A sampling system and process for water pollution control
Through the combined structure of buoyant bending plate and oscillating arch block, combined with the design of threaded columns and sealing sliders, the problem of blockage and collection position flexibility in the water pollution control sampling system is solved, and efficient and stable water sample collection is achieved.
Patent Information
- Application Number
- CN202310839197.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-07-10
AI Technical Summary
The existing water pollution control sampling system is prone to affect the accuracy due to contaminants during the collection process, and it is difficult to disassemble the collection tube after a single collection, making it difficult to efficiently collect samples at different locations.
The syringe mechanism is composed of buoyant bending plates and oscillating arch blocks. The buoyant arch block is deflected under the water flow pressure to limit the position to avoid blockage, and the air pressure is achieved using threaded columns and sealed sliders. Water absorption, combined with positioning hook and motor drive, facilitates sample collection at different locations.
Effectively prevent blockage during sewage collection, ensure sample accuracy and stability, simplify the sample collection process at different locations, and improve collection efficiency and stability.
Smart Images

Figure CN116839984B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water pollution control, and more specifically, to a sampling system and process for water pollution control. Background Art
[0002] Water pollution is caused by harmful chemicals that reduce or lose the use value of water and pollute the environment. Acids, alkalis, oxidants, compounds such as copper, cadmium, mercury, arsenic, and organic toxins such as benzene, ethylene dichloride, and ethylene glycol in sewage can poison aquatic organisms and affect drinking water sources and scenic landscapes. When organic matter in sewage is decomposed by microorganisms, it consumes oxygen in the water, affecting the life of aquatic organisms. After the dissolved oxygen in the water is exhausted, the organic matter undergoes anaerobically decomposition, producing unpleasant gases such as hydrogen sulfide and mercaptans, which further deteriorate the water quality. Therefore, it is necessary to sample the sewage, analyze the specific components, and complete a specific water pollution control plan.
[0003] According to Chinese patent number CN218035886U, the first piston rod is connected to the bottom of the piston disc at one end away from the first piston tube, and the piston disc is moved upward to block the bottom of the sampling tube. The liquid inlet pipe is provided with a pressurizing component for increasing the air pressure in the first piston tube. This solution uses the lifting and lowering of the piston disc to open and close the bottom of the sampling tube. After the sampling tube is flushed with sewage, the piston disc blocks its bottom again, replacing manual multiple sampling and dumping of samples, thereby improving the efficiency and quality of sampling.
[0004] However, the above scheme has the following defects when implemented:
[0005] 1. Since there are many pollutants in the extracted water, it is easy to block the extraction components during the flushing process, or the accuracy of subsequent sample collection;
[0006] 2. The current method of taking samples is to collect samples from multiple locations in polluted rivers. After a single collection, it is difficult to dismantle the collection tube. Summary of the invention
[0007] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a sampling system and a process for water pollution control. When the buoyancy bending plate floats up, the buoyancy bending plate is opened and closed by a spring pulling rod with the sliding block as a reference point, and the spring pulling rod utilizes the tension of the spring to realize the floating state of the buoyancy bending plate. At the same time, the oscillation arch block passes through the water surface and enters the interior to absorb water flow. The collecting tube and the oscillation arch block form a syringe-like mechanism. When the oscillation arch block is deflected outward by the pressure of the water flow, the corresponding hinged rod and the curved spring play a limiting role to solve the problems raised in the above-mentioned background technology.
[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a sampling system for water pollution control, comprising a buoyancy bending plate, wherein the number of the buoyancy bending plates is a plurality of groups, and a plug-in plate is slidably connected between the plurality of groups of the buoyancy bending plates, a pulling rod is fixedly connected to one end of the buoyancy bending plate, and a hollow clamping block is hinged to one end of the pulling rod, and the pulling rod is arranged in an upward floating state by the buoyancy of the water surface. When the sampling device collects water from different positions of the polluted river source, the positioning hook is fixed to the fixed assembly machine on the shore by a rope, and the sampling device causes the buoyancy bending plate to open outward through the plug-in plate with the buoyancy above the water flow, and the pulling rod floats synchronously with the clamping force of the hollow clamping block by the buoyancy of the buoyancy bending plate, and limits it, so that the sampling device can collect samples more conveniently at different positions of the river;
[0009] The inner wall of the buoyancy bending plate is fixedly connected with a spring pulling rod, one end of the spring pulling rod is fixedly connected with a sliding block, the number of the sliding blocks is multiple groups, one end of the sliding block is fixedly connected with a sewage collection frame, and the multiple groups of sliding blocks are arranged in a ring state with respect to the outer surface of the sewage collection frame, the bottom end of the sewage collection frame is fixedly connected with a multi-layer annular airbag inner wall frame, the bottom end of the airbag inner wall frame is fixedly connected with an oscillation arch block, and the outer surface of the oscillation arch block is hinged with a corresponding hinge in a ring shape with respect to the surface of the oscillation arch block. A connecting rod, the bottom end of the corresponding hinged rod is fixedly connected with a curved spring, and the curved spring is fixedly installed at one end of the oscillation arch block. When the buoyancy bending plate floats, the buoyancy bending plate is opened and closed with the sliding block as a reference point through the spring pulling rod, and the spring pulling rod utilizes the tension of the spring to realize the floating state of the buoyancy bending plate. At the same time, the oscillation arch block passes through the water surface and enters the interior to absorb water flow. The collecting tube and the oscillation arch block form a syringe-like mechanism. When the oscillation arch block is deflected outward under the pressure of the water flow, the corresponding hinged rod and the curved spring play a limiting role.
