A fishing route planning method, system and medium for fishing vessels

By dividing planning areas, predicting climate conditions, and using the ant colony algorithm to construct detour routes, the problem of safe navigation of fishing boats in harsh weather is solved, and the safety and efficiency of fishing boats are improved.

CN116245268BInactive Publication Date: 2024-10-15SOUTH CHINA SEA FISHERIES RES INST CHINESE ACAD OF FISHERY SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310387325.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-12
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When fishing boats are sailing at sea, severe winds and waves and other meteorological factors seriously affect the safe navigation of the ships. How to adjust and plan the sailing routes of fishing boats in real time according to the maritime climate so that fishing boats can carry out fishing operations in a safer, more energy-saving and more efficient manner is an important issue. .

Method used

By obtaining the preset fishing route and current location information of the fishing vessel, the planning area is divided, and the climate conditions are predicted based on the meteorological factor information and the deep learning model to determine whether it is the preset climate condition. If it is the preset climate condition and the disaster level is higher than the disaster resistance Level, it is marked as a route to be planned, and the ant colony algorithm is used to construct a detour route and generate the first or second navigation plan to avoid bad weather, ensure safety and optimize navigation time.

Benefits of technology

It has realized the prediction and avoidance of climate conditions in the areas where fishing boats sail, ensuring the safety of fishing boats, reducing the occurrence of maritime accidents, and improving the operating efficiency of fishing boats through the shortest navigation route.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116245268B_ABST
    Figure CN116245268B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of fishing technology for fishing vessels, and discloses a method, system and medium for planning fishing routes for fishing vessels, which obtains a preset fishing route of a fishing vessel, presets a division range, and divides the preset fishing route into several sub-fishing routes based on the division range, combines the division range with the sub-fishing route to obtain several planning areas, and analyzes the planned sub-fishing routes and the sub-routes to be planned to obtain a first navigation plan or a second navigation plan, and outputs the first navigation plan or the second navigation plan. The method can predict the climate conditions of the area where the fishing vessel passes through, so that the fishing vessel can avoid bad weather, thereby ensuring the safety of the fishing vessel and the crew, and reducing the occurrence of marine accidents.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of fishing vessel fishing, in particular to a method, system and medium for planning a fishing route for a fishing vessel. Background Art

[0002] With the advancement of fishing boat technology, the safety, energy saving and efficiency of fishing at sea have gradually become the focus of human attention. When fishing boats are sailing at sea, severe weather factors such as wind and waves seriously affect the safe navigation of ships. Therefore, how to adjust and plan the fishing route of fishing boats in real time according to the marine climate so that fishing boats can carry out fishing operations in a safer, more energy-saving and more efficient manner is an important issue. Summary of the invention

[0003] The present invention overcomes the deficiencies of the prior art and provides a method, system and medium for planning a fishing route for a fishing vessel.

[0004] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is:

[0005] The first aspect of the present invention discloses a method for planning a fishing route for a fishing vessel, comprising the following steps:

[0006] Acquire a preset fishing route of a fishing boat, preset a division range, divide the preset fishing route into a plurality of sub-fishing routes based on the division range, and combine the division range with the sub-fishing routes to obtain a plurality of planning areas;

[0007] Acquire the current position information and average sailing speed information of the fishing boat, calculate the first time node when the fishing boat enters each planning area and the second time node when the fishing boat leaves each planning area based on the current position information and the average sailing speed information, and calculate the sailing time period corresponding to the fishing boat passing through each planning area based on the first time node and the second time node;

[0008] Determine the climate forecast time period of each planning area based on the navigation time period, obtain the meteorological factor information of each planning area within the climate forecast time period, and obtain the climate conditions when the fishing boat passes through each planning area based on the meteorological factor information;

[0009] Determine whether the climate condition is a preset climate condition. If it is a preset climate condition, obtain the disaster level of the preset climate condition and the disaster resistance level of the fishing boat, determine whether the disaster level is greater than the disaster resistance level, and if it is greater than the disaster resistance level, mark the sub-fishing route corresponding to the planning area where the climate condition is the preset climate condition as a sub-route to be planned, obtain the regional location information of the planning area corresponding to the sub-route to be planned, and obtain the planned sub-fishing route based on the regional location information;

[0010] The planned sub-fishing route and the sub-route to be planned are analyzed to obtain a first navigation plan or a second navigation plan, and the first navigation plan or the second navigation plan is output.

[0011] Preferably, in a preferred embodiment of the present invention, meteorological factor information of each planning area within the climate prediction time period is obtained, and the climate conditions when the fishing boat passes through each planning area are obtained based on the meteorological factor information, specifically:

[0012] By setting key search word information for the climate evolution conditions, setting key search tags based on the key search word information, searching the big data network according to the key search tags, the meteorological factor data information required for each climate condition is obtained;

[0013] A climate prediction model is constructed based on a deep learning network, and the meteorological factor data information is divided into a training data book and a test data book; the training data book is input into the climate prediction model, and the training data book in the climate prediction model is reversely trained through a cross entropy loss function, and when the error converges to a preset value, the training parameters in the climate prediction model are saved;

[0014] The training parameters in the climate prediction model are tested by using the test data. If the training parameters meet the preset requirements, the training parameters meeting the preset requirements are used as the final parameters of the model to obtain a trained climate prediction model.

