optionally, the calculating the matching degree between the curve label and a preset numerical curve label, and determining the numerical curve label corresponding to the maximum matching degree as the target label, includes:

[0025] The matching degree between the curve label and the preset numerical curve label is calculated using the following matching degree calculation formula:

[0026]

[0027] Wherein, P is the matching degree, α is the curve label, and β is the numerical curve label.

[0028] Optionally, mapping the transport capacity value curves corresponding to all the secondary pipelines into the same coordinate system includes:

[0029] The horizontal and vertical coordinates corresponding to all transport capacity value curves are mapped into the same coordinate system through a preset normalization function to obtain a standard coordinate system;

[0030] The transport capacity value curve is mapped into a standard coordinate system through a preset mapping function.

[0031] Optionally, mapping the horizontal and vertical coordinates corresponding to all transport capacity value curves into the same coordinate system through a preset normalization function to obtain a standard coordinate system includes:

[0032] Use the following normalization function to map the horizontal and vertical coordinates corresponding to all transport capacity value curves into the same coordinate system to obtain the standard coordinate system:

[0033]

[0034]

[0035] in, Represents the horizontal and vertical coordinates of the normalized new coordinate system. It represents the horizontal and vertical coordinates of the normalized old coordinate system, N represents the total amount of horizontal and vertical coordinates calculated, and i represents the sequence number of the coordinates. represents the i-th horizontal and vertical coordinates in the new coordinate system, represents the i-th horizontal and vertical coordinates in the old coordinate system, Indicates the minimum value of the horizontal and vertical coordinates in the new coordinate system. It represents the minimum value of the old horizontal and vertical coordinates in the old coordinate system, where the horizontal and vertical coordinates are the horizontal coordinate or the vertical coordinate.

[0036] Optionally, the method of performing a numerical micro-correction on each of the transport capacity numerical curves by a preset tuning algorithm to obtain a standard curve set includes:

[0037] Calculate the standard error value corresponding to each value on the transport capacity value curve using a preset error formula;

[0038] According to the standard error value, each value on the transport capacity value curve is numerically adjusted to obtain a standard curve value;

[0039] The standard curve values ​​are plotted into a standard curve, and all standard curves are collected into a curve collection.

[0040] In order to solve the above problems, the present invention also provides a novel high-position air intake pipe design device based on a main + auxiliary dual transport pipeline, the device comprising:

[0041] Preprocessing module: using a preset sensor to obtain the storage pressure of the target gas in real time, and to obtain the transport volume per unit time when the preset main pipeline transports the target gas;

[0042] A pressure change calculation module: calculates the real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline;

[0043] Curve drawing module: obtaining pipeline data of each pipeline in a preset sub-pipeline set, selecting one of the sub-pipelines in the sub-pipeline set as the target pipeline one by one, and using a preset fitting neural network model to calculate the transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change;

[0044] Curve adjustment module: maps the transport capacity value curves corresponding to all secondary pipelines into the same coordinate system, and performs numerical micro-correction on each transport capacity value curve through a preset tuning algorithm to obtain a set of standard curves;

[0045] Final transport module: calculates a transport capacity numerical curve with the maximum mean transport capacity according to the standard curve set, and opens a secondary pipeline corresponding to the numerical curve with the maximum transport capacity to transport the target gas together with the main pipeline.

[0046] The embodiment of the present invention can quickly, effectively and accurately calculate the real-time pressure change of a large number of pipelines by calculating the real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline, thereby reducing costs and simplifying operations; obtain pipeline data of each pipeline in a preset sub-pipeline set, select one of the sub-pipelines in the sub-pipeline set as the target pipeline one by one, and use a preset fitting neural network model to calculate the transport capacity value curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change; by drawing the transport capacity value curve, the transport capacity of different pipelines can be intuitively reflected, and it is displayed in the form of an icon, and the trend is clear and concise, which is convenient for subsequent clear and reliable comparison of the transport capacity of different pipelines; calculate the transport capacity value curve with the largest mean value of the transport capacity, and open the sub-pipeline corresponding to the numerical curve with the largest transport capacity to transport the target gas together with the main pipeline, so as to ensure the maximum efficiency of gas transportation. Therefore, the novel high-position air intake pipe design method and device based on the main + auxiliary dual transport pipelines proposed in the present invention can solve the problem of low pipeline air intake efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 A schematic flow chart of a novel high-position air intake pipe design method based on a main + auxiliary dual transport pipeline provided in one embodiment of the present invention;

