A two-step stope pre-reinforcement wall protection method for thick and large ore bodies, a segmented rock drilling stage, an empty site and subsequent filling mining method
By designing reserved walls in thick ore mining sites and pre-reinforced them, using the combined support of anchor cables and steel strands, the problem of poor filling quality of the step mining site is solved, and the safety of the second step mining site is achieved Efficient mining reduces the thickness and safety hazards of wall protection, and improves the ore mining rate and wall protection strength.
Patent Information
- Application Number
- CN202310888413.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2043-07-19
AI Technical Summary
The poor quality of the one-step mining filling body of the thick ore body leads to high safety risks and high difficulty in mining in the second step mining. The existing technology wall protection design is prone to collapse during the mining process, which increases safety hazards and large-scale mining rates. .
Design and pre-reinforcement of the sectional rock drilling stage. Through the combined support of anchor cables and steel strands, a mesh support of ∩ steel strands is formed to isolate low-quality fills, and pass through cutting grooves and blasting. Retrieval reduces the exposed area of the wall protection and improves the strength and stability of the wall protection.
Effectively isolate low-quality fills, reduce wall protection thickness, improve ore recovery rate and wall protection strength, ensure the safety and efficiency of the second-step mining site recovery, and avoid the risk of surface settlement.
Smart Images

Figure CN117005907B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of underground mining, and particularly relates to a two-step stope pre-reinforced wall protection, segmented rock drilling stage, empty site subsequent filling mining method for thick and large ore bodies, and is particularly suitable for the recovery of a two-step stope when the filling quality is poor after the recovery and filling of a first-step stope of a thick and large ore body is completed. Background Art
[0002] In recent years, with the advancement of green mine construction, backfill mining has been widely used in major mines for reasons such as operational safety and delaying surface subsidence. The segmented rock drilling stage empty field followed by backfill mining method has been widely used in major mines because of its safety, wide range of applications, and large production capacity, and has achieved considerable economic benefits. When the thick and large ore body is mined by the segmented rock drilling stage empty field followed by backfill mining method, the ore body is divided into two steps of mining chamber and pillar. The first step is to mine the chamber. After the mining of the chamber is completed, a higher strength cemented backfill is used to fill the chamber. After the filling and curing is completed, the second step is to mine the pillar. After the mining of the pillar is completed, a non-cemented backfill is used to prevent environmental pollution caused by surface subsidence and reduce the filling cost at the same time.
[0003] The segmented rock drilling stage empty-site and subsequent backfill mining method is suitable for ore bodies with medium or higher stability. The basic condition for its use is that the stability of the ore body is medium or higher, and a larger open-site exposure area and a longer exposure time can be allowed. For mines that choose to adopt this method, when the first-step mine room is mined, the upper and lower plates and the walls on both sides of the mining area are all native rock bodies with medium or higher stability, so the mining difficulty is relatively small, and generally safe and efficient mining can be achieved. When mining in the second step, the walls on both sides of the mining area are the filling bodies formed after the first-step mining. At this time, the filling body is equivalent to an artificial pillar. The strength requirement is not only to be self-supporting, but also to be able to bear a certain load. Therefore, when filling the mine room in the first step, a higher-strength cemented filling body is required, and the filling quality must be guaranteed. In production practice, some mines have problems with the filling quality of the first-step stope due to reasons such as too fine tailings particles, problems with the ratio of cementitious materials, or inadequate filling quality control, resulting in substandard filling quality in the first-step stope, insufficient or even no filling strength, which has brought huge problems to the mining of the second-step pillars. The filling strength of the first-step stope is substandard or no, and the mining of the second-step pillars is risky and difficult. If mining is carried out in the conventional way, the filling in the first-step stope will collapse over a large area, threatening the safety of the operating personnel and equipment, causing a large amount of loss and depletion, and may also cause the risk of surface subsidence and collapse.
