A pressurizing method for a hot blast furnace device with self-heating and equalizing pressure

Through the self-heating and pressure-equalizing hot blast furnace charging method, the high-temperature exhaust gas of the exhaust hot blast stove is introduced into the hot blast stove that needs to be inflated, and the high-pressure gas tank and regulating valve are used to control the gas mixing, which solves the problem of high-pressure gas source depressurization and low exhaust gas utilization. problem, improving the charging efficiency and the stability of the hot blast furnace.

CN116254380BActive Publication Date: 2024-10-01SHENGYUAN XIANFENG (CHENGDU) ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310260615.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-17
Publication Date
2024-10-01
Estimated Expiration
2043-03-17

AI Technical Summary

Technical Problem

The existing hot blast stove charging method causes heat absorption when the high-pressure gas source is depressurized, causing frost on pipes and valves, affecting stability. In addition, the temperature of the high-pressure gas source is lower than the cold air temperature, resulting in increased heat loss and gas consumption of the hot blast stove, and waste gas utilization. rate is low.

Method used

Using a self-heating and pressure-equalizing hot blast stove device, the high-temperature and high-pressure exhaust gas of the exhaust hot blast stove is automatically flowed into the hot blast stove that needs to be inflated through the ejector, and the gas mixing is controlled through the high-pressure gas tank and the regulating valve to ensure the air pressure in the inflation branch pipe And the flow rate is within the appropriate range, and the exhaust gas main pipe and the charging main pipe are used to connect to achieve a gas utilization rate of more than 90%.

Benefits of technology

It reduces the reduction in inflation efficiency, avoids energy loss, reduces gas consumption, improves the air supply temperature and working stability of the hot blast stove, and reduces project investment and operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116254380B_ABST
    Figure CN116254380B_ABST
Patent Text Reader

Abstract

The present invention discloses a pressurizing method for a self-heating and pressure-equalizing hot blast furnace device, including determining two pressure-equalizing hot blast furnaces; allowing the high-temperature and high-pressure exhaust gas in the exhaust hot blast furnace to automatically flow into the charging hot blast furnace under the action of the pressure difference; detecting the air pressure in the exhaust hot blast furnace and the charging hot blast furnace, and the high-pressure gas in the high-pressure gas tank drives the exhaust gas into the charging branch pipe through an ejector; and controlling the outlet pressure of the high-pressure gas output by the high-pressure gas tank through a regulating valve. The present invention can open the high-pressure gas tank in time according to the pressure conditions of the two pressure-equalizing hot blast furnaces, and eject the exhaust gas of the exhaust hot blast furnace into the charging hot blast furnace through the ejector. When the air pressure of the exhaust hot blast furnace gradually decreases, the high-pressure gas pressure is continuously increased as needed, so that a relatively stable charging pressure and flow rate can be maintained at the output end of the ejector, so that the charging efficiency is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hot blast stove equipment, and in particular to a pressurizing method for a self-heating and pressure-equalizing hot blast stove device. Background Art

[0002] A hot blast furnace is a thermal equipment that integrates combustion and heat transfer processes. As an important auxiliary equipment for blast furnaces and non-blast furnaces, the hot blast furnace's main function is to heat the heat storage body in the hot blast furnace by burning the low-pressure clean coal gas produced by the blast furnace or non-blast furnace. When the heat storage body reaches a certain heat storage capacity, the high-pressure cold air introduced passes through the heat storage body and is heated into hot air, which is then sent to the blast furnace or non-blast furnace to provide a heat source for the smelting process and support the pressure generated by the height of the material column.

[0003] The functional characteristics of the hot blast furnace determine that each cycle of the hot blast furnace needs to work in the order of "combustion" → "air supply" → "combustion"; and through continuous circulation, hot air can be continuously output to the blast furnace or non-blast furnace. The process of the hot blast furnace from "combustion" state to "air supply" state is a process from low pressure to high pressure, and pressurization treatment is required to open the cold air valve and hot air valve to meet the conditions for air supply to the blast furnace or non-blast furnace.

[0004] The transition from the "air supply" state to the "combustion" state of the hot blast stove is a process from high pressure to low pressure, and pressure relief is required to open the air combustion valve, gas combustion valve and flue valve to meet the conditions for the hot blast stove to burn. Therefore, the working cycle of the hot blast stove is "combustion" - "pressurization and furnace change" - "air supply" - "pressure relief and furnace change".

[0005] In order to ensure the continuity of the smelting process, the hot blast furnace needs to provide hot blast uninterruptedly. Therefore, a blast furnace usually needs to be equipped with a number of hot blast furnaces to form a hot blast furnace group, and adopt a working system of one burning and one sending, two burning and one sending, two burning and two sending, or staggered parallel connection to achieve the purpose of continuous air supply.

[0006] At present, the commonly used pressurization method for hot blast furnaces is to divert a part of the cold air from the blower, and separate a part of the cold air from the cold air main pipe as the pressurization gas source. The cold air blower blows air to the blast furnace or non-blast furnace in a "constant air pressure" or "constant air volume" manner. When a hot blast furnace needs to be pressurized, a part of the cold air is diverted from the cold air main pipe, which will suddenly reduce the amount of air entering the blast furnace or non-blast furnace, and cause the temperature, pressure and flow rate of the hot air entering the furnace to fluctuate. In order to stabilize the production of the blast furnace or non-blast furnace, the hot blast furnace usually needs to passively extend the air supply and cannot be turned to combustion on time, while another hot blast furnace needs to burn overtime or the furnace is stuffy and cannot be turned to air supply.

