A high performance asphalt mixture pavement maintenance device and process
By designing a combined system of carrier and inner and outer tanks, efficient melting and filling of asphalt mixture is achieved, solving the problem of replacing filler and cleaning the road surface in the prior art, and improving the strength and efficiency of road surface repair.
Patent Information
- Application Number
- CN202310337307.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2043-03-31
AI Technical Summary
Existing asphalt pavement maintenance devices are difficult to effectively solve the problem of insufficient strength caused by material mixing and impurities contact when replacing fillers and cleaning the pavement.
A high-performance asphalt mixture pavement maintenance device is designed, including a carrier, an outer tank, an inner tank, a material pump and a stirring system. The material is melted through the main heating pipe and the drive motor, and the material pump and a discharge pipe are poured together. The fan cleans the road surface and facilitates replacement of fill and cleaning of the road surface through a detachable structure.
It realizes convenient filling material replacement and preliminary road cleaning, avoids insufficient strength caused by material mixing and impurities contact, and improves the repair effect.
Smart Images

Figure CN116289451B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of asphalt pavement maintenance, and in particular relates to a high-performance asphalt mixture pavement maintenance device and process. Background Art
[0002] Asphalt pavement refers to various types of pavement paved with road asphalt materials mixed into mineral materials. The asphalt binder improves the ability of paving aggregate to resist damage to the road surface caused by driving and natural factors, making the road surface smooth, dust-free, waterproof and durable. Therefore, asphalt pavement is the most widely used high-grade pavement in road construction.
[0003] Chinese patent CN109024186B discloses an asphalt pavement maintenance equipment, which relates to the field of road maintenance, including a storage box, a fixed block and a discharging funnel, wherein a feeding port is arranged at the top of the storage box; a stirring device is rotatably connected in the storage box; a sealing plate is slidably connected at the bottom end of the discharging funnel, and the discharging funnel is provided with two groups of discharging plates, each of which is provided with a plurality of baffles; one group of the discharging plates is slidably connected to the discharging funnel, and the other group of the discharging plates is fixedly connected to the discharging funnel, and a sliding component for driving the discharging plates to move is arranged on the discharging funnel; after the discharging plates are slidably connected, the baffles on the two groups of the discharging plates are close to or away from each other; after feeding from the feeding port on the storage box, the materials are discharged from the discharging funnel, and during the process of discharging from the discharging funnel, the discharging plate is slidably connected on the discharging funnel, so as to stir the materials in the discharging funnel, thereby reducing the blockage of the discharging funnel when discharging, so as to facilitate the maintenance of the asphalt pavement.
[0004] Based on the asphalt pavement maintenance process and the required equipment, there are many situations that may occur when maintaining the asphalt pavement, but not limited to the one mentioned below. When maintaining the asphalt pavement, the cracks in the pavement will be filled with melted filling materials and poured, and then wait for them to dry naturally;
[0005] When the existing asphalt pavement is maintained, the filling material is heated and melted by a heating tank. However, when different filling materials are needed, if different materials are directly put into the material tank, it is easy to mix with the residual material, resulting in the material not reaching the required strength. In addition, when pouring, it is easy to contact with impurities on the ground, resulting in insufficient strength.
[0006] Based on the above-mentioned problems, we found that it is difficult for the asphalt mixture pavement maintenance device in the prior art to avoid the above situations at the same time. Therefore, we proposed an asphalt mixture pavement maintenance device that can easily replace the material tank and perform preliminary cleaning of the road surface. Summary of the invention
[0007] The purpose of the present invention is to provide an existing high-performance asphalt mixture pavement maintenance device and process, which has the advantages of being able to easily replace the material tank and perform preliminary cleaning of the pavement.