[0048] Figure 2 A schematic diagram of a process for drawing a transport capacity value curve provided by an embodiment of the present invention;

[0049] Figure 3 A schematic diagram of a process for collecting a set of standard curves provided by an embodiment of the present invention;

[0050] Figure 4 A functional module diagram of a novel high-position air intake pipe design device based on main + auxiliary dual transport pipes provided in one embodiment of the present invention;

[0051] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0052] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0053] The embodiment of the present application provides a new high-position air intake pipe design method based on main + secondary dual transport pipelines. The execution subject of the new high-position air intake pipe design method based on main + secondary dual transport pipelines includes but is not limited to at least one of the electronic devices such as the server and the terminal that can be configured to execute the method provided by the embodiment of the present application. In other words, the new high-position air intake pipe design method based on main + secondary dual transport pipelines can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc. The server can be an independent server, or it can be a cloud server that provides cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, content delivery networks (Content Delivery Network, CDN), and basic cloud computing services such as big data and artificial intelligence platforms.

[0054] Reference Figure 1 FIG. 1 is a flow chart of a novel high-position air intake pipe design method based on a main + auxiliary dual transport pipeline provided by an embodiment of the present invention. In this embodiment, the novel high-position air intake pipe design method based on a main + auxiliary dual transport pipeline includes:

[0055] S1. Using a preset sensor to obtain in real time the storage pressure of the target gas, and obtaining the transport volume per unit time of the target gas when the preset main pipeline transports the target gas;

[0056] In the embodiment of the present invention, the sensor is a detection device that can sense the information of the detected quantity and can convert the sensed information into electrical signals or other forms of information output according to a certain rule to meet the requirements of information transmission, processing, recording and control. In the present invention, the sensor can detect the storage pressure of the target gas and return it to the computer through a digital signal.

[0057] In the embodiment of the present invention, the method of obtaining the storage pressure of the target gas in real time by using a preset sensor includes:

[0058] placing the sensor into a storage container of the target gas;

[0059] Connect the other end of the sensor to a computer device;

[0060] The pressure value in the storage container is obtained in real time using a computer device, which is called storage pressure.

[0061] In detail, the pressure of the gas is usually not constant, and is closely related to the volume of the gas storage container. The larger the container volume, the lower the pressure, and the smaller the container volume, the higher the pressure. Therefore, it is necessary to obtain the storage pressure of the target gas in real time, so as to monitor the storage state of the target gas in real time and facilitate subsequent calculations.

[0062] Additionally, the transport volume per unit time of the target gas transported by the preset main pipeline can be obtained through a gas transport experiment. By transporting gas in the main pipeline and recording the volume of gas transported per unit time, the transport volume per unit time of the target gas can be obtained.

[0063] S2. Calculating a real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline;

[0064] As the target gas is continuously transported, the volume of the main pipeline remains unchanged. According to the relationship between volume and pressure, it can be seen that the real-time pressure in the main pipeline is constantly changing. In order to further study the changing relationship of the pressure in the pipeline, it is necessary to obtain the real-time pressure change of the target gas in real time to facilitate the intake study of the pipeline.

[0065] In an embodiment of the present invention, the step of calculating the real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline includes:

[0066] Obtaining a preset standard pressure in the main pipeline before transporting the target gas and a pipeline volume of the main pipeline;

[0067] The real-time pressure change of the target gas is calculated using a preset pressure change formula.

[0068] In detail, the method of calculating the real-time pressure change of the target gas by using a preset pressure change formula includes:

[0069]

[0070] Wherein, ΔP is the real-time pressure change, P0 is the standard pressure, S p is the transport volume per unit time, v is the pipeline volume of the main pipeline, t1 is the transport time at a certain moment, and t2 is the transport time different from t1.

[0071] In detail, the pressure change formula can present the real-time pressure change information in the main pipeline in digital form, ensuring that the pressure value in the main pipeline can always be kept within a safe range, making it easier for people to intuitively feel the specific change value of the pressure.

