A data transmission monitoring system and method based on big data

By designing a data transmission monitoring system based on big data, real-time monitoring and control of the traffic flow in the target area is achieved, the problems of human resources waste and safety accidents in the existing technology are solved, and the safety and comfortable environment of the target area are ensured.

CN116471340BActive Publication Date: 2024-12-06CHENGDU RONGTONG MICRO CHAIN TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310440994.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-23
Publication Date
2024-12-06
Estimated Expiration
2043-04-23

AI Technical Summary

Technical Problem

In the prior art, the target area fails to reasonably monitor target data, resulting in waste of human resources and safety accidents, and a big data monitoring system and method are needed to realize real-time data monitoring and control.

Method used

A data transmission monitoring system based on big data is designed, including data acquisition module, data processing module, data monitoring module, data feedback module and data control module, through identity identification, data reception and processing, database storage, prediction and alarm control , monitor and control the flow of people in the target area in real time, prevent alarms when the flow of people exceeds the threshold and conduct reasonable control.

Benefits of technology

It effectively reduces the number of security personnel, saves human resources, provides a variety of real-time flow monitoring and control, and ensures the safety and comfortable environment of the target area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0004193941700000041
    Figure BDA0004193941700000041
  • Figure BDA0004193941700000042
    Figure BDA0004193941700000042
  • Figure BDA0004193941700000051
    Figure BDA0004193941700000051
Patent Text Reader

Abstract

The present invention discloses a data transmission monitoring system and method based on big data, and relates to the data monitoring technical field of big data. The system includes a data acquisition module, a data processing module, a data monitoring module, a data feedback module, and a data control module; the output end of the data acquisition module is connected to the input end of the data processing module; the output end of the data processing module is connected to the input end of the data monitoring module; the output end of the data monitoring module is connected to the input end of the data feedback module; the output end of the data feedback module is connected to the input end of the data control module; the present invention also provides a method for implementing the system, and the present invention can effectively improve the situation of excessive flow of people in the target area and meet the needs of protecting people's lives and property.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of target area data monitoring security technology, and in particular to a data transmission monitoring system and method based on big data. Background Art

[0002] Data monitoring of big data refers to collecting data through scientific experiments, physical information, etc., professionally processing meaningful data to obtain new data, and realizing data appreciation and creating more value by organizing, analyzing and utilizing new data.

[0003] In modern life, with the vigorous development of science and technology, big data is no longer an abstract term, and big data is everywhere in our lives. In the existing technology, big data monitoring can provide us with a more convenient and safe social environment, but there are many target areas that do not reasonably monitor target data, resulting in waste of human resources and the occurrence of safety accidents. In order to be able to safely and effectively monitor the target area in real time, people urgently need a big data monitoring system and method to solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to provide a data transmission monitoring system and method based on big data to solve the problems raised in the above background technology.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a data transmission monitoring system based on big data, the system comprises a data acquisition module, a data processing module, a data monitoring module, a data feedback module, and a data control module;

[0006] The data acquisition module is used to collect the flow of people in the target area; the data processing module is used to process the data collected by the data acquisition module; the data monitoring module is used to monitor the flow of people entering and leaving the target area per unit time; the data feedback module is used to feedback the flow of people inside the target area and alarm when the flow of people exceeds the threshold; the data control module is used to reasonably control the flow of people entering the target area according to the results of data acquisition and monitoring;

[0007] The output end of the data acquisition module is connected to the input end of the data processing module; the output end of the data processing module is connected to the input end of the data monitoring module; the output end of the data monitoring module is connected to the input end of the data feedback module; the output end of the data feedback module is connected to the input end of the data control module.

[0008] The data acquisition module includes an identity recognition unit;

[0009] The identity recognition unit is used to recognize the identity of people entering and leaving the target area.

[0010] The data processing module includes a data receiving unit and a data processing unit;

[0011] The data receiving unit is used to receive data from the data acquisition module; the data processing unit is used to further organize and process the data received by the data receiving unit;

[0012] The output end of the data receiving unit is connected to the input end of the data processing unit; the output end of the data processing unit is connected to the input end of the data monitoring module.