[0008] The above technical objectives of the present invention are achieved through the following technical solutions: a high-performance asphalt mixture pavement maintenance device and process, including a carrier, an outer tank is bolted to the top of the carrier, a pressure roller is arranged on the left side of the carrier, an inner tank is arranged on the inner side of the outer tank, a material pump is bolted to the bottom of the inner wall of the outer tank, a connecting component is arranged on the top of the material pump, a top cover is arranged on the top of the outer tank, a driving motor is bolted to the top of the top cover, a stirring shaft is bolted to the output end of the driving motor, a main heating pipe is bolted to the inner wall of the outer tank, and the main heating pipe is arranged on the outside of the inner tank;
[0009] The connecting component includes an outer frame, a top plug is arranged on the top of the outer frame, the bottom of the outer frame is bolted to the bottom of the inner wall of the inner tank, a connecting bucket is arranged at the bottom of the inner tank, the bottom of the connecting bucket is bolted to the feeding end of the material pump, and a pressure rod is arranged on the inner side of the connecting bucket, and the top of the pressure rod is in contact with the bottom of the top plug.
[0010] By adopting the above technical solution, by setting up a carrier, the structure can be easily installed, and the device can be moved by the rollers installed at the bottom. The outer tank and the inner tank are used to hold the maintenance and repair materials, and the materials are melted by the main heating tank, the driving motor and the stirring shaft. Then they can be pumped out and discharged from the device to maintain the road surface. When the filling material needs to be replaced, the top cover can be removed, and the inner tank can be taken out, and the new filling material and the inner tank used for holding are connected to the outer tank. When the inner tank is placed in the outer tank, the pressure rod presses the top plug, so that a gap is generated between the top plug and the outer frame, so that the filling material can flow down from the outer frame.
[0011] The present invention is further configured as follows: a narrow frame is bolted to the inner wall of the connecting bucket, the top of the narrow frame is bolted to the top of the pressure rod, and a wide frame is arranged on the inner side of the outer frame.
[0012] By adopting the above technical solution, by providing a narrow frame, it is convenient to connect the pressure rod, and the wide frame on the inner side of the outer frame is also used to support the structure, making the structure more reasonable.
[0013] The present invention is further configured as follows: a layer plate is bolted to the outer side of the outer frame, the outer side of the layer plate is bolted to the inner wall of the inner tank, and an outer cylinder is bolted to the top of the wide frame.
[0014] By adopting the above technical solution, by setting the layer plate, it can be avoided that the material is located between the bottom of the outer frame and the outer tank and cannot be discharged, and the outer cylinder arranged on the wide frame can facilitate the support of the top plug.
[0015] The present invention is further configured as follows: a first spring is bolted to the bottom of the inner wall of the outer cylinder, an inner cylinder is bolted to the top of the first spring, the outer side of the inner cylinder is slidably connected to the outer cylinder, and the top of the inner cylinder is bolted to the top plug.
[0016] By adopting the above technical solution, by setting the first spring and the inner tube, it is convenient to connect and support the top plug, and when the pressure rod presses the top plug, the inner tube extends from the inside of the outer tube. At this time, the first spring accumulates force and rebounds when the pressure rod stops pressing to reset the top plug.
[0017] The present invention is further configured as follows: a leak-proof ring is bolted to the bottom of the inner tank, and the inner side of the leak-proof ring is clamped to the top of the connecting bucket.
[0018] By adopting the above technical solution and providing a leak-proof ring, it is possible to prevent material from overflowing when the inner tank is connected to the connecting bucket.
[0019] The present invention is further configured as follows: an inner frame is bolted to the bottom of the inner wall of the outer tank, and the inner side of the inner frame is in contact with the inner tank.
[0020] By adopting the above technical solution and providing an inner frame, the inner tank can be stably placed inside the outer tank, making the structure more stable.
[0021] The present invention is further configured as follows: a hinged joint is bolted on the top of the top cover, a door panel is rotatably connected to the bottom of the hinged joint, a matching ring is bolted on the inner wall of the outer tank, an assembly ring is clamped on the inner side of the matching ring, and the top of the assembly ring is bolted to the bottom of the top cover.
[0022] By adopting the above technical solution and setting a hinged joint, the door panel can be rotated along the hinged joint to open it when it is necessary to add materials into the inner tank. The set assembly ring cooperates with the matching ring to facilitate the connection or disassembly of the top cover and the outer tank.
[0023] The present invention is further configured as follows: a fan is bolted to the top of the carrier, and an air duct is bolted to the air outlet of the fan.
[0024] By adopting the above technical solution, by setting up a fan, air flow can be discharged through the air duct while working, and impurities on the ground can be blown away, making the working position relatively clean.