[0007] In order to solve the cold air blast fluctuation caused by the existing blast pressure to the blast furnace or non-blast furnace, the existing technology mainly adopts the independent pressure charging method to solve it. That is, an additional set of pressurized air sources is configured, and when a hot blast furnace needs to be pressurized and replaced, the hot blast furnace is pressurized through the independent air source.

[0008] Although the above technical solution solves the blast fluctuation caused by conventional cold air blast pressure charging to the blast furnace to a certain extent, shortens the pressure charging time, and helps the hot blast furnace to get rid of the constraints of blast furnace or non-blast furnace production instructions, it still has obvious technical deficiencies in the actual operation process:

[0009] (1) The gas source for charging is generally a high-pressure gas source. The high-pressure gas source cannot be used directly as the charging gas source. It needs to be depressurized during the charging process to meet the safety requirements of the hot air furnace. The high-pressure gas source will absorb heat during the depressurization process, causing the gas temperature to drop sharply, which is easy to cause frost on the pipeline and valve, affecting the stability of the independent charging system.

[0010] (2) High-pressure gas source usually uses compressed air, and the gas source temperature is 120℃~160℃ lower than the conventional cold air temperature. During the process of filling into the furnace, a large gradient temperature exchange occurs with the hot blast stove heat storage body, which consumes part of the hot blast stove's heat and damages the service life of the hot blast stove's refractory materials. In the long term, it will also significantly increase the gas consumption during the hot blast stove's burning period.

[0011] In order to solve the above problems, the prior art CN201610145660.8 also discloses an independent hot blast furnace charging method and charging device:

[0012] When one of the multiple hot blast furnaces is in the transition period from the "furnace burning" mode to the "air supply" mode, and at the same time another hot blast furnace is in the transition period from the "air supply" mode to the "furnace burning" mode, the two hot blast furnaces are firstly subjected to a "pre-pressurization" operation, specifically, the pressure-charging valves on the corresponding pressure-charging branches of the two hot blast furnaces are opened, and the check valve and the pressure-regulating valve on the pressure-charging main pipe are closed. At this time, the pressure in the hot blast furnace in the transition period from the "air supply" mode to the "furnace burning" mode is pressurized to the other hot blast furnace in the transition period from the "furnace burning" mode to the "air supply" mode through the pressure-charging main pipe;

[0013] After the "pre-charging" is completed, close the charging valve on the charging branch pipe of the hot blast furnace from the "air supply" mode to the "furnace burning" mode, open the check valve and the pressure regulating valve in turn, and the gas tank begins to continue pressurizing the hot blast furnace from the "furnace burning" mode to the "air supply" mode.

[0014] The above patent can inject the exhaust gas from one of the hot blast furnaces into another hot blast furnace that needs to be pressurized. However, since the pipelines of the two are directly connected, the air pressure between the two hot blast furnaces is the same after the final pre-pressurization is completed. Therefore, the hot blast furnace that needs to be exhausted can only discharge 50% of the exhaust gas into the hot blast furnace that needs to be pressurized, and the remaining 50% of the exhaust gas can only be discharged through the flue, which makes the utilization rate of the exhaust gas low and the utilization rate of the heat also low, and it still cannot completely overcome the problems in the prior art. Summary of the invention

[0015] The object of the present invention is to provide a charging method for a self-heating and pressure-equalizing hot blast furnace device, which can maintain the charging pressure and flow rate in the charging branch pipe within a suitable flow pressure range value, and reduce the influence of the pressure and flow rate of the charging gas on the charging efficiency caused by the reduction of the pressure in the exhaust hot blast furnace.

[0016] To achieve the above-mentioned purpose, an embodiment of the present invention provides a pressurizing method for a self-heating and pressure-equalizing hot blast furnace device, the hot blast furnace device comprising:

[0017] Hot blast furnace group; the hot blast furnace group includes several hot blast furnaces, each of which is equipped with a main pipe and branch pipes, and each branch pipe is equipped with a valve;

[0018] Cold air main pipe; the cold air main pipe is provided with a number of cold air branch pipes respectively connected to each hot air furnace; the cold air branch pipes are provided with cold air valves;

[0019] The main inflatable pipe is provided with a plurality of inflatable branches which are respectively connected with each hot air furnace; the inflatable branches are provided with inflatable valves;

[0020] Hot air main pipe; the hot air main pipe is provided with a number of hot air branch pipes respectively connected to each hot air furnace; the hot air branch pipes are provided with hot air valves;

[0021] Flue main pipe; the flue main pipe is provided with a number of flue branches respectively connected with each hot air stove; the flue branches are provided with flue valves;

[0022] The exhaust main pipe is provided with a plurality of exhaust branch pipes connected to each hot air furnace respectively; the exhaust branch pipes are provided with exhaust valves;

[0023] The cold air main pipe is equipped with a cold air blower; the charging main pipe is equipped with a high-pressure fan, a high-pressure gas tank, a regulating valve and a stop valve; the charging main pipe is equipped with an ejector, the ejector includes a low-pressure gas inlet and a high-pressure gas inlet, the high-pressure gas tank is connected to one end of the high-pressure gas inlet of the ejector, and the exhaust gas main pipe is connected to the low-pressure gas inlet of the ejector; the hot blast furnace, the charging main pipe and the exhaust gas main pipe are provided with an air pressure detection device for detecting air pressure and a flow meter for detecting gas flow;

[0024] The pressurization method of the hot blast stove device comprises the following steps:

[0025] (1) According to the working mode of the hot blast stove, a hot blast stove that needs to be exhausted and a hot blast stove that needs to be filled are determined as two hot blast stoves with equalized pressure;

