An online monitoring and control system and method for circulating cooling water
By adding branch circuits and real-time monitoring equipment in the circulating cooling water system, precise dosing and sewage control of circulating cooling water is achieved, and the problem of inaccurate control in the existing technology is solved, the anti-corrosion effect is improved, and resource waste is reduced and security risks.
Patent Information
- Application Number
- CN202211482844.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-24
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2042-11-24
AI Technical Summary
The dosing and sewage discharge control in the existing circulating cooling water system is not accurate enough, resulting in poor anti-corrosion and scale resistance, waste of chemicals and water resources, and safety hazards.
A circulating cooling water online monitoring and control system was designed. By adding branch circuits in the main circulating water pipeline, installing pressure sensors, conductivity probes and dosing metering pumps, the controller collects signals in real time, and accurately controls dosing and sewage discharge to ensure that Real-time and accuracy of water quality monitoring and chemical use.
The accuracy of scale-resistance corrosion inhibitor is improved, and the water quality loss and waste of medicines caused by excessive or hysteresis is reduced. The scale of the refrigeration unit and cooling tower is avoided, and the safety hazards of system water drainage are eliminated.
Smart Images

Figure CN116300556B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of industrial circulating cooling water monitoring and control, and in particular to an online monitoring and control system and method for circulating cooling water. Background Art
[0002] During the operation of the circulating cooling water system, water will continue to evaporate, causing the salt content of the circulating water to increase continuously, among which calcium carbonate and magnesium carbonate are the most abundant, which easily forms scale on the surface of the heat exchanger. At the same time, when the electrolytes such as dissolved gases, corrosive salts and acids contained in the water come into contact with metals, Fe2+ will be precipitated from the metal surface due to the action of the electrolytes, causing damage to the equipment and pipeline metals. In addition, pollutants in the air such as dust, debris, soluble gases and leakage of heat exchanger materials can enter the circulating water, causing the proliferation of microorganisms and accelerating the corrosion of metals.
[0003] Therefore, water quality management work such as industrial circulating cooling water anti-corrosion and scale prevention, sterilization and algae removal, sewage discharge, water quality monitoring, etc. needs to be continuously improved.
[0004] At present, most of the circulating cooling water treatment dosing is done manually or by time relays connected to dosing metering pumps, and the dosing accuracy and water quality cannot be controlled. Sewage discharge is also done manually or by time relays connected to sewage solenoid valves, and the sewage discharge accuracy cannot be controlled.
[0005] In addition, the inventors have also recognized the following current situations and problems:
[0006] 1. In the prior art, the timed dosing based on the time relay and the sewage discharge based on the conductivity control are mostly independent of each other, which may cause sewage discharge while adding the medicine.
[0007] 2. Water quality testing and testing are all done this week and submitted when water samples are collected next week, which lags behind in water quality control. Excessive sewage discharge will cause waste due to delayed water quality testing results. The amount of medicine in the cooling water system is reduced due to excessive sewage discharge, resulting in a decrease in the anti-scaling and slow-release effect of the cooling water system. The direct result is that although water treatment is done, the refrigeration unit is still scaled, the cooling tower is scaled, and excessive sewage discharge leads to waste of water resources.
[0008] 3. At present, most of the dosing metering pumps are directly welded to the cooling water pipeline. When adding medicine, the concentration of the medicine at the dosing port is high, which will cause corrosion of the welding point and even rot, perforation and leakage.
[0009] 4. Although some users control sewage discharge based on conductivity detection data, the conductivity probe is usually installed on the cooling water main pipeline. When the refrigeration unit (circulating pump, etc.) is shut down, if the water quality exceeds the standard, sewage will continue to be discharged, which will cause the system water to be drained. Summary of the invention
[0010] The present application provides an online monitoring and control system and method for circulating cooling water to solve the problems in the prior art of inaccurate dosing and sewage discharge control, resulting in unsatisfactory anti-corrosion and anti-scaling effects, waste of chemicals and water resources, and possible safety hazards.