[0015] The meteorological factor information of each planning area within the climate prediction time period is obtained, and the meteorological factor information of each planning area within the climate prediction time period is input into the trained climate prediction model for analysis and prediction to obtain the climate conditions when the fishing boat passes through each planning area.

[0016] Preferably, in a preferred embodiment of the present invention, the regional location information of the planned area corresponding to the sub-route to be planned is obtained, and the planned sub-fishing route is obtained based on the regional location information, specifically:

[0017] Acquire the area location information of the planned area corresponding to the sub-route to be planned, and mark the area location information as a prohibited area;

[0018] Based on the preset fishing route, obtain the entry point position information of the fishing boat entering the planned area corresponding to the sub-route to be planned, and based on the preset fishing route, obtain the exit point position information of the fishing boat exiting the planned area corresponding to the sub-route to be planned;

[0019] The prohibited area, the entry point location information and the exit point location information are introduced into the ant colony algorithm for repeated construction to obtain multiple navigation routes, and the navigation distance value corresponding to each navigation route is obtained;

[0020] A size sorting table is constructed, and the sailing distance values ​​corresponding to each sailing route are imported into the size sorting table for size sorting, the shortest sailing distance value is extracted, and the sailing route corresponding to the shortest sailing distance value is marked as the planned sub-fishing route.

[0021] Preferably, in a preferred embodiment of the present invention, the planned sub-fishing route and the sub-route to be planned are analyzed to obtain the first navigation plan or the second navigation plan, specifically:

[0022] Acquire the navigation distance value of the planned sub-fishing route, and determine the first time value required for the fishing vessel to navigate the planned sub-fishing route based on the navigation distance value of the planned sub-fishing route;

[0023] Obtaining the navigation distance value of the sub-route to be planned, and determining a second time value required for the fishing boat to navigate the sub-route to be planned based on the navigation distance value of the sub-route to be planned;

[0024] Obtaining a start time point and an end time point at which a preset climate condition occurs in a planning area corresponding to the sub-route to be planned, and obtaining a third time value based on the start time point and the end time point;

[0025] Determine whether the sum of the second time value and the third time value is greater than the first time value;

[0026] If the sum of the second time value and the third time value is greater than the first time value, a first navigation plan is generated; if the sum of the second time value and the third time value is not greater than the first time value, a second navigation plan is generated.

[0027] Preferably, in a preferred embodiment of the present invention, if the sum of the second time value and the third time value is greater than the first time value, a first navigation plan is generated, specifically:

[0028] The sub-fishing routes corresponding to the planned areas where the climate conditions are the preset climate conditions are removed from the preset fishing routes, and the planned sub-fishing routes are added to the preset fishing routes to generate an adjusted fishing route, and a first navigation plan is generated based on the adjusted fishing route.

[0029] Preferably, in a preferred embodiment of the present invention, if the sum of the second time value and the third time value is not greater than the first time value, a second navigation plan is generated, specifically:

[0030] The sub-fishing route corresponding to the planned area with the preset climate conditions is retained in the preset fishing route, and the fishing boat docking time is determined based on the sum of the second time value and the third time value, and a second navigation plan is generated based on the preset fishing route and the fishing boat docking time.

[0031] The second aspect of the present invention discloses a fishing route planning system for a fishing vessel, the planning system comprising a memory and a processor, the memory comprising a fishing route planning method program for a fishing vessel, and when the fishing route planning method program for a fishing vessel is executed by the processor, the following steps are implemented:

[0032] Acquire a preset fishing route of a fishing boat, preset a division range, divide the preset fishing route into a plurality of sub-fishing routes based on the division range, and combine the division range with the sub-fishing routes to obtain a plurality of planning areas;

[0033] Acquire the current position information and average sailing speed information of the fishing boat, calculate the first time node when the fishing boat enters each planning area and the second time node when the fishing boat leaves each planning area based on the current position information and the average sailing speed information, and calculate the sailing time period corresponding to the fishing boat passing through each planning area based on the first time node and the second time node;

[0034] Determine the climate forecast time period of each planning area based on the navigation time period, obtain the meteorological factor information of each planning area within the climate forecast time period, and obtain the climate conditions when the fishing boat passes through each planning area based on the meteorological factor information;

[0035] Determine whether the climate condition is a preset climate condition. If it is a preset climate condition, mark the sub-fishing route corresponding to the planning area where the climate condition is the preset climate condition as a sub-route to be planned, obtain the regional location information of the planning area corresponding to the sub-route to be planned, and obtain the planned sub-fishing route based on the regional location information;

[0036] The planned sub-fishing route and the sub-route to be planned are analyzed to obtain a first navigation plan or a second navigation plan, and the first navigation plan or the second navigation plan is output.

