Offshore towing system and offshore towing method for floating wind turbine foundation
By designing the offshore towing system of the main tugboat and the secondary tugboat based on the floating fan, and using Y-shaped cable to connect the floating fan foundation, wet tow needs in different draft states are solved, wet tow efficiency and safety are improved, and Reduces installation difficulty.
Patent Information
- Application Number
- CN202310873284.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-17
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2043-07-17
AI Technical Summary
The prior art is difficult to meet the wet drag demand of floating fan bases under different draft states, resulting in low wet drag efficiency and safety.
A marine towing system including the main tugboat, the main tow, the secondary tow and the secondary tow are designed. The columns or slobbers of the main tugboat and the floating fan foundation are connected through Y-shaped cables, and whether to be equipped according to the draft state is selected. The secondary tugboat is to ensure wet tow speed and safety.
It improves the efficiency and safety of the wet-drag process, ensures the stability and positioning accuracy of the floating fan foundation under different draft conditions, and reduces the installation difficulty.
Smart Images

Figure CN116834898B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of offshore wind power installation, and in particular relates to an offshore towing system and an offshore towing method for a floating wind turbine foundation. Background Art
[0002] Clean energy has received extensive attention. Among them, wind energy is one of the important clean energy sources. Compared with land wind energy, offshore wind resources are more abundant, and the sea area is vast, not limited by land resources, and has great development potential.
[0003] At present, wind turbines are mainly floated on the sea surface through floating wind turbine foundations to generate electricity using offshore wind energy. After the floating wind turbine foundation is built by the land manufacturer, it must first be transported to the designated wharf to complete the assembly of the wind turbine and the floating wind turbine foundation, and then the floating wind turbine foundation with the wind turbine is transported to the designated sea area for mooring and positioning; since dry towing requires the use of a crane to complete the disassembly and assembly of the floating wind turbine foundation on the transport barge, the overall transportation cost is relatively high. Based on cost considerations, the floating wind turbine foundation can be transported by wet towing. However, due to the influence of the wind turbine, there is a large difference in the load on the floating wind turbine foundation before and after the installation of the wind turbine, resulting in a large difference in the wet towing requirements. Therefore, how to reasonably design the offshore towing system and towing method of the floating wind turbine foundation to meet the wet towing requirements of the floating wind turbine foundation under different draft conditions is a technical problem that needs to be solved urgently by technical personnel in this field. Summary of the invention
[0004] In view of the above shortcomings of the prior art, an object of the present invention is to provide an offshore towing system and offshore towing method for a floating wind turbine foundation, which can meet the wet towing requirements of the floating wind turbine foundation under different draft conditions, so as to improve the wet towing efficiency and wet towing safety of the entire wet towing process.
[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides an offshore towing system for a floating wind turbine foundation, wherein the floating wind turbine foundation comprises three columns distributed in an equilateral triangle, a heave plate located at the bottom of each column, and a herringbone deck for connecting the tops of the three columns, wherein the herringbone deck is used to install the wind turbine; the offshore towing system comprises a main tugboat, a main tow cable, an auxiliary tugboat and an auxiliary tow cable; the main tow cable is a Y-shaped cable, which is used to connect the main tugboat and a heave plate in the floating wind turbine foundation or to connect the main tugboat and two columns in the floating wind turbine foundation ; When the main towline is used to connect the main tugboat and two columns in the floating wind turbine foundation, the auxiliary towline connects the remaining columns in the floating wind turbine foundation with the auxiliary tugboat; when the main towline is used to connect the main tugboat and the heave plate in the floating wind turbine foundation, the auxiliary tugboat is in an idle state; the present application ensures the wet towing speed of the floating wind turbine foundation by towing the floating wind turbine foundation by the main tugboat, and at the same time, according to the state of the floating wind turbine foundation, chooses whether to equip an auxiliary tugboat to ensure the wet towing safety of the floating wind turbine foundation and improves the wet towing efficiency and wet towing safety of the entire wet towing process.