[0026] (2) Open the valves on the main pipe and branch pipes to form a passage between the exhaust hot blast furnace, the exhaust gas branch pipe, the exhaust gas main pipe, the ejector, the charging main pipe, the charging branch pipe, and the charging hot blast furnace, so that the high-temperature and high-pressure exhaust gas in the exhaust hot blast furnace automatically flows into the charging hot blast furnace under the action of the pressure difference;

[0027] (3) Detecting the air pressure in the exhaust hot blast furnace and the charging hot blast furnace, calculating the air pressure difference between the exhaust hot blast furnace and the charging hot blast furnace, and when the air pressure difference is reduced to a first threshold, opening the cut-off valve between the high-pressure gas tank and the ejector, and the high-pressure gas in the high-pressure gas tank drives the exhaust gas in the exhaust hot blast furnace into the charging branch pipe through the high-pressure gas inlet of the ejector;

[0028] (4) Setting the adjustment cycle t, detecting relevant parameters once in each adjustment cycle t, and controlling the outlet pressure of the high-pressure gas output by the high-pressure gas tank through the regulating valve. The outlet pressure calculation formula is:

[0029]

[0030] H low Defined as the exhaust gas enthalpy;

[0031] H hig Defined as the enthalpy of high-pressure gas;

[0032] H mix Defined as the thermal enthalpy of the gas mixture;

[0033] i is the degree of freedom coefficient of the gas, which is 5;

[0034] K is the ratio of the mixing chamber and the nozzle of the ejector, that is, the cross-sectional ratio;

[0035] P low is the exhaust gas pressure of the exhaust gas main pipe at the low-pressure inlet of the ejector;

[0036] Q low is the exhaust gas flow rate of the exhaust gas main pipe at the low-pressure inlet of the ejector;

[0037] P hig It is the pressure of high-pressure gas discharged from the high-pressure gas tank at the high-pressure inlet of the ejector;

[0038] Q hig It is the high-pressure gas flow rate discharged from the high-pressure gas tank at the high-pressure inlet of the ejector;

[0039] P mix The preset inflation pressure of the pressurized gas at the outlet of the ejector diffusion chamber;

[0040] Q mix is the preset inflation flow rate of the pressurized gas at the outlet of the ejector diffusion chamber;

[0041] C is the specific heat capacity of air; M is the molar mass of air; R is the gas constant;

[0042] T low is the temperature of the exhaust gas; T hig is the temperature of high pressure gas; T mix is the temperature of the mixed gas;

[0043] (5) Continue to detect the air pressure in the exhaust hot blast furnace and the charging hot blast furnace. When the air pressure in the exhaust hot blast furnace drops to the exhaust threshold, end the exhaust charging and close the exhaust valve of the exhaust hot blast furnace; or when the air pressure in the charging hot blast furnace reaches the supply air pressure, end the exhaust charging.

[0044] In the optimized solution of the present invention, both the inflation manifold and the exhaust manifold are provided with check valves.

[0045] In the optimized solution of the present invention, the ejector includes a low-pressure gas inlet, a high-pressure gas inlet, a nozzle, a suction chamber, a mixing chamber and a diffusion chamber; the inner diameter of the mixing chamber is smaller than the inner diameter of the diffusion chamber.

[0046] In the optimized solution of the present invention, the high-pressure gas pressure output by the high-pressure gas tank is 0.8-2.0MPa, and the flow rate is 20-100Nm 3 / s; the gas flow rate in the pressurized branch pipe is 50Nm 3 / s~100Nm 3 / s, the gas pressure is 0.45MPa~0.6MPa; the exhaust gas temperature in the exhaust gas main pipe is 200℃~500℃, and the pressure is 0.3MPa~0.6Mpa.

[0047] In the optimized scheme of the present invention, the specific operation process of step (2) is as follows: the cold air valve and the inflation valve of the exhaust hot blast furnace are closed, and the hot air valve and the flue valve are closed; the waste gas valve is opened, the inflation valve of the inflation hot blast furnace is opened, and the cold air valve, the hot air valve, the flue valve and the waste gas valve are closed; the shut-off valve between the exhaust port end of the ejector and the hot blast furnace is opened to form a passage between the exhaust hot blast furnace, the waste gas branch pipe, the waste gas main pipe, the ejector, the inflation main pipe, the inflation branch pipe and the inflation hot blast furnace, so that the high-temperature and high-pressure exhaust gas in the exhaust hot blast furnace automatically flows into the inflation hot blast furnace under the action of the pressure difference.

[0048] In the optimized solution of the present invention, the preset inflation pressure P of the pressurized gas at the outlet of the ejector diffusion chamber in step (4) is mix The preset inflation flow rate Q of the pressurized gas at the outlet of the injector diffusion chamber is 0.45MPa~0.6MPa; mix 50Nm 3 / s~100Nm 3 / s.

[0049] In the optimization scheme of the present invention, in step (5), when the air pressure in the exhaust hot blast furnace drops to the exhaust threshold, the exhaust pressurization is ended and the exhaust valve of the exhaust hot blast furnace is closed; at this time, it is detected whether the air pressure of the charging hot blast furnace reaches the supply air pressure. If the air pressure of the charging hot blast furnace reaches the supply air pressure at this time, the stop valve of the high-pressure gas tank is closed; if it has not reached the pressure, the charging is continued through the high-pressure gas tank.

[0050] In the optimization scheme of the present invention, in step (5), when the air pressure of the charging hot blast furnace reaches the air supply pressure, the exhaust charging is ended; at this time, it is detected whether the air pressure of the exhaust hot blast furnace is reduced to the exhaust threshold value. If it is not reduced to the exhaust threshold value, the excess exhaust gas is discharged into the flue main pipe through the pressure relief valve and the pressure relief branch pipe.