[0072] In addition, the use of the pressure change formula to calculate the real-time pressure change is more accurate and precise. The pressure change formula can be written into the program using a programming language to quickly, effectively and accurately calculate the real-time pressure change inside a large number of pipelines, thereby reducing costs and simplifying operations.

[0073] S3, obtaining pipeline data of each pipeline in a preset secondary pipeline set, selecting one of the secondary pipelines in the secondary pipeline set as a target pipeline one by one, and using a preset fitting neural network model to calculate a transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change;

[0074] In an embodiment of the present invention, the pipeline data is basic physical information of the pipeline, such as pipeline length, material, circumference of the pipeline mouth, internal volume of the pipeline, etc. The difference in the pipeline data not only affects the pressure of the gas in the pipeline, but also affects the transportation rate of the gas in the pipeline, etc.

[0075] Additionally, obtaining the pipeline data can help accurately calculate the transportation capacity of different pipelines based on the differences in the pipeline data, ensuring the most efficient use of pipelines for gas transportation, thereby saving time and cost.

[0076] In the embodiment of the present invention, refer to Figure 2 As shown, the preset fitting neural network model is used to calculate the transport capacity value curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change, including:

[0077] S21, processing the pipeline data, the storage pressure and the real-time pressure change, and using the processed data to determine the curve label corresponding to the transport capacity value curve through the fitting neural network model;

[0078] S22, calculating the matching degree between the curve label and the preset numerical curve label, and determining the numerical curve label corresponding to the maximum matching degree as the target label;

[0079] S23, using the target tag to draw a corresponding transport capacity value curve according to a drawing function preset in a MATLAB toolbox.

[0080] In detail, the pipeline data, the storage pressure and the real-time pressure variation are processed, and the curve label corresponding to the transport capacity value curve is determined by the fitting neural network model using the processed data, including:

[0081] Encoding the pipeline data, the stored pressure and the real-time pressure variation to obtain data coding, pressure coding and variation coding;

[0082] The data code, the pressure code and the variation code are fused to obtain a fused code;

[0083] Performing convolution and pooling processing on the fusion code to obtain a low-dimensional feature code of the fusion code;

[0084] Mapping the low-dimensional feature semantics to a pre-constructed high-dimensional space using a preset mapping function to obtain a high-dimensional feature encoding;

[0085] The high-dimensional feature encoding is screened using a preset activation function to obtain a curve label.

[0086] In detail, the low-dimensional feature semantics is mapped to a pre-constructed high-dimensional space using a preset mapping function, and the mapping function includes a Gaussian Radial Basis Function function, a Gaussian function, etc. in a MATLAB library.

[0087] For example, the low-dimensional feature semantics is a point in a two-dimensional plane, and the curve label is a point in a three-dimensional plane. The two-dimensional coordinates of the point in the two-dimensional plane can be calculated using a mapping function to convert the two-dimensional coordinates into three-dimensional coordinates, and the calculated three-dimensional coordinates can be used to map the point to a pre-constructed three-dimensional space, mapping the low-dimensional feature code to a dimension that conforms to the curve label.

[0088] In an embodiment of the present invention, a preset activation function can be used to calculate the output value of the model output layer, and the output value greater than a preset threshold is determined as the curve label. The activation function includes but is not limited to a sigmoid activation function, a tanh activation function, and a relu activation function.

[0089] Specifically, calculating the matching degree between the curve label and the preset numerical curve label, and determining the numerical curve label corresponding to the maximum matching degree as the target label, includes:

[0090] The matching degree between the curve label and the preset numerical curve label is calculated using the following matching degree calculation formula:

[0091]

[0092] Wherein, P is the matching degree, α is the curve label, and β is the numerical curve label.

[0093] In detail, by calculating the matching degree between the curve label and the preset numerical curve label through the matching degree calculation formula, a label closest to the curve label can be selected from all numerical curve labels as the target label of the curve label, and the curve graph corresponding to the target label can be quickly determined according to the target label, and the curve graph can simulate the transport capacity numerical curve of the target pipeline to the greatest extent.

[0094] In detail, by drawing the transport capacity numerical curve, the transport capacity of different pipelines can be intuitively reflected and displayed in the form of icons. The trend is clear and concise, which facilitates a clear and reliable comparison of the transport capacity of different pipelines in the future.