[0006] The offshore towing system also includes an auxiliary tugboat, a main installation ship and an auxiliary installation ship; the auxiliary tugboat, the auxiliary tugboat, the main installation ship and the auxiliary installation ship cooperate to tow the floating wind turbine foundation located in the installation area to the designated installation position; the main installation ship and the auxiliary installation ship cooperate to position the floating wind turbine foundation to the designated installation position.
[0007] Preferably, when the main installation vessel and the auxiliary installation vessel cooperate to position the floating wind turbine foundation, the main installation vessel is connected to two columns in the floating wind turbine foundation through four main mooring cables, and the auxiliary installation vessel is connected to the remaining columns in the floating wind turbine foundation through two auxiliary mooring cables; wherein the two main mooring cables are cross-arranged to form a cross cable, and the other two main mooring cables are respectively arranged on both sides of the cross cable for connecting the main installation vessel and the columns on the corresponding side.
[0008] Preferably, there is one auxiliary tugboat, and the auxiliary towing cable is a Y-type cable. Since the auxiliary tugboat is connected to two towing points on the corresponding columns through the Y-type cable, a stable triangular relationship is formed to ensure the wet towing stability of the floating wind turbine foundation in a deep draft state.
[0009] Preferably, there are two auxiliary tugboats, and each auxiliary tugboat is connected to the remaining columns of the floating wind turbine foundation through a linear auxiliary tow cable, so as to ensure wet towing stability and improve the steering ability of the floating wind turbine foundation during wet towing.
[0010] Preferably, the Y-shaped cable includes a main cable and two split cables; the two split cables are of equal length, and one end of the main cable is simultaneously connected to one end of the two split cables through an adapter plate, ensuring that the three distal ends of the Y-shaped cable form an isosceles triangle, so as to facilitate the control of the travel route of the floating wind turbine foundation and avoid its deviation during wet dragging.
[0011] The present invention also provides a method for offshore towing a floating wind turbine foundation, using the above-mentioned offshore towing system to tow the floating wind turbine foundation; the offshore towing method includes the following working modes:
[0012] Shallow draft wet towing mode: the main tugboat is connected to a heave plate in the floating wind turbine foundation through the main towing cable to tow the floating wind turbine foundation without wind turbine installed from the sea area near the manufacturer to the designated wharf sea area;
[0013] Deep draft wet towing mode: The main tugboat is connected to two columns in the floating wind turbine foundation through the main towline at the same time, and the auxiliary tugboat is connected to the remaining columns in the floating wind turbine foundation through the auxiliary towline, so as to tow the floating wind turbine foundation with the wind turbine installed from the designated wharf waters to the offshore installation area.
[0014] Preferably, the offshore towing method also includes an offshore installation positioning mode, and its specific steps are: positioning the main installation ship and the auxiliary installation ship in the sea area near the designated installation position, requiring the installation ship and the floating wind turbine foundation to be located on both sides of the designated installation position respectively; connecting the auxiliary installation ship with the column connected to the auxiliary tugboat through an auxiliary mooring cable, connecting the main installation ship with the column closest to the remaining two columns through a main mooring cable, and at the same time, arranging an auxiliary tugboat for connecting to the last column; separating the floating wind turbine foundation from the main tugboat; and adjusting the main tugboat to connect the floating wind turbine foundation to the main tugboat. The length of the main mooring cable and the auxiliary mooring cable is adjusted, and the auxiliary tugboat and the auxiliary tugboat are used to adjust the direction to drag the floating wind turbine foundation to the designated installation position; the main installation ship is connected to the column connected to the auxiliary tugboat through a main mooring cable, and two cross-set main mooring cables are added between the main installation ship and the two columns connected to the main installation ship, and then an auxiliary mooring cable is added between the auxiliary installation ship and the column connected to the auxiliary installation ship, and all tugboats are removed, and the floating wind turbine foundation is positioned at the designated installation position by the cooperation of the main installation ship and the auxiliary installation ship.
[0015] Preferably, before dragging the floating wind turbine foundation to the designated installation location, a temporary cable is first set between the main installation ship and the auxiliary installation ship to achieve relative fixation of the main installation ship and the auxiliary installation ship, thereby reducing the interference of the external environment on the dragging of the floating wind turbine foundation to the designated installation location.