[0010] In a preferred embodiment, the top of the sewage collection rack is rotatably connected to a snap-fit gear, the interior of the sewage collection rack is slidably connected to a sealing slider through a cavity, the top of the sealing slider is fixedly connected to an upper positioning rod, and the outer surface of the sewage collection rack is fixedly connected to multiple groups of placement snap-fit blocks, the interiors of the multiple groups of placement snap-fit blocks are fixedly connected with the same number of positioning hooks, and the tops of the positioning hooks are provided with pull ropes for positioning, the sealing slider is slidably connected to the inner cavity of the sewage collection rack, and the motor is used as a drive to drive the threaded column to rotate, and the corresponding hinged block drives the sealing slider to move downward along the inside of the collection pipe through the upper positioning rod to discharge the air inside the collection pipe.
[0011] In a preferred embodiment, a corresponding hinge block is inserted at one end of the upper positioning rod, an auxiliary hinge block is inserted at one end of the corresponding hinge block, an auxiliary threaded rod is threadedly connected to the connection between the auxiliary hinge block and the corresponding hinge block, a threaded column is inserted at one end of the corresponding hinge block, and a guide column is threadedly connected to one end of the auxiliary hinge block, and the threaded column and the guide column respectively pass through the placement clamping blocks, and the staff manually removes the corresponding hinge block from the surface of the threaded column, and then grabs the upper positioning rod and the collecting tube to separate them from the inside of the sewage collection rack, and the collection tube has a smaller absorption aperture at one end for absorbing water. When the collecting tube and the upper positioning rod are taken out, compared with using a set of syringes to preserve the extracted sample, it is placed in a collection bag.
[0012] In a preferred embodiment, the sewage collection rack is located at a guide column and one end of the guide column passing through the mounting clamping block is fixedly connected to a fixed support limit block, the bottom end of the fixed support limit block is fixedly connected to the limit block, the limit block is located above the pulling rod and is set in a limiting state, and the limit block limits the opening position of the buoyancy bending plate.
[0013] In a preferred embodiment, the threaded column passes through one end of the locking block and is fixedly connected to a positioning gear, the top of the threaded column is fixedly connected to a motor, the positioning gear is meshingly connected to the outer surface of the locking gear, and the inside of the locking gear is fixedly connected to multiple groups of sweeping blocks that are attached to the inner wall of the sewage collection frame.
[0014] In a preferred embodiment, the interior of the sewage collection rack is fixedly connected with a positioning snap-fit groove, the inner wall of the sewage collection rack is connected with a positioning anti-blocking plate through the positioning snap-fit groove, the interior of the sewage collection rack is connected with a collecting pipe, the inner wall of the collecting pipe is slidably connected to the outer surface of the sealing slider, when too much sediment in the river enters the positioning anti-blocking plate, the positioning anti-blocking plate blocks larger plastic garbage particles or mud, at this time, the threaded column drives the snap-fit gear to rotate through the positioning gear, and the snap-fit gear scrapes along the inner wall of the sewage collection rack through multiple sets of sweeping blocks.
[0015] In a preferred embodiment, the airbag inner wall frame is fixedly connected to a pressure bump at one end facing the inner wall of the sewage collection frame, the inner wall of the pressure bump is fixedly connected to an inclined inner wall, one end of the inclined inner wall is fixedly connected to the airbag frame, the outer surface of the airbag frame is fixedly connected to an external airbag, and the end of the airbag frame away from the inclined inner wall is fixedly connected to an inclined pressure wall block.
[0016] In a preferred embodiment, the inner wall of the airbag inner wall frame is fixedly connected with a buffer spring, one end of the buffer spring is fixedly connected with an annular sealing block, the inclined pressure wall block is fixedly installed on the inner wall of the annular sealing block, the end of the inclined pressure wall block away from the airbag frame is fixedly connected with a rubber block, and the outer surface is fixedly connected with four groups of pressure conduction tubes fixedly installed on the surface of the annular sealing block.
[0017] In a preferred embodiment, one end of the rubber block is fixedly connected to a linkage rod, and the outer surface of the linkage rod is hinged with multiple groups of small hinged rods, and corresponding push rods are hinged between the multiple groups of small hinged rods, and one end of the corresponding push rod is fixedly connected to a rubber pad installed on the inner wall of the airbag inner wall frame. Since a negative pressure state is generated inside the collection tube to collect a large amount of river water samples, a large amount of river water enters the oscillation arch block, and the water flow and various impurities come into contact with the pressure protrusion, causing the pressure protrusion to transfer the load pressure to the inclined inner wall through the buffer spring, and the inclined inner wall transmits the pressure inside the pressure protrusion to the airbag frame normally through the smaller pipe opening. The airbag frame expands under pressure and transfers the expanded surface to the external airbag, and the external airbag transfers the pressure to the annular sealing block.