[0095] S4, mapping the transport capacity numerical curves corresponding to all the secondary pipelines into the same coordinate system, and performing numerical micro-correction on each of the transport capacity numerical curves through a preset tuning algorithm to obtain a set of standard curves;

[0096] In the embodiment of the present invention, mapping the transport capacity value curves corresponding to all the secondary pipelines into the same coordinate system can display all the transport capacity curves through one coordinate system, making the comparison more obvious, which is the most intuitive display of the transport capacity of different pipelines.

[0097] In detail, since the transport capacity numerical curve is simulated by the fitting neural network model, there may be a certain error between it and the real-time transport capacity numerical curve of the actual pipeline. Therefore, it is necessary to correct the transport capacity numerical curve through the tuning algorithm to make the result more accurate and the scheme more executable.

[0098] In the embodiment of the present invention, mapping the transport capacity value curves corresponding to all the secondary pipelines into the same coordinate system includes:

[0099] The horizontal and vertical coordinates corresponding to all transport capacity value curves are mapped into the same coordinate system through a preset normalization function to obtain a standard coordinate system;

[0100] The transport capacity value curve is mapped into a standard coordinate system through a preset mapping function.

[0101] Specifically, the horizontal and vertical coordinates corresponding to all transport capacity value curves are mapped to the same coordinate system through a preset normalization function to obtain a standard coordinate system, including:

[0102] Use the following normalization function to map the horizontal and vertical coordinates corresponding to all transport capacity value curves into the same coordinate system to obtain the standard coordinate system:

[0103]

[0104]

[0105] in, Represents the horizontal and vertical coordinates of the normalized new coordinate system. It represents the horizontal and vertical coordinates of the normalized old coordinate system, N represents the total amount of horizontal and vertical coordinates calculated, and i represents the sequence number of the coordinates. represents the i-th horizontal and vertical coordinates in the new coordinate system, represents the i-th horizontal and vertical coordinates in the old coordinate system, Indicates the minimum value of the horizontal and vertical coordinates in the new coordinate system. It represents the minimum value of the old horizontal and vertical coordinates in the old coordinate system, where the horizontal and vertical coordinates are the horizontal coordinate or the vertical coordinate.

[0106] In detail, since the unit scales of different transport capacity numerical curves in the coordinate system may be different, integrating all transport capacity numerical curves into one coordinate system requires unifying the horizontal and vertical coordinates of all transport capacity numerical curves to facilitate subsequent integration operations.

[0107] In the embodiment of the present invention, refer to Figure 3 As shown, each of the transport capacity value curves is numerically slightly corrected by a preset tuning algorithm to obtain a standard curve set, including:

[0108] S31, using a preset error formula to calculate the standard error value corresponding to each value on the transport capacity value curve;

[0109] S32, adjusting each value on the transport capacity value curve according to the standard error value to obtain a standard curve value;

[0110] S33, plotting the standard curve values ​​into a standard curve, and collecting all standard curves into a curve collection.

[0111] In detail, the method of calculating the standard error value corresponding to each value on the transport capacity value curve using a preset error formula includes:

[0112] The standard error value corresponding to each value on the transport capacity value curve is calculated using the following error formula:

[0113]

[0114] Among them, loss represents the standard error value, b represents the number of values ​​on the transport capacity value curve, y(x i ) represents the preset value on the transport capacity value curve, represents the actual value on the transport capacity value curve, x i Represents the horizontal coordinate of the i-th value on the transport capacity value curve.

[0115] In detail, the standard error value corresponding to each value on the transport capacity value curve calculated using the error formula is more accurate, the curve fitting can be more realistic, and the calculation is simple, fast, and easy to operate.

[0116] Specifically, by using the tuning algorithm to perform numerical micro-corrections on each of the transport capacity numerical curves, the accuracy and precision of the transport capacity numerical curves are guaranteed, which can greatly improve the transportation efficiency of the pipeline, display the transportation conditions of different pipelines, and reduce the transportation cost of the pipeline.

[0117] S5. Calculate a transport capacity numerical curve with the maximum mean transport capacity according to the standard curve set, and open the secondary pipeline corresponding to the numerical curve with the maximum transport capacity to transport the target gas together with the main pipeline.