[0051] In summary, the present invention has the following advantages:

[0052] 1. The exhaust gas main pipe and the pressurized main pipe of the present invention are connected through an ejector, the exhaust gas main pipe is connected to the low-pressure inlet of the ejector, and the high-pressure gas tank is connected to the high-pressure inlet of the ejector. The present invention can use the high-temperature residual wind released by the exhaust pressure of the hot blast furnace as the pressure-equalizing gas source of another hot blast furnace, and after reaching a preliminary balance, the gas of the exhaust hot blast furnace is gradually sucked into the pressurized hot blast furnace through the cooperation of the ejector and a small amount of high-pressure gas source, and the pressure is adjusted while mixing, and the pressurization of the hot blast furnace of the exchange furnace is completed, and the utilization rate of the exhaust pressure gas reaches more than 90%.

[0053] 2. The device of the present invention can fully recover heat energy and kinetic energy, avoid energy loss caused by conventional pressure relief measures, and is also beneficial to saving gas consumption in the hot blast furnace; compared with the technical solution of completely using high-pressure gas as the pressurized gas source, the gas source consumption is small, and the project investment and operating costs are low; the implementation of the device and its pressurization method helps to release the capacity of the blower and avoid fluctuations in the furnace inlet air temperature, air pressure and air volume caused by conventional blast pressurization; it can also significantly shorten the pressurization time, and the saved time can be used for hot blast furnace burning, which helps to increase the hot blast furnace air supply temperature.

[0054] 3. The gas source sent into the blast furnace by the hot blast main pipe is a high-pressure gas source. According to the design requirements of the blast furnace, there are relevant regulations on the air supply pressure. The greater the design requirements of the blast furnace, the higher the air supply pressure, which is generally 0.3MPa~0.6MPa. Therefore, the initial air pressure of the exhaust gas discharged from the hot blast furnace is also 0.3MPa~0.6MPa. The hot blast furnace is fired at a pressure close to atmospheric pressure during the firing process, and the pressure difference with the external air pressure is 0~15KPa. The air pressure of the hot blast furnace during the air supply process is much higher than the air pressure of the furnace, so when switching from the air supply mode to the furnace firing mode, it is necessary to discharge excess gas through the exhaust gas branch pipe. Therefore, the present invention is provided with an air pressure detection device for detecting air pressure and a flowmeter for detecting gas flow on the hot blast furnace, the inflation main pipe, and the exhaust gas main pipe; it can adjust the closing state of each valve according to the working mode of the hot blast furnace, the air pressure in the hot blast furnace and the pipeline air pressure, and guide the gas source through the ejector and the high-pressure gas tank.

[0055] 4. During the exhaust process of the device of the present invention, the inflation efficiency will gradually decrease due to the gradual decrease in the air pressure of the exhaust hot blast furnace, especially when the furnace pressures of the exhaust hot blast furnace and the inflation hot blast furnace are equivalent, the inflation will be stopped. Therefore, when the air pressure difference is reduced to the first threshold value, the shut-off valve between the high-pressure gas tank and the ejector is opened, and the gas in the exhaust hot blast furnace can continue to be mixed with the high-pressure gas through the high-pressure gas tank and the ejector, and then be filled into the inflation hot blast furnace; at the same time, during the inflation process, the air pressure of the exhaust hot blast furnace gradually decreases more, so it is necessary to gradually increase the air pressure of the high-pressure gas in the high-pressure gas tank, in order to maintain the air pressure and flow in the inflation branch pipe at the preset inflation pressure and preset inflation flow, it is necessary to continuously increase the pressure of the high-pressure gas, so as to maintain a relatively stable inflation pressure and flow at the output end of the ejector, so that the inflation efficiency is guaranteed and will not be greatly affected by the reduction in the furnace pressure of the exhaust hot blast furnace. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] Figure 1 A schematic diagram of a hot blast stove device in one embodiment of the present invention;

[0057] Figure 2 A schematic diagram of an ejector in one embodiment of the present invention;

[0058] Figure 3 The figure is a schematic flow chart of a pressurization method in one embodiment of the present invention.

[0059] Among them, 1. cold air main pipe; 2. inflation main pipe; 3. hot air main pipe; 4. flue main pipe; 5. cold air branch pipe; 6. inflation branch pipe; 7. hot air branch pipe; 8. flue branch pipe; 9. ejector; 91. low-pressure gas inlet; 92. high-pressure gas inlet; 93. nozzle; 94. suction chamber; 95. mixing chamber; 96. diffusion chamber; 10. exhaust gas main pipe; 11. exhaust gas branch pipe. DETAILED DESCRIPTION

[0060] The present invention provides a charging method for a self-heating and pressure-equalizing hot blast furnace device, wherein the hot blast furnace group is equipped with a cold blast main pipe 1, a charging main pipe 2, a hot blast main pipe 3, a flue main pipe 4 and an exhaust gas main pipe 10. The hot blast furnace group includes a plurality of hot blast furnaces, which are equipped with a main pipe and a branch pipe, each of which is provided with a valve, and the main pipe is connected with each corresponding branch pipe, so that the corresponding gas source of each hot blast furnace can be unified. For example, the cold blast main pipe can pass the cold blast generated by the blower into each corresponding hot blast furnace through the cold blast branch pipe and the cold blast valve, so as to provide sufficient oxygen for the burning process of the hot blast furnace.

[0061] The cold air main pipe is provided with a plurality of cold air branch pipes 5 connected to each hot air furnace respectively, and a cold air valve is arranged on the cold air branch pipe. The inflation main pipe is provided with a plurality of inflation branch pipes 6 connected to each hot air furnace respectively, and an inflation valve is arranged on the inflation branch pipe. The inflation branch pipe can inflate each hot air furnace, so that a pressurized gas source can be provided for the hot air furnace in the air supply mode. Both the inflation main pipe and the exhaust main pipe are provided with check valves to prevent gas backflow.