[0037] Preferably, in a preferred embodiment of the present invention, meteorological factor information of each planning area within the climate prediction time period is obtained, and the climate conditions when the fishing boat passes through each planning area are obtained based on the meteorological factor information, specifically:

[0038] By setting key search word information for the climate evolution conditions, setting key search tags based on the key search word information, searching the big data network according to the key search tags, the meteorological factor data information required for each climate condition is obtained;

[0039] A climate prediction model is constructed based on a deep learning network, and the meteorological factor data information is divided into a training data book and a test data book; the training data book is input into the climate prediction model, and the training data book in the climate prediction model is reversely trained through a cross entropy loss function, and when the error converges to a preset value, the training parameters in the climate prediction model are saved;

[0040] The training parameters in the climate prediction model are tested by using the test data. If the training parameters meet the preset requirements, the training parameters meeting the preset requirements are used as the final parameters of the model to obtain a trained climate prediction model.

[0041] The meteorological factor information of each planning area within the climate prediction time period is obtained, and the meteorological factor information of each planning area within the climate prediction time period is input into the trained climate prediction model for analysis and prediction to obtain the climate conditions when the fishing boat passes through each planning area.

[0042] Preferably, in a preferred embodiment of the present invention, the regional location information of the planned area corresponding to the sub-route to be planned is obtained, and the planned sub-fishing route is obtained based on the regional location information, specifically:

[0043] Acquire the area location information of the planned area corresponding to the sub-route to be planned, and mark the area location information as a prohibited area;

[0044] Based on the preset fishing route, obtain the entry point position information of the fishing boat entering the planned area corresponding to the sub-route to be planned, and based on the preset fishing route, obtain the exit point position information of the fishing boat exiting the planned area corresponding to the sub-route to be planned;

[0045] The prohibited area, the entry point location information and the exit point location information are introduced into the ant colony algorithm for repeated construction to obtain multiple navigation routes, and the navigation distance value corresponding to each navigation route is obtained;

[0046] A size sorting table is constructed, and the sailing distance values ​​corresponding to each sailing route are imported into the size sorting table for size sorting, the shortest sailing distance value is extracted, and the sailing route corresponding to the shortest sailing distance value is marked as the planned sub-fishing route.

[0047] The third aspect of the present invention discloses a computer-readable storage medium, which includes a fishing route planning method program for a fishing vessel. When the fishing route planning method program for a fishing vessel is executed by a processor, the steps of any one of the fishing route planning methods for a fishing vessel are implemented.

[0048] The present invention solves the technical defects existing in the background technology, and has the following beneficial effects: by obtaining the preset fishing route of the fishing boat, the preset division range, and dividing the preset fishing route into several sub-fishing routes based on the division range, the division range and the sub-fishing route are combined to obtain several planning areas, and the planned sub-fishing routes and the sub-routes to be planned are analyzed to obtain the first navigation plan or the second navigation plan, and the first navigation plan or the second navigation plan is output. Through this method, the climate conditions of the area where the fishing boat passes through can be predicted, so that the fishing boat can avoid bad weather, thereby ensuring the safety of the fishing boat and the crew, and reducing the occurrence of maritime accidents. And through this method, the shortest time-consuming strategic navigation is planned, so that the fishing boat can reach the destination more quickly, thereby improving the operating efficiency of the fishing boat. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.

[0050] Figure 1 A first method flow chart of a method for planning a fishing route for a fishing vessel;

[0051] Figure 2 A second method flow chart of a method for planning a fishing route for a fishing vessel;

[0052] Figure 3 A third method flow chart of a method for planning a fishing route for a fishing vessel;

[0053] Figure 4 The system block diagram of a fishing route planning method for fishing vessels. DETAILED DESCRIPTION

[0054] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0055] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0056] The first aspect of the present invention discloses a method for planning a fishing route for a fishing vessel, such as Figure 1 As shown, the following steps are included:

[0057] S102: obtaining a preset fishing route of a fishing boat, a preset division range, and dividing the preset fishing route into a plurality of sub-fishing routes based on the division range, and combining the division range with the sub-fishing routes to obtain a plurality of planning areas;

[0058] S104: obtaining the current position information and average sailing speed information of the fishing boat, calculating the first time node when the fishing boat enters each planning area and the second time node when the fishing boat leaves each planning area based on the current position information and the average sailing speed information, and calculating the sailing time period corresponding to the sailing of the fishing boat through each planning area based on the first time node and the second time node;

[0059] S106: determining a climate prediction time period for each planning area based on the navigation time period, obtaining meteorological factor information for each planning area within the climate prediction time period, and obtaining the climate conditions when the fishing vessel passes through each planning area based on the meteorological factor information;

[0060] S108: Determine whether the climate condition is a preset climate condition. If it is a preset climate condition, obtain the disaster level of the preset climate condition and the disaster resistance level of the fishing boat, determine whether the disaster level is greater than the disaster resistance level, and if it is greater than the disaster resistance level, mark the sub-fishing route corresponding to the planning area where the climate condition is the preset climate condition as a sub-route to be planned, obtain the regional location information of the planning area corresponding to the sub-route to be planned, and obtain the planned sub-fishing route based on the regional location information;

[0061] S110: Analyze the planned sub-fishing route and the sub-route to be planned to obtain a first navigation plan or a second navigation plan, and output the first navigation plan or the second navigation plan.