[0013] The data monitoring module includes a database and a data prediction unit;

[0014] The database is used to store data related to the flow of people entering and leaving the target area; the data prediction unit is used to predict the flow of people entering and leaving the target area within a unit time;

[0015] The output end of the database is connected to the input end of the data prediction unit.

[0016] The data feedback module and the data control module respectively include a recording alarm unit and a receiving control unit;

[0017] The recording and alarming unit is used to record the monitored flow of people and to give an alarm when the flow of people in the target area exceeds a threshold; the receiving and controlling unit is used to receive data transmitted by the data feedback module and to control the flow of people entering the target area.

[0018] A data transmission monitoring method based on big data, characterized in that the method comprises the following steps:

[0019] S1. Calculate the maximum flow of people that the target area can accommodate according to the area of ​​the target area, and feed back the maximum flow of people that the target area can accommodate to the target area manager. When the target area monitors that the difference between the current flow of people and the maximum flow of people is less than a threshold, an alarm is triggered, and the time node of each receipt of the warning information is set as the target time node;

[0020] S2. In the historical time period from the opening time of the target area to the target time node, a unit cycle is set, and the flow rate of personnel in the unit cycle is calculated according to the flow of personnel in and out of the target area per unit cycle;

[0021] S3. Calculate the average flow rate of personnel in each historical time period according to the flow rate of personnel in the unit period;

[0022] S4, according to the average flow rate of personnel in each historical time period in step S3, calculate the average flow rate of personnel entering and leaving the target area, and obtain the historical fitting curve equation;

[0023] S5. Calculate the current average flow rate of personnel entering and leaving the target area according to the flow rate of personnel per unit period in the current target area, and obtain the current fitting curve equation;

[0024] S6. Compare the slope of the historical fitting curve equation in step S5 with the slope of the current fitting curve equation in step S6. If the ratio of the slope of the current fitting curve equation to the slope of the historical fitting curve equation is greater than a threshold value B, the alarm system is activated to control the flow of people entering the target area.

[0025] In step S1, the maximum flow of people that the target area can accommodate and the alarm steps are as follows:

[0026] S7-1. Calculate the maximum flow of people that the target area can accommodate, according to the formula:

[0027]

[0028] Among them, D is the maximum flow of people that the target area can accommodate; S is the activity area of ​​the target area; H is the average floor space occupied by an adult;

[0029] S7-2. Set the system threshold A. When the difference between the current human flow and the maximum human flow monitored in the target area is less than the threshold, an alarm is triggered, and the time point of each receipt of the warning information is recorded as the target time node.

[0030] In step S2, the personnel flow speed per unit cycle is calculated according to the formula:

[0031]

[0032] Among them, K i is the personnel flow rate per unit cycle, R 进 is the flow of people entering the target area per unit period, R 出 is the flow of people leaving the target area per unit period;

[0033] In step S3, according to the personnel flow speed of the unit period, the average personnel flow speed of each historical time period is calculated according to the formula:

[0034]

[0035] Among them, S i K is the average flow rate of personnel in each historical time period. iis the personnel flow rate per unit period, i is the number of unit periods selected in each historical time period;

[0036] In step S4, the average flow rate of people entering and leaving the target area is calculated based on the average flow rate of people in each historical time period, according to the formula:

[0037]

[0038] Among them, K 平1 is the average flow rate of people entering and leaving the target area, S i is the average flow rate of personnel in each historical time period retrieved, and n is the number of historical time periods selected;

[0039] According to the average flow rate of people entering and leaving the target area, the historical fitting curve equation is obtained, according to the formula:

[0040] y1=K 平1 X+C

[0041] Among them, y1 is the total amount of people flow in the target area after the prediction, and C is the amount of people flow into the target area from the time the target area is opened to before the prediction.

[0042] In step S5, the steps of obtaining a new fitting curve equation are as follows:

[0043] S9-1. Calculate the personnel flow rate of the current unit cycle according to the formula:

[0044]

[0045] Among them, K p is the personnel flow rate of the current unit cycle, R 进1 is the flow of people entering the target area per unit period, R 出1 is the flow of people leaving the target area per unit period;

[0046] S9-2. Calculate the average flow rate of personnel in and out of the target area based on the personnel flow rate of the current unit cycle, according to the formula:

[0047]

[0048] Among them, K 平2 is the average flow rate of people entering and leaving the target area, K p is the personnel flow rate of the current unit cycle, and p is the current unit time;

[0049] S9-3. According to the current average flow rate of people entering and leaving the target area, the current fitting curve equation is obtained according to the formula:

[0050] y2=K 平2 X+C

[0051] Among them, y2 is the total number of people in the current target area after prediction, K 平2 is the current average flow rate of people entering and leaving the target area, and C is the flow of people entering the target area before the target area is opened to the prediction.