[0011] In order to achieve the above objectives, this application provides the following technical solutions:
[0012] A circulating cooling water online monitoring and control system comprises a circulating water main pipeline, wherein the circulating water main pipeline is divided into a cooling water supply pipeline and a return water main pipeline; a discharge pipeline is provided on the return water main pipeline, and a sewage valve is provided on the discharge pipeline; compared with the prior art, the improvement is that:
[0013] A branch loop is added, one end of which is connected to the high-pressure point of the cooling water supply pipe, and the other end is connected to the low-pressure point of the return water main pipe; a pressure sensor, a conductivity probe, a sampling valve and a dosing pipeline are installed on the branch loop, and a dosing metering pump is provided on the dosing pipeline;
[0014] A controller, wherein the controller has at least two signal acquisition input terminals, which are respectively connected to the signal output terminals of the pressure sensor and the conductivity probe, and the controller has at least two groups of control signal output terminals, which are respectively connected to the control signal input terminals of the dosing metering pump and the drain valve; so that: when the pressure sensor senses that there is continuous water flow in the branch circuit, the controller starts to execute the set dosing metering pump control program; when the pressure sensor senses that the branch circuit stops flowing, the controller stops executing the set dosing metering pump control program and stops the drain valve; when the conductivity probe detects that the water quality reaches the set drain start threshold / drain stop threshold, the controller starts the drain valve / stops the drain valve; when the conductivity probe detects that the water quality reaches the set drain start threshold and the dosing metering pump control program also reaches the operating conditions of the dosing metering pump, dosing is performed first and the drain valve is started with a delay after dosing.
[0015] Optionally, the dosing pipelines have three routes, which are connected to the branch circuit in parallel, and the corresponding three dosing metering pumps are used to input the scale inhibitor, the first bactericidal algaecide and the second bactericidal algaecide into the branch circuit respectively.
[0016] Optionally, the branch circuit is provided with at least one stop valve.
[0017] Optionally, the branch circuit is divided into a first vertical section, a horizontal section and a second vertical section from top to bottom; and the dosing pipeline is connected to the horizontal section.
[0018] Optionally, the conductivity probe and the sampling valve are sequentially arranged in the second vertical section.
[0019] Optionally, a Y-type filter is also installed on the second vertical section.
[0020] Optionally, a stop valve is respectively provided on the first vertical section, the horizontal section and the second vertical section.
[0021] Optionally, the pressure sensor is located at the junction of the horizontal segment and the second vertical segment.
[0022] Optionally, the controller is configured with a human-machine interaction interface, supports data display, setting of sewage discharge start threshold / sewage discharge stop threshold, and delay setting when the sewage discharge valve is delayed after adding medicine, and is also configured with a manual control button or knob.
[0023] The control method based on the above-mentioned circulating cooling water online monitoring and control system includes:
[0024] When the pressure sensor senses that there is a continuous water flow in the branch circuit, the controller starts to execute the set dosing metering pump control program, which is: for the scale inhibitor and the first bactericidal algaecide, the evaporation amount and water replenishment amount of the circulation system are calculated according to the set cycle in accordance with the national standard, and the dosing time within the cycle time is calculated according to the pump flow of the dosing metering pump, the dosage of the agent per ton of water, and the water replenishment amount during the cycle time, and the corresponding dosing metering pump is driven; in each cycle, the dosing metering pump is started once; for the second bactericidal algaecide, the corresponding dosing metering pump is driven according to the preset delivery time and delivery amount;
[0025] When the conductivity probe detects that the water quality reaches the set sewage discharge start threshold / sewage discharge stop threshold, the controller starts the sewage discharge valve / stops the sewage discharge valve;
[0026] When the water quality detected by the conductivity probe reaches the set sewage discharge start threshold and the dosing metering pump control program also reaches the dosing metering pump operation conditions, the dosing is performed first and the sewage discharge valve is started after the dosing is delayed;
[0027] When the pressure sensor senses that the branch circuit stops flowing, the controller stops signal collection and stops executing the set dosing metering pump control program; if the current drain valve is working, the drain valve will stop working at the same time.