[0016] Preferably, in the deep draft wet towing mode, the wind turbine is arranged above the column connected to the auxiliary tugboat or at the center of the herringbone deck to improve the stability of the floating wind turbine foundation in the deep draft wet towing mode.
[0017] As described above, the offshore towing system and towing method of a floating wind turbine foundation of the present invention have the following beneficial effects:
[0018] The offshore towing system and offshore towing method of the present invention have good stability in a shallow draft state because the floating wind turbine foundation is subjected to a small load. It only needs to connect the main tugboat and a heave plate in the floating wind turbine foundation through a Y-shaped main towing cable, so that the towing force provided by the main tugboat and the forward direction of the floating wind turbine foundation can be basically maintained in the same straight line, while ensuring the safety of wet towing and improving the wet towing speed; in a deep draft state, since the wind turbine is located on the floating wind turbine foundation, the floating wind turbine will be subjected to a large load and have low stability. The present application uses a Y-shaped main towing cable to connect the main tugboat and two columns in the floating wind turbine foundation to provide towing power and main towing direction for the floating wind turbine foundation, and at the same time connect the auxiliary tugboat and the remaining The remaining column is connected to control the deviation and overturning of the entire floating wind turbine foundation to ensure wet towing stability under deep draft; in the offshore installation and positioning mode, the length of the mooring cable is adjusted by the cable retracting device on the installation vessel, and the position of the floating wind turbine foundation is adjusted in cooperation with the auxiliary tugboat and the auxiliary tugboat, so that the floating wind turbine foundation is dragged to the designated installation position, thereby reducing the difficulty of installation and positioning of the floating wind turbine foundation and improving the installation and positioning efficiency of the floating wind turbine foundation; the present invention selects whether to be equipped with an auxiliary tugboat for auxiliary towing according to the state of the floating wind turbine foundation, thereby improving the efficiency and safety of the entire wet towing process, and utilizing the installation vessel to assist in dragging the floating wind turbine foundation into place, thereby reducing the difficulty of positioning the floating wind turbine foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a top view of the connection between the floating wind turbine foundation and the tugboat in shallow draft wet towing mode.
[0020] Figure 2 This is a top view of the connection between the floating wind turbine foundation and the tugboat in the deep draft wet towing mode in the first embodiment.
[0021] Figure 3 It is a top view of the connection between the floating wind turbine foundation and the tugboat in the deep draft wet towing mode in the second embodiment.
[0022] Figure 4 It is a schematic diagram of an installation vessel towing a floating wind turbine foundation in the offshore installation positioning mode in the first embodiment.
[0023] Figure 5 It is a schematic diagram of positioning a floating wind turbine foundation by an installation vessel in the offshore installation positioning mode in the first embodiment.
[0024] Description of Reference Numerals
[0025] Semi-submersible wind turbine foundation 1, column 11, heave plate 12, herringbone deck 13, main tugboat 2, main towline 3, auxiliary tugboat 4, auxiliary towline 5, auxiliary tugboat 6, main installation vessel 7, main mooring cable 71, auxiliary installation vessel 8, auxiliary mooring cable 81. DETAILED DESCRIPTION
[0026] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0027] See also Figures 1 to 5 . It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings in this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change in the proportional relationship, or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. Changes or adjustments in their relative relationships should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.
[0028] The offshore towing system of the present invention is used to tow the floating wind turbine foundation 1 before and after the installation of the wind turbine; that is, the floating wind turbine foundation 1 just shipped from the factory is towed to the designated dock for assembly with the wind turbine, and then the floating wind turbine foundation 1 with the wind turbine is towed to the designated installation position in the designated sea area for mooring and positioning; the floating wind turbine foundation 1 is a centrally symmetrical structure, which includes three columns 11 distributed in an equilateral triangle, a heave plate 12 located at the bottom of each column 11, and a herringbone deck 13 for connecting the tops of the three columns 11; the herringbone deck 13 is used to install the wind turbine, specifically, the wind turbine is installed above any one of the columns 11 or at the center of the herringbone deck 13; the columns 11 and the heave plate 12 both have ballast tanks, and the draft of the floating wind turbine foundation 1 can be changed by adjusting the ballast water to improve the stability of the floating wind turbine foundation.