[0004] Patent No. CN106121643A discloses a two-step nested combined filling mining method with reserved ore wall. The purpose is to prevent the loss and dilution of ore due to the relatively broken ore rock. The reserved ore wall is used to further prevent the broken surrounding rock from mixing into the stope due to the influence of blasting vibration and causing dilution. Patent No. CN115182728A discloses a downward segmented empty field and subsequent filling mining method, which also divides the ore block into a mine room and a pillar, and adopts medium-deep hole or deep hole rock drilling and blasting from top to bottom for mining. At the same time, the stope is mined in the form of staggered arrangement of the upper and lower middle sections corresponding to the stope to avoid the impact of blasting vibration on the filling body. When the strength of the filling body in the first-step mining area does not meet the standard or has no strength, a certain amount of retaining wall can be considered for the second-step mining. However, in production practice, the thickness of the retaining wall cannot be too thick due to factors such as ore recovery rate. In addition, due to factors such as blasting vibration and long mining cycle during mining, the retaining wall often collapses during mining. Not only does it fail to isolate the low-quality filling body in the first step and prevent it from collapsing, but the original rock blocks caused by the collapse of the retaining wall increase the safety hazard and the large block rate in the mining area.
[0005] In view of the two-step mining under the above conditions and the shortcomings of the existing technology, there is an urgent need for a two-step mining method for thick and large ore bodies with pre-reinforced wall protection, segmented rock drilling and subsequent empty-site filling mining, to solve the problem of safe and efficient mining in the two-step mining when the filling quality of the first-step mining of thick and large ore bodies is poor, so as to achieve its smooth mining. Summary of the invention
[0006] In order to solve the above technical problems, the present invention provides a two-step stope pre-reinforcement wall protection and segmented rock drilling stage empty site subsequent filling mining method for thick and large ore bodies, which comprises the following steps:
[0007] Step a, design reserved retaining walls on both sides of the second-step stope to isolate the filling bodies of the first-step stope on both sides, arrange two anchor cable construction lanes on both sides of the boundaries of the top pillars of the second-step stope, construct a row of downward anchor cable holes along the direction of the lane in the anchor cable construction lane, the downward anchor cable holes are located at the midline position of the reserved retaining walls, the hole diameter is 90-100mm, the hole depth is the stage height, and the hole grid spacing is 1-2m; construct horizontal drilling holes on the side wall of the anchor cable construction lane to penetrate the anchor cable construction lane of the adjacent second-step stope, the horizontal drilling holes are 1.5-2m away from the bottom plate of the anchor cable construction lane and correspond to the positions of the downward anchor cable holes one by one;
[0008] Step b, after the construction of the downward anchor hole is completed, the vertical steel strand and the grouting pipe are pre-placed in the downward anchor hole, the vertical steel strand is exposed 1.5 to 2m from the hole mouth, and the transverse steel strand is inserted into the transverse borehole as a transverse reinforcement, and the transverse steel strand is exposed 2 to 3m at both ends of the transverse borehole; then the downward anchor hole is grouted twice in the form of hole bottom return, the first grouting pressure is ≥0.5 to 1.0 MPa, and the first grouting is stopped when thick cement slurry flows out of the hole mouth. The second grouting is high-pressure splitting grouting, and the second grouting is carried out 3 to 5 hours after the first grouting, and the second grouting pressure is ≥1.5 to 2.0 MPa. After the second grouting is completed, it is cured for 25 to 30 days;
[0009] Step c, after the maintenance is completed, the vertical steel strands in the downward anchor cable holes are tensioned, and a secondary multi-stage tensioning process is adopted. The first tensioning straightens the vertical steel strands and stabilizes them for 20 to 30 minutes to facilitate the transmission and adjustment of the prestress in the anchor cable. The second tensioning is carried out after the prestress of the first tensioning is stabilized to compensate for the prestress loss. The total tonnage of tensioning is not less than the designed tonnage. After the vertical steel strands are tensioned, the vertical steel strands are tensioned and connected with the corresponding transverse steel strands, so that the anchor cables on the adjacent side of the adjacent two-step mining site are supported by the transverse steel strands in a "∩" shape, and the reinforced support of the reserved retaining walls on both sides of the two-step mining site is completed.