[0028] This application has at least the following beneficial effects:
[0029] On the basis of the existing circulating water main pipeline, the present application adds a branch loop, which is connected from the high-pressure point of the cooling water supply pipeline to the low-pressure point of the return water main pipeline; a pressure sensor, a conductivity probe, a sampling valve and a dosing pipeline are installed on the branch loop; the controller collects the signals of the pressure sensor and the conductivity probe, and controls the dosing metering pump and the drain valve respectively, so that: when the pressure sensor senses that there is a continuous water flow in the branch loop, the controller starts to execute the set dosing metering pump control program; when the pressure sensor senses that the branch loop stops flowing, the controller stops executing the set dosing metering pump control program and stops the drain valve from working; when the conductivity probe detects that the water quality reaches the set When the set sewage start threshold / sewage stop threshold is reached, the controller starts / stops the sewage valve; when the conductivity probe detects that the water quality reaches the set sewage start threshold and the dosing metering pump control program also reaches the operating conditions of the dosing metering pump, the dosing is performed first and the sewage valve is started after the delay of dosing; thus, a unified logic control system is formed, the dosing accuracy of scale inhibitors and corrosion inhibitors is improved, effective sewage is discharged according to the real-time monitored cooling water conditions, water quality out of control caused by excessive sewage discharge and delayed sewage discharge is reduced, waste of chemicals caused by excessive sewage discharge is eliminated, scaling of refrigeration units and cooling towers is avoided, and safety hazards such as system water draining are eliminated. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly explain the prior art and the present application, the drawings required for describing the prior art and the embodiments of the present application are briefly introduced below. Obviously, the drawings described below are only exemplary, and for ordinary technicians in this field, other drawings can be derived from the provided drawings without creative work.
[0031] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which this application can be implemented. Any structural modification, change in proportion or adjustment of size should still fall within the scope of the technical contents disclosed in this application without affecting the effects and purposes that can be achieved by this application.
[0032] Figure 1 A schematic diagram of an online monitoring and control system for circulating cooling water provided by one embodiment of the present application;
[0033] Figure 2 A statistical chart of circulating water test data (pH value) for an application example;
[0034] Figure 3 A statistical graph of circulating water test data (turbidity) for an application example;
[0035] Figure 4A statistical chart of circulating water test data (conductivity) for an application example;
[0036] Figure 5 A statistical chart of circulating water test data (calcium hardness) for an application example;
[0037] Figure 6 A statistical chart of circulating water test data (total alkalinity) for an application example;
[0038] Figure 7 This is a statistical chart of circulating water test data (calcium hardness + total alkalinity) for an application example.
[0039] Description of Figure Numbers:
[0040] 1. Cooling water supply pipeline; 2. Return water main pipeline; 3. Discharge pipeline; 4. Branch loop;
[0041] 5. Pressure sensor; 6. Conductivity probe; 7. Sampling valve; 8. Y-type filter; 9. Dosing metering pump; 10. Drain valve; 11. Y-type filter; 12. Circulation pump; 13. Stop valve; 14. Stop valve; 15. Stop valve. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0043] In the description of this application, unless otherwise specified, "plurality" means two or more than two. The terms "first", "second", "third", etc. in the specification and claims of this application and the above-mentioned drawings are intended to distinguish the objects referred to. For schemes with sequential processes, this terminology does not have to be understood as describing a specific order or sequence. For schemes with device structures, this terminology does not distinguish between importance, positional relationships, etc.
[0044] In addition, the terms "comprises", "has" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus that includes a series of steps or units is not necessarily limited to those steps or units that have been explicitly listed, but may also include other steps or units that are not explicitly listed but are inherent to these processes, methods, products or apparatuses, or steps or units added based on further optimization schemes conceived in the present application.
[0045] In one embodiment, Figure 1As shown, a circulating cooling water online monitoring and control system is provided, including a circulating water main pipeline, which is divided into a cooling water supply pipeline 1 and a return water main pipeline 2; a discharge pipeline 3 is opened on the return water main pipeline 2, and a sewage valve 10 and a Y-type filter 11 are arranged on the discharge pipeline 3; a branch loop 4 is added to the circulating water main pipeline, one end of the branch loop 4 is connected to the high pressure point of the cooling water supply pipeline 1 (near the water outlet of the circulating pump), and the other end is connected to the low pressure point of the return water main pipeline 2 (near the water outlet of the cooling tower); a pressure sensor 5, a conductivity probe 6, a sampling valve 7 and a dosing pipeline are installed on the branch loop 4, and a dosing metering pump 9 is arranged on the dosing pipeline.