[0025] The present invention is further configured as follows: a discharge pipe is bolted to the discharge end of the material pump, a drop bucket is bolted to the bottom of the discharge pipe, an outer pipe is arranged on the outer side of the discharge pipe, and an auxiliary heating pipe is bolted to the inner side of the outer pipe;
[0026] A fixed frame is bolted to the left side of the carrier, a movable frame is arranged on the inner side of the fixed frame, the inner side of the movable frame is rotatably connected to the pressure roller, a guide frame is bolted to the top of the movable frame, a second spring is arranged on the outer side of the guide frame, the bottom of the second spring is bolted to the movable frame, and the top of the second spring is bolted to the bottom of the fixed frame.
[0027] By adopting the above technical solution, a discharge pipe is provided to facilitate the discharge of materials from the material pump, and the materials fall to the road repair site through the drop bucket. The auxiliary heating pipe provided can reheat the passing materials to prevent them from solidifying.
[0028] A maintenance process for a high-performance asphalt mixture pavement comprises the following steps:
[0029] S1. Open the door panel and put the repair and filling materials into the inner tank. The main heating tube heats the inner tank to melt the internal materials. At the same time, the driving motor stirs the materials inside the inner tank through the stirring shaft to assist in melting.
[0030] S2. The melted material is pumped out by the material pump and falls through the discharge pipe and the drop bucket to inject the repair material into the position to be repaired. When the device passes the working position, the roller rolls the repair position to make it flat;
[0031] S3. The fan blows out air through the air duct to disperse the impurities on the ground to avoid contact with the repair material and cause insufficient repair strength.
[0032] In summary, the present invention has the following beneficial effects:
[0033] By setting up a carrier, the device can be moved in conjunction with the rollers installed at its bottom. The outer tank and the inner tank are used to hold the maintenance and repair materials, and the materials are melted by the main heating tank, the driving motor and the stirring shaft. Then they can be pumped out by the material pump and discharged from the discharge pipe and the drop bucket to inject and maintain the road surface. The pressure roller flattens the repair position. When the filling material needs to be replaced, the top cover can be removed through the matching ring and the assembly ring, and the inner tank is taken out and connected to the outer tank together with the new filling material and the inner tank used for holding. When the inner tank is placed in the outer tank, the pressure rod presses the top plug, so that a gap is generated between the top plug and the outer frame, so that the filling material can flow from the outer frame to the position of the material pump, which can facilitate the replacement of materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0035] Figure 2 It is a schematic diagram of the internal structure of the outer tank of the present invention;
[0036] Figure 3 It is a schematic diagram of the structure of the connected components of the present invention;
[0037] Figure 4 It is a schematic diagram of the outer cylinder structure of the present invention;
[0038] Figure 5 It is a schematic diagram of the outer frame structure of the present invention;
[0039] Figure 6 It is a schematic diagram of the discharge pipe structure of the present invention;
[0040] Figure 7 It is a schematic diagram of the structure of the pressing roller of the present invention;
[0041] Figure 8 It is a schematic flow diagram of the curing process in the present invention.