[0062] The hot air main pipe is provided with several hot air branch pipes 7, which are respectively connected to each hot air furnace, and the hot air branch pipes are equipped with hot air valves; the hot air branch pipes are used to send the hot air heated by the heat storage material of the hot air furnace to the blast furnace or non-blast furnace to realize gas supply. The flue main pipe is provided with several flue branch pipes 8, which are respectively connected to each hot air furnace, and the flue branch pipes are equipped with flue valves; the flue branch pipes can discharge the flue gas generated during the burning process. The exhaust gas main pipe 10 is provided with several exhaust gas branch pipes 11, which are respectively connected to each hot air furnace, and the exhaust gas branch pipes are equipped with exhaust gas valves; the exhaust gas branch pipes are used to discharge the gas in the hot air furnace when switching from the air supply mode to the furnace burning mode, so that the air pressure in the hot air furnace is reduced to a state close to the external air pressure.

[0063] When the hot blast furnace is switched from the burning mode to the air supply mode, the air pressure inside the hot blast furnace is also close to the atmospheric pressure. The pressure difference with the atmospheric pressure is generally 0-15KPa. Then it enters the pressurization stage. The continuous pressurization makes the pressure inside the hot blast furnace reach 0.3MPa-0.6Mpa when it reaches the air supply condition.

[0064] The cold air main pipe is equipped with a cold air blower, which can deliver heat exchange air for the hot blast furnace air supply process and provide a continuous supply of hot air for blast furnace smelting. The charging main pipe is equipped with a high-pressure fan, a high-pressure gas tank, a regulating valve and a stop valve. The charging main pipe is equipped with an ejector 9, which includes a low-pressure gas inlet and a high-pressure gas inlet. The high-pressure gas tank is connected to one end of the high-pressure gas inlet of the ejector, and the exhaust gas main pipe is connected to the low-pressure gas inlet of the ejector. The ejector includes a low-pressure gas inlet 91, a high-pressure gas inlet 92, a nozzle 93, an intake chamber 94, a mixing chamber 95 and a diffusion chamber 96; the inner diameter of the mixing chamber is smaller than the inner diameter of the diffusion chamber.

[0065] The hot blast furnace, the gas charging main pipe and the exhaust gas main pipe of the present invention are provided with an air pressure detection device for detecting air pressure and a flow meter for detecting gas flow. The air pressure detection device and the flow meter can detect the air pressure in the corresponding equipment and pipelines, and can adjust the working state of the high-pressure gas tank and the ejector according to the air pressure in the furnace.

[0066] The high-pressure gas source pressure output by the high-pressure gas tank of the present invention is 0.8-2.0 MPa, and the flow rate is 20-100 Nm 3 / s. The gas flow rate in the pressurized branch pipe is 50~100Nm 3 / s, the gas pressure is 0.45~0.6MPa; the exhaust gas temperature in the exhaust gas main pipe is 200℃~500℃, and the pressure is 0.3MPa~0.6Mpa.

[0067] In a preferred embodiment of the present invention, a plurality of ejectors are connected in parallel between the exhaust gas main pipe and the inflation main pipe, and are respectively connected to the exhaust gas main pipe and the inflation main pipe through a plurality of branch pipes, and each ejector is independently connected to each inflation branch pipe.

[0068] Taking the example that the 1# hot blast furnace needs to be pressurized and the 3# hot blast furnace needs to be depressurized, the usage of the hot blast furnace device is as follows:

[0069] 1. When the 1# hot blast furnace issues a pressure charging command, the 3# hot blast furnace simultaneously issues a pressure relief command; the exhaust valve, check valve and charging valve of the 3# hot blast furnace are opened in sequence, so that the 3# hot blast furnace and the 1# hot blast furnace form a communicating vessel through the exhaust gas main pipe, ejector and charging branch pipe. Since the air pressure of the 3# hot blast furnace is higher than that of the 1# hot blast furnace, the high-temperature exhaust gas of the 3# hot blast furnace will be actively charged into the 1# hot blast furnace. As the high-pressure gas released by the 3# hot blast furnace is continuously charged into the 1# hot blast furnace, when the pressure in the 1# hot blast furnace reaches 40% to 50% of the air supply pressure of 0.3MPa to 0.6Mpa, the pressure difference between the exhaust hot blast furnace 3# and the charging hot blast furnace 1# is reduced to the first threshold value, and then the shut-off valve on the charging main pipe is opened, so that the high-pressure gas source in the high-pressure gas tank enters the suction chamber of the ejector through the high-pressure gas inlet and nozzle of the ejector, and forms a negative pressure, and the exhaust gas released by the 3# hot blast furnace is continuously extracted and sent to the charging main pipe, and the 1# hot blast furnace is continuously pressurized. The exhaust port end of the ejector of the present invention is provided with a shut-off valve, and a shut-off valve can also be provided between the high-pressure gas inlet of the ejector and the high-pressure gas tank.

[0070] As the air pressure of the 3# hot blast furnace continues to drop, the inflation efficiency will gradually decrease. In order to match the effect of the pressure drop of the 3# hot blast furnace during the pressure release process on the inflation speed of the 1# hot blast furnace, it is necessary to adjust the outlet pressure and flow of the high-pressure fan and the high-pressure gas tank continuously according to the pressure change of the 1# hot blast furnace, combined with the regulating valve that controls the flow of the high-pressure gas tank, so as to form a matching negative pressure in the suction chamber of the ejector, and ensure that the gas in the 3# hot blast furnace is continuously extracted without affecting the inflation effect.