[0018] A sampling process for water pollution control comprises the following steps:
[0019] Step 1: The staff manually removes the corresponding hinge block from the surface of the threaded column, and then installs a new collection tube and upper positioning rod, and inserts the collection tube along the inner surface slide groove of the sewage collection rack. Then, the corresponding hinge block is put on the upper positioning rod and fixed with a nut. After the corresponding hinge block is plugged into the auxiliary plug-in hinge block, the auxiliary threaded rod is connected by threading between the auxiliary plug-in hinge block and the corresponding hinge block, and the upper positioning rod is replaced and positioned to complete the installation of the sampling container;
[0020] Step 2: The motor is used as a drive to drive the threaded column to rotate, and the corresponding hinge block drives the sealing slider to move downward along the inside of the collection tube through the upper positioning rod to discharge the air inside the collection tube to ensure the accuracy of the collection volume;
[0021] Step 3: Then the positioning hook is fixed with the fixed assembly machine on the shore by ropes. When the sampling device collects water from different locations of the polluted river source, the sampling device follows the buoyancy of the water flow to cause the buoyancy bending plate to open outward through the plug-in plate, and the pulling rod floats synchronously with the clamping force of the hollow clamping block through the buoyancy of the buoyancy bending plate until it moves to the specified area, such as the center of the river, the deepest part of the pollutant color, etc.
[0022] Step 4: After the sampling device moves to the specified position, the motor drives the threaded column to rotate in the opposite direction, and then the corresponding hinged block drives the sealing slider to move upward along the inside of the collection tube through the upper positioning rod, and the water flow in the river is sucked into the upper positioning rod through the air pressure force. The water flow and various impurities come into contact with the pressure protrusion, causing the pressure protrusion to transfer the load pressure to the inclined inner wall through the buffer spring. The inclined inner wall transmits the pressure inside the pressure protrusion to the airbag frame normally through the smaller pipe mouth. The airbag frame expands under pressure and transfers the expanded surface to the external airbag, causing the layers of pressure to be buffered by the airbag inner wall frame and the water pressure, so that the sampling device can sample smoothly, and the water flow in the river is sucked into the upper positioning rod through the air pressure force, completing the single sample collection;
[0023] Step 5: The staff pulls back the sampling device, and the staff manually removes the corresponding hinge block from the surface of the threaded column, and then grabs the upper positioning rod and the collection tube to separate from the inside of the sewage collection rack. The end of the collection tube that absorbs water has a smaller absorption aperture. When the collection tube and the upper positioning rod are taken out, the sample extracted this time is stored in a collection bag compared to using a set of syringes;
[0024] Step 6: The sample is moved between the electron microscope and the fill light bulb. The electron microscope takes a picture of the sewage sample and transmits the picture to the insect recognition system. The insect recognition system then returns the result and transmits the recognized data to the terminal through the PLC control box.
[0025] Technical effects and advantages of the present invention:
[0026] 1. When the buoyancy bending plate floats, the buoyancy bending plate is opened and closed by the spring pulling rod with the sliding block as the reference point, and the spring pulling rod uses the spring to pull and elasticize to realize the floating state of the buoyancy bending plate. At the same time, the oscillation arch block passes through the water surface and enters the interior to absorb water flow. The collection tube and the oscillation arch block form a syringe-like mechanism. When the oscillation arch block is deflected outward by the pressure of the water flow, the corresponding hinged rod and the curved spring play a limiting role, causing the oscillation arch block to float within the specified range. While the water absorption aperture of the oscillation arch block remains fixed, the plastic bags and other garbage in the water are blocked by the oscillation arch block, thereby preventing the water inlet from being blocked and the test samples from being successfully collected;
[0027] 2. When too much sediment in the river enters the positioning anti-blocking plate, the positioning anti-blocking plate blocks larger plastic garbage particles or silt. At this time, the threaded column drives the snap-on gear to rotate through the positioning gear. The snap-on gear scrapes along the inner wall of the sewage collection rack through multiple sets of sweeping blocks, so that the detection objects stuck to the inner wall of the sewage collection rack can be scraped off and sucked into the collection pipe, while preventing the pipe mouth of the collection pipe from being blocked and unable to complete normal collection;
[0028] 3. When the sampling device collects water from different locations of the polluted river source, the positioning hook is fixed to the fixed component machine on the shore by ropes. The sampling device causes the buoyancy bending plate to open outward through the plug-in plate with the buoyancy above the water flow, and the pulling rod floats synchronously with the clamping force of the hollow clamping block through the buoyancy of the buoyancy bending plate, limiting its position, so that the sampling device can collect samples more conveniently at different locations of the river;
[0029] 4. The annular sealing block uses the elastic force of the buffer spring to shake, which slows down the pressure transmission layer by layer in the airbag inner wall frame. At the same time, the inclined pressure wall block is compressed and extended to squeeze the rubber block, which pushes the corresponding push rod through the linkage rod. The corresponding push rod transmits the pressure to the rubber pad. Multiple sets of small hinged rods are used to synchronously transmit the pressure in all directions to the rubber pad. The rubber pad drives the airbag inner wall frame to expand outward, and finally resists it through water pressure, which improves the stability of water flow collection. At the same time, when the buffer spring and the pressure protrusion use the sealed space to restore their original state, they can also shake off the impurities blocked in the oscillation arch block. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic structural diagram of the buoyancy bent plate of the present invention.