[0052] In step S6, the slope of the historical fitting curve equation is compared with the slope of the current fitting curve equation. If the ratio of the slope of the current fitting curve equation to the slope of the historical fitting curve equation is greater than threshold B, the alarm system is activated to control the flow of people entering the target area.

[0053] Compared with the prior art, the present invention has the following beneficial effects:

[0054] 1. The present invention can reduce the number of security personnel in the target area, conduct effective control at the entrance, save human resources, and is more in line with the actual situation;

[0055] 2. The present invention can integrate big data with data monitoring, monitor the total real-time flow of people in the target area from multiple aspects, and provide a basis for controlling the flow and speed of people;

[0056] 3. The present invention can record the flow of people leaving the target area from the exit of the target area, so as to more accurately obtain the total real-time flow of people inside the target area, avoiding the situation where people keep entering without considering leaving. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0058] Figure 1 It is a structural schematic diagram of a data transmission monitoring system based on big data of the present invention;

[0059] Figure 2 It is a schematic diagram of the steps of a data transmission monitoring method based on big data of the present invention. DETAILED DESCRIPTION

[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] See also Figure 1-Figure 2 ,The present invention provides a technical solution: a data transmission monitoring system based on big data, the system includes a data acquisition module, a data processing module, a data monitoring module, a data feedback module, and a data control module;

[0062] The data acquisition module is used to collect the flow of people in the target area; the data processing module is used to process the data collected by the data acquisition module; the data monitoring module is used to monitor the flow of people entering and leaving the target area per unit time; the data feedback module is used to feedback the flow of people inside the target area and alarm when the flow of people exceeds the threshold; the data control module is used to reasonably control the flow of people entering the target area according to the results of data acquisition and monitoring;

[0063] The output end of the data acquisition module is connected to the input end of the data processing module; the output end of the data processing module is connected to the input end of the data monitoring module; the output end of the data monitoring module is connected to the input end of the data feedback module; the output end of the data feedback module is connected to the input end of the data control module.

[0064] The data acquisition module includes an identity recognition unit;

[0065] The identity recognition unit is used to recognize the identity of people entering and leaving the target area.

[0066] The data processing module includes a data receiving unit and a data processing unit;

[0067] The data receiving unit is used to receive data from the data acquisition module; the data processing unit is used to further organize and process the data received by the data receiving unit;

[0068] The output end of the data receiving unit is connected to the input end of the data processing unit; the output end of the data processing unit is connected to the input end of the data monitoring module.

[0069] The data monitoring module includes a database and a data prediction unit;

[0070] The database is used to store data related to the flow of people entering and leaving the target area; the data prediction unit is used to predict the flow of people entering and leaving the target area within a unit time;

[0071] The output end of the database is connected to the input end of the data prediction unit.

[0072] The data feedback module and the data control module respectively include a recording alarm unit and a receiving control unit;

[0073] The recording and alarming unit is used to record the monitored flow of people and to give an alarm when the flow of people in the target area exceeds a threshold; the receiving and controlling unit is used to receive data transmitted by the data feedback module and to control the flow of people entering the target area.

[0074] A data transmission monitoring method based on big data, characterized in that the method comprises the following steps:

[0075] S1. Calculate the maximum flow of people that the target area can accommodate according to the area of ​​the target area, and feed back the maximum flow of people that the target area can accommodate to the target area manager. When the target area monitors that the difference between the current flow of people and the maximum flow of people is less than a threshold, an alarm is triggered, and the time node of each receipt of the warning information is set as the target time node;

[0076] S2. In the historical time period from the opening time of the target area to the target time node, a unit cycle is set, and the flow rate of personnel in the unit cycle is calculated according to the flow of personnel in and out of the target area per unit cycle;

[0077] S3. Calculate the average flow rate of personnel in each historical time period according to the flow rate of personnel in the unit period;