[0118] Although all the transport capacity value curves have been collected into a standard curve set, it is still impossible to directly determine the fastest pipeline, because the sizes of different pipelines are different, so the transport capacity will fluctuate over time. Therefore, it is necessary to find the transport capacity value curve with the largest mean transport capacity to determine the best pipeline.

[0119] In the embodiment of the present invention, the transport capacity value curve with the maximum mean transport capacity calculated according to the standard curve set includes:

[0120] Taking a point as a test point at every preset section on the transport curve, and obtaining the ordinate values ​​of all the test points;

[0121] The vertical coordinate values ​​are accumulated and summed and the average is taken to obtain the transport mean;

[0122] The maximum value among all transport means is determined as the maximum transport mean, and the transport capacity numerical curve corresponding to the maximum transport mean is determined as the transport capacity numerical curve with the maximum transport capacity mean.

[0123] In addition, by selecting the transport capacity numerical curve with the largest mean transport capacity from the standard curve set, in order to ensure the rapid transportation of gas, it is necessary to open the secondary pipeline corresponding to the transport capacity numerical curve with the largest mean transport capacity together with the main pipeline to ensure the maximum efficiency of gas transportation.

[0124] Specifically, in actual processes, as time goes by or the transported gas changes, the secondary pipeline that transports gas together with the main pipeline will also change, so it is necessary to modify the pipeline in real time to always ensure the maximum efficiency of gas transportation.

[0125] like Figure 4 , is a functional module diagram of a novel high-position air intake pipe design device based on main + auxiliary dual transport pipes provided by one embodiment of the present invention.

[0126] The novel high-position air intake pipe design device 100 based on main + auxiliary dual transport pipes of the present invention can be installed in an electronic device. According to the functions to be implemented, the novel high-position air intake pipe design device 100 based on main + auxiliary dual transport pipes can include a pre-processing module 101, a pressure change calculation module 102, a curve drawing module 103, a curve adjustment module 104 and a final transport module 105. The module of the present invention can also be called a unit, which refers to a series of computer program segments that can be executed by an electronic device processor and can complete fixed functions, which are stored in the memory of the electronic device.

[0127] In this embodiment, the functions of each module / unit are as follows:

[0128] The preprocessing module 101: uses a preset sensor to obtain the storage pressure of the target gas in real time, and obtains the transport volume per unit time when the preset main pipeline transports the target gas;

[0129] The pressure change calculation module 102 calculates the real-time pressure change of the target gas according to the transportation volume per unit time and the transportation time of the target gas by the main pipeline;

[0130] The curve drawing module 103: obtains pipeline data of each pipeline in a preset sub-pipeline set, selects one of the sub-pipelines in the sub-pipeline set as a target pipeline one by one, and uses a preset fitting neural network model to calculate a transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change;

[0131] The curve adjustment module 104 maps the transport capacity value curves corresponding to all the secondary pipelines into the same coordinate system, and performs a numerical micro-correction on each of the transport capacity value curves through a preset tuning algorithm to obtain a standard curve set;

[0132] The final transport module 105 calculates a transport capacity numerical curve with the maximum mean transport capacity according to the standard curve set, and opens a secondary pipeline corresponding to the numerical curve with the maximum transport capacity to transport the target gas together with the main pipeline.

[0133] In detail, each module described in the novel high-position intake pipe design device 100 based on the main + auxiliary dual transport pipes in the embodiment of the present invention is used in the same manner as described above. Figures 1 to 3The new high-position intake pipe design method based on main + auxiliary dual transport pipes described in the invention has the same technical means and can produce the same technical effects, so it will not be repeated here.

[0134] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.

[0135] Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present invention is limited by the appended claims rather than the above description, so it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any attached figure mark in the claims should not be regarded as limiting the claims involved.

[0136] The blockchain referred to in the present invention is a new application model of computer technologies such as distributed data storage, peer-to-peer transmission, consensus mechanism, encryption algorithm, etc. Blockchain is essentially a decentralized database, a string of data blocks generated by cryptographic methods. Each data block contains a batch of network transaction information, which is used to verify the validity of its information (anti-counterfeiting) and generate the next block. Blockchain can include the blockchain underlying platform, platform product service layer, and application service layer.