[0031] Figure 2 It is a schematic structural diagram of the plug-in board of the present invention.
[0032] Figure 3 It is a schematic structural diagram of the pulling rod of the present invention.
[0033] Figure 4 It is a structural schematic diagram of the upper positioning rod of the present invention.
[0034] Figure 5 It is a structural schematic diagram of the positioning hook of the present invention.
[0035] Figure 6 It is a schematic diagram of the structure of the collecting tube of the present invention.
[0036] Figure 7 For the present invention Figure 6 A-section structure enlarged view.
[0037] Figure 8 It is a structural schematic diagram of the corresponding hinged rod of the present invention.
[0038] Fig. 9 It is a schematic structural diagram of the rubber pad of the present invention.
[0039] Fig.10 For the present invention Fig. 9 Enlarged view of the structure of part B.
[0040] The accompanying drawings are marked as follows: 1. buoyancy bending plate; 2. sewage collection frame; 3. plug-in plate; 4. placement clamping block; 5. positioning hook; 6. guide column; 7. auxiliary plug-in hinge block; 8. corresponding hinge block; 9. threaded column; 10. positioning gear; 11. fixed support limit block; 12. pulling rod; 13. oscillating arch block; 14. sliding block; 15. spring pulling rod; 16. limit block; 17. clamping gear; 18. sweeping block; 19. auxiliary threaded rod; 20. upper positioning rod; 21. collection pipe; 22. Positioning anti-blocking plate; 23. Corresponding hinged rod; 24. Curved spring; 25. Positioning snap-fit groove; 26. Airbag inner wall frame; 27. Pressure bulge; 28. Airbag frame; 29. Buffer spring; 30. Pressure transmission tube; 31. External airbag; 32. Inclined pressure wall block; 33. Rubber block; 34. Linkage rod; 35. Small hinged pair of rods; 36. Rubber pad; 37. Corresponding push rod; 38. Annular sealing block; 39. Inclined inner wall; 40. Hollow clamping block; 41. Sealing slider. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] Refer to the instruction manual Figure 1-3 A sampling system for water pollution control according to an embodiment of the present invention comprises a buoyancy bending plate 1, wherein the number of the buoyancy bending plates 1 is a plurality of groups, and a plug-in plate 3 is slidably connected between the plurality of buoyancy bending plates 1, and a pulling rod 12 is fixedly connected to one end of the buoyancy bending plate 1, and a hollow clamping block 40 is hinged to one end of the pulling rod 12, and the pulling rod 12 is arranged in an upward floating state by the buoyancy of the water surface. When the sampling device collects water from different positions of the polluted river source, the positioning hook 5 is fixed to the fixed assembly machine on the shore by a rope, and the sampling device causes the buoyancy bending plate 1 to open outward through the plug-in plate 3 with the buoyancy above the water flow, and the pulling rod 12 floats synchronously with the clamping force of the hollow clamping block 40 by the buoyancy of the buoyancy bending plate 1, and limits it, thereby making it more convenient for the sampling device to collect samples at different positions of the river;
[0043] The inner wall of the buoyancy bending plate 1 is fixedly connected with a spring pulling rod 15, one end of the spring pulling rod 15 is fixedly connected with a sliding block 14, the number of the sliding blocks 14 is multiple groups, one end of the sliding block 14 is fixedly connected with a sewage collecting frame 2, and the multiple groups of sliding blocks 14 are arranged in a ring state with respect to the outer surface of the sewage collecting frame 2, the bottom end of the sewage collecting frame 2 is fixedly connected with a multi-layer annular airbag inner wall frame 26, the bottom end of the airbag inner wall frame 26 is fixedly connected with an oscillation arch block 13, the outer surface of the oscillation arch block 13 is hinged with a corresponding hinged rod 23 in a ring shape with respect to the surface of the oscillation arch block 13, the bottom end of the corresponding hinged rod 23 is fixedly connected with a curved spring 24, and the curved spring 24 is fixedly installed on one side of the oscillation arch block 13 At the end, when the buoyancy bending plate 1 floats up, the buoyancy bending plate 1 is opened and closed by the spring pulling rod 15 with the sliding block 14 as the reference point, and the spring pulling rod 15 uses the spring to pull the buoyancy bending plate 1 to achieve the floating state, and at the same time, the oscillation arch block 13 passes through the water surface and enters the interior to absorb water flow. The collecting tube 21 and the oscillation arch block 13 form a syringe-like mechanism. When the oscillation arch block 13 is deflected outward by the pressure of the water flow, the corresponding hinged rod 23 and the curved spring 24 play a limiting role, causing the oscillation arch block 13 to float within the specified range. While the water absorption aperture of the oscillation arch block 13 remains fixed, garbage such as plastic bags in the water is blocked by the oscillation arch block 13, thereby preventing the water inlet from being blocked and the test sample from being successfully collected.