[0029] Embodiment 1:
[0030] like Figure 1 and Figure 2As shown, the present embodiment provides an offshore towing system for a floating wind turbine foundation, comprising a main tugboat 2, a main tow cable 3, an auxiliary tugboat 4 and an auxiliary tow cable 5; the main tow cable 3 and the auxiliary tow cable 5 are both Y-type cables, wherein the Y-type cable comprises a main cable and two split cables of equal length, and one end of the main cable is simultaneously connected to one end of the two split cables through an adapter plate to ensure that the far end of the entire Y-type cable (i.e., the end away from the adapter plate) forms an isosceles triangle; the far end of the main cable in the main tow cable 3 (i.e., the end of the main cable away from the adapter plate) is connected to the main tugboat 2, and the far ends of the two split cables in the main tow cable 3 (i.e., the end of the split cable away from the adapter plate) are both connected to a heave plate 12 in the floating wind turbine foundation 1 or are respectively connected to any two columns 11 in the floating wind turbine foundation 1, so as to realize the connection between the main tugboat 2 and the floating wind turbine foundation 1, so as to achieve ... The floating wind turbine foundation 1 is towed by the main tugboat 2, providing the main towing force for the floating wind turbine foundation 1 and controlling the main towing direction; when the main towline 3 is used to connect the main tugboat 2 and the heave plate 12 in the floating wind turbine foundation 1, the auxiliary tugboat 4 is in an idle state and does not participate in the towing, and only the floating wind turbine foundation 1 is towed from the sea area near the manufacturer to the vicinity of the designated wharf by the main tugboat 2 to install the wind turbine; when the main towline 3 is used to connect the main tugboat 2 and the two columns 11 in the floating wind turbine foundation 1, the auxiliary towline 5 connects the remaining columns 11 in the floating wind turbine foundation with the auxiliary tugboat 4, so that the floating wind turbine foundation 1 with the wind turbine installed is towed from the designated wharf sea area to the installation area of the designated installation sea area by the cooperation of the main tugboat 2 and the auxiliary tugboat 4; in this embodiment, the main cable and the split cable are connected to the adapter plate by a shackle to facilitate disassembly and assembly.
[0031] Since the overall structure of the floating wind turbine foundation 1 before and after the installation of the wind turbine is quite different, the draft depth and load of the two when towing in the water are quite different. That is, before the installation of the wind turbine, the draft of the floating wind turbine foundation 1 is shallow, the environmental load is small, and it has good stability, which is relatively stable and safe during wet towing. Therefore, it is only necessary to connect the main tugboat 2 and a heave plate 12 in the floating wind turbine foundation 1 through the main towing cable 3, so that the towing force on the main tugboat 2 is basically in the same straight line as the forward direction, so as to increase the towing speed; in addition, since the main towing cable 3 is Y-shaped, the two connection points on the floating wind turbine foundation 1 and the one connection point on the main tugboat 2 form a stable isosceles triangle, so as to limit the deviation of the floating wind turbine foundation 1 and ensure the accuracy of the traveling direction; after the wind turbine is installed. The floating wind turbine foundation 1 has a deep draft and is subjected to large environmental loads (especially a significant increase in wind loads). It has poor overall stability and is very easy to deflect and flip in the water. Therefore, in order to ensure the safety of wet towing, the main tugboat 2 is connected to the two columns 11 in the floating wind turbine foundation 1 through the main towline 3, and at the same time, the main tugboat 2 is connected to the remaining columns of the floating wind turbine foundation 1 through the auxiliary towline 5; the main tugboat 2 can provide the main towing force for the floating wind turbine foundation 1, and the Y-shaped structure of the main towline 3 can effectively limit the deviation of the floating wind turbine foundation 1. The auxiliary tugboat 4 cooperates with the main towline 3 through the Y-shaped auxiliary towline 5 to limit the flipping of the floating wind turbine foundation 1, thereby effectively improving the wet towing safety of the floating wind turbine foundation 1 in a deep draft state; the offshore towing system of the present application can be flexibly adjusted and used in shallow draft and deep draft states according to actual conditions, effectively ensuring the wet towing safety and wet towing efficiency of the entire wet towing process.