[0078] S4, according to the average flow rate of personnel in each historical time period in step S3, calculate the average flow rate of personnel entering and leaving the target area, and obtain the historical fitting curve equation;

[0079] S5. Calculate the current average flow rate of personnel entering and leaving the target area according to the flow rate of personnel per unit period in the current target area, and obtain the current fitting curve equation;

[0080] S6. Compare the slope of the historical fitting curve equation in step S5 with the slope of the current fitting curve equation in step S6. If the ratio of the slope of the current fitting curve equation to the slope of the historical fitting curve equation is greater than a threshold value B, the alarm system is activated to control the flow of people entering the target area.

[0081] In step S1, the maximum flow of people that the target area can accommodate and the alarm steps are as follows:

[0082] S7-1. Calculate the maximum flow of people that the target area can accommodate, according to the formula:

[0083]

[0084] Among them, D is the maximum flow of people that the target area can accommodate; S is the activity area of ​​the target area; H is the average floor space occupied by an adult;

[0085] S7-2. Set a system threshold A. When the difference between the current human flow and the maximum human flow monitored in the target area is less than the threshold, an alarm is triggered, and each time point of receiving the warning information is recorded as the target time node.

[0086] In step S2, the personnel flow speed per unit cycle is calculated according to the formula:

[0087]

[0088] Among them, K i is the personnel flow rate per unit cycle, R 进 is the flow of people entering the target area per unit period, R 出 is the flow of people leaving the target area per unit period;

[0089] In step S3, according to the personnel flow speed of the unit period, the average personnel flow speed of each historical time period is calculated according to the formula:

[0090]

[0091] Among them, S i K is the average flow rate of personnel in each historical time period. i is the personnel flow rate per unit period, i is the number of unit periods selected in each historical time period;

[0092] In step S4, the average flow rate of people entering and leaving the target area is calculated based on the average flow rate of people in each historical time period, according to the formula:

[0093]

[0094] Among them, K 平1 is the average flow rate of people entering and leaving the target area, S i is the average flow rate of personnel in each historical time period retrieved, and n is the number of historical time periods selected;

[0095] According to the average flow rate of people entering and leaving the target area, the historical fitting curve equation is obtained, according to the formula:

[0096] y1=K 平1 X+C

[0097] Among them, y1 is the total amount of people flow in the target area after the prediction, and C is the amount of people flow into the target area from the time the target area is opened to before the prediction.

[0098] In step S5, the steps of obtaining a new fitting curve equation are as follows:

[0099] S9-1. Calculate the personnel flow rate of the current unit cycle according to the formula:

[0100]

[0101] Among them, K p is the personnel flow rate of the current unit cycle, R 进1 is the flow of people entering the target area per unit period, R 出1 is the flow of people leaving the target area per unit period;

[0102] S9-2. Calculate the average flow rate of personnel in and out of the target area based on the personnel flow rate of the current unit cycle, according to the formula:

[0103]

[0104] Among them, K 平2 is the average flow rate of people entering and leaving the target area, K p is the personnel flow rate of the current unit cycle, and p is the current unit time;

[0105] S9-3. According to the current average flow rate of people entering and leaving the target area, the current fitting curve equation is obtained according to the formula:

[0106] y2=K 平2 X+C

[0107] Among them, y2 is the total number of people in the current target area after prediction, K 平2 is the current average flow rate of people entering and leaving the target area, and C is the flow of people entering the target area before the target area is opened to the prediction.

[0108] In step S6, the slope of the historical fitting curve equation is compared with the slope of the current fitting curve equation. If the ratio of the slope of the current fitting curve equation to the slope of the historical fitting curve equation is greater than threshold B, the alarm system is activated to control the flow of people entering the target area.