[0010] Step d, construct the mining and cutting project, construct a bottom rock drilling tunnel on one side of the bottom of the stope in step 2, which also serves as a receiving tunnel, and forms a bottom mine access road; in order to reduce the exposed area of the retaining wall, leave a strip pillar in the middle of the stope, construct a cutting skylight and a cutting cross tunnel on both sides of the strip pillar, construct a ramp from the middle transport tunnel to each segment transport tunnel, and construct a segment rock drilling tunnel at each segment elevation;
[0011] Step e, mining in the mine, first use the cutting shaft and cutting cross tunnel to form a cutting groove, then use the cutting groove as the free surface and compensation space for backward blasting mining, construct upward fan-shaped medium-deep holes in the segmented rock drilling tunnel and charge and blast, the mining of the upper segment is 2 to 3 ore collapse steps ahead of the mining of the lower segment, the collapsed ore is shoveled out by a shovel loader through the mine exit tunnel and the mine exit access and poured into the middle chute, and the mine is filled and topped after the mining is completed.
[0012] Furthermore, when the second-step stope is mined, the strip-shaped ore pillar left in the middle of the stope is used as the boundary, and the ore body on the upper wall side is mined and filled first, and then the ore body on the lower wall side is mined and filled.
[0013] Preferably, when grouting the downward anchor cable hole, the grouting liquid is cement slurry, and the water-cement ratio of the cement slurry is 1:4 to 1:6.
[0014] Preferably, the width of the retaining wall is 2 to 3 m, and the stage height is 50 to 60 m.
[0015] Preferably, the width of the strip pillar is 4 to 6 m.
[0016] Preferably, when filling after the mining is completed in the second step, the 28-day uniaxial compressive strength of the filling body within 5 to 6 m of the top and bottom of the mining area is greater than or equal to 3 MPa.
[0017] Beneficial Effects
[0018] Compared with the existing technologies and methods, the two-step stope pre-reinforcement and wall protection of thick and large ore bodies provided by the present invention, the empty site and subsequent filling mining method in the stage of segmented rock drilling, has the following beneficial effects:
[0019] By leaving a retaining wall, the low-quality filling body of the first-step mining area can be effectively isolated to prevent the filling body from collapsing and causing great losses and depletion. At the same time, the retained retaining wall is pre-reinforced and strengthened, and the supports of the adjacent retaining walls of the two adjacent second-step mining areas are formed into a complete whole by using vertical anchor cables and transverse reinforcements to support each other. This can effectively reduce the thickness of the retained retaining wall and increase the ore recovery rate, while also significantly improving the strength and stability of the retained retaining wall, ensuring the safety and efficiency of mining in the second-step mining area. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The present invention is further described in detail below with reference to the accompanying drawings.
[0021] Figure 1 It is a front view of a two-step stope pre-reinforcement wall protection and segmented rock drilling stage empty site and subsequent filling mining method for thick and large ore bodies provided by the present invention;
[0022] Figure 2 A side view of a two-step stope pre-reinforcement wall protection and segmented rock drilling stage empty site followed by filling mining method for thick and large ore bodies provided by the present invention;
[0023] Figure 3 A top view of a two-step stope pre-reinforcement wall protection and segmented rock drilling stage empty site followed by filling mining method for thick and large ore bodies provided by the present invention;
[0024] In the figure: 1-middle transport tunnel; 2-middle chute; 3-segmented transport tunnel; 4-cutting horizontal tunnel; 5-cutting skylight; 6-mine access; 7-vertical steel strand; 8-upward fan-shaped medium-deep hole; 9-protective wall; 10-collapsed ore; 11-bottom rock drilling tunnel; 12-segmented rock drilling tunnel; 13-mine exit tunnel; 14-ramp; 15-anchor cable construction tunnel; 16-horizontal steel strand; 17-strip ore pillar. DETAILED DESCRIPTION