[0042] 1. The connecting assembly is shown in FIG. 1 . The connecting assembly is shown in FIG. 1 . The connecting assembly is shown in FIG. 1 . The connecting assembly is shown in FIG. 1 . The connecting assembly is shown in FIG. 1 . The connecting assembly is shown in FIG. 1 . The connecting assembly is shown in FIG. 1 . The connecting assembly is shown in FIG. 1 . The connecting assembly is shown in FIG. 1 . DETAILED DESCRIPTION
[0043] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0044] Embodiment 1:
[0045] refer to Figure 1-5 A high-performance asphalt mixture pavement maintenance device comprises a carrier 1, an outer tank 2 is bolted to the top of the carrier 1, a pressure roller 3 is arranged on the left side of the carrier 1, an inner tank 4 is arranged on the inner side of the outer tank 2, a material pump 5 is bolted to the bottom of the inner wall of the outer tank 2, a connecting component 6 is arranged on the top of the material pump 5, a top cover 15 is arranged on the top of the outer tank 2, a driving motor 16 is bolted to the top of the top cover 15, a stirring shaft 17 is bolted to the output end of the driving motor 16, a main heating pipe 18 is bolted to the inner wall of the outer tank 2, and the main heating pipe 18 is arranged on the outer side of the inner tank 4;
[0046] The connecting component 6 includes an outer frame 601, a top plug 602 is arranged on the top of the outer frame 601, the bottom of the outer frame 601 is bolted to the bottom of the inner wall of the inner tank 4, a connecting bucket 603 is arranged at the bottom of the inner tank 4, the bottom of the connecting bucket 603 is bolted to the feeding end of the material pump 5, and a pressure rod 604 is arranged on the inner side of the connecting bucket 603, and the top of the pressure rod 604 contacts the bottom of the top plug 602. By setting the carrier 1, it is convenient to install the structure, and the device can be moved by the roller installed at the bottom thereof. The outer tank 2 is arranged to cooperate with the inner tank 4 for the maintenance and repair materials. The filling material is contained and melted by the cooperation of the main heating tank, the driving motor 16 and the stirring shaft 17. It can then be extracted by the material pump 5 and discharged from the device to maintain the road surface. When the filling material needs to be replaced, the top cover 15 can be removed, and the inner tank 4 can be taken out, and the newly replaced filling material and the inner tank 4 used for containing the filling material can be connected to the outer tank 2. When the inner tank 4 is placed in the outer tank 2, the pressing rod 604 presses the top plug 602, so that a gap is generated between the top plug 602 and the outer frame 601, so that the filling material can flow down from the outer frame 601.
[0047] like Figure 3 As shown, a narrow frame 7 is bolted to the inner wall of the connecting bucket 603, and the top of the narrow frame 7 is bolted to the top of the pressure rod 604. A wide frame 8 is arranged on the inner side of the outer frame 601. By arranging the narrow frame 7, it is convenient to connect the pressure rod 604. The wide frame 8 is also used to support the structure on the inner side of the outer frame 601, making the structure more reasonable.
[0048] like Figure 2 As shown, a layer plate 9 is bolted to the outside of the outer frame 601, and the outside of the layer plate 9 is bolted to the inner wall of the inner tank 4. An outer cylinder 10 is bolted to the top of the wide frame 8. By setting the layer plate 9, it can be avoided that the material is located between the bottom of the outer frame 601 and the outer tank 2 and cannot be discharged. The outer cylinder 10 set on the wide frame 8 can facilitate the support of the top plug 602.
[0049] like Figure 4 As shown, the bottom of the inner wall of the outer cylinder 10 is bolted with a first spring 11, the top of the first spring 11 is bolted with an inner cylinder 12, the outer side of the inner cylinder 12 is slidably connected to the outer cylinder 10, and the top of the inner cylinder 12 is bolted to the top plug 602. By arranging the first spring 11 and the inner cylinder 12 to cooperate, it is convenient to connect and support the top plug 602, and when the pressure rod 604 presses the top plug 602, the inner cylinder 12 extends from the inside of the outer cylinder 10. At this time, the first spring 11 accumulates force, and rebounds when the pressure rod 604 stops pressing, so that the top plug 602 is reset.
[0050] like Figure 3As shown, a leak-proof ring 13 is bolted to the bottom of the inner tank 4, and the inner side of the leak-proof ring 13 is clamped with the top of the connecting bucket 603. By providing the leak-proof ring 13, material overflow can be easily prevented when the inner tank 4 is connected to the connecting bucket 603.
[0051] like Figure 2 As shown, an inner frame 14 is bolted to the bottom of the inner wall of the outer tank 2, and the inner side of the inner frame 14 is in contact with the inner tank 4. By providing the inner frame 14, the inner tank 4 can be stably placed on the inner side of the outer tank 2, making the structure more stable.
[0052] Brief description of the use process: when the filling material needs to be replaced, the top cover 15 can be removed, and the inner tank 4 can be taken out, and connected to the outer tank 2 together with the new filling material and the inner tank 4 used for containing the filling material. When the inner tank 4 is placed in the outer tank 2, the pressing rod 604 presses the top plug 602, so that a gap is generated between the top plug 602 and the outer frame 601, forming a space for the filling material to flow down, and the repair filling material is put into the inner tank 4. The main heating tube 18 heats the inner tank 4 to melt the internal material. At the same time, the driving motor 16 stirs the material inside the inner tank 4 through the stirring shaft 17 to assist its melting. The melted material is pumped out by the material pump 5 and the maintenance position is repaired.