[0109] In this embodiment:

[0110] Taking the scenic area as the target area, the data collection module uses identity recognition technology to count the flow of people at different entrances of the scenic area and the flow of people leaving the scenic area at different exits in the same unit period at the entrance and exit of the scenic area, so as to obtain the current flow of people inside the scenic area at that time;

[0111] In this example, the maximum upper limit of the number of tourists that the scenic spot can accommodate is based on the formula:

[0112]

[0113] Different unit cycles are intercepted in the historical time period from the initial opening time of the scenic spot to the issuance of the warning. The three unit cycles of 8:30-9:00; 9:30-10:00; 10:30:11:00 are intercepted. The flow rate of people in the intercepted unit cycle is calculated, and the flow of people in and out of the scenic spot in the three unit cycles is recorded as follows:

[0114] Data 1: Entrance (381, 217, 248); Exit (183, 233, 125);

[0115] Data 2: Entrance (290, 320, 332); Exit (321, 121, 172);

[0116] Data 3: Entry (342, 295, 275); Exit (212, 287, 153);

[0117] According to the formula:

[0118]

[0119] The calculated flow rates of people entering and leaving the scenic area in the three unit cycles are K1≈1.56, K2≈1.53, and K3≈1.40;

[0120] According to the flow rate of people entering and leaving the scenic area in the above three unit cycles, the average flow rate of people in the first group of historical data is calculated according to the formula:

[0121]

[0122] The average flow rate of personnel in the first set of historical data is calculated to be S1≈1.50

[0123] Repeat the above steps to select another two groups of historical data and calculate the average personnel turnover speed of the second and third groups of historical data, which are recorded as S1 and S2. The calculation results are S2 = 2.10 and S3 = 1.80;

[0124] Based on the above data, the average flow rate of people entering and leaving the scenic area is calculated according to the formula:

[0125]

[0126] Get the average flow rate K of people entering and leaving the scenic area 平1 =1.8, and the historical fitting curve equation is obtained.

[0127] y1=K 平1 X+C

[0128] According to step S5, the current fitting curve equation is calculated, where the personnel flow speed of the current unit cycle is K p1 =2.28, Kp2 =2.45, K p3 =2.52; According to the personnel flow speed of the current unit cycle, the current flow speed of people entering and leaving the target area K is obtained 平2 =1.75, where K 平2 is the slope of the current fitting curve equation;

[0129] The slope K of the current fitting curve equation 平2 =1.75, and the slope K of the historical fitting curve equation 平1 =1.8 is At this time, the ratio of the slope of the current fitting curve to the slope of the historical fitting curve is greater than the system threshold B=90%, the alarm system starts the alarm, and the data control module starts working, feeding back the number of existing tourists in the scenic area to the scenic area management personnel, controlling the flow of people entering the scenic area, and providing tourists with a comfortable and safe travel environment.

[0130] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0131] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A data transmission monitoring method based on big data, Features: The method comprises the following steps: S1. Calculate the maximum flow of people that the target area can accommodate according to the area of ​​the target area, and feed back the maximum flow of people that the target area can accommodate to the target area manager. When the target area monitors that the difference between the current flow of people and the maximum flow of people is less than a threshold, an alarm is triggered, and the time node of each receipt of the warning information is set as the target time node; S2. In the historical time period from the opening time of the target area to the target time node, a unit cycle is set, and the flow rate of personnel in the unit cycle is calculated according to the flow of personnel in and out of the target area per unit cycle; S3. Calculate the average flow rate of personnel in each historical time period according to the flow rate of personnel in the unit period; S4, according to the average flow rate of personnel in each historical time period in step S3, calculate the average flow rate of personnel entering and leaving the target area, and obtain the historical fitting curve equation; S5. Calculate the current average flow rate of personnel entering and leaving the target area according to the flow rate of personnel per unit period in the current target area, and obtain the current fitting curve equation; S6, comparing the slope of the historical fitting curve equation in step S5 with the slope of the current fitting curve equation in step S6, if the ratio of the slope of the current fitting curve equation to the slope of the historical fitting curve equation is greater than a threshold value B, the alarm system is activated to control the flow of people entering the target area; In step S1, the maximum flow of people that the target area can accommodate and the alarm steps are as follows: S7-1. Calculate the maximum flow of people that the target area can accommodate, according to the formula: Among them, D is the maximum flow of people that the target area can accommodate; S is the activity area of ​​the target area; H is the average floor space occupied by an adult; S7-2, set the system threshold A, when the target area detects that the difference between the current flow of people and the maximum flow of people is less than the threshold, an alarm is triggered, and the time point of each receipt of the warning information is recorded as the target time node; In step S2, the personnel flow speed per unit cycle is calculated according to the formula: Among them, K i is the personnel flow rate per unit cycle, R 进 is the flow of people entering the target area per unit period, R 出 is the flow of people leaving the target area per unit period; In step S3, according to the personnel flow speed of the unit period, the average personnel flow speed of each historical time period is calculated according to the formula: Among them, S i K is the average flow rate of personnel in each historical time period. i is the personnel flow rate per unit period, i is the number of unit periods selected in each historical time period; In step S4, the average flow rate of people entering and leaving the target area is calculated based on the average flow rate of people in each historical time period, according to the formula: Among them, K 平1 is the average flow rate of people entering and leaving the target area, S i is the average flow rate of personnel in each historical time period retrieved, and n is the number of historical time periods selected; According to the average flow rate of people entering and leaving the target area, the historical fitting curve equation is obtained, according to the formula: y 1 =K 平1 x+C; Among them, y 1 is the total flow of people in the target area after the prediction, and C is the flow of people entering the target area before the target area is opened to the prediction.