[0062] It should be noted that the preset fishing route is the shortest sailing route pre-planned based on the departure point of the ship and the fishing destination. The division range can be freely set by the user, such as a radius of 2 kilometers, a radius of 5 kilometers, a radius of 10 kilometers, etc., preferably a radius of 5 kilometers. The preset weather conditions are severe weather such as thunderstorms, storms, rain, hail, etc.

[0063] It should be noted that if it is predicted that a preset climate condition will occur when a fishing boat passes through a certain planned area, and the disaster level of the preset climate condition is greater than the current disaster resistance level of the fishing boat, the planned area where the preset climate condition occurs will be marked as a prohibited area to prevent the fishing boat from entering the area during this time period and being damaged by severe weather such as storms, thunderstorms, hail, etc. with excessively high disaster levels, thereby ensuring the safety of the fishing boat and crew and reducing the occurrence of maritime accidents.

[0064] Preferably, in a preferred embodiment of the present invention, meteorological factor information of each planning area within the climate prediction time period is obtained, and the climate conditions when the fishing boat passes through each planning area are obtained based on the meteorological factor information, such as Figure 2 As shown, specifically:

[0065] S202: Setting key search term information for the climate condition evolution condition, setting key search tags based on the key search term information, searching the big data network according to the key search tags, and obtaining meteorological factor data information required for each climate condition to occur;

[0066] S204: constructing a climate prediction model based on a deep learning network, and dividing the meteorological factor data information into a training data book and a test data book; inputting the training data book into the climate prediction model, performing reverse training on the training data book in the climate prediction model through a cross entropy loss function, and saving the training parameters in the climate prediction model after the error converges to a preset value;

[0067] S206: Testing the training parameters in the climate prediction model using the test data. If the training parameters meet the preset requirements, the training parameters meeting the preset requirements are used as the final parameters of the model to obtain a trained climate prediction model.

[0068] S208: Obtain the meteorological factor information of each planning area within the climate prediction time period, and input the meteorological factor information of each planning area within the climate prediction time period into the trained climate prediction model for analysis and prediction to obtain the climate conditions when the fishing boat passes through each planning area.

[0069] It should be noted that the meteorological factors include temperature, humidity, wind pressure, wind speed, solar radiation, etc. Each climate condition (such as heavy rain, storm, hail, sunny day, etc.) will have certain regular signs before the occurrence of meteorological factors. For example, when the rising water vapor in the ocean is supersaturated and the air flow intensity is greater than a certain degree, heavy rain will form. The climate prediction time period should be set before the fishing boat passes through each planned area. The corresponding meteorological sensors of the drone can be used to obtain the meteorological factor information of each planned area during the climate prediction time period, and then the collected meteorological factor information is imported into the climate prediction model for prediction, so that the climate conditions when the fishing boat passes through each planned area can be obtained. This method can predict the climate conditions of the area where the fishing boat passes.

[0070] Preferably, in a preferred embodiment of the present invention, the regional location information of the planned area corresponding to the sub-route to be planned is obtained, and the planned sub-fishing route is obtained based on the regional location information, such as Figure 3 As shown, specifically:

[0071] S302: Acquire the area location information of the planned area corresponding to the sub-route to be planned, and mark the area location information as a prohibited area;

[0072] S304: obtaining the entry point position information of the fishing boat into the planned area corresponding to the sub-route to be planned based on the preset fishing route, and obtaining the exit point position information of the fishing boat out of the planned area corresponding to the sub-route to be planned based on the preset fishing route;

[0073] S306: importing the prohibited area, the entry point location information, and the exit point location information into an ant colony algorithm for repeated construction to obtain multiple navigation routes, and obtaining the navigation distance value corresponding to each navigation route;

[0074] S308: Construct a size sorting table, import the sailing distance values ​​corresponding to each sailing route into the size sorting table for size sorting, extract the shortest sailing distance value, and mark the sailing route corresponding to the shortest sailing distance value as the planned sub-fishing route.