[0053] Embodiment 2:
[0054] refer to Figure 1-7 A high-performance asphalt mixture pavement maintenance device includes a carrier 1, an outer tank 2 is bolted to the top of the carrier 1, a pressure roller 3 is arranged on the left side of the carrier 1, and a material pump 5 is bolted to the bottom of the inner wall of the outer tank 2; the carrier 1 can be used to support the structure, the pressure roller 3 can be used to flatten the material after filling, and the material pump 5 is used to extract the material from the inner tank 4 for discharge.
[0055] like Figure 1 and Figure 2 As shown, the top of the top cover 15 is bolted with a hinge joint 19, the bottom of the hinge joint 19 is rotatably connected to a door panel 20, the inner wall of the outer tank 2 is bolted with a matching ring 21, the inner side of the matching ring 21 is clamped with an assembly ring 22, the top of the assembly ring 22 is bolted to the bottom of the top cover 15, by setting the hinge joint 19, when it is necessary to add materials to the inner tank 4, the door panel 20 can be rotated along the hinge joint 19 to open it, and the assembly ring 22 cooperates with the matching ring 21, which can facilitate the connection or disassembly of the top cover 15 and the outer tank 2.
[0056] like Figure 1As shown, a fan 23 is bolted to the top of the carrier 1, and an air duct 24 is bolted to the air outlet of the fan 23. By setting the fan 23, air flow can be discharged through the air duct 24 during operation, and impurities on the ground can be blown away, making the working position relatively clean.
[0057] like Figure 6 and Figure 7 As shown, the discharge end of the material pump 5 is bolted with a discharge pipe 25, the bottom of the discharge pipe 25 is bolted with a drop bucket 26, an outer pipe 27 is arranged outside the discharge pipe 25, and an auxiliary heating pipe 28 is bolted inside the outer pipe 27;
[0058] A fixed frame 29 is bolted to the left side of the carrier 1, a movable frame 30 is arranged on the inner side of the fixed frame 29, the inner side of the movable frame 30 is rotatably connected to the pressure roller 3, a guide frame 32 is bolted to the top of the movable frame 30, a second spring 31 is arranged on the outer side of the guide frame 32, the bottom of the second spring 31 is bolted to the movable frame 30, and the top of the second spring 31 is bolted to the bottom of the fixed frame 29. By setting up a discharge pipe 25, the material of the material pump 5 can be discharged conveniently and fall to the road repair area through the drop bucket 26. The auxiliary heating pipe 28 can be arranged to heat the passing material again to prevent it from solidifying.
[0059] Brief description of the use process: when in use, open the door panel 20 along the hinge joint 19, and put the repair and filling materials into the device. When the inner tank 4 needs to be replaced, the assembly ring 22 together with the top cover 15 can be removed along the matching ring 21. The melted material is extracted by the material pump 5 and falls into the repair position from the discharge pipe 25 and the drop bucket 26. The outer tank 2 cooperates with the auxiliary heating tank to heat the discharge pipe 25 to avoid material solidification. The fan 23 discharges air through the air duct 24 to blow away impurities and accelerate the drying of the filling position. The fixed frame 29 is matched with the movable frame 30, and the second spring 31 presses the movable frame 30 along the fixed frame 29, so that the pressure roller 3 connected to the movable frame 30 contacts the ground and the repair position to flatten the repair position.
[0060] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.