[0137] The embodiments of the present application can acquire and process relevant data based on artificial intelligence technology. Among them, artificial intelligence (AI) is the theory, method, technology and application system that uses digital computers or machines controlled by digital computers to simulate, extend and expand human intelligence, perceive the environment, acquire knowledge and use knowledge to obtain the best results.

[0138] In addition, it is obvious that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. The multiple units or devices stated in the system embodiment can also be implemented by one unit or device through software or hardware. The words first, second, etc. are used to indicate names, and do not indicate any specific order.

[0139] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A new high-position air intake pipe design method based on main + auxiliary dual transport pipes, characterized in that: The method comprises: Using a preset sensor to obtain in real time the storage pressure of the target gas, and the transport volume per unit time of the target gas when the preset main pipeline transports the target gas; Calculating a real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline; The calculating the real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline includes: Obtaining a preset standard pressure in the main pipeline before transporting the target gas and a pipeline volume of the main pipeline; Calculating the real-time pressure change of the target gas using a preset pressure change formula; The method of calculating the real-time pressure change of the target gas by using a preset pressure change formula includes: ; in, is the real-time pressure change, is the standard pressure, is the transport volume per unit time, is the pipe volume of the main pipe, The transportation time at a certain moment, Different from The transit time of the moment; Obtaining pipeline data of each pipeline in a preset sub-pipeline set, selecting one of the sub-pipelines in the sub-pipeline set as a target pipeline one by one, and using a preset fitting neural network model to calculate a transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change; The method of calculating the transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened by using a preset fitting neural network model according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change includes: Processing the pipeline data, the storage pressure and the real-time pressure variation, and using the processed data to determine a curve label corresponding to the transport capacity value curve through the fitting neural network model; Calculating the matching degree between the curve label and the preset numerical curve label, and determining the numerical curve label corresponding to the maximum matching degree as the target label; Using the target tag, a corresponding transport capacity value curve is drawn according to a drawing function preset in a MATLAB toolbox; The processing of the pipeline data, the storage pressure and the real-time pressure variation, and using the processed data to determine the curve label corresponding to the transport capacity value curve through the fitting neural network model, includes: Encoding the pipeline data, the stored pressure and the real-time pressure variation to obtain data coding, pressure coding and variation coding; The data code, the pressure code and the variation code are fused to obtain a fused code; Performing convolution and pooling processing on the fusion code to obtain a low-dimensional feature code of the fusion code; Mapping the low-dimensional feature semantics to a pre-constructed high-dimensional space using a preset mapping function to obtain a high-dimensional feature encoding; Using a preset activation function to filter the high-dimensional feature code to obtain a curve label; Mapping the transport capacity numerical curves corresponding to all the secondary pipelines into the same coordinate system, and performing numerical micro-correction on each of the transport capacity numerical curves through a preset tuning algorithm to obtain a set of standard curves; A transport capacity numerical curve with the maximum mean transport capacity is calculated according to the standard curve set, and a secondary pipeline corresponding to the maximum transport capacity numerical curve is opened to transport the target gas together with the main pipeline.

2. The novel high-position air intake pipe design method based on main + auxiliary dual transport pipes as claimed in claim 1 is characterized in that: The calculating the matching degree between the curve label and the preset numerical curve label, and determining the numerical curve label corresponding to the maximum matching degree as the target label, includes: The matching degree between the curve label and the preset numerical curve label is calculated using the following matching degree calculation formula: ; in, is the matching degree, is the curve label, is the label of the numerical curve.

3. The novel high-position air intake pipe design method based on main + auxiliary dual transport pipes as claimed in claim 1 is characterized in that: The transport capacity value curves corresponding to all the secondary pipelines are mapped into the same coordinate system, including: The horizontal and vertical coordinates corresponding to all transport capacity value curves are mapped into the same coordinate system through a preset normalization function to obtain a standard coordinate system; The transport capacity value curve is mapped into a standard coordinate system through a preset mapping function.