[0025] The following will clearly and completely describe the technical solutions of various embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0026] Step a, design reserved retaining walls 9 on both sides of the second-step stope to isolate the filling bodies of the first-step stope on both sides, the retaining walls 9 are 2-3m wide, and the stope stage height is 50-60m; arrange two anchor cable construction lanes 15 on both sides of the top pillar of the second-step stope, construct a row of downward anchor cable holes in the anchor cable construction lane 15 along the direction of the lane, the downward anchor cable holes are located at the midline position of the reserved retaining walls 9, the hole diameter is 90-100mm, the hole depth is the stage height, and the hole network spacing is 1-2m; construct horizontal drilling holes on the side wall of the anchor cable construction lane 15 to penetrate the anchor cable construction lane 15 of the adjacent second-step stope, the horizontal drilling holes are 1.5-2m away from the bottom plate of the anchor cable construction lane 15 and correspond to the positions of the downward anchor cable holes one by one;
[0027] After the construction of the downward anchor hole is completed, the vertical steel strand 7 and the grouting pipe are pre-placed in the downward anchor hole, the vertical steel strand 7 is exposed 1.5 to 2 m from the hole mouth, and the transverse steel strand 16 is inserted into the transverse borehole as a transverse tensioning bar, and the transverse steel strand 16 is exposed 2 to 3 m at both ends of the transverse borehole; then the downward anchor hole is grouted twice in the form of hole bottom return, the first grouting pressure is ≥0.5 to 1.0 MPa, and the first grouting is stopped when thick cement slurry flows out of the hole mouth. The second grouting is high-pressure splitting grouting, and the second grouting is carried out 3 to 5 hours after the first grouting, and the second grouting pressure is ≥1.5 to 2.0 MPa. After the second grouting is completed, it is cured for 25 to 30 days; the grouting liquid is cement slurry, and the water-cement ratio of the cement slurry is 1:4 to 1:6.
[0028] Step c, after the maintenance is completed, the vertical steel strands 7 in the downward anchor cable holes are tensioned, and a secondary multi-stage tensioning process is adopted. The first tensioning straightens the vertical steel strands and stabilizes them for 20 to 30 minutes to facilitate the transmission and adjustment of the prestress in the anchor cable. The second tensioning is carried out after the prestress of the first tensioning is stabilized to compensate for the prestress loss. The total tensioning tonnage is not less than the designed tonnage. After the vertical steel strands 7 are tensioned, the vertical steel strands 7 are tensioned and connected with the corresponding transverse steel strands 16, so that the anchor cables on the adjacent side of the adjacent second-step mining site are supported by the transverse steel strands 16 to form a "∩"-shaped steel strand mesh support, and the reinforced support of the reserved retaining walls 9 on both sides of the second-step mining site is completed.
[0029] Step d, construct the mining and cutting project, construct a bottom rock drilling tunnel 11 on one side of the bottom of the stope in step 2 and serve as a receiving tunnel, and form a bottom mine access road 6; in order to reduce the exposed area of the retaining wall 9, leave a strip pillar 17 in the middle of the stope, the width of the strip pillar 17 is 4 to 6 meters, construct a cutting skylight 5 and a cutting cross tunnel 4 on both sides of the strip pillar 17, construct a ramp 14 from the middle transport tunnel 1 to each segment transport tunnel 3, and construct a segment rock drilling tunnel 12 at each segment elevation;
[0030] Step e, mining in the stope, first use the cutting skylight 5 and the cutting cross tunnel 4 to form a cutting groove, then use the cutting groove as the free surface and compensation space for backward blasting mining, construct an upward fan-shaped medium-deep hole 8 in the segmented rock drilling tunnel 12 and charge and blast, the mining of the upper segment is 2 to 3 caving steps ahead of the mining of the lower segment, the collapsed ore 10 is shoveled out by a scraper through the mining tunnel 13 and the mining access road 6 and poured into the middle chute 2, and the stope is filled and topped after the mining is completed, and the filling body within 5 to 6m of the top and bottom of the stope is greater than or equal to 3Mpa in 28 days. When the stope is mined in the second step, the strip ore pillar 17 left in the middle of the stope is used as the boundary, first the ore body on the upper plate side is mined and filled, and then the ore body on the lower plate side is mined and filled.