[0075] It should be noted that the ant colony algorithm uses a certain number of ants to repeatedly construct feasible solutions to the optimization problem. Each construction result will leave some pheromones. The higher the quality of the feasible solution, the higher the concentration of the accumulated pheromones. Finally, the entire ant will be concentrated on the best path under the action of positive feedback, and the corresponding optimal solution to the problem to be optimized is obtained. The ant colony algorithm has good robustness and parallelism, and has good search performance for the optimal solution. It should also be noted that when the disaster level of the preset climate situation is greater than the disaster resistance level of the current fishing boat, the planned area where the preset climate situation occurs will be marked as a prohibited area. In order to ensure the safety of fishing boats and crew members, fishing boats cannot enter this area during this period of time when the preset climate situation occurs. Therefore, when planning a new navigation route through the ant colony algorithm, this area needs to be avoided. This method can plan the shortest navigation route for fishing boats to sail to the destination on the basis of avoiding the prohibited area.

[0076] Preferably, in a preferred embodiment of the present invention, the planned sub-fishing route and the sub-route to be planned are analyzed to obtain the first navigation plan or the second navigation plan, specifically:

[0077] Acquire the navigation distance value of the planned sub-fishing route, and determine the first time value required for the fishing vessel to navigate the planned sub-fishing route based on the navigation distance value of the planned sub-fishing route;

[0078] Obtaining the navigation distance value of the sub-route to be planned, and determining a second time value required for the fishing boat to navigate the sub-route to be planned based on the navigation distance value of the sub-route to be planned;

[0079] Obtaining a start time point and an end time point at which a preset climate condition occurs in a planning area corresponding to the sub-route to be planned, and obtaining a third time value based on the start time point and the end time point;

[0080] Determine whether the sum of the second time value and the third time value is greater than the first time value;

[0081] If the sum of the second time value and the third time value is greater than the first time value, a first navigation plan is generated; if the sum of the second time value and the third time value is not greater than the first time value, a second navigation plan is generated.

[0082] Preferably, in a preferred embodiment of the present invention, if the sum of the second time value and the third time value is greater than the first time value, a first navigation plan is generated, specifically:

[0083] The sub-fishing routes corresponding to the planned areas where the climate conditions are the preset climate conditions are removed from the preset fishing routes, and the planned sub-fishing routes are added to the preset fishing routes to generate an adjusted fishing route, and a first navigation plan is generated based on the adjusted fishing route.

[0084] Preferably, in a preferred embodiment of the present invention, if the sum of the second time value and the third time value is not greater than the first time value, a second navigation plan is generated, specifically:

[0085] The sub-fishing route corresponding to the planned area with the preset climate conditions is retained in the preset fishing route, and the fishing boat docking time is determined based on the sum of the second time value and the third time value, and a second navigation plan is generated based on the preset fishing route and the fishing boat docking time.

[0086] It should be noted that severe weather such as storms, thunderstorms, and hail often have a certain time limit. Therefore, in actual navigation scenarios, in addition to choosing to detour to avoid severe weather, fishing boats can also choose to stop and rest outside the prohibited area, and then wait for the severe weather such as storms, thunderstorms, and hail in the prohibited area to fade away before crossing the prohibited area. In this way, the actual driving path of the fishing boat is the same as the initial driving path. The difference is that the fishing boat needs to stop and rest for a period of time at a certain location during the actual driving process, and then continue to sail after the severe weather fades away. In practical applications, fishing boats often need to reach their destination in the shortest time. Therefore, this method can evaluate the time consumption of the two strategies of choosing a new route detour and stopping for rest, and then choose the strategy with shorter time consumption to sail, so that the fishing boat can reach the destination more quickly, thereby improving the operating efficiency of the fishing boat.

[0087] In addition, the disaster resistance level of the fishing vessel is obtained as follows:

[0088] Acquiring characteristic data of the fishing vessel, and determining an evaluation index based on the characteristic data of the fishing vessel;

[0089] Acquire meteorological factor information corresponding to a preset climate condition, and determine an evaluation score based on the meteorological factor information corresponding to the preset climate condition;

[0090] The evaluation index and the evaluation score are introduced into the hierarchical analysis method for solution to obtain the weight value associated with the fishing boat and the preset climate condition; and the disaster level of the preset climate condition is determined based on the weight value.

[0091] It should be noted that the disaster level of the preset climate conditions is fixed. For example, in the event of a storm, the wind force between 2 and 5 can be determined as low, between 5 and 10 as medium, and between 10 and 15 as high. The disaster resistance level of fishing boats is different. The disaster resistance level of fishing boats is related to the characteristic data such as the tonnage of fishing boats, the structure of fishing boats, the characteristics of fishing boat materials, and the service life of fishing boats. For example, the larger the tonnage of fishing boats, the greater the wind resistance, the higher the disaster resistance level, but the longer the service life of fishing boats, the lower the disaster resistance level. In general, the disaster resistance level of fishing boats is related to the various characteristic data of fishing boats, so the disaster resistance level of fishing boats will change. The analytic hierarchy process is a decision-making method that decomposes the elements that are always related to decision-making into levels such as goals, criteria, and plans, and conducts qualitative and quantitative analysis on this basis. The characteristic data of the fishing boat is analyzed through the hierarchical analysis method and combined with the meteorological factor information corresponding to the assumed climate conditions, and then the actual disaster resistance level of the current fishing boat is evaluated and analyzed, so as to obtain the actual disaster resistance level of the current fishing boat. The system can judge whether the fishing boat can safely pass through the area where the preset weather conditions occur based on the disaster resistance level of the fishing boat, and can evaluate the disaster resistance level of the fishing boat in real time to avoid maritime accidents caused by misjudgment.