[0071] The pressurizing method of the hot blast stove device of the present invention comprises the following steps:

[0072] (1) According to the working mode of the hot blast stove, a hot blast stove that needs to be exhausted and a hot blast stove that needs to be filled are determined as two hot blast stoves with equalized pressure;

[0073] (2) Open the valves on the main pipe and branch pipes to form a passage between the exhaust hot blast furnace, the exhaust gas branch pipe, the exhaust gas main pipe, the ejector, the charging main pipe, the charging branch pipe, and the charging hot blast furnace, so that the high-temperature and high-pressure exhaust gas in the exhaust hot blast furnace automatically flows into the charging hot blast furnace under the action of the pressure difference;

[0074] (3) Detecting the air pressure in the exhaust hot blast furnace and the charging hot blast furnace, calculating the air pressure difference between the exhaust hot blast furnace and the charging hot blast furnace, and when the air pressure difference is reduced to a first threshold, opening the cut-off valve between the high-pressure gas tank and the ejector, and the high-pressure gas in the high-pressure gas tank drives the exhaust gas in the exhaust hot blast furnace into the charging branch pipe through the high-pressure gas inlet of the ejector;

[0075] (4) Setting the adjustment cycle t, detecting relevant parameters once in each adjustment cycle t, and controlling the outlet pressure of the high-pressure gas output by the high-pressure gas tank through the regulating valve. The outlet pressure calculation formula is:

[0076]

[0077] H low Defined as the exhaust gas enthalpy;

[0078] H hig Defined as the enthalpy of high-pressure gas;

[0079] H mix Defined as the thermal enthalpy of the gas mixture;

[0080] i is the degree of freedom coefficient of the gas, which is 5;

[0081] K is the ratio of the mixing chamber and the nozzle of the ejector, that is, the cross-sectional ratio. The cross-sectional ratio of the ejector selected in the present invention is 6;

[0082] P low is the exhaust gas pressure of the exhaust gas main pipe at the low-pressure inlet of the ejector;

[0083] Q low is the exhaust gas flow rate of the exhaust gas main pipe at the low-pressure inlet of the ejector;

[0084] P hig It is the pressure of high-pressure gas discharged from the high-pressure gas tank at the high-pressure inlet of the ejector;

[0085] Q hig It is the high-pressure gas flow rate discharged from the high-pressure gas tank at the high-pressure inlet of the ejector;

[0086] P mix The preset inflation pressure of the pressurized gas at the outlet of the ejector diffusion chamber;

[0087] Q mix is the preset inflation flow rate of the pressurized gas at the outlet of the ejector diffusion chamber;

[0088] T low is the temperature of the exhaust gas; T hig is the temperature of high pressure gas; T mix is the temperature of the mixed gas.

[0089] (5) Continue to detect the air pressure in the exhaust hot blast furnace and the charging hot blast furnace. When the air pressure in the exhaust hot blast furnace drops to the exhaust threshold, end the exhaust charging and close the exhaust valve of the exhaust hot blast furnace; or when the air pressure in the charging hot blast furnace reaches the supply air pressure, end the exhaust charging.

[0090] In the optimized embodiment of the present invention, the high-pressure gas pressure output by the high-pressure gas tank can be 0.8-2.0 MPa, and the flow rate is 20-100 Nm 3 / s, that is, the pressure of high-pressure gas changes according to the pressure flow rate in the exhaust hot blast furnace. When the pressure flow rate of the exhaust hot blast furnace decreases, the output of high-pressure gas is higher. The gas flow rate in the pressurized branch pipe is 50Nm 3 / s~100Nm 3 / s, the gas pressure is 0.45MPa~0.6MPa; the exhaust gas temperature in the exhaust gas main pipe is 200℃~500℃, and the pressure is 0.3MPa~0.6Mpa.

[0091] In the optimized embodiment of the present invention, the specific operation process of step (2) is: the cold air valve and the inflation valve of the exhaust hot blast furnace are closed, and the hot air valve and the flue valve are closed; the waste gas valve is opened, the inflation valve of the inflation hot blast furnace is opened, and the cold air valve, the hot air valve, the flue valve and the waste gas valve are closed; the shut-off valve between the exhaust port end of the ejector and the hot blast furnace is opened to form a passage between the exhaust hot blast furnace, the waste gas branch pipe, the waste gas main pipe, the ejector, the inflation main pipe, the inflation branch pipe and the inflation hot blast furnace, so that the high-temperature and high-pressure exhaust gas in the exhaust hot blast furnace automatically flows into the inflation hot blast furnace under the action of the pressure difference.

[0092] In the optimized embodiment of the present invention, the preset inflation pressure P of the pressurized gas at the outlet of the ejector diffusion chamber in step (4) is mix The preset inflation flow rate Q of the pressurized gas at the outlet of the injector diffusion chamber is 0.45MPa~0.6MPa; mix 50Nm 3 / s~100Nm 3 / s.

[0093] In an optimized embodiment of the present invention, in step (5), when the air pressure in the exhaust hot blast furnace drops to the exhaust threshold, the exhaust pressurization is terminated and the exhaust valve of the exhaust hot blast furnace is closed; at this time, it is detected whether the air pressure of the charging hot blast furnace reaches the supply air pressure. If the air pressure of the charging hot blast furnace reaches the supply air pressure at this time, the stop valve of the high-pressure gas tank is closed; if it has not reached the supply air pressure, the charging is continued through the high-pressure gas tank.

[0094] In an optimized embodiment of the present invention, in step (5), when the air pressure of the charging hot blast furnace reaches the air supply pressure, the exhaust charging is terminated; at this time, it is detected whether the air pressure of the exhaust hot blast furnace is reduced to the exhaust threshold value. If it is not reduced to the exhaust threshold value, the excess exhaust gas is discharged into the flue main pipe through the pressure relief valve and the pressure relief branch pipe.