[0031] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A two-step stope pre-reinforcement and wall protection method for thick and large ore bodies, a staged rock drilling phase, and a subsequent emptying and filling mining method, characterized in that The following steps are involved: Step a, design reserved retaining walls on both sides of the second-step stope to isolate the filling bodies of the first-step stope on both sides, arrange two anchor cable construction lanes on both sides of the boundaries of the top pillars of the second-step stope, construct a row of downward anchor cable holes along the direction of the lane in the anchor cable construction lane, the downward anchor cable holes are located at the midline position of the reserved retaining walls, the hole diameter is 90-100mm, the hole depth is the stage height, and the hole grid spacing is 1-2m; construct horizontal drilling holes on the side wall of the anchor cable construction lane to penetrate the anchor cable construction lane of the adjacent second-step stope, the horizontal drilling holes are 1.5-2m away from the bottom plate of the anchor cable construction lane and correspond to the positions of the downward anchor cable holes one by one; Step b, after the construction of the downward anchor hole is completed, the vertical steel strand and the grouting pipe are pre-placed in the downward anchor hole, the vertical steel strand is exposed 1.5 to 2m from the hole mouth, and the transverse steel strand is inserted into the transverse borehole as a transverse reinforcement, and the transverse steel strand is exposed 2 to 3m at both ends of the transverse borehole; then the downward anchor hole is grouted twice in the form of hole bottom return, the first grouting pressure is ≥0.5 to 1.0 MPa, and the first grouting is stopped when thick cement slurry flows out of the hole mouth. The second grouting is high-pressure splitting grouting, and the second grouting is carried out 3 to 5 hours after the first grouting, and the second grouting pressure is ≥1.5 to 2.0 MPa. After the second grouting is completed, it is cured for 25 to 30 days; Step c, after the maintenance is completed, the vertical steel strands in the downward anchor cable holes are tensioned, and a secondary multi-stage tensioning process is adopted. The first tensioning straightens the vertical steel strands and stabilizes them for 20 to 30 minutes to facilitate the transmission and adjustment of the prestress in the anchor cable. The second tensioning is carried out after the prestress of the first tensioning is stabilized to compensate for the prestress loss. The total tensioning tonnage is not less than the designed tonnage. After the vertical steel strands are tensioned, the vertical steel strands are tensioned and connected with the corresponding transverse steel strands, so that the anchor cables on the adjacent side of the adjacent two-step mining site are supported by the transverse steel strands in a "∩" shape, and the reinforced support of the reserved retaining walls on both sides of the two-step mining site is completed. Step d, construct the mining and cutting project, construct a bottom rock drilling tunnel on one side of the bottom of the stope in step 2, which also serves as a receiving tunnel, and forms a bottom mine access road; in order to reduce the exposed area of the retaining wall, leave a strip pillar in the middle of the stope, construct a cutting skylight and a cutting cross tunnel on both sides of the strip pillar, construct a ramp from the middle transport tunnel to each segment transport tunnel, and construct a segment rock drilling tunnel at each segment elevation; Step e, mining in the mine, first use the cutting shaft and cutting cross tunnel to form a cutting groove, then use the cutting groove as the free surface and compensation space for backward blasting mining, construct upward fan-shaped medium-deep holes in the segmented rock drilling tunnel and charge and blast, the mining of the upper segment is 2 to 3 ore collapse steps ahead of the mining of the lower segment, the collapsed ore is shoveled out by a shovel loader through the mine exit tunnel and the mine exit access and poured into the middle chute, and the mine is filled and topped after the mining is completed.
2. A two-step stope pre-reinforcement and wall protection method for thick and large ore bodies according to claim 1, characterized in that: When the second step of mining is carried out in the stope, the strip pillar left in the middle of the stope is used as the boundary. The ore body on the upper side is mined and filled first, and then the ore body on the lower side is mined and filled.
3. A two-step stope pre-reinforcement and wall protection method for thick and large ore bodies according to claim 1, characterized in that: When grouting the downward anchor cable hole, the grouting liquid is cement slurry, and the water-cement ratio of the cement slurry is 1:4 to 1:
6.
4. A two-step stope pre-reinforcement and wall protection method for thick and large ore bodies according to claim 1, characterized in that: The width of the protective wall is 2 to 3 m, and the stage height is 50 to 60 m.
5. A two-step stope pre-reinforcement and wall protection method for thick and large ore bodies according to claim 1, characterized in that: The width of the strip pillar is 4 to 6 meters.
6. A two-step stope pre-reinforcement and wall protection method for thick and large ore bodies according to claim 1, characterized in that: When filling after the mining is completed in the second step, the 28-day uniaxial compressive strength of the filling body within 5 to 6 m of the top and bottom of the mining area is greater than or equal to 3 MPa.