[0032] In addition, since the fan can be located on one column 11 or at the center of the herringbone deck 13 when installed; in order to ensure the safety of wet towing, when the fan is located on one column 11, the main tugboat 2 needs to be connected to the two columns 11 where the fan is not installed.
[0033] When selecting the main tugboat 2, it is necessary to meet the towing requirements, that is, the towing resistance F is greater than the towing resistance of the floating wind turbine foundation. f The calculation formula is: f =0.5ρC d V 2 A, where ρ is the density of seawater; C d is the flow resistance coefficient; V is the towing speed, which can be determined according to the towing safety requirements; A is the projection area of the underwater part of the floating wind turbine foundation 1 perpendicular to the water flow direction.
[0034] The force F1 of the main cable of the main tow cable 3 needs to be greater than the towing resistance of the floating wind turbine foundation 1. The force F2 of the split cable of the main tow cable 3 is determined by the length of the split cable and the distance between the connection points of the two split cables on the floating wind turbine foundation 1, that is, F2=0.5F1 / cosα, wherein cosα=0.5S / L, S is the distance between the two connection points of the main tow cable 3 on the floating wind turbine foundation 1, and L is the length of the split cable in the main tow cable 3.
[0035] like Figure 3 and Figure 4 As shown, the offshore towing system of the floating wind turbine foundation also includes an auxiliary tugboat 6, a main installation ship 7 and an auxiliary installation ship 8; wherein the auxiliary tugboat 6, the auxiliary tugboat 4, the main installation ship 7 and the auxiliary installation ship 8 cooperate to tow the floating wind turbine foundation 1 located in the installation area to the designated installation position; the main installation ship 7 and the auxiliary installation ship 8 cooperate to position the floating wind turbine foundation 1 to the designated installation position.
[0036] Since the installation vessel is equipped with a cable retracting device (such as an anchor windlass), the floating wind turbine foundation 1 can be towed by retracting the mooring cable to move it toward the designated installation location. At the same time, the auxiliary tugboat 4 and the auxiliary tugboat 6 can be used to adjust the angle of the floating wind turbine foundation 1 to ensure that it can smoothly reach the designated installation location.
[0037] In order to ensure positioning stability, the main installation vessel 7 is connected to two columns 11 in the floating wind turbine foundation 1 through four main mooring cables 71, and the auxiliary installation vessel 8 is connected to the remaining columns 11 in the floating wind turbine foundation 1 through two auxiliary mooring cables 81; wherein, the two main mooring cables 71 are cross-arranged to form a cross cable, and the other two main mooring cables 71 are respectively arranged on both sides of the cross cable for connecting the main installation vessel 7 and the columns 11 on the corresponding side.
[0038] Embodiment 2
[0039] like Figure 1 and Figure 3 As shown, the difference between this embodiment and the first embodiment is that, in the deep draft state, the remaining column 11 of the floating wind turbine foundation 1 needs to be connected to the two auxiliary tugboats 4 respectively through two auxiliary tow cables 5 of equal length and both of which are linear; since two auxiliary tugboats 4 are equipped, the angle between the two auxiliary tugboats 4 and the forward direction of the floating wind turbine foundation 1 can be adjusted according to actual conditions, which is not only conducive to improving the switching efficiency, but also can better control the deviation and flipping of the floating wind turbine foundation 1, and further ensure the safety of wet towing.
[0040] Embodiment 3
[0041] The only difference between this embodiment and the second embodiment is that, in the offshore installation positioning mode, an auxiliary tugboat 4 of the floating wind turbine foundation can be dismantled and used as an auxiliary tugboat 6 to improve the utilization rate of the tugboat.