[0044] Refer to the instruction manual Figure 1-2 The top of the sewage collection frame 2 is rotatably connected with a snap-fit gear 17, and the interior of the sewage collection frame 2 is slidably connected with a sealing slider 41 through a cavity, and the top of the sealing slider 41 is fixedly connected with an upper positioning rod 20. The outer surface of the sewage collection frame 2 is fixedly connected with multiple groups of placement snap-fit blocks 4, and the interiors of the multiple groups of placement snap-fit blocks 4 are fixedly connected with the same number of positioning hooks 5, and the tops of the positioning hooks 5 are provided with pull ropes for positioning. The sealing slider 41 is slidably connected to the inner cavity of the sewage collection frame 2, and the motor is used as a drive to drive the threaded column 9 to rotate, and the corresponding hinged block 8 drives the sealing slider 41 to move downward along the inside of the collection pipe 21 through the upper positioning rod 20 to discharge the air inside the collection pipe 21. After the sampling device moves to the specified position, the motor drives the threaded column 9 to rotate in the opposite direction, and the corresponding hinged block 8 drives the sealing slider 41 to move upward along the inside of the collection pipe 21 through the upper positioning rod 20, and the water flow in the river is sucked into the interior of the upper positioning rod 20 through the air pressure force, completing a single sample collection.
[0045] Refer to the instruction manual Figure 1-3, one end of the upper positioning rod 20 is plugged with a corresponding hinge block 8, one end of the corresponding hinge block 8 is plugged with an auxiliary plug-in hinge block 7, the connection between the auxiliary plug-in hinge block 7 and the corresponding hinge block 8 is connected with an auxiliary threaded rod 19 through a thread, one end of the corresponding hinge block 8 is plugged with a threaded column 9, one end of the auxiliary plug-in hinge block 7 is connected with a guide column 6 through a thread, the threaded column 9 and the guide column 6 pass through the placement clamping block 4 respectively, the staff manually removes the corresponding hinge block 8 from the surface of the threaded column 9, and then grabs the upper positioning rod 20 and the collection tube 21 to separate from the inside of the sewage collection frame 2, and the collection tube 21 has a smaller absorption aperture at one end that absorbs water. When the collection tube 21 and the upper positioning rod 20 are taken out, compared with using a set of syringes to store the extracted sample, it is placed in a collection bag;
[0046] Furthermore, a new collecting pipe 21 and an upper positioning rod 20 are installed, and the collecting pipe 21 is inserted into the slide groove on the inner surface of the sewage collecting frame 2. Next, the corresponding hinge block 8 is put on the upper positioning rod 20 and fixed with a nut. After the corresponding hinge block 8 is plugged into the auxiliary plug-in hinge block 7, the upper positioning rod 20 is replaced and positioned by using the auxiliary threaded rod 19 that is threadedly connected between the auxiliary plug-in hinge block 7 and the corresponding hinge block 8.
[0047] Refer to the instruction manual Figure 1-7 , the sewage collection frame 2 is located at one end of the guide column 6 passing through the placement of the clamping block 4 and is fixedly connected with a fixed support limit block 11, the bottom end of the fixed support limit block 11 is fixedly connected with a limit block 16, the limit block 16 is located above the pulling rod 12 and is set in a limited state, the limit block 16 limits the opening position of the buoyancy bending plate 1, the threaded column 9 passes through one end of the placement of the clamping block 4 and is fixedly connected with a positioning gear 10, the top of the threaded column 9 is fixedly connected with a motor, the positioning gear 10 is meshed and connected to the outer surface of the clamping gear 17, and the inside of the clamping gear 17 is fixedly connected with a plurality of groups of sweeping blocks 18 that are attached to the inner wall of the sewage collection frame 2;
[0048] Furthermore, a positioning snap-fit groove 25 is fixedly connected to the interior of the sewage collection frame 2, and a positioning anti-blocking plate 22 is inserted into the inner wall of the sewage collection frame 2 through the positioning snap-fit groove 25. A collection pipe 21 is inserted into the interior of the sewage collection frame 2, and the inner wall of the collection pipe 21 is slidably connected to the outer surface of the sealing slider 41. When too much sediment in the river enters the positioning anti-blocking plate 22, the positioning anti-blocking plate 22 blocks larger plastic garbage particles or mud. At this time, the threaded column 9 drives the snap-fit gear 17 to rotate through the positioning gear 10, and the snap-fit gear 17 scrapes along the inner wall of the sewage collection frame 2 through multiple sets of sweeping blocks 18, so that the detection object stuck to the inner wall of the sewage collection frame 2 can be scraped and sucked into the collection pipe 21, while avoiding the pipe mouth of the collection pipe 21 being blocked and unable to complete normal collection.