[0092] In addition, the method for planning a fishing route for a fishing vessel further comprises the following steps:

[0093] An energy loss model is constructed based on a convolutional neural network, and the average energy loss rate of the fishing boat under various temperature conditions is obtained through a big data network, and the average energy loss rate of the fishing boat under various temperature conditions is introduced into the energy loss model for training to obtain a trained energy loss model;

[0094] Obtaining a final navigation path of the fishing boat from the first navigation plan or the second navigation plan, dividing the final navigation path into a plurality of sub-segments, and obtaining an ambient temperature value of each sub-segment at a preset time node;

[0095] The ambient temperature value of each sub-section is introduced into the trained energy loss model to obtain the energy consumption value corresponding to each fishing boat in each sub-section; and based on the energy consumption value corresponding to each fishing boat in each sub-section, the total energy value consumed by the fishing boat to the destination is obtained;

[0096] The total energy value is compared with the preset energy value to obtain the energy value deviation; whether the energy value deviation is greater than the preset deviation is determined, and if so, the fishing boat is stopped from going to the destination for fishing, and a new operating fishing boat is retrieved.

[0097] It should be noted that the energy loss rate of a fishing boat varies with the temperature during navigation, such as greater energy loss in low temperature weather. This method can determine whether the current fishing boat can reach the destination within the preset energy consumption range. If not, the current fishing boat will stop fishing at the destination, thereby avoiding the situation where the remaining energy of the current fishing boat after fishing at the destination is insufficient to return due to weather changes (temperature changes), thus realizing intelligent evaluation and regulation functions.

[0098] The step of retrieving a new operating fishing vessel specifically includes the following steps:

[0099] Acquire the position information of the remaining fishing vessels in an idle state within a preset range, and calculate the distance value information between each of the remaining fishing vessels and the destination based on the position information of the remaining fishing vessels in an idle state;

[0100] A sorting table is established, and the distance value information between the remaining operating fishing vessels and the destination is imported into the sorting table for sorting to obtain the shortest distance value information with the destination, and the operating fishing vessels corresponding to the shortest distance value information with the destination are marked, and the operating tasks are sent to the operating fishing vessels corresponding to the shortest distance value information with the destination.

[0101] It should be noted that when it is determined that the current fishing boat cannot reach the fishing destination within the preset energy consumption range, a new fishing boat is retrieved to go to the fishing destination to carry out fishing operations, thereby improving the same capabilities among the fishing boats and making the fishing operations more reasonable.

[0102] The second aspect of the present invention discloses a fishing route planning system for a fishing vessel, the planning system comprising a memory 41 and a processor 62, the memory 41 comprising a fishing route planning method program for a fishing vessel, and when the fishing route planning method program for a fishing vessel is executed by the processor 62, Figure 4 As shown, implement the following steps:

[0103] Acquire a preset fishing route of a fishing boat, preset a division range, divide the preset fishing route into a plurality of sub-fishing routes based on the division range, and combine the division range with the sub-fishing routes to obtain a plurality of planning areas;

[0104] Acquire the current position information and average sailing speed information of the fishing boat, calculate the first time node when the fishing boat enters each planning area and the second time node when the fishing boat leaves each planning area based on the current position information and the average sailing speed information, and calculate the sailing time period corresponding to the fishing boat passing through each planning area based on the first time node and the second time node;

[0105] Determine the climate forecast time period of each planning area based on the navigation time period, obtain the meteorological factor information of each planning area within the climate forecast time period, and obtain the climate conditions when the fishing boat passes through each planning area based on the meteorological factor information;

[0106] Determine whether the climate condition is a preset climate condition. If it is a preset climate condition, mark the sub-fishing route corresponding to the planning area where the climate condition is the preset climate condition as a sub-route to be planned, obtain the regional location information of the planning area corresponding to the sub-route to be planned, and obtain the planned sub-fishing route based on the regional location information;

[0107] The planned sub-fishing route and the sub-route to be planned are analyzed to obtain a first navigation plan or a second navigation plan, and the first navigation plan or the second navigation plan is output.

[0108] Preferably, in a preferred embodiment of the present invention, meteorological factor information of each planning area within the climate prediction time period is obtained, and the climate conditions when the fishing boat passes through each planning area are obtained based on the meteorological factor information, specifically:

[0109] By setting key search word information for the climate evolution conditions, setting key search tags based on the key search word information, searching the big data network according to the key search tags, the meteorological factor data information required for each climate condition is obtained;

[0110] A climate prediction model is constructed based on a deep learning network, and the meteorological factor data information is divided into a training data book and a test data book; the training data book is input into the climate prediction model, and the training data book in the climate prediction model is reversely trained through a cross entropy loss function, and when the error converges to a preset value, the training parameters in the climate prediction model are saved;

[0111] The training parameters in the climate prediction model are tested by using the test data. If the training parameters meet the preset requirements, the training parameters meeting the preset requirements are used as the final parameters of the model to obtain a trained climate prediction model.