[0042] Embodiment 4
[0043] This embodiment provides an offshore towing method, which uses the offshore towing system of the first or second embodiment to tow a floating wind turbine foundation. The offshore towing method includes the following working modes:
[0044] Shallow draft wet towing mode: the main tugboat 2 is connected to a heave plate 12 in the floating wind turbine foundation 1 through the main towing cable 3, so as to tow the floating wind turbine foundation without the wind turbine installed from the sea area near the manufacturer to the designated wharf sea area;
[0045] Deep draft wet towing mode: the main tugboat 2 is connected to two columns 11 in the floating wind turbine foundation 1 through the main towline 3 at the same time, and the auxiliary tugboat 4 is connected to the remaining columns 11 in the floating wind turbine foundation 1 through the auxiliary towline 5, so as to tow the floating wind turbine foundation installed with the wind turbine from the designated wharf waters to the offshore installation area.
[0046] Specifically, in the deep draft wet towing mode, the fan is arranged above the column 11 connected to the auxiliary tugboat 4 or at the center of the herringbone deck 13 to further ensure the wet towing safety in the deep draft mode.
[0047] like Figure 4 and Figure 5 As shown, the offshore towing method also includes an offshore installation positioning mode, and its specific steps are: positioning the main installation ship 7 and the auxiliary installation ship 8 in the sea area near the designated installation position, requiring the installation ship and the floating wind turbine foundation 1 to be located on both sides of the designated installation position respectively; connecting the auxiliary installation ship 8 with the column 11 connected to the auxiliary tugboat 4 through an auxiliary mooring line 81, connecting the main installation ship 7 with the column 11 closest to the remaining two columns 11 through a main mooring line 7, and at the same time, arranging an auxiliary tugboat 6 for connecting with the last column 11; separating the floating wind turbine foundation 1 from the main tugboat 2; by adjusting the main mooring line 71 The floating wind turbine foundation 11 is towed to the designated installation position by adjusting the length of the auxiliary mooring cable 81 and cooperating with the steering function of the auxiliary tugboat 4 and the auxiliary tugboat 6; the main installation ship 7 is connected to the column 11 connected to the auxiliary tugboat 6 by a main mooring cable 71, and two cross-arranged main mooring cables 71 are added between the main installation ship 7 and the two columns 11 connected to the main installation ship 7, and then an auxiliary mooring cable 81 is added between the auxiliary installation ship 8 and the column 11 connected to the auxiliary installation ship 8, and all tugboats are removed, and the floating wind turbine foundation 11 is positioned at the designated installation position by cooperating with the main installation ship 7 and the auxiliary installation ship 8.
[0048] Specifically, the two auxiliary mooring lines 81 are arranged in a figure eight shape or in a cross shape, and the figure eight shape arrangement is preferred in this embodiment.
[0049] Before dragging the floating wind turbine foundation 11 to the designated installation location, a temporary cable is first set between the main installation ship 7 and the auxiliary installation ship 8 for relative fixation to prevent the unstable positioning of one installation ship from affecting the smooth placement of the floating wind turbine foundation 11.
[0050] The present application flexibly selects a towing device in the offshore towing system according to the draft depth of the floating wind turbine foundation 1 to ensure towing safety and towing efficiency.