4. The novel high-position air intake pipe design method based on main + auxiliary dual transport pipes as described in claim 3 is characterized in that: The horizontal and vertical coordinates corresponding to all transport capacity value curves are mapped to the same coordinate system through a preset normalization function to obtain a standard coordinate system, including: Use the following normalization function to map the horizontal and vertical coordinates corresponding to all transport capacity value curves into the same coordinate system to obtain the standard coordinate system: ; ; in, Represents the horizontal and vertical coordinates of the normalized new coordinate system. It represents the horizontal and vertical coordinates of the normalized old coordinate system, N represents the total amount of horizontal and vertical coordinates calculated, and i represents the sequence number of the coordinates. represents the i-th horizontal and vertical coordinates in the new coordinate system, represents the i-th horizontal and vertical coordinates in the old coordinate system, Indicates the minimum value of the horizontal and vertical coordinates in the new coordinate system. It represents the minimum value of the old horizontal and vertical coordinates in the old coordinate system, where the horizontal and vertical coordinates are the horizontal coordinate or the vertical coordinate.

5. The novel high-position air intake pipe design method based on main + auxiliary dual transport pipes according to any one of claims 1 to 4, characterized in that: The preset optimization algorithm is used to perform a numerical micro-correction on each of the transport capacity value curves to obtain a standard curve set, including: Calculate the standard error value corresponding to each value on the transport capacity value curve using a preset error formula; Adjust each value on the transport capacity value curve according to the standard error value to obtain a standard curve value; The standard curve values ​​are plotted into a standard curve, and all standard curves are collected into a curve collection.

6. A new high-position air intake pipe design device based on main + auxiliary dual transport pipelines, characterized in that: The device comprises: Preprocessing module: using a preset sensor to obtain the storage pressure of the target gas in real time, and to obtain the transport volume per unit time when the preset main pipeline transports the target gas; A pressure change calculation module: calculates the real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline; The calculating the real-time pressure change of the target gas according to the transport volume per unit time and the transport time of the target gas by the main pipeline includes: Obtaining a preset standard pressure in the main pipeline before transporting the target gas and a pipeline volume of the main pipeline; Calculating the real-time pressure change of the target gas using a preset pressure change formula; The method of calculating the real-time pressure change of the target gas by using a preset pressure change formula includes: ; in, is the real-time pressure change, is the standard pressure, is the transport volume per unit time, is the pipe volume of the main pipe, The transportation time at a certain moment, Different from The transit time of the moment; Curve drawing module: obtaining pipeline data of each pipeline in a preset sub-pipeline set, selecting one of the sub-pipelines in the sub-pipeline set as the target pipeline one by one, and using a preset fitting neural network model to calculate the transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change; The method of calculating the transport capacity curve of the main pipeline and the target pipeline for the target gas when the target pipeline is opened by using a preset fitting neural network model according to the pipeline data of the target pipeline, the storage pressure and the real-time pressure change includes: Processing the pipeline data, the storage pressure and the real-time pressure variation, and using the processed data to determine a curve label corresponding to the transport capacity value curve through the fitting neural network model; Calculating the matching degree between the curve label and the preset numerical curve label, and determining the numerical curve label corresponding to the maximum matching degree as the target label; Using the target tag, a corresponding transport capacity value curve is drawn according to a drawing function preset in a MATLAB toolbox; The processing of the pipeline data, the storage pressure and the real-time pressure variation, and using the processed data to determine the curve label corresponding to the transport capacity value curve through the fitting neural network model, includes: Encoding the pipeline data, the stored pressure and the real-time pressure variation to obtain data coding, pressure coding and variation coding; The data code, the pressure code and the variation code are fused to obtain a fused code; Performing convolution and pooling processing on the fusion code to obtain a low-dimensional feature code of the fusion code; Mapping the low-dimensional feature semantics to a pre-constructed high-dimensional space using a preset mapping function to obtain a high-dimensional feature encoding; Using a preset activation function to filter the high-dimensional feature code to obtain a curve label; Curve adjustment module: maps the transport capacity value curves corresponding to all secondary pipelines into the same coordinate system, and performs numerical micro-correction on each transport capacity value curve through a preset tuning algorithm to obtain a set of standard curves; Final transport module: calculates a transport capacity numerical curve with the maximum mean transport capacity according to the standard curve set, and opens a secondary pipeline corresponding to the numerical curve with the maximum transport capacity to transport the target gas together with the main pipeline.