[0049] Refer to the instruction manual Figure 8-10 The end of the airbag inner wall frame 26 facing the inner wall of the sewage collecting frame 2 is fixedly connected with a pressure protrusion 27, the inner wall of the pressure protrusion 27 is fixedly connected with an inclined inner wall 39, one end of the inclined inner wall 39 is fixedly connected with an airbag frame 28, the outer surface of the airbag frame 28 is fixedly connected with an external airbag 31, the end of the airbag frame 28 away from the inclined inner wall 39 is fixedly connected with an inclined pressure wall block 32, the inner wall of the airbag inner wall frame 26 is fixedly connected with a buffer spring 29, one end of the buffer spring 29 is fixedly connected with an annular sealing block 38, the inclined pressure wall block 32 is fixedly installed on the inner wall of the annular sealing block 38, the end of the inclined pressure wall block 32 away from the airbag frame 28 is fixedly connected with a rubber block 33, and the outer surface of 28 is fixedly connected with four groups of pressure transmission pipes 30 fixedly installed on the surface of the annular sealing block 38;
[0050] At the same time, one end of the rubber block 33 is fixedly connected to a linkage rod 34, and the outer surface of the linkage rod 34 is hinged with multiple groups of small hinged rods 35, and corresponding push rods 37 are hinged between the multiple groups of small hinged rods 35. One end of the corresponding push rod 37 is fixedly connected to a rubber pad 36 installed on the inner wall of the airbag inner wall frame 26. Since a negative pressure state is generated inside the collection tube 21 to collect a large amount of river water samples, a large amount of river water enters the oscillation arch block 13, and the water flow and various impurities come into contact with the pressure protrusion 27, causing the pressure protrusion 27 to transfer the load pressure to the inclined inner wall 39 through the buffer spring 29. The inclined inner wall 39 transmits the pressure inside the pressure protrusion 27 to the airbag frame 28 normally through the smaller pipe mouth. The airbag frame 28 is compressed and expanded, and the expanded surface is transferred to the external airbag 31, and the external airbag 31 is compressed and transferred to the annular seal The pressure of the rubber pad 13 is transmitted to the rubber pad 36 by the rubber pad 36, and the pressure of the rubber pad 36 is transmitted to the rubber pad 36 by the rubber pad 36. The rubber pad 36 drives the inner wall 26 of the airbag to expand outward, and finally resists it through water pressure, thereby improving the stability of water flow collection. At the same time, when the buffer spring 29 and the pressure protrusion 27 are restored to their original state by the sealed space, the impurities blocked in the oscillation arch block 13 can be dispersed.
[0051] A sampling process for water pollution control comprises the following steps:
[0052] Step 1: The staff manually removes the corresponding hinge block 8 from the surface of the threaded column 9, and then installs a new collection tube 21 and an upper positioning rod 20, and inserts the collection tube 21 along the inner surface slide groove of the sewage collection frame 2. Then, the corresponding hinge block 8 is sleeved on the upper positioning rod 20 and fixed with a nut. After the corresponding hinge block 8 is plugged into the auxiliary plug-in hinge block 7, the auxiliary threaded rod 19 is threadedly connected between the auxiliary plug-in hinge block 7 and the corresponding hinge block 8 to replace and position the upper positioning rod 20, and the installation of the sampling container is completed;
[0053] Step 2: The motor is used as a drive to drive the threaded column 9 to rotate, and the corresponding hinge block 8 drives the sealing slider 41 to move downward along the inside of the collection tube 21 through the upper positioning rod 20 to discharge the air inside the collection tube 21 to ensure the accuracy of the collection amount;
[0054] Step 3: Then the positioning hook 5 is fixed to the fixed assembly machine on the shore with a rope. When the sampling device collects water from different locations of the polluted river source, the sampling device causes the buoyancy bending plate 1 to open outward through the plug-in plate 3 with the buoyancy above the water flow, and the pulling rod 12 floats synchronously under the clamping force of the hollow clamping block 40 due to the buoyancy of the buoyancy bending plate 1 until it moves to the specified area, such as the center of the river, the deepest part of the pollutant color, etc.