Claims
1. A high-performance asphalt mixture pavement maintenance device, comprising a carrier (1), characterized in that: An outer tank (2) is bolted to the top of the carrier (1), a pressure roller (3) is arranged on the left side of the carrier (1), an inner tank (4) is arranged on the inner side of the outer tank (2), a material pump (5) is bolted to the bottom of the inner wall of the outer tank (2), a connecting component (6) is arranged on the top of the material pump (5), a top cover (15) is arranged on the top of the outer tank (2), a driving motor (16) is bolted to the top of the top cover (15), a stirring shaft (17) is bolted to the output end of the driving motor (16), a main heating pipe (18) is bolted to the inner wall of the outer tank (2), and the main heating pipe (18) is arranged on the outer side of the inner tank (4); The connecting component (6) comprises an outer frame (601), a top plug (602) is arranged on the top of the outer frame (601), the bottom of the outer frame (601) is bolted to the bottom of the inner wall of the inner tank (4), a connecting bucket (603) is arranged at the bottom of the inner tank (4), the bottom of the connecting bucket (603) is bolted to the feeding end of the material pump (5), a pressure rod (604) is arranged on the inner side of the connecting bucket (603), the top of the pressure rod (604) is in contact with the bottom of the top plug (602); a narrow frame (7) is bolted to the inner wall of the connecting bucket (603), the top of the narrow frame (7) is bolted to the top of the pressure rod (604), and a wide frame (8) is arranged on the inner side of the outer frame (601); the outer frame The outer side of the (601) is bolted with a layer plate (9), the outer side of the layer plate (9) is bolted with the inner wall of the inner tank (4), and the top of the wide frame (8) is bolted with an outer tube (10); the bottom of the inner wall of the outer tube (10) is bolted with a first spring (11), the top of the first spring (11) is bolted with an inner tube (12), the outer side of the inner tube (12) is slidably connected with the outer tube (10), and the top of the inner tube (12) is bolted with a top plug (602); the discharge end of the material pump (5) is bolted with a discharge pipe (25), the bottom of the discharge pipe (25) is bolted with a drop bucket (26), the outer side of the discharge pipe (25) is provided with an outer tube (27), and the inner side of the outer tube (27) is bolted with an auxiliary heating pipe (28); A fixed frame (29) is bolted to the left side of the carrier (1); a movable frame (30) is arranged on the inner side of the fixed frame (29); the inner side of the movable frame (30) is rotatably connected to the pressure roller (3); a guide frame (32) is bolted to the top of the movable frame (30); a second spring (31) is arranged on the outer side of the guide frame (32); the bottom of the second spring (31) is bolted to the movable frame (30); and the top of the second spring (31) is bolted to the bottom of the fixed frame (29).
2. A high-performance asphalt mixture pavement maintenance device according to claim 1, characterized in that: A leak-proof ring (13) is bolted to the bottom of the inner tank (4), and the inner side of the leak-proof ring (13) is clamped to the top of the connecting bucket (603).
3. A high performance asphalt mixture pavement maintenance device according to claim 1, characterized in that: An inner frame (14) is bolted to the bottom of the inner wall of the outer tank (2), and the inner side of the inner frame (14) is in contact with the inner tank (4).
4. A high-performance asphalt mixture pavement maintenance device according to claim 1, characterized in that: The top of the top cover (15) is bolted with a hinged joint (19), the bottom of the hinged joint (19) is rotatably connected to a door panel (20), the inner wall of the outer tank (2) is bolted with a matching ring (21), the inner side of the matching ring (21) is clamped with an assembly ring (22), and the top of the assembly ring (22) is bolted to the bottom of the top cover (15).
5. The high-performance asphalt mixture pavement maintenance device according to claim 1, characterized in that: A fan (23) is bolted to the top of the carrier (1), and an air duct (24) is bolted to the air outlet of the fan (23).
6. The maintenance process of the high-performance asphalt mixture pavement maintenance device according to claim 5, characterized in that: The following steps are involved: S1: Open the door panel (20), and put the repair and filling material into the inner tank (4), the main heating tube (18) heats the inner tank (4) to melt the material inside, and at the same time, the driving motor (16) stirs the material inside the inner tank (4) through the stirring shaft (17) to assist in melting; S2. The melted material is pumped out by the material pump (5) and falls through the discharge pipe (25) and the drop bucket (26) to inject the repair material into the position to be repaired. When the device passes the working position, the pressure roller (3) rolls the repair position to make it flat; S3. The fan (23) blows out air through the air duct (24) to blow away impurities on the ground to prevent them from coming into contact with the repair material and causing insufficient repair strength.
Citation Information
Cited By
Road surface maintenance device for road construction of highway engineering
CN224063244U