[0112] The meteorological factor information of each planning area within the climate prediction time period is obtained, and the meteorological factor information of each planning area within the climate prediction time period is input into the trained climate prediction model for analysis and prediction to obtain the climate conditions when the fishing boat passes through each planning area.

[0113] Preferably, in a preferred embodiment of the present invention, the regional location information of the planned area corresponding to the sub-route to be planned is obtained, and the planned sub-fishing route is obtained based on the regional location information, specifically:

[0114] Acquire the area location information of the planned area corresponding to the sub-route to be planned, and mark the area location information as a prohibited area;

[0115] Based on the preset fishing route, obtain the entry point position information of the fishing boat entering the planned area corresponding to the sub-route to be planned, and based on the preset fishing route, obtain the exit point position information of the fishing boat exiting the planned area corresponding to the sub-route to be planned;

[0116] The prohibited area, the entry point location information and the exit point location information are introduced into the ant colony algorithm for repeated construction to obtain multiple navigation routes, and the navigation distance value corresponding to each navigation route is obtained;

[0117] A size sorting table is constructed, and the sailing distance values ​​corresponding to each sailing route are imported into the size sorting table for size sorting, the shortest sailing distance value is extracted, and the sailing route corresponding to the shortest sailing distance value is marked as the planned sub-fishing route.

[0118] The third aspect of the present invention discloses a computer-readable storage medium, which includes a fishing route planning method program for a fishing vessel. When the fishing route planning method program for a fishing vessel is executed by a processor, the steps of any one of the fishing route planning methods for a fishing vessel are implemented.

[0119] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the devices or units can be electrical, mechanical or other forms.

[0120] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units; they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0121] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.

[0122] A person of ordinary skill in the art can understand that: all or part of the steps of implementing the above method embodiment can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps of the above method embodiment; and the aforementioned storage medium includes: a mobile storage device, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.

[0123] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the methods of each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.