[0046] The controller has at least two signal acquisition input terminals, which are respectively connected to the signal output terminals of the pressure sensor 5 and the conductivity probe 6. The controller has at least two groups of control signal output terminals, which are respectively connected to the control signal input terminals of the dosing metering pump 9 and the drain valve 10; so that: when the pressure sensor 5 senses that there is continuous water flow in the branch loop 4, the controller starts to execute the set dosing metering pump 9 control program; when the pressure sensor 5 senses that the branch loop 4 stops flowing, the controller stops executing the set dosing metering pump 9 control program and stops the drain valve 10; when the conductivity probe 6 detects that the water quality reaches the set drain start threshold / drain stop threshold, the controller starts the drain valve 10 to work / stops the drain valve 10; when the conductivity probe 6 detects that the water quality reaches the set drain start threshold and the dosing metering pump 9 control program also reaches the operating conditions of the dosing metering pump 9, dosing is performed first and the drain valve 10 is started with a delay after dosing.
[0047] Among them, the pressure sensor 5 is triggered by the water pressure difference of the main pipeline when the circulating pump 12 is running, and the controller is started by the signal of the pressure sensor 5 to execute the control logic of the dosing metering pump 9 and the drain valve 10. That is, when the refrigeration unit starts to run, the dosing or draining is carried out according to the program and water quality. When the refrigeration unit stops running, the dosing and draining are stopped. The dosing metering pump 9 is no longer installed in the circulating water main pipeline, but is connected to the branch loop 4. Because the water in the branch loop 4 is flowing when the refrigeration unit is running, the drug is mixed with water to reduce the concentration of the drug during dosing, so that the drug is diluted by the water flowing in the branch loop 4, avoiding corrosion and leakage of the welding points of the circulating water main pipeline due to excessive local drug concentration, thereby extending the service life of the circulating water main pipeline equipment.
[0048] The conductivity probe 6 is installed on the loop pipeline to monitor the cooling water status in real time, and discharge sewage in time according to the water quality, so as to avoid the water quality out of control caused by the lag of water quality testing and the waste of medicine and water caused by excessive sewage discharge.
[0049] The control mode of dosing priority and delayed sewage discharge can achieve timely control of cooling water and avoid waste of chemicals.
[0050] The conductivity probe 6 detects the water quality of the branch circuit 4, not the water quality of the circulating main pipeline. When the refrigeration unit is shut down, sewage discharge is stopped to avoid accidents in which the cooling water system is emptied.
[0051] There are three dosing pipelines, which are connected to the branch circuit 4 in parallel. The corresponding three dosing metering pumps 9 are used to input the scale inhibitor, the first bactericidal algaecide and the second bactericidal algaecide into the branch circuit 4 respectively.
[0052] The branch circuit 4 is divided into a first vertical section, a horizontal section and a second vertical section from top to bottom; the dosing pipeline is connected to the horizontal section, and the conductivity probe 6 and the sampling valve 7 are arranged in the second vertical section. A Y-type filter 8 is also installed on the second vertical section. The first vertical section, the horizontal section and the second vertical section are respectively provided with a stop valve 13, a stop valve 14 and a stop valve 15. The pressure sensor 5 is located at the junction of the horizontal section and the second vertical section.
[0053] The controller is equipped with a human-machine interactive interface, supporting data display, setting of sewage discharge start threshold value / sewage discharge stop threshold value, and delay setting of delayed start of sewage discharge valve 10 under working condition after adding medicine.
[0054] The controller is also equipped with automatic, manual and stop control knobs:
[0055] a. The automatic working state is linked with the refrigeration unit. When the refrigeration unit is turned on, the system starts to work; when the refrigeration unit stops working, the system stops working;
[0056] b. The program in the manual working state is the same as the program in the automatic working state, and the working state of this system needs to be manually controlled;
[0057] c. No work is performed in the stop working state.
[0058] For example, four contactors may be controlled by a programmable controller inside the controller, and the four contactors are respectively connected to three dosing metering pumps and a sewage discharge solenoid valve or electric valve for sewage discharge.