[0095] Embodiment 1:

[0096] A hot blast furnace group at a certain site is arranged according to the method of the present invention, the hot blast furnace group includes four hot blast furnaces, among which hot blast furnace No. 1 and hot blast furnace No. 2 need to be depressurized and inflated, wherein hot blast furnace No. 1 performs exhaust operation and hot blast furnace No. 2 needs to perform inflation operation; when performing pressure equalization, hot blast furnace No. 1 was previously in air supply mode, the air pressure of hot blast furnace No. 1 was 0.5MPa, the temperature was 320°C, and the air pressure of hot blast furnace No. 2 was 0.1MPa, the temperature was 22°C.

[0097] (1) After the pipelines of hot blast furnace No. 1 and hot blast furnace No. 2 are connected, the high-pressure and high-temperature gas of hot blast furnace No. 1 is introduced into hot blast furnace No. 2, and the temperature, air pressure and flow rate at each node are detected by temperature sensors, air pressure detection devices and flow meters.

[0098] (2) When it is detected that the gas pressure of the No. 1 hot blast furnace drops to the first threshold value of 0.35 MPa, it is necessary to open the shut-off valve between the high-pressure gas tank and the ejector so that the high-pressure gas in the high-pressure gas tank enters the ejector. At this time, the gas pressure of the high-pressure gas tank is 1.2 MPa;

[0099] (3) Continue to detect the air pressure of hot blast furnace No. 1 and hot blast furnace No. 2, and calculate the output air pressure of the high-pressure gas tank according to the change of the air pressure of hot blast furnace No. 1 according to the calculation method of the present invention. The change of the output air pressure is obtained according to the calculation formula of the present invention.

[0100] i is the degree of freedom coefficient of the gas, which is 5;

[0101] K is the cross-sectional ratio, which is 6;

[0102] P low The exhaust gas pressure of the exhaust gas main pipe at the low-pressure inlet of the ejector is obtained according to the corresponding data of the air pressure detection device installed on site;

[0103] Q low The exhaust gas flow rate of the exhaust gas main pipe at the low-pressure inlet of the ejector is obtained through the flow meter installed on site;

[0104] P hig is the pressure of high-pressure gas discharged from the high-pressure gas tank at the high-pressure inlet of the ejector, calculated by the formula of the present invention;

[0105] Q hig It is the high-pressure gas flow rate discharged from the high-pressure gas tank at the high-pressure inlet of the ejector. The flow rate can be set by the regulating valve and can also be tested;

[0106] P mix is the preset inflation pressure of the pressurized gas at the outlet of the ejector diffusion chamber, which is generally set to a fixed value, and the value of this embodiment 1 is 0.5 MPa;

[0107] Q mixis the preset inflation flow rate of the pressurized gas at the outlet of the ejector diffusion chamber, which is generally set to a fixed value. In this embodiment 1, the value is 60Nm 3 / s;

[0108] C is the specific heat capacity of air, which is 1.0×103J / (kg.℃);

[0109] M is the molar mass of air, and its value is 28.97;

[0110] R is the gas constant, which is 8.314 J / (mol·K);

[0111] T low is the temperature of the exhaust gas, which is detected by the temperature sensor;

[0112] T hig is the temperature of the high-pressure gas, detected by a temperature sensor;

[0113] T mix is the temperature of the mixed gas, detected by a temperature sensor.

[0114] (4) When the air pressure of hot air furnace No. 1 drops to close to the standard atmospheric pressure, stop charging.

[0115] Although the specific implementation of the present invention is described in detail in conjunction with the drawings, it should not be understood as limiting the scope of protection of this patent. Within the scope described in the claims, various modifications and variations that can be made by those skilled in the art without creative work still fall within the scope of protection of this patent.