[0124] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A fishing route planning method for a fishing vessel, characterized in that: The following steps are involved: Acquire a preset fishing route of a fishing boat, preset a division range, divide the preset fishing route into a plurality of sub-fishing routes based on the division range, and combine the division range with the sub-fishing routes to obtain a plurality of planning areas; Acquire the current position information and average sailing speed information of the fishing boat, calculate the first time node when the fishing boat enters each planning area and the second time node when the fishing boat leaves each planning area based on the current position information and the average sailing speed information, and calculate the sailing time period corresponding to the fishing boat passing through each planning area based on the first time node and the second time node; Determine the climate forecast time period of each planning area based on the navigation time period, obtain the meteorological factor information of each planning area within the climate forecast time period, and obtain the climate conditions when the fishing boat passes through each planning area based on the meteorological factor information; Determine whether the climate condition is a preset climate condition. If it is a preset climate condition, obtain the disaster level of the preset climate condition and the disaster resistance level of the fishing boat, determine whether the disaster level is greater than the disaster resistance level, and if it is greater than the disaster resistance level, mark the sub-fishing route corresponding to the planning area where the climate condition is the preset climate condition as a sub-route to be planned, obtain the regional location information of the planning area corresponding to the sub-route to be planned, and obtain the planned sub-fishing route based on the regional location information; Analyze the planned sub-fishing route and the sub-route to be planned to obtain a first navigation plan or a second navigation plan, and output the first navigation plan or the second navigation plan; The process of obtaining the regional location information of the planned area corresponding to the sub-route to be planned and obtaining the planned sub-fishing route based on the regional location information is as follows: Acquire the area location information of the planned area corresponding to the sub-route to be planned, and mark the area location information as a prohibited area; Based on the preset fishing route, obtain the entry point position information of the fishing boat entering the planned area corresponding to the sub-route to be planned, and based on the preset fishing route, obtain the exit point position information of the fishing boat exiting the planned area corresponding to the sub-route to be planned; The prohibited area, the entry point location information and the exit point location information are introduced into the ant colony algorithm for repeated construction to obtain multiple navigation routes, and the navigation distance value corresponding to each navigation route is obtained; Constructing a size sorting table, importing the sailing distance values ​​corresponding to each sailing route into the size sorting table for size sorting, extracting the shortest sailing distance value, and marking the sailing route corresponding to the shortest sailing distance value as the planned sub-fishing route; The planned sub-fishing route and the sub-route to be planned are analyzed to obtain the first navigation plan or the second navigation plan, specifically: Acquire the navigation distance value of the planned sub-fishing route, and determine the first time value required for the fishing vessel to navigate the planned sub-fishing route based on the navigation distance value of the planned sub-fishing route; Obtaining the navigation distance value of the sub-route to be planned, and determining a second time value required for the fishing boat to navigate the sub-route to be planned based on the navigation distance value of the sub-route to be planned; Obtaining a start time point and an end time point at which a preset climate condition occurs in a planning area corresponding to the sub-route to be planned, and obtaining a third time value based on the start time point and the end time point; Determine whether the sum of the second time value and the third time value is greater than the first time value; If the sum of the second time value and the third time value is greater than the first time value, a first navigation plan is generated; if the sum of the second time value and the third time value is not greater than the first time value, a second navigation plan is generated; If the sum of the second time value and the third time value is greater than the first time value, a first navigation plan is generated, specifically: Eliminate the sub-fishing routes corresponding to the planned areas with the preset climate conditions from the preset fishing route, add the planned sub-fishing routes into the preset fishing route, generate an adjusted fishing route, and generate a first navigation plan based on the adjusted fishing route; Among them, if the sum of the second time value and the third time value is not greater than the first time value, a second navigation plan is generated, specifically: The sub-fishing routes corresponding to the planned areas with the preset climate conditions are retained in the preset fishing routes, and the docking time of the fishing boat is determined based on the sum of the second time value and the third time value, and a second navigation plan is generated based on the preset fishing route and the docking time of the fishing boat; The following steps are also included: An energy loss model is constructed based on a convolutional neural network, and the average energy loss rate of the fishing boat under various temperature conditions is obtained through a big data network, and the average energy loss rate of the fishing boat under various temperature conditions is introduced into the energy loss model for training to obtain a trained energy loss model; Obtaining a final navigation path of the fishing boat from the first navigation plan or the second navigation plan, dividing the final navigation path into a plurality of sub-segments, and obtaining an ambient temperature value of each sub-segment at a preset time node; The ambient temperature value of each sub-section is introduced into the trained energy loss model to obtain the energy consumption value corresponding to each fishing boat in each sub-section; and based on the energy consumption value corresponding to each fishing boat in each sub-section, the total energy value consumed by the fishing boat to the destination is obtained; Compare the total energy value with the preset energy value to obtain an energy value deviation; determine whether the energy value deviation is greater than the preset deviation, and if so, stop the fishing boat from going to the destination for fishing and retrieve a new operating fishing boat; Among them, the meteorological factor information of each planning area within the climate forecast time period is obtained, and the climate conditions when the fishing boat passes through each planning area are obtained based on the meteorological factor information, specifically: By setting key search word information for the climate evolution conditions, setting key search tags based on the key search word information, searching the big data network according to the key search tags, the meteorological factor data information required for each climate condition is obtained; A climate prediction model is constructed based on a deep learning network, and the meteorological factor data information is divided into a training data book and a test data book; the training data book is input into the climate prediction model, and the training data book in the climate prediction model is reversely trained through a cross entropy loss function, and when the error converges to a preset value, the training parameters in the climate prediction model are saved; The training parameters in the climate prediction model are tested by using the test data. If the training parameters meet the preset requirements, the training parameters meeting the preset requirements are used as the final parameters of the model to obtain a trained climate prediction model. Obtaining meteorological factor information of each planning area within the climate prediction time period, and inputting the meteorological factor information of each planning area within the climate prediction time period into the trained climate prediction model for analysis and prediction, so as to obtain the climate conditions when the fishing boat passes through each planning area; The method of obtaining the disaster resistance level of the fishing vessel is as follows: Acquiring characteristic data of the fishing vessel, and determining an evaluation index based on the characteristic data of the fishing vessel; Acquire meteorological factor information corresponding to a preset climate condition, and determine an evaluation score based on the meteorological factor information corresponding to the preset climate condition; The evaluation index and the evaluation score are introduced into the hierarchical analysis method for solving, and the weight value associated with the fishing boat and the preset climate condition is obtained; based on the weight value, the disaster level of the preset climate condition is determined; The retrieving of new operating fishing vessels is specifically as follows: Acquire the position information of the remaining fishing vessels in an idle state within a preset range, and calculate the distance value information between each of the remaining fishing vessels and the destination based on the position information of the remaining fishing vessels in an idle state; A sorting table is established, and the distance value information between the remaining operating fishing vessels and the destination is imported into the sorting table for sorting to obtain the shortest distance value information with the destination, and the operating fishing vessels corresponding to the shortest distance value information with the destination are marked, and the operating tasks are sent to the operating fishing vessels corresponding to the shortest distance value information with the destination.

2. A fishing route planning system for fishing vessels, characterized in that: The planning system includes a memory and a processor, wherein the memory includes a fishing vessel fishing route planning method program, and when the fishing vessel fishing route planning method program is executed by the processor, the steps of the fishing vessel fishing route planning method as described in claim 1 are implemented.

3. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a fishing vessel fishing route planning method program, and when the fishing vessel fishing route planning method program is executed by a processor, the steps of the fishing vessel fishing route planning method as described in claim 1 are implemented.