[0051] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A method for towing a floating wind turbine foundation at sea, wherein the floating wind turbine foundation is towed by an offshore towing system; the floating wind turbine foundation comprises three columns distributed in an equilateral triangle, a heave plate at the bottom of each column and a herringbone deck for connecting the tops of the three columns, wherein the herringbone deck is used to install the wind turbine; the offshore towing system comprises a main tugboat, a main tow cable, an auxiliary tugboat and an auxiliary tow cable; the main tow cable is a Y-shaped cable, which is used to connect the main tugboat with a heave plate in the floating wind turbine foundation or to connect the main tugboat with two columns in the floating wind turbine foundation; when the main tow cable is used to connect the main tugboat with two columns in the floating wind turbine foundation, the auxiliary tow cable connects the remaining columns in the floating wind turbine foundation with the auxiliary tugboat; when the main tow cable is used to connect the main tugboat with the heave plate in the floating wind turbine foundation, the auxiliary tugboat is in an idle state; It is characterized in that The offshore towing system further comprises an auxiliary tugboat, a main installation ship and an auxiliary installation ship; the auxiliary tugboat, the auxiliary tugboat, the main installation ship and the auxiliary installation ship cooperate to tow the floating wind turbine foundation located in the installation area to the designated installation position; the main installation ship and the auxiliary installation ship cooperate to position the floating wind turbine foundation to the designated installation position; the offshore towing method comprises the following working modes: Shallow draft wet towing mode: the main tugboat is connected to a heave plate in the floating wind turbine foundation through the main towing cable, so as to tow the floating wind turbine foundation without wind turbine installed from the sea area near the manufacturer to the designated dock sea area; Deep draft wet towing mode: the main tugboat is connected to two columns in the floating wind turbine foundation through the main towing cable at the same time, and the auxiliary tugboat is connected to the remaining columns in the floating wind turbine foundation through the auxiliary towing cable, so as to tow the floating wind turbine foundation with wind turbine installed from the designated dock sea area to the offshore installation area; The offshore installation positioning mode has the following specific steps: positioning the main installation vessel and the auxiliary installation vessel in the sea area near the designated installation location, requiring the installation vessel and the floating wind turbine foundation to be located on both sides of the designated installation location respectively; connecting the auxiliary installation vessel to the column connected to the auxiliary tugboat through an auxiliary mooring line, connecting the main installation vessel to the column closest to the remaining two columns through a main mooring line, and at the same time, arranging an auxiliary tugboat to connect to the last column; separating the floating wind turbine foundation from the main tugboat; and adjusting the main mooring line and the auxiliary mooring line to connect to the floating wind turbine foundation. The length of the mooring cable is adjusted, and the steering function of the auxiliary tugboat and the auxiliary tugboat is cooperated to drag the floating wind turbine foundation to the designated installation position; the main installation ship is connected to the column connected to the auxiliary tugboat through a main mooring cable, and two cross-set main mooring cables are added between the main installation ship and the two columns connected to the main installation ship, and then an auxiliary mooring cable is added between the auxiliary installation ship and the column connected to the auxiliary installation ship, and all tugboats are removed, and the floating wind turbine foundation is positioned at the designated installation position by the cooperation of the main installation ship and the auxiliary installation ship.
2. A method for offshore towing of a floating wind turbine foundation according to claim 1, It is characterized in that When the main installation vessel and the auxiliary installation vessel cooperate to position the floating wind turbine foundation, the main installation vessel is connected to two columns in the floating wind turbine foundation through four main mooring cables, and the auxiliary installation vessel is connected to the remaining columns in the floating wind turbine foundation through two auxiliary mooring cables; wherein the two main mooring cables are cross-arranged to form a cross cable, and the other two main mooring cables are respectively arranged on both sides of the cross cable for connecting the main installation vessel and the columns on the corresponding side.
3. A method for offshore towing of a floating wind turbine foundation according to claim 1 or 2, It is characterized in that There is one auxiliary tugboat, and the auxiliary tow cable is a Y-type cable.
4. A method for offshore towing of a floating wind turbine foundation according to claim 1 or 2, It is characterized in that There are two auxiliary tugboats, and each auxiliary tugboat is connected to the remaining columns of the floating wind turbine foundation through a straight auxiliary tow cable.
5. A method for offshore towing of a floating wind turbine foundation according to claim 1 or 2, It is characterized in that The Y-type cable includes a main cable and two split cables; the two split cables are of equal length, and one end of the main cable is simultaneously connected to one end of the two split cables through an adapter plate.
6. A method for offshore towing of a floating wind turbine foundation according to claim 1, It is characterized in that Before dragging the floating wind turbine foundation to the designated installation location, a temporary cable must be set between the main installation vessel and the auxiliary installation vessel.
7. A method for offshore towing of a floating wind turbine foundation according to claim 1, It is characterized in that In the deep draft wet towing mode, the fan is arranged above the column connected to the auxiliary tugboat or at the center of the herringbone deck.