2. According to the data transmission monitoring method based on big data in claim 1, Features: In step S5, the steps of obtaining a new fitting curve equation are as follows: S9-1. Calculate the personnel flow rate of the current unit cycle according to the formula: Among them, K p is the personnel flow rate of the current unit cycle, R 进1 is the flow of people entering the target area per unit period, R 出1 is the flow of people leaving the target area per unit period; S9-2. Calculate the average flow rate of personnel in and out of the target area based on the personnel flow rate of the current unit cycle, according to the formula: Among them, K 平2 is the average flow rate of people entering and leaving the target area, K p is the personnel flow rate of the current unit cycle, and p is the current unit time; S9-3. According to the current average flow rate of people entering and leaving the target area, the current fitting curve equation is obtained according to the formula: y 2 =K 平2 x+C; Among them, y 2 is the total number of people in the current target area after prediction, K 平2 is the current average flow rate of people entering and leaving the target area, and C is the flow of people entering the target area before the target area is opened to the prediction; In step S6, the slope of the historical fitting curve is compared with the slope of the current fitting curve. If the ratio of the slope of the current fitting curve equation to the slope of the historical fitting curve equation is greater than threshold B, the alarm system is activated to control the flow of people entering the target area.

3. A data transmission monitoring system based on big data, the system being used to execute the method of any one of claims 1-2, Features: Data acquisition module, data processing module, data monitoring module, data feedback module, data control module; The data acquisition module is used to collect the flow of people in the target area; the data processing module is used to process the data collected by the data acquisition module; the data monitoring module is used to monitor the flow of people entering and leaving the target area within a unit time; The data feedback module is used to feedback the flow of people in the target area and to alarm when the flow of people exceeds a threshold; the data control module is used to reasonably control the flow of people entering the target area according to the results of data collection and monitoring; The output end of the data acquisition module is connected to the input end of the data processing module; the output end of the data processing module is connected to the input end of the data monitoring module; the output end of the data monitoring module is connected to the input end of the data feedback module; the output end of the data feedback module is connected to the input end of the data control module.

4. A data transmission monitoring system based on big data according to claim 3, Features: The data acquisition module includes an identity recognition unit; The identity recognition unit is used to recognize the identity of people entering and leaving the target area.

5. A data transmission monitoring system based on big data according to claim 3, Features: The data processing module includes a data receiving unit and a data processing unit; The data receiving unit is used to receive data from the data acquisition module; the data processing unit is used to further organize and process the data received by the data receiving unit; The output end of the data receiving unit is connected to the input end of the data processing unit; the output end of the data processing unit is connected to the input end of the data monitoring module.

6. A data transmission monitoring system based on big data according to claim 3, Features: The data monitoring module includes a database and a data prediction unit; The database is used to store data related to the flow of people entering and leaving the target area; the data prediction unit is used to predict the flow of people entering and leaving the target area within a unit time; The output end of the database is connected to the input end of the data prediction unit.

7. A data transmission monitoring system based on big data according to claim 3, Features: The data feedback module and the data control module respectively include a recording alarm unit and a receiving control unit; The recording and alarming unit is used to record the monitored flow of people and to give an alarm when the flow of people in the target area exceeds a threshold; the receiving and controlling unit is used to receive data transmitted by the data feedback module and to control the flow of people entering the target area.