[0059] The contactor coil is powered by a 24V AC transformer controlled by a programmable controller; the contactor output is 220V AC power supply; the programmable controller power supply is provided by a 24V DC switching power supply; the conductivity device is provided with 24V DC power by the DC switching power supply; the conductivity value is provided by the conductivity device with 0-10V to input the conductivity value to the programmable controller; the pressure sensor is provided with 24V DC power by the DC switching power supply; the pressure sensor outputs a dry junction switch quantity to provide a signal to the programmable controller.
[0060] The first bactericidal algaecide is an oxidizing agent (containing chlorine), and the second bactericidal algaecide is a non-oxidizing agent. In order to improve the dosing accuracy, the scale inhibitor and the first bactericidal algaecide (oxidizing agent) are added once every hour. Referring to the national standard GB50050-2017 on the calculation method of cooling water evaporation concentration and water replenishment, the accurate hourly dosage is calculated for agent replenishment; and the second bactericidal algaecide (non-oxidizing agent) can be added regularly and quantitatively according to its specific properties (drug property attenuation characteristics, etc.) (the addition time and amount can be set in advance).
[0061] Specifically, according to the national standard GB50050-2017 Industrial Circulating Cooling Water Treatment Design Specification, the calculation of evaporation and water replenishment is carried out in units of hours (cycles). According to the metering pump flow and the dosage of the agent per ton of water, combined with the hourly water replenishment, the hourly dosing time of the scale inhibitor and the first bactericidal algaecide is calculated in seconds; the purpose of adding the second bactericidal algaecide is to use different bactericides to dosing regularly in an impact manner to kill resistant bacteria and viruses and completely kill the bacteria and viruses in the system. The dosing logic is based on the characteristics of different bactericides. It can be added one to three times a week, and the date is adjustable (Monday to Sunday). The dosing time of the day is adjustable. The number of times of dosing on the day is adjustable.
[0062] In this way, the problem of uncertain dosing amount when the startup time of the refrigeration unit is uncertain is solved. The equipment will add medicine when the unit is started, and stop adding medicine when it is shut down, avoiding excessive or insufficient dosing due to the uncertain startup time of the refrigeration unit. The advantage of hourly dosing is that it can maintain the same working state as the refrigeration unit and reduce the waste of medicine caused by extensive dosing.
[0063] Through the conductivity online monitoring probe, the conductivity data can be transmitted to the touch screen of this device in real time and the value can be displayed. The conductivity control discharge range (set threshold) can be set manually on the touch screen. When the conductivity of the cooling water reaches the maximum range of the scale and corrosion inhibitor (i.e. 3-5 times the concentration specified in GB50050-2017), the discharge begins. The stop discharge value is set according to the 3-5 times concentration of the cooling water. Conductivity control range 0-4500us / cm 2 Adjustable.
[0064] When the conductivity is set to start sewage discharge, if it is also the time for adding chemicals, the dosing will take priority, and sewage discharge will be delayed for 0-20 minutes after adding chemicals. The delay time can be set through the touch screen (the time can be adjusted according to the amount of water saturated in the system) to avoid waste of chemicals caused by adding chemicals while discharging or discharging after adding chemicals.
[0065] An application example is given below to illustrate the effect of this application.
[0066] Table 1 shows the test data generated by an IT industrial park in an electronics city applying the solution of this embodiment to perform online monitoring and control (trial operation) of circulating cooling water. The main test items in Table 1 are made into line graphs, see Figure 2-Figure 7 Among them, from Figure 4 It can be seen that after more than a month of operation, starting from July 20, the conductivity has tended to be stable (the existing technology often continues to fluctuate over a large range), indicating that the solution of this embodiment can continuously, accurately and stably treat the circulating water.