Claims

1. A method for charging a hot air furnace device with self-heating and equalizing pressure, characterized in that: The hot air stove device includes: Hot blast furnace group; the hot blast furnace group includes several hot blast furnaces, each of which is equipped with a main pipe and branch pipes, and each branch pipe is equipped with a valve; Cold air main pipe; the cold air main pipe is provided with a number of cold air branch pipes respectively connected to each hot air furnace; the cold air branch pipes are provided with cold air valves; The main inflatable pipe is provided with a plurality of inflatable branches which are respectively connected with each hot air furnace; the inflatable branches are provided with inflatable valves; Hot air main pipe; the hot air main pipe is provided with a number of hot air branch pipes respectively connected to each hot air furnace; the hot air branch pipes are provided with hot air valves; Flue main pipe; the flue main pipe is provided with a number of flue branches respectively connected with each hot air stove; the flue branches are provided with flue valves; The exhaust main pipe is provided with a plurality of exhaust branch pipes connected to each hot air furnace respectively; the exhaust branch pipes are provided with exhaust valves; The cold air main pipe is equipped with a cold air blower; the charging main pipe is equipped with a high-pressure fan, a high-pressure gas tank, a regulating valve and a stop valve; the charging main pipe is equipped with an ejector, the ejector includes a low-pressure gas inlet and a high-pressure gas inlet, the high-pressure gas tank is connected to one end of the high-pressure gas inlet of the ejector, and the exhaust gas main pipe is connected to the low-pressure gas inlet of the ejector; the hot blast furnace, the charging main pipe and the exhaust gas main pipe are provided with an air pressure detection device for detecting air pressure and a flow meter for detecting gas flow; The pressurization method of the hot blast stove device comprises the following steps: (1) According to the working mode of the hot blast stove, a hot blast stove that needs to be exhausted and a hot blast stove that needs to be filled are determined as two hot blast stoves with equalized pressure; (2) Open the valves on the main pipe and branch pipes to form a passage between the exhaust hot blast furnace, the exhaust gas branch pipe, the exhaust gas main pipe, the ejector, the charging main pipe, the charging branch pipe, and the charging hot blast furnace, so that the high-temperature and high-pressure exhaust gas in the exhaust hot blast furnace automatically flows into the charging hot blast furnace under the action of the pressure difference; (3) Detecting the air pressure in the exhaust hot blast furnace and the charging hot blast furnace, calculating the air pressure difference between the exhaust hot blast furnace and the charging hot blast furnace, and when the air pressure difference is reduced to a first threshold, opening the cut-off valve between the high-pressure gas tank and the ejector, and the high-pressure gas in the high-pressure gas tank drives the exhaust gas in the exhaust hot blast furnace into the charging branch pipe through the high-pressure gas inlet of the ejector; (4) Set the adjustment cycle t, detect the relevant parameters once in each adjustment cycle t, and control the outlet pressure P of the high-pressure gas output by the high-pressure gas tank through the regulating valve hig , outlet pressure P hig The calculation formula is: H low Defined as the exhaust gas enthalpy; H hig Defined as the enthalpy of high-pressure gas; H mix Defined as the thermal enthalpy of the gas mixture; i is the degree of freedom coefficient of the gas, which is 5; K is the ratio of the mixing chamber and the nozzle of the ejector, that is, the cross-sectional ratio; P low is the exhaust gas pressure of the exhaust gas main pipe at the low-pressure inlet of the ejector; Q low is the exhaust gas flow rate of the exhaust gas main pipe at the low-pressure inlet of the ejector; P hig It is the pressure of high-pressure gas discharged from the high-pressure gas tank at the high-pressure inlet of the ejector; Q hig It is the high-pressure gas flow rate discharged from the high-pressure gas tank at the high-pressure inlet of the ejector; P mix The preset inflation pressure of the pressurized gas at the outlet of the ejector diffusion chamber; Q mix is the preset inflation flow rate of the pressurized gas at the outlet of the ejector diffusion chamber; C is the specific heat capacity of air; M is the molar mass of air; R is the gas constant; T low is the temperature of the exhaust gas; T hig is the temperature of high pressure gas; T mix is the temperature of the mixed gas; (5) Continue to detect the air pressure in the exhaust hot blast furnace and the charging hot blast furnace. When the air pressure in the exhaust hot blast furnace drops to the exhaust threshold, end the exhaust charging and close the exhaust valve of the exhaust hot blast furnace; or when the air pressure in the charging hot blast furnace reaches the supply air pressure, end the exhaust charging.

2. The charging method according to claim 1, characterized in that: The inflation main pipe and the exhaust main pipe are both provided with check valves.

3. The charging method according to claim 1, characterized in that: The ejector comprises a low-pressure gas inlet, a high-pressure gas inlet, a nozzle, a suction chamber, a mixing chamber and a diffusion chamber; the inner diameter of the mixing chamber is smaller than the inner diameter of the diffusion chamber.

4. The charging method according to claim 1, characterized in that: The high-pressure gas output by the high-pressure gas tank has a pressure of 0.8-2.0 MPa and a flow rate of 20-100 Nm 3 / s; the gas flow rate in the pressurized branch pipe is 50Nm 3 / s~100Nm 3 / s, the gas pressure is 0.45MPa~0.6MPa; the exhaust gas temperature in the exhaust gas main pipe is 200℃~500℃, and the pressure is 0.3MPa~0.6Mpa.

5. The charging method according to claim 1, characterized in that: The specific operation process of step (2) is as follows: the cold air valve and the inflation valve of the exhaust hot blast furnace are closed, and the hot air valve and the flue valve are closed; the waste gas valve is opened, the inflation valve of the inflation hot blast furnace is opened, and the cold air valve, the hot air valve, the flue valve and the waste gas valve are closed; the shut-off valve between the exhaust port end of the ejector and the hot blast furnace is opened to form a passage between the exhaust hot blast furnace, the waste gas branch pipe, the waste gas main pipe, the ejector, the inflation main pipe, the inflation branch pipe and the inflation hot blast furnace, so that the high-temperature and high-pressure exhaust gas in the exhaust hot blast furnace automatically flows into the inflation hot blast furnace under the action of the pressure difference.

6. The charging method according to claim 1, characterized in that: The preset inflation pressure P of the pressurized gas at the outlet of the ejector diffusion chamber in step (4) is mix 0.45MPa~0.6MPa; the preset inflation flow rate Q of the pressurized gas at the outlet of the ejector diffusion chamber mix 50Nm 3 / s~100Nm 3 / s.

7. The charging method according to claim 1, characterized in that: In the step (5), when the air pressure in the exhaust hot blast furnace drops to the exhaust threshold, the exhaust pressurization is terminated and the exhaust valve of the exhaust hot blast furnace is closed; at this time, it is detected whether the air pressure of the charging hot blast furnace reaches the supply air pressure. If the air pressure of the charging hot blast furnace reaches the supply air pressure at this time, the stop valve of the high-pressure gas tank is closed; if it has not reached the supply air pressure, the charging is continued through the high-pressure gas tank.

8. The charging method according to claim 1, characterized in that: In the step (5), when the air pressure of the charging hot blast furnace reaches the air supply pressure, the exhaust charging is ended; at this time, it is detected whether the air pressure of the exhaust hot blast furnace is reduced to the exhaust threshold value. If it is not reduced to the exhaust threshold value, the excess exhaust gas is discharged into the flue main pipe through the pressure relief valve and the pressure relief branch pipe.