[0055] Step 4: After the sampling device moves to the specified position, the motor drives the threaded column 9 to rotate in the opposite direction, and then the corresponding hinged block 8 drives the sealing slider 41 to move upward along the inside of the collection tube 21 through the upper positioning rod 20, and the water flow in the river is sucked into the upper positioning rod 20 through the air pressure force. The water flow and various impurities come into contact with the pressure protrusion 27, causing the pressure protrusion 27 to transfer the load pressure to the inclined inner wall 39 through the buffer spring 29. The inclined inner wall 39 transmits the pressure inside the pressure protrusion 27 to the airbag frame 28 normally through the smaller pipe mouth. The airbag frame 28 is pressurized and expanded, and the expanded surface is transferred to the external airbag 31, so that the layers of pressure are buffered by the airbag inner wall frame 26 and the water pressure, so that the sampling device can sample smoothly, and the water flow in the river is sucked into the upper positioning rod 20 through the air pressure force, completing the single sample collection;
[0056] Step 5: The staff pulls back the sampling device, and the staff manually removes the corresponding hinge block 8 from the surface of the threaded column 9, and then grabs the upper positioning rod 20 and the collection tube 21 to separate from the inside of the sewage collection rack 2. The end of the collection tube 21 that absorbs water has a smaller absorption aperture. When the collection tube 21 and the upper positioning rod 20 are taken out, the sample extracted this time is stored in a collection bag compared to using a set of syringes;
[0057] Step 6: The sample is moved between the electron microscope and the fill light bulb. The electron microscope takes a picture of the sewage sample and transmits the picture to the insect recognition system. The insect recognition system then returns the result and transmits the recognized data to the terminal through the PLC control box.
[0058] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0059] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
[0060] Finally: The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A sampling system for water pollution control, comprising a buoyancy bending plate (1), characterized in that: The buoyancy bending plates (1) are provided in a plurality of groups, and a plug-in plate (3) is slidably connected between the plurality of groups of buoyancy bending plates (1). One end of the buoyancy bending plates (1) is fixedly connected to a pulling rod (12), and one end of the pulling rod (12) is hinged to a hollow clamping block (40). The pulling rod (12) is arranged in an upward floating state by the buoyancy of the water surface. The inner wall of the buoyancy bending plate (1) is fixedly connected to a spring pulling rod (15), one end of the spring pulling rod (15) is fixedly connected to a sliding block (14), the number of the sliding blocks (14) is multiple groups, one end of the sliding block (14) is fixedly connected to a sewage collection frame (2), and the multiple groups of sliding blocks (14) are arranged in a ring state with respect to the outer surface of the sewage collection frame (2), the bottom end of the sewage collection frame (2) is fixedly connected to a multi-layer circular ring-shaped airbag inner wall frame (26), the bottom end of the airbag inner wall frame (26) is fixedly connected to an oscillation arch block (13), the outer surface of the oscillation arch block (13) is hinged to a corresponding hinged rod (23) in a ring shape with respect to the surface of the oscillation arch block (13), the bottom end of the corresponding hinged rod (23) is fixedly connected to a curved spring (24), and the curved spring (24) is fixedly installed on one end of the oscillation arch block (13).
2. A sampling system for water pollution control according to claim 1, characterized in that: The top end of the sewage collection rack (2) is rotatably connected to a snap-fit gear (17); the interior of the sewage collection rack (2) is slidably connected to a sealing slider (41) through a cavity; the top end of the sealing slider (41) is fixedly connected to an upper positioning rod (20); the outer surface of the sewage collection rack (2) is fixedly connected to multiple groups of placement snap-fit blocks (4); the interiors of the multiple groups of placement snap-fit blocks (4) are fixedly connected to the same number of positioning hooks (5); and the top ends of the positioning hooks (5) are provided with pull ropes for positioning; the sealing slider (41) is slidably connected to the inner cavity of the sewage collection rack (2).
3. A sampling system for water pollution control according to claim 2, characterized in that: One end of the upper positioning rod (20) is plugged with a corresponding hinge block (8), one end of the corresponding hinge block (8) is plugged with an auxiliary plug-in hinge block (7), the connection between the auxiliary plug-in hinge block (7) and the corresponding hinge block (8) is connected to an auxiliary threaded rod (19) through a thread, one end of the corresponding hinge block (8) is plugged with a threaded column (9), one end of the auxiliary plug-in hinge block (7) is connected to a guide column (6) through a thread, and the threaded column (9) and the guide column (6) respectively pass through the placement clamping block (4).
4. A sampling system for water pollution control according to claim 3, characterized in that: The sewage collection rack (2) is located on a guide column (6) and one end of the guide column (6) passing through the mounting clamping block (4) is fixedly connected to a fixed support limit block (11), and the bottom end of the fixed support limit block (11) is fixedly connected to a limit block (16), and the limit block (16) is located above the pulling rod (12) and is arranged in a limited state.
5. A sampling system for water pollution control according to claim 4, characterized in that: The threaded column (9) passes through one end of the mounting clamping block (4) and is fixedly connected to a positioning gear (10). The top end of the threaded column (9) is fixedly connected to a motor. The positioning gear (10) is meshedly connected to the outer surface of the clamping gear (17). The inside of the clamping gear (17) is fixedly connected to a plurality of sweeping blocks (18) that are attached to the inner wall of the sewage collection frame (2).