[0067] Table 1 Detection data of circulating cooling water in an IT industrial park of an electronics city
[0068]
[0069] The above is a relatively specific and detailed description of the present application through general description and specific embodiments. It should be pointed out that, without departing from the concept of the present application, it is obvious that several variations and improvements can be made to these specific embodiments, which all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A circulating cooling water online monitoring and control system, comprising a circulating water main pipeline, wherein the circulating water main pipeline is divided into a cooling water supply pipeline and a return water main pipeline; a discharge pipeline is provided on the return water main pipeline, and a drain valve is provided on the discharge pipeline; characterized in that: The circulating cooling water online monitoring and control system also includes: A branch loop, one end of which is connected to the high-pressure point of the cooling water supply pipe, and the other end is connected to the low-pressure point of the return water main pipe; a pressure sensor, a conductivity probe, a sampling valve and a dosing pipeline are installed on the branch loop, and a dosing metering pump is arranged on the dosing pipeline; the branch loop is divided into a first vertical section, a horizontal section and a second vertical section from top to bottom; the dosing pipeline is connected to the horizontal section; the conductivity probe and the sampling valve are arranged in turn in the second vertical section; a stop valve is arranged on the first vertical section, the horizontal section and the second vertical section respectively; the pressure sensor is located at the junction of the horizontal section and the second vertical section; A controller, wherein the controller has at least two signal acquisition input terminals, which are respectively connected to the signal output terminals of the pressure sensor and the conductivity probe, and the controller has at least two groups of control signal output terminals, which are respectively connected to the control signal input terminals of the dosing metering pump and the drain valve; so that: when the pressure sensor senses that there is continuous water flow in the branch circuit, the controller starts to execute the set dosing metering pump control program; when the pressure sensor senses that the branch circuit stops flowing, the controller stops executing the set dosing metering pump control program and stops the drain valve; when the conductivity probe detects that the water quality reaches the set drain start threshold / drain stop threshold, the controller starts the drain valve / stops the drain valve; when the conductivity probe detects that the water quality reaches the set drain start threshold and the dosing metering pump control program also reaches the dosing metering pump operation condition, the dosing is performed first and the drain valve is started after the dosing is delayed; the controller is configured with a human-computer interaction interface, supports data display, the setting of the drain start threshold / drain stop threshold, and the delay setting when the drain valve is started after the dosing is delayed, and is also configured with a manual control button or knob.
2. The circulating cooling water online monitoring and control system according to claim 1 is characterized in that: There are three dosing pipelines in total, which are connected to the branch circuit in parallel. The corresponding three dosing metering pumps are used to input the scale inhibitor, the first bactericidal algaecide and the second bactericidal algaecide into the branch circuit respectively.
3. The circulating cooling water online monitoring and control system according to claim 1 is characterized in that: A Y-type filter is also installed on the second vertical section.
4. A control method based on the online monitoring and control system for circulating cooling water according to claim 2, comprising: When the pressure sensor senses that there is a continuous water flow in the branch circuit, the controller starts to execute the set dosing metering pump control program, which is: for the scale inhibitor and the first bactericidal algaecide, the evaporation amount and water replenishment amount of the circulation system are calculated according to the set cycle in accordance with the national standard, and the dosing time within the cycle time is calculated according to the pump flow of the dosing metering pump, the dosage of the agent per ton of water, and the water replenishment amount during the cycle time, and the corresponding dosing metering pump is driven; in each cycle, the dosing metering pump is started once; for the second bactericidal algaecide, the corresponding dosing metering pump is driven according to the preset delivery time and delivery amount; When the conductivity probe detects that the water quality reaches the set sewage discharge start threshold / sewage discharge stop threshold, the controller starts the sewage discharge valve / stops the sewage discharge valve; When the water quality detected by the conductivity probe reaches the set sewage discharge start threshold and the dosing metering pump control program also reaches the dosing metering pump operation conditions, the dosing is performed first and the sewage discharge valve is started after the dosing is delayed; When the pressure sensor senses that the branch circuit stops flowing, the controller stops signal collection and stops executing the set dosing metering pump control program; if the current drain valve is working, the drain valve will stop working at the same time.
Citation Information
Patent Citations
Control method and system for open type cooling water chemical-adding device
CN108829146A
Automatic dosing system for water treatment
CN114349184A
Novel intelligent water treatment monitoring apparatus
CN202720514U
Water treatment regulation system for seawater circulating cooling system
CN204281425U
Automatic dosing and blowdown device suitable for circulating cooling water system
CN208829301U