6. A sampling system for water pollution control according to claim 5, characterized in that: The sewage collection frame (2) is fixedly connected to a positioning snap-fit groove (25) inside, and a positioning anti-blocking plate (22) is inserted into the inner wall of the sewage collection frame (2) through the positioning snap-fit groove (25). A collection pipe (21) is inserted into the interior of the sewage collection frame (2), and the inner wall of the collection pipe (21) is slidably connected to the outer surface of the sealing slide block (41).
7. A sampling system for water pollution control according to claim 6, characterized in that: One end of the airbag inner wall frame (26) facing the inner wall of the sewage collection frame (2) is fixedly connected to a pressure protrusion (27); the inner wall of the pressure protrusion (27) is fixedly connected to an inclined inner wall (39); one end of the inclined inner wall (39) is fixedly connected to an airbag frame (28); an outer surface of the airbag frame (28) is fixedly connected to an external airbag (31); and one end of the airbag frame (28) away from the inclined inner wall (39) is fixedly connected to an inclined pressure wall block (32).
8. A sampling system for water pollution control according to claim 7, characterized in that: The inner wall of the airbag inner wall frame (26) is fixedly connected to a buffer spring (29), one end of the buffer spring (29) is fixedly connected to an annular sealing block (38), the inclined pressure wall block (32) is fixedly mounted on the inner wall of the annular sealing block (38), one end of the inclined pressure wall block (32) away from the airbag frame (28) is fixedly connected to a rubber block (33), and the outer surface of the airbag frame (28) is fixedly connected to four groups of pressure transmission pipes (30) fixedly mounted on the surface of the annular sealing block (38).
9. A sampling system for water pollution control according to claim 8, characterized in that: One end of the rubber block (33) is fixedly connected to a linkage rod (34), and the outer surface of the linkage rod (34) is hinged with multiple groups of small hinged rods (35). Corresponding push rods (37) are hinged between the multiple groups of small hinged rods (35), and one end of the corresponding push rod (37) is fixedly connected to a rubber pad (36) installed on the inner wall of the airbag inner wall frame (26).
10. A sampling process of a sampling system for water pollution control according to claim 8 or 9, characterized in that: The following steps are involved: Step 1: The staff manually removes the corresponding hinge block (8) from the surface of the threaded column (9), and then installs a new collection tube (21) and an upper positioning rod (20), and inserts the collection tube (21) along the inner surface slide groove of the sewage collection frame (2). Then, the corresponding hinge block (8) is sleeved on the upper positioning rod (20) and fixed with a nut. After the corresponding hinge block (8) is plugged into the auxiliary plug-in hinge block (7), the auxiliary threaded rod (19) is connected by threading between the auxiliary plug-in hinge block (7) and the corresponding hinge block (8), and the upper positioning rod (20) is replaced and positioned, and the installation of the sampling container is completed; Step 2: The motor is used as a drive to drive the threaded column (9) to rotate, and the corresponding hinge block (8) drives the sealing slider (41) to move downward along the inside of the collection tube (21) through the upper positioning rod (20), so as to discharge the air inside the collection tube (21) and ensure the accuracy of the collection amount; Step 3: Then the positioning hook (5) is fixed to the fixed assembly machine on the shore by ropes. When the sampling system collects water from different locations of the polluted river source, the sampling system causes the buoyancy bending plate (1) to open outward through the plug-in plate (3) with the buoyancy above the water flow, and the pulling rod (12) floats synchronously with the clamping force of the hollow clamping block (40) through the buoyancy of the buoyancy bending plate (1) until it moves to the specified area; Step 4: After the sampling system moves to the specified position, the motor drives the threaded column (9) to rotate in the opposite direction, and then the corresponding hinge block (8) drives the sealing slider (41) to move upward along the inside of the collection tube (21) through the upper positioning rod (20), and the water flow in the river is sucked into the inside of the upper positioning rod (20) by the air pressure force. The water flow and various impurities come into contact with the pressure protrusion (27), causing the pressure protrusion (27) to transfer the load pressure to the inclined inner wall (39) through the buffer spring (29). The inclined inner wall (39) transmits the pressure inside the pressure protrusion (27) to the airbag frame (28) through the smaller pipe mouth. The airbag frame (28) expands under pressure and transfers the expanded surface to the external airbag (31), causing the layered pressure to be buffered by the airbag inner wall frame (26) and the water pressure, so that the sampling system can sample stably, and the water flow in the river is sucked into the inside of the upper positioning rod (20) by the air pressure force, completing the single sample collection; Step 5: The staff pulls back the sampling system, and the staff manually removes the corresponding hinge block (8) from the surface of the threaded column (9), and then grabs the upper positioning rod (20) and the collection tube (21) and separates them from the inside of the sewage collection rack (2). The end of the collection tube (21) that absorbs water has a smaller absorption aperture. When the collection tube (21) and the upper positioning rod (20) are taken out, the sample extracted this time is stored in a collection bag compared to using a set of syringes; Step 6: The sample is moved between the electron microscope and the fill light bulb. The electron microscope takes a picture of the sewage sample and transmits the picture to the recognition system. The recognition system then returns the result and transmits the recognized data to the terminal through the PLC control box.
